Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Examen Parcial Desarrollo
Examen Parcial Desarrollo
Ítem CBRdescen %
1 19.19% 8.33%
2 19.17% 16.67%
3 18.76% 25.00%
4 18.45% 33.33%
5 15.99% 41.67%
6 13.67% 50.00%
7 11.71% 58.33%
8 11.59% 66.67% CBR diseño = 11.11%
9 11.50% 75.00%
10 11.47% 83.33%
11 10.75% 91.67% 0.00167
12 10.31% 100.00%
1
1 2
EE Percentil
- 60.00% X= 10.94%
10,001 75.00% Y= 83.47%
1,000,000 87.50%
EE = 26,326,237 X Y
Percentil = 87.50% 10.00% 87.50%
HORIZONTAL
20.00% 87.50%
X Y
10.94% 0.00%
VERTICAL
10.94% 100.00%
Chart Title
100%
40%
20%
0%
10.00% 12.00% 14.00% 16.00% 18.00%
CBR diseño
Cemento Resistencia Máxima densidad seca 2,000.00 (kg/m3)
% (kg/cm2) Cemento 3.50%
4% 22.10 Cemento por m3 70.00 (kg/m3)
5% 23.65 Cemento por m3 1.65 (bls/m3)
6% 26.70 Afirmado espesor 0.15 (m)
Afirmado (m3 por m2) 0.15 (m3/m2)
Cemento por m2 10.50 (kg/m2)
Máxima densidad seca 1,500.00 (kg/m3) Máxima densidad seca 2,130.00
Cemento 3.73% Cemento 3.73%
Cemento por m3 56 (kg/m3) Cemento por m3 79
Contratista Diseño
(kg/m3)
RESISTENCIA A LA COMPRESION DE PROBETAS DE SUELO-CEMENTO
MTC E 1103
Fecha = 6/17/2023
Resistencia min = 1.80 (MPA)
Resistencia min = 18.35 (kg/cm2) 95%
Diámetro cilindro = 10.16 (cm)
Área de cilindro = 81.07 (cm2)
17.43