Está en la página 1de 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A A

SALA DE TERMOS
SON 6 DE 454lts
SALA DE TERMOS
SON 12 DE 454lts

8 DUCHAS MUJERES

20 DUCHA HOMBRES

B B
VESTIDORES
C VESTIDORES MUJERES 80 C
VESTIDORES LOCKERS AREA
HOMBRES 180
MUJERES 80 365
LOCKERS AREA LIMPIA
LOCKERS AREA
SUCIA 2680 559 2685 3261 3242 3471 8702 2906 2994 6034
SUCIA

D D

BAÑOS HOMBRES
BAÑOS MUJERES
SALA DE ASEO

5031
ACCESO
E E
ACCESO

SALIDA

BAÑO UNIVERSAL
SALA ELECTRICA ø1
00 50 LAVADO
ø15 0

F F

1 2 3 4 5 6 7 8 9 10 11 12 13 14 00
15 16
ø15
00
ø15

PLANTA DE AGUA FRIA

CUADRO DE GASTO ARTEFACTOS


CASA DE CAMBIO - SECTOR HOMBRES
Artefactos Cantidad Gasto Lt/min Total Lt/min
Lavamanos (Lo) 12 8 96
Inodoros (Wc) 6 10 60 TRAZADO POR MURO

Ducha (B°ll) 20 10 200


TRAZADO POR CIELO
Urinario (Ur) 6 6 36
Gasto Instalado (Q.I.) 392
Gasto Máximo Probable (Q.M.P.) 106,50 REDUCCION Quebrada Blanca Fase 2 (QB2)

PO/Contract Number: 25800-220-HC5-G00Z-00118


LLAVE DE PASO
CUADRO DE GASTO ARTEFACTOS Supplier/Contractor Name: TECNO FAST S.A.

CASA DE CAMBIO - SECTOR MUJERES Document Title: AS-BUILT - CASA DE CAMBIO, CONCENTRADORA -
RED DE AGUA POTABLE FRIA

Artefactos Cantidad Gasto Lt/min Total Lt/min Document Number: 25800-220-V118-G00Z-00077

Document Revision: 2
Lavamanos (Lo) 9 8 72
Document Submittal: 004
Inodoros (Wc) 7 10 70
Equipment Number (if applicable): N/A
Ducha (B°ll) 9 10 90
Lavadero 1 12 12 DOCUMENT REVIEW STATUS STAMP (To be filled by Bechtel)

Gasto Instalado (Q.I.) 244 Job No 25800 Project


SELLER/CONTRACTOR DOCUMENT REVIEW
Gasto Máximo Probable (Q.M.P.) 76,82 Permission to proceed does not constitute acceptance or approval of design detail,
calculations, analysis, test methods, or materials developed or selected by
Seller/Contractor, and does not relieve the Seller/Contractor from full compliance
with contractual obligations
CUADRO DE GASTO ARTEFACTOS
WORK MAY PROCEED, Editorial comments need only
CASA DE CAMBIO - EDIFICIO COMPLETO X 1 be incorporated if document revised and resubmitted

SISTEMA AISLACION TUBERIAS AGUA FRIA Artefactos Cantidad Gasto Lt/min Total Lt/min 2 REVISE & RESUBMIT - WORK MAY PROCEED
SUBJECT TO INCORPORATION OF CHANGES

Lavamanos (Lo) 21 8 168 3 REVISE & RESUBMIT - WORK MAY NOT


PROCEED
Inodoros (Wc) 13 10 130
Ducha (B°ll) 29 10 290 4 REVIEW NOT REQUIRED. WORK MAY PROCEED

Urinario (Ur) 6 6 36 5 CANCELLED / SUPERSEDED

Lavadero 1 12 12 Ariel Campos Ernst 23-01-2023


Gasto Instalado (Q.I.) 636
REVIEWER:
Piping
DISCIPLINE:
DATE:
DDR No.:
Gasto Máximo Probable (Q.M.P.) 148,66 PLANO DE EMPLAZAMIENTO SECTOR MINA

AS-BUILT

Avda. La Montaña 692.


Lampa - Santiago - Chile
Fono:(56 2) 27 90 5000
www.tecnofast.cl

IGOR VIDAL

CONTENIDO
IGOR VIDAL
IGOR VIDAL