Documentos de Académico
Documentos de Profesional
Documentos de Cultura
60
1.70
1.80
FIJAR EL TANQUE CON
CINCHOS METALICOS
0.10
3
TUBO DE SALIDA
" TUB0
HG Ø 1" 1 4"
1 HG Ø 2 1/2"
Ø
HG
1.50
VER DETALLE
No. 4
TUB0
HG Ø 2 1/2"
2
TUBO
HG Ø 2 1/2" COLUMNA
TUBO HG 2 1 2"
COLUMNA
1.61
TUBO HG 2 1 2" 1 4"
"
4.84
1
Ø
HG
LOSA CONCRETO ARMADO
CONCRETO FC´= 200 KG/CM2
VIGA DE TAPADERA T= .08m. MALLA ELECTROMALLA
REF ELECTROMALLA 6X6 10/10
CIMENTACION
6X6 10/10
0.30
NIVEL DE SUELO
INGRESO
PVC 3/4
COLUMNA DE
0.20X0.20
CISTERNA ROTOPLAS
REF. 4 No. 4 EST. No.
1.18
CAP. 2800 LTS 3 @ 0.15
COLUMNA DE
2.20
0.20X0.20
REF. 4 No. 4 EST. No. BOMBA DE AGUA
RELLENO
3 @ 0.15
0.25
ZAPATA DE ZAPATA DE
1.00x1.00x0.25 1.00x1.00x0.25
1.00 1.00
BASE DE CONCRETO
REF. ELECTROMALLA 6/6 10-10