Está en la página 1de 8

Descripción Und. PRECIO (S/.) CANTIDAD Parcial (S/.

)
SETIEMBRE 2022

DEL 05 AL 30 (26d

SEMANA 01 SEMANA 02
CANTIDAD PARCIAL CANTIDAD
MATERALES
WINCHA. und 25.00 0.4100 10.25 0.41
PETROLEO DIgal 19.09 751.7562 14,351.03 253.529
ALAMBRE NEG kg 5.93 51.0000 302.43
CLAVOS PARAkg 5.93 0.4100 2.430 0.4100
CLAVOS CON kg 5.93 45.9000 272.19
GAVION CAJAund 680.00 34.0000 23,120.00
GAVION CAJAund 550.00 84.0000 46,200.00
GAVION CAJAund 350.00 17.0000 5,950.00
PIEDRA GRANDm3 5.00 726.0000 3,630.00
GEOTEXTIL NTm2 12.00 377.1750 4,526.10
MADERA TORN p2 2.50 1,466.2500 3,665.63
ESTACAS DE und 5.00 8.2000 41.00 8.2
PINTURA ESMund 45.00 0.4100 18.45 0.41
CINTA SEÑAL M 0.30 170.0000 51.00 170 S/ 51.00
COSTO DEL PROYECTO 102,140.51
CALENDARIO DE ADQUISICION DE M
SETIEMBRE 2022 OCTUBRE. 2022

DEL 05 AL 30 (26dc) DEL 01 AL 31 ( 31d

SEMANA 02 SEMANA 03 SEMANA 04 SEMANA 05 SEMANA 06


PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD

S/ 10.25
S/ 4,839.87 114.6392 S/ 2,188.46 240.3016 S/ 4,587.36 143.2866 S/ 2,735.34
51
S/ 2.43
20.52

557.175
S/ 41.00
S/ 18.45

S/ 4,912.00 S/ 2,188.46 S/ 4,587.36 S/ 2,735.34


DE ADQUISICION DE MATERIALES
OCTUBRE. 2022 NOVIEMBRE 202

DEL 01 AL 31 ( 31dc) DEL 01 AL 30 (30 d

SEMANA 06 SEMANA 07 SEMANA 08 SEMANA 09 SEMANA 10


PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD

S/ 302.43

S/ 121.68 25.38 S/ 150.50


11.2056
50.036
3.4 S/ 1,190.00 11.9
51.5 S/ 257.50 180.25
377.175 S/ 4,526.10
S/ 1,392.94 219.9375 S/ 549.84 689.1375 S/ 1,722.84

S/ 1,817.05 S/ 549.84 S/ 7,846.95


NOVIEMBRE 2022 DICIEMBRE 2022

DEL 01 AL 30 (30 dc) DEL 01 AL 03(03dc) TOTAL

SEMANA 10 SEMANA 11 SEMANA 12 SEMANA 13


PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL

S/ 10.25
S/ 14,351.03
S/ 302.43
S/ 2.43
S/ 272.19
S/ 7,619.81 22.7944 S/ 15,500.19 S/ 23,120.00
S/ 27,519.80 33.964 S/ 18,680.20 S/ 46,200.00
S/ 4,165.00 1.7 S/ 595.00 S/ 5,950.00
S/ 901.25 169.95 S/ 849.75 172.525 S/ 862.63 151.775 S/ 758.88 S/ 3,630.00
S/ 4,526.10
S/ 3,665.63
S/ 41.00
S/ 18.45
S/ 51.00
S/ 40,205.86 S/ 20,124.95 S/ 862.63 S/ 16,259.07 S/ 102,140.51
PRECIO
Descripción Und. CANTIDAD Parcial (S/.)
(S/.)

EQUIPOS
0301000020 ESTACION TOTAL hm S/ 40.00 4.3870 S/ 175.48
0301000021 NIVEL DE INGENIERO hm S/ 15.00 1.1070 S/ 16.61
0301010006 HERRAMIENTAS MANUALES %mo S/ 2,320.23
PLANCHA COMPACTADORA VIBRAT. S/ 18.00 42.4958 S/ 764.92
03010300060 hm
4.0 HP
0301160001 CARGADOR FRONTAL hm S/ 180.00 26.0504 S/ 4,689.07
03011700020RETROEXCAVADORA 76 kW (102 CV) hm S/ 180.00 29.6200 S/ 5,331.60
0301180003 TRACTOR S/ORUGAS 190-240 D7G hm S/ 200.00 72.7895 S/ 14,557.90
03012200040CAMION VOLQUETE DE 15 m3 hm S/ 160.00 90.5918 S/ 14,494.69
COSTO DEL PROYECTO S/ 42,350.50
CALENDARIO DE ADQUISICION D
SETIEMBRE 2022

DEL 05 AL 30 (26dc)

SEMANA 01 SEMANA 02 SEMANA 03 SEMANA 04


CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL

4.387 S/ 175.48
1.107 S/ 16.61
5.1 105.45 317.03 282.03

12.87 S/ 2,316.60
48.07 S/ 9,614.00 21.736 S/ 4,347.20 2.9835 S/ 596.70

S/ 9,806.09 S/ 4,347.20 S/ 2,913.30

S/ -
RIO DE ADQUISICION DE EQUIPOS
OCTUBRE. 2022

DEL 01 AL 31 ( 31dc)

SEMANA 05 SEMANA 06 SEMANA 07 SEMANA 08 SEMANA 09


CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD

568.26 275.88 500.94 116.025 149.515

42.4958 S/ 764.92
26.0504 S/ 4,689.07
16.75 S/ 3,015.00

45 S/ 7,200.00 45 S/ 7,200.00 0.35 S/ 56.00 0.2418 S/ 38.69


S/ 15,669.00 S/ 7,200.00 S/ 56.00 S/ 38.69
NOVIEMBRE 2022 DICIEMBRE 2022

TOTAL
DEL 01 AL 30 (30 dc) DEL 01 AL 03(03dc)

SEMANA 09 SEMANA 10 SEMANA 11 SEMANA 12 SEMANA 13


PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL

S/ 175.48
S/ 16.61
S/ 2,320.23

S/ 764.92
S/ 4,689.07
S/ 5,331.60
S/ 14,557.90
S/ 14,494.69
S/ 42,350.50