METRADO DE PINTURA PARA ESTRUCTURAS

"MEJORAMIENTO DE LOS SERVICIOS DE SALUD DEL HOSPITAL DE APOYO ILAVE,


OBRA PROVINCIA DE EL COLLAO – REGIÓN PUNO"

ENTIDAD EJECUTORA : GOBIERNO REGIONAL DE PUNO


MODALIDAD DE EJECUCION : ADMINISTRACION DIRECTA
SUPERVISOR DE OBRA : ING. MIGUEL ANGEL TUPAYACHI PINEDO
RESIDENTE DE OBRA : ING. ALEXANDER HUMPIRE COLQUEHUANCA
MES :MAYO DEL 2023
FECHA: Saturday, December 31, 2022
MEDIDAS
CANTIDAD
DESCRIPCION UND AREA DE PARCIAL TOTAL
REQUERIDA
PINTADO (M2)

PINTURA DE ESTRUCTURAS m2 8047.09


TUBO CUADRADO 100x100x4.5mm L=6 m ASTM A500 168.00 2.40 403.20
TUBO RECTANGULAR 250X100X4.5mm L=6 m ASTM A500 110.00 4.20 462.00
TUBO RECTANGULAR 150X75X4.5mm L=6 m ASTM A500 21.00 10.80 226.80
TUBO CUADRADO 250x250x10.0mm L=6 m ASTM A500 35.00 6.00 210.00
PERFIL Z 197x67x20x3mm L= 6m ASTM A36 235.00 8.77 2061.42
VIGA H DE ALA ANCHA W 16x26 ASTM A992 80.00 17.52 1401.59
VIGA H DE ALA ANCHA W 10x22 ASTM A992 52.00 15.40 800.72
PERFIL C DE CHAPA DOBLADA 12"x3"x3/4”x3.0mm ASTM A36 356.00 5.94 2114.64
PLANCHA DE ACERO 1.20x2.40m e=3/8" ASTM A36 22.00 5.76 126.72
PLANCHA DE ACERO 1.50x6.00m e=4.5mm ASTM A36 5.00 18.00 90.00
PLANCHA DE ACERO 1.20x2.40m e=6.0mm ASTM A36 5.00 5.76 28.80
PLANCHA DE ACERO 1.20x2.40m e=12 mm ASTM A36 8.00 5.76 46.08
PLANCHA DE ACERO 1.20x2.40m e=16 mm ASTM A36 5.00 5.76 28.80
ANGULAR 50x50x4.5mm L=6 m ASTM A36. 8.00 1.20 9.60
ANGULAR 4”x4”x3/8” L=6 m ASTM A36. 15.00 2.45 36.72
TOTAL(M2) 8047.09
LIJA (PLG)(0.015PLG/M2 SEGÚN ACU) 121.00
PINTURA ESMALTE SINTETICO (GAL)(0.0833 GLN/M2 SEGÚN ACU) 671.00
PINTURA ANTICORROSIVA (GAL)(0.05 GLN/M2 SEGÚN ACU) 403.00
AGUARRAS MINERAL 0.02 (GAL)(0.02 GLN/M2 SEGÚN ACU) 161.00
PINTURA ESMALTE SINT. (GAL)(0.0238 GLN/M2 1MANO SEGÚN F.T.) 192.00
PINTURA ANTICORROSIVA (GAL)(0.0389 GLN/M2 1 MANO SEGÚN F.T.) 314.00
AGUARRAS MINERAL 0.02 (GAL)(0.01 GLN/M2 1 MANO SEGÚN F.T.) 81.00
METRADO DE COBERTURA
OBRA "MEJORAMIENTO DE LOS SERVICIOS DE SALUD DEL HOSPITAL DE APOYO ILAVE, PROVINCIA DE EL COLLAO – REGIÓN PUNO"

ENTIDAD EJECUTORA : GOBIERNO REGIONAL DE PUNO


MODALIDAD DE EJECUCION : ADMINISTRACION DIRECTA
SUPERVISOR DE OBRA : ING. ALEX DARWIN ROQUE ROQUE
RESIDENTE DE OBRA : ING. JUAN CARLOS FLORES ABARCA
MES :MAYO DEL 2023
FECHA: Saturday, December 31, 2022
MEDIDAS
N° DE
DESCRIPCION UND PARCIAL TOTAL
VECES LARGO ANCHO ALTURA

CUBIERTA m2
UPSS MEDICINA DE REHABILITACION
CARA 1 2.00 AREA= 11.95 --------- 23.91
CARA 2 2.00 AREA= 41.92 --------- 83.85
CARA 3 2.00 AREA= 29.97 --------- 59.94
CARA 4 1.00 AREA= 63.15 --------- 63.15
CARA 5 1.00 AREA= 39.25 --------- 39.25
CARA 6
CARA 7
UPSS ANATOMIA PATOLOGICA
CARA 1 2.00 AREA= 57.43 --------- 114.87
CARA 2 2.00 AREA= 54.39 --------- 108.78
UPSS MODULO DE VIH
CARA 1 2.00 AREA= 38.28 --------- 76.56
CARA 2 2.00 AREA= 20.36 --------- 40.72
UPSS MODULO DE VIH
CARA 1 2.00 AREA= 38.28 --------- 76.56
CARA 2 2.00 AREA= 20.36 --------- 40.72
UPSS C.GASES, LAVANDERIA, CADENA DE FRIO
CARA 1 2.00 AREA= 178.28 --------- 356.57
CARA 2 2.00 AREA= 61.86 --------- 123.72
UPSS C.FUERZA 1
CARA 1 2.00 AREA= 40.65 --------- 81.31
CARA 2 2.00 AREA= 6.38 --------- 12.77
UPSS NUTRICIÓN Y DIETPETICA
CARA 1 2.00 AREA= 203.84 --------- 407.68
CARA 2 2.00 AREA= 61.86 --------- 123.72
UPSS C FUERZAS 2, CISTERNA
CARA 1 2.00 AREA= 55.01 --------- 110.02
CARA 2 2.00 AREA= 29.32 --------- 58.64
CARA 3 2.00 AREA= 41.35 --------- 82.69
CARA 4 2.00 AREA= 13.40 --------- 26.81
UPSS TALLER Y ALMACENES
CARA 1 1.00 AREA= 32.78 --------- 32.78
CARA 2 2.00 AREA= 105.57 --------- 211.14
CARA 3 1.00 AREA= 18.56 --------- 18.56
CARA 4 2.00 AREA= 6.00 --------- 12.00
CARA 5 4.00 AREA= 37.25 --------- 149.01
UPSS SANEAMIENTO AMBIENTAL
CARA 1 1.00 AREA= 57.48 --------- 57.48
CARA 2 1.00 AREA= 77.81 --------- 77.81
CARA 3 1.00 AREA= 41.79 --------- 41.79
CARA 4 1.00 AREA= 95.01 --------- 95.01
CARA 5 1.00 AREA= 17.20 --------- 17.20
CARA 6 1.00 AREA= 15.77 --------- 15.77
UPSS SANEAMIENTO AMBIENTAL
CARA 1 2.00 AREA= 38.65 --------- 77.31
CARA 2 2.00 AREA= 11.76 --------- 23.53

#REF!
2.00 31.55 0.25 1.20
2.00 26.00 0.25 1.20
2.00 26.00 0.25 1.20
METRADO DE COBERTURA
OBRA "MEJORAMIENTO DE LOS SERVICIOS DE SALUD DEL HOSPITAL DE APOYO ILAVE, PROVINCIA DE EL COLLAO – REGIÓN PUNO"

ENTIDAD EJECUTORA : GOBIERNO REGIONAL DE PUNO


MODALIDAD DE EJECUCION : ADMINISTRACION DIRECTA
SUPERVISOR DE OBRA : ING. ALEX DARWIN ROQUE ROQUE
RESIDENTE DE OBRA : ING. JUAN CARLOS FLORES ABARCA
MES :MAYO DEL 2023
FECHA: Saturday, December 31, 2022
MEDIDAS
N° DE
DESCRIPCION UND PARCIAL TOTAL
VECES LARGO ANCHO ALTURA

8.00 2.16 0.20 1.13

#REF!
1.00 31.55 1.70 0.25
1.00 26.00 1.70 0.25
1.00 26.00 1.70 0.25
4.00 AREA= 8.45 0.25 #REF!
4.00 4.25 0.25 0.45

Err:504
1.00 31.55 1.70 0.25
1.00 26.00 1.70 0.25
1.00 26.00 1.70 0.25
1.70 3.00 0.20 0.45

Err:504 #REF!
1.00 488.78 AREA= 0.07
1.00 486.66 AREA= 0.07
1.00 41.10 AREA= 0.14
2.00 15.70 AREA= 0.14

Err:504 #REF!
TOTAL DE CEMENTO #REF!
TOTAL DE CEMENTO #REF!
PLANILLA DE METRADOS DIARIOS EN OBRA - MAYORES METRADOS

OBRA #REF!

ENTIDAD EJECUTOR #REF!


MODALIDAD DE EJECUCION #REF!
SUPERVISOR DE OBRA #REF!
RESIDENTE DE OBRA #REF!
MES #REF!
ACTIVIDADES REALIZADAS Tuesday, January 5, 2021
PROG
Nº partida PARTIDAS EJECUTADAS EN EL DIA UND Nº VECES CANTIDAD L (m) A (m) H (m) PARCIAL TOTAL
DE A
01 CONSTRUCCION PRESA KHAPIA
01.04 CUERPO DE PRESA
01.04.11 Err:504
01.04.11.01 Err:504 m3 5.00
relleno compactado con material propio en pantalla de presa 0+050 0+075 1.00 1.00 5.00 1.00 1.00 5.00
ACTIVIDADES REALIZADAS Wednesday, January 6, 2021
PROG
Nº partida PARTIDAS EJECUTADAS EN EL DIA UND Nº VECES CANTIDAD L (m) A (m) H (m) PARCIAL TOTAL
DE A
01 CONSTRUCCION PRESA KHAPIA
01.04 CUERPO DE PRESA
01.04.11 Err:504
01.04.11.01 Err:504 m3 5.00
relleno compactado con material propio en pantalla de presa 0+050 0+075 1.00 1.00 10.00 0.50 1.00 5.00
ACTIVIDADES REALIZADAS Friday, January 8, 2021
PROG
Nº partida PARTIDAS EJECUTADAS EN EL DIA UND Nº VECES CANTIDAD L (m) A (m) H (m) PARCIAL TOTAL
DE A
01 CONSTRUCCION PRESA KHAPIA
01.04 CUERPO DE PRESA
01.04.11 Err:504
01.04.11.01 Err:504 m3 2.50
relleno compactado con material propio en pantalla de presa 0+050 0+075 1.00 1.00 10.00 0.50 0.50 2.50
ACTIVIDADES REALIZADAS Saturday, January 9, 2021
PROG
Nº partida PARTIDAS EJECUTADAS EN EL DIA UND Nº VECES CANTIDAD L (m) A (m) H (m) PARCIAL TOTAL
DE A
01 CONSTRUCCION PRESA KHAPIA
01.04 CUERPO DE PRESA
01.04.11 Err:504
01.04.11.01 Err:504 m3 2.50
relleno compactado con material propio en pantalla de presa 0+050 0+075 1.00 1.00 10.00 0.50 0.50 2.50
PLANILLA DE METRADOS DIARIOS EN OBRA - MAYORES METRADOS

OBRA #REF!

ENTIDAD EJECUTOR #REF!


MODALIDAD DE EJECUCION #REF!
SUPERVISOR DE OBRA #REF!
RESIDENTE DE OBRA #REF!
MES #REF!
ACTIVIDADES REALIZADAS Monday, January 11, 2021
PROG
Nº partida PARTIDAS EJECUTADAS EN EL DIA UND Nº VECES CANTIDAD L (m) A (m) H (m) PARCIAL TOTAL
DE A
01 CONSTRUCCION PRESA KHAPIA
01.04 CUERPO DE PRESA
01.04.11 Err:504
01.04.11.01 Err:504 m3 5.00
relleno compactado con material propio en pantalla de presa 0+050 0+075 1.00 1.00 5.00 1.00 1.00 5.00
PLANILLA DE METRADOS DIARIOS EN OBRA - PARTIDAS NUEVAS

OBRA #REF!

ENTIDAD EJECUTOR #REF!


MODALIDAD DE EJECUCION #REF!
SUPERVISOR DE OBRA #REF!
RESIDENTE DE OBRA #REF!
MES #REF!