CLAVE CONCEPTO UNIDAD LARGO ANCHO ALTO PIEZAS RESULTADO OBSERVACIONES
TIPO TRAMO EJE
A1103 RELLENOS
COSTRUCCION DE LA CAPA SUBRASANTE CON M3 TRAMO 01 190 6 0.2 1.00 228.00 KM 0+000.00 AL KM 1+180
N*CTRCAR-1- MATERIAL PRODUCTO DE DEMOLICION PARA
01.009/16 ESTABILIZAR EL TERRENO DE DESPLANTE DE LA
SUBRASANTE 70% MATERIAL RECUPERADO Y 30%
UTLIZADO MATERIAL NOCOMPACTABLE DE BANCO,
INCLUYE P.U.O.T.
BASE HIDRAULICA CON MATERIALES PÉTREOS M3 TRAMO 01 190.00 5.3 0.1 1.00 100.70 KM 0+000.00 AL KM 0+976.69
PROCEDENTES DE BANCOS QUE ELIJA EL
CONTRATISTA, INCLUYENDO ACARREO, COMPACTADO
N-CTRCAR-1- AL 100%, P.U.O.T.
04-002/11
LOCALIZACION
CLAVE CONCEPTO UNIDAD LARGO ANCHO ALTO PIEZAS RESULTADO OBSERVACIONES
TIPO TRAMO EJE
CARPETA ASFALTICA CON MEZCLA EN CALIENTE, M3 TRAMO 01 190.00 5 0.07 1.00 66.50 KM 0+000.00 AL KM 0+976.69
NCTR-CAR-1- INCLUYE ACARREOS P.U.O.T.
04-006/15
N*CTRCAR-1-01-009/17
0
0
BASE HIDRAULICA CON MATERIALES PÉTREOS
PROCEDENTES DE BANCOS QUE ELIJA EL CONTRATISTA,
INCLUYENDO ACARREO, COMPACTADO AL 100%, P.U.O.T.
N-CTRCAR-1-04-002/11 M3 106.00 100.70 0.00 $ 140,724.54 $ 133,688.31 0.00 100.70 $1,327.59 $133,688.31
HOJA 01 $859,581.17
6 DE 1
OBRA: APERRTURA DE CAMINO, CARPETA ASFALTICA NUMEROS GENERADORES
LOCALIDAD: COMUNIDAD SAN ANTONIO, COMUNIDAD ANEXO ESTIMACION: 01 (UNO)
MUNICIPIO: RAYÓN, CHIAPAS PERIODO DE ESTIMACION:
CONTRATO: 001-2023 01 DE ABRILDEL 2023 AL 31 DE MAYO DEL 2023
D´CONS CONSTRUCTORA S.A. DE C.V. FECHA DE ELABORACION: 31 DE MAYO DEL 2023
7 DE 1
OBRA: APERRTURA DE CAMINO, CARPETA ASFALTICA
CARATULA DE ESTIMACIÓN
LOCALIDAD: COMUNIDAD SAN ANTONIO, COMUNIDAD ANEXO
0
CALCULO DE RETENCIÓN POR EL 2,00 % GRAVABLE DEL IMPUESTO SOBRE PAGO DE NOMINA
IMPORTE
FACTOR 0.003846154
$ 859,581.17
IMPORTE DE LA ESTIMACIÓN 01 (UNO)
OPERACIÓN RESULTADO
ELABORO:
C. XXXXXXXXXXXXXXXXXXXX
ADMINISTRADOR UNICO
OBRA: APERRTURA DE CAMINO, CARPETA ASFALTICA
RESUMEN FISICO FINANCIERO
LOCALIDAD:
XXXXXXXXXXXXXXX ESTIMACION: 01 (UNO)
MUNICIPIO: PERIODO DE ESTIMACION:
XXXXXXXXXXXXX PXXXXXXXXXX
CONTRATO:
01 DE ABRILDEL 2023 AL 31 DE MAYO DEL 2023
FECHA DE ELABORACION:
XXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXX 24 DE OCTUBRE DEL 2022
X
C O N C E P T O ESTIMADO ANTERIOR ACUMULADO ESTA ESTIMACION ACUMULADO
E S T I M A C I O N TOTAL ALCANCE
AMORT. 1 % AL 1 % AL ESTADO 5 AL MILLAR 2,0 % IMPUESTO 6% Art. 265 Edo. AMORTIZACION DE
ESTIMACION No. PERIODO ANTICIPO MUNICIPIO DE O.B.S. CONTRALORIA SOBRE NOMINAS Chis. ANTICIPO
IMPORTE I.V.A. TOTAL GENERAL DEDUCCIONES LIQUIDO
ESTIMACION 01
(UNO) 0 $488,341.40 $78,134.62 $566,476.02 $283,238.01 $4,883.41 $4,883.41 $2,441.71 $1,953.37 $117.20 $283,238.01 $297,517.11 $268,958.91
T O T A L E S $488,341.40 $78,134.62 $566,476.02 $283,238.01 $4,883.41 $4,883.41 $2,441.71 $1,953.37 $117.20 $283,238.01 $297,517.11 $268,958.91
SALDO POR ESTIMAR: $233,523.98 ANTICIPO POR AMORTIZAR: $116,761.99
LOCALIDAD:
RESUMEN DE ESTIMACIÓN
XXXXXXXXXXXX
MUNICIPIO: ESTIMACION: 01 (UNO)
XXXXXXXXXXXXXXXXXXXXXX 0
CONTRATO: FECHA DE ELABORACION: 31 DE MAYO DEL 2023
0 XXXXXXXXXXXXXXXXXXXXXX
INICIO DE OBRA 22 DE SEPTIEMBRE DEL 2022 Avance Fis. Acumul. 124.64% Avance Financ. Acum. 112.32%
IMPORTE DE CONTRATO CON IVA $ 800,000.00 Avance Fis. Estimac. 124.64% Avance Financ. Estimac. 62.32%
REPORTE FOTOGRAFICO
00 BASE HIDRAULICA CON MATERIALES PÉTREOS PROCEDENTES DE BANCOS QUE ELIJA EL CONTRATISTA, INCLUYENDO ACARREO, COMPACTADO AL 100%, P.U.O.T.
OBRA: “XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX”
REPORTE FOTOGRAFICO
LOCALIDAD: XXXXXXXXXXXXXXX
___________________________
C. XXXXXXXXXXXXXXXXXXXXXX MUNICIPIO: XXXXXXXXXXXXXXXXXX ESTIMACION: 01 (UNO)
REPRESENTANTE LEGAL CONTRATO: XXXXXXXXXXXXXX 01 DE ABRILDEL 2023 AL 31 DE MAYO DEL 2023
REPORTE FOTOGRAFICO
00 BASE HIDRAULICA CON MATERIALES PÉTREOS PROCEDENTES DE BANCOS QUE ELIJA EL CONTRATISTA, INCLUYENDO ACARREO, COMPACTADO AL 100%, P.U.O.T.
REPORTE FOTOGRAFICO
Revestimiento con material de prestato de banco, cribado para eliminar las particulas mayores a 75 mm (3"), por unidad de obra terminada, incluye: carga de material a
00
unidades de transporte.
REPORTE FOTOGRAFICO
086-C.02b) CONSTRUCCIÓN DE TERRAPLENES UTILIZANDO MATERIAL COMPACTADO DE BANCO, EN LA CAPA SUBASE COMPACTADA AL 100%, INCLUYE ACARREOS, P.U.O.T.G
REPORTE FOTOGRAFICO
086-C.02b) CONSTRUCCIÓN DE TERRAPLENES UTILIZANDO MATERIAL COMPACTADO DE BANCO, EN LA CAPA SUBASE COMPACTADA AL 100%, INCLUYE ACARREOS, P.U.O.T.G
REPORTE FOTOGRAFICO
086-C.02b) CONSTRUCCIÓN DE TERRAPLENES UTILIZANDO MATERIAL COMPACTADO DE BANCO, EN LA CAPA SUBASE COMPACTADA AL 100%, INCLUYE ACARREOS, P.U.O.T.G
REPORTE FOTOGRAFICO
00 BASE HIDRAULICA CON MATERIALES PÉTREOS PROCEDENTES DE BANCOS QUE ELIJA EL CONTRATISTA, INCLUYENDO ACARREO, COMPACTADO AL 100%, P.U.O.T.
REPORTE FOTOGRAFICO
00 BASE HIDRAULICA CON MATERIALES PÉTREOS PROCEDENTES DE BANCOS QUE ELIJA EL CONTRATISTA, INCLUYENDO ACARREO, COMPACTADO AL 100%, P.U.O.T.
REPORTE FOTOGRAFICO
00 BASE HIDRAULICA CON MATERIALES PÉTREOS PROCEDENTES DE BANCOS QUE ELIJA EL CONTRATISTA, INCLUYENDO ACARREO, COMPACTADO AL 100%, P.U.O.T.