S/ L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D
OBRAS PROVISIONALES
CASETA P/GUARDIANIA Y/O DEPOSITO DE MAT. 2,237.40 2,237.40
CERCO PROVISIONAL CON ARPILLERA Y ROLLIZOS DE EUCALIPTO 2,118.00 2,118.00
INSTALACION PROVISIONAL DE ENERGIA ELECTRICA 250.00 250.00
INSTALACION PROVISIONAL DE AGUA 250.00 250.00
CARTELDE OBRA 399.25 399.25
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO 3,715.46 3,715.46
MOVIMIENTO DE TIERRAS
EXCAVACION MASIVA A MAQUINA EN TERRENO NORMAL"C"/RETRO UNSAAC 19,250.18 19,250.18
ELIMINACION DE DESMONTE,PROV.DEL MOV.EN TERRENO NORMAL "C" 45,593.60 45,593.60
DEMOLICION DE ALBAÑILERIA 1,105.77 1,105.77
DEMOLICION DE VEREDAS 2,385.08 2,385.08
RELLENO CON MATERIAL PROPIO SELECCIONADO 22,283.37 22,283.37
RELLENO Y APISONADO CON MATERIAL SELECCIONADO 6,061.75 6,061.75
PERFILADO E=0.15 M 2,801.87 2,801.87
CONCRETO SIMPLE
SOLADO PARA LOSA DE FUNDACION MEZCAL 1:12 7,289.88 7,289.88
CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOS 1,488.34 1,488.34
ENCOFRADO PARA CIMENTACIONES RENDIMIENTO=15 M2/DIA 1,083.31 1,083.31
CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS 823.31 823.31
ENCOFRADO Y DESENCOF. SOBRECIMIENTO DE 0.30 A 0.60 MT 706.20 706.20
OBRAS DE CONCRETO ARMADO
VIGAS DE CIMENTACION Y PLATEA DE CIMENTACION
CONCRETO EN VIGAS PLATEA DE CIMENTACION F'C= 210 KG/CM2 129,716.94 129,716.94
ENCOFRADO Y DESENCOFRADO VIGA Y PLATEA DE CIMENTACION 23,487.96 23,487.96
ACERO EN VIGA Y PLATEA DE CIMENTACION GRADO 60 202,280.65 101,140.33 101,140.33
TECNOPORT EN JUNTAS 2" 1,031.21 1,031.21
MUROS DE CONTENCION REFORZADO
CONCRETO EN MURO DE CONTENCION F'C= 210 KG/CM2 17,729.15 17,729.15
ENCOFRADO Y DESENCOFRADO EN MURO DE CONTENCION 13,872.59 13,872.59
ACERO EN MURO DE CONTENCION GRADO 60 15,940.71 15,940.71
TECNOPORT EN JUNTAS 2" 1,828.02 1,828.02
COLUMNAS
ESTRUCTURAS
S/ L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D
VESTIDURA DE DERRAMES 4,699.33 783.22 1,566.44 1,174.83 1,174.83
BRUÑAS DE 1/2" 1,452.12 726.06 726.06
CIELORRASOS EN INTERIOR CON MEZCLA DE CEMENTO-ARENA UNSAAC 16,077.19 8,038.60 8,038.60
PISOS Y PAVIMENTOS
CONTRAPISO DE 48 MM. 19,119.24 19,119.24
FALSO PISO 4" INCLUYE ENRROCADO 29,026.53 29,026.53
PISO DE TERRAZO CON ESTRIAS DE ALUMINIO 22,708.97 11,354.49 11,354.49
PISO CERAMICO 0.30X0.30 SERIE ORIGENES 1,693.40 1,693.40
ARQUITECTURA
S/ L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D
TUBERIA PVC SAL 6" 1,342.05 1,342.05
TUBERIA PVC SAL10" 3,691.74 3,691.74
CAJA DE REGISTRO DE DESAGUE C/TAPA Cº 10"X20" 172.32 172.32
CAJA DE REGISTRO DE DESAGUE C/TAPA Cº 18"X24" 144.01 144.01
CAJA DE REGISTRO DE DESAGUE C/TAPA Cº 28"X28" 526.94 526.94
BUZON TIPO I TERR.NORMAL E.D. C/CARG.+VOLQ.HASTA 3.00M 4,881.72 4,881.72
SOPORTE METALICO T/ABRAZADERA P/TUB. DE DIAMETRO 3"- 4" 522.99 522.99
SISTEMA DEDESAGUE DE AGUAS PLUVIALES
TUBERIA PVC SAL3" 56.82 56.82
TUBERIA PVC SAL4" 38.88 38.88
ACCESORIOS DE FIJACION DE RECUBRIMIENTO DE MONTANTES 557.16 ###
TARRAJEO DE RECUBRIMIENTO DE MONTANTES C:M 1:5 E=1.5cm 1,924.91 1,924.91
CODO PVC SAL 4"X45° 10.91 10.91
CODO PVC SAL 3"X45° 24.64 24.64
TEE PVC SAL 4" 15.17 15.17
TEE PVC-SAL 3" 10.42 10.42
SISTEMA COLECTOR DE AGUAS DE PLUVIALES
TRAZO Y REPLANTEO 239.17 239.17
EXCAVACION DE TERRENO P/TUB COLECTOR AGUAS SERVIDAS ( A MANO) 3,974.06 3,974.06
ELIMINACION DE EXCESO DE CORTE CON VOLQUETE, CARGUIO A MANO 1,459.35 1,459.35
RELLENO CON MATERIAL PROPIO SELECCIONADO 5,705.79 5,705.79
PERFILADO E=0.15 M 231.54 231.54
TUBERIA PVC SAL3" 44.60 44.60
TUBERIA PVC SAL4" 378.43 378.43
TUBERIA PVC SAL 6" 1,369.51 1,369.51
TUBERIA PVC SAL10" 5,856.89 5,856.89
CAJA DE REGISTRO DE DESAGUE C/TAPA Cº 10"X20" 258.48 258.48
CAJA DE REGISTRO DE DESAGUE C/TAPA Cº 12"X24" 121.20 121.20
CAJA DE REGISTRO DE DESAGUE C/TAPA Cº 18"X24" 144.01 144.01
CAJA DE REGISTRO DE DESAGUE C/TAPA Cº 24"X24" 579.39 579.39
CAJA DE REGISTRO DE DESAGUE C/TAPA Cº 28"X28" 263.47 263.47
BUZON TIPO I TERR.NORMAL E.D. C/CARG.+VOLQ.HASTA 2.00M 1,030.20 1,030.20
BUZON TIPO I TERR.NORMAL E.D. C/CARG.+VOLQ.HASTA 3.00M 1,220.43 1,220.43
SALIDA DE DESAGÜE DE 3" 149.40 149.40
SISTEMA DE DISTRIBUCION
SALIDA DE TOMACORRIENTE CON PUESTA TIERRA 4,327.68 2,163.84 2,163.84
SALIDA DE TOMACORRIENTE TRIFASICO CON PUESTA TIERRA sin cableado ni acces. 3,760.00 1,880.00 1,880.00
SALIDA PARA TOMACORRIENTES MONOFASICO EN PISO 455.40 227.70 227.70
SALIDA PARA TOMACORRIENTES MONOFASICO EN PISO sin cableado ni acces. 274.20 137.10 137.10
SALIDA PARA TOMACORRIENTE AH=1.80 m 60.72 30.36 30.36
SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVC sin cableado ni acces. 109.68 54.84 54.84
SALIDA DE TECHO TW 4.0mmUNSAAC 3,817.80 1,908.90 1,908.90
SALIDA DE TECHO TW 4.0mmUNSAAC sin cableado ni acces. 3,887.84 1,943.92 1,943.92
SALIDA DE PARED (BRAQUETES) CON PVC 1,271.51 635.76 635.76
SALIDA DE PARED (BRAQUETES) CON PVC sin cableado ni acces. 1,106.84 553.42 553.42
CAJA DEPASO F°G° 200X200X30 MM. INC. TAPA 159.00 79.50 79.50
LUMINARIAS
LAMPARA FLUORESCENTE SIMPLE ADOSADA A PARED 684.00 684.00
LAMPARA FLUORESCENTE SIMPLE ADOSADA A CIELO RASO 205.20 205.20
LAMPARA FLUORESCENTE DOBLE CON REJILLA ADOSADA A CIELORASO 3,242.40 3,242.40
LUMINARIA CEILING LIGTH CLR 304 DE 60 W O EQUIVALENTE 1,937.60 1,937.60
LUMINARIA WALL SPOTLIGTH 1*50 W O EQUIVALENTE 574.20 574.20
LUMINARIA WALL SPOTLIGTH 3*50 W O EQUIVALENTE 477.60 477.60
REFLEXTOR LAMPARA HALOGENA DE 150 W PISO 636.80 636.80
LAMPARA VAPOR DE SODIO DE 150W CON POSTE DE C°A° 1,356.80 1,356.80
LAMPARA INCANDECENTE DE 50w 59.40 59.40
FOTOCELULAS RELOJ 111.53 ###
INSTALACIONES ESPECIALES
INTERNET
SALIDA PARA RED INFORMATICA 2,519.20 1,259.60 1,259.60
CAJA DE PASO METALICA DE 100X100X50 MM. INC. TAPA INTERNET 37.20 18.60 18.60
TUBERIAS PVC SAP (ELECTRICAS) D=1 1/2" 608.61 304.30 304.30
TV CABLE
SALIDA PARA TELEVISION - CABLE 464.52 232.26 232.26
CAJA DE PASO METALICA DE 100X100X50 MM. INC. TAPA TV-CABLE 43.40 21.70 21.70
TUBERIAS PVC SAP (ELECTRICAS) D=2" 774.11 387.06 387.06
TELEFONO DIRECTO E INTERNO
SALIDA PARA TELEFONIA INTERNA 66.96 33.48 33.48
TUBERIAS PVC SAP (ELECTRICAS) D=1" 126.17 63.09 63.09
TUBERIAS PVC SAP (ELECTRICAS) D=2" 357.12 178.56 178.56
CAJA DE PASO METALICA DE 400X250X50 MM. INC. TAPA TELEFONIA 63.86 31.93 31.93
LUZ DE EMERGENCIA
SALIDA DE PARED (BRAQUETES) CON PVC PARA EMERGENCIA 147.85 73.93 73.93
TUBERIAS PVC SAP (ELECTRICAS) D=1 1/2" PARA EMERGENCIA 702.24 351.12 351.12
CAJA DEPASO F°G° 200X200X30 MM. INC. TAPA EMERGENCIA 159.00 79.50 79.50
ALARMA CONTRAINCENDIO
SALIDA PARA ALARMA CONTRAINCENDIO INC. SISTEMA 239.04 ### ###
TUBERIAS PVC SAP (ELECTRICAS) D=1 1/2" PARA EMERGENCIA 147.90 73.95 73.95
53,879.50
3,715.46
19,250.18
45,593.60
1,105.77
2,385.08
22,283.37
6,061.75
2,801.87
7,289.88
1,488.34
1,083.31
823.31
706.20
129,716.94
23,487.96
202,280.65
1,031.21
17,729.15
13,872.59
15,940.71
1,828.02
40,557.26
22,665.67
211,499.10
2,403.37
1,723.16
2,733.50
2,329.45
68,086.57
43,107.32
79,313.86
1,616.56
1,342.67
1,811.71
473.21
347.53
550.79
1,019.90
467.81
1,942.63
1,404.94
1,821.96
2,677.56
54,468.76
41,177.67
28,059.78
30,512.22
4,394.60
2,379.15
5,437.02
11,132.37
10,757.20
21,797.57
40,760.27
27,476.64
62,074.35
2,829.69
19,622.46
666.14
393.74
747.72
525.28
8,139.27
3,363.21
4,388.92
10,637.63
1,776.65
4,936.61
2,912.46
10,992.74
3,618.55
762.78
2,178.94
860.03
4,699.33
1,452.12
16,077.19
19,119.24
29,026.53
22,708.97
1,693.40
16,457.70
892.31
546.20
421.17
3,586.50
4,231.47
2,329.44
1,247.01
6,543.69
10,140.12
2,138.94
1,809.48
5,147.48
1,588.22
1,002.80
124.08
33.54
2,091.68
469.30
195.84
7,292.00
8,750.28
980.10
210.00
782.88
167.22
2,730.00
222.32
2,621.59
597.19
6,006.97
340.06
1,913.98
47.02
487.73
14,127.89
939.00
280.71
1,379.00
1,400.00
70.00
218.79
120.00
522.00
619.68
1,100.29
864.05
19.92
53.44
622.69
36.64
108.70
26.58
13.65
1,236.38
93.03
1,897.50
2,232.00
1,764.37
344.03
212.26
86.13
49.71
81.80
10.53
60.18
65.46
147.84
40.32
84.30
145.20
162.30
4,939.19
2,358.03
7,091.48
127.73
46.20
98.22
56.82
38.88
1,342.05
3,691.74
172.32
144.01
526.94
4,881.72
522.99
56.82
38.88
557.16
1,924.91
10.91
24.64
15.17
10.42
239.17
3,974.06
1,459.35
5,705.79
231.54
44.60
378.43
1,369.51
5,856.89
258.48
121.20
144.01
579.39
263.47
1,030.20
1,220.43
149.40
636.23
2,004.62
2,562.00
258.45
1,036.21
1,334.34
718.62
790.16
1,168.16
2,373.61
101.75
1,829.88
138.03
45.30
107.94
239.20
1,154.79
2,406.83
4,327.68
3,760.00
455.40
274.20
60.72
109.68
3,817.80
3,887.84
1,271.51
1,106.84
159.00
684.00
205.20
3,242.40
1,937.60
574.20
477.60
636.80
1,356.80
59.40
111.53
2,519.20
37.20
608.61
464.52
43.40
774.11
66.96
126.17
357.12
63.86
147.85
702.24
159.00
239.04
147.90
1,761,149.06
1,761,149.06
Duración 1° MES 2° MES 3° MES
FASE ACTIVIDAD (días) LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
OBRAS PROVISIONALES
CERCO PROVISIONAL CON ARPILLERA Y ROLLIZOS DE EUCALIPTO 0.50
INSTALACION PROVISIONAL DE AGUA 0.50
INSTALACION PROVISIONAL DE ENERGIA ELECTRICA 1.00
CARTELDE OBRA 1.00
ENCOFRADO Y DESENCOFRADO PARA PROTECCION DE DUCTOS PASILLO 1.00
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO 4.00
OBRAS DE CONCRETO ARMADO
COLUMNAS
CONCRETO EN COLUMNAS F'C=210 KG/CM2 4.00
ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS 16.00
ACERO GRADO 60 EN COLUMNAS 12.00
TECNOPORT EN JUNTAS 2" EN COLUMNAS 2.00
COLUMNAS DE AMARRE
CONCRETO EN COLUMNAS DE AMARRE F'C=175 KG/CM2 4.00
ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS DE AMARRE 4.00
ACERO GRADO 60 EN COLUMNAS DE AMARRE 4.00
VIGAS
CONCRETO EN VIGAS F'C=210 KG/CM2 4.00
ESTRUCTURAS
CUBIERTAS
COBERTURA DE TEJAS SOBRE TIJERALES DE MADERA Y CORREAS 14.00
COBERTURA DE POLICARBONATO SOBRE ESTRUCT METALICA 5.00
MURO LADRILLO SOGA 9.00
TARRAJEO DE PARAPETOS DE TECHO 14.00
TARRAJEO CON IMPERMEABILIZANTE EN CANALES DE TECHO 6.00
CANALETA DE LATON 2.00
SUMIDERO DE BRONCE DE 6" 2.00
CARPINTERIA DE MADERA
PUERTA DE MELAMINA CON BORDES DE MADERA AGUANO e=45mm. 12.00
ASIENTOS DE MADERA SOBRE TUBO DE 2" Y PERFILES DE FIERRO 8mm 12.00
CARPINTERIA METALICA
PUERTA DE VIDRIO CRUDO 8mm CON BORDES DE TUBO DE ACERO 6.00
SEPARADORES METALICOS DE BAÑO e= 2.50MM 6.00
SEPARADORES DE URINARIOS METALICO e= 6MM INC INSTALACION Y PINTURA 6.00
BARANDAS METALICAS DE TUBO 2" CON FIERRO LISO DE 5/8" SEGUN DISEÑO 12.00
TUBO DECORATIVO DE FIERRO DE 4" PINTADO DE COLOR ALUMINIO 110 12.00
ANCLADO CON ANGULAR ESTRIADO DE 1 1/2" X 1 1/2" X 1/8" EN GRADAS 12.00
PLATAFORMAS DE DESCANSO TIPO CANASTILLA 1.00
ESCALERA DE GATO METALICA 5.00
PIZARRA ACRILICA 2.00
CERRAJERIA
CERRADURA TIPO PERILLAS TIPO FORTE 12.00
CERRADURA DE POMO PARA PUERTAS DE VIDRIO O CRITAL 12.00
CERRADURA PARA PISO EN PUERTAS DE VIDRIO SIMILAR A CISA 12.00
BISAGRA CAPUCHINA ALUMINIZADA DE 4" X 4" UNSAAC 12.00
CERROJO DE FIERRO REDONDO DE 5/8" X 0.60 M. 1.00
CERROJO DE FIERRO REDONDO DE 5/8" X 0.35 M. 1.00
PICAPORTES DE FIERRO REDONDO DE 4" 1.00
VIDRIOS, CRISTALES Y SIMILARES
VENTANA VIDRIO CRUDO TRASLUCIDO 8mm INCL ACCESORIOS 8.00
VENTANA VIDRIO PAVONADO 8mm INCL ACCESORIOS 1.00
VIDRIOS PAVONADO DE 8mm EN PUERTAS 1.00
VIDRIO CRUDO 8mm TRASLUCIDO EN PUERTAS 1.00
MAMPARA DE VIDRIO CRUDO 8mm C/TUBO ELECTROSOLDADO DE 2" X 1" 10.00
PUERTA DE VIDRIO CRUDO 8mm 3.00
ESPEJO BISELADO CON MARCO DE ALUMINIO 3.00
PINTURA
PINTURA LATEX EN MUROS INTERIORES UNSAAC 30.00
PINTURALATEX EN MUROS EXTERIORES 24.00
PINTURA VINILICA EN COLUMNAS , VIGAS Y/O PLACAS 30.00
PINTURA VINILICA EN ESCALERAS, RAMPAS Y PARAPETOS 24.00
PINTURA LATEX EN CIELORRASOS UNSAAC 21.00
PINTURALATEX EN DERRAMES 3.00
APARATOS Y ACCESORIOS SANITARIOS
INODORO BLANCO CON ACCESORIOS 6.00
LAVATORIOS TIPO OVALIN BLANCO SOBRE MESA DE CONCRETO 6.00
URINARIOS DE LOZA DE PICO BLANCO 6.00
GRIFERIA DE URINARIOS UNSAAC 4.00
GRIFERIA DE LAVATORIOS UNSAAC 1.00
COLOCACION DE APARATOS SANITARIOS 1.00
PAPELERA DE LOSA Y BARRA PLASTICA, COLOR BLANCO 1.00
GABINETE CONTRAINCENDIOS 1.00
SISTEMA DE AGUA FRIA Y CONTRA INCENDIO
REDES DE DISTRIBUCION DE AGUA FRIA Y CONTRAINCENDIO
TUBERIA DE AGUA PVC. DE 2"(50MM).INSTALACION.INC.PRUEBA HIDR 1.00
VALVULA DE COMPUERTA 1 1/2" 2.00
REDUCCION PVC SAP DE 2" A 1 1/2" 2.00
INSTALACIONES SANITARIAS
INSTALACIONES ELECTRICAS
LINEA DE ALIMENTACION
TUBERIAS PVC SAP (ELECTRICAS) D=3/4"
CABLE ELECTRICO TW AWG NO. 12
CABLE ELECTRICO TW AWG-MCM NO. 14 -2.5 MM2.
EXCAVACION
POZO-CONEXION A TIERRA EN SISTEMA C/EQ.BOMBEO,ALUMB,TOMACORR
INSTALACIONES ELECTRICAS
TABLERO DE DISTRIBUCION CAJA METALICA CON PUERTA Y CERRADURA PARA 8TERMOMAGNETICOS TIPO ENGRAMPE
INTERRUPTOR TERMOMAGNETICO 2X20A
SISTEMA DE DISTRIBUCION
SALIDA DE TOMACORRIENTE TRIFASICO CON PUESTA TIERRA
SALIDA DE TECHO TW 4.0mmUNSAAC
CAJA DEPASO F°G° 200X200X30 MM. INC. TAPA
CAJA DE PASO CUADRADO
CAJA DE PASO CIRCULAR
LUMINARIAS
LAMPARA FLUORESCENTE DOBLE PARA EMPOTRAR DE 40W
LAMPARA FLUORESCENTE DOBLE CON REJILLA ADOSADA A CIELORASO
LAMPARA FLUORESCENTE CIRCULAR PARA DOSAR CON DIFUSOR
LAMPARA FLUORESCENTE DOBLE PARA ADOSAR 40W
LAMPARA HALOGENA FLOOD LIGTH DE 150 W O EQUIVALENTE
REFLEXTOR LAMPARA HALOGENA DE 75 W CIELO RASO
LAMPARA VAPOR DE SODIO DE 150W CON POSTE DE C°A°
INSTALACIONES ESPECIALES
INTERNET
SALIDA PARA RED INFORMATICA
CAJA DE PASO METALICA DE 100X100X50 MM. INC. TAPA INTERNET
TELECONFERENCIAS
SALIDA PARA TELECONFERENCIAS
CAJA DE PASO METALICA DE 100X100X50 MM. INC. TAPA TV-CABLE
ALARMA CONTRAINCENDIO
SALIDA PARA ALARMA CONTRAINCENDIO INC. SISTEMA
CAJA DE PASO CUADRADO
PARLANTES
SALIDA DE PARLANTES
CAJA DE PASO CUADRADO
OBRAS PRELIMINARES
TRAZO Y REPLANTEO DURANTE UNSAAC
REUBICACION DE ESTRUCTURAS DE CONCRETO
ELIMINACION DE ARBOLES
REUBICACION DE POSTES DE LUZ
MOVIMIENTO DE TIERRAS
EXCAVACION MASIVA A MAQUINA
CORTE Y EXCAVACION MANUAL
DEMOLICION ESTRUCTURA DE CONCRETO
PICADO DE MURO DE CONCRETO (JARDINERA)
REMOSION DE PAVIMENTO- VEREDAS
PICADO DE PAVIMENTO PARA NUEVO VACIADO
RELLENO CON MATERIAL PROPIO SELECCIONADO
ELIMINACION DE DESMONTE,
COMPACTADO Y APISONADO CON MAT. SELECCIONADO
PERFILADO E=0.15 M
OBRAS EXTERIORES
CONCRETO SIMPLE
MURO-SARDINEL FC=140 KG/CM2 DE 0.30*1.20 M
SARDINELES FC=175 KG/CM2 DE H= 15 E=30 M
SARDINELES FC=175 KG/CM2 DE 15*10 M
MURO DE C° C° REVESTIDO CON LAJA
GRADA DE CONCRETO 175 KG/CM2
BANCAS DE CONCRETO CICLOPEO TARRAJEADAS
MURO DE CONTENCION C° C° TIPO BANCA REVESTIDO
CUNETAS REVESTIDAS EVAC. PLUVIAL
OBRAS DE ARTE CONCRETO ARMADO
MURO DE CONTENCION CONCRETO ARMADO TIPO 1 H=2.50
MURO DE CONTENCION CONCRETO ARMADO TIPO2 H=1.20
TAPA DE CANAL CONCRETO ARMADO ANCHO=0.70M
RAMPA TAPA DE CANAL CONCRETO ARMADO
BANCAS MADERA C/SOPORTE DE C° A° INCL PINTADO
REJILLA FIERRO ANGULAR 3/4" Y FIERRO DE 1/2"
OB PAVIMENTO Y VEREDAS
ASENTADO DE BLOCK GRASS DE CONCRETO
PISO SEMIRIGIDO BLOQUES DE CONCRETO S/ CAMA ARENA
PISO DE TERRAZO CON ESTRIAS DE ALUMINIO
PAVIMENTO/VEREDAS DE C° FC=175 KG/CM2
REPOSICION DE PISOS CONCRETO E=2" C:A 1:2 UNSAAC
BRUÑAS
JARDINES
NIVELACION CON TIERRA AGRICOLA Y ARENA
SEMBRADOD E GRASS
PLANTACION DE ARBOLES
VARIOS
LAMPARA VAPOR DE SODIO DE 150W CON POSTE DE C°A°
LIMPIEZA DE OBRA UNSAAC
3° MES 4° MES 5° MES 6° MES
JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU
27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1° MES 2°
FASE ACTIVIDAD TOTAL LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9
OBRAS PROVISIONALES
CERCO PROVISIONAL CON ARPILLERA Y ROLLIZOS DE EUCALIPTO 0.50
INSTALACION PROVISIONAL DE AGUA 0.50
INSTALACION PROVISIONAL DE ENERGIA ELECTRICA 1.00
CARTELDE OBRA 1.00
ENCOFRADO Y DESENCOFRADO PARA PROTECCION DE DUCTOS PASILLO 1.00
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO 4.00
OBRAS DE CONCRETO ARMADO
COLUMNAS
CONCRETO EN COLUMNAS F'C=210 KG/CM2 4.00
ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS 16.00
ACERO GRADO 60 EN COLUMNAS 12.00
TECNOPORT EN JUNTAS 2" EN COLUMNAS 2.00
COLUMNAS DE AMARRE
CONCRETO EN COLUMNAS DE AMARRE F'C=175 KG/CM2 4.00
ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS DE AMARRE 4.00
VIGAS DE AMARRE
CONCRETO EN VIGAS DE AMARRE F'C=210 KG/CM2 4.00
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS DE AM ARRE 4.00
ACERO GRADO 60 EN VIGAS DE AMARRE 4.00
PLACAS
CONCRETO EN PLACAS F'C= 210 KG/CM2 2.00
ENCOFRADO Y DESENCOFRADO EN PLACAS 4.00
ACERO GRADO 60 EN PLACAS 4.00
LOSAS ALIGERADAS
CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2 5.00
ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS 27.00
ACERO GRADO 60 EN LOSAS ALIGERADAS 20.00
BLOQUE HUECO/CONCRETO 15X20X30 CM PARA TECHO ALIGERADO 7.00
LOSAS SOLIDAS PLEGADAS
CONCRETO EN LOSAS SOLIDAS PLEGADAS F'C=210 KG/CM2 4.00
ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS SOLIDAS PLEGADAS 4.00
ACERO GRADO 60 EN LOSAS SOLIDAS PLEGADAS 4.00
ESCALERAS
CONCRETO EN ESCALERAS F'C=210 KG/CM2 1.00
ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS 3.00
ACERO GRADO 60 EN ESCALERAS 2.00
RAMPA
CONCRETO EN RAMPAS F'C=210 KG/CM2 2.00
ENCOFRADO Y DESENCOFRADO EN RAMPAS 6.00
ACERO GRADO 60 EN RAMPAS 6.00
PARAPETOS
CONCRETO EN PARAPETO F'C= 210 KG/CM2 2.00
ENCOFRADO Y DESENCOFRADO ENPARAPETO 8.00
ACERO ENPARAPETO GRADO 60 4.00
MUROS Y TABIQUES DE ALBAÑILERIA
MURO DE BLOQUE HUECO DE CONCRETO e=15 cm, mezcla 1:5 12.00
MURO DE BLOQUE HUECO DE CONCRETO e=30 cm, mezcla 1:5 30.00
REVOQUES, ENLUCIDOS Y MOLDURAS
TARRAJEO DEL TIPO RAYADO O PRIMARIO C/MORTERO 1:5 UNSAAC 6.00
TARRAJEO FINO unsaac 42.00
TARRAJEO FROTACHADO CON CEMENTO-ARENA UNSAAC 30.00
TARRAJEO DE COLUMNAS C:M 1:5 E=2cm 42.00
TARRAJEO DE VIGAS PERALTADAS 48.00
TARRAJEO DE PLACAS INT. C:M 1:5 E=2cm 3.00
TARRAJEO DE ESCALERAS C:A 1:5 20.00
TARRAJEO DE PARAPETOS EN RAMPAS Y ESCALERASC:M 1:5 E=2cm 27.00
VESTIDURA DE DERRAMES 24.00
BRUÑAS 24.00
TARRAJEO FINO EN CIELORRASOS CON MEZCLA DE CEMENTO-ARENA UNSAAC 54.00
TARRAJEO FROTACHADO EN CIELORRASOS CON MEZCLA DE CEMENTO-ARENA U 24.00
PISOS Y PAVIMENTOS
CONTRAPISO DE 48 MM. 24.00
PISO DE TERRAZO CON ESTRIAS DE ALUMINIO E= 2.50 cm 54.00
PISO DE PARQUET HUAYACAN 6 X 30 CM VETEADO 60.00
PISO CERAMICO 0.30X0.30 12.00
PISO CERAMICO VITRIFICADO ALTO TRANSITO ANTIDESLIZANTE DE 0.30X0.30 10.00
REVESTIMIENTO DE GRADAS CON TERRAZO ICL. CANTONERA ALUMINIO 11.00
TAPAJUNTAS METALICO 12.00
CONTRAZOCALOS
CONTRAZOCALO DE TERRAZO C/PERFILES DE ALUMINIO 48.00
CONTRAZOCALO DE MADERA AGUANO DE 4" x 3/4" C/RODON DE 3/4" 12.00
CONTRAZOCALO DE MADERA AGUANO DE 6" x 3/4" C/RODON DE 3/4" 2.00
CONTRAZOCALO CERAMICO 1.00
ZOCALOS
ZOCALO DE CERAMICO DE 30x30cm. 18.00
LISTELO TIPO CINTILLO DE 0.015x0.30m. 2.00
CUBIERTAS
COBERTURA DE TEJAS SOBRE TIJERALES DE MADERA Y CORREAS 14.00
RQUITECTURA
OBRAS PRELIMINARES
TRAZO Y REPLANTEO DURANTE UNSAAC
REUBICACION DE ESTRUCTURAS DE CONCRETO
IORES
2° MES 3° MES 4° MES
VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
4° MES 5° MES
MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI
23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14