Subpresupuesto 001
Cliente BANCO DE CREDITO DEL PERU Costo al
PARTIDAS NUEVAS
RESANE DE MUROS FISURADOS
DESMONTAJE Y MONTAJE DE VENTANA und 8.00 180.08
RETIRO DE TARRAJEO DE MUROS m2 19.12 8.80
MALLA EN RESANE m 47.80 13.95
TARRAJEO DE MUROS
m2 23.90 39.14
INTERIORES/EXTERIORES
PINTURA EN ZONAS EXTERIORES m2 38.76 17.81
PINTURA EN ZONAS INTERIORES m2 123.76 16.31
ANCLAJE EN MUROS
ANCLAJE DE ACERO EN ENCUENTRO DE
und 33.00 57.03
MURO Y VIGA PERALTADA
cd 26,855.18
utilidad 11.5% 3,088.35
sub total 29,943.52
igv 18% 5,389.83
total 35,333.35
Parcial S/.
998.19
2106.62
1348.96
1361.29
528.66
995.75
1035.75
991.09
71.24
89.05
9526.60
1440.64
168.26
666.81
935.45
690.32
2018.53
1881.99
7801.98
26,855.18
3,088.35
29,943.52
5,389.83
35,333.35
MEDIDAS RESULTADOS
DESCRIPCION UND
N° CANT LARGO ANCHO ALTO PARCIAL TOTAL
1 ARQUITECTURA Y ACABADOS
TARRAJEO DE MUROS EXTERIORES/INTERIORES 34.78
PRIMARIA
BLOQUE A-2
EJE R,1Y2 PRIMER PISO M2 2.00 5.90 0.25 2.95
EJE R,3Y4 PRIMER PISO M2 2.00 5.90 0.25 2.95
EJE M,3Y4 PRIMER PISO M2 2.00 6.30 0.25 3.15
EJE 4, H-I PRIMER PISO M2 2.00 3.33 0.25 1.67
EJE 4, I-J PRIMER PISO M2 2.00 3.40 0.25 1.70
EJE 4, J-K PRIMER PISO M2 2.00 3.40 0.25 1.70
EJE 4, K-L PRIMER PISO M2 2.00 3.33 0.25 1.67
BLOQUE A-3
EJE L,1Y2 PRIMER PISO M2 2.00 5.90 0.25 2.95
EJE J,1Y2 PRIMER PISO M2 2.00 6.80 0.25 3.40
EJE J,3Y4 PRIMER PISO M2 2.00 6.80 0.25 3.40
EJE H,1Y2 PRIMER PISO M2 2.00 5.90 0.25 2.95
EJE G,1Y2 PRIMER PISO M2 2.00 6.30 0.25 3.15
EJE G,3Y4 PRIMER PISO M2 2.00 6.30 0.25 3.15
BRUÑAS 69.56
PRIMARIA
BLOQUE A-2
EJE R,1Y2 PRIMER PISO M 1.00 5.90 5.90
EJE R,3Y4 PRIMER PISO M 1.00 5.90 5.90
EJE M,3Y4 PRIMER PISO M 1.00 6.30 6.30
EJE 4, H-I PRIMER PISO M 1.00 3.33 3.33
EJE 4, I-J PRIMER PISO M 1.00 3.40 3.40
EJE 4, J-K PRIMER PISO M 1.00 3.40 3.40
EJE 4, K-L PRIMER PISO M 1.00 3.33 3.33
BLOQUE A-3
EJE L,1Y2 PRIMER PISO M 1.00 5.90 5.90
EJE J,1Y2 PRIMER PISO M 1.00 6.80 6.80
EJE J,3Y4 PRIMER PISO M 1.00 6.80 6.80
EJE H,1Y2 PRIMER PISO M 1.00 5.90 5.90
EJE G,1Y2 PRIMER PISO M 1.00 6.30 6.30
EJE G,3Y4 PRIMER PISO M 1.00 6.30 6.30
MEDIDAS RESULTADOS
DESCRIPCION UND
N° CANT LARGO ANCHO ALTO PARCIAL TOTAL
POR REPARACION DE MUROS
MONTAJE Y DESMONTAJE DE VENTANA 8.00
PRIMARIA
PRIMER PISO
BLOQUE A-2
EJE 01,OYN UND 1.00 1.00
BLOQUE A-3
EJE 01,LYK UND 1.00 1.00
EJE 01,KYJ UND 1.00 1.00
EJE 01,IYJ UND 1.00 1.00
EJE 01,IYH UND 1.00 1.00
EJE 03,OYN UND 1.00 1.00
EJE 02, OYP UND 1.00 1.00
SEGUNDO PISO
BLOQUE A-2
EJE 03,MYN UND 1.00 1.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Materiales
0272080001 VARILLAS und 0.0500
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Materiales
02040300010043 ACERO CORRUGADO D=1/4" var 0.1333
Fecha :
Página : 1
8.80
28.10 0.75
19.50 5.20
5.95
5.95 0.18
10.00 2.67
2.85
57.03
19.50 7.80
7.80
100.00 5.00
180.00 36.00
41.00
7.80 0.23
10.00 4.00
10.00 4.00
8.23
13.95
28.10 2.81
19.50 1.04
3.85
12.00 1.60
10.00 1.00
30.00 7.50
10.10
###