Está en la página 1de 6

Id Nombre de tarea Duración Comienzo Fin 06 feb '23 13 feb '23 20 feb '23 27 feb '23 06 mar '23

06 feb '23 13 feb '23 20 feb '23 27 feb '23 06 mar '23 13 mar '23 20 mar '23 27 mar '23 03 abr '23 10 abr '23 17 abr '23 24 abr '23 01 may '23 08 may '23 15 may '23 22 may '23 29 may '23 05 jun '23 12 jun '23 19 jun '23 26 jun '23 03 jul '23
X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L
1 ELABORACIÓN DEL EXPEDIENTE TÉCNICO  150 días vie 03/02/23 dom 
DENOMINADO: “MEJORAMIENTO DEL  02/07/23
SERVICIO DE EDUCACIÓN DE LA I.E. N°30187 
HIPÓLITO UNANUE DE NIVEL PRIMARIA DEL 
CENTRO POBLADO DE CEDRO DEL DISTRITO DE 
ANCO‐PROVINCIA DE 
CHURCAMPA‐DEPARTAMENTO DE 
HUANCAVELICA” 
2 OBRAS PROVISIONALES, TRABAJOS 150 días jue  sáb 
PRELIMINARES, SEGURIDAD Y SALUD
02/02/23 01/07/23
3 OBRAS PROVISIONALES 2 días jue 02/02/23 vie 03/02/23
4 CONSTRUCCIONES PROVISIONALES 1 día vie 03/02/23 vie 03/02/23
5 ALMACÉN, OFICINA Y GUARDIANÍA 1 día vie 03/02/23 vie 03/02/23
6 INSTALACIONES PROVISIONALES 1 día jue 02/02/23 jue 02/02/23
7 ENERGIA ELECTRICA PROVISIONAL PARA 1 día jue 02/02/23 jue 02/02/23
LA CONSTRUCCION

8 TRABAJOS PRELIMINARES 5 días jue 02/02/23 lun 06/02/23


9 TRAZO NIVEL Y REPLANTEO 1 día jue 02/02/23 jue 02/02/23
10 FLETE TERRESTRE 5 días jue 02/02/23 lun 06/02/23
11 FLETE TERRESTRE PARA TRANSPORTE DE 5 días jue 02/02/23 lun 06/02/23
MATERIALES

12 ESTRUCTURAS 35 días vie 03/02/23 jue 09/03/23


13 OBRAS EXTERIORES 27 días vie 03/02/23 mié 01/03/23
14 EXCAVACIONES 5 días vie 03/02/23 mar 07/02/23
15 EXCAVACIÓN DE VEREDA PERIMETRAL DE 3 días vie 03/02/23 dom 
CEMENTO SEMIPULIDO Y BRUÑADO
05/02/23
16 EXCAVACIÓN DE VEREDA ESTAMPADO 4 días vie 03/02/23 lun 06/02/23
ADOQUINADO

17 EXCAVACIÓN DE SARDINEL 3 días vie 03/02/23 dom 05/02/2


18 EXCAVACIÓN DE CANAL PLUVIAL 5 días vie 03/02/23 mar 07/02/23
19 EXCAVACIÓN DE DADOS DE JUEGOS 1 día lun 06/02/23 lun 06/02/23
INFANTILES

20 RELLENOS 1 día jue 09/02/23 jue 09/02/23


21 COLOCACION DE CANTO RODADO 1 día jue 09/02/23 jue 09/02/23
22 OBRAS DE CONCRETO SIMPLE 11 días mié 08/02/23sáb 18/02/23
23 CIMIENTOS CORRIDOS 3 días mié 08/02/23vie 10/02/23
24 CIMIENTOS CORRIDOS 1:10 + 30 % P.G 3 días mié 08/02/23vie 10/02/23
25 SOBRECIMIENTOS 11 días mié 08/02/23sáb 18/02/23
26 CONCRETO 1:8 + 25% PM. 8 días sáb  sáb 
SOBRECIMIENTOS
11/02/23 18/02/23
27 VEREDA PERIMETRAL DE CEMENTO 5 días mié  dom 
SEMIPULIDO
08/02/23 12/02/23
28 CONCRETO F'C=175kg/cm2 PARA 5 días mié  dom 
VEREDA PERIMETRAL DE CEMENTO
SEMIPULIDO 08/02/23 12/02/23

29 ENCOFRADO Y DESENCOFRADO 2 días mié  jue 09/02/23


PARA VEREDA PERIMETRAL DE
CEMENTO SEMIPULIDO 08/02/23

30 VEREDA ESTAMPADO ADOQUINADO 4 días mié 08/02/23sáb 11/02/23


31 CONCRETO F'C=175kg/cm2 PARA 4 días mié  sáb 
VEREDA ESTAMPADO ADOQUINADO
08/02/23 11/02/23
32 ENCOFRADO Y DESENCOFRADO PARA 2 días mié  jue 09/02/23
VEREDA ESTAMPADO ADOQUINADO
08/02/23
33 RAMPAS 2 días mié 08/02/23jue 09/02/23
34 CONCRETO f'c=175 kg/cm2 PARA RAMPAS 2 días mié  jue 09/02/23
08/02/23
35 ENCOFRADO Y DESENCOFRADO DE 2 días mié  jue 09/02/23
RAMPAS
08/02/23
36 ESCALERAS 2 días mié 08/02/23jue 09/02/23
37 CONCRETO f'c=175 kg/cm2 PARA 2 días mié  jue 09/02/23
ESCALERAS
08/02/23
38 ENCOFRADO Y DESENCOFRADO PARA 2 días mié  jue 09/02/23
ESCALERAS
08/02/23
39 SARDINEL 3 días mié 08/02/23vie 10/02/23
40 CONCRETO f'c=175 kg/cm2 PARA 3 días mié  vie 10/02/23
SARDINEL
08/02/23
41 ENCOFRADO Y DESENCOFRADO PARA 2 días mié  jue 09/02/23
SARDINEL
08/02/23
42 CANAL PLUVIAL 5 días mié 08/02/23dom 12/02/2
43 CONCRETO f'c=175 kg/cm2 PARA CANAL 5 días mié  dom 
PLUVIAL
08/02/23 12/02/23
44 ENCOFRADO Y DESENCOFRADO PARA 2 días mié  jue 09/02/23
CANAL PLUVIAL
08/02/23
45 LOSA DEPORTIVA 8 días mié 08/02/23mié 15/02/23
46 CONCRETO f'c =175 kg/cm2 PARA LOSA 8 días mié  mié 
DEPORTIVA
08/02/23 15/02/23
47 ENCOFRADO Y DESENCOFRADO PARA 4 días mié  sáb 
LOSA DEPORTIVA
08/02/23 11/02/23
48 DADO DE JUEGOS INFANTILES 1 día mié 08/02/23mié 08/02/23
49 CONCRETO f'c =175 kg/cm2 PARA DADO 1 día mié  mié 
DE JUEGOS INFANTILES
08/02/23 08/02/23
50 DADO DE ASTA DE BANDERA 2 días mié 08/02/23jue 09/02/23
51 CONCRETO f'c=175 kg/cm2 PARA DADO 1 día mié  mié 
DE ASTA DE BANDERA
08/02/23 08/02/23
52 ENCOFRADO Y DESENCOFRADO PARA 2 días mié  jue 09/02/23
DADO DE ASTA DE BANDERA
08/02/23
53 OBRAS DE CONCRETO ARMADO 16 días mié 08/02/23jue 23/02/23
54 SOBRECIMIENTO ARMADO 15 días mié 08/02/23mié 22/02/23
55 CONCRETO f'c=175 kg/cm2 PARA 15 días mié  mié 
SOBRECIMIENTO ARMADO
08/02/23 22/02/23
56 ENCOFRADO Y DESENCOFRADO PARA 6 días mié  lun 13/02/23
SOBRECIMIENTO ARMADO
08/02/23
57 ACERO GRADO 60 PARA 4 días mié  sáb 
SOBRECIMIENTO ARMADO
08/02/23 11/02/23
58 MURO ARMADO 6 días mié 08/02/23lun 13/02/23
59 CONCRETO f'c=175 kg/cm2 PARA MURO 6 días mié  lun 13/02/23
ARMADO
08/02/23
60 ENCOFRADO Y DESENCOFRADO PARA 4 días mié  sáb 
MURO ARMADO
08/02/23 11/02/23
61 ACERO GRADO 60 PARA MURO ARMADO 1 día mié  mié 
08/02/23 08/02/23
62 COLUMNAS 16 días mié 08/02/23jue 23/02/23
63 CONCRETO PARA COLUMNAS f'c=210 10 días mar  jue 23/02/23
kg/cm2
14/02/23
64 ENCOFRADO Y DESENCOFRADO DE 4 días mar  vie 17/02/23
COLUMNA
14/02/23
65 ACERO GRADO 60 EN COLUMNA 2 días mié 08/02/23jue 09/02/23
66 VARIOS 6 días vie 24/02/23 mié 01/03/23
67 JUNTAS CON TECNOPOR DE 1" 6 días vie 24/02/23 mié 01/03/23
68 JUNTAS DE DILATACIÓN DE 1" BREA 1 día vie 24/02/23 vie 24/02/23
69 MODULO A - ADMINISTRACIÓN 19 días vie 03/02/23 mar 21/02/23
70 OBRAS DE CONCRETO SIMPLE 17 días vie 03/02/23 dom 19/02/2
71 FALSO PISO 1 día vie 03/02/23 vie 03/02/23
72 FALSO PISO DE 4" DE CONCRETO 1:8 1 día vie 03/02/23 vie 03/02/23
73 CUNETAS DE DRENAJE PLUVIAL 1 día dom 19/02/2dom 19/02/2
74 CONCRETO f'c=175 kg/cm2 PARA CANAL 1 día dom  dom 
PLUVIAL
19/02/23 19/02/23
75 OBRAS DE CONCRETO ARMADO 16 días vie 03/02/23 sáb 18/02/23
76 COLUMNAS 5 días vie 03/02/23 mar 07/02/23
77 CONCRETO PARA COLUMNAS f'c=210 2 días lun 06/02/23 mar 
kg/cm2
07/02/23
78 ENCOFRADO Y DESENCOFRADO DE 3 días vie 03/02/23 dom 
COLUMNA
05/02/23
79 COLUMNETAS DE CONFINAMIENTO 4 días vie 03/02/23 lun 06/02/23
80 CONCRETO PARA COLUMNETAS f'c=175 2 días dom  lun 06/02/23
kg/cm2
05/02/23
81 ENCOFRADO Y DESENCOFRADO DE 2 días vie 03/02/23 sáb 
COLUMNETAS
04/02/23
82 VIGAS 8 días mié 08/02/23mié 15/02/23
83 CONCRETO PARA VIGAS f'c=210 kg/cm2 1 día mié  mié 
15/02/23 15/02/23
84 ENCOFRADO Y DESENCOFRADO DE 4 días mié  sáb 
VIGAS
08/02/23 11/02/23
85 ACERO GRADO 60 EN VIGAS 3 días dom 12/02/2 mar 14/02/23
86 VIGUETAS DE CONFINAMIENTO 6 días vie 03/02/23 mié 08/02/23
87 CONCRETO EN VIGUETAS DE 2 días mar  mié 
COFINAMIENTO f'c=175 kg/cm2
07/02/23 08/02/23
88 ENCOFRADO Y DESENCOFRADO DE 2 días dom  lun 06/02/23
VIGUETAS DE CONFINAMIENTO
05/02/23
89 ACERO GRADO 60 EN VIGUETAS DE 2 días vie 03/02/23 sáb 
COFINAMIENTO
04/02/23
90 LOSAS ALIGERADAS 11 días mié 08/02/23sáb 18/02/23
91 CONCRETO PARA LOSAS ALIGERADAS 1 día sáb  sáb 
f'c=210 kg/cm2
18/02/23 18/02/23
92 ENCOFRADO Y DESENCOFRADO DE 4 días mié  sáb 
LOSA ALIGERADA
08/02/23 11/02/23
93 ACERO GRADO 60 EN LOSA ALIGERADA 5 días dom  jue 16/02/23
12/02/23
94 LADRILLO PARA TECHO DE h=0.15m 1 día vie 17/02/23 vie 17/02/23
95 VARIOS 1 día mar 21/02/23mar 21/02/23
96 JUNTAS CON TECNOPOR DE 1" 1 día mar 21/02/23mar 21/02/23
97 MODULO B - SALA DE USOS MULTIPLES 20 días vie 03/02/23 mié 22/02/23
98 MOVIMIENTO DE TIERRAS 2 días vie 03/02/23 sáb 04/02/23
99 NIVELACION DE TERRENO 2 días vie 03/02/23 sáb 04/02/23
100 NIVELACION INTERIOR Y COMPACTADO 2 días vie 03/02/23 sáb 
PARA FALSO PISO
04/02/23
101 OBRAS DE CONCRETO SIMPLE 14 días dom 05/02/2sáb 18/02/23
102 FALSO PISO 1 día dom 05/02/2dom 05/02/2
103 FALSO PISO DE 4" DE CONCRETO 1:8 1 día dom 05/02/2 dom 05/02/2
104 CUNETAS DE DRENAJE PLUVIAL 1 día sáb 18/02/23sáb 18/02/23
105 CONCRETO f'c=175 kg/cm2 PARA CANAL 1 día sáb  sáb 
PLUVIAL
18/02/23 18/02/23
106 OBRAS DE CONCRETO ARMADO 20 días vie 03/02/23 mié 22/02/23
107 COLUMNAS 4 días vie 03/02/23 lun 06/02/23
108 CONCRETO PARA COLUMNAS f'c=210 2 días dom  lun 06/02/23
kg/cm2
05/02/23
109 ENCOFRADO Y DESENCOFRADO DE 2 días vie 03/02/23 sáb 
COLUMNA
04/02/23
110 COLUMNETAS DE CONFINAMIENTO 4 días vie 03/02/23 lun 06/02/23
111 CONCRETO PARA COLUMNETAS f'c=175 2 días dom  lun 06/02/23
kg/cm2
05/02/23
112 ENCOFRADO Y DESENCOFRADO DE 2 días vie 03/02/23 sáb 
COLUMNETAS
04/02/23
113 VIGAS 7 días mar 07/02/23lun 13/02/23
114 CONCRETO PARA VIGAS f'c=210 kg/cm2 1 día lun 13/02/23 lun 13/02/23

115 ENCOFRADO Y DESENCOFRADO DE 3 días mar  jue 09/02/23


VIGAS
07/02/23
116 ACERO GRADO 60 EN VIGAS 3 días vie 10/02/23 dom 12/02/2
117 VIGUETAS DE CONFINAMIENTO 3 días lun 20/02/23mié 22/02/23
118 CONCRETO EN VIGUETAS DE 1 día mié  mié 
COFINAMIENTO f'c=175 kg/cm2
22/02/23 22/02/23
119 ENCOFRADO Y DESENCOFRADO DE 1 día mar  mar 
VIGUETAS DE CONFINAMIENTO
21/02/23 21/02/23
120 ACERO GRADO 60 EN VIGUETAS DE 1 día lun 20/02/23 lun 20/02/23
COFINAMIENTO

121 LOSA MACIZA 3 días sáb 18/02/23lun 20/02/23


122 CONCRETO EN LOSAS MACIZAS f'c=210 1 día lun 20/02/23 lun 20/02/23
kg/cm2

123 ENCOFRADO Y DESENCOFRADO DE 1 día dom  dom 


LOSA MACIZA
19/02/23 19/02/23
124 ACERO GRADO 60 EN LOSA MACIZA 1 día sáb 18/02/23sáb 18/02/23
125 LOSAS ALIGERADAS 11 días mar 07/02/23vie 17/02/23
126 CONCRETO PARA LOSAS ALIGERADAS 1 día vie 17/02/23 vie 17/02/23
f'c=210 kg/cm2

127 ENCOFRADO Y DESENCOFRADO DE 5 días mar  sáb 


LOSA ALIGERADA
07/02/23 11/02/23
128 ACERO GRADO 60 EN LOSA ALIGERADA 4 días dom  mié 
12/02/23 15/02/23
129 LADRILLO PARA TECHO DE h=0.15m 1 día jue 16/02/23 jue 16/02/23
130 VARIOS 1 día vie 03/02/23 vie 03/02/23
131 JUNTAS CON TECNOPOR DE 1" 1 día vie 03/02/23 vie 03/02/23
132 MODULO C - DORMITORIOS 21 días vie 03/02/23 jue 23/02/23
133 MOVIMIENTO DE TIERRAS 1 día vie 03/02/23 vie 03/02/23
134 NIVELACION DE TERRENO 1 día vie 03/02/23 vie 03/02/23
135 NIVELACION INTERIOR Y COMPACTADO 1 día vie 03/02/23 vie 03/02/23
PARA FALSO PISO

136 OBRAS DE CONCRETO SIMPLE 15 días sáb 04/02/23sáb 18/02/23


137 FALSO PISO 1 día sáb 04/02/23sáb 04/02/23
138 FALSO PISO DE 4" DE CONCRETO 1:8 1 día sáb 04/02/23sáb 04/02/23
139 CUNETAS DE DRENAJE PLUVIAL 2 días vie 17/02/23 sáb 18/02/23
140 CONCRETO f'c=175 kg/cm2 PARA CANAL 2 días vie 17/02/23 sáb 
PLUVIAL
18/02/23
141 OBRAS DE CONCRETO ARMADO 21 días vie 03/02/23 jue 23/02/23
142 COLUMNAS 4 días vie 03/02/23 lun 06/02/23
143 CONCRETO PARA COLUMNAS f'c=210 2 días dom  lun 06/02/23
kg/cm2
05/02/23
144 ENCOFRADO Y DESENCOFRADO DE 2 días vie 03/02/23 sáb 
COLUMNA
04/02/23
145 COLUMNETAS DE CONFINAMIENTO 2 días vie 03/02/23 sáb 04/02/23
146 CONCRETO PARA COLUMNETAS f'c=175 2 días vie 03/02/23 sáb 
kg/cm2
04/02/23
147 ENCOFRADO Y DESENCOFRADO DE 1 día vie 03/02/23 vie 03/02/23
COLUMNETAS

148 VIGAS 6 días mar 07/02/23dom 12/02/2


149 CONCRETO PARA VIGAS f'c=210 kg/cm2 1 día dom  dom 
12/02/23 12/02/23
150 ENCOFRADO Y DESENCOFRADO DE 3 días mar  jue 09/02/23
VIGAS
07/02/23
151 ACERO GRADO 60 EN VIGAS 2 días vie 10/02/23 sáb 11/02/23
152 VIGUETAS DE CONFINAMIENTO 5 días dom 19/02/2jue 23/02/23
153 CONCRETO EN VIGUETAS DE 2 días mié  jue 23/02/23
COFINAMIENTO f'c=175 kg/cm2
22/02/23
154 ENCOFRADO Y DESENCOFRADO DE 1 día mar  mar 
VIGUETAS DE CONFINAMIENTO
21/02/23 21/02/23
155 ACERO GRADO 60 EN VIGUETAS DE 2 días dom  lun 20/02/23
COFINAMIENTO
19/02/23
156 LOSA MACIZA 3 días vie 17/02/23 dom 19/02/2
157 CONCRETO EN LOSAS MACIZAS f'c=210 1 día dom  dom 
kg/cm2
19/02/23 19/02/23
158 ENCOFRADO Y DESENCOFRADO DE 1 día sáb  sáb 
LOSA MACIZA
18/02/23 18/02/23
159 ACERO GRADO 60 EN LOSA MACIZA 1 día vie 17/02/23 vie 17/02/23
160 LOSAS ALIGERADAS 10 días mar 07/02/23jue 16/02/23
161 CONCRETO PARA LOSAS ALIGERADAS 1 día jue 16/02/23 jue 16/02/23
f'c=210 kg/cm2

162 ENCOFRADO Y DESENCOFRADO DE 5 días mar  sáb 


LOSA ALIGERADA
07/02/23 11/02/23
163 ACERO GRADO 60 EN LOSA ALIGERADA 3 días dom  mar 
12/02/23 14/02/23
164 LADRILLO PARA TECHO DE h=0.15m 1 día mié 15/02/23mié 15/02/23
165 VARIOS 1 día mié 22/02/23mié 22/02/23
166 JUNTAS CON TECNOPOR DE 1" 1 día mié 22/02/23mié 22/02/23
167 MODULO D - BIBLIOTECA 21 días vie 03/02/23 jue 23/02/23
168 MOVIMIENTO DE TIERRAS 1 día vie 03/02/23 vie 03/02/23
169 NIVELACION DE TERRENO 1 día vie 03/02/23 vie 03/02/23
170 NIVELACION INTERIOR Y COMPACTADO 1 día vie 03/02/23 vie 03/02/23
PARA FALSO PISO

171 OBRAS DE CONCRETO SIMPLE 15 días sáb 04/02/23sáb 18/02/23


172 FALSO PISO 1 día sáb 04/02/23sáb 04/02/23
173 FALSO PISO DE 4" DE CONCRETO 1:8 1 día sáb 04/02/23sáb 04/02/23
174 CUNETAS DE DRENAJE PLUVIAL 1 día sáb 18/02/23sáb 18/02/23
175 CONCRETO f'c=175 kg/cm2 PARA CANAL 1 día sáb  sáb 
PLUVIAL
18/02/23 18/02/23
176 OBRAS DE CONCRETO ARMADO 21 días vie 03/02/23 jue 23/02/23
177 COLUMNAS 5 días vie 03/02/23 mar 07/02/23
178 CONCRETO PARA COLUMNAS f'c=210 2 días lun 06/02/23 mar 
kg/cm2
07/02/23
179 ENCOFRADO Y DESENCOFRADO DE 3 días vie 03/02/23 dom 
COLUMNA
05/02/23
180 COLUMNETAS DE CONFINAMIENTO 3 días vie 03/02/23 dom 05/02/2
181 CONCRETO PARA COLUMNETAS f'c=175 2 días sáb  dom 
kg/cm2
04/02/23 05/02/23
182 ENCOFRADO Y DESENCOFRADO DE 1 día vie 03/02/23 vie 03/02/23
COLUMNETAS

183 VIGAS 4 días mié 08/02/23sáb 11/02/23


184 CONCRETO PARA VIGAS f'c=210 kg/cm2 1 día sáb  sáb 
11/02/23 11/02/23
185 ENCOFRADO Y DESENCOFRADO DE 3 días mié  vie 10/02/23
VIGAS
08/02/23
186 ACERO GRADO 60 EN VIGAS 1 día sáb 11/02/23sáb 11/02/23
187 VIGUETAS DE CONFINAMIENTO 4 días lun 20/02/23jue 23/02/23
188 CONCRETO EN VIGUETAS DE 2 días mié  jue 23/02/23
COFINAMIENTO f'c=175 kg/cm2
22/02/23
189 ENCOFRADO Y DESENCOFRADO DE 1 día mar  mar 
VIGUETAS DE CONFINAMIENTO
21/02/23 21/02/23

Proyecto: CEDRO1 Tarea División Hito Resumen Resumen del proyecto Tarea inactiva Hito inactivo Resumen inactivo Tarea manual solo duración Informe de resumen manual Resumen manual solo el comienzo solo fin Tareas externas Hito externo Fecha límite Progreso Progreso manual
Fecha: mar 21/02/23

Página 1
Id Nombre de tarea Duración Comienzo Fin 06 feb '23 13 feb '23 20 feb '23 27 feb '23 06 mar '23 13 mar '23 20 mar '23 27 mar '23 03 abr '23 10 abr '23 17 abr '23 24 abr '23 01 may '23 08 may '23 15 may '23 22 may '23 29 may '23 05 jun '23 12 jun '23 19 jun '23 26 jun '23 03 jul '23
X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L
190 ACERO GRADO 60 EN VIGUETAS DE 1 día lun 20/02/23 lun 20/02/23
COFINAMIENTO

191 LOSA MACIZA 3 días sáb 18/02/23lun 20/02/23


192 CONCRETO EN LOSAS MACIZAS f'c=210 1 día lun 20/02/23 lun 20/02/23
kg/cm2

193 ENCOFRADO Y DESENCOFRADO DE 1 día dom  dom 


LOSA MACIZA
19/02/23 19/02/23
194 ACERO GRADO 60 EN LOSA MACIZA 1 día sáb 18/02/23sáb 18/02/23
195 LOSAS ALIGERADAS 10 días mié 08/02/23vie 17/02/23
196 CONCRETO PARA LOSAS ALIGERADAS 1 día vie 17/02/23 vie 17/02/23
f'c=210 kg/cm2

197 ENCOFRADO Y DESENCOFRADO DE 5 días mié  dom 


LOSA ALIGERADA
08/02/23 12/02/23
198 ACERO GRADO 60 EN LOSA ALIGERADA 3 días lun 13/02/23 mié 
15/02/23
199 LADRILLO PARA TECHO DE h=0.15m 1 día jue 16/02/23 jue 16/02/23
200 VARIOS 1 día lun 20/02/23lun 20/02/23
201 JUNTAS CON TECNOPOR DE 1" 1 día lun 20/02/23 lun 20/02/23
202 MODULO E - AULA DE INNOVACIÓN 23 días sáb 04/02/23dom 26/02/2
203 MOVIMIENTO DE TIERRAS 1 día sáb 04/02/23sáb 04/02/23
204 NIVELACION DE TERRENO 1 día sáb 04/02/23sáb 04/02/23
205 NIVELACION INTERIOR Y COMPACTADO 1 día sáb  sáb 
PARA FALSO PISO
04/02/23 04/02/23
206 OBRAS DE CONCRETO ARMADO 23 días sáb 04/02/23dom 26/02/2
207 COLUMNAS 5 días sáb 04/02/23mié 08/02/23
208 CONCRETO PARA COLUMNAS f'c=210 2 días mar  mié 
kg/cm2
07/02/23 08/02/23
209 ENCOFRADO Y DESENCOFRADO DE 3 días sáb  lun 06/02/23
COLUMNA
04/02/23
210 COLUMNETAS DE CONFINAMIENTO 4 días sáb 04/02/23mar 07/02/23
211 CONCRETO PARA COLUMNETAS f'c=175 2 días lun 06/02/23 mar 
kg/cm2
07/02/23
212 ENCOFRADO Y DESENCOFRADO DE 2 días sáb  dom 
COLUMNETAS
04/02/23 05/02/23
213 VIGAS 8 días jue 09/02/23 jue 16/02/23
214 CONCRETO PARA VIGAS f'c=210 kg/cm2 1 día jue 16/02/23 jue 16/02/23

215 ENCOFRADO Y DESENCOFRADO DE 4 días jue 09/02/23 dom 


VIGAS
12/02/23
216 ACERO GRADO 60 EN VIGAS 3 días lun 13/02/23 mié 15/02/23
217 VIGUETAS DE CONFINAMIENTO 5 días mié 22/02/23dom 26/02/2
218 CONCRETO EN VIGUETAS DE 2 días sáb  dom 
COFINAMIENTO f'c=175 kg/cm2
25/02/23 26/02/23
219 ENCOFRADO Y DESENCOFRADO DE 2 días jue 23/02/23 vie 24/02/23
VIGUETAS DE CONFINAMIENTO

220 ACERO GRADO 60 EN VIGUETAS DE 1 día mié  mié 


COFINAMIENTO
22/02/23 22/02/23
221 LOSAS ALIGERADAS 11 días jue 09/02/23 dom 19/02/2
222 CONCRETO PARA LOSAS ALIGERADAS 1 día dom  dom 
f'c=210 kg/cm2
19/02/23 19/02/23
223 ENCOFRADO Y DESENCOFRADO DE 5 días jue 09/02/23 lun 13/02/23
LOSA ALIGERADA

224 ACERO GRADO 60 EN LOSA ALIGERADA 4 días mar  vie 17/02/23


14/02/23
225 LADRILLO PARA TECHO DE h=0.15m 1 día sáb 18/02/23sáb 18/02/23
226 VARIOS 1 día sáb 04/02/23sáb 04/02/23
227 JUNTAS CON TECNOPOR DE 1" 1 día sáb 04/02/23sáb 04/02/23
228 MODULO G - AULAS 20 días sáb 04/02/23jue 23/02/23
229 MOVIMIENTO DE TIERRAS 1 día sáb 04/02/23sáb 04/02/23
230 NIVELACION DE TERRENO 1 día sáb 04/02/23sáb 04/02/23
231 NIVELACION INTERIOR Y COMPACTADO 1 día sáb  sáb 
PARA FALSO PISO
04/02/23 04/02/23
232 OBRAS DE CONCRETO SIMPLE 11 días dom 05/02/2mié 15/02/23
233 FALSO PISO 1 día dom 05/02/2dom 05/02/2
234 FALSO PISO DE 4" DE CONCRETO 1:8 1 día dom 05/02/2 dom 05/02/2
235 CUNETAS DE DRENAJE PLUVIAL 1 día mié 15/02/23mié 15/02/23
236 CONCRETO f'c=175 kg/cm2 PARA CANAL 1 día mié  mié 
PLUVIAL
15/02/23 15/02/23
237 OBRAS DE CONCRETO ARMADO 20 días sáb 04/02/23jue 23/02/23
238 COLUMNAS 4 días sáb 04/02/23mar 07/02/23
239 CONCRETO PARA COLUMNAS f'c=210 2 días lun 06/02/23 mar 
kg/cm2
07/02/23
240 ENCOFRADO Y DESENCOFRADO DE 2 días sáb  dom 
COLUMNA
04/02/23 05/02/23
241 COLUMNETAS DE CONFINAMIENTO 2 días mié 22/02/23jue 23/02/23
242 CONCRETO PARA COLUMNETAS f'c=175 1 día jue 23/02/23 jue 23/02/23
kg/cm2

243 ENCOFRADO Y DESENCOFRADO DE 1 día mié  mié 


COLUMNETAS
22/02/23 22/02/23
244 VIGAS 7 días mié 08/02/23mar 14/02/23
245 CONCRETO PARA VIGAS f'c=210 kg/cm2 1 día mar  mar 
14/02/23 14/02/23
246 ENCOFRADO Y DESENCOFRADO DE 4 días mié  sáb 
VIGAS
08/02/23 11/02/23
247 ACERO GRADO 60 EN VIGAS 3 días dom 12/02/2 mar 14/02/23
248 VIGUETAS DE CONFINAMIENTO 9 días mié 15/02/23jue 23/02/23
249 CONCRETO EN VIGUETAS DE 1 día jue 23/02/23 jue 23/02/23
COFINAMIENTO f'c=175 kg/cm2

250 ENCOFRADO Y DESENCOFRADO DE 1 día mié  mié 


VIGUETAS DE CONFINAMIENTO
22/02/23 22/02/23
251 ACERO GRADO 60 EN VIGUETAS DE 1 día mié  mié 
COFINAMIENTO
15/02/23 15/02/23
252 LOSAS ALIGERADAS 8 días mié 08/02/23mié 15/02/23
253 CONCRETO PARA LOSAS ALIGERADAS 1 día mar  mar 
f'c=210 kg/cm2
14/02/23 14/02/23
254 ENCOFRADO Y DESENCOFRADO DE 5 días mié  dom 
LOSA ALIGERADA
08/02/23 12/02/23
255 ACERO GRADO 60 EN LOSA ALIGERADA 3 días lun 13/02/23 mié 
15/02/23
256 LADRILLO PARA TECHO DE h=0.15m 1 día lun 13/02/23 lun 13/02/23
257 MODULO H - INGRESO 14 días vie 24/02/23 jue 09/03/23
258 OBRAS DE CONCRETO SIMPLE 7 días vie 24/02/23 jue 02/03/23
259 CIMIENTOS CORRIDOS 1 día vie 24/02/23 vie 24/02/23
260 CIMIENTOS CORRIDOS 1:10 + 30 % P.G 1 día vie 24/02/23 vie 24/02/23
f'c=140 kg/cm2

261 SOLADO 1 día vie 24/02/23 vie 24/02/23


262 SOLADO DE CONCRETO C:H:1:12 E=4" 1 día vie 24/02/23 vie 24/02/23
PARA ZAPATAS

263 SOBRECIMIENTOS 4 días lun 27/02/23jue 02/03/23


264 CONCRETO f´c=140 kg/cm2 + 25% PM. 2 días mié  jue 02/03/23
SOBRECIMIENTOS
01/03/23
265 ENCOFRADO Y DESENCOFRADO DE 2 días lun 27/02/23 mar 
SOBRECIMIENTOS
28/02/23
266 OBRAS DE CONCRETO ARMADO 14 días vie 24/02/23 jue 09/03/23
267 ZAPATAS 2 días sáb 25/02/23dom 26/02/2
268 CONCRETO PARA ZAPATAS f'c=210 1 día dom  dom 
kg/cm2
26/02/23 26/02/23
269 ACERO GRADO 60 EN ZAPATAS 1 día sáb 25/02/23sáb 25/02/23
270 COLUMNAS 7 días vie 24/02/23 jue 02/03/23
271 CONCRETO PARA COLUMNAS f'c=210 2 días mié  jue 02/03/23
kg/cm2
01/03/23
272 ENCOFRADO Y DESENCOFRADO DE 2 días lun 27/02/23 mar 
COLUMNA
28/02/23
273 ACERO GRADO 60 EN COLUMNA 2 días vie 24/02/23 sáb 25/02/23
274 VIGAS 7 días vie 03/03/23 jue 09/03/23
275 CONCRETO PARA VIGAS f'c=210 kg/cm2 1 día jue 09/03/23 jue 09/03/23

276 ENCOFRADO Y DESENCOFRADO DE 4 días vie 03/03/23 lun 06/03/23


VIGAS

277 ACERO GRADO 60 EN VIGAS 2 días vie 03/03/23 sáb 04/03/23


278 LOSAS ALIGERADAS 7 días vie 03/03/23 jue 09/03/23
279 CONCRETO PARA LOSAS ALIGERADAS 1 día jue 09/03/23 jue 09/03/23
f'c=210 kg/cm2

280 ENCOFRADO Y DESENCOFRADO DE 5 días vie 03/03/23 mar 


LOSA ALIGERADA
07/03/23
281 ACERO GRADO 60 EN LOSA ALIGERADA 4 días vie 03/03/23 lun 06/03/23

282 LADRILLO PARA TECHO DE h=0.15m 1 día mié 08/03/23mié 08/03/23


283 MODULO I - TANQUE ELEVADO Y CISTERNA 10 días vie 24/02/23 dom 05/03/2
284 MOVIMIENTO DE TIERRAS 4 días vie 24/02/23 lun 27/02/23
285 EXCAVACIONES 1 día vie 24/02/23 vie 24/02/23
286 EXCAVACION MANUAL PARA CIMIENTOS 1 día vie 24/02/23 vie 24/02/23

287 RELLENOS 3 días sáb 25/02/23lun 27/02/23


288 RELLENO COMPACTADO CON MATERIAL 1 día sáb  sáb 
PROPIO
25/02/23 25/02/23
289 ACARREO INTERNO, MATERIAL 2 días sáb  dom 
PROCEDENTE DE EXCAVACIONES
25/02/23 26/02/23
290 ELIMINACION MATERIAL EXCEDENTE 1 día lun 27/02/23 lun 27/02/23
CON MAQUINARIA

291 OBRAS DE CONCRETO SIMPLE 2 días vie 24/02/23 sáb 25/02/23


292 SOLADO 2 días vie 24/02/23 sáb 25/02/23
293 SOLADO DE CONCRETO C:H:1:12 E=4 1 día vie 24/02/23 vie 24/02/23
PARA ZAPATAS

294 SOLADO DE CONCRETO C:H:1:12 E=4 1 día sáb  sáb 


PARA V.C.
25/02/23 25/02/23
295 OBRAS DE CONCRETO ARMADO 9 días sáb 25/02/23dom 05/03/2
296 ZAPATA 9 días sáb 25/02/23dom 05/03/2
297 CONCRETO EN MURO ARMADO f'c=210 2 días sáb  dom 
kg/cm2
04/03/23 05/03/23
298 ENCOFRADO Y DESENCOFRADO PARA 3 días mié  vie 03/03/23
MURO ARMADO
01/03/23
299 ACERO GRADO 60 PARA MURO ARMADO 1 día sáb  sáb 
25/02/23 25/02/23
300 COLUMNAS 4 días sáb 25/02/23mar 28/02/23
301 CONCRETO PARA COLUMNAS f'c=210 2 días lun 27/02/23 mar 
kg/cm2
28/02/23
302 ENCOFRADO Y DESENCOFRADO DE 2 días sáb  dom 
COLUMNA
25/02/23 26/02/23
303 ACERO GRADO 60 EN COLUMNA 1 día sáb 25/02/23sáb 25/02/23
304 VIGAS 8 días sáb 25/02/23sáb 04/03/23
305 CONCRETO PARA VIGAS f'c=210 kg/cm2 1 día sáb  sáb 
04/03/23 04/03/23
306 ENCOFRADO Y DESENCOFRADO DE 3 días mié  vie 03/03/23
VIGAS
01/03/23
307 ACERO GRADO 60 EN VIGAS 2 días sáb 25/02/23dom 26/02/2
308 LOSA MACIZA 3 días sáb 25/02/23lun 27/02/23
309 CONCRETO EN LOSAS MACIZA f'c=210 1 día lun 27/02/23 lun 27/02/23
kg/cm2

310 ENCOFRADO Y DESENCOFRADO DE 1 día dom  dom 


LOSA MACIZA
26/02/23 26/02/23
311 ACERO GRADO 60 EN LOSA MACIZA 1 día sáb 25/02/23sáb 25/02/23
312 ARQUITECTURA 63 días vie 03/02/23 jue 06/04/23
313 OBRAS EXTERIORES 61 días vie 03/02/23 mar 04/04/23
314 MUROS Y TABIQUERIA DE ALBAÑILERIA 3 días vie 03/02/23 dom 05/02/2
315 MURO DE LADRILLO TIPO IV 18 HUECOS DE 3 días vie 03/02/23 dom 
SOGA MEZ C:A 1:5
05/02/23
316 REVOQUES ENLUCIDOS Y MOLDURAS 10 días dom 19/02/2mar 28/02/23
317 TARRAJEO DE SUPERFICIE EN MUROS 2 días dom  lun 20/02/23
MEZCLA 1:5 E=1.5CM
19/02/23
318 TARRAJEO DE SUPERFICIE DE 1 día mar  mar 
SOBRECIMIENTO MEZCLA 1:5 E=1.5CM
21/02/23 21/02/23
319 TARRAJEO EN MUROS ARMADOS MEZCLA 3 días mié  vie 24/02/23
1:5 E=1.5CM
22/02/23
320 TARRAJEO EN COLUMNAS CON C:A - 1:5 2 días sáb  dom 
E=1.5 CM
25/02/23 26/02/23
321 TARRAJEO MEZCLA 1:5 E=1.5CM 1 día lun 27/02/23 lun 27/02/23
322 TARRAJEO EN CUNETA CON 1 día mar  mar 
IMPERMEABILIZANTE
28/02/23 28/02/23
323 PISOS Y PAVIMENTOS 5 días vie 03/02/23 mar 07/02/23
324 PISOS 5 días vie 03/02/23 mar 07/02/23
325 PISO DE CONCRETO ESTAMPADO 5 días vie 03/02/23 mar 
(SEGÚN DISEÑO)
07/02/23
326 PISO DE CEMENTO SEMIPULIDO Y 4 días vie 03/02/23 lun 06/02/23
BRUÑADO (SEGÚN DISEÑO)

327 PISO DE CEMENTO SIN PULIR 3 días vie 03/02/23 dom 


FROTACHADO
05/02/23
328 CARPINTERIA METALICA Y HERRERIA 17 días jue 16/02/23 sáb 04/03/23
329 CERCO METÁLICO + ARMADURA DE 10 días jue 23/02/23 sáb 
SUJECIÓN SEGÚN DISEÑO
04/03/23
330 PUERTA CON REJAS MISMO TRATAMIENTO 2 días jue 23/02/23 vie 24/02/23
DE CERCO METALICO + ARMADURA SEGÚN
DISEÑO

331 BARANDA METALICA SEGUN DISEÑO 5 días jue 23/02/23 lun 27/02/23


332 REJILLA METÁLICA (INCL. PINTURA SEGÚN 3 días jue 23/02/23 sáb 
DISEÑO)
25/02/23
333 ARCO DE FULBITO-BASQUET METALICO 1 día jue 16/02/23 jue 16/02/23
CUBIERTO POR MALLA OLIMPICA SEGÚN
DISEÑO

334 CERRAJERIA 2 días jue 16/02/23 vie 17/02/23


335 ASTA METALICA PARA BANDERA SEGÚN 2 días jue 16/02/23 vie 17/02/23
DISEÑO INC. ACCESORIOS DE FIJACION

336 TUBO Ø 2 1/2" SEP PARA EMBONE DE 1 día jue 16/02/23 jue 16/02/23


POSTES PARANTE DE VOLEY SEGÚN
DISEÑO

337 TAPA DE T=ROSCADA SEP 2"x1 1/2" 1 día jue 16/02/23 jue 16/02/23


338 ANCLAJE PARA POSTES DE VOLEY SEGÚN 1 día jue 16/02/23 jue 16/02/23
DISEÑO

339 PINTURA 8 días jue 23/02/23 jue 02/03/23


340 PINTURA LATEX LAVABLE DE PRIMERA 6 días jue 23/02/23 mar 
CALIDAD-RESISTENTE AL UV EN
SUPERFICIEDE MUROS 2 MANOS 28/02/23

341 PINTURA LATEX LAVABLE DE PRIMERA 3 días vie 24/02/23 dom 


CALIDAD-RESISTENTE AL UV EN
SOBRECIMIENTOS 2 MANOS 26/02/23

342 PINTURA LATEX LAVABLE DE PRIMERA 4 días lun 27/02/23 jue 02/03/23


CALIDAD-RESISTENTE AL UV EN MUROS
ARMADOS 2 MANOS

343 PINTURA LATEX LAVABLE DE PRIMERA 2 días mié  jue 02/03/23


CALIDAD - RESISTENTE AL UV EN
COLUMNAS 2 MANOS 01/03/23

344 PINTURA EN CARPINTERIA METALICA (2 M 2 días sáb  dom 


ANTICORROSIVO + 2 M ESMALTE)
25/02/23 26/02/23
345 VARIOS 58 días lun 06/02/23mar 04/04/23
346 ELEMENTOS MODULARES 1 día lun 06/02/23lun 06/02/23
347 MODULOS DE JUEGOS INFANTILES 1 día lun 06/02/23 lun 06/02/23
(INCL. INSTALACIÓN Y ACABADOS
SEGÚN DISEÑO)

348 MODULOS DE TACHOS DE BASURA 1 día lun 06/02/23 lun 06/02/23


(INCL. INSTALACIÓN Y ACABADOS
SEGÚN DISEÑO)

349 JARDINERIA 8 días jue 16/03/23 jue 23/03/23


350 PLANTAS 2 días jue 16/03/23 vie 17/03/23
351 TIERRA NEGRA 8 días jue 16/03/23 jue 23/03/23
352 SEMBRADO DE GRASS 20 días jue 16/03/23 mar 04/04/23
353 MODULO A - ADMINISTRACIÓN 15 días mié 22/02/23mié 08/03/23
354 MUROS Y TABIQUERIA DE ALBAÑILERIA 4 días mié 22/02/23sáb 25/02/23
355 MURO DE LADRILLO TIPO IV 18 HUECOS DE 2 días mié  jue 23/02/23
SOGA MEZ C:A 1:5
22/02/23
356 MURO DE LADRILLO TIPO IV 18 HUECOS DE 2 días vie 24/02/23 sáb 
CABEZA MEZ C:A 1:5
25/02/23
357 MURO DE LADRILLO TIPO IV DE 18 HUECOS 1 día vie 24/02/23 vie 24/02/23
DE CANTO MEZ C:A 1:5

358 MURO CON ESTRUCTURA METÁLICA 2 días vie 24/02/23 sáb 


E=90MM CON UNA PLACA DE
FIBROCEMENTO 8MM POR UNA CARA, CON 25/02/23
FIBRA DE VIDRIO, MACILLADO Y
ENCINTADO

359 REVOQUES ENLUCIDOS Y MOLDURAS 5 días dom 26/02/2jue 02/03/23


360 TARRAJEO PRIMARIO RAYADO CON 1 día dom  dom 
CEMENTO - ARENA
26/02/23 26/02/23
361 TARRAJEO EN MUROS INTERIORES CON 2 días mar  mié 
C:A - 1:5 E=1.5 CM
28/02/23 01/03/23
362 TARRAJEO EN MUROS EXTERIORES CON 2 días mar  mié 
C:A - 1:5 E=1.5 CM
28/02/23 01/03/23
363 TARRAJEO EN COLUMNAS CON C:A - 1:5 1 día jue 02/03/23 jue 02/03/23
E=1.5 CM

364 TARRAJEO EN VIGAS CON C:A - 1:5 E=1.5 1 día jue 02/03/23 jue 02/03/23
CM

365 VESTIDURA DE DERRAMES EN PUERTAS Y 1 día jue 02/03/23 jue 02/03/23


VENTANAS ANCHO 0.15 M MEZC. C:A E=1.50
CM

366 BRUÑAS DE 1" 1 día lun 27/02/23 lun 27/02/23


367 TARRAJEO CON IMPERMEABILIZANTES 1 día lun 27/02/23 lun 27/02/23
368 CIELORRASOS 10 días dom 26/02/2mar 07/03/23
369 CIELORRASOS CON MEZCLA C:A 1:5 CINTAS 1 día dom  dom 
E=1.5 CM
26/02/23 26/02/23

Proyecto: CEDRO1 Tarea División Hito Resumen Resumen del proyecto Tarea inactiva Hito inactivo Resumen inactivo Tarea manual solo duración Informe de resumen manual Resumen manual solo el comienzo solo fin Tareas externas Hito externo Fecha límite Progreso Progreso manual
Fecha: mar 21/02/23

Página 2
Id Nombre de tarea Duración Comienzo Fin 06 feb '23 13 feb '23 20 feb '23 27 feb '23 06 mar '23 13 mar '23 20 mar '23 27 mar '23 03 abr '23 10 abr '23 17 abr '23 24 abr '23 01 may '23 08 may '23 15 may '23 22 may '23 29 may '23 05 jun '23 12 jun '23 19 jun '23 26 jun '23 03 jul '23
X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L
370 FALSO CIELORASO SUSPENDIDO CON 2 días lun 06/03/23 mar 
BALDOSAS ACUSTICAS DE FIBRA MINERAL
07/03/23

371 PISOS Y PAVIMENTOS 3 días mar 28/02/23jue 02/03/23


372 CONTRAPISO 2 días mar 28/02/23mié 01/03/23
373 CONTRAPISO DE MORTERO C:A -1:4 DE 1 día mar  mar 
35MM
28/02/23 28/02/23
374 CONTRAPISO DE MORTERO C:A -1:4 DE 1 día mié  mié 
40MM
01/03/23 01/03/23
375 PISOS 1 día jue 02/03/23 jue 02/03/23
376 PISO DE CERAMICO DE 60x60 CM. ALTO 1 día jue 02/03/23 jue 02/03/23
TRANSITO ANTIDESLIZANTE

377 PISO VINILICO ALTO TRANSITO 5.5MM 1 día jue 02/03/23 jue 02/03/23


TEXTURA MADERA ROBLE

378 ZOCALOS Y CONTRAZOCALOS 2 días vie 03/03/23 sáb 04/03/23


379 ZOCALO DE CERAMICA DE 0.60 X 0.60 M 2 días vie 03/03/23 sáb 
H=1.10 M
04/03/23
380 CONTRAZOCALO DE CEMENTO PULIDO 1 día vie 03/03/23 vie 03/03/23
H=0.30 M

381 CONTRAZOCALO SANITARIO ACABADO 2 días vie 03/03/23 sáb 


GRANITO PULIDO H=0.10M SEGÚN DISEÑO
04/03/23
382 CONTRAZOCALO DE MADERA DE H=0.10 M 1 día vie 03/03/23 vie 03/03/23
SEGUN DISEÑO

383 COBERTURA 6 días mié 22/02/23lun 27/02/23


384 CORREAS DE MADERA TORNILLO 2"X2" 2 días mié 22/02/23jue 23/02/23
385 COBERTURA DE TEJA ANDINA TIPO 3 días vie 24/02/23 dom 
ETERNIT
26/02/23
386 CUMBRERA ARTICULADA TIPO TEJA 1 día lun 27/02/23 lun 27/02/23
ANDINA

387 CARPINTERIA DE MADERA 2 días lun 06/03/23mar 07/03/23


388 PUERTA CONTRAPLACADA MDF e=8mm 2 días lun 06/03/23 mar 
ACABADO EN BARNIZ INCOLORO SATINADO
07/03/23

389 PUERTA APANELADA e=1" ACABADO EN 2 días lun 06/03/23 mar 


BARNIZ INCOLORO SATINADO
07/03/23
390 CERRAJERIA 1 día lun 06/03/23lun 06/03/23
391 BISAGRA ALUMINIZADA PESADO DE 4"x4" 1 día lun 06/03/23 lun 06/03/23
392 CERRADURA DE BRONCE TIPO BOLA DE 4" 1 día lun 06/03/23 lun 06/03/23
PARA PUERTAS SEGÚN DISEÑO

393 CERRADURA TUBULAR DE PALANCA 1 día lun 06/03/23 lun 06/03/23


CROMADO

394 VIDRIOS, CRISTALES Y SIMILARES 3 días lun 06/03/23mié 08/03/23


395 DOBLE VIDRIO LAMINADO E=6MM 3 días lun 06/03/23 mié 08/03/23
396 ESPEJO BISELADO 6 MM EN PARED 1 día lun 06/03/23 lun 06/03/23
397 PINTURA 3 días vie 03/03/23 dom 05/03/2
398 PINTURA LATEX LAVABLE DE PRIMERA 3 días vie 03/03/23 dom 
CALIDAD-RESISTENTE AL UV EN MUROS
INTERIORES 2 MANOS 05/03/23

399 PINTURA LATEX LAVABLE DE PRIMERA 3 días vie 03/03/23 dom 


CALIDAD-RESISTENTE AL UV EN MUROS
EXTERIORES 2 MANOS 05/03/23

400 PINTURA LATEX LAVABLE DE PRIMERA 2 días vie 03/03/23 sáb 


CALIDAD - RESISTENTE AL UV EN
COLUMNAS 2 MANOS 04/03/23

401 PINTURA LATEX LAVABLE DE PRIMERA 2 días vie 03/03/23 sáb 


CALIDAD - RESISTENTE AL UV EN VIGAS 2
MANOS 04/03/23

402 PINTURA LATEX LAVABLE DE PRIMERA 1 día vie 03/03/23 vie 03/03/23


CALIDAD - RESISTENTE AL UV EN
DERRAMES 2 MANOS

403 PINTURA LATEX LAVABLE 2 MANOS EN 1 día vie 03/03/23 vie 03/03/23


BRUÑAS

404 PINTURA LATEX LAVABLE 2 MANOS EN 2 días vie 03/03/23 sáb 


CIELORASO
04/03/23
405 PINTURA BARNIZ SATINADO INCOLORO 2 1 día vie 03/03/23 vie 03/03/23
MANOS EN PUERTA DE MADERA

406 PINTURA ESMALTE SINTETICO EN 1 día vie 03/03/23 vie 03/03/23


CONTRAZOCALO DE CEMENTO 2 MANOS
H=30 cm

407 VARIOS 1 día lun 06/03/23lun 06/03/23


408 DOSIFICADOR DE JABON LIQUIDO 1 día lun 06/03/23 lun 06/03/23
409 PERFIL "T" DE ALUMNIO EN PISO 1 día lun 06/03/23 lun 06/03/23
410 MODULO B - SALA DE USOS MULTIPLES 27 días jue 23/02/23 mar 21/03/23
411 MUROS Y TABIQUERIA DE ALBAÑILERIA 6 días jue 23/02/23 mar 28/02/23
412 MURO DE LADRILLO TIPO IV 18 HUECOS DE 2 días jue 23/02/23 vie 24/02/23
SOGA MEZ C:A 1:5

413 MURO DE LADRILLO TIPO IV 18 HUECOS DE 3 días sáb  lun 27/02/23


CABEZA MEZ C:A 1:5
25/02/23
414 MURO DE LADRILLO TIPO IV DE 18 HUECOS 1 día mar  mar 
DE CANTO MEZ C:A 1:5
28/02/23 28/02/23
415 REVOQUES ENLUCIDOS Y MOLDURAS 9 días mié 01/03/23jue 09/03/23
416 TARRAJEO PRIMARIO RAYADO CON 1 día mié  mié 
CEMENTO - ARENA
01/03/23 01/03/23
417 TARRAJEO EN MUROS INTERIORES CON 3 días mié  vie 03/03/23
C:A - 1:5 E=1.5 CM
01/03/23
418 TARRAJEO EN MUROS EXTERIORES CON 3 días sáb  lun 06/03/23
C:A - 1:5 E=1.5 CM
04/03/23
419 TARRAJEO EN COLUMNAS CON C:A - 1:5 1 día mar  mar 
E=1.5 CM
07/03/23 07/03/23
420 TARRAJEO EN VIGAS CON C:A - 1:5 E=1.5 1 día mié  mié 
CM
08/03/23 08/03/23
421 VESTIDURA DE DERRAMES EN PUERTAS Y 1 día jue 09/03/23 jue 09/03/23
VENTANAS ANCHO 0.15 M MEZC. C:A E=1.50
CM

422 BRUÑAS DE 1" 1 día mié 01/03/23mié 01/03/23


423 TARRAJEO CON IMPERMEABILIZANTES 1 día mié 01/03/23mié 01/03/23
424 CIELORRASOS 5 días mié 08/03/23dom 12/03/2
425 CIELORRASOS CON MEZCLA C:A 1:5 CINTAS 2 días mié  jue 09/03/23
E=1.5 CM
08/03/23
426 FALSO CIELORASO SUSPENDIDO CON 3 días vie 10/03/23 dom 
BALDOSAS ACUSTICAS DE FIBRA MINERAL
12/03/23

427 PISOS Y PAVIMENTOS 9 días lun 13/03/23mar 21/03/23


428 CONTRAPISO 2 días lun 13/03/23mar 14/03/23
429 CONTRAPISO DE MORTERO C:A -1:4 DE 1 día lun 13/03/23 lun 13/03/23
35MM

430 CONTRAPISO DE MORTERO C:A -1:4 DE 1 día mar  mar 


40MM
14/03/23 14/03/23
431 PISOS 7 días mié 15/03/23mar 21/03/23
432 PISO DE CERAMICO DE 60x60 CM. ALTO 2 días mié  jue 16/03/23
TRANSITO ANTIDESLIZANTE
15/03/23
433 PISO DE PORCELANATO DE 60x60 CM. 3 días vie 17/03/23 dom 
ALTO TRANSITO ANTIDESLIZANTE
19/03/23
434 PISO VINILICO ALTO TRANSITO 5.5MM 2 días lun 20/03/23 mar 
TEXTURA MADERA ROBLE
21/03/23
435 ZOCALOS Y CONTRAZOCALOS 2 días lun 20/03/23mar 21/03/23
436 ZOCALO DE CERAMICA DE 0.60 X 0.60 M 2 días lun 20/03/23 mar 
H=1.60 M
21/03/23
437 ZOCALO DE PORCELANTO DE 0.60 X 0.60 M 2 días lun 20/03/23 mar 
H=1.60 M
21/03/23
438 REVESTIMIENTO 1 día lun 20/03/23 lun 20/03/23
439 CONTRAZOCALO DE CEMENTO PULIDO 1 día lun 20/03/23 lun 20/03/23
H=0.30 M

440 CONTRAZOCALO SANITARIO ACABADO 1 día lun 20/03/23 lun 20/03/23


GRANITO PULIDO H=0.10M SEGÚN DISEÑO

441 CONTRAZOCALO DE PORCELANATO H=0.10 1 día lun 20/03/23 lun 20/03/23


M SEGUN DISEÑO

442 CONTRAZOCALO DE MADERA DE H=0.10 M 1 día lun 20/03/23 lun 20/03/23


SEGUN DISEÑO

443 COBERTURA 6 días jue 23/02/23 mar 28/02/23


444 CORREAS DE MADERA TORNILLO 2"X2" 2 días jue 23/02/23 vie 24/02/23
445 COBERTURA DE TEJA ANDINA TIPO 3 días sáb  lun 27/02/23
ETERNIT
25/02/23
446 CUMBRERA ARTICULADA TIPO TEJA 1 día mar  mar 
ANDINA
28/02/23 28/02/23
447 CARPINTERIA DE MADERA 1 día dom 05/03/2dom 05/03/2
448 PUERTA APANELADA e=1" ACABADO EN 1 día dom  dom 
BARNIZ INCOLORO SATINADO
05/03/23 05/03/23
449 CERRAJERIA 1 día dom 05/03/2dom 05/03/2
450 BISAGRA ALUMINIZADA PESADO DE 4"x4" 1 día dom 05/03/2 dom 05/03/2
451 CERRADURA TUBULAR DE PALANCA 1 día dom  dom 
CROMADO
05/03/23 05/03/23
452 VIDRIOS, CRISTALES Y SIMILARES 3 días dom 05/03/2mar 07/03/23
453 DOBLE VIDRIO LAMINADO E=6MM 3 días dom 05/03/2 mar 07/03/23
454 PINTURA 3 días jue 02/03/23 sáb 04/03/23
455 PINTURA LATEX LAVABLE DE PRIMERA 2 días jue 02/03/23 vie 03/03/23
CALIDAD-RESISTENTE AL UV EN MUROS
INTERIORES 2 MANOS

456 PINTURA LATEX LAVABLE DE PRIMERA 3 días jue 02/03/23 sáb 


CALIDAD-RESISTENTE AL UV EN MUROS
EXTERIORES 2 MANOS 04/03/23

457 PINTURA LATEX LAVABLE DE PRIMERA 3 días jue 02/03/23 sáb 


CALIDAD - RESISTENTE AL UV EN
COLUMNAS 2 MANOS 04/03/23

458 PINTURA LATEX LAVABLE DE PRIMERA 2 días jue 02/03/23 vie 03/03/23


CALIDAD - RESISTENTE AL UV EN VIGAS 2
MANOS

459 PINTURA LATEX LAVABLE DE PRIMERA 1 día jue 02/03/23 jue 02/03/23


CALIDAD - RESISTENTE AL UV EN
DERRAMES 2 MANOS

460 PINTURA LATEX LAVABLE 2 MANOS EN 1 día jue 02/03/23 jue 02/03/23


BRUÑAS

461 PINTURA LATEX LAVABLE 2 MANOS EN 2 días jue 02/03/23 vie 03/03/23


CIELORASO

462 PINTURA BARNIZ SATINADO INCOLORO 2 1 día jue 02/03/23 jue 02/03/23


MANOS EN PUERTA DE MADERA

463 PINTURA ESMALTE SINTETICO EN 1 día jue 02/03/23 jue 02/03/23


CONTRAZOCALO DE CEMENTO 2 MANOS
H=30 cm

464 VARIOS 1 día vie 03/03/23 vie 03/03/23


465 PERFIL "T" DE ALUMNIO EN PISO 1 día vie 03/03/23 vie 03/03/23
466 MODULO C - DORMITORIOS 17 días vie 24/02/23 dom 12/03/2
467 MUROS Y TABIQUERIA DE ALBAÑILERIA 5 días vie 03/03/23 mar 07/03/23
468 MURO DE LADRILLO TIPO IV 18 HUECOS DE 2 días vie 03/03/23 sáb 
SOGA MEZ C:A 1:5
04/03/23
469 MURO DE LADRILLO TIPO IV 18 HUECOS DE 2 días dom  lun 06/03/23
CABEZA MEZ C:A 1:5
05/03/23
470 MURO DE LADRILLO TIPO IV DE 18 HUECOS 1 día mar  mar 
DE CANTO MEZ C:A 1:5
07/03/23 07/03/23
471 MURO CON ESTRUCTURA METÁLICA 1 día dom  dom 
E=90MM CON UNA PLACA DE
FIBROCEMENTO 8MM POR UNA CARA, CON 05/03/23 05/03/23
FIBRA DE VIDRIO, MACILLADO Y
ENCINTADO

472 REVOQUES ENLUCIDOS Y MOLDURAS 2 días lun 06/03/23mar 07/03/23


473 TARRAJEO PRIMARIO RAYADO CON 1 día lun 06/03/23 lun 06/03/23
CEMENTO - ARENA

474 TARRAJEO EN MUROS INTERIORES CON 2 días lun 06/03/23 mar 


C:A - 1:5 E=1.5 CM
07/03/23
475 TARRAJEO EN MUROS EXTERIORES CON 2 días lun 06/03/23 mar 
C:A - 1:5 E=1.5 CM
07/03/23
476 TARRAJEO EN COLUMNAS CON C:A - 1:5 2 días lun 06/03/23 mar 
E=1.5 CM
07/03/23
477 TARRAJEO EN VIGAS CON C:A - 1:5 E=1.5 2 días lun 06/03/23 mar 
CM
07/03/23
478 VESTIDURA DE DERRAMES EN PUERTAS Y 1 día lun 06/03/23 lun 06/03/23
VENTANAS ANCHO 0.15 M MEZC. C:A E=1.50
CM

479 BRUÑAS DE 1" 1 día lun 06/03/23 lun 06/03/23


480 TARRAJEO CON IMPERMEABILIZANTES 1 día lun 06/03/23 lun 06/03/23
481 CIELORRASOS 3 días lun 06/03/23mié 08/03/23
482 CIELORRASOS CON MEZCLA C:A 1:5 CINTAS 2 días lun 06/03/23 mar 
E=1.5 CM
07/03/23
483 FALSO CIELORASO SUSPENDIDO CON 3 días lun 06/03/23 mié 
BALDOSAS ACUSTICAS DE FIBRA MINERAL
08/03/23

484 PISOS Y PAVIMENTOS 3 días jue 09/03/23 sáb 11/03/23


485 CONTRAPISO 1 día jue 09/03/23 jue 09/03/23
486 CONTRAPISO DE MORTERO C:A -1:4 DE 1 día jue 09/03/23 jue 09/03/23
35MM

487 CONTRAPISO DE MORTERO C:A -1:4 DE 1 día jue 09/03/23 jue 09/03/23


40MM

488 PISOS 2 días vie 10/03/23 sáb 11/03/23


489 PISO DE CERAMICO DE 60x60 CM. ALTO 1 día vie 10/03/23 vie 10/03/23
TRANSITO ANTIDESLIZANTE

490 PISO DE PORCELANATO DE 60x60 CM. 2 días vie 10/03/23 sáb 


ALTO TRANSITO ANTIDESLIZANTE
11/03/23
491 PISO VINILICO ALTO TRANSITO 5.5MM 1 día vie 10/03/23 vie 10/03/23
TEXTURA MADERA ROBLE

492 ZOCALOS Y CONTRAZOCALOS 2 días vie 10/03/23 sáb 11/03/23


493 ZOCALO DE CERAMICA DE 0.60 X 0.60 M 2 días vie 10/03/23 sáb 
H=1.80 M
11/03/23
494 ZOCALO DE PORCELANATO DE 0.60 X 0.60 2 días vie 10/03/23 sáb 
M H=1.20 M
11/03/23
495 REVESTIMIENTO 1 día vie 10/03/23 vie 10/03/23
496 CONTRAZOCALO DE CEMENTO PULIDO 1 día vie 10/03/23 vie 10/03/23
H=0.30 M

497 CONTRAZOCALO SANITARIO ACABADO 2 días vie 10/03/23 sáb 


GRANITO PULIDO H=0.10M SEGÚN DISEÑO
11/03/23
498 CONTRAZOCALO DE CERAMICO H=0.10 m. 1 día vie 10/03/23 vie 10/03/23
SEGUN DISEÑO

499 CONTRAZOCALO DE PORCELANATO H=0.10 2 días vie 10/03/23 sáb 


M SEGUN DISEÑO
11/03/23
500 CONTRAZOCALO DE MADERA DE H=0.10 M 1 día vie 10/03/23 vie 10/03/23
SEGUN DISEÑO

501 COBERTURA 6 días vie 24/02/23 mié 01/03/23


502 CORREAS DE MADERA TORNILLO 2"X2" 2 días vie 24/02/23 sáb 25/02/23
503 COBERTURA DE TEJA ANDINA TIPO 3 días dom  mar 
ETERNIT
26/02/23 28/02/23
504 CUMBRERA ARTICULADA TIPO TEJA 1 día mié  mié 
ANDINA
01/03/23 01/03/23
505 CARPINTERIA DE MADERA 3 días vie 10/03/23 dom 12/03/2
506 PUERTA CONTRAPLACADA MDF e=8mm 1 día vie 10/03/23 vie 10/03/23
ACABADO EN BARNIZ INCOLORO SATINADO

507 PUERTA APANELADA e=1" ACABADO EN 1 día vie 10/03/23 vie 10/03/23


BARNIZ INCOLORO SATINADO

508 MUEBLES DE COCINA O SIMILARES 3 días vie 10/03/23 dom 12/03/2


509 CERRAJERIA 1 día vie 10/03/23 vie 10/03/23
510 BISAGRA ALUMINIZADA PESADO DE 4"x4" 1 día vie 10/03/23 vie 10/03/23
511 CERRADURA DE BRONCE TIPO BOLA DE 4" 1 día vie 10/03/23 vie 10/03/23
PARA PUERTAS SEGÚN DISEÑO

512 CERRADURA TUBULAR DE PALANCA 1 día vie 10/03/23 vie 10/03/23


CROMADO

513 VIDRIOS, CRISTALES Y SIMILARES 1 día vie 10/03/23 vie 10/03/23


514 DOBLE VIDRIO LAMINADO E=6MM 1 día vie 10/03/23 vie 10/03/23
515 ESPEJO BISELADO 6 MM EN PARED 1 día vie 10/03/23 vie 10/03/23
516 PINTURA 2 días mié 08/03/23jue 09/03/23
517 PINTURA LATEX LAVABLE DE PRIMERA 2 días mié  jue 09/03/23
CALIDAD-RESISTENTE AL UV EN MUROS
INTERIORES 2 MANOS 08/03/23

518 PINTURA LATEX LAVABLE DE PRIMERA 2 días mié  jue 09/03/23


CALIDAD-RESISTENTE AL UV EN MUROS
EXTERIORES 2 MANOS 08/03/23

519 PINTURA LATEX LAVABLE DE PRIMERA 2 días mié  jue 09/03/23


CALIDAD - RESISTENTE AL UV EN
COLUMNAS 2 MANOS 08/03/23

520 PINTURA LATEX LAVABLE DE PRIMERA 2 días mié  jue 09/03/23


CALIDAD - RESISTENTE AL UV EN VIGAS 2
MANOS 08/03/23

521 PINTURA LATEX LAVABLE DE PRIMERA 1 día mié  mié 


CALIDAD - RESISTENTE AL UV EN
DERRAMES 2 MANOS 08/03/23 08/03/23

522 PINTURA LATEX LAVABLE 2 MANOS EN 1 día mié  mié 


BRUÑAS
08/03/23 08/03/23
523 PINTURA LATEX LAVABLE 2 MANOS EN 1 día mié  mié 
CIELORASO
08/03/23 08/03/23
524 PINTURA BARNIZ SATINADO INCOLORO 2 1 día mié  mié 
MANOS EN PUERTA DE MADERA
08/03/23 08/03/23
525 PINTURA ESMALTE SINTETICO EN 1 día mié  mié 
CONTRAZOCALO DE CEMENTO 2 MANOS
H=30 cm 08/03/23 08/03/23

526 VARIOS 1 día jue 09/03/23 jue 09/03/23


527 DOSIFICADOR DE JABON LIQUIDO 1 día jue 09/03/23 jue 09/03/23
528 PERFIL "T" DE ALUMNIO EN PISO 1 día jue 09/03/23 jue 09/03/23
529 MODULO D - BIBLIOTECA 17 días vie 24/02/23 dom 12/03/2
530 MUROS Y TABIQUERIA DE ALBAÑILERIA 4 días sáb 04/03/23mar 07/03/23
531 MURO DE LADRILLO TIPO IV 18 HUECOS DE 2 días sáb  dom 
SOGA MEZ C:A 1:5
04/03/23 05/03/23
532 MURO DE LADRILLO TIPO IV 18 HUECOS DE 2 días lun 06/03/23 mar 
CABEZA MEZ C:A 1:5
07/03/23

Proyecto: CEDRO1 Tarea División Hito Resumen Resumen del proyecto Tarea inactiva Hito inactivo Resumen inactivo Tarea manual solo duración Informe de resumen manual Resumen manual solo el comienzo solo fin Tareas externas Hito externo Fecha límite Progreso Progreso manual
Fecha: mar 21/02/23

Página 3
Id Nombre de tarea Duración Comienzo Fin 06 feb '23 13 feb '23 20 feb '23 27 feb '23 06 mar '23 13 mar '23 20 mar '23 27 mar '23 03 abr '23 10 abr '23 17 abr '23 24 abr '23 01 may '23 08 may '23 15 may '23 22 may '23 29 may '23 05 jun '23 12 jun '23 19 jun '23 26 jun '23 03 jul '23
X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L
533 MURO DE LADRILLO TIPO IV DE 18 HUECOS 1 día lun 06/03/23 lun 06/03/23
DE CANTO MEZ C:A 1:5

534 MURO CON ESTRUCTURA METÁLICA 2 días lun 06/03/23 mar 


E=90MM CON UNA PLACA DE
FIBROCEMENTO 8MM POR UNA CARA, CON 07/03/23
FIBRA DE VIDRIO, MACILLADO Y
ENCINTADO

535 REVOQUES ENLUCIDOS Y MOLDURAS 3 días lun 06/03/23mié 08/03/23


536 TARRAJEO PRIMARIO RAYADO CON 2 días lun 06/03/23 mar 
CEMENTO - ARENA
07/03/23
537 TARRAJEO EN MUROS INTERIORES CON 2 días lun 06/03/23 mar 
C:A - 1:5 E=1.5 CM
07/03/23
538 TARRAJEO EN MUROS EXTERIORES CON 3 días lun 06/03/23 mié 
C:A - 1:5 E=1.5 CM
08/03/23
539 TARRAJEO EN COLUMNAS CON C:A - 1:5 2 días lun 06/03/23 mar 
E=1.5 CM
07/03/23
540 TARRAJEO EN VIGAS CON C:A - 1:5 E=1.5 2 días lun 06/03/23 mar 
CM
07/03/23
541 VESTIDURA DE DERRAMES EN PUERTAS Y 1 día lun 06/03/23 lun 06/03/23
VENTANAS ANCHO 0.15 M MEZC. C:A E=1.50
CM

542 BRUÑAS DE 1" 1 día lun 06/03/23 lun 06/03/23


543 TARRAJEO CON IMPERMEABILIZANTES 1 día lun 06/03/23 lun 06/03/23
544 CIELORRASOS 3 días mié 08/03/23vie 10/03/23
545 CIELORRASOS CON MEZCLA C:A 1:5 CINTAS 2 días mié  jue 09/03/23
E=1.5 CM
08/03/23
546 FALSO CIELORASO SUSPENDIDO CON 3 días mié  vie 10/03/23
BALDOSAS ACUSTICAS DE FIBRA MINERAL
08/03/23

547 PISOS Y PAVIMENTOS 6 días mar 07/03/23dom 12/03/2


548 CONTRAPISO 2 días mar 07/03/23mié 08/03/23
549 CONTRAPISO DE MORTERO C:A -1:4 DE 1 día mar  mar 
35MM
07/03/23 07/03/23
550 CONTRAPISO DE MORTERO C:A -1:4 DE 1 día mié  mié 
40MM
08/03/23 08/03/23
551 PISOS 4 días jue 09/03/23 dom 12/03/2
552 PISO DE CERAMICO DE 60x60 CM. ALTO 2 días jue 09/03/23 vie 10/03/23
TRANSITO ANTIDESLIZANTE

553 PISO DE PORCELANATO DE 60x60 CM. 4 días jue 09/03/23 dom 


ALTO TRANSITO ANTIDESLIZANTE
12/03/23
554 PISO VINILICO ALTO TRANSITO 5.5MM 2 días jue 09/03/23 vie 10/03/23
TEXTURA MADERA ROBLE

555 ZOCALOS Y CONTRAZOCALOS 2 días sáb 11/03/23dom 12/03/2


556 ZOCALO DE CERAMICA DE 0.60 X 0.60 M 2 días sáb  dom 
H=1.80 M
11/03/23 12/03/23
557 ZOCALO DE PORCELANATO DE 0.60 X 0.60 2 días sáb  dom 
M H=1.20 M
11/03/23 12/03/23
558 REVESTIMIENTO 1 día sáb 11/03/23sáb 11/03/23
559 CONTRAZOCALO DE CEMENTO PULIDO 1 día sáb  sáb 
H=0.30 M
11/03/23 11/03/23
560 CONTRAZOCALO SANITARIO ACABADO 2 días sáb  dom 
GRANITO PULIDO H=0.10M SEGÚN DISEÑO
11/03/23 12/03/23
561 CONTRAZOCALO DE CERAMICO H=0.10 m. 1 día sáb  sáb 
SEGUN DISEÑO
11/03/23 11/03/23
562 CONTRAZOCALO DE PORCELANATO H=0.10 1 día sáb  sáb 
M SEGUN DISEÑO
11/03/23 11/03/23
563 CONTRAZOCALO DE MADERA DE H=0.10 M 1 día sáb  sáb 
SEGUN DISEÑO
11/03/23 11/03/23
564 COBERTURA 6 días vie 24/02/23 mié 01/03/23
565 CORREAS DE MADERA TORNILLO 2"X2" 2 días vie 24/02/23 sáb 25/02/23
566 COBERTURA DE TEJA ANDINA TIPO 3 días dom  mar 
ETERNIT
26/02/23 28/02/23
567 CUMBRERA ARTICULADA TIPO TEJA 1 día mié  mié 
ANDINA
01/03/23 01/03/23
568 CARPINTERIA DE MADERA 1 día vie 10/03/23 vie 10/03/23
569 PUERTA CONTRAPLACADA MDF e=8mm 1 día vie 10/03/23 vie 10/03/23
ACABADO EN BARNIZ INCOLORO SATINADO

570 PUERTA APANELADA e=1" ACABADO EN 1 día vie 10/03/23 vie 10/03/23


BARNIZ INCOLORO SATINADO

571 MUEBLES DE COCINA O SIMILARES 1 día vie 10/03/23 vie 10/03/23


572 CERRAJERIA 1 día vie 10/03/23 vie 10/03/23
573 BISAGRA ALUMINIZADA PESADO DE 4"x4" 1 día vie 10/03/23 vie 10/03/23
574 CERRADURA DE BRONCE TIPO BOLA DE 4" 1 día vie 10/03/23 vie 10/03/23
PARA PUERTAS SEGÚN DISEÑO

575 CERRADURA TUBULAR DE PALANCA 1 día vie 10/03/23 vie 10/03/23


CROMADO

576 VIDRIOS, CRISTALES Y SIMILARES 1 día vie 10/03/23 vie 10/03/23


577 DOBLE VIDRIO LAMINADO E=6MM 1 día vie 10/03/23 vie 10/03/23
578 ESPEJO BISELADO 6 MM EN PARED 1 día vie 10/03/23 vie 10/03/23
579 PINTURA 3 días mié 08/03/23vie 10/03/23
580 PINTURA LATEX LAVABLE DE PRIMERA 2 días mié  jue 09/03/23
CALIDAD-RESISTENTE AL UV EN MUROS
INTERIORES 2 MANOS 08/03/23

581 PINTURA LATEX LAVABLE DE PRIMERA 3 días mié  vie 10/03/23


CALIDAD-RESISTENTE AL UV EN MUROS
EXTERIORES 2 MANOS 08/03/23

582 PINTURA LATEX LAVABLE DE PRIMERA 3 días mié  vie 10/03/23


CALIDAD - RESISTENTE AL UV EN
COLUMNAS 2 MANOS 08/03/23

583 PINTURA LATEX LAVABLE DE PRIMERA 2 días mié  jue 09/03/23


CALIDAD - RESISTENTE AL UV EN VIGAS 2
MANOS 08/03/23

584 PINTURA LATEX LAVABLE DE PRIMERA 1 día mié  mié 


CALIDAD - RESISTENTE AL UV EN
DERRAMES 2 MANOS 08/03/23 08/03/23

585 PINTURA LATEX LAVABLE 2 MANOS EN 1 día mié  mié 


BRUÑAS
08/03/23 08/03/23
586 PINTURA LATEX LAVABLE 2 MANOS EN 1 día mié  mié 
CIELORASO
08/03/23 08/03/23
587 PINTURA BARNIZ SATINADO INCOLORO 2 1 día mié  mié 
MANOS EN PUERTA DE MADERA
08/03/23 08/03/23
588 PINTURA ESMALTE SINTETICO EN 1 día mié  mié 
CONTRAZOCALO DE CEMENTO 2 MANOS
H=30 cm 08/03/23 08/03/23

589 VARIOS 1 día sáb 11/03/23sáb 11/03/23


590 DOSIFICADOR DE JABON LIQUIDO 1 día sáb 11/03/23sáb 11/03/23
591 PERFIL "T" DE ALUMNIO EN PISO 1 día sáb 11/03/23sáb 11/03/23
592 MODULO E - AULA DE INNOVACIÓN 13 días lun 27/02/23sáb 11/03/23
593 MUROS Y TABIQUERIA DE ALBAÑILERIA 5 días lun 27/02/23vie 03/03/23
594 MURO DE LADRILLO TIPO IV 18 HUECOS DE 2 días lun 27/02/23 mar 
SOGA MEZ C:A 1:5
28/02/23
595 MURO DE LADRILLO TIPO IV 18 HUECOS DE 2 días mié  jue 02/03/23
CABEZA MEZ C:A 1:5
01/03/23
596 MURO DE LADRILLO TIPO IV DE 18 HUECOS 1 día vie 03/03/23 vie 03/03/23
DE CANTO MEZ C:A 1:5

597 REVOQUES ENLUCIDOS Y MOLDURAS 3 días vie 03/03/23 dom 05/03/2


598 TARRAJEO EN MUROS INTERIORES CON 2 días vie 03/03/23 sáb 
C:A - 1:5 E=1.5 CM
04/03/23
599 TARRAJEO EN MUROS EXTERIORES CON 3 días vie 03/03/23 dom 
C:A - 1:5 E=1.5 CM
05/03/23
600 TARRAJEO EN COLUMNAS CON C:A - 1:5 2 días vie 03/03/23 sáb 
E=1.5 CM
04/03/23
601 TARRAJEO EN VIGAS CON C:A - 1:5 E=1.5 1 día vie 03/03/23 vie 03/03/23
CM

602 VESTIDURA DE DERRAMES EN PUERTAS Y 1 día vie 03/03/23 vie 03/03/23


VENTANAS ANCHO 0.15 M MEZC. C:A E=1.50
CM

603 BRUÑAS DE 1" 1 día vie 03/03/23 vie 03/03/23


604 TARRAJEO CON IMPERMEABILIZANTES 1 día vie 03/03/23 vie 03/03/23
605 CIELORRASOS 5 días sáb 04/03/23mié 08/03/23
606 CIELORRASOS CON MEZCLA C:A 1:5 CINTAS 2 días sáb  dom 
E=1.5 CM
04/03/23 05/03/23
607 FALSO CIELORASO SUSPENDIDO CON 3 días lun 06/03/23 mié 
BALDOSAS ACUSTICAS DE FIBRA MINERAL
08/03/23

608 PISOS Y PAVIMENTOS 4 días lun 06/03/23jue 09/03/23


609 CONTRAPISO 2 días lun 06/03/23mar 07/03/23
610 CONTRAPISO DE MORTERO C:A -1:4 DE 1 día lun 06/03/23 lun 06/03/23
35MM

611 CONTRAPISO DE MORTERO C:A -1:4 DE 1 día mar  mar 


40MM
07/03/23 07/03/23
612 PISOS 2 días mié 08/03/23jue 09/03/23
613 PISO DE CERAMICO DE 60x60 CM. ALTO 2 días mié  jue 09/03/23
TRANSITO ANTIDESLIZANTE
08/03/23
614 PISO VINILICO ALTO TRANSITO 5.5MM 2 días mié  jue 09/03/23
TEXTURA MADERA ROBLE
08/03/23
615 ZOCALOS Y CONTRAZOCALOS 2 días vie 10/03/23 sáb 11/03/23
616 CONTRAZOCALO DE CEMENTO PULIDO 2 días vie 10/03/23 sáb 
H=0.30 M
11/03/23
617 CONTRAZOCALO DE CERAMICO H=0.10 m. 2 días vie 10/03/23 sáb 
SEGUN DISEÑO
11/03/23
618 CONTRAZOCALO DE MADERA DE H=0.10 M 1 día vie 10/03/23 vie 10/03/23
SEGUN DISEÑO

619 COBERTURA 6 días lun 27/02/23sáb 04/03/23


620 CORREAS DE MADERA TORNILLO 2"X2" 2 días lun 27/02/23 mar 28/02/23
621 COBERTURA DE TEJA ANDINA TIPO 3 días mié  vie 03/03/23
ETERNIT
01/03/23
622 CUMBRERA ARTICULADA TIPO TEJA 1 día sáb  sáb 
ANDINA
04/03/23 04/03/23
623 CARPINTERIA DE MADERA 1 día mié 08/03/23mié 08/03/23
624 PUERTA CONTRAPLACADA MDF e=8mm 1 día mié  mié 
ACABADO EN BARNIZ INCOLORO SATINADO
08/03/23 08/03/23

625 PUERTA APANELADA e=1" ACABADO EN 1 día mié  mié 


BARNIZ INCOLORO SATINADO
08/03/23 08/03/23
626 CERRAJERIA 1 día mié 08/03/23mié 08/03/23
627 BISAGRA ALUMINIZADA PESADO DE 4"x4" 1 día mié 08/03/23mié 08/03/23
628 CERRADURA DE BRONCE TIPO BOLA DE 4" 1 día mié  mié 
PARA PUERTAS SEGÚN DISEÑO
08/03/23 08/03/23
629 CERRADURA TUBULAR DE PALANCA 1 día mié  mié 
CROMADO
08/03/23 08/03/23
630 VIDRIOS, CRISTALES Y SIMILARES 3 días mié 08/03/23vie 10/03/23
631 DOBLE VIDRIO LAMINADO E=6MM 3 días mié 08/03/23vie 10/03/23
632 PINTURA 2 días lun 06/03/23mar 07/03/23
633 PINTURA LATEX LAVABLE DE PRIMERA 2 días lun 06/03/23 mar 
CALIDAD-RESISTENTE AL UV EN MUROS
INTERIORES 2 MANOS 07/03/23

634 PINTURA LATEX LAVABLE DE PRIMERA 2 días lun 06/03/23 mar 


CALIDAD-RESISTENTE AL UV EN MUROS
EXTERIORES 2 MANOS 07/03/23

635 PINTURA LATEX LAVABLE DE PRIMERA 2 días lun 06/03/23 mar 


CALIDAD - RESISTENTE AL UV EN
COLUMNAS 2 MANOS 07/03/23

636 PINTURA LATEX LAVABLE DE PRIMERA 2 días lun 06/03/23 mar 


CALIDAD - RESISTENTE AL UV EN VIGAS 2
MANOS 07/03/23

637 PINTURA LATEX LAVABLE DE PRIMERA 1 día lun 06/03/23 lun 06/03/23


CALIDAD - RESISTENTE AL UV EN
DERRAMES 2 MANOS

638 PINTURA LATEX LAVABLE 2 MANOS EN 1 día lun 06/03/23 lun 06/03/23


BRUÑAS

639 PINTURA LATEX LAVABLE 2 MANOS EN 1 día lun 06/03/23 lun 06/03/23


CIELORASO

640 PINTURA BARNIZ SATINADO INCOLORO 2 1 día lun 06/03/23 lun 06/03/23


MANOS EN PUERTA DE MADERA

641 PINTURA ESMALTE SINTETICO EN 1 día lun 06/03/23 lun 06/03/23


CONTRAZOCALO DE CEMENTO 2 MANOS
H=30 cm

642 VARIOS 1 día mié 08/03/23mié 08/03/23


643 PERFIL "T" DE ALUMNIO EN PISO 1 día mié 08/03/23mié 08/03/23
644 MODULO F - AULA Y SSHH 18 días lun 27/02/23jue 16/03/23
645 MUROS Y TABIQUERIA DE ALBAÑILERIA 9 días lun 27/02/23mar 07/03/23
646 MURO DE LADRILLO TIPO IV 18 HUECOS DE 2 días lun 27/02/23 mar 
SOGA MEZ C:A 1:5
28/02/23
647 MURO DE LADRILLO TIPO IV 18 HUECOS DE 3 días mié  vie 03/03/23
CABEZA MEZ C:A 1:5
01/03/23
648 MURO DE LADRILLO TIPO IV DE 18 HUECOS 2 días sáb  dom 
DE CANTO MEZ C:A 1:5
04/03/23 05/03/23
649 MURO CON ESTRUCTURA METÁLICA 2 días lun 06/03/23 mar 
E=90MM CON UNA PLACA DE
FIBROCEMENTO 8MM POR UNA CARA, CON 07/03/23
FIBRA DE VIDRIO, MACILLADO Y
ENCINTADO

650 REVOQUES ENLUCIDOS Y MOLDURAS 3 días lun 06/03/23mié 08/03/23


651 TARRAJEO PRIMARIO RAYADO CON 2 días lun 06/03/23 mar 
CEMENTO - ARENA
07/03/23
652 TARRAJEO EN MUROS INTERIORES CON 2 días lun 06/03/23 mar 
C:A - 1:5 E=1.5 CM
07/03/23
653 TARRAJEO EN MUROS EXTERIORES CON 3 días lun 06/03/23 mié 
C:A - 1:5 E=1.5 CM
08/03/23
654 TARRAJEO EN COLUMNAS CON C:A - 1:5 2 días lun 06/03/23 mar 
E=1.5 CM
07/03/23
655 TARRAJEO EN VIGAS CON C:A - 1:5 E=1.5 1 día lun 06/03/23 lun 06/03/23
CM

656 VESTIDURA DE DERRAMES EN PUERTAS Y 1 día lun 06/03/23 lun 06/03/23


VENTANAS ANCHO 0.15 M MEZC. C:A E=1.50
CM

657 BRUÑAS DE 1" 1 día lun 06/03/23 lun 06/03/23


658 TARRAJEO CON IMPERMEABILIZANTES 1 día lun 06/03/23 lun 06/03/23
659 CIELORRASOS 3 días lun 06/03/23mié 08/03/23
660 CIELORRASOS CON MEZCLA C:A 1:5 CINTAS 1 día lun 06/03/23 lun 06/03/23
E=1.5 CM

661 FALSO CIELORASO SUSPENDIDO CON 3 días lun 06/03/23 mié 


BALDOSAS ACUSTICAS DE FIBRA MINERAL
08/03/23

662 PISOS Y PAVIMENTOS 8 días mar 07/03/23mar 14/03/23


663 CONTRAPISO 2 días mar 07/03/23mié 08/03/23
664 CONTRAPISO DE MORTERO C:A -1:4 DE 1 día mar  mar 
35MM
07/03/23 07/03/23
665 CONTRAPISO DE MORTERO C:A -1:4 DE 1 día mié  mié 
40MM
08/03/23 08/03/23
666 PISOS 6 días jue 09/03/23 mar 14/03/23
667 PISO DE CERAMICO DE 60x60 CM. ALTO 2 días jue 09/03/23 vie 10/03/23
TRANSITO ANTIDESLIZANTE

668 PISO DE PORCELANATO DE 60x60 CM. 2 días sáb  dom 


ALTO TRANSITO ANTIDESLIZANTE
11/03/23 12/03/23
669 PISO VINILICO ALTO TRANSITO 5.5MM 2 días lun 13/03/23 mar 
TEXTURA MADERA ROBLE
14/03/23
670 ZOCALOS Y CONTRAZOCALOS 2 días mié 15/03/23jue 16/03/23
671 ZOCALO DE CERAMICA DE 0.60 X 0.60 M 2 días mié  jue 16/03/23
H=1.20 M
15/03/23
672 CONTRAZOCALO DE CEMENTO PULIDO 2 días mié  jue 16/03/23
H=0.30 M
15/03/23
673 CONTRAZOCALO SANITARIO ACABADO 2 días mié  jue 16/03/23
GRANITO PULIDO H=0.10M SEGÚN DISEÑO
15/03/23
674 CONTRAZOCALO DE CERAMICO H=0.10 m. 1 día mié  mié 
SEGUN DISEÑO
15/03/23 15/03/23
675 CONTRAZOCALO DE MADERA DE H=0.10 M 1 día mié  mié 
SEGUN DISEÑO
15/03/23 15/03/23
676 COBERTURA 6 días lun 27/02/23sáb 04/03/23
677 CORREAS DE MADERA TORNILLO 2"X2" 2 días lun 27/02/23 mar 28/02/23
678 COBERTURA DE TEJA ANDINA TIPO 3 días mié  vie 03/03/23
ETERNIT
01/03/23
679 CUMBRERA ARTICULADA TIPO TEJA 1 día sáb  sáb 
ANDINA
04/03/23 04/03/23
680 CARPINTERIA DE MADERA 1 día sáb 11/03/23sáb 11/03/23
681 PUERTA APANELADA e=1" ACABADO EN 1 día sáb  sáb 
BARNIZ INCOLORO SATINADO
11/03/23 11/03/23
682 CERRAJERIA 1 día sáb 11/03/23sáb 11/03/23
683 BISAGRA ALUMINIZADA PESADO DE 4"x4" 1 día sáb 11/03/23sáb 11/03/23
684 CERRADURA TUBULAR DE PALANCA 1 día sáb  sáb 
CROMADO
11/03/23 11/03/23
685 VIDRIOS, CRISTALES Y SIMILARES 3 días sáb 11/03/23lun 13/03/23
686 DOBLE VIDRIO LAMINADO E=6MM 3 días sáb 11/03/23lun 13/03/23
687 ESPEJO BISELADO 6 MM EN PARED 1 día sáb 11/03/23sáb 11/03/23
688 PINTURA 3 días jue 09/03/23 sáb 11/03/23
689 PINTURA LATEX LAVABLE DE PRIMERA 2 días jue 09/03/23 vie 10/03/23
CALIDAD-RESISTENTE AL UV EN MUROS
INTERIORES 2 MANOS

690 PINTURA LATEX LAVABLE DE PRIMERA 3 días jue 09/03/23 sáb 


CALIDAD-RESISTENTE AL UV EN MUROS
EXTERIORES 2 MANOS 11/03/23

691 PINTURA LATEX LAVABLE DE PRIMERA 2 días jue 09/03/23 vie 10/03/23


CALIDAD - RESISTENTE AL UV EN
COLUMNAS 2 MANOS

692 PINTURA LATEX LAVABLE DE PRIMERA 2 días jue 09/03/23 vie 10/03/23


CALIDAD - RESISTENTE AL UV EN VIGAS 2
MANOS

693 PINTURA LATEX LAVABLE DE PRIMERA 2 días jue 09/03/23 vie 10/03/23


CALIDAD - RESISTENTE AL UV EN
DERRAMES 2 MANOS

Proyecto: CEDRO1 Tarea División Hito Resumen Resumen del proyecto Tarea inactiva Hito inactivo Resumen inactivo Tarea manual solo duración Informe de resumen manual Resumen manual solo el comienzo solo fin Tareas externas Hito externo Fecha límite Progreso Progreso manual
Fecha: mar 21/02/23

Página 4
Id Nombre de tarea Duración Comienzo Fin 06 feb '23 13 feb '23 20 feb '23 27 feb '23 06 mar '23 13 mar '23 20 mar '23 27 mar '23 03 abr '23 10 abr '23 17 abr '23 24 abr '23 01 may '23 08 may '23 15 may '23 22 may '23 29 may '23 05 jun '23 12 jun '23 19 jun '23 26 jun '23 03 jul '23
X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L
694 PINTURA LATEX LAVABLE 2 MANOS EN 1 día jue 09/03/23 jue 09/03/23
BRUÑAS

695 PINTURA LATEX LAVABLE 2 MANOS EN 2 días jue 09/03/23 vie 10/03/23


CIELORASO

696 PINTURA BARNIZ SATINADO INCOLORO 2 1 día jue 09/03/23 jue 09/03/23


MANOS EN PUERTA DE MADERA

697 PINTURA ESMALTE SINTETICO EN 1 día jue 09/03/23 jue 09/03/23


CONTRAZOCALO DE CEMENTO 2 MANOS
H=30 cm

698 VARIOS 1 día sáb 11/03/23sáb 11/03/23


699 DOSIFICADOR DE JABON LIQUIDO 1 día sáb 11/03/23sáb 11/03/23
700 PERFIL "T" DE ALUMNIO EN PISO 1 día sáb 11/03/23sáb 11/03/23
701 MODULO G - AULAS 16 días vie 24/02/23 sáb 11/03/23
702 MUROS Y TABIQUERIA DE ALBAÑILERIA 6 días vie 24/02/23 mié 01/03/23
703 MURO DE LADRILLO TIPO IV 18 HUECOS DE 2 días vie 24/02/23 sáb 
SOGA MEZ C:A 1:5
25/02/23
704 MURO DE LADRILLO TIPO IV 18 HUECOS DE 3 días dom  mar 
CABEZA MEZ C:A 1:5
26/02/23 28/02/23
705 MURO DE LADRILLO TIPO IV DE 18 HUECOS 1 día mié  mié 
DE CANTO MEZ C:A 1:5
01/03/23 01/03/23
706 REVOQUES ENLUCIDOS Y MOLDURAS 4 días jue 02/03/23 dom 05/03/2
707 TARRAJEO EN MUROS INTERIORES CON 2 días jue 02/03/23 vie 03/03/23
C:A - 1:5 E=1.5 CM

708 TARRAJEO EN MUROS EXTERIORES CON 2 días jue 02/03/23 vie 03/03/23


C:A - 1:5 E=1.5 CM

709 TARRAJEO EN COLUMNAS CON C:A - 1:5 2 días jue 02/03/23 vie 03/03/23


E=1.5 CM

710 TARRAJEO EN VIGAS CON C:A - 1:5 E=1.5 1 día sáb  sáb 
CM
04/03/23 04/03/23
711 VESTIDURA DE DERRAMES EN PUERTAS Y 1 día dom  dom 
VENTANAS ANCHO 0.15 M MEZC. C:A E=1.50
CM 05/03/23 05/03/23

712 BRUÑAS DE 1" 1 día jue 02/03/23 jue 02/03/23


713 TARRAJEO CON IMPERMEABILIZANTES 1 día jue 02/03/23 jue 02/03/23
714 CIELORRASOS 5 días mié 01/03/23dom 05/03/2
715 CIELORRASOS CON MEZCLA C:A 1:5 CINTAS 2 días mié  jue 02/03/23
E=1.5 CM
01/03/23
716 FALSO CIELORASO SUSPENDIDO CON 3 días vie 03/03/23 dom 
BALDOSAS ACUSTICAS DE FIBRA MINERAL
05/03/23

717 PISOS Y PAVIMENTOS 3 días vie 03/03/23 dom 05/03/2


718 CONTRAPISO 1 día vie 03/03/23 vie 03/03/23
719 CONTRAPISO DE MORTERO C:A -1:4 DE 1 día vie 03/03/23 vie 03/03/23
40MM

720 PISOS 2 días sáb 04/03/23dom 05/03/2


721 PISO VINILICO ALTO TRANSITO 5.5MM 2 días sáb  dom 
TEXTURA MADERA ROBLE
04/03/23 05/03/23
722 ZOCALOS Y CONTRAZOCALOS 3 días lun 06/03/23mié 08/03/23
723 CONTRAZOCALO DE CEMENTO PULIDO 2 días lun 06/03/23 mar 
H=0.30 M
07/03/23
724 CONTRAZOCALO DE MADERA DE H=0.10 M 1 día mié  mié 
SEGUN DISEÑO
08/03/23 08/03/23
725 COBERTURA 6 días vie 24/02/23 mié 01/03/23
726 CORREAS DE MADERA TORNILLO 2"X2" 2 días vie 24/02/23 sáb 25/02/23
727 COBERTURA DE TEJA ANDINA TIPO 3 días dom  mar 
ETERNIT
26/02/23 28/02/23
728 CUMBRERA ARTICULADA TIPO TEJA 1 día mié  mié 
ANDINA
01/03/23 01/03/23
729 CARPINTERIA DE MADERA 1 día jue 09/03/23 jue 09/03/23
730 PUERTA APANELADA e=1" ACABADO EN 1 día jue 09/03/23 jue 09/03/23
BARNIZ INCOLORO SATINADO

731 CERRAJERIA 1 día jue 09/03/23 jue 09/03/23


732 BISAGRA ALUMINIZADA PESADO DE 4"x4" 1 día jue 09/03/23 jue 09/03/23
733 CERRADURA TUBULAR DE PALANCA 1 día jue 09/03/23 jue 09/03/23
CROMADO

734 VIDRIOS, CRISTALES Y SIMILARES 3 días jue 09/03/23 sáb 11/03/23


735 DOBLE VIDRIO LAMINADO E=6MM 3 días jue 09/03/23 sáb 11/03/23
736 PINTURA 3 días lun 06/03/23mié 08/03/23
737 PINTURA LATEX LAVABLE DE PRIMERA 2 días lun 06/03/23 mar 
CALIDAD-RESISTENTE AL UV EN MUROS
INTERIORES 2 MANOS 07/03/23

738 PINTURA LATEX LAVABLE DE PRIMERA 3 días lun 06/03/23 mié 


CALIDAD-RESISTENTE AL UV EN MUROS
EXTERIORES 2 MANOS 08/03/23

739 PINTURA LATEX LAVABLE DE PRIMERA 3 días lun 06/03/23 mié 


CALIDAD - RESISTENTE AL UV EN
COLUMNAS 2 MANOS 08/03/23

740 PINTURA LATEX LAVABLE DE PRIMERA 2 días lun 06/03/23 mar 


CALIDAD - RESISTENTE AL UV EN VIGAS 2
MANOS 07/03/23

741 PINTURA LATEX LAVABLE DE PRIMERA 2 días lun 06/03/23 mar 


CALIDAD - RESISTENTE AL UV EN
DERRAMES 2 MANOS 07/03/23

742 PINTURA LATEX LAVABLE 2 MANOS EN 1 día lun 06/03/23 lun 06/03/23


BRUÑAS

743 PINTURA LATEX LAVABLE 2 MANOS EN 1 día lun 06/03/23 lun 06/03/23


CIELORASO

744 PINTURA BARNIZ SATINADO INCOLORO 2 1 día lun 06/03/23 lun 06/03/23


MANOS EN PUERTA DE MADERA

745 PINTURA ESMALTE SINTETICO EN 1 día lun 06/03/23 lun 06/03/23


CONTRAZOCALO DE CEMENTO 2 MANOS
H=30 cm

746 VARIOS 1 día mié 08/03/23mié 08/03/23


747 PERFIL "T" DE ALUMNIO EN PISO 1 día mié 08/03/23mié 08/03/23
748 MODULO H - INGRESO 16 días vie 10/03/23 sáb 25/03/23
749 MUROS Y TABIQUERIA DE ALBAÑILERIA 3 días vie 10/03/23 dom 12/03/2
750 MURO DE LADRILLO TIPO IV 18 HUECOS DE 3 días vie 10/03/23 dom 
CABEZA MEZ C:A 1:5
12/03/23
751 REVOQUES ENLUCIDOS Y MOLDURAS 9 días lun 13/03/23mar 21/03/23
752 TARRAJEO EN MUROS INTERIORES CON 2 días lun 13/03/23 mar 
C:A - 1:5 E=1.5 CM
14/03/23
753 TARRAJEO EN MUROS EXTERIORES CON 3 días mié  vie 17/03/23
C:A - 1:5 E=1.5 CM
15/03/23
754 TARRAJEO EN COLUMNAS CON C:A - 1:5 2 días sáb  dom 
E=1.5 CM
18/03/23 19/03/23
755 TARRAJEO EN VIGAS CON C:A - 1:5 E=1.5 2 días lun 20/03/23 mar 
CM
21/03/23
756 TARRAJEO CON IMPERMEABILIZANTES 1 día lun 13/03/23 lun 13/03/23
757 CIELORRASOS 2 días mié 15/03/23jue 16/03/23
758 CIELORRASOS CON MEZCLA C:A 1:5 CINTAS 2 días mié  jue 16/03/23
E=1.5 CM
15/03/23
759 ZOCALOS Y CONTRAZOCALOS 2 días vie 17/03/23 sáb 18/03/23
760 CONTRAZOCALO DE CEMENTO PULIDO 2 días vie 17/03/23 sáb 
H=0.30 M
18/03/23
761 CARPINTERIA METALICA Y HERRERIA 10 días vie 10/03/23 dom 19/03/2
762 CERCO METÁLICO + ARMADURA DE 10 días vie 10/03/23 dom 
SUJECIÓN SEGÚN DISEÑO
19/03/23
763 PUERTA CON REJAS MISMO TRATAMIENTO 2 días vie 10/03/23 sáb 
DE CERCO METALICO + ARMADURA SEGÚN
DISEÑO 11/03/23

764 PINTURA 4 días mié 22/03/23sáb 25/03/23


765 PINTURA LATEX LAVABLE DE PRIMERA 2 días mié  jue 23/03/23
CALIDAD-RESISTENTE AL UV EN MUROS
INTERIORES 2 MANOS 22/03/23

766 PINTURA LATEX LAVABLE DE PRIMERA 4 días mié  sáb 


CALIDAD-RESISTENTE AL UV EN MUROS
EXTERIORES 2 MANOS 22/03/23 25/03/23

767 PINTURA LATEX LAVABLE DE PRIMERA 3 días mié  vie 24/03/23


CALIDAD - RESISTENTE AL UV EN
COLUMNAS 2 MANOS 22/03/23

768 PINTURA LATEX LAVABLE DE PRIMERA 2 días mié  jue 23/03/23


CALIDAD - RESISTENTE AL UV EN VIGAS 2
MANOS 22/03/23

769 PINTURA LATEX LAVABLE 2 MANOS EN 2 días mié  jue 23/03/23


CIELORASO
22/03/23
770 PINTURA ESMALTE SINTETICO EN 2 días mié  jue 23/03/23
CONTRAZOCALO DE CEMENTO 2 MANOS
H=30 cm 22/03/23

771 MODULO I - TANQUE ELEVADO Y CISTERNA 10 días lun 06/03/23mié 15/03/23


772 MUROS Y TABIQUERIA DE ALBAÑILERIA 2 días lun 06/03/23mar 07/03/23
773 MURO DE LADRILLO TIPO IV 18 HUECOS DE 2 días lun 06/03/23 mar 
SOGA MEZ C:A 1:5
07/03/23
774 REVOQUES ENLUCIDOS Y MOLDURAS 5 días mié 08/03/23dom 12/03/2
775 TARRAJEO PRIMARIO RAYADO CON 2 días mié  jue 09/03/23
CEMENTO - ARENA
08/03/23
776 TARRAJEO EN MUROS INTERIORES CON 2 días vie 10/03/23 sáb 
C:A - 1:5 E=1.5 CM
11/03/23
777 TARRAJEO EN MUROS EXTERIORES CON 1 día dom  dom 
C:A - 1:5 E=1.5 CM
12/03/23 12/03/23
778 TARRAJEO EN COLUMNAS CON C:A - 1:5 1 día dom  dom 
E=1.5 CM
12/03/23 12/03/23
779 TARRAJEO EN VIGAS CON C:A - 1:5 E=1.5 1 día dom  dom 
CM
12/03/23 12/03/23
780 VESTIDURA DE DERRAMES EN PUERTAS Y 1 día dom  dom 
VENTANAS ANCHO 0.15 M MEZC. C:A E=1.50
CM 12/03/23 12/03/23

781 BRUÑAS DE 1" 1 día dom 12/03/2 dom 12/03/2


782 CIELORRASOS 1 día vie 10/03/23 vie 10/03/23
783 CIELORRASOS CON MEZCLA C:A 1:5 CINTAS 1 día vie 10/03/23 vie 10/03/23
E=1.5 CM

784 PISOS Y PAVIMENTOS 1 día sáb 11/03/23sáb 11/03/23


785 PISOS 1 día sáb 11/03/23sáb 11/03/23
786 PISO DE CEMENTO SEMIPULIDO 1 día sáb 11/03/23sáb 11/03/23
787 CARPINTERIA METALICA Y HERRERIA 1 día mié 15/03/23mié 15/03/23
788 VENTANA DE ESTRUCTURA METALICA 1 día mié  mié 
SEGÚN DISEÑO INCL. ACCESORIOS E
INSTALACION 15/03/23 15/03/23

789 PUERTA METALICA SEGUN DISEÑO INCL. 1 día mié  mié 


INSTALACION
15/03/23 15/03/23
790 BARANDA METALICA H=0.80 ( INCL. 1 día mié  mié 
ACCESORIOS E INSTALACION SEGUN
DISEÑO) 15/03/23 15/03/23

791 ESCALERA DE INSPECCION ( INCL. 1 día mié  mié 


ACCESORIOS E INSTALACION SEGUN
DISEÑO) 15/03/23 15/03/23

792 TAPA DE INSPECCIÓN CON PLANCHA 1 día mié  mié 


METALICA (SEGUN DISEÑO)
15/03/23 15/03/23
793 CERRAJERIA 1 día mié 15/03/23mié 15/03/23
794 BISAGRA ALUMINIZADA PESADO DE 4"x4" 1 día mié 15/03/23mié 15/03/23
795 CERRADURA TIPO FORTE CON MANIJA 2 1 día mié  mié 
GOLPES CON TIRADOR
15/03/23 15/03/23
796 PINTURA 2 días lun 13/03/23mar 14/03/23
797 PINTURA LATEX LAVABLE DE PRIMERA 2 días lun 13/03/23 mar 
CALIDAD-RESISTENTE AL UV EN MUROS
INTERIORES 2 MANOS 14/03/23

798 PINTURA LATEX LAVABLE DE PRIMERA 2 días lun 13/03/23 mar 


CALIDAD-RESISTENTE AL UV EN MUROS
EXTERIORES 2 MANOS 14/03/23

799 PINTURA LATEX LAVABLE DE PRIMERA 2 días lun 13/03/23 mar 


CALIDAD - RESISTENTE AL UV EN
COLUMNAS 2 MANOS 14/03/23

800 PINTURA LATEX LAVABLE DE PRIMERA 1 día lun 13/03/23 lun 13/03/23


CALIDAD - RESISTENTE AL UV EN VIGAS 2
MANOS

801 PINTURA LATEX LAVABLE DE PRIMERA 1 día lun 13/03/23 lun 13/03/23


CALIDAD - RESISTENTE AL UV EN
DERRAMES 2 MANOS

802 PINTURA LATEX LAVABLE 2 MANOS EN 1 día lun 13/03/23 lun 13/03/23


BRUÑAS

803 PINTURA LATEX LAVABLE 2 MANOS EN 1 día lun 13/03/23 lun 13/03/23


CIELORASO

804 PINTURA EN CARPINTERIA METALICA (2 M 1 día lun 13/03/23 lun 13/03/23


ANTICORROSIVO + 2 M ESMALTE)

805 SEÑALES DE SEGURIDAD, ADVERTENCIA Y 2 días mié  jue 


PROHICIÓN
05/04/23 06/04/23
806 SEÑALES DE SEGURIDAD 2 días mié 05/04/23jue 06/04/23
807 EQUIPOS CONTRA INCENDIOS 2 días mié 05/04/23jue 06/04/23
808 EQUIPOS DE PRIMEROS AUXILIOS 2 días mié 05/04/23jue 06/04/23
809 INSTALACIONES SANITARIAS 15 días jue 02/03/23 jue 16/03/23
810 OBRAS EXTERIORES 11 días jue 02/03/23 dom 12/03/2
811 MOVIMIENTO DE TIERRAS 9 días jue 02/03/23 vie 10/03/23
812 TRAZO NIVEL Y REPLANTEO 1 día jue 02/03/23 jue 02/03/23
813 EXCAVACION MANUAL DE TERRENO (a=0.40 2 días vie 03/03/23 sáb 
m a 0.80 m - h= var. de 0.40 m a 1.00 m)
04/03/23

814 REFINE, NIVELACION Y CONFOMACION DE 3 días dom  mar 


FONDOS
05/03/23 07/03/23
815 PREPARACION Y COLOCACION DE CAMA 3 días mié  vie 10/03/23
DE APOYO
08/03/23
816 RELLENO Y COMPACTACION DE ZANJA 2 días mié  jue 09/03/23
(a=0.40 m a 0.80 m - h= var. de 0.40 m a 1.00
m) 08/03/23

817 SISTEMA DE AGUA FRIA 7 días dom 05/03/2sáb 11/03/23


818 RED DE DISTRIBUCION 2 días dom 05/03/2lun 06/03/23
819 SUM. E INST. DE TUBERIA PVC SAP 2 días dom  lun 06/03/23
ROSCA D=1/2" N.T.N. 399.002 C-10x5m
05/03/23
820 SUM. E INST. DE TUBERIA PVC SAP 2 días dom  lun 06/03/23
ROSCA D=3/4" N.T.N. 399.002 C-10x5m
05/03/23
821 SUM. E INST. DE TUBERIA PVC SAP 2 días dom  lun 06/03/23
ROSCA D=1" N.T.N. 399.002 C-10x5m
05/03/23
822 SUM. E INST. DE TUBERIA PVC SAP 2 días dom  lun 06/03/23
ROSCA D=1 1/2" N.T.N. 399.002 C-10x5m
05/03/23

823 SUM. E INST. DE TUBERIA PVC SAP 2 días dom  lun 06/03/23


ROSCA D=1 1/4" N.T.N. 399.002 C-10x5m
05/03/23

824 ACCESORIOS REDES DE AGUA 1 día mar 07/03/23mar 07/03/23


825 SUM. E INST. DE TEE PVC SAP ROSCA Ø 1 día mar  mar 
1/2"x1/2"
07/03/23 07/03/23
826 SUM. E INST. DE TEE PVC SAP ROSCA Ø 1 día mar  mar 
2"x 2"
07/03/23 07/03/23
827 SUM. E INST. DE CODO PVC SAP ROSCA 1 día mar  mar 
Ø 1/2"x90°
07/03/23 07/03/23
828 SUM. E INST. DE CODO PVC SAP ROSCA 1 día mar  mar 
Ø 1"x90°
07/03/23 07/03/23
829 SUM. E INST. DE REDUCCION PVC SAP 1 día mar  mar 
ROSCA Ø 1"a 1/2"
07/03/23 07/03/23
830 SUM. E INST. DE REDUCCION PVC SAP 1 día mar  mar 
ROSCA Ø 2"a 3/4"
07/03/23 07/03/23
831 SUM. E INST. DE GRIFO de RIEGO Ø 1/2" 1 día mar 07/03/23mar 07/03/23
832 SUM. E INST. DE LLAVE ESFERICA TIPO 1 día mar  mar 
PESADO PARA GRIFO Ø 1/2"
07/03/23 07/03/23
833 VALVULAS 1 día mar 07/03/23mar 07/03/23
834 SUM. E INST. DE VALVULA DE 1 día mar  mar 
COMPUERTA Ø 1/2"
07/03/23 07/03/23
835 SUM. E INST. DE VALVULA DE 1 día mar  mar 
COMPUERTA Ø 3/4"
07/03/23 07/03/23
836 SUM. E INST. DE VALVULA DE 1 día mar  mar 
COMPUERTA Ø 1"
07/03/23 07/03/23
837 SUM. E INST. DE VALVULA DE PASO Ø 1" 1 día mar  mar 
07/03/23 07/03/23
838 SUM. E INST. DE CAJA DE VALVULAS 1 día mar 07/03/23mar 07/03/23
839 ALMACENAMIENTO DE AGUA 1 día mar 07/03/23mar 07/03/23
840 SUM. E INST. DE VALVULA FLOTADORA 1 día mar  mar 
Ø1"
07/03/23 07/03/23
841 SUM. E INST. DE TUB. F° Gvdo. Ø 1 1/2" 1 día mar 07/03/23mar 07/03/23
842 SUM. E INST. DE VALVULA DE PIE Ø 1 1/2" 1 día mar  mar 
07/03/23 07/03/23
843 CODO F° Gvdo. 1 1/2"x90º 1 día mar 07/03/23mar 07/03/23
844 UNION UNIVERSAL F° Gvdo. Ø1 1/2" 1 día mar 07/03/23mar 07/03/23
845 REDUCCIÓN DE BRONCE - 1 1/2" A 1 1/4" 1 día mar  mar 
07/03/23 07/03/23
846 VALVULA COMP. DE BRONCE DE 1 1/2" 1 día mar 07/03/23mar 07/03/23
847 ELECTROBOMBA CENTRIFUGA POT=1.00 1 día mar  mar 
HP
07/03/23 07/03/23
848 SUM. E INST. DE TUB. F° Gvdo. Ø1 1/4"
1 día mar 07/03/23mar 07/03/23
849 SUM. E INST. DE TUB. F° Gvdo. Ø2" 1 día mar 07/03/23mar 07/03/23
850 VALVULA COMP. DE BRONCE DE 1 1/4" 1 día mar 07/03/23mar 07/03/23
851 VALVULA COMP. DE BRONCE DE 2" 1 día mar 07/03/23mar 07/03/23
852 UNION UNIVERSAL F° Gvdo. Ø2" 1 día mar 07/03/23mar 07/03/23
853 CODO F°G° 1 1/4" X 90° 1 día mar 07/03/23mar 07/03/23
854 CODO F°G° 2" X 90° 1 día mar 07/03/23mar 07/03/23
855 VALVULA CHECK Ø 1 1/4" 1 día mar 07/03/23mar 07/03/23
856 SUM. E INST. DE VALVULA FLOTADORA Ø 1 día mar  mar 
1 1/4"
07/03/23 07/03/23
857 CANASTILLA DE BRONCE 1" 1 día mar 07/03/23mar 07/03/23
858 TEE F° Gvdo. 1 1/4" x 90° 1 día mar 07/03/23mar 07/03/23
859 SUM. E INST. DE SOMBRERO 1 día mar  mar 
VENTILACION Ø2"
07/03/23 07/03/23
860 SUM. E INST. DE ABRAZADERAS 1 día mar  mar 
METALICAS
07/03/23 07/03/23

Proyecto: CEDRO1 Tarea División Hito Resumen Resumen del proyecto Tarea inactiva Hito inactivo Resumen inactivo Tarea manual solo duración Informe de resumen manual Resumen manual solo el comienzo solo fin Tareas externas Hito externo Fecha límite Progreso Progreso manual
Fecha: mar 21/02/23

Página 5
Id Nombre de tarea Duración Comienzo Fin 06 feb '23 13 feb '23 20 feb '23 27 feb '23 06 mar '23 13 mar '23 20 mar '23 27 mar '23 03 abr '23 10 abr '23 17 abr '23 24 abr '23 01 may '23 08 may '23 15 may '23 22 may '23 29 may '23 05 jun '23 12 jun '23 19 jun '23 26 jun '23 03 jul '23
X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L
861 EQUIPO Y OTRAS INSTALACIONES 5 días mar 07/03/23sáb 11/03/23
862 CONEXIONES A LA RED EXTERNA Y 2 días mar  mié 
MEDIDOR
07/03/23 08/03/23
863 PRUEBA HIDRAULICA DE AGUA POTABLE 5 días mar  sáb 
TUB. PVC Ø2"- 11/2"-11/4"-1" -3/4"-1/2"
07/03/23 11/03/23

864 SISTEMA DE DRENAJE PLUVIAL 5 días jue 02/03/23 lun 06/03/23


865 REDES COLECTORAS 4 días jue 02/03/23 dom 05/03/2
866 SUM. E INST. DE TUBERIA DE P.V.C. NPT 4 días jue 02/03/23 dom 
ISO 4435 UNIFLEX S-25 DN 75 MM
05/03/23
867 PRUEBAS HIDRAULICAS 1 día lun 06/03/23lun 06/03/23
868 PRUEBA HIDRAULICA DE DESAGUE TUB. 1 día lun 06/03/23 lun 06/03/23
PVC DN= 75 mm

869 SISTEMA DE DESAGUE Y VENTILACION 11 días jue 02/03/23 dom 12/03/2


870 REDES DE DERIVACION 2 días sáb 11/03/23dom 12/03/2
871 SUM. E INST. DE TUBERIA DE P.V.C. NPT 2 días sáb  dom 
ISO 4435 UNIFLEX S-25 DN 100 MM
11/03/23 12/03/23
872 PRUEBAS HIDRAULICAS 1 día jue 02/03/23 jue 02/03/23
873 PRUEBA HIDRAULICA DE DESAGUE TUB. 1 día jue 02/03/23 jue 02/03/23
PVC DN= 100 mm

874 CAMARAS DE INSPECCION 8 días dom 05/03/2dom 12/03/2


875 CAJA VALVULA DE CONTROL 12"X12" 4 días dom 05/03/2 mié 08/03/23
876 CAJA DE REUNION 12" X 24" 2 días dom 05/03/2 lun 06/03/23
877 CAJA DE REGISTRO DE DESAGUE 12" X 24" 8 días dom  dom 
CON TAPA
05/03/23 12/03/23
878 MODULOS 15 días jue 02/03/23 jue 16/03/23
879 SISTEMA DE DESAGUE 10 días vie 03/03/23 dom 12/03/2
880 APARATOS Y ACCESORIOS SANITARIOS 10 días vie 03/03/23 dom 12/03/2
881 SUMINISTRO DE APARATOS SANITARIOS 8 días vie 03/03/23 vie 10/03/23
Y ACCESORIOS

882 INODORO TANQUE DE LOSA 1ERA 2 días vie 03/03/23 sáb 


CALIDAD P/NIÑOS (NAC. BLANCO)
04/03/23
883 LAVATORIO DE LOSA TIPO OVALIN 2 días dom  lun 06/03/23
INC. GRIFERIA TIPO PALANCA P/
NIÑOS 05/03/23

884 URINARIO DE LOSA TIPO BAMBI O 2 días mar  mié 


SIMILAR
07/03/23 08/03/23
885 LAVADERO ACERO INOXIDABLE 2 días jue 09/03/23 vie 10/03/23
C/ESCURRIDERA DE 18"x35"

886 INSTALACION DE APARATOS 2 días sáb  dom 


SANITARIOS Y ACCESORIOS
11/03/23 12/03/23
887 INSTALACION DE INODORO TANQUE 2 días sáb  dom 
DE LOSA 1ERA CALIDAD P/NIÑOS
(NAC. BLANCO) 11/03/23 12/03/23

888 INSTALACION DE LAVATORIO DE 2 días sáb  dom 


LOSA TIPO OVALIN INC. GRIFERIA
TIPO PALANCA P/ NIÑOS 11/03/23 12/03/23

889 INSTALACION DE URINARIO DE LOSA 2 días sáb  dom 


TIPO BAMBI O SIMILAR
11/03/23 12/03/23
890 INSTALACION DE LAVADERO ACERO 2 días sáb  dom 
INOXIDABLE C/ESCURRIDERA DE
18"x35" 11/03/23 12/03/23

891 SISTEMA DE AGUA FRIA 6 días jue 02/03/23 mar 07/03/23


892 SALIDA DE AGUA FRIA 3 días jue 02/03/23 sáb 04/03/23
893 SALIDA DE AGUA FRIA PVC C-10 Ø 1/2" 3 días jue 02/03/23 sáb 04/03/23
894 REDES DE ALIMENTACION 2 días dom 05/03/2lun 06/03/23
895 TUBERIA PVC SAP PRESION D=1/2" N.T.N. 2 días dom  lun 06/03/23
399.002 C-10x5m
05/03/23
896 ACCESORIOS DE REDES DE AGUA 1 día mar 07/03/23mar 07/03/23
897 CODO PVC SAP 1/2" X 90° 1 día mar 07/03/23mar 07/03/23
898 TEE PVC SAP 1/2" X 1/2" 1 día mar 07/03/23mar 07/03/23
899 VALVULAS 1 día mar 07/03/23mar 07/03/23
900 VALVULA COMP. DE BRONCE DE 1/2" 1 día mar 07/03/23mar 07/03/23
901 UNION UNIVERSAL PVC SAP Ø 1/2" 1 día mar 07/03/23mar 07/03/23
902 SISTEMA DE DRENAJE PLUVIAL 7 días jue 02/03/23 mié 08/03/23
903 REDES DE RECOLECCCION SISTEMA 3 días jue  sáb 
PLUVIAL
02/03/23 04/03/23
904 TUBERIA PVC UF S-25 D=75 mm 3 días jue 02/03/23 sáb 04/03/23
905 ACCESORIOS 4 días dom 05/03/2mié 08/03/23
906 CODO DN=75 mm x 90° 2 días dom 05/03/2 lun 06/03/23
907 REGISTRO Ø3" 1 día mar 07/03/23mar 07/03/23
908 ABRAZADERA DE FIJACION EN LA 1 día mié  mié 
COLUMNA
08/03/23 08/03/23
909 DESAGUE Y VENTILACION 8 días jue 09/03/23 jue 16/03/23
910 SALIDA DE DESAGÜE 6 días jue 09/03/23 mar 14/03/23
911 SALIDAS DE DESAGUE Ø4" 2 días jue 09/03/23 vie 10/03/23
912 SALIDAS DE DESAGUE Ø2" 2 días sáb 11/03/23dom 12/03/2
913 SALIDAS DE VENTILACION Ø2" 2 días lun 13/03/23 mar 14/03/23
914 REDES COLECTORAS 5 días sáb 11/03/23mié 15/03/23
915 TUBERIA PVC PESADO Ø4" (COLECTOR) 4 días sáb  mar 
11/03/23 14/03/23
916 TUBERIA PVC PESADO Ø2" (COLECTOR) 3 días lun 13/03/23 mié 
15/03/23
917 ACCESORIOS DE REDES COLECTORAS 1 día jue 16/03/23 jue 16/03/23
918 REGISTRO ROSCADO Ø4" 1 día jue 16/03/23 jue 16/03/23
919 REGISTRO ROSCADO Ø2" 1 día jue 16/03/23 jue 16/03/23
920 SUMIDERO PISO DE BRONCE Ø2" 1 día jue 16/03/23 jue 16/03/23
921 YEE PVC SAL DE 4" A 4" 1 día jue 16/03/23 jue 16/03/23
922 YEE PVC SAL DE 4" A 2" 1 día jue 16/03/23 jue 16/03/23
923 YEE PVC SAL DE 2" A 2" 1 día jue 16/03/23 jue 16/03/23
924 CODO PVC SAP 4"x 45º 1 día jue 16/03/23 jue 16/03/23
925 CODO PVC SAP 2"x 45º 1 día jue 16/03/23 jue 16/03/23
926 CODO PVC SAP 2"x 90º 1 día jue 16/03/23 jue 16/03/23
927 REDUCCION 4" a 2" 1 día jue 16/03/23 jue 16/03/23
928 SOMBRERO VENTILACION PVC DE 2" 1 día jue 16/03/23 jue 16/03/23
929 BIODIGESTOR-POZO PERCOLADOR-CAJA DE 8 días jue  jue 
LODOS
02/03/23 09/03/23
930 TRABAJOS PRELIMINARES 2 días jue 02/03/23 vie 03/03/23
931 LIMPIEZA DE TERRENO MANUAL 1 día jue 02/03/23 jue 02/03/23
932 TRAZO Y REPLANTEO 1 día vie 03/03/23 vie 03/03/23
933 MOVIMIENTO DE TIERRAS 4 días jue 02/03/23 dom 05/03/2
934 EXCAVACIÓN MANUAL PARA 2 días jue 02/03/23 vie 03/03/23
ESTRUCTURAS DE SANEAMIENTO

935 FILTRO DE GRAVA 2 días sáb 04/03/23dom 05/03/2


936 ACARREO MATERIAL EXCEDENTE HASTA 2 días sáb  dom 
UNA DISTANCIA PROMEDIO DE 30.00 ML
04/03/23 05/03/23
937 TAPA DE CONCRETO 5 días sáb 04/03/23mié 08/03/23
938 CONCRETO F'C=175 Kg/CM2 2 días mar 07/03/23mié 08/03/23
939 ENCOFRADO Y DESENCOFRADO 2 días dom 05/03/2 lun 06/03/23
940 ACERO f'y=4200 kg/cm2, GRADO 60 1 día sáb 04/03/23sáb 04/03/23
941 ANILLO DE CONCRETO 5 días sáb 04/03/23mié 08/03/23
942 CONCRETO F'C=175 Kg/CM2 2 días mar 07/03/23mié 08/03/23
943 ENCOFRADO Y DESENCOFRADO 2 días dom 05/03/2 lun 06/03/23
944 ACERO f'y=4200 kg/cm2, GRADO 60 1 día sáb 04/03/23sáb 04/03/23
945 MURO DE LADRILLO 3 días sáb 04/03/23lun 06/03/23
946 MURO DE LADRILLO ARTESANAL DE SOGA 3 días sáb  lun 06/03/23
DE 9 X 12.5 X 23 C:a 1:4 X 1.5CM
04/03/23
947 SISTEMA DE DESAGUE 1 día jue 09/03/23 jue 09/03/23
948 TUBERIA PVC 2" 1 día jue 09/03/23 jue 09/03/23
949 CODO PVC SAP 2"x 90º 1 día jue 09/03/23 jue 09/03/23
950 INSTALACION DE BIODIGESTOR 8 días jue 02/03/23 jue 09/03/23
951 TRABAJOS PRELIMINARES 2 días jue 02/03/23 vie 03/03/23
952 LIMPIEZA DE TERRENO MANUAL 1 día jue 02/03/23 jue 02/03/23
953 TRAZO Y REPLANTEO 1 día vie 03/03/23 vie 03/03/23
954 MOVIMIENTO DE TIERRAS 4 días jue 02/03/23 dom 05/03/2
955 EXCAVACIÓN MANUAL PARA 2 días jue 02/03/23 vie 03/03/23
ESTRUCTURAS DE SANEAMIENTO

956 RELLENO CON MATERIAL PROPIO EN 2 días sáb  dom 


SANEAMIENTO
04/03/23 05/03/23
957 ACARREO MATERIAL EXCEDENTE HASTA 1 día sáb  sáb 
UNA DISTANCIA PROMEDIO DE 30.00 ML
04/03/23 04/03/23

958 CONCRETO SIMPLE 1 día sáb 04/03/23sáb 04/03/23


959 SOLADO f'c=140 kg/cm2 + 30 % P.G 1 día sáb 04/03/23sáb 04/03/23
960 CONCRETO ARMADO 3 días sáb 04/03/23lun 06/03/23
961 CONCRETO F'C=175 Kg/CM2 1 día lun 06/03/23 lun 06/03/23
962 ENCOFRADO Y DESENCOFRADO 1 día dom 05/03/2 dom 05/03/2
963 ELECTROMALLA HIERRO N°3 1 día sáb 04/03/23sáb 04/03/23
964 BIODIGESTOR 1 día mar 07/03/23mar 07/03/23
965 SUMINISTRO E INST. DE BIODIGESTOR 1 día mar  mar 
AUTOLIMPIABLE DE PVC DE 3000 L.
07/03/23 07/03/23
966 SUMINISTRO Y COLOCACIÓN DE TUBERIAS 2 días mié  jue 
08/03/23 09/03/23
967 TUBERIA PVC 2" 1 día mié 08/03/23mié 08/03/23
968 SUMINISTRO E INST. VALVULA DE PVC 1 día jue 09/03/23 jue 09/03/23
DE 2"

969 INSTALACIONES ELECTRICAS 47 días vie 03/02/23 mar 21/03/23


970 ACOMETIDA PRINCIPAL 13 días mié 22/02/23lun 06/03/23
971 MEDIDOR ELECTRÓNICO MONOFASICO 2 días jue 02/03/23 vie 03/03/23
972 CONDUCTOR DE COBRE CONCENTRICO 10MM2 3 días sáb 04/03/23lun 06/03/23
973 ZANJA DE 0.40m x 0.60m 2 días mié 22/02/23jue 23/02/23
974 BUZON DE CONCRETO DE 30X30X25 2 días vie 24/02/23 sáb 25/02/23
975 MURETE INCL. CAJA PORTAMEDIDOR, 6 días vie 24/02/23 mié 
TUBERIA, MASTIL
01/03/23
976 SERVICIO DE INSTALACIÓN 1 día mié 22/02/23mié 22/02/23
977 SALIDAS PARA ALUMBRADO, TOMACORRIENTE Y 5 días mar  sáb 
FUERZA
07/03/23 11/03/23
978 SALIDA DE ILUMINACIÓN 4 días mar 07/03/23vie 10/03/23
979 SALIDA PARA LUMINARIA CIRCULAR LED 4 días mar  vie 10/03/23
30W (INCL. LUMINARIA Y EQUIP.)
07/03/23
980 SALIDA PARA LUMINARIA PANEL LED 40W 4 días mar  vie 10/03/23
(INCL. LUMINARIA Y EQUIP.)
07/03/23
981 SALIDA PARA INTERRUPTORES 2 días mar 07/03/23mié 08/03/23
982 SALIDA PARA INTERRUPTOR DOBLE (INCL. 2 días mar  mié 
INTERRUPTOR)
07/03/23 08/03/23
983 SALIDA PARA INTERRUPTOR SIMPLE (INCL. 2 días mar  mié 
INTERRUPTOR)
07/03/23 08/03/23
984 SALIDA PARA TOMACORRIENTES 5 días mar 07/03/23sáb 11/03/23
985 SALIDA PARA TOMACORRIENTE 3 días mar  jue 09/03/23
MONOFÁSICO DOBLE 15A, CON L/T PLACA
DE ACERO INOXIDABLE EN PARED 07/03/23

986 SALIDA PARA TOMACORRIENTE 4 días mar  vie 10/03/23


MONOFÁSICO A PRUEBA DE AGUA 15A,
CON L/T PLACA DE ACERO INOXIDABLE EN 07/03/23
PARED

987 SALIDA PARA LUZ DE EMERGENCIA 5 días mar  sáb 


(LLEGADA CONDUIT FLEXIBLE INCL. EQ.)
07/03/23 11/03/23
988 CONDUCTORES 2 días dom 12/03/2lun 13/03/23
989 2-1x16mm2 N2XOH (F)+1x10mm2LSOH(T) 2 días dom 12/03/2 lun 13/03/23
990 2-1x6mm2 N2XOH (F)+1x6mm2LSOH(T) 2 días dom 12/03/2 lun 13/03/23
991 2-1x4mm2 N2XOH (F)+1x4mm2LSOH(T) 2 días dom 12/03/2 lun 13/03/23
992 2-1x2.5mm2 N2XOH (F)+1x2.5mm2LSOH(T) 2 días dom 12/03/2 lun 13/03/23
993 CANALIZACION CONDUCTOS O TUBERIA 8 días mar 07/03/23mar 14/03/23
994 TUBERIA ELECTRICA PVC-SAP-20mm 6 días mar 07/03/23dom 12/03/2
995 TUBERIA ELECTRICA PVC-SAP-30mm 8 días mar 07/03/23mar 14/03/23
996 TABLEROS 4 días dom 12/03/2mié 15/03/23
997 TABLERO GENERAL 4 días dom 12/03/2 mié 15/03/23
998 TABLERO DE DISTRIBUCION TD 1-1 2 días dom 12/03/2 lun 13/03/23
999 TABLERO DE DISTRIBUCION TD 1-2 2 días dom 12/03/2 lun 13/03/23
1000 TABLERO DE DISTRIBUCION TD 1-3 2 días dom 12/03/2 lun 13/03/23
1001 TABLERO DE DISTRIBUCION TD 1-4 2 días dom 12/03/2 lun 13/03/23
1002 TABLERO DE DISTRIBUCION TD 1-5 2 días dom 12/03/2 lun 13/03/23
1003 TABLERO DE DISTRIBUCION TD 1-6 2 días dom 12/03/2 lun 13/03/23
1004 TABLERO DE DISTRIBUCION TD 1-7 2 días dom 12/03/2 lun 13/03/23
1005 TABLERO DE DISTRIBUCION TD 1-8 2 días dom 12/03/2 lun 13/03/23
1006 TABLERO DE ELECTROBOMBA 2 días dom 12/03/2 lun 13/03/23
1007 INTERRUPTORES 1 día jue 16/03/23 jue 16/03/23
1008 INTERRUPTOR TERMOMAGNETICO TIPO CAJA 1 día jue 16/03/23 jue 16/03/23
MOLDEADA 3P 63A

1009 INTERRUPTOR TERMOMAGNETICO TIPO RIEL 1 día jue 16/03/23 jue 16/03/23


DIN BIPOLAR 32A

1010 INTERRUPTOR TERMOMAGNETICO TIPO RIEL 1 día jue 16/03/23 jue 16/03/23


DIN BIPOLAR 20A

1011 INTERRUPTOR TERMOMAGNETICO TIPO RIEL 1 día jue 16/03/23 jue 16/03/23


DIN BIPOLAR 16A

1012 DETECCCION DE INCENDIO 6 días jue 16/03/23 mar 21/03/23


1013 DETECTOR DE HUMO ÁNALOGO 2 días jue 16/03/23 vie 17/03/23
DIRECCIONABLE

1014 CENTRAL DE ALARMA CONTRAINCENDIO 4 días jue 16/03/23 dom 19/03/2


1015 CABLE FPL 4X18 AWG 6 días jue 16/03/23 mar 21/03/23
1016 SALIDA PARA LUZ ESTROBOSCOPICA Y 4 días jue 16/03/23 dom 
PULSADOR
19/03/23
1017 DATA E INTERNET 4 días jue 16/03/23 dom 19/03/2
1018 CABLE F.O. MULTIMODO 12 PARES 2 días jue 16/03/23 vie 17/03/23
1019 SWITCH PRINCIPAL 2 días jue 16/03/23 vie 17/03/23
1020 SWITCH DE DISTRIBUCIÓN 2 días jue 16/03/23 vie 17/03/23
1021 CABLE UTP CAT-6 4 días jue 16/03/23 dom 19/03/2
1022 TUBERIA ELECTRICA PVC-SAP-20mm 2 días jue 16/03/23 vie 17/03/23
1023 SALIDA PARA DATA (INCL FACE PLATE) 1 día jue 16/03/23 jue 16/03/23
1024 CAJA DE PASO PVC 150x150mm 1 día jue 16/03/23 jue 16/03/23
1025 PUESTA A TIERRA Y PROTECCION 8 días mar 07/03/23mar 14/03/23
1026 CABLE DE COBRE DESNUDO 16 mm2 1 día mar 07/03/23mar 07/03/23
1027 POZO DE PUESTA A TIERRA 8 días mar 07/03/23mar 14/03/23
1028 PARARRAYO DESIONIZANTE 4 días mar 07/03/23vie 10/03/23
1029 MASTIL DE A°G°15m 2 días mar 07/03/23mié 08/03/23
1030 AISLADOR TIPO CARRETE 2 días mar 07/03/23mié 08/03/23
1031 OBRAS EXTERIORES 15 días vie 03/02/23 vie 17/02/23
1032 POSTE ESTRUCTURA ORNAMENTAL 15 días vie 03/02/23 vie 17/02/23
1033 LUMINARIA TIPO FAROLAS 150W 8 días vie 03/02/23 vie 10/02/23
1034 MOBILIARIO - EQUIPAMIENTO 40 días jue 16/03/23 lun 24/04/23
1035 MOBILIARIO-EQUIPAMIENTO MODULO A 5 días jue 16/03/23 lun 20/03/23
1036 MOBILIARIO-EQUIPAMIENTO MODULO B 5 días mar 21/03/23sáb 25/03/23
1037 MOBILIARIO-EQUIPAMIENTO MODULO C 5 días dom 26/03/2 jue 30/03/23
1038 MOBILIARIO-EQUIPAMIENTO MODULO D 5 días vie 31/03/23 mar 04/04/23
1039 MOBILIARIO-EQUIPAMIENTO MODULO E 5 días mié 05/04/23dom 09/04/2
1040 MOBILIARIO-EQUIPAMIENTO MODULO F 5 días lun 10/04/23 vie 14/04/23
1041 MOBILIARIO-EQUIPAMIENTO MODULO G 5 días sáb 15/04/23mié 19/04/23
1042 MATERIAL DIDACTICO 5 días jue 20/04/23 lun 24/04/23
1043 CAPACITACION 4 días vie 03/02/23 lun 06/02/23
1044 PROGRAMA DE CAPACITACION A LOS DOCENTES 1 día vie 03/02/23 vie 03/02/23
EN EL SISTEMA CURRICULAR NACIONAL-RUTAS
DE APRENDISAJE.

1045 CAPACITACION A LOS DOCENTES EN OPERACIÓN 1 día sáb  sáb 


DE BIENES
04/02/23 04/02/23
1046 CAPACITACION A LOS DOCENTES Y APAFA EN EL 1 día dom  dom 
MANTENIMIENTO DE BIENES EDUCATIVOS.
05/02/23 05/02/23
1047 CAPACITACION T.I.C. PARA DOCENTES 1 día lun 06/02/23 lun 06/02/23
1048 PLAN DE MANEJO DE RESIDUOS SOLIDOS 139 días vie 03/02/23 mié 21/06/23
1049 DISPOSICIÓN FINAL DE RESIDUOS SOLIDOS A 9 días vie 03/02/23 sáb 
TRAVES DE EO-RS
11/02/23
1050 CAPACITACIÓN EN MATERIA DE MANEJO DE 60 días dom  mié 
RESIDUOS GENERADOS EN OBRA DIRIGIDO A
LOS TRABAJADORES 12/02/23 12/04/23

1051 INSTALACIÓN DE CASETAS PROVISIONALES 30 días jue 13/04/23 vie 12/05/23


PARA SEGREGACIÓN DE RESIDUOS DE OBRA

1052 INSTALACION DE CONTENEDORES 20 días sáb  jue 01/06/23


PROVISIONALES PARA SEGREGACIÓN DE
RESIDUOS GENERADOS EN OBRA 13/05/23

1053 INSTALACION DE SEÑALIZACIÓN EN CASETAS DE 20 días vie 02/06/23 mié 


CONTENEDORES PARA SEGREGACIÓN DE
RESIDUOS GENERADOS EN OBRA 21/06/23

1054 PERSONAL ENCARGADO DEL MANEJO DE LOS 2 días vie 03/02/23 sáb 


RESIDUOS GENERADOS EN OBRA (ING.
AMBIENTAL) 04/02/23

Proyecto: CEDRO1 Tarea División Hito Resumen Resumen del proyecto Tarea inactiva Hito inactivo Resumen inactivo Tarea manual solo duración Informe de resumen manual Resumen manual solo el comienzo solo fin Tareas externas Hito externo Fecha límite Progreso Progreso manual
Fecha: mar 21/02/23

Página 6