"MEJORAMIENTO Y AMPPLIACION DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO EN EL CC.NN. NUEVA JERUSALEN, DISTRITO DE TROMPETEROS,
OBRA:
PROVINCIA DE LORETO, REGION LORETO"
VALORIZACION %
MONTO SALDO POR
DESCRIPCION AVANCE
CONTRATADO ANTERIOR ACTUAL ACUMULADO VALORIZAR
ACUMULADO
VALORIZACION CONTRACTUAL
VALORIZACION DE OBRA N°10
01 SISTEMA DE AGUA POTABLE 1,698,503.28 915,001.28 0.00 915,001.28 53.87% 783,502.00
02 SISTEMA DE DISPOSICION DE EXCRETAS - UBS 1,330,689.02 1,036,839.85 0.00 1,036,839.85 77.92% 293,849.17
03 MEDIDAS PREVENTIVAS Y ADECUACIONES - COVID19 170,551.27 162,363.10 0.00 162,363.10 95.20% 8,188.17
80.00%
10; 66.04%
60.00%
11; 53.87%
6; 48.58% 7; 47.04% 8; 50.49% 9; 49.75%
10; 53.87%
6; 44.75%
8; 48.58% 9; 50.74%
4; 42.18% 5; 38.80%
3; 40.62% 7; 48.58%
40.00%
5; 42.93%
AVANCE PROGRAMADO
2; 26.26% 4; 32.32%
AVANCE VALORIZADO
3; 26.82%
2; 20.38%
20.00%
1; 0.00% 0 0 0 0 0 0 0 0 0 0 0
0.00%
MONTOS y/o PORCENTAJES VALORIZADOS PROGRAMADOS MONTOS y/o PORCENTAJES VALORIZADOS EJECUTADOS
NUEVOS SOLES PORCENTAJES NUEVOS SOLES PORCENTAJES
MES - AÑO PARCIAL ACUMULADO PARCIAL ACUMULADO MES - AÑO PARCIAL ACUMULADO PARCIAL ACUMULADO
0 0.00% 0.00% 0.00% 0.00%
22 Sep-21 446,009.88 446,009.88 26.26% 26.26% Sep-21 346,096.55 346,096.55 20.38% 20.38%
31 Oct-21 9,595.57 455,605.45 0.56% 26.82% Oct-21 343,781.35 689,877.90 20.24% 40.62%
30 Nov-21 93,427.24 549,032.69 5.50% 32.32% Nov-21 26,495.41 716,373.31 1.56% 42.18%
20 Dec-21 110,000.00 659,032.69 6.48% 38.80% Dec-21 12,743.02 729,116.33 0.75% 42.93%
11 Dec-21 101,097.00 760,129.69 5.95% 44.75% Dec-21 96,009.43 825,125.76 5.65% 48.58%
9 May-22 38,850.21 798,979.90 2.29% 47.04% May-22 - 825,125.76 0.00% 48.58%
30 Jun-22 58,529.93 857,509.83 3.45% 50.49% Jun-22 - 825,125.76 0.00% 48.58%
31 Jul-22 4,303.47 861,813.30 0.25% 50.74% Jul-22 19,825.36 844,951.12 1.17% 49.75%
15 Sep-22 259,839.90 1,121,653.20 15.30% 66.04% Sep-22 70,050.16 915,001.28 4.12% 53.87%
31 Oct-22 510,661.61 1,632,314.81 30.07% 96.11% Oct-22 - 915,001.28 0.00% 53.87%
8 Nov-22 66,188.53 1,698,503.28 3.90% 100% Nov-22
238 1,698,503.28 100% 0.00 915,001.28 0.00% 53.87%
10; 77.91%
11; 77.91% 80.00%
9; 75.23%
8; 71.80%
9; 68.31%
7; 60.09%
60.00%
6; 45.76% 8; 49.17%
AVANCE PROGRAMADO
5; 42.01% 7; 43.22%
AVANCE VALORIZADO
20.00%
2; 4.43%
1; 0.00%
0 0.00%
MONTOS y/o PORCENTAJES VALORIZADOS PROGRAMADOS MONTOS y/o PORCENTAJES VALORIZADOS EJECUTADOS
NUEVOS SOLES PORCENTAJES NUEVOS SOLES PORCENTAJES
MES - AÑO PARCIAL ACUMULADO PARCIAL ACUMULADO MES - AÑO PARCIAL ACUMULADO PARCIAL ACUMULADO
0 0.00% 0.00% 0.00% 0.00%
22 Sep-21 343,430.49 343,430.49 25.81% 25.81% Sep-21 58,929.97 58,929.97 4.43% 4.43%
31 Oct-21 152,678.81 496,109.30 11.47% 37.28% Oct-21 285,865.48 344,795.45 21.48% 25.91%
30 Nov-21 - 496,109.30 0.00% 37.28% Nov-21 164,876.83 509,672.28 12.39% 38.30%
20 Dec-21 3,260.13 499,369.43 0.24% 37.52% Dec-21 49,368.17 559,040.45 3.71% 42.01%
11 Dec-21 44,625.15 543,994.58 3.35% 40.87% Dec-21 49,940.80 608,981.25 3.75% 45.76%
9 May-22 31,207.48 575,202.06 2.35% 43.22% May-22 190,646.43 799,627.68 14.33% 60.09%
30 Jun-22 79,166.69 654,368.75 5.95% 49.17% Jun-22 155,873.19 955,500.87 11.71% 71.80%
31 Jul-22 254,692.07 909,060.82 19.14% 68.31% Jul-22 45,610.50 1,001,111.37 3.43% 75.23%
15 Sep-22 356,496.58 1,265,557.38 26.79% 95.10% Sep-22 35,728.48 1,036,839.85 2.68% 77.91%
31 Oct-22 65,131.63 1,330,688.99 4.89% 100.0% Oct-22 - 1,036,839.85 0.00% 77.91%
8 Nov-22 Nov-22
238 1,330,689.02 100.0% 0.00 1,036,839.85 0.00% 77.91%
NOTA: LOS MONTOS INCLUYEN COSTO DIRECTO DEL COMPONENTE SISTEMA DE DISPOSICION DE EXCRETAS - UBS
PORCENTAJE DE AVANCE: PROGRAMADO Vs EJECUTADO (CURVA S) - COMPONENTE COVID-19
0 días 30 días 60 días 90 días 120 días 150 días 180 días 210 días
1 100.00%
10; 97.16%
11;11;100%
100.00%
10; 95.20%
9; 90.39%
9; 89.85%
80.00%
8; 73.99%
7; 62.43% 8; 73.86%
5; 54.05% 6; 55.80%
7; 57.90% 60.00%
4; 52.46%
3; 31.51%
2; 25.07%
2; 16.52% 20.00%
1; 0.00%
0 0.00%
MONTOS y/o PORCENTAJES VALORIZADOS PROGRAMADOS MONTOS y/o PORCENTAJES VALORIZADOS EJECUTADOS
NUEVOS SOLES PORCENTAJES NUEVOS SOLES PORCENTAJES
MES - AÑO PARCIAL ACUMULADO PARCIAL ACUMULADO MES - AÑO PARCIAL ACUMULADO PARCIAL ACUMULADO
0 0.00% 0.00% 0.00% 0.00%
22 Sep-21 28,177.03 28,177.03 16.52% 16.52% Sep-21 42,761.19 42,761.19 25.07% 25.07%
31 Oct-21 25,559.74 53,736.77 14.99% 31.51% Oct-21 36,581.19 79,342.38 21.45% 46.52%
30 Nov-21 19,014.92 72,751.69 11.15% 42.66% Nov-21 10,137.12 89,479.50 5.94% 52.46%
20 Dec-21 11,205.78 83,957.47 6.57% 49.23% Dec-21 2,716.70 92,196.20 1.59% 54.05%
11 Dec-21 6,380.86 90,338.33 3.74% 52.97% Dec-21 2,978.50 95,174.70 1.75% 55.80%
9 May-22 8,414.07 98,752.40 4.93% 57.90% May-22 11,301.18 106,475.88 6.63% 62.43%
30 Jun-22 27,433.32 126,185.72 16.09% 73.99% Jun-22 19,489.36 125,965.24 11.43% 73.86%
31 Jul-22 27,976.27 154,161.99 16.40% 90.39% Jul-22 27,269.68 153,234.92 15.99% 89.85%
15 Sep-22 11,542.01 165,704.00 6.77% 97.16% Sep-22 9,128.18 162,363.10 5.35% 95.20%
31 Oct-22 4,847.31 170,551.27 2.83% 100% Oct-22 8,188.18 170,551.28 4.80% 100.00%
8 Nov-22 Nov-22
238 CD TOTAL 170,551.27 100% 8,188.18 170,551.28 4.80% 100.00%
80.00%
11; 72.80%
10; 79.78%
10; 66.07%
9; 62.48%
8; 59.58%
60.00%
7; 54.10% 9; 60.16%
8; 51.19%
5; 43.14%
6; 47.79% 7; 46.03% AVANCE VALORIZADO
AVANCE PROGRAMADO
4; 41.11%
PROGRAMADO 80%
6; 43.58% 40.00%
3; 34.81%
5; 40.51%
4; 34.93%
2; 25.55% 3; 31.42%
20.00%
2; 13.99%
1; 0.00% 1; 0.00% 0 0 0 0 0 0 0 0 0 0 0
0.00%
MONTOS y/o PORCENTAJES VALORIZADOS PROGRAMADOS MONTOS y/o PORCENTAJES VALORIZADOS EJECUTADOS
NUEVOS SOLES PORCENTAJES NUEVOS SOLES PORCENTAJES
MES - AÑO PARCIAL ACUMULADO PARCIAL ACUMULADO MES - AÑO PARCIAL ACUMULADO PARCIAL ACUMULADO
0 0.00% 0.00% 0.00% 0.00%
22 Sep-21 1,009,814.05 1,009,814.05 25.55% 25.55% Sep-21 553,048.80 553,048.80 13.99% 13.99%
31 Oct-21 231,988.13 1,241,802.18 5.87% 31.42% Oct-21 822,837.69 1,375,886.49 20.82% 34.81%
30 Nov-21 138,873.85 1,380,676.03 3.51% 34.93% Nov-21 248,878.00 1,624,764.49 6.30% 41.11%
20 Dec-21 220,375.32 1,601,051.35 5.58% 40.51% Dec-21 80,066.93 1,704,831.42 2.03% 43.14%
11 Dec-21 121,206.43 1,722,257.78 3.07% 43.58% Dec-21 183,937.28 1,888,768.70 4.65% 47.79%
9 May-22 96,918.05 1,819,175.83 2.45% 46.03% May-22 249,419.27 2,138,187.97 6.31% 54.10%
30 Jun-22 203,946.90 2,023,122.73 5.16% 51.19% Jun-22 216,584.88 2,354,772.85 5.48% 59.58%
31 Jul-22 354,430.04 2,377,552.77 8.97% 60.16% Jul-22 114,497.75 2,469,270.60 2.90% 62.48%
15 Sep-22 775,473.37 3,153,026.14 19.62% 79.78% Sep-22 141,921.41 2,611,192.01 3.59% 66.07%
31 Oct-22 717,131.24 3,870,157.38 18.15% 97.93% Oct-22 265,976.42 2,877,168.43 6.73% 72.80%
8 Nov-22 81,747.41 3,951,904.65 2.07% 100.00% Nov-22
238 3,951,904.65 100.00% 265,976.42 2,877,168.43 6.73% 72.80%
NOTA: LOS MONTOS INCLUYEN COSTO DIRECTO, GASTOS GENERALES Y UTILIDAD
SOLICITUD DE PAGO
Fecha Oct-22
Señor :
Cargo : ING° GUSTAVO PADILLA PINEDO
SUPERVISOR - PNSR
“MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO EN LA CCNN DE NUEVA JERUSALEN, DISTRITO DE
TROMPETEROS - LORETO – LORETO”
De acuerdo con la documentación y cálculos adjuntos se ha encontrado procedente efectuar los siguientes
pagos con cargo al Contrato de la Obra en referencia.
Estos pagos se harán de acuerdo a las siguientes reglas como se establece en el Reglamento de la Ley de
Contrataciones del Estado; aprobado mediante decreto Supremo Nª 350-2015-EF
SENCICO S/ -
Por lo expuesto :
Agradeceré a Ud. dar trámite al pago que se solicita.
Atentamente
.......................................................
Representante Legal
PROGRAMA NACIONAL DE SANEAMIENTO RURAL
OBRA:
GENERALIDADES DE LA OBRA
VALORIZACION DE OBRA N° 10 - OCTUBRE 2022
Nº DE VALORIZACION : 10
PERIODO DE VALORIZACION : Oct-22
MONTO DEL CONTRATO SIN IGV : 4,157,928.83
ADELANTO EN EFECTIVO
MONTO DEL ADELANTO CON IGV : 0.00
MONTO DEL ADELANTO SIN IGV : 415,792.88
FECHA DEL ADELANTO EN EFECTIVO : 13/07/2021
ADELANTO POR MATERIALES
MONTO DEL ADELANTO CON IGV : 0.00
MONTO DEL ADELANTO SIN IGV 831,585.76
FECHA PAGO DEL ADELANTO MATERIALES 23/09/2021
CUADRO COMPARATIVO DE AVANCE DE OBRA
DATOS GENERALES
FECHA
% % AVANCE (adelantada /
MONTO % MENSUAL PARCIAL ACUMULADO % ACUMULADO
ACUMULADO MENSUAL retrasada)
PROGRAMADO EJECUTADO
No
PERIODO PORCENTAJE SOLES PORCENTAJE
VAL.
MENSUAL ACUMULADO MENSUAL ACUMULADO MENSUAL ACUMULADO
1 Sep-21 25.55% 25.55% 553,048.80 553,048.80 13.30% 13.30%
2 Oct-21 5.87% 31.42% 822,837.69 1,375,886.49 19.79% 33.09%
3 Nov-21 3.51% 34.93%
4 Dec-21 3.07% 38.00%
5 May-22 2.45% 40.45%
6 Jun-22 5.16% 45.61%
7 Jul-22 8.97% 54.58%
8 Sep-22 19.62% 74.20%
1000.00%
800.00%
% DE AVANCE
600.00%
400.00%
200.00%
0.00%
Sep-18 Oct-18 Nov-18 Dec-18
PERIODO DE EJECUCION
VALORIZACION DE OBRA N° 10 - OCTUBRE 2022
MONTOS (S/.)
MES DE
CONCEPTO
VALORIZACIÓN PARCIAL TOTAL
CUADRO DE VALORIZACIONES
DEDUCCIONES AL CONTRATISTA
MONTOS (S/.)
FECHA CONCEPTO
PARCIAL TOTAL
CUADRO DE AMORTIZACIONES AD. DIRECTO
Sep-21 ADELANTO DIRECTO VAL No 01 55,304.88
Oct-21 ADELANTO DIRECTO VAL No 02 82,283.77
Nov-21 ADELANTO DIRECTO VAL No 03 24,887.80
Dec-21 ADELANTO DIRECTO VAL No 04 8,006.69
Dec-21 ADELANTO DIRECTO VAL No 05 18,393.73
May-22 ADELANTO DIRECTO VAL No 06 24,941.93
Jun-22 ADELANTO DIRECTO VAL No 07 21,658.49
Jul-22 ADELANTO DIRECTO VAL No 08 11,449.78
Sep-22 ADELANTO DIRECTO VAL No 09 14,192.14
Oct-22 ADELANTO DIRECTO VAL No 10 26,597.64
TOTAL AMORTIZACION ADEL.DIRECTO 287,716.85
SALDO 128,076.03
HOJA DE LIQUIDACION
1. CALCULO DE VALORIZACION Nº 10 Oct-22
2. AMORTIZACIONES
3. REAJUSTE DE VALORIZACIÓN N° 10
Total de Reajuste -
Deduccion de Reintegros por adelanto en Efectivo -
Deduccion de Reintegros por adelanto en Materiales -
Reajuste Neto - C
5. SENCICO
“MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO EN LA CCNN DE NUEVA JERUSALEN, DISTRITO DE
OBRA :
TROMPETEROS - LORETO – LORETO”
A= 415,792.88
C= 4,157,928.83
FORMULA : D = A * V /C (Kr / Ka - 1)
#REF!
VAL FECHA Imr FECHA AVANCES SEGÚN MONTO UTILIZADO SEGÚN DEDUCC. DE REINTEGRO SEGÚN
CALENDARIO VALORIZAC. CALENDARIO VALORIZAC. CALENDARIO VALORIZAC.
01 Sep-21 Sep-21 #REF! 553,048.80 #REF! 118,904.38 #REF! #REF!
02 Oct-21 Oct-21 - 822,837.69 #REF! #REF!
03 Nov-21 Nov-21 - 248,878.00 #REF! #REF!
04 Dec-21 Dec-21 - 183,937.28 #REF! #REF!
Proceso A.S. N° 02-2021-PNSR L.P N° 003-2020-PNSR Supervisor: ING° GUSTAVO PADILLA PINEDO
Entidad PROGRAMA NACIONAL DE SANEAMIENTO RURAL Residente: ING. ROBERTO URQUIA NORIEGA
Ubicación: CCNN NUEVA JERUSALEN - TROMPETEROS - LORETO - LORETMonto Referencial C/IGV: S/. 4,255,155.88 Fecha de Inicio: 9/9/2021
Contratista: CONSTRUCTORA C y C S.A.C Monto Contratado S/IGV: S/. 4,157,928.83 Plazo de Ejecución: 238 D.C.
Fecha de Término: 11/8/2022
01.04.05.01.02 SUMINISTRO E INSTALACION DE MANGUERA DE JEBE REFORZADA CON LONA Ø 2" m 5.53 21.10 116.68 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.53 116.68 100.00%
0.00
01.04.05.02 SUMINISTRO E INSTALACION DE ACCESORIOS
01.04.05.02.01 SUMINISTRO E INSTALACION DE ABRAZADERA INOXIDABLE Ø 3" und 1.00 16.72 16.72 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 16.72 100.00%
01.04.05.02.02 SUMINISTRO E INSTALACION DE REDUCCION DE PVC - Ø 3" x Ø 2" und 1.00 10.16 10.16 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 10.16 100.00%
01.04.06 OTROS
01.04.06.01 SUMINISTRO E INSTALACION DE CABLE DE ACERO TIPO BOA DE Ø 1/2" m 24.00 9.58 229.92 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 24.00 229.92 100.00%
01.04.06.02 SUMINISTRO E INSTALACION DE BARRA DE ANCLAJE DE Ø 5/8" und 2.00 105.52 211.04 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 211.04 100.00%
01.04.06.03 SUMINISTRO E INSTALACION DE FLOTADOR und 1.00 173.41 173.41 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 173.41 100.00%
01.04.06.04 SUMINISTRO E INSTALACION DE CABLE DE ACERO GALVANIZADO 3/8" m 1.58 7.43 11.74 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.58 11.74 100.00%
01.04.06.05 SUMINISTRO E INSTALACION DE GRAPAS DE Ø 3/8" und 4.00 31.16 124.64 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 124.64 100.00%
01.05 CASETA DE ALMACENAMIENTO DE BATERIAS E INSUMOS
01.05.01 OBRAS PRELIMINARES
01.05.01.01 LIMPIEZA DE TERRENO MANUAL m2 35.75 1.41 50.41 35.75 50.41 100.00% 0.00 0.00% 35.75 50.41 100.00% 0.00 0.00 0.00%
01.05.01.02 TRAZO, NIVELES Y REPLANTEO m2 15.75 1.07 16.85 15.75 16.85 100.00% 0.00 0.00% 15.75 16.85 100.00% 0.00 0.00 0.00%
01.05.02 MOVIMIENTO DE TIERRAS
01.05.02.01 EXCAVACION MANUAL EN TERRENO NORMAL m3 6.03 56.31 339.55 6.03 339.55 100.00% 0.00 0.00% 6.03 339.55 100.00% 0.00 0.00 0.00%
01.05.02.02 NIVELACION Y APISONADO MANUAL m2 10.24 1.76 18.02 10.24 18.02 100.00% 0.00 0.00% 10.24 18.02 100.00% 0.00 0.00 0.00%
01.05.02.03 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 1.03 58.99 60.76 1.03 60.76 100.00% 0.00 0.00% 1.03 60.76 100.00% 0.00 0.00 0.00%
01.05.02.04 ELIMINACION DE MATERIAL EXCEDENTE MANUAL HASTA UNA DISTANCIA PROMEDIO 30 ml. m3 6.50 25.60 166.40 6.50 166.40 100.00% 0.00 0.00% 6.50 166.40 100.00% 0.00 0.00 0.00%
01.05.03 OBRAS DE CONCRETO SIMPLE
01.05.03.01 CONCRETO EN CIMIENTOS CORRIDOS F´C = 140 KG/CM2 m3 4.69 351.33 1,647.74 4.69 1,647.74 100.00% 0.00 0.00% 4.69 1,647.74 100.00% 0.00 0.00 0.00%
01.05.03.02 DADO DE CONCRETO F´c = 140 Kg/cm2 m3 0.01 404.41 4.04 0.01 4.04 100.00% 0.00 0.00% 0.01 4.04 100.00% 0.00 0.00 0.00%
01.05.04 OBRAS DE CONCRETO ARMADO
01.05.04.01 SOBRECIMIENTO
01.05.04.01.01 CONCRETO F'c = 175 Kg/cm2 EN SOBRECIMIENTO m3 0.83 498.35 413.63 0.83 413.63 100.00% 0.00 0.00% 0.83 413.63 100.00% 0.00 0.00 0.00%
01.05.04.01.02 ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTO m2 11.00 48.01 528.11 11.00 528.11 100.00% 0.00 0.00% 11.00 528.11 100.00% 0.00 0.00 0.00%
VALORIZACION REAL DE OBRA
EJECUTADO
REAL POR EJECUTAR
PRESUPUESTO AVANCES
SALDO DE OBRA
PART. DESCRIPCIÓN Und. Metrado Precio U. Parcial ACUMULADO ANTERIOR MES ACTUAL ACUMULADO ACTUAL
Base S/. S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
01.05.04.01.03 ACERO DE REFUERZO FY= 4200 kg/cm2 EN SOBRECIMIENTO kg 59.92 4.66 279.23 59.92 279.23 100.00% 0.00 0.00% 59.92 279.23 100.00% 0.00 0.00 0.00%
01.05.04.02 COLUMNETAS
01.05.04.02.03 ACERO DE REFUERZO FY= 4200 kg/cm2 EN COLUMNETAS kg 96.16 4.66 448.11 96.16 448.11 100.00% 0.00 0.00% 96.16 448.11 100.00% 0.00 0.00 0.00%
01.05.04.03 COLUMNAS
01.05.04.03.01 CONCRETO F´C = 210 KG/CM2 EN COLUMNAS m3 0.76 569.93 433.15 0.00 0.00 0.00% 0.00 0.00% 0.76 433.15 100.00% 0.00 0.00 0.00%
01.05.04.03.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 12.20 56.71 691.86 0.00 0.00 0.00% 0.00 0.00% 12.20 691.86 100.00% 0.00 0.00 0.00%
01.05.04.03.03 ACERO DE REFUERZO FY= 4200 kg/cm2 EN COLUMNAS kg 137.20 4.66 639.35 137.20 639.35 100.00% 0.00 0.00% 137.20 639.35 100.00% 0.00 0.00 0.00%
01.05.04.04 VIGUETAS
01.05.04.04.01 CONCRETO f'c=175 kg/cm2 EN VIGUETAS m3 0.74 417.10 308.65 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.74 308.65 100.00%
01.05.04.04.02 ENCOFRADO Y DESENCOFRADO EN VIGUETAS m2 8.37 53.77 450.05 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.37 450.05 100.00%
01.05.04.04.03 ACERO DE REFUERZO fy=4,200 kg/cm2 EN VIGUETAS 74.95 4.66 349.27 74.95 349.27 100.00% 0.00 0.00% 74.95 349.27 100.00% 0.00 0.00 0.00%
01.05.04.05 VIGAS
01.05.04.05.03 ACERO DE REFUERZO fy=4,200 kg/cm2 EN VIGAS kg 167.39 4.66 780.04 41.85 195.02 25.00% 0.00 0.00% 41.85 195.02 25.00% 125.54 585.02 75.00%
01.05.04.06 LOSA ALIGERADA
01.05.04.06.01 CONCRETO F´C = 210 KG/CM2 EN LOSA ALIGERADA m3 0.81 423.72 343.21 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.81 343.21 100.00%
01.05.04.06.02 ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA m2 19.25 46.54 895.90 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 19.25 895.90 100.00%
01.05.04.06.03 ACERO DE REFUERZO fy=4,200 kg/cm2 EN LOSA ALIGERADA kg 89.73 4.66 418.14 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 89.73 418.14 100.00%
01.05.04.06.04 LADRILLO HUECO DE ARCILLA 15x30x30 PARA TECHO ALIGERADO und 136.00 2.71 368.56 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 136.00 368.56 100.00%
01.05.05 MUROS Y TABIQUES DE ALBAÑILERIA
01.05.05.01 MURO DE LADRILLO TUBULAR 12x15x24 ASENTADO DE CANTO m2 20.18 42.43 856.24 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.18 856.24 100.00%
01.05.05.02 SARDINEL DE LADRILLO TUBULAR 12x15x24 ASENTADO DE CANTO EN LOSA SUPERIOR m 18.40 31.62 581.81 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.40 581.81 100.00%
01.05.05.03 JUNTA EN MURO DE 1.5 CM m 30.00 8.77 263.10 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 30.00 263.10 100.00%
01.05.06 REVOQUES, ENLUCIDOS Y MOLDURAS
01.05.06.01 TARRAJEO CON IMPERMEAB.EN LOSA ALIGERADA - PARTE SUP. -1:5 (1bls cemento x 5 arena) m2 19.49 26.52 516.87 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 19.49 516.87 100.00%
01.05.06.02 TARRAJEO DE MUROS INTERIOR Y EXTERIOR - 1:5 (1 bls. cemento x 5 arena) m2 54.42 26.22 1,426.89 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 54.42 1,426.89 100.00%
01.05.06.03 TARRAJEO EN COLUMNAS - 1:5 (1 bls. cemento x 5 arena) m2 17.52 39.52 692.39 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 17.52 692.39 100.00%
01.05.06.04 VESTIDURA DE ARISTAS EN COLUMNAS - 1:5 (1 bls. cemento x 5 arena) m 23.35 19.33 451.36 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 23.35 451.36 100.00%
01.05.06.05 TARRAJEO EN VIGAS - 1:5 (1 bls. cemento x 5 arena) m2 7.75 39.52 306.28 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.75 306.28 100.00%
01.05.06.06 VESTIDURA DE ARISTAS EN VIGAS - 1:5 (1 bls. cemento x 5 arena) m 12.00 19.33 231.96 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.00 231.96 100.00%
01.05.06.07 TARRAJEO EN CIELORRASO - 1:5 (1 bls. cemento x 5 arena) m2 19.16 38.27 733.25 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 19.16 733.25 100.00%
01.05.06.08 VESTIDURA DE DERRAMES A= 0.15m MORTERO 1:5 m 20.30 15.02 304.91 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.30 304.91 100.00%
01.05.07 ZOCALOS Y CONTRAZOCALOS
01.05.07.01 CONTRAZOCALO CEMENTO SEMIPULIDO SIN COLOREAR H=20CM (EXTERIOR) m 13.10 15.42 202.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.10 202.00 100.00%
01.05.08 PISOS Y PAVIMENTOS
01.05.08.01 PISO DE CEMENTO SEMIPULIDO Y BRUÑADO E=4" m2 10.34 39.29 406.26 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.34 406.26 100.00%
01.05.08.02 VEREDA DE CEMENTO SEMIPULIDO Y BRUÑADO E=4" m2 3.50 39.27 137.45 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.50 137.45 100.00%
01.05.08.03 ENCOFRADO Y DESENCOFRADO EN PISOS Y COLUMNAS m2 1.10 26.17 28.79 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.10 28.79 100.00%
01.05.08.04 JUNTA DE DILATACION E=1/2" EN PISO m 23.60 12.68 299.25 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 23.60 299.25 100.00%
01.05.09 CARPINTERIA METALICA
01.05.09.01 PUERTA METALICA 0.90x2.20M INC/MARCO Y CERRAJERIA und 1.00 445.53 445.53 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 445.53 100.00%
01.05.09.02 VENTANA METALICA CON MALLA DE ALAMBRE GALVANIZADO N° 10 COCADA 2"x2" m2 3.36 225.40 757.34 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.36 757.34 100.00%
01.05.10 PINTURA
01.05.10.01 PINTURA LATEX EN MUROS INTERIORES Y EXTERIORES m2 54.42 7.87 428.29 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 54.42 428.29 100.00%
01.05.10.02 PINTURA LATEX EN COLUMNAS Y VIGAS m2 26.16 8.80 230.21 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 26.16 230.21 100.00%
01.05.10.03 PINTURA LATEX EN CIELORRASO m2 19.16 12.28 235.28 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 19.16 235.28 100.00%
01.05.11 SISTEMA DE DRENAJE PLUVIAL
01.05.11.01 BAJADA DE DRENAJE PLUVIAL D=4" pto 1.00 113.70 113.70 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 113.70 100.00%
01.05.11.02 PROTECTOR D/ TUBO, BAJADA DE DRENAJE PLUVIAL und 1.00 122.67 122.67 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 122.67 100.00%
01.05.11.03 TUBO DE ESCAPE DE EMISION DE GASES pto 1.00 80.19 80.19 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 80.19 100.00%
01.05.12 CERCO PERIMETRICO PARA SISTEMA DE AGUA POTABLE
01.05.12.01 OBRAS PRELIMINARES
01.05.12.01.01 LIMPIEZA DE TERRENO MANUAL m2 65.48 1.41 92.33 65.48 92.33 100.00% 0.00 0.00% 65.48 92.33 100.00% 0.00 0.00 0.00%
01.05.12.01.02 TRAZO, NIVELES Y REPLANTEO m2 13.10 1.07 14.02 13.10 14.02 100.00% 0.00 0.00% 13.10 14.02 100.00% 0.00 0.00 0.00%
01.05.12.02 MOVIMIENTO DE TIERRAS
01.05.12.02.01 EXCAVACION MANUAL EN TERRENO NORMAL m3 0.59 56.31 33.22 0.59 33.22 100.00% 0.00 0.00% 0.59 33.22 100.00% 0.00 0.00 0.00%
01.05.12.02.02 ELIMINACION DE MATERIAL EXCEDENTE MANUAL HASTA UNA DISTANCIA PROMEDIO 30 ml. m3 0.77 25.60 19.71 0.77 19.71 100.00% 0.00 0.00% 0.77 19.71 100.00% 0.00 0.00 0.00%
01.05.12.03 OBRAS DE CONCRETO SIMPLE
VALORIZACION REAL DE OBRA
EJECUTADO
REAL POR EJECUTAR
PRESUPUESTO AVANCES
SALDO DE OBRA
PART. DESCRIPCIÓN Und. Metrado Precio U. Parcial ACUMULADO ANTERIOR MES ACTUAL ACUMULADO ACTUAL
Base S/. S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
01.05.12.03.01 DADO DE CONCRETO 0.20x0.20x0.50 M m3 0.74 358.14 265.02 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.74 265.02 100.00%
01.05.12.03.02 ENCOFRADO Y DESENCOFRADO DADOS m2 2.96 48.57 143.77 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.96 143.77 100.00%
01.05.12.04 CARPINTERIA METALICA
01.05.12.04.01 PARANTE DE TUBO DE F°G° D= 2 1/2" und 37.00 101.13 3,741.81 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 37.00 3,741.81 100.00%
01.05.12.04.02 PUERTA METALICA 0.95x2.20M INC./MARCO Y CERRAJERIA und 1.00 414.75 414.75 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 414.75 100.00%
01.05.12.04.03 MALLA METALICA GALVANIZADO TIPO COCADA m 55.20 113.11 6,243.67 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 55.20 6,243.67 100.00%
01.06 PLANTA DE TRATAMIENTO DE AGUA POTABLE
01.06.01 CAMARA DE AIREACION
01.06.01.01 TRABAJOS PRELIMINARES
01.06.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 30.60 1.41 43.15 30.60 43.15 100.00% 0.00 0.00% 30.60 43.15 100.00% 0.00 0.00 0.00%
01.06.01.01.02 TRAZO, NIVELES Y REPLANTEO m2 12.14 1.07 12.99 12.14 12.99 100.00% 0.00 0.00% 12.14 12.99 100.00% 0.00 0.00 0.00%
01.06.01.02 MOVIMIENTO DE TIERRAS
01.06.01.02.01 EXCAVACION MANUAL EN TERRENO NORMAL m3 2.90 56.31 163.30 2.90 163.30 100.00% 0.00 0.00% 2.90 163.30 100.00% 0.00 0.00 0.00%
01.06.01.02.02 NIVELACION Y APISONADO MANUAL m2 3.56 1.76 6.27 3.56 6.27 100.00% 0.00 0.00% 3.56 6.27 100.00% 0.00 0.00 0.00%
01.06.01.02.03 RELLENO COMPACTADO CON MATERIAL PROPIO SELECCIONADO m3 0.94 58.99 55.45 0.94 55.45 100.00% 0.00 0.00% 0.94 55.45 100.00% 0.00 0.00 0.00%
01.06.01.02.04 ELIMINACION DE MATERIAL EXCEDENTE MANUAL HASTA UNA DISTANCIA PROMEDIO 30 ml. m3 2.55 25.60 65.28 65.28 100.00% 0.00 0.00% 2.55 65.28 100.00% 0.00 0.00 0.00%
2.55
01.06.01.03 OBRAS DE CONCRETO SIMPLE
01.06.01.03.01 SOLADO DE CONCRETO C:H 1:10 E=4" m2 3.56 37.11 132.11 3.56 132.11 100.00% 0.00 0.00% 3.56 132.11 100.00% 0.00 0.00 0.00%
01.06.01.03.02 CONCRETO F'c = 175 Kg/cm2 EN DADO m3 0.03 498.35 14.95 0.03 14.95 100.00% 0.00 0.00% 0.03 14.95 100.00% 0.00 0.00 0.00%
01.06.01.04 OBRAS DE CONCRETO ARMADO
01.06.01.04.01 ZAPATAS
01.06.01.04.01.01 CONCRETO F'c = 210 Kg/cm2 EN ZAPATAS m3 1.42 423.72 601.68 1.42 601.68 100.00% 0.00 0.00% 1.42 601.68 100.00% 0.00 0.00 0.00%
01.06.01.04.01.02 ACERO DE REFUERZO fy=4,200 kg/cm2 EN ZAPATAS kg 24.65 4.66 114.87 24.65 114.87 100.00% 0.00 0.00% 24.65 114.87 100.00% 0.00 0.00 0.00%
01.06.01.04.02 COLUMNAS
01.06.01.04.02.01 CONCRETO F'c = 210 Kg/cm2 EN COLUMNAS m3 1.15 569.93 655.42 1.15 655.42 100.00% 0.00 0.00% 1.15 655.42 100.00% 0.00 0.00 0.00%
01.06.01.04.02.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS. m2 18.32 64.21 1,176.33 18.32 1,176.33 100.00% 0.00 0.00% 18.32 1,176.33 100.00% 0.00 0.00 0.00%
01.06.01.04.02.03 ACERO DE REFUERZO fy=4,200 kg/cm2 EN COLUMNAS kg 191.85 4.66 894.02 191.85 894.02 100.00% 0.00 0.00% 191.85 894.02 100.00% 0.00 0.00 0.00%
01.06.01.04.03 VIGAS
01.06.01.04.03.01 CONCRETO F'c = 210 Kg/cm2 EN VIGAS m3 0.87 448.08 389.83 0.87 389.83 100.00% 0.00 0.00% 0.87 389.83 100.00% 0.00 0.00 0.00%
01.06.01.04.03.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 8.10 64.21 520.10 8.10 520.10 100.00% 0.00 0.00% 8.10 520.10 100.00% 0.00 0.00 0.00%
01.06.01.04.03.03 ACERO DE REFUERZO fy=4,200 kg/cm2 EN VIGAS kg 130.24 4.66 606.92 130.24 606.92 100.00% 0.00 0.00% 130.24 606.92 100.00% 0.00 0.00 0.00%
01.06.01.04.04 MUROS
01.06.01.04.04.01 CONCRETO F'c = 210 Kg/cm2 EN MUROS m3 0.66 569.93 376.15 0.66 376.15 100.00% 0.00 0.00% 0.66 376.15 100.00% 0.00 0.00 0.00%
01.06.01.04.04.02 ENCOFRADO Y DESENCOFRADO EN MUROS m2 7.97 48.01 382.64 7.97 382.64 100.00% 0.00 0.00% 7.97 382.64 100.00% 0.00 0.00 0.00%
01.06.01.04.04.03 ACERO DE REFUERZO fy=4,200 kg/cm2 EN MUROS kg 68.99 4.66 321.49 68.99 321.49 100.00% 0.00 0.00% 68.99 321.49 100.00% 0.00 0.00 0.00%
01.06.01.04.05 GRADAS
01.06.01.04.05.01 CONCRETO F'c = 210 Kg/cm2 EN GRADAS m3 0.30 569.93 170.98 0.30 170.98 100.00% 0.00 0.00% 0.30 170.98 100.00% 0.00 0.00 0.00%
01.06.01.04.05.02 ENCOFRADO Y DESENCOFRADO - GRADAS m2 1.45 48.01 69.61 1.45 69.61 100.00% 0.00 0.00% 1.45 69.61 100.00% 0.00 0.00 0.00%
01.06.01.04.05.03 ACERO DE REFUERZO fy=4,200 kg/cm2 - GRADAS kg 12.91 4.66 60.16 12.91 60.16 100.00% 0.00 0.00% 12.91 60.16 100.00% 0.00 0.00 0.00%
01.06.01.04.06 LOSA MACIZA
01.06.01.04.06.01 CONCRETO F'c = 210 Kg/cm2 EN LOSA MACIZA m3 0.83 569.93 473.04 0.83 473.04 100.00% 0.00 0.00% 0.83 473.04 100.00% 0.00 0.00 0.00%
01.06.01.04.06.02 ENCOFRADO Y DESENCOFRADO EN LOSA MACIZA m2 5.68 42.24 239.92 5.68 239.92 100.00% 0.00 0.00% 5.68 239.92 100.00% 0.00 0.00 0.00%
01.06.01.04.06.03 ACERO DE REFUERZO fy=4,200 kg/cm2 EN LOSA MACIZA kg 75.76 4.66 353.04 75.76 353.04 100.00% 0.00 0.00% 75.76 353.04 100.00% 0.00 0.00 0.00%
01.06.01.05 ESTRUCTURA DE MADERA
01.06.01.05.01 SUMINISTRO E INSTALACION DE PARANTE DE MADERA DE 3"x3" - QUINILLA O SIMILAR p2 32.78 114.54 3,754.62 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 32.78 3,754.62 100.00%
01.06.01.05.02 SUMINISTRO E INSTALACION DE VIGA DE MADERA DE 3"x2" - QUINILLA O SIMILAR p2 23.80 30.60 728.28 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 23.80 728.28 100.00%
01.06.01.05.03 SUMINISTRO E INSTALACION DE TIJERAL DE MADERA DE 3"x2" - QUINILLA O SIMILAR p2 25.52 78.06 1,992.09 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 25.52 1,992.09 100.00%
01.06.01.05.04 SUMINISTRO E INSTALACION DE CORREAS DE MADERA DE 2"x2" - QUINILLA O SIMILAR p2 23.95 50.82 1,217.14 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 23.95 1,217.14 100.00%
01.06.01.05.05 SUMINISTRO E INSTALACION DE CARTELAS INC./PERNOS TIPO 1 und 8.00 13.35 106.80 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 106.80 100.00%
01.06.01.05.06 SUMINISTRO E INSTALACION DE CARTELAS INC./PERNOS TIPO 2 und 8.00 13.12 104.96 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 104.96 100.00%
01.06.01.05.07 SUMINISTRO E INSTALACION DE CARTELAS INC./PERNOS TIPO 3 und 8.00 9.98 79.84 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 79.84 100.00%
01.06.01.05.08 SUMINISTRO E INSTALACION DE CARTELAS INC./PERNOS TIPO 4 und 8.00 10.13 81.04 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 81.04 100.00%
01.06.01.06 COBERTURAS
01.06.01.06.01 COBERTURA OPACA ONDA 100 DE FIBRA VEGETAL DE 2.00x0.95 M E=3 MM m2 13.14 56.24 738.99 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.14 738.99 100.00%
01.06.01.06.02 SUMINISTRO E INSTALACION DE CUMBRERA PARA CAMARA DE AIREACION m 3.65 92.22 336.60 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.65 336.60 100.00%
01.06.01.07 PINTURA
01.06.01.07.01 PINTURA BARNIZ EN ESTRUCTURA DE MADERA (2 MANOS) m2 2.52 8.30 20.92 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.52 20.92 100.00%
01.06.01.08 REVOQUES, ENLUCIDOS Y MOLDURAS
VALORIZACION REAL DE OBRA
EJECUTADO
REAL POR EJECUTAR
PRESUPUESTO AVANCES
SALDO DE OBRA
PART. DESCRIPCIÓN Und. Metrado Precio U. Parcial ACUMULADO ANTERIOR MES ACTUAL ACUMULADO ACTUAL
Base S/. S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
01.06.01.08.01 TARRAJEO CON IMPERMEABILZANTE EN ESTRUCTURA DE CAMARA DE AIREACION -1:5 (1bls cementm2 5.52 26.21 144.68 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.52 144.68 100.00%
01.06.01.08.02 TARRAJEO EN EXTERIORES - 1:5 (1 bls. cemento x 5 arena) m2 40.88 31.10 1,271.37 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 40.88 1,271.37 100.00%
01.06.01.09 SUMINISTRO E INSTALACION DE TUBERIAS, VALVULAS COMPUERTA Y ACCESORIOS
01.06.01.09.01 SUMINISTRO E INSTALACION DE TUBERIAS
01.06.01.09.01.01 SUMINISTRO E INSTALACION DE TUBERIA DE F°G° DE D=4" m 3.77 48.33 182.20 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.77 182.20 100.00%
01.06.01.09.01.02 SUMINISTRO E INSTALACION DE TUBERIA DE F°G° DE D=3" m 2.84 45.13 128.17 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.84 128.17 100.00%
01.06.01.09.02 SUMINISTRO E INSTALACION DE ACCESORIOS
01.06.01.09.02.01 SUMINISTRO E INSTALACION DE CODO 90° DE F°G° DE D=4" und 7.00 48.84 341.88 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.00 341.88 100.00%
01.06.01.09.02.02 SUMINISTRO E INSTALACION DE CODO 90° DE F°G° DE D=3" und 2.00 34.44 68.88 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 68.88 100.00%
01.06.01.09.02.03 SUMINISTRO E INSTALACION DE TRANSICION DE F°G° A PVC DE D=3" und 1.00 31.05 31.05 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 31.05 100.00%
01.06.01.09.02.04 SUMINISTRO E INSTALACION DE TEE DE F°G° DE D=4" und 3.00 53.08 159.24 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 159.24 100.00%
01.06.01.09.02.05 SUMINISTRO E INSTALACION DE SOMBRERO DE VENTILACION DE D=4" und 1.00 17.45 17.45 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 17.45 100.00%
01.06.01.09.02.06 SUMINISTRO E INSTALACION DE BRIDA ROMPE AGUA O DE ANCLAJE DE D=4" und 4.00 45.19 180.76 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 180.76 100.00%
01.06.01.09.02.07 SUMINISTRO E INSTALACION DE BRIDA ROMPE AGUA O DE ANCLAJE DE D=3" und 1.00 44.13 44.13 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 44.13 100.00%
01.06.01.09.03 SUMINISTRO E INSTALACION DE VALVULAS
01.06.01.09.03.01 SUMINISTRO E INSTALACION DE VALVULA DE CIERRE RAPIDO DE BRONCE D=3" EN TUB. F°G° und 1.00 585.98 585.98 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 585.98 100.00%
01.06.01.09.03.02 SUMINISTRO E INSTALACION DE VALVULA DE CIERRE RAPIDO DE BRONCE D=4" EN TUB. F°G° und 2.00 322.21 644.42 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 644.42 100.00%
01.06.01.09.03.03 SUMINISTRO E INSTALACION DE VALVULA TIPO GLOBO D=4" EN TUB. F°G° und 1.00 404.02 404.02 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 404.02 100.00%
01.06.01.09.04 SUMINISTRO E INSTALACION DE MEDIDOR DE CAUDAL, MANOMETRO Y FILTRO TIPO "Y"
01.06.01.09.04.01 SUMINISTRO E INSTALACION DE MEDIDOR DE CAUDAL DIGITAL CON LECTURA L/S, GPM Y/O LM und 1.00 3,372.10 3,372.10 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 3,372.10 100.00%
01.06.01.09.04.02 SUMINISTRO E INSTALACION DE MANOMETRO DE GLICERINA 0-100 PSI und 1.00 303.51 303.51 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 303.51 100.00%
01.06.01.10 OTROS
01.06.01.10.01 SUMINISTRO E INSTALACION DE TANQUE DE POLIETILENO PARA AGUA CAP. 6000 L und 1.00 3,064.56 3,064.56 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 3,064.56 100.00%
01.06.01.10.02 ESCALERA TIPO MARINERO DE F°G° D=1" EN CAMARA DE AIREACION und 1.00 327.39 327.39 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 327.39 100.00%
01.06.02 PREFILTRO DE GRAVA
01.06.02.01 TRABAJOS PRELIMINARES
01.06.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 144.00 1.41 203.04 144.00 203.04 100.00% 0.00 0.00% 144.00 203.04 100.00% 0.00 0.00 0.00%
01.06.02.01.02 TRAZO, NIVELES Y REPLANTEO m2 87.50 1.07 93.63 87.50 93.63 100.00% 0.00 0.00% 87.50 93.63 100.00% 0.00 0.00 0.00%
01.06.02.02 MOVIMIENTO DE TIERRAS
01.06.02.02.01 EXCAVACION MANUAL EN TERRENO NORMAL m3 110.07 56.31 6,198.04 110.07 6,198.04 100.00% 0.00 0.00% 110.07 6,198.04 100.00% 0.00 0.00 0.00%
01.06.02.02.02 NIVELACION Y APISONADO MANUAL m2 77.07 1.76 135.64 77.07 135.64 100.00% 0.00 0.00% 77.07 135.64 100.00% 0.00 0.00 0.00%
01.06.02.02.03 RELLENO DE CAMA DE ARENA PARA TUBERIA m3 1.13 65.30 73.79 1.13 73.79 100.00% 0.00 0.00% 1.13 73.79 100.00% 0.00 0.00 0.00%
01.06.02.02.04 RELLENO COMPACTADO CON MATERIAL PROPIO SELECCIONADO m3 6.08 58.99 358.66 6.08 358.66 100.00% 0.00 0.00% 6.08 358.66 100.00% 0.00 0.00 0.00%
01.06.02.02.05 ELIMINACION DE MATERIAL EXCEDENTE MANUAL HASTA UNA DISTANCIA PROM. 30 ml. m3 135.19 25.60 3,460.86 135.19 3,460.86 100.00% 0.00 0.00% 135.19 3,460.86 100.00% 0.00 0.00 0.00%
01.06.02.03 OBRAS DE CONCRETO SIMPLE
01.06.02.03.01 SOLADO DE CONCRETO C:H 1:10 E=4" m2 62.03 37.11 2,301.93 62.03 2,301.93 100.00% 0.00 0.00% 62.03 2,301.93 100.00% 0.00 0.00 0.00%
01.06.02.04 OBRAS DE CONCRETO ARMADO
01.06.02.04.01 PREFILTRO DE GRAVA
01.06.02.04.01.01 LOSA INFERIOR
01.06.02.04.01.01.02ACERO DE REFUERZO fy=4,200 kg/cm2 EN LOSA INFERIOR kg 1,225.96 4.66 5,712.97 1,225.96 5,712.97 100.00% 0.00 0.00% 1,225.96 5,712.97 100.00% 0.00 0.00 0.00%
01.06.02.04.01.02 MUROS
01.06.02.04.01.02.03ACERO DE REFUERZO fy=4,200 kg/cm2 EN MUROS kg 4,673.10 4.66 21,776.65 4,673.10 21,776.65 100.00% 0.00 0.00% 4,673.10 21,776.65 100.00% 0.00 0.00 0.00%
01.06.02.04.01.03 LOSA SUPERIOR
01.06.02.04.01.03.01CONCRETO F'c = 210 Kg/cm2 EN LOSA SUPERIOR m3 2.23 569.93 1,270.94 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.23 1,270.94 100.00%
01.06.02.04.01.03.02ENCOFRADO Y DESENCOFRADO EN LOSA SUPERIOR m2 8.70 48.01 417.69 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.70 417.69 100.00%
01.06.02.04.01.03.03ACERO DE REFUERZO fy=4,200 kg/cm2 EN LOSA SUPERIOR kg 200.50 4.66 934.33 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 200.50 934.33 100.00%
01.06.02.04.01.04 ESCALERA
01.06.02.04.01.04.01CONCRETO F'c = 210 Kg/cm2 EN ESCALERA m3 1.92 529.33 1,016.31 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.92 1,016.31 100.00%
01.06.02.04.01.04.02ENCOFRADO Y DESENCOFRADO EN ESCALERA m2 14.79 54.57 807.09 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.79 807.09 100.00%
01.06.02.04.01.04.03ACERO DE REFUERZO fy=4,200 kg/cm2 EN ESCALERA kg 86.82 4.66 404.58 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 86.82 404.58 100.00%
01.06.02.04.02 CONSTRUCCION DE UNIDAD DE LAVADO Y GRAVA
01.06.02.04.02.01 LOSA INFERIOR
01.06.02.04.02.01.01CONCRETO F'c = 210 Kg/cm2 EN LOSA INFERIOR m3 0.91 569.92 518.63 0.91 518.63 100.00% 0.00 0.00% 0.91 518.63 100.00% 0.00 0.00 0.00%
01.06.02.04.02.01.02ACERO DE REFUERZO fy=4,200 kg/cm2 EN LOSA INFERIOR kg 40.46 4.66 188.54 40.46 188.54 100.00% 0.00 0.00% 40.46 188.54 100.00% 0.00 0.00 0.00%
01.06.02.04.02.02 MUROS
01.06.02.04.02.02.01CONCRETO F'c = 210 Kg/cm2 EN MUROS m3 1.59 569.93 906.19 1.59 906.19 100.00% 0.00 0.00% 1.59 906.19 100.00% 0.00 0.00 0.00%
01.06.02.04.02.02.02ENCOFRADO Y DESENCOFRADO EN MUROS m2 29.79 48.01 1,430.22 29.79 1,430.22 100.00% 0.00 0.00% 29.79 1,430.22 100.00% 0.00 0.00 0.00%
01.06.02.04.02.02.03ACERO DE REFUERZO fy=4,200 kg/cm2 EN MUROS kg 117.68 4.66 548.39 117.68 548.39 100.00% 0.00 0.00% 117.68 548.39 100.00% 0.00 0.00 0.00%
VALORIZACION REAL DE OBRA
EJECUTADO
REAL POR EJECUTAR
PRESUPUESTO AVANCES
SALDO DE OBRA
PART. DESCRIPCIÓN Und. Metrado Precio U. Parcial ACUMULADO ANTERIOR MES ACTUAL ACUMULADO ACTUAL
Base S/. S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
01.06.02.04.03 CAMARA DE VALVULAS
01.06.02.04.03.01 CONCRETO F'c = 210 Kg/cm2 EN CAJA DE REGISTRO Y CAMARA DE VALVULA m3 0.14 569.93 79.79 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.14 79.79 100.00%
0.00
01.06.02.04.03.02 ENCOFRADO Y DESENCOFRADO EN CAMARA DE VALVULA m2 1.13 48.01 54.25 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.13 54.25 100.00%
01.06.02.04.03.03 ACERO DE REFUERZO fy=4,200 kg/cm2 EN CAMARA DE VALVULA kg 10.17 4.66 47.39 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.17 47.39 100.00%
01.06.02.05 REVOQUES, ENLUCIDOS Y MOLDURAS
01.06.02.05.01 TARRAJEO CON IMPERMEABILZANTE EN INTERIOR -1:5 (1bls cemento x 5 arena) m2 380.81 26.21 9,981.03 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 380.81 9,981.03 100.00%
01.06.02.05.02 TARRAJEO EN EXTERIORES - 1:5 (1 bls. cemento x 5 arena) m2 74.87 31.10 2,328.46 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 74.87 2,328.46 100.00%
01.06.02.06 CARPINTERIA METALICA
01.06.02.06.01 BARANDA METALICA DE F°N° DE D=2" - H=1.00M m 31.92 86.96 2,775.76 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 31.92 2,775.76 100.00%
01.06.02.06.02 ESCALERA TIPO MARINERO DE F°G° D=1" und 1.00 327.39 327.39 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 327.39 100.00%
01.06.02.06.03 ESCALERA TIPO MARINERO DE A°I° D=1" und 3.00 397.56 1,192.68 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 1,192.68 100.00%
01.06.02.07 SUMINISTRO E INSTALACION DE TUBERIAS, VALVULAS COMPUERTA Y ACCESORIOS
01.06.02.07.01 SUMINISTRO E INSTALACION DE TUBERIAS
01.06.02.07.01.01 SUMINISTRO E INSTALACION DE TUBERIA F°G° DE D=3" m 1.30 45.13 58.67 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.30 58.67 100.00%
01.06.02.07.01.02 SUMINISTRO E INSTALACION DE TUBERIA F°G° DE D=2" m 0.42 34.78 14.61 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.42 14.61 100.00%
01.06.02.07.01.03 SUMINISTRO E INSTALACION DE TUBERIA PVC-SP D=3" C-10 m 23.50 15.01 352.74 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 23.50 352.74 100.00%
01.06.02.07.02 SUMINISTRO E INSTALACION DE ACCESORIOS
01.06.02.07.02.01 SUMINISTRO E INSTALACION DE CODO 90° DE F°G° D=3" und 3.00 34.44 103.32 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 103.32 100.00%
01.06.02.07.02.02 SUMINISTRO E INSTALACION DE CODO 90° DE F°G° D=2" und 1.00 19.18 19.18 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 19.18 100.00%
01.06.02.07.02.03 SUMINISTRO E INSTALACION DE BRIDA ROMPE AGUA O DE ANCLAJE D=250MM und 2.00 59.14 118.28 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 118.28 100.00%
01.06.02.07.02.04 SUMINISTRO E INSTALACION DE BRIDA ROMPE AGUA O DE ANCLAJE D=200MM und 4.00 55.15 220.60 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 220.60 100.00%
01.06.02.07.02.05 SUMINISTRO E INSTALACION DE BRIDA ROMPE AGUA O DE ANCLAJE D=110MM und 1.00 45.19 45.19 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 45.19 100.00%
01.06.02.07.02.06 SUMINISTRO E INSTALACION DE BRIDA ROMPE AGUA O DE ANCLAJE DE D=3" und 2.00 44.13 88.26 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 88.26 100.00%
01.06.02.07.02.07 SUMINISTRO E INSTALACION DE TEE DE D=3" PVC-SP und 1.00 14.32 14.32 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 14.32 100.00%
01.06.02.07.02.08 SUMINISTRO E INSTALACION DE NIPLE DE F°G° D=110MM und 1.00 12.40 12.40 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 12.40 100.00%
01.06.02.07.02.09 SUMINISTRO E INSTALACION DE NIPLE DE F°G° D=200MM und 4.00 15.79 63.16 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 63.16 100.00%
01.06.02.07.02.10 SUMINISTRO E INSTALACION DE NIPLE DE F°G° D=250MM und 2.00 17.86 35.72 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 35.72 100.00%
01.06.02.07.02.11 SUMINISTRO E INSTALACION DE TRANSICION DE F°G° A PVC DE D=3" und 1.00 31.05 31.05 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 31.05 100.00%
01.06.02.07.02.12 SUMINISTRO E INSTALACION DE JUNTA WATER STOPNEOPRENE 6" m 158.40 18.96 3,003.26 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 158.40 3,003.26 100.00%
01.06.02.07.03 SUMINISTRO E INSTALACION DE VALVULAS
01.06.02.07.03.01 SUMINISTRO E INSTALACION DE VALVULA DE COMPUERTA DE BRONCE DE D=4" EN TUB. F°G° und 1.00 322.21 322.21 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 322.21 100.00%
01.06.02.07.03.02 SUMINISTRO E INSTALACION DE VALVULA DE COMPUERTA DE BRONCE DE D=3" EN TUB. F°G° und 2.00 245.62 491.24 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 491.24 100.00%
01.06.02.07.03.03 SUMINISTRO E INSTALACION DE VALVULA DE COMPUERTA DE BRONCE DE D=2" EN TUB. F°G° und 1.00 233.26 233.26 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 233.26 100.00%
01.06.02.07.03.04 SUMINISTRO E INSTALACION DE VALVULA MARIPOSA D=250MM und 2.00 366.53 733.06 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 733.06 100.00%
01.06.02.07.03.05 SUMINISTRO E INSTALACION DE VALVULA MARIPOSA D=200MM und 4.00 322.33 1,289.32 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 1,289.32 100.00%
01.06.02.07.03.06 SUMINISTRO E INSTALACION DE VALVULA COMPUERTA TIPO TARJETA 0.30x1.50M und 2.00 241.94 483.88 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 483.88 100.00%
01.06.02.07.03.07 SUMINISTRO E INSTALACION DE VALVULA COMPUERTA TIPO TARJETA 0.30x0.26M und 2.00 152.97 305.94 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 305.94 100.00%
01.06.02.08 OTROS
01.06.02.08.01 GRAVA D=13 MM A 19 MM TIPO FILTRO, E=0.75 M m3 4.14 107.68 445.80 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.14 445.80 100.00%
01.06.02.08.02 GRAVA D=10 MM A 15 MM TIPO FILTRO, E=0.75 M m3 12.16 107.68 1,309.39 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.16 1,309.39 100.00%
01.06.02.08.03 GRAVA D=15 MM A 325 MM TIPO FILTRO, E=0.75 M m3 4.58 103.87 475.72 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.58 475.72 100.00%
01.06.02.08.04 TAPAS DE CONCRETO EN PRE FILTRO glb 1.00 288.68 288.68 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 288.68 100.00%
01.06.03 CISTERNA V =32.00 M3
01.06.03.01 OBRAS PRELIMINARES
01.06.03.01.01 LIMPIEZA DE TERRENO MANUAL m2 41.16 1.41 58.04 41.16 58.04 100.00% 0.00 0.00% 41.16 58.04 100.00% 0.00 0.00 0.00%
01.06.03.01.02 TRAZO, NIVELES Y REPLANTEO m2 19.40 1.07 20.76 19.40 20.76 100.00% 0.00 0.00% 19.40 20.76 100.00% 0.00 0.00 0.00%
01.06.03.02 MOVIMIENTO DE TIERRAS
01.06.03.02.01 EXCAVACION MANUAL EN TERRENO NORMAL m3 70.04 56.31 3,943.95 70.04 3,943.95 100.00% 0.00 0.00% 70.04 3,943.95 100.00% 0.00 0.00 0.00%
01.06.03.02.02 CORTE Y PERFILAMIENTO MANUAL EN TERRENO NORMAL E=0.05 M m3 4.31 56.31 242.70 4.31 242.70 100.00% 0.00 0.00% 4.31 242.70 100.00% 0.00 0.00 0.00%
01.06.03.02.03 NIVELACION Y APISONADO MANUAL m2 19.40 1.76 34.14 19.40 34.14 100.00% 0.00 0.00% 19.40 34.14 100.00% 0.00 0.00 0.00%
01.06.03.02.04 ELIMINACION DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO 30 ml. m3 96.66 25.60 2,474.50 96.66 2,474.50 100.00% 0.00 0.00% 96.66 2,474.50 100.00% 0.00 0.00 0.00%
01.06.03.03 OBRAS DE CONCRETO SIMPLE
01.06.03.03.01 SOLADO DE CONCRETO C:H 1:10 E=4" m2 19.40 37.11 719.93 19.40 719.93 100.00% 0.00 0.00% 19.40 719.93 100.00% 0.00 0.00 0.00%
01.06.03.03.02 DADO DE CONCRETO F´c = 140 Kg/cm2 - SOPORTE DE TUBERIA und 8.00 37.62 300.96 8.00 300.96 100.00% 0.00 0.00% 8.00 300.96 100.00% 0.00 0.00 0.00%
01.06.03.03.03 DADO DE CONCRETO F´c = 140 Kg/cm2 - RECUBRIMIENTO DE DUCTO und 4.00 21.13 84.52 4.00 84.52 100.00% 0.00 0.00% 4.00 84.52 100.00% 0.00 0.00 0.00%
01.06.03.03.04 DADO DE CONCRETO F´c = 140 Kg/cm2 - SOPORTE DE ELECTROBOMBA und 4.00 42.35 169.40 4.00 169.40 100.00% 0.00 0.00% 4.00 169.40 100.00% 0.00 0.00 0.00%
01.06.03.04 OBRAS DE CONCRETO ARMADO
VALORIZACION REAL DE OBRA
EJECUTADO
REAL POR EJECUTAR
PRESUPUESTO AVANCES
SALDO DE OBRA
PART. DESCRIPCIÓN Und. Metrado Precio U. Parcial ACUMULADO ANTERIOR MES ACTUAL ACUMULADO ACTUAL
Base S/. S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
01.06.03.04.01 LOSA DE CIMENTACION DE CISTERNA
01.06.03.04.01.01 CONCRETO F'c = 210 Kg/cm2 EN LOSA INFERIOR m3 5.34 569.92 3,043.37 5.34 3,043.37 100.00% 0.00 0.00% 5.34 3,043.37 100.00% 0.00 0.00 0.00%
01.06.03.04.01.02 ACERO DE REFUERZO fy=4,200 kg/cm2 EN LOSA INFERIOR kg 424.32 4.66 1,977.33 424.32 1,977.33 100.00% 0.00 0.00% 424.32 1,977.33 100.00% 0.00 0.00 0.00%
01.06.03.04.02 MUROS LATERALES DE CISTERNA
01.06.03.04.02.01 CONCRETO F'c = 210 Kg/cm2 EN MUROS LATERALES m3 13.06 554.66 7,243.86 13.06 7,243.86 100.00% 0.00 0.00% 13.06 7,243.86 100.00% 0.00 0.00 0.00%
01.06.03.04.02.02 ENCOFRADO Y DESENCOFRADO EN MUROS m2 71.79 48.01 3,446.64 71.79 3,446.64 100.00% 0.00 0.00% 71.79 3,446.64 100.00% 0.00 0.00 0.00%
01.06.03.04.02.03 ACERO DE REFUERZO fy=4,200 kg/cm2 EN MUROS kg 1,184.93 4.66 5,521.77 1,184.93 5,521.77 100.00% 0.00 0.00% 1,184.93 5,521.77 100.00% 0.00 0.00 0.00%
01.06.03.04.03 LOSA MACIZA DEL TECHO DE CISTERNA
01.06.03.04.03.01 CONCRETO F'c = 210 Kg/cm2 EN LOSA MACIZA m3 3.81 569.93 2,171.43 3.81 2,171.43 100.00% 0.00 0.00% 3.81 2,171.43 100.00% 0.00 0.00 0.00%
01.06.03.04.03.02 ENCOFRADO Y DESENCOFRADO EN LOSA MACIZA m2 16.49 42.24 696.54 16.49 696.54 100.00% 0.00 0.00% 16.49 696.54 100.00% 0.00 0.00 0.00%
01.06.03.04.03.03 ACERO DE REFUERZO fy=4,200 kg/cm2 EN LOSA MACIZA kg 184.22 4.66 858.47 184.22 858.47 100.00% 0.00 0.00% 184.22 858.47 100.00% 0.00 0.00 0.00%
01.06.03.04.04 COLUMNETAS
01.06.03.04.04.01 CONCRETO F'c = 175 Kg/cm2 EN COLUMNETAS m3 0.33 538.95 177.85 0.33 177.85 100.00% 0.00 0.00% 0.33 177.85 100.00% 0.00 0.00 0.00%
01.06.03.04.04.02 ENCOFRADO Y DESENCOFRADO EN COLUMNETAS m2 5.06 48.01 242.93 5.06 242.93 100.00% 0.00 0.00% 5.06 242.93 100.00% 0.00 0.00 0.00%
01.06.03.04.04.03 ACERO DE REFUERZO fy=4,200 kg/cm2 EN COLUMNETAS kg 88.40 4.66 411.94 88.40 411.94 100.00% 0.00 0.00% 88.40 411.94 100.00% 0.00 0.00 0.00%
01.06.03.04.05 VIGUETAS
01.06.03.04.05.01 CONCRETO F'c = 175 Kg/cm2 EN VIGUETAS m3 0.46 417.10 191.87 0.46 191.87 100.00% 0.00 0.00% 0.46 191.87 100.00% 0.00 0.00 0.00%
01.06.03.04.05.02 ENCOFRADO Y DESENCOFRADO EN VIGUETAS m2 5.78 53.77 310.79 5.78 310.79 100.00% 0.00 0.00% 5.78 310.79 100.00% 0.00 0.00 0.00%
01.06.03.04.05.03 ACERO DE REFUERZO fy=4,200 kg/cm2 EN VIGUETAS kg 138.12 4.66 643.64 138.12 643.64 100.00% 0.00 0.00% 138.12 643.64 100.00% 0.00 0.00 0.00%
01.06.03.05 ESTRUCTURA DE MADERA
01.06.03.05.01 SUMINISTRO E INSTALACION DE TIJERAL DE MADERA DE 3"x2" - QUINILLA O SIMILAR p2 46.06 78.06 3,595.44 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 46.06 3,595.44 100.00%
01.06.03.05.02 SUMINISTRO E INSTALACION DE CORREAS DE MADERA DE 2"x2" - QUINILLA O SIMILAR p2 67.22 50.82 3,416.12 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 67.22 3,416.12 100.00%
01.06.03.05.03 SUMINISTRO E INSTALACION DE CARTELAS INC./PERNOS TIPO 5 und 6.00 13.35 80.10 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 80.10 100.00%
01.06.03.05.04 SUMINISTRO E INSTALACION DE CARTELAS INC./PERNOS TIPO 6 und 3.00 14.28 42.84 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 42.84 100.00%
01.06.03.05.05 SUMINISTRO E INSTALACION DE CARTELAS INC./PERNOS TIPO 7 und 3.00 12.84 38.52 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 38.52 100.00%
01.06.03.05.06 SUMINISTRO E INSTALACION DE CARTELAS INC./PERNOS TIPO 8 und 6.00 9.97 59.82 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 59.82 100.00%
01.06.03.06 MUROS Y TABIQUES DE ALBAÑILERIA
01.06.03.06.01 MURO DE LADRILLO IKARO 9x13x24 CM ASENTADO DE SOGA m2 29.78 86.89 2,587.58 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 29.78 2,587.58 100.00%
01.06.03.06.02 TIMPANO DE MADERA MACHIHEMBRADA QUINILLA O SIMILAR E=1/2" m2 2.58 53.06 136.89 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.58 136.89 100.00%
01.06.03.06.03 MURO EXTERIOR E INTERIOR DE MADERA MACHIHEMBRADA QUINILLA O SIMILAR E=1/2" m2 7.19 41.68 299.68 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.19 299.68 100.00%
01.06.03.07 REVOQUES, ENLUCIDOS Y MOLDURAS
01.06.03.07.01 TARRAJEO CON IMPERMEABILZANTE EN MUROS LATERALES e=1.5 CM -1:5 (1bls cemento x 5 arena m2 60.28 26.21 1,579.94 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 60.28 1,579.94 100.00%
01.06.03.07.02 TARRAJEO CON IMPERMEABILZANTE EN LOSA INFERIOR e= 1.5 CM -1:5 (1bls cemento x 5 arena) m2 16.01 26.21 419.62 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.01 419.62 100.00%
01.06.03.07.03 TARRAJEO EN EXTERIORES - 1:5 (1 bls. cemento x 5 arena) m2 33.12 31.10 1,030.03 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 33.12 1,030.03 100.00%
01.06.03.07.04 TARRAJEO EN COLUMNETAS e=1.5 CM - 1:5 (1 bls. cemento x 5 arena) m2 5.06 39.52 199.97 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.06 199.97 100.00%
01.06.03.07.05 TARRAJEO EN VIGUETAS e=1.5 CM - 1:5 (1 bls. cemento x 5 arena) m2 6.28 39.52 248.19 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.28 248.19 100.00%
01.06.03.08 CARPINTERIA DE MADERA
01.06.03.08.01 SUMINISTRO E INSTALACION DE PUERTA MACHIHEMBRADA 0.90x1.80 M - INC. MARCO und 2.00 217.98 435.96 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 435.96 100.00%
01.06.03.08.02 SUMINISTRO E INSTALACION DE VENTANA DE MADERA QUINILLA O SIMILAR CON MALLA METALICAund 1.00 53.51 53.51 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 53.51 100.00%
01.06.03.09 PINTURA
01.06.03.09.01 PINTURA BARNIZ EN TIMPANO DE MADERA - 02 manos m2 2.58 10.24 26.42 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.58 26.42 100.00%
01.06.03.09.02 PINTURA BARNIZ EN PUERTA CONTRAPLACADA - 02 manos m2 6.48 13.30 86.18 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.48 86.18 100.00%
01.06.03.09.03 PINTURA BARNIZ EN VENTANAS - 02 manos m2 1.44 13.30 19.15 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.44 19.15 100.00%
01.06.03.09.04 PINTURA BARNIZ EN MURO EXTERIOR E INTERIOR - 02 manos m2 14.38 10.24 147.25 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.38 147.25 100.00%
01.06.03.10 COBERTURAS
01.06.03.10.01 COBERTURA OPACA ONDA 100 DE FIBRA VEGETAL DE 1.80x0.95 M E=3 MM m2 25.20 56.24 1,417.25 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 25.20 1,417.25 100.00%
01.06.03.10.02 SUMINISTRO E INSTALACION DE CUMBRERA PARA COBERTURA DE CISTERNA m 5.60 108.74 608.94 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.60 608.94 100.00%
01.06.03.11 CERRAJERIA
01.06.03.11.01 SUMINISTRO E INSTALACION DE CERRADURA TIPO PERILLA und 2.00 28.24 56.48 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 56.48 100.00%
01.06.03.11.02 SUMINISTRO E INSTALACION DE BISAGRA ALUMINIZADO DE 3"x2" und 6.00 19.08 114.48 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 114.48 100.00%
01.06.03.12 SUMINISTRO E INSTALACION DE TUBERIAS, ACCESORIOS Y VALVULAS COMPUERTA
01.06.03.12.01 SUMINISTRO E INSTALACION DE TUBERIAS
01.06.03.12.01.01 SUMINISTRO E INSTALACION DE TUBERIA DE F°G° DE D=3" m 0.60 45.13 27.08 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.60 27.08 100.00%
01.06.03.12.01.02 SUMINISTRO E INSTALACION DE TUBERIA DE F°G° DE D=2" m 13.20 34.78 459.10 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.20 459.10 100.00%
01.06.03.12.01.03 SUMINISTRO E INSTALACION DE TUBERIA DE F°G° DE D=1 1/2" m 12.80 29.29 374.91 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.80 374.91 100.00%
01.06.03.12.02 SUMINISTRO E INSTALACION DE ACCESORIOS
01.06.03.12.02.01 SUMINISTRO E INSTALACION DE TEE DE F°G° DE D=2" und 2.00 23.42 46.84 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 46.84 100.00%
01.06.03.12.02.02 SUMINISTRO E INSTALACION DE TEE DE F°G° DE D=1 1/2" und 2.00 16.64 33.28 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 33.28 100.00%
01.06.03.12.02.03 SUMINISTRO E INSTALACION DE CODO 90° DE F°G° DE D=3" und 2.00 34.44 68.88 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 68.88 100.00%
VALORIZACION REAL DE OBRA
EJECUTADO
REAL POR EJECUTAR
PRESUPUESTO AVANCES
SALDO DE OBRA
PART. DESCRIPCIÓN Und. Metrado Precio U. Parcial ACUMULADO ANTERIOR MES ACTUAL ACUMULADO ACTUAL
Base S/. S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
01.06.03.12.02.04 SUMINISTRO E INSTALACION DE CODO 90° DE F°G° D=2" und 7.00 19.18 134.26 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.00 134.26 100.00%
01.06.03.12.02.05 SUMINISTRO E INSTALACION DE CODO 90° DE F°G° D=1 1/2" und 3.00 14.94 44.82 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 44.82 100.00%
01.06.03.12.02.06 SUMINISTRO E INSTALACION DE YEE DE D=2" DE F°G° und 2.00 12.40 24.80 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 24.80 100.00%
01.06.03.12.02.07 SUMINISTRO E INSTALACION DE YEE DE D=1 1/2" DE F°G° und 2.00 10.71 21.42 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 21.42 100.00%
01.06.03.12.02.08 SUMINISTRO E INSTALACION DE UNION UNIVERSAL DE F°G° DE D=2" und 5.00 54.57 272.85 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.00 272.85 100.00%
01.06.03.12.02.09 SUMINISTRO E INSTALACION DE UNION UNIVERSAL DE F°G° DE D=1 1/2" und 5.00 35.12 175.60 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.00 175.60 100.00%
01.06.03.12.02.10 SUMINISTRO E INSTALACION DE TAPON DE D=2" DE F°G° und 3.00 13.25 39.75 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 39.75 100.00%
01.06.03.12.02.11 SUMINISTRO E INSTALACION DE TAPON DE D=1 1/2" DE F°G° und 3.00 13.25 39.75 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 39.75 100.00%
01.06.03.12.02.12 SUMINISTRO E INSTALACION DE CANASTILLA DE BRONCE DE D=2" und 2.00 49.06 98.12 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 98.12 100.00%
01.06.03.12.02.13 SUMINISTRO E INSTALACION DE CANASTILLA DE BRONCE DE D=1 1/2" und 2.00 58.00 116.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 116.00 100.00%
01.06.03.12.02.14 SUMINISTRO E INSTALACION DE BRIDA ROMPE AGUA O DE ANCLAJE DE D=4" und 4.00 45.19 180.76 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 180.76 100.00%
01.06.03.12.02.15 SUMINISTRO E INSTALACION DE BRIDA ROMPE AGUA O DE ANCLAJE DE D=3" und 1.00 44.13 44.13 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 44.13 100.00%
01.06.03.12.02.16 SUMINISTRO E INSTALACION DE BRIDA ROMPE AGUA O DE ANCLAJE DE D=2" und 2.00 40.67 81.34 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 81.34 100.00%
01.06.03.12.02.17 SUMINISTRO E INSTALACION DE TUBERIA DE VENTILACION F°G° DE D=2" und 2.00 40.58 81.16 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 81.16 100.00%
01.06.03.12.02.18 SUMINISTRO E INSTALACION DE REJILLA DE BRONCE DE D=2" und 1.00 10.71 10.71 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 10.71 100.00%
01.06.03.12.02.19 SUMINISTRO E INSTALACION DE WATER STOP DE PVC DE 6" m 16.96 18.96 321.56 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.96 321.56 100.00%
01.06.03.12.03 SUMINISTRO E INSTALACION DE VALVULAS
01.06.03.12.03.01 SUMINISTRO E INSTALACION DE VALVULA DE COMPUERTA DE BRONCE DE D=3" EN TUB. F°G° und 1.00 245.62 245.62 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 245.62 100.00%
01.06.03.12.03.02 SUMINISTRO E INSTALACION DE VALVULA DE COMPUERTA DE BRONCE DE D=2" EN TUB. F°G° und 2.00 233.26 466.52 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 466.52 100.00%
01.06.03.12.03.03 SUMINISTRO E INSTALACION DE VALVULA DE COMPUERTA DE BRONCE DE D=1 1/2" EN TUB. F°G° und 2.00 158.73 317.46 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 317.46 100.00%
01.06.03.12.03.04 SUMINISTRO E INSTALACION DE VALVULA DE CIERRE RAPIDO DE BRONCE D=2" EN TUB. F°G° und 2.00 238.15 476.30 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 476.30 100.00%
01.06.03.12.03.05 SUMINISTRO E INSTALACION DE VALVULA DE CIERRE RAPIDO DE BRONCE D=1 1/2" EN TUB. F°G und 2.00 179.33 358.66 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 358.66 100.00%
01.06.03.12.03.06 SUMINISTRO E INSTALACION DE VALVULA FLOTADORA INC. BOYA DE D=3" und 1.00 92.55 92.55 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 92.55 100.00%
01.06.03.12.04 SUMINISTRO E INSTALACION DE MEDIDOR DE CAUDAL Y MANOMETRO
01.06.03.12.04.01 SUMINISTRO E INSTALACION DE MEDIDOR DE CAUDAL DIGITAL CON LECTURA L/S, GPM Y/O LM und 2.00 3,372.10 6,744.20 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 6,744.20 100.00%
01.06.03.12.04.02 SUMINISTRO E INSTALACION DE MANOMETRO DE GLICERINA 0-100 PSI und 2.00 303.51 607.02 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 607.02 100.00%
01.06.03.13 CARPINTERIA METALICA
01.06.03.13.01 ESCALERA TIPO MARINERO DE A°I° D=2" EN CISTERNA und 2.00 460.17 920.34 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 920.34 100.00%
01.06.03.13.02 TAPA METALICA DE 0.60 X 0.60 M C/PLANCHA ESTRIADA DE E=1/8" und 1.00 452.88 452.88 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 452.88 100.00%
01.06.03.13.03 PROTECTOR D/ TUBO, LINEA DE ADUCCION und 2.00 152.21 304.42 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 304.42 100.00%
01.06.04 SUMINISTRO E INSTALACION DE SISTEMA DE BAYPASS (02 UND)
01.06.04.01 OBRAS PRELIMINARES
01.06.04.01.01 LIMPIEZA DE TERRENO MANUAL m2 15.58 1.41 21.97 15.58 21.97 100.00% 0.00 0.00% 15.58 21.97 100.00% 0.00 0.00 0.00%
01.06.04.01.02 TRAZO, NIVELES Y REPLANTEO m2 7.41 1.07 7.93 7.41 7.93 100.00% 0.00 0.00% 7.41 7.93 100.00% 0.00 0.00 0.00%
01.06.04.02 MOVIMIENTO DE TIERRAS
01.06.04.02.01 EXCAVACION MANUAL EN TERRENO NORMAL m3 6.33 56.31 356.44 6.33 356.44 100.00% 0.00 0.00% 6.33 356.44 100.00% 0.00 0.00 0.00%
01.06.04.02.02 NIVELACION Y APISONADO MANUAL m2 7.41 1.76 13.04 7.41 13.04 100.00% 0.00 0.00% 7.41 13.04 100.00% 0.00 0.00 0.00%
01.06.04.02.03 RELLENO DE CAMA DE ARENA PARA TUBERIA m3 2.24 65.30 146.27 2.24 146.27 100.00% 0.00 0.00% 2.24 146.27 100.00% 0.00 0.00 0.00%
01.06.04.02.04 RELLENO COMPACTADO CON MATERIAL PROPIO SELECCIONADO m3 2.63 58.99 155.14 2.63 155.14 100.00% 0.00 0.00% 2.63 155.14 100.00% 0.00 0.00 0.00%
01.06.04.02.05 ELIMINACION DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO 30 ml. m3 4.82 25.60 123.39 123.39 100.00% 0.00 0.00% 4.82 123.39 100.00% 0.00 0.00 0.00%
4.82
01.06.04.03 OBRAS DE CONCRETO SIMPLE
01.06.04.03.01 SOLADO DE CONCRETO C:H 1:10 E=4" m2 1.45 37.11 53.81 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.45 53.81 100.00%
01.06.04.04 OBRAS DE CONCRETO ARMADO
01.06.04.04.01 LOSA INFERIOR
01.06.04.04.01.01 CONCRETO F'c = 175 Kg/cm2 EN LOSA DE FONDO m3 0.14 498.62 69.81 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.14 69.81 100.00%
01.06.04.04.01.02 ACERO DE REFUERZO fy=4,200 kg/cm2 EN LOSA INFERIOR kg 10.08 4.66 46.97 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.08 46.97 100.00%
01.06.04.04.02 MUROS
01.06.04.04.02.01 CONCRETO F'c = 175 Kg/cm2 EN MUROS m3 0.55 538.95 296.42 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.55 296.42 100.00%
01.06.04.04.02.02 ENCOFRADO Y DESENCOFRADO EN MUROS m2 5.44 48.01 261.17 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.44 261.17 100.00%
01.06.04.04.02.03 ACERO DE REFUERZO fy=4,200 kg/cm2 EN MUROS kg 33.62 4.66 156.67 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 33.62 156.67 100.00%
01.06.04.05 SUMINISTRO E INSTALACION DE TUBERIAS
01.06.04.05.01 SUMINISTRO E INSTALACION DE TUBERIA PVC-SP D=3" C-10 m 13.05 15.01 195.88 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.05 195.88 100.00%
01.06.04.06 SUMINISTRO E INSTALACION DE ACCESORIOS
01.06.04.06.01 SUMINISTRO E INSTALACION DE CODO 90° DE PVC-SP D=3" und 1.00 20.89 20.89 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 20.89 100.00%
01.06.04.06.02 SUMINISTRO E INSTALACION DE CODO 45° DE PVC-SP D=3" und 2.00 18.45 36.90 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 36.90 100.00%
01.06.04.06.03 SUMINISTRO E INSTALACION DE TEE DE D=3" PVC-SP und 2.00 14.32 28.64 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 28.64 100.00%
01.06.04.06.04 DADO DE CONCRETO PARA ANCLAJE DE ACCESORIOS F´c = 140 Kg/cm2 und 4.00 59.75 239.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 239.00 100.00%
VALORIZACION REAL DE OBRA
EJECUTADO
REAL POR EJECUTAR
PRESUPUESTO AVANCES
SALDO DE OBRA
PART. DESCRIPCIÓN Und. Metrado Precio U. Parcial ACUMULADO ANTERIOR MES ACTUAL ACUMULADO ACTUAL
Base S/. S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
01.06.04.07 SUMINISTRO E INSTALACION DE VALVULAS
01.06.04.07.01 SUMINISTRO E INSTALACION DE VALVULA DE COMPUERTA DE BRONCE DE D=3" EN TUB. PVC-SP und 4.00 276.56 1,106.24 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 1,106.24 100.00%
01.06.04.08 SUMINISTRO E INSTALACION DE TAPAS DE CONCRETO ARMADO
01.06.04.08.01 TAPA DE CONCRETO EN CAJA BAYPASS (0.70X0.70M) und 2.00 252.39 504.78 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 504.78 100.00%
01.06.05 º
01.06.05.01 OBRAS PRELIMINARES
01.06.05.01.01 LIMPIEZA DE TERRENO MANUAL m2 168.56 1.41 237.67 168.56 237.67 100.00% 0.00 0.00% 168.56 237.67 100.00% 0.00 0.00 0.00%
01.06.05.01.02 TRAZO, NIVELES Y REPLANTEO m2 210.70 1.07 225.45 210.70 225.45 100.00% 0.00 0.00% 210.70 225.45 100.00% 0.00 0.00 0.00%
01.06.05.02 MOVIMIENTO DE TIERRAS
01.06.05.02.01 EXCAVACION MANUAL EN TERRENO NORMAL m3 216.83 56.31 12,209.70 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 216.83 12,209.70 100.00%
01.06.05.02.02 EXCAVACION DE ZANJA MANUAL P/DESAGUE TUB. EN TERRENO NORMAL A=0.80M H=0.55M m 65.39 23.02 1,505.28 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 65.39 1,505.28 100.00%
01.06.05.02.03 REFINE Y NIVELACION DE ZANJAS P/TUB. A=0.80M m 210.70 1.38 290.77 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 210.70 290.77 100.00%
01.06.05.02.04 RELLENO DE CAMA DE ARENA SOBRE LA CLAVE DEL TUBO Y LATERALES DE TUB. A=0.80M H=0. m 210.70 18.12 3,817.88 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 210.70 3,817.88 100.00%
01.06.05.02.05 RELLENO DE ZANJA C/MAT. PROPIO SELEC. EN TUB. A=0.80M H=0.20M m 65.39 9.22 602.90 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 65.39 602.90 100.00%
01.06.05.02.06 RELLENO COMPACTADO CON MATERIAL PROPIO SELECCIONADO m3 164.09 58.99 9,679.67 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 164.09 9,679.67 100.00%
ELIMINACION DE MATERIAL EXCEDENTE MANUAL HASTA UNA DISTANCIA PROMEDIO 30 ml.
01.06.05.02.07 m3 85.56 25.60 2,190.34 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 85.56 2,190.34 100.00%
01.06.05.03 OBRAS DE CONCRETO SIMPLE
01.06.05.03.01 SOLADO DE CONCRETO C:H 1:10 E=4" m2 10.05 37.11 372.96 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.05 372.96 100.00%
01.06.05.03.02 DADO DE CONCRETO F´c = 140 Kg/cm2 m3 0.17 404.41 68.75 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.17 68.75 100.00%
01.06.05.04 OBRAS DE CONCRETO ARMADO
01.06.05.04.01 BUZONES
01.06.05.04.01.01 LOSA INFERIOR
01.06.05.04.01.01.01CONCRETO F'c = 210 Kg/cm2 EN LOSA INFERIOR m3 2.01 569.92 1,145.54 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.01 1,145.54 100.00%
01.06.05.04.01.01.02ACERO DE REFUERZO fy=4,200 kg/cm2 EN LOSA INFERIOR kg 262.50 4.66 1,223.25 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 262.50 1,223.25 100.00%
01.06.05.04.01.02 MUROS
01.06.05.04.01.02.01CONCRETO F'c = 210 Kg/cm2 EN MUROS m3 8.50 569.93 4,844.41 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.50 4,844.41 100.00%
01.06.05.04.01.02.02ENCOFRADO Y DESENCOFRADO EN MUROS m2 36.42 48.01 1,748.52 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 36.42 1,748.52 100.00%
01.06.05.04.01.03 LOSA SUPERIOR
01.06.05.04.01.03.01CONCRETO F'c = 210 Kg/cm2 EN LOSA SUPERIOR m3 0.73 569.93 416.05 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.73 416.05 100.00%
01.06.05.04.01.03.02ENCOFRADO Y DESENCOFRADO EN LOSA SUPERIOR m2 4.90 48.01 235.25 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.90 235.25 100.00%
01.06.05.04.01.03.03ACERO DE REFUERZO fy=4,200 kg/cm2 EN LOSA SUPERIOR kg 289.27 4.66 1,348.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 289.27 1,348.00 100.00%
01.06.05.04.02 CAJA DE REGISTRO
01.06.05.04.02.01 CONCRETO F'c = 210 Kg/cm2 EN CAJA DE REGISTRO m3 2.40 569.93 1,367.83 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.40 1,367.83 100.00%
01.06.05.04.02.02 ENCOFRADO Y DESENCOFRADO EN CAJA DE REGISTRO m2 20.39 48.01 978.92 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.39 978.92 100.00%
01.06.05.04.02.03 ACERO DE REFUERZO fy=4,200 kg/cm2 EN CAJA DE REGISTRO kg 416.97 4.66 1,943.08 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 416.97 1,943.08 100.00%
01.06.05.04.03 DISPOSICION FINAL
01.06.05.04.03.01 CONCRETO F'c = 175 Kg/cm2 EN DISPOSICION FINAL m3 0.81 496.82 402.42 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.81 402.42 100.00%
01.06.05.04.03.02 ENCOFRADO Y DESENCOFRADO EN DISPOSICION FINAL m2 4.10 48.01 196.84 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.10 196.84 100.00%
01.06.05.04.03.03 ACERO DE REFUERZO fy=4,200 kg/cm2 EN DISPOSICION FINAL kg 35.34 4.66 164.68 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 35.34 164.68 100.00%
01.06.05.05 SUMINISTRO E INSTALACION DE TUBERIAS, ACCESORIOS Y VALVULAS COMPUERTA
01.06.05.05.01 SUMINISTRO E INSTALACION DE TUBERIAS DE REDES DE EVACUACION
01.06.05.05.01.01 SUMINISTRO E INSTALACION DE TUBERIA Ø 2" PVC-SAL m 2.39 6.33 15.13 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.39 15.13 100.00%
01.06.05.05.01.02 SUMINISTRO E INSTALACION DE TUBERIA PVC SAL DE Ø 4" m 189.75 7.71 1,462.97 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 189.75 1,462.97 100.00%
01.06.05.05.02.01 SUMINISTRO E INSTALACION DE CODO D=4" DE 45° PVC-SAL und 2.00 12.15 24.30 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 24.30 100.00%
01.06.05.05.02.02 SUMINISTRO E INSTALACION DE CODO D=2" DE 90° PVC-SAL und 1.00 8.38 8.38 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 8.38 100.00%
01.06.05.05.02.03 SUMINISTRO E INSTALACION DE VALVULA ANTI ROEDORES D=2" DE PVC und 1.00 25.87 25.87 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 25.87 100.00%
01.06.05.05.02.04 SUMINISTRO E INSTALACION DE VALVULA ANTI ROEDORES D=4" DE PVC und 2.00 35.27 70.54 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 70.54 100.00%
01.06.05.05.03 CAIDAS ESPECIALES EN REDES DE EVACUACION
01.06.05.05.03.01 SUMINISTRO E INSTALACION DE TUBERIA PVC SAL DE Ø 4" m 5.77 7.71 44.49 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.77 44.49 100.00%
01.06.05.05.03.02 SUMINISTRO E INSTALACION DE CODO D=4" DE 90° PVC-SAL und 8.00 12.15 97.20 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 97.20 100.00%
01.06.05.05.03.03 SUMINISTRO E INSTALACION DE TEE D=4" PVC-SAL und 8.00 10.57 84.56 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 84.56 100.00%
01.06.05.05.03.04 SUMINISTRO E INSTALACION DE TAPON D=4" PVC-SAL und 8.00 9.54 76.32 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 76.32 100.00%
01.06.05.05.03.05 SUMINISTRO E INSTALACION DE ABRAZADERA METALICA D=4" und 8.00 16.67 133.36 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 133.36 100.00%
01.06.05.06 VARIOS
01.06.05.06.01 TAPA DE CONCRETO ARMADO PARA BUZON und 5.00 366.02 1,830.10 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.00 1,830.10 100.00%
01.06.05.06.02 TAPA DE CONCRETO ARMADO PARA CAJAS DE REGISTROS (0.40M x0.70M) und 11.00 90.94 1,000.34 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.00 1,000.34 100.00%
01.06.06 CERCO PERIMETRICO PARA SISTEMA DE POTABLE
VALORIZACION REAL DE OBRA
EJECUTADO
REAL POR EJECUTAR
PRESUPUESTO AVANCES
SALDO DE OBRA
PART. DESCRIPCIÓN Und. Metrado Precio U. Parcial ACUMULADO ANTERIOR MES ACTUAL ACUMULADO ACTUAL
Base S/. S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
01.06.06.01 OBRAS PRELIMINARES
01.06.06.01.01 LIMPIEZA DE TERRENO MANUAL m2 195.64 1.41 275.85 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 195.64 275.85 100.00%
01.06.06.01.02 TRAZO, NIVELES Y REPLANTEO m2 39.13 1.07 41.87 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 39.13 41.87 100.00%
01.06.06.02 MOVIMIENTO DE TIERRAS
01.06.06.02.01 EXCAVACION MANUAL EN TERRENO NORMAL m3 1.71 56.31 96.29 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.71 96.29 100.00%
01.06.06.02.02 ELIMINACION DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO 30 ml. m3 2.23 25.60 57.09 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.23 57.09 100.00%
0.00
01.06.06.03 OBRAS DE CONCRETO SIMPLE
01.06.06.03.01 DADO DE CONCRETO 0.20x0.20x0.50 M m3 2.14 358.14 766.42 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.14 766.42 100.00%
01.06.06.03.02 ENCOFRADO Y DESENCOFRADO DADOS m2 8.56 48.57 415.76 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.56 415.76 100.00%
01.06.06.04 CARPINTERIA METALICA
01.06.06.04.01 PARANTE DE TUBO DE F°G° D= 2 1/2" und 107.00 101.13 10,820.91 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 107.00 10,820.91 100.00%
01.06.06.04.02 PUERTA METALICA 0.95x2.00M INC./MARCO Y CERRAJERIA und 3.00 414.75 1,244.25 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 1,244.25 100.00%
01.06.06.04.03 MALLA METALICA GALVANIZADO TIPO COCADA m 165.84 113.11 18,758.16 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 165.84 18,758.16 100.00%
01.07 LINEAS DE IMPULSION (L1 = 836.63 ml - L2 = 30.57ml - L3 = 32.98ml.)
01.07.01 OBRAS PRELIMINARES
01.07.01.01 TRAZO, NIVELES Y REPLANTEO m 900.18 1.07 963.19 900.18 963.19 100.00% 0.00 0.00% 900.18 963.19 100.00% 0.00 0.00 0.00%
01.07.02 MOVIMIENTO DE TIERRAS
01.07.02.01 EXCAVACION MANUAL DE TERRENO NORMAL PARA ZANJA A=0.50M H=0.70M m 900.18 19.73 17,760.55 900.18 17,760.55 100.00% 0.00 0.00% 900.18 17,760.55 100.00% 0.00 0.00 0.00%
01.07.02.02 REFINE Y NIVELACION DE ZANJAS P/TUB. PVC-SP A=0.50M m 900.18 0.87 783.16 900.18 783.16 100.00% 0.00 0.00% 900.18 783.16 100.00% 0.00 0.00 0.00%
01.07.02.03 RELLENO DE CAMA DE ARENA SOBRE LA CLAVE DEL TUBO Y LATERALES-TUBERIA D=3" PVC-O H m 836.63 12.15 10,165.05 836.63 10,165.05 100.00% 0.00 0.00% 836.63 10,165.05 100.00% 0.00 0.00 0.00%
01.07.02.04 RELLENO DE CAMA DE ARENA SOBRE LA CLAVE DEL TUBO Y LATERALES-TUBERIA D=2" PVC-O H m 30.57 11.12 339.94 30.57 339.94 100.00% 0.00 0.00% 30.57 339.94 100.00% 0.00 0.00 0.00%
01.07.02.05 RELLENO DE CAMA DE ARENA SOBRE LA CLAVE DEL TUBO Y LATERALES-TUBERIA D=1 1/2" PVC- m 32.98 10.87 358.49 32.98 358.49 100.00% 0.00 0.00% 32.98 358.49 100.00% 0.00 0.00 0.00%
01.07.02.06 RELLENO Y COMPACTACION CON MATERIAL PROPIO SELECCIONADO - TUBERIA D=3" PVC-O E=0 m3 836.63 9.45 7,906.15 836.63 7,906.15 100.00% 0.00 0.00% 836.63 7,906.15 100.00% 0.00 0.00 0.00%
01.07.02.07 RELLENO Y COMPACTADO CON MATERIAL PROPIO SELECCIONADO - TUBERIA D=2" PVC-O E=0.3 m3 30.57 10.00 305.70 30.57 305.70 100.00% 0.00 0.00% 30.57 305.70 100.00% 0.00 0.00 0.00%
01.07.02.08 RELLENO Y COMPACTADO CON MATERIAL PROPIO SELECCIONADO - TUBERIA D=1 1/2" PVC-O E= m3 32.98 10.60 349.59 32.98 349.59 100.00% 0.00 0.00% 32.98 349.59 100.00% 0.00 0.00 0.00%
01.07.02.09 ELIMINACION DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO 30 ml. m3 380.33 25.60 9,736.45 9,736.45 100.00% 0.00 0.00% 380.33 9,736.45 100.00% 0.00 0.00 0.00%
380.33
01.07.03 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
01.07.03.01 SUMINISTRO E INSTALACION DE TUBERIAS
01.07.03.01.04 SUMINISTRO E INSTALACION DE TUBERIA PVC-O DE D=3" LINEA DE IMPUSION N° 01 m 829.75 30.02 24,909.10 829.75 24,909.10 100.00% 0.00 0.00% 829.75 24,909.10 100.00% 0.00 0.00 0.00%
01.07.03.01.06 SUMINISTRO E INSTALACION DE TUBERIA PVC-O DE D=1 1/2" LINEA DE IMPUSION N° 03 m 32.58 7.62 248.26 32.58 248.26 100.00% 0.00 0.00% 32.58 248.26 100.00% 0.00 0.00 0.00%
01.07.03.02 SUMINISTRO E INSTALACION DE ACCESORIOS
01.07.03.02.01 SUMINISTRO E INSTALACION DE TRANSICION DE F°G° A PVC DE D=3" und 3.00 31.05 93.15 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 93.15 100.00%
01.07.03.02.02 SUMINISTRO E INSTALACION DE TRANSICION DE F°G° A PVC DE D=2" und 2.00 17.74 35.48 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 35.48 100.00%
01.07.03.02.03 SUMINISTRO E INSTALACION DE TRANSICION DE F°G° A PVC DE D=1 1/2" und 2.00 13.61 27.22 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 27.22 100.00%
01.07.03.02.04 SUMINISTRO E INSTALACION DE CODO 90° DE F°G° D=3" und 2.00 34.44 68.88 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 68.88 100.00%
01.07.03.02.05 SUMINISTRO E INSTALACION DE CODO 22.5° DE PVC-O D=3" und 5.00 23.10 115.50 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.00 115.50 100.00%
01.07.03.02.06 SUMINISTRO E INSTALACION DE CODO 45° DE PVC-SP D=2" und 2.00 17.78 35.56 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 35.56 100.00%
01.07.03.02.07 SUMINISTRO E INSTALACION DE CODO 90° DE PVC-SP D=2" und 2.00 20.00 40.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 40.00 100.00%
01.07.03.02.08 SUMINISTRO E INSTALACION DE CODO 22.5° DE PVC-SP D=1 1/2" und 1.00 13.38 13.38 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 13.38 100.00%
01.07.03.02.09 SUMINISTRO E INSTALACION DE CODO 90° DE PVC-SP D=1 1/2" und 3.00 9.03 27.09 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 27.09 100.00%
01.07.03.02.10 DADO DE CONCRETO PARA ANCLAJE DE ACCESORIOS F´c = 140 Kg/cm2 und 22.00 59.75 1,314.50 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 22.00 1,314.50 100.00%
CAMARA DE VALVULA DE ALIVIO (01 UND), CAMARA DE PRESOSTATO (01 UND), VALVULA DE
01.07.04
PURGA TIPO II (02 UND) Y VALVULA DE AIRE (01 UND)
01.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 1,811.78 1.41 2,554.61 2,554.61 100.00% 0.00 0.00% 1,811.78 2,554.61 100.00% 0.00 0.00 0.00%
1,811.78
01.02.01.02 TRAZO, NIVELES Y REPLANTEO. m2 518.18 0.79 409.36 518.18 409.36 100.00% 0.00 0.00% 518.18 409.36 100.00% 0.00 0.00 0.00%
01.02.02 ESTRUCTURAS
01.02.02.01 MOVIMIENTO DE TIERRAS
01.02.02.01.01 EXCAVACION MANUAL EN TERRENO NORMAL. m3 155.23 55.24 8,574.91 155.23 8,574.91 100.00% 0.00 0.00% 155.23 8,574.91 100.00% 0.00 0.00 0.00%
01.02.02.01.02 RELLENO COMPACTADO CON MATERIAL PROPIO SELECCIONADO m3 31.55 58.99 1,861.13 31.55 1,861.13 100.00% 0.00 0.00% 31.55 1,861.13 100.00% 0.00 0.00 0.00%
01.02.02.01.03 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO MEJORADO m3 10.53 96.20 1,012.99 10.53 1,012.99 100.00% 0.00 0.00% 10.53 1,012.99 100.00% 0.00 0.00 0.00%
ELIMINACION DE MATERIAL EXCEDENTE MANUAL A UNA DISTANCIA
01.02.02.01.04
PROMEDIO 30 ml.
m3 160.79 25.60 4,116.22 160.79 4,116.22 100.00% 0.00 0.00% 160.79 4,116.22 100.00% 0.00 0.00 0.00%
01.02.02.02 OBRAS DE CONCRETO SIMPLE
01.02.02.02.01 CONCRETO EN CIMIENTOS CORRIDOS F´C = 140 KG/CM2 m3 103.49 350.59 36,282.56 103.49 36,282.56 100.00% 0.00 0.00% 103.49 36,282.56 100.00% 0.00 0.00 0.00%
01.02.02.03 OBRAS DE CONCRETO ARMADO
01.02.02.03.01 SOBRECIMIENTO
01.02.02.03.01.01 CONCRETO F'c = 175 Kg/cm2 EN SOBRECIMIENTO m3 26.15 498.35 13,031.85 26.15 13,031.85 100.00% 0.00 0.00% 26.15 13,031.85 100.00% 0.00 0.00 0.00%
01.02.02.03.01.02 ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTO m2 357.50 48.01 17,163.58 357.50 17,163.58 100.00% 0.00 0.00% 357.50 17,163.58 100.00% 0.00 0.00 0.00%
01.02.02.03.01.03 ACERO DE REFUERZO fy=4,200 kg/cm2 EN SOBRECIMIENTO kg 1,848.91 4.66 8,615.92 1,848.91 8,615.92 100.00% 0.00 0.00% 1,848.91 8,615.92 100.00% 0.00 0.00 0.00%
01.02.02.04 ESTRUCTURA DE MADERA
01.02.02.04.03 SUMINISTRO E INSTALACION DE VIGA DE MADERA DE 3"x2" - QUINILLA O S p2 2,122.05 7.43 15,766.83 2,122.05 15,766.83 100.00% 0.00 0.00% 2,122.05 15,766.83 100.00% 0.00 0.00 0.00%
01.02.02.04.04 SUMINISTRO E INSTALACION DE CORREAJES DE MADERA 2"x2" - QUINILLA und 1,527.23 6.88 10,507.34 1,527.23 10,507.34 100.00% 0.00 0.00% 1,527.23 10,507.34 100.00% 0.00 0.00 0.00%
01.02.02.04.05 SUMINISTRO E INSTALACION DE ARRIOSTRES DE MADERA 3"x2" - QUINILL p2 762.01 6.88 5,242.63 762.01 5,242.63 100.00% 0.00 0.00% 762.01 5,242.63 100.00% 0.00 0.00 0.00%
01.02.02.04.06 SUMINISTRO E INSTALACION DE CARTELAS INC/PERNOS und 784.00 8.32 6,522.88 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 784.00 6,522.88 100.00%
01.02.03 ARQUITECTURA
01.02.03.01 MUROS Y TABIQUES DE ALBAÑILERIA
01.02.03.01.01 MURO EXTERIOR E INTERIOR DE MADERA MACHIHEMBRADA QUINILLA O SIMm2 2,362.26 41.68 98,459.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2,362.26 98,459.00 100.00%
01.02.03.02 CARPINTERIA DE MADERA
01.02.03.02.01 SUMINSTRO E INST. PUERTA DE MADERA MACHIHEM. 0.75x1.80M -INC. M und 98.00 251.74 24,670.52 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 98.00 24,670.52 100.00%
01.02.03.02.02 SUMINISTRO E INST. VENTANA DE MADERA QUIN. O SIMILAR CON MALLA MEund 98.00 72.22 7,077.56 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 98.00 7,077.56 100.00%
01.02.03.02.03 SUMINISTRO E INST.VENTANA DE MADERA QUIN. O SIMILAR CON MALLA METund 98.00 56.22 5,509.56 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 98.00 5,509.56 100.00%
01.02.03.03 COBERTURAS
01.02.03.03.01 COBERTURA OPACA ONDA 100 DE FIBRA VEGETAL DE 2.00x0.95 M E=3 MM m2 843.49 56.24 47,437.88 843.49 47,437.88 100.00% 0.00 0.00% 843.49 47,437.88 100.00% 0.00 0.00 0.00%
01.02.03.04 CERRAJERIA 0.00
01.02.03.04.01 SUMINISTRO E INSTALACION DE CERRADURA TIPO PERILLA und 98.00 28.24 2,767.52 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 98.00 2,767.52 100.00%
01.02.03.04.02 SUMINISTRO E INSTALACION DE BISAGRA ALUMINIZADO DE 3"x2" und 294.00 19.08 5,609.52 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 294.00 5,609.52 100.00%
01.02.03.05 SARDINELES
01.02.03.05.01 SARDINEL DE DUCHA F'C=175 KG/CM2 H=0.10M m 117.60 37.57 4,418.23 94.08 3,534.59 80.00% 0.00 0.00 0.00% 94.08 3,534.59 80.00% 23.52 883.64 20.00%
01.02.03.06 PISOS
01.02.03.06.01 FALSO PISO DE CEMENTO E=2" m2 210.70 17.30 3,645.11 168.56 2,916.09 80.00% 0.00 0.00 0.00% 168.56 2,916.09 80.00% 42.14 729.02 20.00%
01.02.03.06.02 CONTRAPISO DE CEMENTO SEMIPULIDO E= 2" m2 252.84 28.86 7,296.96 202.88 5,855.12 80.24% 0.00 0.00 0.00% 202.88 5,855.12 80.24% 49.96 1,441.84 19.76%
01.02.03.06.03 VEREDA DE CEMENTO FROTACHADO E=2" m2 164.64 40.83 6,722.25 131.70 5,377.31 79.99% 0.00 0.00 0.00% 131.70 5,377.31 79.99% 32.94 1,344.94 20.01%
01.02.04 INSTALACIONES SANITARIAS
01.02.04.01 APARATOS SANITARIOS Y ACCESORIOS
01.02.04.01.01 SUMINISTRO E INSTALACION DE INODORO CERAMICO CON TANQUE INC. und 98.00 229.00 22,442.00 80.00 18,320.00 81.63% 0.00 0.00 0.00% 80.00 18,320.00 81.63% 18.00 4,122.00 18.37%
01.02.04.01.02 SUMINISTRO E INSTALACION DE DUCHA CROMADA 1 LLAVE INC./ACCESO und 98.00 100.82 9,880.36 80.00 8,065.60 81.63% 0.00 0.00 0.00% 80.00 8,065.60 81.63% 18.00 1,814.76 18.37%
01.02.04.01.03 SUMINISTRO E INSTALACION DE GRIFO DE BRONCE STANDARD - LLAVE DE und 98.00 28.45 2,788.10 80.00 2,276.00 81.63% 0.00 0.00 0.00% 80.00 2,276.00 81.63% 18.00 512.10 18.37%
01.02.04.02 SISTEMA DE AGUA FRIA
01.02.04.02.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" C-10 pto 294.00 31.06 9,131.64 236.00 7,330.16 80.27% 0.00 0.00 0.00% 236.00 7,330.16 80.27% 58.00 1,801.48 19.73%
01.02.04.02.02 SUMINISTRO E INSTALACION DE TUBERIA PVC-SAP DE 1/2" C-10 m 2,672.46 6.20 16,569.25 2,142.23 13,281.83 80.16% 0.00 0.00 0.00% 2,142.23 13,281.83 80.16% 530.23 3,287.42 19.84%
01.02.04.02.03 SUMINISTRO E INSTALACION DE CODO DE PVC D=1/2"x 90° C-10 und 196.00 7.66 1,501.36 158.00 1,210.28 80.61% 0.00 0.00 0.00% 158.00 1,210.28 80.61% 38.00 291.08 19.39%
01.02.04.02.04 SUMINISTRO E INSTALACION DE TEE DE PVC D=1/2"x1/2" C-10 und 196.00 8.59 1,683.64 158.00 1,357.22 80.61% 0.00 0.00 0.00% 158.00 1,357.22 80.61% 38.00 326.42 19.39%
01.02.04.02.05 SUMINISTRO E INSTALACION DE VALVULA COMPUERTA DE BRONCE DE 1/2" und 98.00 69.41 6,802.18 81.00 5,622.21 82.65% 0.00 0.00 0.00% 81.00 5,622.21 82.65% 17.00 1,179.97 17.35%
01.02.04.03 DESAGUE Y VENTILACION
01.02.04.03.01 SALIDAS DE DESAGUE EN INTERIOR
01.02.04.03.01.01 SALIDA DE DESAGUE DE 2" pto 392.00 63.91 25,052.72 314.00 20,067.74 80.10% 0.00 0.00 0.00% 314.00 20,067.74 80.10% 78.00 4,984.98 19.90%
01.02.04.03.01.02 SALIDA DE DESAGUE DE 4" pto 98.00 90.48 8,867.04 81.00 7,328.88 82.65% 0.00 0.00 0.00% 81.00 7,328.88 82.65% 17.00 1,538.16 17.35%
01.02.04.03.02 SUMINISTRO E INSTALACION DE ACCESORIOS EN REDES EN INTERIOR
01.02.04.03.02.01 SUMINISTRO E INSTALACION DE TUBERIA PVC SAL DE Ø 2" m 457.66 6.33 2,896.99 336.12 2,127.64 73.44% 0.00 0.00 0.00% 336.12 2,127.64 73.44% 121.54 769.35 26.56%
VALORIZACION DE OBRA N° 011 - NOVIEMBRE 2022
PRESUPUESTO AVANCES
SALDO DE OBRA
PART. DESCRIPCIÓN Und. Metrado Precio U. Parcial ACUMULADO ANTERIOR MES ACTUAL ACUMULADO ACTUAL
Base S/. S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
01.02.04.03.02.02 SUMINISTRO E INSTALACION DE TUBERIA PVC SAL DE Ø 4" m 283.22 7.78 2,203.45 226.58 1,762.79 80.00% 0.00 0.00 0.00% 226.58 1,762.79 80.00% 56.64 440.66 20.00%
01.02.04.03.02.03 SUMINISTRO E INSTALACION DE YEE PVC-SAL DE D=4" und 294.00 19.00 5,586.00 236.00 4,484.00 80.27% 0.00 0.00 0.00% 236.00 4,484.00 80.27% 58.00 1,102.00 19.73%
01.02.04.03.02.04 SUMINISTRO E INSTALACION DE CODO D=4" DE 45° PVC-SAL und 98.00 12.15 1,190.70 81.00 984.15 82.65% 0.00 0.00 0.00% 81.00 984.15 82.65% 17.00 206.55 17.35%
01.02.04.03.02.05 SUMINISTRO E INSTALACION DE REDUCCION DE PVC - SAL Ø 4" A Ø 2" und 294.00 9.49 2,790.06 236.00 2,239.64 80.27% 0.00 0.00 0.00% 236.00 2,239.64 80.27% 58.00 550.42 19.73%
01.02.04.03.02.06 SUMINISTRO E INSTALACION DE SOMBRERO DE VENTILACION DE D=2" und 98.00 14.37 1,408.26 81.00 1,163.97 82.65% 0.00 0.00 0.00% 81.00 1,163.97 82.65% 17.00 244.29 17.35%
01.02.04.03.02.07 SUMINISTRO E INSTALACION DE SUMIDERO CROMADO DE 2" und 196.00 24.04 4,711.84 158.00 3,798.32 80.61% 0.00 0.00 0.00% 158.00 3,798.32 80.61% 38.00 913.52 19.39%
01.02.04.03.02.08 SUMINISTRO E INSTALACION DE ABRAZADERA METALICA D=2" und 294.00 24.92 7,326.48 236.00 5,881.12 80.27% 0.00 0.00 0.00% 236.00 5,881.12 80.27% 58.00 1,445.36 19.73%
01.02.04.03.02.09 SUMINISTRO E INSTALACION DE CODO SANITARIO DE 4" A 2" und 98.00 10.48 1,027.04 81.00 848.88 82.65% 0.00 0.00 0.00% 81.00 848.88 82.65% 17.00 178.16 17.35%
SISTEMA DE TRATAMIENTO PARA UBS ARRASTRE HIDRÁULICO (97 UND.
01.02.06
DOMICILIARAS Y 01 UND. PUESTO DE SALUD)
01.02.06.01 REDES COLECTORAS - EXTERIOR
01.02.06.01.05 CAMARA DE INSPECCION
01.02.06.01.05.01 CAJA DE REGISTRO DE12" x 24" - INC. PANTALLA INTERMEDIA Y TAPA DE und 196.00 121.18 23,751.28 187.00 22,660.66 95.41% 0.00 0.00 0.00% 187.00 22,660.66 95.41% 9.00 1,090.62 4.59%
01.02.06.01.05.02 SUMINISTRO E INSTALACION DE CAJA DE EVACUACION DE LODOS DE 80x und 98.00 203.64 19,956.72 94.00 19,142.16 95.92% 0.00 0.00 0.00% 94.00 19,142.16 95.92% 4.00 814.56 4.08%
01.02.06.03 POZO DE PERCOLACION
01.02.06.03.03 OBRAS DE CONCRETO ARMADO
01.02.06.03.03.01 LOSA SUPERIOR DE POZO
01.02.06.03.03.01 CONCRETO F'c = 175 Kg/cm2 EN LOSA SUPERIOR m3 15.06 538.95 8,116.59 14.38 7,750.10 95.48% 0.00 0.00 0.00% 14.38 7,750.10 95.48% 0.68 366.49 4.52%
01.02.06.03.03.01 ENCOFRADO Y DESENCOFRADO EN LOSA SUPERIOR. m2 150.15 53.77 8,073.57 143.40 7,710.62 95.50% 0.00 0.00 0.00% 143.40 7,710.62 95.50% 6.75 362.95 4.50%
01.02.06.03.03.01 ACERO DE REFUERZO fy=4,200 kg/cm2 EN LOSA SUPERIOR kg 998.82 4.66 4,654.50 953.88 4,445.08 95.50% 0.00 0.00 0.00% 953.88 4,445.08 95.50% 44.94 209.42 4.50%
01.02.06.03.04 MATERIAL FILTRANTE
01.02.06.03.04.01 SUMINISTRO Y COLOCACION DE FILTRO DE GRAVA DE Ø 1/2" - FONDO DE m3 7.70 165.73 1,276.12 6.16 1,020.90 80.00% 0.00 0.00 0.00% 6.16 1,020.90 80.00% 1.54 255.22 20.00%
01.02.06.03.05 VARIOS
01.02.06.03.05.02 MURO DE CABEZA LADRILLO TUBULAR 12 x15 x 24 m2 593.09 73.89 43,823.42 593.09 43,823.42 100.00% 0.00 0.00% 593.09 43,823.42 100.00% 0.00 0.00 0.00%
01.02.06.03.05.03 TAPA DE CONCRETO ARMADO DE 0.60 x 0.60 M und 98.00 132.50 12,985.00 90.00 11,925.00 91.84% 0.00 0.00 0.00% 90.00 11,925.00 91.84% 8.00 1,060.00 8.16%
01.02.06.03.05.05 SUMINISTRO E INSTALACION DE CODO 90° DE D=4", PVC -SAL und 98.00 12.15 1,190.70 95.00 1,154.25 96.94% 0.00 0.00 0.00% 95.00 1,154.25 96.94% 3.00 36.45 3.06%
UBS ARRASTRE HIDRÁULICO CON BIODIGESTOR Y POZO DE
01.03
PERCOLACIÓN (03 UND. INSTITUCIONES EDUCATIVAS)
01.03.02 ESTRUCTURAS
01.03.02.04 ESTRUCTURA DE MADERA
01.03.02.04.03 SUMINISTRO E INSTALACION DE VIGA DE MADERA DE 3"x2" - QUINILLA O S p2 102.36 7.43 760.53 102.36 760.53 100.00% 0.00 0.00% 102.36 760.53 100.00% 0.00 0.00 0.00%
01.03.02.04.04 SUMINISTRO E INSTALACION DE CORREAJES DE MADERA 2"x2" - QUINILLA und 71.36 6.88 490.96 71.36 490.96 100.00% 0.00 0.00% 71.36 490.96 100.00% 0.00 0.00 0.00%
01.03.02.04.05 SUMINISTRO E INSTALACION DE ARRIOSTRES DE MADERA 3"x2" - QUINILL p2 38.85 6.88 267.29 38.85 267.29 100.00% 0.00 0.00% 38.85 267.29 100.00% 0.00 0.00 0.00%
01.03.02.04.06 SUMINISTRO E INSTALACION DE CARTELAS INC/PERNOS und 48.00 8.32 399.36 48.00 399.36 100.00% 0.00 0.00% 48.00 399.36 100.00% 0.00 0.00 0.00%
01.03.03 ARQUITECTURA
01.03.03.02 CARPINTERIA DE MADERA
01.03.03.02.01 SUMINISTRO E INSTALACION DE PUERTA MACHIHEMBRADA 0.75x1.80 M - und 6.00 251.74 1,510.44 6.00 1,510.44 100.00% 0.00 0.00% 6.00 1,510.44 100.00% 0.00 0.00 0.00%
01.03.03.02.02 SUMINISTRO E INSTALACION DE VENTANA DE MADERA QUINILLA O SIMILA und 3.00 57.73 173.19 3.00 173.19 100.00% 0.00 0.00% 3.00 173.19 100.00% 0.00 0.00 0.00%
01.03.03.02.03 SUMINISTRO E INSTALACION DE VENTANA DE MADERA QUINILLA O SIMILA und 6.00 56.22 337.32 6.00 337.32 100.00% 0.00 0.00% 6.00 337.32 100.00% 0.00 0.00 0.00%
01.03.03.03 COBERTURAS
01.03.03.03.01 COBERTURA OPACA ONDA 100 DE FIBRA VEGETAL DE 2.00x0.95 M E=3 MM m2 39.41 56.24 2,216.42 39.41 2,216.42 100.00% 0.00 0.00% 39.41 2,216.42 100.00% 0.00 0.00 0.00%
01.03.03.04 CERRAJERIA
01.03.03.04.01 SUMINISTRO E INSTALACION DE CERRADURA TIPO PERILLA und 6.00 28.24 169.44 6.00 169.44 100.00% 0.00 0.00% 6.00 169.44 100.00% 0.00 0.00 0.00%
01.03.03.04.02 SUMINISTRO E INSTALACION DE BISAGRA ALUMINIZADO DE 3"x2" und 18.00 19.08 343.44 18.00 343.44 100.00% 0.00 0.00% 18.00 343.44 100.00% 0.00 0.00 0.00%
01.03.03.05 SARDINELES
01.03.03.05.01 SARDINEL DE URINARIO F'C=175 KG/CM2 H=0.20M m 3.60 59.63 214.67 3.60 214.67 100.00% 0.00 0.00% 3.60 214.67 100.00% 0.00 0.00 0.00%
01.03.03.06 PISOS
01.03.03.06.01 FALSO PISO DE CEMENTO E=2" m2 8.64 17.30 149.47 8.64 149.47 100.00% 0.00 0.00% 8.64 149.47 100.00% 0.00 0.00 0.00%
01.03.03.06.02 CONTRAPISO DE CEMENTO SEMIPULIDO E= 2" m2 10.61 28.86 306.20 10.61 306.20 100.00% 0.00 0.00% 10.61 306.20 100.00% 0.00 0.00 0.00%
01.03.03.06.03 VEREDA DE CEMENTO FROTACHADO E=2" m2 11.85 40.83 483.84 11.85 483.84 100.00% 0.00 0.00% 11.85 483.84 100.00% 0.00 0.00 0.00%
01.03.03.06.04 CERAMICO EN PARED COLOR GRIS 15x30 CM m2 7.20 81.70 588.24 7.20 588.24 100.00% 0.00 0.00% 7.20 588.24 100.00% 0.00 0.00 0.00%
01.03.03.07 PINTURA
01.03.03.07.01 PINTURA BARNIZ EN MURO EXTERIOR - 02 manos m2 75.53 10.24 773.43 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 75.53 773.43 100.00%
01.03.03.07.02 PINTURA BARNIZ EN PUERTA CONTRAPLACADA - 02 manos m2 8.10 13.30 107.73 8.10 107.73 100.00% 0.00 0.00% 8.10 107.73 100.00% 0.00 0.00 0.00%
01.03.03.07.03 PINTURA BARNIZ EN VENTANAS - 02 manos m2 2.42 13.30 32.19 2.42 32.19 100.00% 0.00 0.00% 2.42 32.19 100.00% 0.00 0.00 0.00%
01.03.04 INSTALACIONES SANITARIAS
01.03.04.01 APARATOS SANITARIOS Y ACCESORIOS
VALORIZACION DE OBRA N° 011 - NOVIEMBRE 2022
PRESUPUESTO AVANCES
SALDO DE OBRA
PART. DESCRIPCIÓN Und. Metrado Precio U. Parcial ACUMULADO ANTERIOR MES ACTUAL ACUMULADO ACTUAL
Base S/. S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
01.03.04.01.01 SUMINISTRO E INSTALACION DE INODORO CERAMICO CON TANQUE INC und 6.00 229.00 1,374.00 6.00 1,374.00 100.00% 0.00 0.00% 6.00 1,374.00 100.00% 0.00 0.00 0.00%
01.03.04.01.02 SUMINISTRO E INSTALACION DE GRIFO DE BRONCE STANDARD - LLAVE DE und 12.00 28.45 341.40 12.00 341.40 100.00% 0.00 0.00% 12.00 341.40 100.00% 0.00 0.00 0.00%
01.03.04.02 SISTEMA DE AGUA FRIA
01.03.04.02.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" C-10 pto 21.00 31.06 652.26 21.00 652.26 100.00% 0.00 0.00% 21.00 652.26 100.00% 0.00 0.00 0.00%
01.03.04.02.02 SUMINISTRO E INSTALACION DE TUBERIA PVC-SAP DE 1/2" C-10 m 115.68 6.20 717.22 115.68 717.22 100.00% 0.00 0.00% 115.68 717.22 100.00% 0.00 0.00 0.00%
01.03.04.02.03 SUMINISTRO E INSTALACION DE CODO DE PVC D=1/2"x 90° C-10 und 30.00 7.66 229.80 30.00 229.80 100.00% 0.00 0.00% 30.00 229.80 100.00% 0.00 0.00 0.00%
01.03.04.02.04 SUMINISTRO E INSTALACION DE TEE DE PVC D=1/2"x1/2" C-10 und 18.00 8.59 154.62 18.00 154.62 100.00% 0.00 0.00% 18.00 154.62 100.00% 0.00 0.00 0.00%
01.03.04.02.05 SUMINISTRO E INSTALACION DE VALVULA COMPUERTA DE BRONCE DE 1/2" und 6.00 69.41 416.46 6.00 416.46 100.00% 0.00 0.00% 6.00 416.46 100.00% 0.00 0.00 0.00%
01.03.04.03 DESAGUE Y VENTILACION
01.03.04.03.01 SALIDAS DE DESAGUE EN INTERIOR
01.03.04.03.01.01 SALIDA DE DESAGUE DE 2" pto 21.00 63.91 1,342.11 21.00 1,342.11 100.00% 0.00 0.00% 21.00 1,342.11 100.00% 0.00 0.00 0.00%
01.03.04.03.01.02 SALIDA DE DESAGUE DE 4" pto 6.00 90.48 542.88 6.00 542.88 100.00% 0.00 0.00% 6.00 542.88 100.00% 0.00 0.00 0.00%
01.03.04.03.02 SUMINISTRO E INSTALACION DE ACCESORIOS EN REDES EN INTERIOR
01.03.04.03.02.01 SUMINISTRO E INSTALACION DE TUBERIA Ø 2" PVC-SAL m 25.41 6.33 160.85 25.41 160.85 100.00% 0.00 0.00% 25.41 160.85 100.00% 0.00 0.00 0.00%
01.03.04.03.02.02 SUMINISTRO E INSTALACION DE TUBERIA Ø 4" PVC-SAL m 14.04 7.78 109.23 14.04 109.23 100.00% 0.00 0.00% 14.04 109.23 100.00% 0.00 0.00 0.00%
01.03.04.03.02.03 SUMINISTRO E INSTALACION DE YEE PVC-SAL DE D=4" und 15.00 19.00 285.00 15.00 285.00 100.00% 0.00 0.00% 15.00 285.00 100.00% 0.00 0.00 0.00%
01.03.04.03.02.04 SUMINISTRO E INSTALACION DE CODO D=4" DE 45° PVC-SAL und 12.00 12.15 145.80 12.00 145.80 100.00% 0.00 0.00% 12.00 145.80 100.00% 0.00 0.00 0.00%
01.03.04.03.02.05 SUMINISTRO E INSTALACION DE REDUCCION DE PVC - SAL Ø 4" A Ø 2" und 15.00 9.49 142.35 15.00 142.35 100.00% 0.00 0.00% 15.00 142.35 100.00% 0.00 0.00 0.00%
01.03.04.03.02.06 SUMINISTRO E INSTALACION DE SOMBRERO DE VENTILACION DE D=2" und 6.00 14.37 86.22 6.00 86.22 100.00% 0.00 0.00% 6.00 86.22 100.00% 0.00 0.00 0.00%
01.03.04.03.02.07 SUMINISTRO E INSTALACION DE SUMIDERO CROMADO DE 2" und 12.00 24.04 288.48 12.00 288.48 100.00% 0.00 0.00% 12.00 288.48 100.00% 0.00 0.00 0.00%
01.03.04.03.02.08 SUMINISTRO E INSTALACION DE ABRAZADERA METALICA D=2". und 18.00 24.92 448.56 18.00 448.56 100.00% 0.00 0.00% 18.00 448.56 100.00% 0.00 0.00 0.00%
01.03.04.03.02.09 SUMINISTRO E INSTALACION DE CODO SANITARIO DE 4" A 2" und 6.00 10.48 62.88 6.00 62.88 100.00% 0.00 0.00% 6.00 62.88 100.00% 0.00 0.00 0.00%
01.03.06 SISTEMA DE TRATAMIENTO PARA UBS ARRASTRE HIDRÁULICO (03 UND. INSTITUCIONES EDUCATIVAS)
01.03.06.01 REDES COLECTORAS - EXTERIOR
01.03.06.01.03 TUBERIA DE REDES DE DESAGUE
01.03.06.01.03.01 SUMINISTRO E INSTALACION DE TUBERIA Ø 4" PVC-SAL m 22.50 7.78 175.05 22.50 175.05 100.00% 0.00 0.00% 22.50 175.05 100.00% 0.00 0.00 0.00%
01.03.06.01.04 CAMARA DE INSPECCION
01.03.06.01.04.01 CAJA DE REGISTRO DE12" x 24" - INC. PANTALLA INTERMEDIA Y TAPA DE und 12.00 121.18 1,454.16 12.00 1,454.16 100.00% 0.00 0.00% 12.00 1,454.16 100.00% 0.00 0.00 0.00%
SUMINISTRO E INSTALACION DE CAJA DE EVACUACION DE LODOS DE
01.03.06.01.04.02
80x60 CM
und 6.00 203.64 1,221.84 6.00 1,221.84 100.00% 0.00 0.00% 6.00 1,221.84 100.00% 0.00 0.00 0.00%
01.03.06.02 TANQUE SEPTICO BIODIGESTOR DE PVC
01.03.06.02.04 VARIOS
SUMINISTRO Y COLOCACIÓN DE BIODIGESTOR AUTOLIMPIANTE
01.03.06.02.04.01
INC./ACCES-300Lts
und 6.00 1,527.60 9,165.60 6.00 9,165.60 100.00% 0.00 0.00% 6.00 9,165.60 100.00% 0.00 0.00 0.00%
01.03.06.02.04.02 SUMINISTRO Y COLOCACION DE FILTRO DE GRAVA DE Ø 1/2" m3 0.02 165.73 3.31 0.02 3.31 100.00% 0.00 0.00% 0.02 3.31 100.00% 0.00 0.00 0.00%
01.03.06.03 POZO DE PERCOLACION
01.03.06.03.03 OBRAS DE CONCRETO ARMADO
01.03.06.03.03.01 LOSA SUPERIOR DE POZO
01.03.06.03.03.01 CONCRETO F'c = 175 Kg/cm2 EN LOSA SUPERIOR m3 0.92 538.95 495.83 0.92 495.83 100.00% 0.00 0.00% 0.92 495.83 100.00% 0.00 0.00 0.00%
01.03.06.03.03.01 ENCOFRADO Y DESENCOFRADO EN LOSA SUPERIOR. m2 9.19 53.77 494.15 9.19 494.15 100.00% 0.00 0.00% 9.19 494.15 100.00% 0.00 0.00 0.00%
01.03.06.03.03.01 ACERO DE REFUERZO fy=4,200 kg/cm2 EN LOSA SUPERIOR kg 61.15 4.66 284.96 61.15 284.96 100.00% 0.00 0.00% 61.15 284.96 100.00% 0.00 0.00 0.00%
01.03.06.03.04 MATERIAL FILTRANTE
SUMINISTRO Y COLOCACION DE FILTRO DE GRAVA DE Ø 1/2" - FONDO DE
01.03.06.03.04.01
POZO
m3 0.47 165.73 77.89 0.47 77.89 100.00% 0.00 0.00% 0.47 77.89 100.00% 0.00 0.00 0.00%
01.03.06.03.04.02 SUMINISTRO Y COLOCACION DE FILTRO DE GRAVA DE Ø 2" A 3" m3 8.20 132.68 1,087.98 8.20 1,087.98 100.00% 0.00 0.00% 8.20 1,087.98 100.00% 0.00 0.00 0.00%
01.03.06.03.05 VARIOS
01.03.06.03.05.01 CONCRETO F'c=100 kg/cm2 - ANILLO DE LOSA INFERIOR m3 0.59 377.81 222.91 0.59 222.91 100.00% 0.00 0.00% 0.59 222.91 100.00% 0.00 0.00 0.00%
01.03.06.03.05.02 MURO DE CABEZA LADRILLO TUBULAR 12 x15 x 24 m2 36.31 73.89 2,682.95 36.31 2,682.95 100.00% 0.00 0.00% 36.31 2,682.95 100.00% 0.00 0.00 0.00%
01.03.06.03.05.03 TAPA DE CONCRETO ARMADO DE 0.60 x 0.60 M und 6.00 132.50 795.00 6.00 795.00 100.00% 0.00 0.00% 6.00 795.00 100.00% 0.00 0.00 0.00%
01.03.06.03.05.04 SUMINISTRO Y COLOCACIÓN DE VENTILACION DE 4" EN POZO DE PERCO und 6.00 23.43 140.58 6.00 140.58 100.00% 0.00 0.00% 6.00 140.58 100.00% 0.00 0.00 0.00%
01.03.06.03.05.05 SUMINISTRO E INSTALACION DE CODO D=4" DE 90° PVC-SAL und 6.00 12.15 72.90 6.00 72.90 100.00% 0.00 0.00% 6.00 72.90 100.00% 0.00 0.00 0.00%
PRESUPUESTO AVANCES
SALDO DE OBRA
PART. DESCRIPCIÓN Und. Metrado Precio U. Parcial ACUMULADO ANTERIOR MES ACTUAL ACUMULADO ACTUAL
Base S/. S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
01 MEDIDAS PREVENTIVAS Y ADECUACIONES, DURANTE LA EJECUCIÓN DE OBRAS
ELABORACIÓN DE PLANES (CONCORDANTE A PROTOCOLOS SANITARIOS:
01.01
R.M. N° 448-2020-MINSA / R.M. N° 087-2020-VIVIENDA)
01.01.01 PLAN PARA LA VIGILANCIA, PREVENCION Y CONTROL DE COVID-19 EN EL glb 1.00 4,000.00 4,000.00 1.00 4,000.00 100.00% 0.00 0.00% 1.00 4,000.00 100.00% 0.00 0.00 0.00%
EVALUACIÓN DE LA CONDICIÓN DE SALUD DEL TRABAJADOR, PREVIO A LA
01.02
REINCORPORACIÓN DE LA OBRA
01.02.01 EVALUACION DE SALUD DEL TRABAJADOR PREVIO A LA INCORPORACION A glb 1.00 10,800.00 10,800.00 1.00 10,800.00 100.00% 0.00 0.00% 1.00 10,800.00 100.00% 0.00 0.00 0.00%
01.03 IMPLEMENTACIÓN Y/O EQUIPAMIENTO DEL TÓPICO DE SALUD
01.03.01 IMPLEMENTACION DE TOPICO PARA LA VIGILANCIA DE SALUD DEL TRABAJ glb 1.00 11,030.00 11,030.00 1.00 11,030.00 100.00% 0.00 0.00% 1.00 11,030.00 100.00% 0.00 0.00 0.00%
01.04 SUMINISTRO E INSTALACION DE LAVADEROS PREFABRICADOS
01.04.01 SUMINSTRO E INSTALACION DE LAVADEROS METALICOS CON PEDAL PREF und 8.00 1,539.81 12,318.48 8.00 12,318.48 100.00% 0.00 0.00% 8.00 12,318.48 100.00% 0.00 0.00 0.00%
01.05 ADECUACIONES DE AMBIENTE DE TRABAJO
01.05.01 ADECUACION DE AMBIENTES DE TRABAJO (COMEDOR, AMBIENTE DE SALU glb 1.00 5,720.00 5,720.00 1.00 5,720.00 100.00% 0.00 0.00% 1.00 5,720.00 100.00% 0.00 0.00 0.00%
01.05.02 ADECUACION DE SS.HH. glb 1.00 515.00 515.00 1.00 515.00 100.00% 0.00 0.00% 1.00 515.00 100.00% 0.00 0.00 0.00%
01.06 SEÑALETICA Y DEMARCACION DE OBRA
01.06.01 SEÑALIZACION IMFORMATIVA REFERIDA AL COVID-19 und 6.00 1,646.03 9,876.18 6.00 9,876.18 100.00% 0.00 0.00% 6.00 9,876.18 100.00% 0.00 0.00 0.00%
01.06.02 DEMARCACION Y SEÑALIZACION DURANTE LA EJECUCION DE LA OBRA glb 1.00 1,270.00 1,270.00 1.00 1,270.00 100.00% 0.00 0.00% 1.00 1,270.00 100.00% 0.00 0.00 0.00%
02 MEDIDAS DE MITIGACION
02.01 ACCIONES DE CONTROL PREVIO
02.01.01 SALUD OCUPACIONAL DE OBRA mes 6.70 4,900.00 32,830.00 6.70 32,830.00 100.00% 0.00 0.00% 6.70 32,830.00 100.00% 0.00 0.00 0.00%
02.02 ACCIONES DE IMPLEMENTACION DE VESTUARIOS DE BIOSEGURIDAD
02.02.01 EQUIPOS E IMPLEMENTOS DE SEGURIDAD mes 6.70 6,860.00 45,962.00 6.70 45,962.00 100.00% 0.00 0.00% 6.70 45,962.00 100.00% 0.00 0.00 0.00%
02.03 ACCIONES DE DESINFECCION EN AMBIENTES DE TRABAJO
02.03.01 DESINFECCION PERIODICA DE AMBIENTES mes 6.70 4,616.36 30,929.61 6.70 30,929.61 100.00% 0.00 0.00% 6.70 30,929.61 100.00% 0.00 0.00 0.00%
02.04 FLETE
02.04.01 FLETE TERRESTRE glb 1.00 800.00 800.00 1.00 800.00 100.00% 0.00 0.00% 1.00 800.00 100.00% 0.00 0.00 0.00%
02.04.02 FLETE FLUVIAL glb 1.00 4,500.00 4,500.00 1.00 4,500.00 100.00% 0.00 0.00% 1.00 4,500.00 100.00% 0.00 0.00 0.00%
PRESUPUESTO AVANCES
SALDO DE OBRA
PART. DESCRIPCIÓN Und. Metrado Precio U. Parcial ACUMULADO ANTERIOR MES ACTUAL ACUMULADO ACTUAL
Base S/. S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
01 SISTEMA DE AGUA POTABLE
01.01 OBRAS PROVISIONALES
01.01.01 CARTEL DE OBRA DE 2.40 x 3.60M und 1.00 642.72 642.72 1.00 642.72 100.00% 0.00 0.00 0.00% 1.00 642.72 100.00% 0.00 0.00 0.00%
01.01.02 TRANQUERA PORTABLE 3.06 X 1.20 M PROV. P/SEÑALIZACION PROTECCION D und 20.00 113.71 2,274.20 10.00 1,137.10 50.00% 10.00 1,137.10 50.00% 20.00 2,274.20 100.00% 0.00 0.00 0.00%
01.02 SEGURIDAD Y SALUD
01.02.01 ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO
01.02.01.01+B966 EQUIPOS DE PROTECCION PERSONAL und 30.00 355.70 10,671.00 15.00 5,335.50 50.00% 10.00 3,557.00 33.33% 25.00 8,892.50 83.33% 5.00 1,778.50 16.67%
01.02.01.02 EQUIPOS DE PROTECCION COLECTIVA und 6.00 416.07 2,496.42 3.00 1,248.21 50.00% 2.00 832.14 33.33% 5.00 2,080.35 83.33% 1.00 416.07 16.67%
01.02.01.03 SEÑALIZACION TEMPORAL DE SEGURIDAD und 6.00 484.36 2,906.16 3.00 1,453.08 50.00% 2.00 968.72 33.33% 5.00 2,421.80 83.33% 1.00 484.36 16.67%
01.02.01.04 CAPACITACION EN SEGURIDAD Y SALUD und 1.00 464.08 464.08 1.00 464.08 100.00% 0.00 0.00% 1.00 464.08 100.00% 0.00 0.00 0.00%
01.02.01.05 RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD und 1.00 284.34 284.34 1.00 284.34 100.00% 0.00 0.00% 1.00 284.34 100.00% 0.00 0.00 0.00%
01.03 TRANSPORTE Y MOVILIZACIONES DE MATERIALES, EQUIPOS, MAQUINARIAS Y HERRAMIENTAS
01.03.01 TRANSPORTE DE MATERIAL Y HERRAMIENTAS - AGUA POTABLE glb 1.00 400,522.88 400,522.88 0.35 140,183.01 35.00% 0.50 200,261.44 50.00% 0.85 340,444.45 85.00% 0.15 60,078.43 15.00%
01.03.02 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIAS Y EQUIPOS PARA LA OB glb 1.00 4,338.53 4,338.53 0.50 2,169.27 50.00% 0.30 1,301.56 30.00% 0.80 3,470.82 80.00% 0.20 867.71 20.00%
01.04 CAPTACION TIPO BALSA CAUTIVA
01.04.01 OBRAS PRELIMINARES
01.04.01.01 LIMPIEZA DE TERRENO MANUAL m2 6.48 1.41 6.48 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.48 9.14 141.05%
01.04.01.02 TRAZO, NIVELES Y REPLANTEO m2 1.28 1.07 1.28 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.28 1.37 107.03%
01.04.02 MOVIMIENTO DE TIERRAS
01.04.02.01 EXCAVACION MANUAL EN TERRENO NORMAL m3 1.02 56.31 57.44 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.02 57.44 100.00%
01.04.02.02 NIVELACION Y APISONADO MANUAL m2 1.28 1.76 2.25 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.28 2.25 100.00%
ELIMINACION DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO 30
01.04.02.03
ml.
m3 0.83 25.60 21.25 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.83 21.25 100.00%
01.04.03 OBRAS DE CONCRETO SIMPLE
01.04.03.01 DADO DE CONCRETO F´c = 140 Kg/cm2 PARA ANCLAJE DE BALSA und 2.00 210.94 421.88 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 421.88 100.00%
01.04.03.02 DADO DE CONCRETO F´c = 140 Kg/cm2 PARA ANCLAJE DE TUBERIA PVC-O und 1.00 30.56 30.56 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 30.56 100.00%
01.04.04 CARPINTERIA METALICA
01.04.04.01 ESTRUCTURA DE PROTECCION PARA BOMBA SUMERGIBLE und 1.00 440.63 440.63 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 440.63 100.00%
01.04.05 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
01.04.05.01 SUMINISTRO E INSTALACION DE TUBERIAS
01.04.05.01.01 SUMINISTRO E INSTALACION DE TUBERIA PVC SP Ø 2" C-10 m 2.45 10.90 26.71 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.45 26.71 100.00%
SUMINISTRO E INSTALACION DE MANGUERA DE JEBE REFORZADA CON LONA
01.04.05.01.02
Ø 2"
m 5.53 21.10 116.68 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.53 116.68 100.00%
01.04.05.02 SUMINISTRO E INSTALACION DE ACCESORIOS
01.04.05.02.01 SUMINISTRO E INSTALACION DE ABRAZADERA INOXIDABLE Ø 3" und 1.00 16.72 16.72 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 16.72 100.00%
01.04.05.02.02 SUMINISTRO E INSTALACION DE REDUCCION DE PVC - Ø 3" x Ø 2" und 1.00 10.16 10.16 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 10.16 100.00%
01.04.06 OTROS
01.04.06.01 SUMINISTRO E INSTALACION DE CABLE DE ACERO TIPO BOA DE Ø 1/2" m 24.00 9.58 229.92 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 24.00 229.92 100.00%
01.04.06.02 SUMINISTRO E INSTALACION DE BARRA DE ANCLAJE DE Ø 5/8" und 2.00 105.52 211.04 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 211.04 100.00%
01.04.06.03 SUMINISTRO E INSTALACION DE FLOTADOR und 1.00 173.41 173.41 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 173.41 100.00%
01.04.06.04 SUMINISTRO E INSTALACION DE CABLE DE ACERO GALVANIZADO 3/8" m 1.58 7.43 11.74 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.58 11.74 100.00%
01.04.06.05 SUMINISTRO E INSTALACION DE GRAPAS DE Ø 3/8" und 4.00 31.16 124.64 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 124.64 100.00%
01.05 CASETA DE ALMACENAMIENTO DE BATERIAS E INSUMOS
01.05.01 OBRAS PRELIMINARES
01.05.01.01 LIMPIEZA DE TERRENO MANUAL m2 35.75 1.41 50.41 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 35.75 50.41 100.00%
01.05.01.02 TRAZO, NIVELES Y REPLANTEO m2 15.75 1.07 16.85 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 15.75 16.85 100.00%
01.05.02 MOVIMIENTO DE TIERRAS
01.05.02.01 EXCAVACION MANUAL EN TERRENO NORMAL m3 6.03 56.31 339.55 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.03 339.55 100.00%
01.05.02.02 NIVELACION Y APISONADO MANUAL m2 10.24 1.76 18.02 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.24 18.02 100.00%
01.05.02.03 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 1.03 58.99 60.76 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.03 60.76 100.00%
ELIMINACION DE MATERIAL EXCEDENTE MANUAL HASTA UNA DISTANCIA
01.05.02.04
PROMEDIO 30 ml.
m3 6.50 25.60 166.40 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.50 166.40 100.00%
01.05.03 OBRAS DE CONCRETO SIMPLE
01.05.03.01 CONCRETO EN CIMIENTOS CORRIDOS F´C = 140 KG/CM2 m3 4.69 351.33 1,647.74 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.69 1,647.74 100.00%
01.05.03.02 DADO DE CONCRETO F´c = 140 Kg/cm2 m3 0.01 404.41 4.04 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.01 4.04 100.00%
01.05.04 OBRAS DE CONCRETO ARMADO
01.05.04.01 SOBRECIMIENTO
01.05.04.01.01 CONCRETO F'c = 175 Kg/cm2 EN SOBRECIMIENTO m3 0.83 498.35 413.63 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.83 413.63 100.00%
01.05.04.01.02 ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTO m2 11.00 48.01 528.11 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.00 528.11 100.00%
01.05.04.01.03 ACERO DE REFUERZO FY= 4200 kg/cm2 EN SOBRECIMIENTO kg 59.92 4.66 279.23 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 59.92 279.23 100.00%
01.05.04.02 COLUMNETAS
VALORIZACION DE OBRA N° 002 - OCTUBRE 2021
OBRA: "MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO EN EL CC.NN. NUEVA JERUSALEN, DISTRITO DE TROMPETEROS, PROVINCIA DE LORETO, REGION LORETO"
ENTIDAD: PROGRAMA NACIONAL DE SANEAMIENTO RURAL -PNSR
LOCALIDAD: LORETO - LORETO - TROMPETEROS
FECHA: SETIEMBRE - 2021
PLAZO DE EJEC.: 225 DIAS CALENDARIO (7 MESES Y MEDIO)
PRESUPUESTO AVANCES
SALDO DE OBRA
PART. DESCRIPCIÓN Und. Metrado Precio U. Parcial ACUMULADO ANTERIOR MES ACTUAL ACUMULADO ACTUAL
Base S/. S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
01.05.04.02.01 CONCRETO F'c = 175 Kg/cm2 EN COLUMNETAS m3 0.58 538.95 312.59 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.58 312.59 100.00%
01.05.04.02.02 ENCOFRADO Y DESENCOFRADO EN COLUMNETAS m2 8.04 48.01 386.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.04 386.00 100.00%
01.05.04.02.03 ACERO DE REFUERZO FY= 4200 kg/cm2 EN COLUMNETAS kg 96.16 4.66 448.11 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 96.16 448.11 100.00%
01.05.04.03 COLUMNAS
01.05.04.03.01 CONCRETO F´C = 210 KG/CM2 EN COLUMNAS m3 0.76 569.93 433.15 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.76 433.15 100.00%
01.05.04.03.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 12.20 56.71 691.86 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.20 691.86 100.00%
01.05.04.03.03 ACERO DE REFUERZO FY= 4200 kg/cm2 EN COLUMNAS kg 137.20 4.66 639.35 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 137.20 639.35 100.00%
01.05.04.04 VIGUETAS
01.05.04.04.01 CONCRETO f'c=175 kg/cm2 EN VIGUETAS m3 0.74 417.10 308.65 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.74 308.65 100.00%
01.05.04.04.02 ENCOFRADO Y DESENCOFRADO EN VIGUETAS m2 8.37 53.77 450.05 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.37 450.05 100.00%
01.05.04.04.03 ACERO DE REFUERZO fy=4,200 kg/cm2 EN VIGUETAS kg 74.95 4.66 349.27 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 74.95 349.27 100.00%
01.05.04.05 VIGAS
01.05.04.05.01 CONCRETO F'c = 210 Kg/cm2 EN VIGAS m3 1.75 448.08 784.14 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.75 784.14 100.00%
01.05.04.05.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 3.80 64.21 244.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.80 244.00 100.00%
01.05.04.05.03 ACERO DE REFUERZO fy=4,200 kg/cm2 EN VIGAS kg 167.39 4.66 780.04 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 167.39 780.04 100.00%
01.05.04.06 LOSA ALIGERADA
01.05.04.06.01 CONCRETO F´C = 210 KG/CM2 EN LOSA ALIGERADA m3 0.81 423.72 343.21 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.81 343.21 100.00%
01.05.04.06.02 ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA m2 19.25 46.54 895.90 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 19.25 895.90 100.00%
01.05.04.06.03 ACERO DE REFUERZO fy=4,200 kg/cm2 EN LOSA ALIGERADA kg 89.73 4.66 418.14 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 89.73 418.14 100.00%
01.05.04.06.04 LADRILLO HUECO DE ARCILLA 15x30x30 PARA TECHO ALIGERADO und 136.00 2.71 368.56 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 136.00 368.56 100.00%
01.05.05 MUROS Y TABIQUES DE ALBAÑILERIA
01.05.05.01 MURO DE LADRILLO TUBULAR 12x15x24 ASENTADO DE CANTO m2 20.18 42.43 856.24 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.18 856.24 100.00%
01.05.05.02 SARDINEL DE LADRILLO TUBULAR 12x15x24 ASENTADO DE CANTO EN LOSA S m 18.40 31.62 581.81 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.40 581.81 100.00%
01.05.05.03 JUNTA EN MURO DE 1.5 CM m 30.00 8.77 263.10 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 30.00 263.10 100.00%
01.05.06 REVOQUES, ENLUCIDOS Y MOLDURAS
01.05.06.01 TARRAJEO CON IMPERMEAB.EN LOSA ALIGERADA - PARTE SUP. -1:5 (1bls cementom2 19.49 26.52 516.87 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 19.49 516.87 100.00%
01.05.06.02 TARRAJEO DE MUROS INTERIOR Y EXTERIOR - 1:5 (1 bls. cemento x 5 arena) m2 54.42 26.22 1,426.89 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 54.42 1,426.89 100.00%
01.05.06.03 TARRAJEO EN COLUMNAS - 1:5 (1 bls. cemento x 5 arena) m2 17.52 39.52 692.39 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 17.52 692.39 100.00%
01.05.06.04 VESTIDURA DE ARISTAS EN COLUMNAS - 1:5 (1 bls. cemento x 5 arena) m 23.35 19.33 451.36 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 23.35 451.36 100.00%
01.05.06.05 TARRAJEO EN VIGAS - 1:5 (1 bls. cemento x 5 arena) m2 7.75 39.52 306.28 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.75 306.28 100.00%
01.05.06.06 VESTIDURA DE ARISTAS EN VIGAS - 1:5 (1 bls. cemento x 5 arena) m 12.00 19.33 231.96 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.00 231.96 100.00%
01.05.06.07 TARRAJEO EN CIELORRASO - 1:5 (1 bls. cemento x 5 arena) m2 19.16 38.27 733.25 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 19.16 733.25 100.00%
01.05.06.08 VESTIDURA DE DERRAMES A= 0.15m MORTERO 1:5 m 20.30 15.02 304.91 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.30 304.91 100.00%
01.05.07 ZOCALOS Y CONTRAZOCALOS
01.05.07.01 CONTRAZOCALO CEMENTO SEMIPULIDO SIN COLOREAR H=20CM (EXTERIOR) m 13.10 15.42 202.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.10 202.00 100.00%
01.05.08 PISOS Y PAVIMENTOS
01.05.08.01 PISO DE CEMENTO SEMIPULIDO Y BRUÑADO E=4" m2 10.34 39.29 406.26 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.34 406.26 100.00%
01.05.08.02 VEREDA DE CEMENTO SEMIPULIDO Y BRUÑADO E=4" m2 3.50 39.27 137.45 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.50 137.45 100.00%
01.05.08.03 ENCOFRADO Y DESENCOFRADO EN PISOS Y COLUMNAS m2 1.10 26.17 28.79 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.10 28.79 100.00%
01.05.08.04 JUNTA DE DILATACION E=1/2" EN PISO m 23.60 12.68 299.25 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 23.60 299.25 100.00%
01.05.09 CARPINTERIA METALICA
01.05.09.01 PUERTA METALICA 0.90x2.20M INC/MARCO Y CERRAJERIA und 1.00 445.53 445.53 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 445.53 100.00%
01.05.09.02 VENTANA METALICA CON MALLA DE ALAMBRE GALVANIZADO N° 10 COCADA 2"x m2 3.36 225.40 757.34 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.36 757.34 100.00%
01.05.10 PINTURA
01.05.10.01 PINTURA LATEX EN MUROS INTERIORES Y EXTERIORES m2 54.42 7.87 428.29 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 54.42 428.29 100.00%
01.05.10.02 PINTURA LATEX EN COLUMNAS Y VIGAS m2 26.16 8.80 230.21 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 26.16 230.21 100.00%
01.05.10.03 PINTURA LATEX EN CIELORRASO m2 19.16 12.28 235.28 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 19.16 235.28 100.00%
01.05.11 SISTEMA DE DRENAJE PLUVIAL
01.05.11.01 BAJADA DE DRENAJE PLUVIAL D=4" pto 1.00 113.70 113.70 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 113.70 100.00%
01.05.11.02 PROTECTOR D/ TUBO, BAJADA DE DRENAJE PLUVIAL und 1.00 122.67 122.67 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 122.67 100.00%
01.05.11.03 TUBO DE ESCAPE DE EMISION DE GASES pto 1.00 80.19 80.19 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 80.19 100.00%
01.05.12 CERCO PERIMETRICO PARA SISTEMA DE AGUA POTABLE
01.05.12.01 OBRAS PRELIMINARES
01.05.12.01.01 LIMPIEZA DE TERRENO MANUAL m2 65.48 1.41 92.33 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 65.48 92.33 100.00%
01.05.12.01.02 TRAZO, NIVELES Y REPLANTEO m2 13.10 1.07 14.02 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.10 14.02 100.00%
01.05.12.02 MOVIMIENTO DE TIERRAS
01.05.12.02.01 EXCAVACION MANUAL EN TERRENO NORMAL m3 0.59 56.31 33.22 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.59 33.22 100.00%
ELIMINACION DE MATERIAL EXCEDENTE MANUAL HASTA UNA DISTANCIA
01.05.12.02.02
PROMEDIO 30 ml.
m3 0.77 25.60 19.71 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.77 19.71 100.00%
01.05.12.03 OBRAS DE CONCRETO SIMPLE
VALORIZACION DE OBRA N° 002 - OCTUBRE 2021
OBRA: "MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO EN EL CC.NN. NUEVA JERUSALEN, DISTRITO DE TROMPETEROS, PROVINCIA DE LORETO, REGION LORETO"
ENTIDAD: PROGRAMA NACIONAL DE SANEAMIENTO RURAL -PNSR
LOCALIDAD: LORETO - LORETO - TROMPETEROS
FECHA: SETIEMBRE - 2021
PLAZO DE EJEC.: 225 DIAS CALENDARIO (7 MESES Y MEDIO)
PRESUPUESTO AVANCES
SALDO DE OBRA
PART. DESCRIPCIÓN Und. Metrado Precio U. Parcial ACUMULADO ANTERIOR MES ACTUAL ACUMULADO ACTUAL
Base S/. S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
01.05.12.03.01 DADO DE CONCRETO 0.20x0.20x0.50 M m3 0.74 358.14 265.02 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.74 265.02 100.00%
01.05.12.03.02 ENCOFRADO Y DESENCOFRADO DADOS m2 2.96 48.57 143.77 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.96 143.77 100.00%
01.05.12.04 CARPINTERIA METALICA
01.05.12.04.01 PARANTE DE TUBO DE F°G° D= 2 1/2" und 37.00 101.13 3,741.81 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 37.00 3,741.81 100.00%
01.05.12.04.02 PUERTA METALICA 0.95x2.20M INC./MARCO Y CERRAJERIA und 1.00 414.75 414.75 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 414.75 100.00%
01.05.12.04.03 MALLA METALICA GALVANIZADO TIPO COCADA m 55.20 113.11 6,243.67 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 55.20 6,243.67 100.00%
01.06 PLANTA DE TRATAMIENTO DE AGUA POTABLE
01.06.01 CAMARA DE AIREACION
01.06.01.01 TRABAJOS PRELIMINARES
01.06.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 30.60 1.41 43.15 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 30.60 43.15 100.00%
01.06.01.01.02 TRAZO, NIVELES Y REPLANTEO m2 12.14 1.07 12.99 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.14 12.99 100.00%
01.06.01.02 MOVIMIENTO DE TIERRAS
01.06.01.02.01 EXCAVACION MANUAL EN TERRENO NORMAL m3 2.90 56.31 163.30 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.90 163.30 100.00%
01.06.01.02.02 NIVELACION Y APISONADO MANUAL m2 3.56 1.76 6.27 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.56 6.27 100.00%
01.06.01.02.03 RELLENO COMPACTADO CON MATERIAL PROPIO SELECCIONADO m3 0.94 58.99 55.45 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.94 55.45 100.00%
ELIMINACION DE MATERIAL EXCEDENTE MANUAL HASTA UNA DISTANCIA
01.06.01.02.04
PROMEDIO 30 ml.
m3 2.55 25.60 65.28 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.55 65.28 100.00%
01.06.01.03 OBRAS DE CONCRETO SIMPLE
01.06.01.03.01 SOLADO DE CONCRETO C:H 1:10 E=4" m2 3.56 37.11 132.11 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.56 132.11 100.00%
01.06.01.03.02 CONCRETO F'c = 175 Kg/cm2 EN DADO m3 0.03 498.35 14.95 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.03 14.95 100.00%
01.06.01.04 OBRAS DE CONCRETO ARMADO
01.06.01.04.01 ZAPATAS
01.06.01.04.01.01 CONCRETO F'c = 210 Kg/cm2 EN ZAPATAS m3 1.42 423.72 601.68 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.42 601.68 100.00%
01.06.01.04.01.02 ACERO DE REFUERZO fy=4,200 kg/cm2 EN ZAPATAS kg 24.65 4.66 114.87 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 24.65 114.87 100.00%
01.06.01.04.02 COLUMNAS
01.06.01.04.02.01 CONCRETO F'c = 210 Kg/cm2 EN COLUMNAS m3 1.15 569.93 655.42 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.15 655.42 100.00%
01.06.01.04.02.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS. m2 18.32 64.21 1,176.33 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.32 1,176.33 100.00%
01.06.01.04.02.03 ACERO DE REFUERZO fy=4,200 kg/cm2 EN COLUMNAS kg 191.85 4.66 894.02 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 191.85 894.02 100.00%
01.06.01.04.03 VIGAS
01.06.01.04.03.01 CONCRETO F'c = 210 Kg/cm2 EN VIGAS m3 0.87 448.08 389.83 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.87 389.83 100.00%
01.06.01.04.03.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 8.10 64.21 520.10 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.10 520.10 100.00%
01.06.01.04.03.03 ACERO DE REFUERZO fy=4,200 kg/cm2 EN VIGAS kg 130.24 4.66 606.92 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 130.24 606.92 100.00%
01.06.01.04.04 MUROS
01.06.01.04.04.01 CONCRETO F'c = 210 Kg/cm2 EN MUROS m3 0.66 569.93 376.15 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.66 376.15 100.00%
01.06.01.04.04.02 ENCOFRADO Y DESENCOFRADO EN MUROS m2 7.97 48.01 382.64 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.97 382.64 100.00%
01.06.01.04.04.03 ACERO DE REFUERZO fy=4,200 kg/cm2 EN MUROS kg 68.99 4.66 321.49 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 68.99 321.49 100.00%
01.06.01.04.05 GRADAS
01.06.01.04.05.01 CONCRETO F'c = 210 Kg/cm2 EN GRADAS m3 0.30 569.93 170.98 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.30 170.98 100.00%
01.06.01.04.05.02 ENCOFRADO Y DESENCOFRADO - GRADAS m2 1.45 48.01 69.61 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.45 69.61 100.00%
01.06.01.04.05.03 ACERO DE REFUERZO fy=4,200 kg/cm2 - GRADAS kg 12.91 4.66 60.16 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.91 60.16 100.00%
01.06.01.04.06 LOSA MACIZA
01.06.01.04.06.01 CONCRETO F'c = 210 Kg/cm2 EN LOSA MACIZA m3 0.83 569.93 473.04 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.83 473.04 100.00%
01.06.01.04.06.02 ENCOFRADO Y DESENCOFRADO EN LOSA MACIZA m2 5.68 42.24 239.92 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.68 239.92 100.00%
01.06.01.04.06.03 ACERO DE REFUERZO fy=4,200 kg/cm2 EN LOSA MACIZA kg 75.76 4.66 353.04 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 75.76 353.04 100.00%
01.06.01.05 ESTRUCTURA DE MADERA
01.06.01.05.01 SUMINISTRO E INSTALACION DE PARANTE DE MADERA DE 3"x3" - QUINILLA O S p2 32.78 114.54 3,754.62 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 32.78 3,754.62 100.00%
01.06.01.05.02 SUMINISTRO E INSTALACION DE VIGA DE MADERA DE 3"x2" - QUINILLA O SIMIL p2 23.80 30.60 728.28 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 23.80 728.28 100.00%
01.06.01.05.03 SUMINISTRO E INSTALACION DE TIJERAL DE MADERA DE 3"x2" - QUINILLA O SI p2 25.52 78.06 1,992.09 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 25.52 1,992.09 100.00%
01.06.01.05.04 SUMINISTRO E INSTALACION DE CORREAS DE MADERA DE 2"x2" - QUINILLA O S p2 23.95 50.82 1,217.14 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 23.95 1,217.14 100.00%
01.06.01.05.05 SUMINISTRO E INSTALACION DE CARTELAS INC./PERNOS TIPO 1 und 8.00 13.35 106.80 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 106.80 100.00%
01.06.01.05.06 SUMINISTRO E INSTALACION DE CARTELAS INC./PERNOS TIPO 2 und 8.00 13.12 104.96 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 104.96 100.00%
01.06.01.05.07 SUMINISTRO E INSTALACION DE CARTELAS INC./PERNOS TIPO 3 und 8.00 9.98 79.84 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 79.84 100.00%
01.06.01.05.08 SUMINISTRO E INSTALACION DE CARTELAS INC./PERNOS TIPO 4 und 8.00 10.13 81.04 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 81.04 100.00%
01.06.01.06 COBERTURAS
01.06.01.06.01 COBERTURA OPACA ONDA 100 DE FIBRA VEGETAL DE 2.00x0.95 M E=3 MM m2 13.14 56.24 738.99 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.14 738.99 100.00%
01.06.01.06.02 SUMINISTRO E INSTALACION DE CUMBRERA PARA CAMARA DE AIREACION m 3.65 92.22 336.60 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.65 336.60 100.00%
01.06.01.07 PINTURA
01.06.01.07.01 PINTURA BARNIZ EN ESTRUCTURA DE MADERA (2 MANOS) m2 2.52 8.30 20.92 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.52 20.92 100.00%
01.06.01.08 REVOQUES, ENLUCIDOS Y MOLDURAS
01.06.01.08.01 TARRAJEO CON IMPERMEABILZANTE EN ESTRUCTURA DE CAMARA DE AIREACION
m2-1 5.52 26.21 144.68 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.52 144.68 100.00%
VALORIZACION DE OBRA N° 002 - OCTUBRE 2021
OBRA: "MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO EN EL CC.NN. NUEVA JERUSALEN, DISTRITO DE TROMPETEROS, PROVINCIA DE LORETO, REGION LORETO"
ENTIDAD: PROGRAMA NACIONAL DE SANEAMIENTO RURAL -PNSR
LOCALIDAD: LORETO - LORETO - TROMPETEROS
FECHA: SETIEMBRE - 2021
PLAZO DE EJEC.: 225 DIAS CALENDARIO (7 MESES Y MEDIO)
PRESUPUESTO AVANCES
SALDO DE OBRA
PART. DESCRIPCIÓN Und. Metrado Precio U. Parcial ACUMULADO ANTERIOR MES ACTUAL ACUMULADO ACTUAL
Base S/. S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
01.06.01.08.02 TARRAJEO EN EXTERIORES - 1:5 (1 bls. cemento x 5 arena) m2 40.88 31.10 1,271.37 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 40.88 1,271.37 100.00%
01.06.01.09 SUMINISTRO E INSTALACION DE TUBERIAS, VALVULAS COMPUERTA Y ACCESORIOS
01.06.01.09.01 SUMINISTRO E INSTALACION DE TUBERIAS
01.06.01.09.01.01 SUMINISTRO E INSTALACION DE TUBERIA DE F°G° DE D=4" m 3.77 48.33 182.20 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.77 182.20 100.00%
01.06.01.09.01.02 SUMINISTRO E INSTALACION DE TUBERIA DE F°G° DE D=3" m 2.84 45.13 128.17 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.84 128.17 100.00%
01.06.01.09.02 SUMINISTRO E INSTALACION DE ACCESORIOS
01.06.01.09.02.01 SUMINISTRO E INSTALACION DE CODO 90° DE F°G° DE D=4" und 7.00 48.84 341.88 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.00 341.88 100.00%
01.06.01.09.02.02 SUMINISTRO E INSTALACION DE CODO 90° DE F°G° DE D=3" und 2.00 34.44 68.88 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 68.88 100.00%
01.06.01.09.02.03 SUMINISTRO E INSTALACION DE TRANSICION DE F°G° A PVC DE D=3" und 1.00 31.05 31.05 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 31.05 100.00%
01.06.01.09.02.04 SUMINISTRO E INSTALACION DE TEE DE F°G° DE D=4" und 3.00 53.08 159.24 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 159.24 100.00%
01.06.01.09.02.05 SUMINISTRO E INSTALACION DE SOMBRERO DE VENTILACION DE D=4" und 1.00 17.45 17.45 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 17.45 100.00%
01.06.01.09.02.06 SUMINISTRO E INSTALACION DE BRIDA ROMPE AGUA O DE ANCLAJE DE D=4" und 4.00 45.19 180.76 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 180.76 100.00%
01.06.01.09.02.07 SUMINISTRO E INSTALACION DE BRIDA ROMPE AGUA O DE ANCLAJE DE D=3" und 1.00 44.13 44.13 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 44.13 100.00%
01.06.01.09.03 SUMINISTRO E INSTALACION DE VALVULAS
01.06.01.09.03.01 SUMINISTRO E INSTALACION DE VALVULA DE CIERRE RAPIDO DE BRONCE D=3" und 1.00 585.98 585.98 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 585.98 100.00%
01.06.01.09.03.02 SUMINISTRO E INSTALACION DE VALVULA DE CIERRE RAPIDO DE BRONCE D=4" und 2.00 322.21 644.42 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 644.42 100.00%
01.06.01.09.03.03 SUMINISTRO E INSTALACION DE VALVULA TIPO GLOBO D=4" EN TUB. F°G° und 1.00 404.02 404.02 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 404.02 100.00%
01.06.01.09.04 SUMINISTRO E INSTALACION DE MEDIDOR DE CAUDAL, MANOMETRO Y FILTRO TIPO "Y"
01.06.01.09.04.01 SUMINISTRO E INSTALACION DE MEDIDOR DE CAUDAL DIGITAL CON LECTURA L und 1.00 3,372.10 3,372.10 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 3,372.10 100.00%
01.06.01.09.04.02 SUMINISTRO E INSTALACION DE MANOMETRO DE GLICERINA 0-100 PSI und 1.00 303.51 303.51 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 303.51 100.00%
01.06.01.10 OTROS
01.06.01.10.01 SUMINISTRO E INSTALACION DE TANQUE DE POLIETILENO PARA AGUA CAP. 60 und 1.00 3,064.56 3,064.56 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 3,064.56 100.00%
01.06.01.10.02 ESCALERA TIPO MARINERO DE F°G° D=1" EN CAMARA DE AIREACION und 1.00 327.39 327.39 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 327.39 100.00%
01.06.02 PREFILTRO DE GRAVA
01.06.02.01 TRABAJOS PRELIMINARES
01.06.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 144.00 1.41 203.04 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 144.00 203.04 100.00%
01.06.02.01.02 TRAZO, NIVELES Y REPLANTEO m2 87.50 1.07 93.63 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 87.50 93.63 100.00%
01.06.02.02 MOVIMIENTO DE TIERRAS
01.06.02.02.01 EXCAVACION MANUAL EN TERRENO NORMAL m3 110.07 56.31 6,198.04 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 110.07 6,198.04 100.00%
01.06.02.02.02 NIVELACION Y APISONADO MANUAL m2 77.07 1.76 135.64 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 77.07 135.64 100.00%
01.06.02.02.03 RELLENO DE CAMA DE ARENA PARA TUBERIA m3 1.13 65.30 73.79 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.13 73.79 100.00%
01.06.02.02.04 RELLENO COMPACTADO CON MATERIAL PROPIO SELECCIONADO m3 6.08 58.99 358.66 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.08 358.66 100.00%
ELIMINACION DE MATERIAL EXCEDENTE MANUAL HASTA UNA DISTANCIA
01.06.02.02.05
PROM. 30 ml.
m3 135.19 25.60 3,460.86 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 135.19 3,460.86 100.00%
01.06.02.03 OBRAS DE CONCRETO SIMPLE
01.06.02.03.01 SOLADO DE CONCRETO C:H 1:10 E=4" m2 62.03 37.11 2,301.93 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 62.03 2,301.93 100.00%
01.06.02.04 OBRAS DE CONCRETO ARMADO
01.06.02.04.01 PREFILTRO DE GRAVA
01.06.02.04.01.01 LOSA INFERIOR
01.06.02.04.01.01.01CONCRETO F'c = 210 Kg/cm2 EN LOSA INFERIOR m3 15.31 569.92 8,725.48 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 15.31 8,725.48 100.00%
01.06.02.04.01.01.02ACERO DE REFUERZO fy=4,200 kg/cm2 EN LOSA INFERIOR kg 1,225.96 4.66 5,712.97 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1,225.96 5,712.97 100.00%
01.06.02.04.01.02 MUROS
01.06.02.04.01.02.01CONCRETO F'c = 210 Kg/cm2 EN MUROS m3 49.81 569.93 28,388.21 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 49.81 28,388.21 100.00%
01.06.02.04.01.02.02ENCOFRADO Y DESENCOFRADO EN MUROS m2 542.89 48.01 26,064.15 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 542.89 26,064.15 100.00%
01.06.02.04.01.02.03ACERO DE REFUERZO fy=4,200 kg/cm2 EN MUROS kg 4,673.10 4.66 21,776.65 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4,673.10 21,776.65 100.00%
01.06.02.04.01.03 LOSA SUPERIOR
01.06.02.04.01.03.01CONCRETO F'c = 210 Kg/cm2 EN LOSA SUPERIOR m3 2.23 569.93 1,270.94 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.23 1,270.94 100.00%
01.06.02.04.01.03.02ENCOFRADO Y DESENCOFRADO EN LOSA SUPERIOR m2 8.70 48.01 417.69 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.70 417.69 100.00%
01.06.02.04.01.03.03ACERO DE REFUERZO fy=4,200 kg/cm2 EN LOSA SUPERIOR kg 200.50 4.66 934.33 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 200.50 934.33 100.00%
01.06.02.04.01.04 ESCALERA
01.06.02.04.01.04.01CONCRETO F'c = 210 Kg/cm2 EN ESCALERA m3 1.92 529.33 1,016.31 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.92 1,016.31 100.00%
01.06.02.04.01.04.02ENCOFRADO Y DESENCOFRADO EN ESCALERA m2 14.79 54.57 807.09 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.79 807.09 100.00%
01.06.02.04.01.04.03ACERO DE REFUERZO fy=4,200 kg/cm2 EN ESCALERA kg 86.82 4.66 404.58 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 86.82 404.58 100.00%
01.06.02.04.02 CONSTRUCCION DE UNIDAD DE LAVADO Y GRAVA
01.06.02.04.02.01 LOSA INFERIOR
01.06.02.04.02.01.01CONCRETO F'c = 210 Kg/cm2 EN LOSA INFERIOR m3 0.91 569.92 518.63 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.91 518.63 100.00%
01.06.02.04.02.01.02ACERO DE REFUERZO fy=4,200 kg/cm2 EN LOSA INFERIOR kg 40.46 4.66 188.54 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 40.46 188.54 100.00%
01.06.02.04.02.02 MUROS
01.06.02.04.02.02.01CONCRETO F'c = 210 Kg/cm2 EN MUROS m3 1.59 569.93 906.19 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.59 906.19 100.00%
01.06.02.04.02.02.02ENCOFRADO Y DESENCOFRADO EN MUROS m2 29.79 48.01 1,430.22 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 29.79 1,430.22 100.00%
VALORIZACION DE OBRA N° 002 - OCTUBRE 2021
OBRA: "MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO EN EL CC.NN. NUEVA JERUSALEN, DISTRITO DE TROMPETEROS, PROVINCIA DE LORETO, REGION LORETO"
ENTIDAD: PROGRAMA NACIONAL DE SANEAMIENTO RURAL -PNSR
LOCALIDAD: LORETO - LORETO - TROMPETEROS
FECHA: SETIEMBRE - 2021
PLAZO DE EJEC.: 225 DIAS CALENDARIO (7 MESES Y MEDIO)
PRESUPUESTO AVANCES
SALDO DE OBRA
PART. DESCRIPCIÓN Und. Metrado Precio U. Parcial ACUMULADO ANTERIOR MES ACTUAL ACUMULADO ACTUAL
Base S/. S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
01.06.02.04.02.02.03ACERO DE REFUERZO fy=4,200 kg/cm2 EN MUROS kg 117.68 4.66 548.39 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 117.68 548.39 100.00%
01.06.02.04.03 CAMARA DE VALVULAS
01.06.02.04.03.01 CONCRETO F'c = 210 Kg/cm2 EN CAJA DE REGISTRO Y CAMARA DE VALVULA m3 0.14 569.93 79.79 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.14 79.79 100.00%
01.06.02.04.03.02 ENCOFRADO Y DESENCOFRADO EN CAMARA DE VALVULA m2 1.13 48.01 54.25 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.13 54.25 100.00%
01.06.02.04.03.03 ACERO DE REFUERZO fy=4,200 kg/cm2 EN CAMARA DE VALVULA kg 10.17 4.66 47.39 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.17 47.39 100.00%
01.06.02.05 REVOQUES, ENLUCIDOS Y MOLDURAS
01.06.02.05.01 TARRAJEO CON IMPERMEABILZANTE EN INTERIOR -1:5 (1bls cemento x 5 arena) m2 380.81 26.21 9,981.03 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 380.81 9,981.03 100.00%
01.06.02.05.02 TARRAJEO EN EXTERIORES - 1:5 (1 bls. cemento x 5 arena) m2 74.87 31.10 2,328.46 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 74.87 2,328.46 100.00%
01.06.02.06 CARPINTERIA METALICA
01.06.02.06.01 BARANDA METALICA DE F°N° DE D=2" - H=1.00M m 31.92 86.96 2,775.76 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 31.92 2,775.76 100.00%
01.06.02.06.02 ESCALERA TIPO MARINERO DE F°G° D=1" und 1.00 327.39 327.39 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 327.39 100.00%
01.06.02.06.03 ESCALERA TIPO MARINERO DE A°I° D=1" und 3.00 397.56 1,192.68 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 1,192.68 100.00%
01.06.02.07 SUMINISTRO E INSTALACION DE TUBERIAS, VALVULAS COMPUERTA Y ACCESORIOS
01.06.02.07.01 SUMINISTRO E INSTALACION DE TUBERIAS
01.06.02.07.01.01 SUMINISTRO E INSTALACION DE TUBERIA F°G° DE D=3" m 1.30 45.13 58.67 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.30 58.67 100.00%
01.06.02.07.01.02 SUMINISTRO E INSTALACION DE TUBERIA F°G° DE D=2" m 0.42 34.78 14.61 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.42 14.61 100.00%
01.06.02.07.01.03 SUMINISTRO E INSTALACION DE TUBERIA PVC-SP D=3" C-10 m 23.50 15.01 352.74 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 23.50 352.74 100.00%
01.06.02.07.02 SUMINISTRO E INSTALACION DE ACCESORIOS
01.06.02.07.02.01 SUMINISTRO E INSTALACION DE CODO 90° DE F°G° D=3" und 3.00 34.44 103.32 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 103.32 100.00%
01.06.02.07.02.02 SUMINISTRO E INSTALACION DE CODO 90° DE F°G° D=2" und 1.00 19.18 19.18 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 19.18 100.00%
01.06.02.07.02.03 SUMINISTRO E INSTALACION DE BRIDA ROMPE AGUA O DE ANCLAJE D=250MM und 2.00 59.14 118.28 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 118.28 100.00%
01.06.02.07.02.04 SUMINISTRO E INSTALACION DE BRIDA ROMPE AGUA O DE ANCLAJE D=200MM und 4.00 55.15 220.60 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 220.60 100.00%
01.06.02.07.02.05 SUMINISTRO E INSTALACION DE BRIDA ROMPE AGUA O DE ANCLAJE D=110MM und 1.00 45.19 45.19 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 45.19 100.00%
01.06.02.07.02.06 SUMINISTRO E INSTALACION DE BRIDA ROMPE AGUA O DE ANCLAJE DE D=3" und 2.00 44.13 88.26 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 88.26 100.00%
01.06.02.07.02.07 SUMINISTRO E INSTALACION DE TEE DE D=3" PVC-SP und 1.00 14.32 14.32 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 14.32 100.00%
01.06.02.07.02.08 SUMINISTRO E INSTALACION DE NIPLE DE F°G° D=110MM und 1.00 12.40 12.40 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 12.40 100.00%
01.06.02.07.02.09 SUMINISTRO E INSTALACION DE NIPLE DE F°G° D=200MM und 4.00 15.79 63.16 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 63.16 100.00%
01.06.02.07.02.10 SUMINISTRO E INSTALACION DE NIPLE DE F°G° D=250MM und 2.00 17.86 35.72 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 35.72 100.00%
01.06.02.07.02.11 SUMINISTRO E INSTALACION DE TRANSICION DE F°G° A PVC DE D=3" und 1.00 31.05 31.05 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 31.05 100.00%
01.06.02.07.02.12 SUMINISTRO E INSTALACION DE JUNTA WATER STOPNEOPRENE 6" m 158.40 18.96 3,003.26 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 158.40 3,003.26 100.00%
01.06.02.07.03 SUMINISTRO E INSTALACION DE VALVULAS
01.06.02.07.03.01 SUMINISTRO E INSTALACION DE VALVULA DE COMPUERTA DE BRONCE DE D=4" und 1.00 322.21 322.21 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 322.21 100.00%
01.06.02.07.03.02 SUMINISTRO E INSTALACION DE VALVULA DE COMPUERTA DE BRONCE DE D=3" und 2.00 245.62 491.24 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 491.24 100.00%
01.06.02.07.03.03 SUMINISTRO E INSTALACION DE VALVULA DE COMPUERTA DE BRONCE DE D=2" und 1.00 233.26 233.26 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 233.26 100.00%
01.06.02.07.03.04 SUMINISTRO E INSTALACION DE VALVULA MARIPOSA D=250MM und 2.00 366.53 733.06 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 733.06 100.00%
01.06.02.07.03.05 SUMINISTRO E INSTALACION DE VALVULA MARIPOSA D=200MM und 4.00 322.33 1,289.32 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 1,289.32 100.00%
01.06.02.07.03.06 SUMINISTRO E INSTALACION DE VALVULA COMPUERTA TIPO TARJETA 0.30x1.5 und 2.00 241.94 483.88 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 483.88 100.00%
01.06.02.07.03.07 SUMINISTRO E INSTALACION DE VALVULA COMPUERTA TIPO TARJETA 0.30x0.2 und 2.00 152.97 305.94 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 305.94 100.00%
01.06.02.08 OTROS
01.06.02.08.01 GRAVA D=13 MM A 19 MM TIPO FILTRO, E=0.75 M m3 4.14 107.68 445.80 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.14 445.80 100.00%
01.06.02.08.02 GRAVA D=10 MM A 15 MM TIPO FILTRO, E=0.75 M m3 12.16 107.68 1,309.39 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.16 1,309.39 100.00%
01.06.02.08.03 GRAVA D=15 MM A 325 MM TIPO FILTRO, E=0.75 M m3 4.58 103.87 475.72 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.58 475.72 100.00%
01.06.02.08.04 TAPAS DE CONCRETO EN PRE FILTRO glb 1.00 288.68 288.68 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 288.68 100.00%
01.06.03 CISTERNA V =32.00 M3
01.06.03.01 OBRAS PRELIMINARES
01.06.03.01.01 LIMPIEZA DE TERRENO MANUAL m2 41.16 1.41 58.04 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 41.16 58.04 100.00%
01.06.03.01.02 TRAZO, NIVELES Y REPLANTEO m2 19.40 1.07 20.76 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 19.40 20.76 100.00%
01.06.03.02 MOVIMIENTO DE TIERRAS
01.06.03.02.01 EXCAVACION MANUAL EN TERRENO NORMAL m3 70.04 56.31 3,943.95 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 70.04 3,943.95 100.00%
01.06.03.02.02 CORTE Y PERFILAMIENTO MANUAL EN TERRENO NORMAL E=0.05 M m3 4.31 56.31 242.70 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.31 242.70 100.00%
01.06.03.02.03 NIVELACION Y APISONADO MANUAL m2 19.40 1.76 34.14 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 19.40 34.14 100.00%
ELIMINACION DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO 30
01.06.03.02.04
ml.
m3 96.66 25.60 2,474.50 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 96.66 2,474.50 100.00%
01.06.03.03 OBRAS DE CONCRETO SIMPLE
01.06.03.03.01 SOLADO DE CONCRETO C:H 1:10 E=4" m2 19.40 37.11 719.93 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 19.40 719.93 100.00%
01.06.03.03.02 DADO DE CONCRETO F´c = 140 Kg/cm2 - SOPORTE DE TUBERIA und 8.00 37.62 300.96 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 300.96 100.00%
01.06.03.03.03 DADO DE CONCRETO F´c = 140 Kg/cm2 - RECUBRIMIENTO DE DUCTO und 4.00 21.13 84.52 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 84.52 100.00%
01.06.03.03.04 DADO DE CONCRETO F´c = 140 Kg/cm2 - SOPORTE DE ELECTROBOMBA und 4.00 42.35 169.40 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 169.40 100.00%
01.06.03.04 OBRAS DE CONCRETO ARMADO
01.06.03.04.01 LOSA DE CIMENTACION DE CISTERNA
VALORIZACION DE OBRA N° 002 - OCTUBRE 2021
OBRA: "MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO EN EL CC.NN. NUEVA JERUSALEN, DISTRITO DE TROMPETEROS, PROVINCIA DE LORETO, REGION LORETO"
ENTIDAD: PROGRAMA NACIONAL DE SANEAMIENTO RURAL -PNSR
LOCALIDAD: LORETO - LORETO - TROMPETEROS
FECHA: SETIEMBRE - 2021
PLAZO DE EJEC.: 225 DIAS CALENDARIO (7 MESES Y MEDIO)
PRESUPUESTO AVANCES
SALDO DE OBRA
PART. DESCRIPCIÓN Und. Metrado Precio U. Parcial ACUMULADO ANTERIOR MES ACTUAL ACUMULADO ACTUAL
Base S/. S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
01.06.03.04.01.01 CONCRETO F'c = 210 Kg/cm2 EN LOSA INFERIOR m3 5.34 569.92 3,043.37 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.34 3,043.37 100.00%
01.06.03.04.01.02 ACERO DE REFUERZO fy=4,200 kg/cm2 EN LOSA INFERIOR kg 424.32 4.66 1,977.33 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 424.32 1,977.33 100.00%
01.06.03.04.02 MUROS LATERALES DE CISTERNA
01.06.03.04.02.01 CONCRETO F'c = 210 Kg/cm2 EN MUROS LATERALES m3 13.06 554.66 7,243.86 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.06 7,243.86 100.00%
01.06.03.04.02.02 ENCOFRADO Y DESENCOFRADO EN MUROS m2 71.79 48.01 3,446.64 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 71.79 3,446.64 100.00%
01.06.03.04.02.03 ACERO DE REFUERZO fy=4,200 kg/cm2 EN MUROS kg 1,184.93 4.66 5,521.77 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1,184.93 5,521.77 100.00%
01.06.03.04.03 LOSA MACIZA DEL TECHO DE CISTERNA
01.06.03.04.03.01 CONCRETO F'c = 210 Kg/cm2 EN LOSA MACIZA m3 3.81 569.93 2,171.43 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.81 2,171.43 100.00%
01.06.03.04.03.02 ENCOFRADO Y DESENCOFRADO EN LOSA MACIZA m2 16.49 42.24 696.54 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.49 696.54 100.00%
01.06.03.04.03.03 ACERO DE REFUERZO fy=4,200 kg/cm2 EN LOSA MACIZA kg 184.22 4.66 858.47 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 184.22 858.47 100.00%
01.06.03.04.04 COLUMNETAS
01.06.03.04.04.01 CONCRETO F'c = 175 Kg/cm2 EN COLUMNETAS m3 0.33 538.95 177.85 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.33 177.85 100.00%
01.06.03.04.04.02 ENCOFRADO Y DESENCOFRADO EN COLUMNETAS m2 5.06 48.01 242.93 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.06 242.93 100.00%
01.06.03.04.04.03 ACERO DE REFUERZO fy=4,200 kg/cm2 EN COLUMNETAS kg 88.40 4.66 411.94 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 88.40 411.94 100.00%
01.06.03.04.05 VIGUETAS
01.06.03.04.05.01 CONCRETO F'c = 175 Kg/cm2 EN VIGUETAS m3 0.46 417.10 191.87 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.46 191.87 100.00%
01.06.03.04.05.02 ENCOFRADO Y DESENCOFRADO EN VIGUETAS m2 5.78 53.77 310.79 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.78 310.79 100.00%
01.06.03.04.05.03 ACERO DE REFUERZO fy=4,200 kg/cm2 EN VIGUETAS kg 138.12 4.66 643.64 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 138.12 643.64 100.00%
01.06.03.05 ESTRUCTURA DE MADERA
01.06.03.05.01 SUMINISTRO E INSTALACION DE TIJERAL DE MADERA DE 3"x2" - QUINILLA O SI p2 46.06 78.06 3,595.44 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 46.06 3,595.44 100.00%
01.06.03.05.02 SUMINISTRO E INSTALACION DE CORREAS DE MADERA DE 2"x2" - QUINILLA O S p2 67.22 50.82 3,416.12 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 67.22 3,416.12 100.00%
01.06.03.05.03 SUMINISTRO E INSTALACION DE CARTELAS INC./PERNOS TIPO 5 und 6.00 13.35 80.10 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 80.10 100.00%
01.06.03.05.04 SUMINISTRO E INSTALACION DE CARTELAS INC./PERNOS TIPO 6 und 3.00 14.28 42.84 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 42.84 100.00%
01.06.03.05.05 SUMINISTRO E INSTALACION DE CARTELAS INC./PERNOS TIPO 7 und 3.00 12.84 38.52 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 38.52 100.00%
01.06.03.05.06 SUMINISTRO E INSTALACION DE CARTELAS INC./PERNOS TIPO 8 und 6.00 9.97 59.82 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 59.82 100.00%
01.06.03.06 MUROS Y TABIQUES DE ALBAÑILERIA
01.06.03.06.01 MURO DE LADRILLO IKARO 9x13x24 CM ASENTADO DE SOGA m2 29.78 86.89 2,587.58 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 29.78 2,587.58 100.00%
01.06.03.06.02 TIMPANO DE MADERA MACHIHEMBRADA QUINILLA O SIMILAR E=1/2" m2 2.58 53.06 136.89 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.58 136.89 100.00%
01.06.03.06.03 MURO EXTERIOR E INTERIOR DE MADERA MACHIHEMBRADA QUINILLA O SIMILARm2 7.19 41.68 299.68 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.19 299.68 100.00%
01.06.03.07 REVOQUES, ENLUCIDOS Y MOLDURAS
01.06.03.07.01 TARRAJEO CON IMPERMEABILZANTE EN MUROS LATERALES e=1.5 CM -1:5 (1bls c m2 60.28 26.21 1,579.94 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 60.28 1,579.94 100.00%
01.06.03.07.02 TARRAJEO CON IMPERMEABILZANTE EN LOSA INFERIOR e= 1.5 CM -1:5 (1bls cemem2 16.01 26.21 419.62 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.01 419.62 100.00%
01.06.03.07.03 TARRAJEO EN EXTERIORES - 1:5 (1 bls. cemento x 5 arena) m2 33.12 31.10 1,030.03 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 33.12 1,030.03 100.00%
01.06.03.07.04 TARRAJEO EN COLUMNETAS e=1.5 CM - 1:5 (1 bls. cemento x 5 arena) m2 5.06 39.52 199.97 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.06 199.97 100.00%
01.06.03.07.05 TARRAJEO EN VIGUETAS e=1.5 CM - 1:5 (1 bls. cemento x 5 arena) m2 6.28 39.52 248.19 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.28 248.19 100.00%
01.06.03.08 CARPINTERIA DE MADERA
01.06.03.08.01 SUMINISTRO E INSTALACION DE PUERTA MACHIHEMBRADA 0.90x1.80 M - INC. und 2.00 217.98 435.96 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 435.96 100.00%
01.06.03.08.02 SUMINISTRO E INSTALACION DE VENTANA DE MADERA QUINILLA O SIMILAR CON und 1.00 53.51 53.51 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 53.51 100.00%
01.06.03.09 PINTURA
01.06.03.09.01 PINTURA BARNIZ EN TIMPANO DE MADERA - 02 manos m2 2.58 10.24 26.42 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.58 26.42 100.00%
01.06.03.09.02 PINTURA BARNIZ EN PUERTA CONTRAPLACADA - 02 manos m2 6.48 13.30 86.18 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.48 86.18 100.00%
01.06.03.09.03 PINTURA BARNIZ EN VENTANAS - 02 manos m2 1.44 13.30 19.15 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.44 19.15 100.00%
01.06.03.09.04 PINTURA BARNIZ EN MURO EXTERIOR E INTERIOR - 02 manos m2 14.38 10.24 147.25 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.38 147.25 100.00%
01.06.03.10 COBERTURAS
01.06.03.10.01 COBERTURA OPACA ONDA 100 DE FIBRA VEGETAL DE 1.80x0.95 M E=3 MM m2 25.20 56.24 1,417.25 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 25.20 1,417.25 100.00%
01.06.03.10.02 SUMINISTRO E INSTALACION DE CUMBRERA PARA COBERTURA DE CISTERNA m 5.60 108.74 608.94 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.60 608.94 100.00%
01.06.03.11 CERRAJERIA
01.06.03.11.01 SUMINISTRO E INSTALACION DE CERRADURA TIPO PERILLA und 2.00 28.24 56.48 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 56.48 100.00%
01.06.03.11.02 SUMINISTRO E INSTALACION DE BISAGRA ALUMINIZADO DE 3"x2" und 6.00 19.08 114.48 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 114.48 100.00%
01.06.03.12 SUMINISTRO E INSTALACION DE TUBERIAS, ACCESORIOS Y VALVULAS COMPUERTA
01.06.03.12.01 SUMINISTRO E INSTALACION DE TUBERIAS
01.06.03.12.01.01 SUMINISTRO E INSTALACION DE TUBERIA DE F°G° DE D=3" m 0.60 45.13 27.08 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.60 27.08 100.00%
01.06.03.12.01.02 SUMINISTRO E INSTALACION DE TUBERIA DE F°G° DE D=2" m 13.20 34.78 459.10 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.20 459.10 100.00%
01.06.03.12.01.03 SUMINISTRO E INSTALACION DE TUBERIA DE F°G° DE D=1 1/2" m 12.80 29.29 374.91 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.80 374.91 100.00%
01.06.03.12.02 SUMINISTRO E INSTALACION DE ACCESORIOS
01.06.03.12.02.01 SUMINISTRO E INSTALACION DE TEE DE F°G° DE D=2" und 2.00 23.42 46.84 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 46.84 100.00%
01.06.03.12.02.02 SUMINISTRO E INSTALACION DE TEE DE F°G° DE D=1 1/2" und 2.00 16.64 33.28 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 33.28 100.00%
01.06.03.12.02.03 SUMINISTRO E INSTALACION DE CODO 90° DE F°G° DE D=3" und 2.00 34.44 68.88 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 68.88 100.00%
01.06.03.12.02.04 SUMINISTRO E INSTALACION DE CODO 90° DE F°G° D=2" und 7.00 19.18 134.26 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.00 134.26 100.00%
VALORIZACION DE OBRA N° 002 - OCTUBRE 2021
OBRA: "MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO EN EL CC.NN. NUEVA JERUSALEN, DISTRITO DE TROMPETEROS, PROVINCIA DE LORETO, REGION LORETO"
ENTIDAD: PROGRAMA NACIONAL DE SANEAMIENTO RURAL -PNSR
LOCALIDAD: LORETO - LORETO - TROMPETEROS
FECHA: SETIEMBRE - 2021
PLAZO DE EJEC.: 225 DIAS CALENDARIO (7 MESES Y MEDIO)
PRESUPUESTO AVANCES
SALDO DE OBRA
PART. DESCRIPCIÓN Und. Metrado Precio U. Parcial ACUMULADO ANTERIOR MES ACTUAL ACUMULADO ACTUAL
Base S/. S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
01.06.03.12.02.05 SUMINISTRO E INSTALACION DE CODO 90° DE F°G° D=1 1/2" und 3.00 14.94 44.82 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 44.82 100.00%
01.06.03.12.02.06 SUMINISTRO E INSTALACION DE YEE DE D=2" DE F°G° und 2.00 12.40 24.80 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 24.80 100.00%
01.06.03.12.02.07 SUMINISTRO E INSTALACION DE YEE DE D=1 1/2" DE F°G° und 2.00 10.71 21.42 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 21.42 100.00%
01.06.03.12.02.08 SUMINISTRO E INSTALACION DE UNION UNIVERSAL DE F°G° DE D=2" und 5.00 54.57 272.85 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.00 272.85 100.00%
01.06.03.12.02.09 SUMINISTRO E INSTALACION DE UNION UNIVERSAL DE F°G° DE D=1 1/2" und 5.00 35.12 175.60 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.00 175.60 100.00%
01.06.03.12.02.10 SUMINISTRO E INSTALACION DE TAPON DE D=2" DE F°G° und 3.00 13.25 39.75 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 39.75 100.00%
01.06.03.12.02.11 SUMINISTRO E INSTALACION DE TAPON DE D=1 1/2" DE F°G° und 3.00 13.25 39.75 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 39.75 100.00%
01.06.03.12.02.12 SUMINISTRO E INSTALACION DE CANASTILLA DE BRONCE DE D=2" und 2.00 49.06 98.12 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 98.12 100.00%
01.06.03.12.02.13 SUMINISTRO E INSTALACION DE CANASTILLA DE BRONCE DE D=1 1/2" und 2.00 58.00 116.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 116.00 100.00%
01.06.03.12.02.14 SUMINISTRO E INSTALACION DE BRIDA ROMPE AGUA O DE ANCLAJE DE D=4" und 4.00 45.19 180.76 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 180.76 100.00%
01.06.03.12.02.15 SUMINISTRO E INSTALACION DE BRIDA ROMPE AGUA O DE ANCLAJE DE D=3" und 1.00 44.13 44.13 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 44.13 100.00%
01.06.03.12.02.16 SUMINISTRO E INSTALACION DE BRIDA ROMPE AGUA O DE ANCLAJE DE D=2" und 2.00 40.67 81.34 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 81.34 100.00%
01.06.03.12.02.17 SUMINISTRO E INSTALACION DE TUBERIA DE VENTILACION F°G° DE D=2" und 2.00 40.58 81.16 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 81.16 100.00%
01.06.03.12.02.18 SUMINISTRO E INSTALACION DE REJILLA DE BRONCE DE D=2" und 1.00 10.71 10.71 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 10.71 100.00%
01.06.03.12.02.19 SUMINISTRO E INSTALACION DE WATER STOP DE PVC DE 6" m 16.96 18.96 321.56 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.96 321.56 100.00%
01.06.03.12.03 SUMINISTRO E INSTALACION DE VALVULAS
01.06.03.12.03.01 SUMINISTRO E INSTALACION DE VALVULA DE COMPUERTA DE BRONCE DE D=3" und 1.00 245.62 245.62 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 245.62 100.00%
01.06.03.12.03.02 SUMINISTRO E INSTALACION DE VALVULA DE COMPUERTA DE BRONCE DE D=2" und 2.00 233.26 466.52 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 466.52 100.00%
01.06.03.12.03.03 SUMINISTRO E INSTALACION DE VALVULA DE COMPUERTA DE BRONCE DE D=1 1/und 2.00 158.73 317.46 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 317.46 100.00%
01.06.03.12.03.04 SUMINISTRO E INSTALACION DE VALVULA DE CIERRE RAPIDO DE BRONCE D=2" und 2.00 238.15 476.30 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 476.30 100.00%
01.06.03.12.03.05 SUMINISTRO E INSTALACION DE VALVULA DE CIERRE RAPIDO DE BRONCE D=1 1 und 2.00 179.33 358.66 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 358.66 100.00%
01.06.03.12.03.06 SUMINISTRO E INSTALACION DE VALVULA FLOTADORA INC. BOYA DE D=3" und 1.00 92.55 92.55 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 92.55 100.00%
01.06.03.12.04 SUMINISTRO E INSTALACION DE MEDIDOR DE CAUDAL Y MANOMETRO
01.06.03.12.04.01 SUMINISTRO E INSTALACION DE MEDIDOR DE CAUDAL DIGITAL CON LECTURA L und 2.00 3,372.10 6,744.20 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 6,744.20 100.00%
01.06.03.12.04.02 SUMINISTRO E INSTALACION DE MANOMETRO DE GLICERINA 0-100 PSI und 2.00 303.51 607.02 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 607.02 100.00%
01.06.03.13 CARPINTERIA METALICA
01.06.03.13.01 ESCALERA TIPO MARINERO DE A°I° D=2" EN CISTERNA und 2.00 460.17 920.34 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 920.34 100.00%
01.06.03.13.02 TAPA METALICA DE 0.60 X 0.60 M C/PLANCHA ESTRIADA DE E=1/8" und 1.00 452.88 452.88 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 452.88 100.00%
01.06.03.13.03 PROTECTOR D/ TUBO, LINEA DE ADUCCION und 2.00 152.21 304.42 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 304.42 100.00%
01.06.04 SUMINISTRO E INSTALACION DE SISTEMA DE BAYPASS (02 UND)
01.06.04.01 OBRAS PRELIMINARES
01.06.04.01.01 LIMPIEZA DE TERRENO MANUAL m2 15.58 1.41 21.97 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 15.58 21.97 100.00%
01.06.04.01.02 TRAZO, NIVELES Y REPLANTEO m2 7.41 1.07 7.93 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.41 7.93 100.00%
01.06.04.02 MOVIMIENTO DE TIERRAS
01.06.04.02.01 EXCAVACION MANUAL EN TERRENO NORMAL m3 6.33 56.31 356.44 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.33 356.44 100.00%
01.06.04.02.02 NIVELACION Y APISONADO MANUAL m2 7.41 1.76 13.04 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.41 13.04 100.00%
01.06.04.02.03 RELLENO DE CAMA DE ARENA PARA TUBERIA m3 2.24 65.30 146.27 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.24 146.27 100.00%
01.06.04.02.04 RELLENO COMPACTADO CON MATERIAL PROPIO SELECCIONADO m3 2.63 58.99 155.14 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.63 155.14 100.00%
ELIMINACION DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO 30
01.06.04.02.05
ml.
m3 4.82 25.60 123.39 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.82 123.39 100.00%
01.06.04.03 OBRAS DE CONCRETO SIMPLE
01.06.04.03.01 SOLADO DE CONCRETO C:H 1:10 E=4" m2 1.45 37.11 53.81 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.45 53.81 100.00%
01.06.04.04 OBRAS DE CONCRETO ARMADO
01.06.04.04.01 LOSA INFERIOR
01.06.04.04.01.01 CONCRETO F'c = 175 Kg/cm2 EN LOSA DE FONDO m3 0.14 498.62 69.81 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.14 69.81 100.00%
01.06.04.04.01.02 ACERO DE REFUERZO fy=4,200 kg/cm2 EN LOSA INFERIOR kg 10.08 4.66 46.97 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.08 46.97 100.00%
01.06.04.04.02 MUROS
01.06.04.04.02.01 CONCRETO F'c = 175 Kg/cm2 EN MUROS m3 0.55 538.95 296.42 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.55 296.42 100.00%
01.06.04.04.02.02 ENCOFRADO Y DESENCOFRADO EN MUROS m2 5.44 48.01 261.17 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.44 261.17 100.00%
01.06.04.04.02.03 ACERO DE REFUERZO fy=4,200 kg/cm2 EN MUROS kg 33.62 4.66 156.67 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 33.62 156.67 100.00%
01.06.04.05 SUMINISTRO E INSTALACION DE TUBERIAS
01.06.04.05.01 SUMINISTRO E INSTALACION DE TUBERIA PVC-SP D=3" C-10 m 13.05 15.01 195.88 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.05 195.88 100.00%
01.06.04.06 SUMINISTRO E INSTALACION DE ACCESORIOS
01.06.04.06.01 SUMINISTRO E INSTALACION DE CODO 90° DE PVC-SP D=3" und 1.00 20.89 20.89 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 20.89 100.00%
01.06.04.06.02 SUMINISTRO E INSTALACION DE CODO 45° DE PVC-SP D=3" und 2.00 18.45 36.90 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 36.90 100.00%
01.06.04.06.03 SUMINISTRO E INSTALACION DE TEE DE D=3" PVC-SP und 2.00 14.32 28.64 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 28.64 100.00%
01.06.04.06.04 DADO DE CONCRETO PARA ANCLAJE DE ACCESORIOS F´c = 140 Kg/cm2 und 4.00 59.75 239.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 239.00 100.00%
01.06.04.07 SUMINISTRO E INSTALACION DE VALVULAS
01.06.04.07.01 SUMINISTRO E INSTALACION DE VALVULA DE COMPUERTA DE BRONCE DE D=3" und 4.00 276.56 1,106.24 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 1,106.24 100.00%
01.06.04.08 SUMINISTRO E INSTALACION DE TAPAS DE CONCRETO ARMADO
VALORIZACION DE OBRA N° 002 - OCTUBRE 2021
OBRA: "MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO EN EL CC.NN. NUEVA JERUSALEN, DISTRITO DE TROMPETEROS, PROVINCIA DE LORETO, REGION LORETO"
ENTIDAD: PROGRAMA NACIONAL DE SANEAMIENTO RURAL -PNSR
LOCALIDAD: LORETO - LORETO - TROMPETEROS
FECHA: SETIEMBRE - 2021
PLAZO DE EJEC.: 225 DIAS CALENDARIO (7 MESES Y MEDIO)
PRESUPUESTO AVANCES
SALDO DE OBRA
PART. DESCRIPCIÓN Und. Metrado Precio U. Parcial ACUMULADO ANTERIOR MES ACTUAL ACUMULADO ACTUAL
Base S/. S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
01.06.04.08.01 TAPA DE CONCRETO EN CAJA BAYPASS (0.70X0.70M) und 2.00 252.39 504.78 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 504.78 100.00%
01.06.05 SISTEMA DE EVACUACION Y DISPOSICION FINAL
01.06.05.01 OBRAS PRELIMINARES
01.06.05.01.01 LIMPIEZA DE TERRENO MANUAL m2 168.56 1.41 237.67 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 168.56 237.67 100.00%
01.06.05.01.02 TRAZO, NIVELES Y REPLANTEO m2 210.70 1.07 225.45 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 210.70 225.45 100.00%
01.06.05.02 MOVIMIENTO DE TIERRAS
01.06.05.02.01 EXCAVACION MANUAL EN TERRENO NORMAL m3 216.83 56.31 12,209.70 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 216.83 12,209.70 100.00%
01.06.05.02.02 EXCAVACION DE ZANJA MANUAL P/DESAGUE TUB. EN TERRENO NORMAL A=0.8 m 65.39 23.02 1,505.28 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 65.39 1,505.28 100.00%
01.06.05.02.03 REFINE Y NIVELACION DE ZANJAS P/TUB. A=0.80M m 210.70 1.38 290.77 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 210.70 290.77 100.00%
01.06.05.02.04 RELLENO DE CAMA DE ARENA SOBRE LA CLAVE DEL TUBO Y LATERALES DE TUB m 210.70 18.12 3,817.88 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 210.70 3,817.88 100.00%
01.06.05.02.05 RELLENO DE ZANJA C/MAT. PROPIO SELEC. EN TUB. A=0.80M H=0.20M m 65.39 9.22 602.90 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 65.39 602.90 100.00%
01.06.05.02.06 RELLENO COMPACTADO
ELIMINACION CON
DE MATERIAL MATERIALMANUAL
EXCEDENTE PROPIO HASTA
SELECCIONADO
UNA DISTANCIA m3 164.09 58.99 9,679.67 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 164.09 9,679.67 100.00%
01.06.05.02.07 PROMEDIO 30 ml. m3 85.56 25.60 2,190.34 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 85.56 2,190.34 100.00%
01.06.05.03 OBRAS DE CONCRETO SIMPLE
01.06.05.03.01 SOLADO DE CONCRETO C:H 1:10 E=4" m2 10.05 37.11 372.96 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.05 372.96 100.00%
01.06.05.03.02 DADO DE CONCRETO F´c = 140 Kg/cm2 m3 0.17 404.41 68.75 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.17 68.75 100.00%
01.06.05.04 OBRAS DE CONCRETO ARMADO
01.06.05.04.01 BUZONES
01.06.05.04.01.01 LOSA INFERIOR
01.06.05.04.01.01.01CONCRETO F'c = 210 Kg/cm2 EN LOSA INFERIOR m3 2.01 569.92 1,145.54 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.01 1,145.54 100.00%
01.06.05.04.01.01.02ACERO DE REFUERZO fy=4,200 kg/cm2 EN LOSA INFERIOR kg 262.50 4.66 1,223.25 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 262.50 1,223.25 100.00%
01.06.05.04.01.02 MUROS
01.06.05.04.01.02.01CONCRETO F'c = 210 Kg/cm2 EN MUROS m3 8.50 569.93 4,844.41 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.50 4,844.41 100.00%
01.06.05.04.01.02.02ENCOFRADO Y DESENCOFRADO EN MUROS m2 36.42 48.01 1,748.52 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 36.42 1,748.52 100.00%
01.06.05.04.01.03 LOSA SUPERIOR
01.06.05.04.01.03.01CONCRETO F'c = 210 Kg/cm2 EN LOSA SUPERIOR m3 0.73 569.93 416.05 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.73 416.05 100.00%
01.06.05.04.01.03.02ENCOFRADO Y DESENCOFRADO EN LOSA SUPERIOR m2 4.90 48.01 235.25 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.90 235.25 100.00%
01.06.05.04.01.03.03ACERO DE REFUERZO fy=4,200 kg/cm2 EN LOSA SUPERIOR kg 289.27 4.66 1,348.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 289.27 1,348.00 100.00%
01.06.05.04.02 CAJA DE REGISTRO
01.06.05.04.02.01 CONCRETO F'c = 210 Kg/cm2 EN CAJA DE REGISTRO m3 2.40 569.93 1,367.83 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.40 1,367.83 100.00%
01.06.05.04.02.02 ENCOFRADO Y DESENCOFRADO EN CAJA DE REGISTRO m2 20.39 48.01 978.92 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.39 978.92 100.00%
01.06.05.04.02.03 ACERO DE REFUERZO fy=4,200 kg/cm2 EN CAJA DE REGISTRO kg 416.97 4.66 1,943.08 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 416.97 1,943.08 100.00%
01.06.05.04.03 DISPOSICION FINAL
01.06.05.04.03.01 CONCRETO F'c = 175 Kg/cm2 EN DISPOSICION FINAL m3 0.81 496.82 402.42 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.81 402.42 100.00%
01.06.05.04.03.02 ENCOFRADO Y DESENCOFRADO EN DISPOSICION FINAL m2 4.10 48.01 196.84 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.10 196.84 100.00%
01.06.05.04.03.03 ACERO DE REFUERZO fy=4,200 kg/cm2 EN DISPOSICION FINAL kg 35.34 4.66 164.68 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 35.34 164.68 100.00%
01.06.05.05 SUMINISTRO E INSTALACION DE TUBERIAS, ACCESORIOS Y VALVULAS COMPUERTA
01.06.05.05.01 SUMINISTRO E INSTALACION DE TUBERIAS DE REDES DE EVACUACION
01.06.05.05.01.01 SUMINISTRO E INSTALACION DE TUBERIA Ø 2" PVC-SAL m 2.39 6.33 15.13 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.39 15.13 100.00%
01.06.05.05.01.02 SUMINISTRO E INSTALACION DE TUBERIA PVC SAL DE Ø 4" m 189.75 7.71 1,462.97 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 189.75 1,462.97 100.00%
01.06.05.05.02 SUMINISTRO E INSTALACION DE ACCESORIOS DE REDES DE EVACUACION
01.06.05.05.02.01 SUMINISTRO E INSTALACION DE CODO D=4" DE 45° PVC-SAL und 2.00 12.15 24.30 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 24.30 100.00%
01.06.05.05.02.02 SUMINISTRO E INSTALACION DE CODO D=2" DE 90° PVC-SAL und 1.00 8.38 8.38 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 8.38 100.00%
01.06.05.05.02.03 SUMINISTRO E INSTALACION DE VALVULA ANTI ROEDORES D=2" DE PVC und 1.00 25.87 25.87 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 25.87 100.00%
01.06.05.05.02.04 SUMINISTRO E INSTALACION DE VALVULA ANTI ROEDORES D=4" DE PVC und 2.00 35.27 70.54 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 70.54 100.00%
01.06.05.05.03 CAIDAS ESPECIALES EN REDES DE EVACUACION
01.06.05.05.03.01 SUMINISTRO E INSTALACION DE TUBERIA PVC SAL DE Ø 4" m 5.77 7.71 44.49 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.77 44.49 100.00%
01.06.05.05.03.02 SUMINISTRO E INSTALACION DE CODO D=4" DE 90° PVC-SAL und 8.00 12.15 97.20 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 97.20 100.00%
01.06.05.05.03.03 SUMINISTRO E INSTALACION DE TEE D=4" PVC-SAL und 8.00 10.57 84.56 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 84.56 100.00%
01.06.05.05.03.04 SUMINISTRO E INSTALACION DE TAPON D=4" PVC-SAL und 8.00 9.54 76.32 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 76.32 100.00%
01.06.05.05.03.05 SUMINISTRO E INSTALACION DE ABRAZADERA METALICA D=4" und 8.00 16.67 133.36 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 133.36 100.00%
01.06.05.06 VARIOS
01.06.05.06.01 TAPA DE CONCRETO ARMADO PARA BUZON und 5.00 366.02 1,830.10 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.00 1,830.10 100.00%
01.06.05.06.02 TAPA DE CONCRETO ARMADO PARA CAJAS DE REGISTROS (0.40M x0.70M) und 11.00 90.94 1,000.34 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.00 1,000.34 100.00%
01.06.06 CERCO PERIMETRICO PARA SISTEMA DE POTABLE
01.06.06.01 OBRAS PRELIMINARES
01.06.06.01.01 LIMPIEZA DE TERRENO MANUAL m2 195.64 1.41 275.85 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 195.64 275.85 100.00%
01.06.06.01.02 TRAZO, NIVELES Y REPLANTEO m2 39.13 1.07 41.87 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 39.13 41.87 100.00%
01.06.06.02 MOVIMIENTO DE TIERRAS
VALORIZACION DE OBRA N° 002 - OCTUBRE 2021
OBRA: "MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO EN EL CC.NN. NUEVA JERUSALEN, DISTRITO DE TROMPETEROS, PROVINCIA DE LORETO, REGION LORETO"
ENTIDAD: PROGRAMA NACIONAL DE SANEAMIENTO RURAL -PNSR
LOCALIDAD: LORETO - LORETO - TROMPETEROS
FECHA: SETIEMBRE - 2021
PLAZO DE EJEC.: 225 DIAS CALENDARIO (7 MESES Y MEDIO)
PRESUPUESTO AVANCES
SALDO DE OBRA
PART. DESCRIPCIÓN Und. Metrado Precio U. Parcial ACUMULADO ANTERIOR MES ACTUAL ACUMULADO ACTUAL
Base S/. S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
01.06.06.02.01 EXCAVACION MANUAL EN TERRENO NORMAL m3 1.71 56.31 96.29 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.71 96.29 100.00%
ELIMINACION DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO 30
01.06.06.02.02
ml.
m3 2.23 25.60 57.09 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.23 57.09 100.00%
01.06.06.03 OBRAS DE CONCRETO SIMPLE
01.06.06.03.01 DADO DE CONCRETO 0.20x0.20x0.50 M m3 2.14 358.14 766.42 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.14 766.42 100.00%
01.06.06.03.02 ENCOFRADO Y DESENCOFRADO DADOS m2 8.56 48.57 415.76 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.56 415.76 100.00%
01.06.06.04 CARPINTERIA METALICA
01.06.06.04.01 PARANTE DE TUBO DE F°G° D= 2 1/2" und 107.00 101.13 10,820.91 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 107.00 10,820.91 100.00%
01.06.06.04.02 PUERTA METALICA 0.95x2.00M INC./MARCO Y CERRAJERIA und 3.00 414.75 1,244.25 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 1,244.25 100.00%
01.06.06.04.03 MALLA METALICA GALVANIZADO TIPO COCADA m 165.84 113.11 18,758.16 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 165.84 18,758.16 100.00%
01.07 LINEAS DE IMPULSION (L1 = 836.63 ml - L2 = 30.57ml - L3 = 32.98ml.)
01.07.01 OBRAS PRELIMINARES
01.07.01.01 TRAZO, NIVELES Y REPLANTEO m 900.18 1.07 963.19 0.00 0.00% 720.00 770.40 79.98% 720.00 770.40 79.98% 180.18 192.79 20.02%
01.07.02 MOVIMIENTO DE TIERRAS
01.07.02.01 EXCAVACION MANUAL DE TERRENO NORMAL PARA ZANJA A=0.50M H=0.70M m 900.18 19.73 17,760.55 0.00 0.00% 720.00 14,205.60 79.98% 720.00 14,205.60 79.98% 180.18 3,554.95 20.02%
01.07.02.02 REFINE Y NIVELACION DE ZANJAS P/TUB. PVC-SP A=0.50M m 900.18 0.87 783.16 0.00 0.00% 720.00 626.40 79.98% 720.00 626.40 79.98% 180.18 156.76 20.02%
01.07.02.03 RELLENO DE CAMA DE ARENA SOBRE LA CLAVE DEL TUBO Y LATERALES-TUBERI m 836.63 12.15 10,165.05 0.00 0.00% 660.94 8,030.42 79.00% 660.94 8,030.42 79.00% 175.69 2,134.63 21.00%
01.07.02.04 RELLENO DE CAMA DE ARENA SOBRE LA CLAVE DEL TUBO Y LATERALES-TUBERI m 30.57 11.12 339.94 0.00 0.00% 30.57 339.94 100.00% 30.57 339.94 100.00% 0.00 0.00 0.00%
01.07.02.05 RELLENO DE CAMA DE ARENA SOBRE LA CLAVE DEL TUBO Y LATERALES-TUBERI m 32.98 10.87 358.49 0.00 0.00% 32.98 358.49 100.00% 32.98 358.49 100.00% 0.00 0.00 0.00%
01.07.02.06 RELLENO Y COMPACTACION CON MATERIAL PROPIO SELECCIONADO - TUBERIA m3 836.63 9.45 7,906.15 0.00 0.00% 660.94 6,245.88 79.00% 660.94 6,245.88 79.00% 175.69 1,660.27 21.00%
01.07.02.07 RELLENO Y COMPACTADO CON MATERIAL PROPIO SELECCIONADO - TUBERIA D m3 30.57 10.00 305.70 0.00 0.00% 30.57 305.70 100.00% 30.57 305.70 100.00% 0.00 0.00 0.00%
01.07.02.08 RELLENO Y COMPACTADO CON MATERIAL PROPIO SELECCIONADO - TUBERIA D=m3 32.98 10.60 349.59 0.00 0.00% 20.00 212.00 60.64% 20.00 212.00 60.64% 12.98 137.59 39.36%
ELIMINACION DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO 30
01.07.02.09
ml.
m3 380.33 25.60 9,736.45 0.00 0.00% 300.46 7,691.78 79.00% 300.46 7,691.78 79.00% 79.87 2,044.67 21.00%
01.07.03 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
01.07.03.01 SUMINISTRO E INSTALACION DE TUBERIAS
01.07.03.01.01 SUMINISTRO E INSTALACION DE TUBERIA F°G° DE D=3" - LINEA DE IMPULSION m 0.35 45.13 15.80 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.35 15.80 100.00%
01.07.03.01.02 SUMINISTRO E INSTALACION DE TUBERIA F°G° DE D=2" - LINEA DE IMPULSION m 0.40 34.78 13.91 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.40 13.91 100.00%
01.07.03.01.03 SUMINISTRO E INSTALACION DE TUBERIA F°G° DE D=1 1/2" - LINEA DE IMPULSI m 0.40 29.29 11.72
01.07.03.01.04 SUMINISTRO E INSTALACION DE TUBERIA PVC-O DE D=3" LINEA DE IMPUSION N m 829.75 30.02 24,909.10 0.00 0.00% 660.94 19,841.42 79.66% 660.94 19,841.42 79.66% 168.81 5,067.68 20.34%
01.07.03.01.05 SUMINISTRO E INSTALACION DE TUBERIA PVC-O DE D=2" LINEA DE IMPUSION N m 30.17 10.90 328.85 30.57
01.07.03.01.06 SUMINISTRO E INSTALACION DE TUBERIA PVC-O DE D=1 1/2" LINEA DE IMPUSI m 32.58 7.62 248.26 0.00 0.00% 20.00 152.40 61.39% 20.00 152.40 61.39% 12.58 95.86 38.61%
01.07.03.02 SUMINISTRO E INSTALACION DE ACCESORIOS
01.07.03.02.01 SUMINISTRO E INSTALACION DE TRANSICION DE F°G° A PVC DE D=3" und 3.00 31.05 93.15 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 93.15 100.00%
01.07.03.02.02 SUMINISTRO E INSTALACION DE TRANSICION DE F°G° A PVC DE D=2" und 2.00 17.74 35.48
01.07.03.02.03 SUMINISTRO E INSTALACION DE TRANSICION DE F°G° A PVC DE D=1 1/2" und 2.00 13.61 27.22
01.07.03.02.04 SUMINISTRO E INSTALACION DE CODO 90° DE F°G° D=3" und 2.00 34.44 68.88 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 68.88 100.00%
01.07.03.02.05 SUMINISTRO E INSTALACION DE CODO 22.5° DE PVC-O D=3" und 5.00 23.10 115.50 0.00 0.00% 3.00 69.30 60.00% 3.00 69.30 60.00% 2.00 46.20 40.00%
01.07.03.02.06 SUMINISTRO E INSTALACION DE CODO 45° DE PVC-SP D=2" und 2.00 17.78 35.56 1.00
01.07.03.02.07 SUMINISTRO E INSTALACION DE CODO 90° DE PVC-SP D=2" und 2.00 20.00 40.00 0.00 0.00% 1.00 20.00 50.00% 1.00 20.00 50.00% 1.00 20.00 50.00%
01.07.03.02.08 SUMINISTRO E INSTALACION DE CODO 22.5° DE PVC-SP D=1 1/2" und 1.00 13.38 13.38 0.00 0.00% 1.00 13.38 100.00% 1.00 13.38 100.00% 0.00 0.00 0.00%
01.07.03.02.09 SUMINISTRO E INSTALACION DE CODO 90° DE PVC-SP D=1 1/2" und 3.00 9.03 27.09 0.00 0.00% 2.00 18.06 66.67% 2.00 18.06 66.67% 1.00 9.03 33.33%
01.07.03.02.10 DADO DE CONCRETO PARA ANCLAJE DE ACCESORIOS F´c = 140 Kg/cm2 und 22.00 59.75 1,314.50 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 22.00 1,314.50 100.00%
CAMARA DE VALVULA DE ALIVIO (01 UND), CAMARA DE PRESOSTATO (01 UND),
01.07.04
VALVULA DE PURGA TIPO II (02 UND) Y VALVULA DE AIRE (01 UND)
01.07.04.01 OBRAS PRELIMINARES
01.07.04.01.01 LIMPIEZA DE TERRENO MANUAL m2 16.76 1.41 23.63 0.00 0.00% 8.38 11.82 50.02% 8.38 11.82 50.02% 8.38 11.82 50.02%
01.07.04.01.02 TRAZO, NIVELES Y REPLANTEO m2 9.21 1.07 9.85 0.00 0.00% 4.96 5.31 53.91% 4.96 5.31 53.91% 4.25 4.55 46.19%
01.07.04.02 MOVIMIENTO DE TIERRAS
01.07.04.02.01 EXCAVACION MANUAL EN TERRENO NORMAL m3 7.40 56.31 416.69 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.40 416.69 100.00%
01.07.04.02.02 NIVELACION Y APISONADO MANUAL m2 9.21 1.76 16.21 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.21 16.21 100.00%
01.07.04.02.03 RELLENO DE CAMA DE ARENA PARA TUBERIA m3 0.10 65.30 6.53 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.10 6.53 100.00%
01.07.04.02.04 RELLENO COMPACTADO CON MATERIAL PROPIO SELECCIONADO m3 2.18 58.99 128.60 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.18 128.60 100.00%
ELIMINACION DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO 30
01.07.04.02.05
ml.
m3 6.79 25.60 173.82 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.79 173.82 100.00%
01.07.04.03 OBRAS DE CONCRETO SIMPLE
01.07.04.03.01 SOLADO DE CONCRETO C:H 1:10 E=4" m2 7.79 37.11 289.09 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.79 289.09 100.00%
01.07.04.03.02 CONCRETO F'c = 175 Kg/cm2 EN DISPOSICION FINAL m3 0.09 496.82 44.71 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.09 44.71 100.00%
01.07.04.03.03 ENCOFRADO Y DESENCOFRADO EN DISPOSICION FINAL m2 0.25 48.01 12.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.25 12.00 100.00%
01.07.04.03.04 DADO DE CONCRETO F´c = 140 Kg/cm2 m3 0.03 404.41 12.13 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.03 12.13 100.00%
01.07.04.04 OBRAS DE CONCRETO ARMADO
01.07.04.04.01 LOSA INFERIOR
VALORIZACION DE OBRA N° 002 - OCTUBRE 2021
OBRA: "MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO EN EL CC.NN. NUEVA JERUSALEN, DISTRITO DE TROMPETEROS, PROVINCIA DE LORETO, REGION LORETO"
ENTIDAD: PROGRAMA NACIONAL DE SANEAMIENTO RURAL -PNSR
LOCALIDAD: LORETO - LORETO - TROMPETEROS
FECHA: SETIEMBRE - 2021
PLAZO DE EJEC.: 225 DIAS CALENDARIO (7 MESES Y MEDIO)
PRESUPUESTO AVANCES
SALDO DE OBRA
PART. DESCRIPCIÓN Und. Metrado Precio U. Parcial ACUMULADO ANTERIOR MES ACTUAL ACUMULADO ACTUAL
Base S/. S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
01.07.04.04.01.01 CONCRETO F'c = 210 Kg/cm2 EN LOSA INFERIOR m3 0.77 569.92 438.84 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.77 438.84 100.00%
01.07.04.04.01.02 ACERO DE REFUERZO fy=4,200 kg/cm2 EN LOSA INFERIOR kg 219.74 4.66 1,023.99 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 219.74 1,023.99 100.00%
01.07.04.04.02 MUROS
01.07.04.04.02.01 CONCRETO F'c = 210 Kg/cm2 EN MUROS m3 15.87 569.93 9,044.79 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 15.87 9,044.79 100.00%
01.07.04.04.02.02 ENCOFRADO Y DESENCOFRADO EN MUROS m2 35.80 48.01 1,718.76 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 35.80 1,718.76 100.00%
01.07.04.04.02.03 ACERO DE REFUERZO fy=4,200 kg/cm2 EN MUROS kg 166.66 4.66 776.64 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 166.66 776.64 100.00%
01.07.04.05 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS
01.07.04.05.01 SUMINISTRO E INSTALACION DE TUBERIAS
01.07.04.05.01.01 SUMINISTRO E INSTALACION DE TUBERIA DE PVC-O Ø 3" m 0.76 30.02 22.82 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.76 22.82 100.00%
01.07.04.05.01.02 SUMINISTRO E INSTALACION DE TUBERIA PVC-SP D=3" C-10 m 3.05 15.01 45.78 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.05 45.78 100.00%
01.07.04.05.02 SUMINISTRO E INSTALACION DE ACCESORIOS
01.07.04.05.02.01 SUMINISTRO E INSTALACION DE TEE DE D=3" PVC-O und 4.00 23.44 93.76 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 93.76 100.00%
01.07.04.05.02.02 SUMINISTRO E INSTALACION DE TAPON HEMBRA PERFORADO DE D=3" PVC-SP und 3.00 9.63 28.89 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 28.89 100.00%
01.07.04.05.02.03 SUMINISTRO E INSTALACION DE PRESOSTATO 20-70 PSI INC./MANOMETRO und 1.00 653.81 653.81 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 653.81 100.00%
01.07.04.05.03 SUMINISTRO E INSTALACION DE VALVULAS
01.07.04.05.03.01 SUMINISTRO E INSTALACION DE VALVULA DE ALIVIO D=3" EN TUB. PVC-O und 1.00 675.50 675.50 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 675.50 100.00%
01.07.04.05.03.02 SUMINISTRO E INSTALACION DE VALVULA DE PURGA DE BRONCE D=3" EN TUB. und 2.00 276.56 553.12 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 553.12 100.00%
01.07.04.05.03.03 SUMINISTRO E INSTALACION DE VALVULA DE AIRE DE BRONCE D=3" EN TUB. und 1.00 176.93 176.93 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 176.93 100.00%
01.07.04.06 SUMINISTRO E INSTALACION DE TAPAS PARA CAMARA DE VALVULAS
01.07.04.06.01 TAPAS METALICAS DE 1.60M x 0.70M und 2.00 557.50 1,115.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 1,115.00 100.00%
01.07.04.06.02 TAPAS DE CONCRETO EN CAMARA DE VALVULA DE PURGA (1.10M x 0.70M) und 2.00 110.52 221.04 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 221.04 100.00%
01.07.04.06.03 TAPAS DE CONCRETO EN CAMARA DE VALVULA DE AIRE (0.50M x 0.50M) und 1.00 65.46 65.46 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 65.46 100.00%
01.07.04.07 VARIOS
01.07.04.07.01 SUMINISTRO Y COLOCACION DE FILTRO DE GRAVA DE Ø 1" m3 0.30 132.68 39.80 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.30 39.80 100.00%
01.07.04.07.02 SUMINISTRO Y COLOCACION DE FILTRO DE GRAVA DE Ø 1/2" m3 0.01 165.73 1.66 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.01 1.66 100.00%
01.08 CONSTRUCCION DE PASE AEREO (L = 50m)
01.08.01 OBRAS PRELIMINARES
01.08.01.01 LIMPIEZA DE TERRENO MANUAL m2 104.40 1.41 147.20 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 104.40 147.20 100.00%
01.08.01.02 TRAZO, NIVELES Y REPLANTEO m2 53.60 1.07 57.35 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 53.60 57.35 100.00%
01.08.02 MOVIMIENTO DE TIERRAS
01.08.02.01 EXCAVACION MANUAL EN TERRENO NORMAL m3 86.48 56.31 4,869.69 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 86.48 4,869.69 100.00%
01.08.02.02 NIVELACION Y APISONADO MANUAL m2 48.00 1.76 84.48 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 48.00 84.48 100.00%
01.08.02.03 RELLENO COMPACTADO CON MATERIAL PROPIO SELECCIONADO m3 39.47 58.99 2,328.34 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 39.47 2,328.34 100.00%
ELIMINACION DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO 30
01.08.02.04
ml.
m3 61.11 25.60 1,564.42 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 61.11 1,564.42 100.00%
01.08.03 OBRAS DE CONCRETO SIMPLE
01.08.03.01 SOLADO DE CONCRETO C:H 1:10 E=4" m2 8.00 37.11 296.88 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 296.88 100.00%
01.08.03.02 CONCRETO F'C=140 KG/CM2 EN CAMARA DE ANCLAJE m2 50.88 334.68 17,028.52 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 50.88 17,028.52 100.00%
01.08.03.03 ENCOFRADO Y DESENCOFRADO EN CAMARA DE ANCLAJE m2 48.00 46.88 2,250.24 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 48.00 2,250.24 100.00%
01.08.04 OBRAS DE CONCRETO ARMADO
01.08.04.01 ZAPATAS
01.08.04.01.01 CONCRETO F'c = 210 Kg/cm2 EN ZAPATAS m3 4.00 423.72 1,694.88 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 1,694.88 100.00%
01.08.04.01.02 ENCOFRADO Y DESENCOFRADO EN ZAPATAS m2 9.60 46.88 450.05 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.60 450.05 100.00%
01.08.04.01.03 ACERO DE REFUERZO fy=4,200 kg/cm2 EN ZAPATAS kg 93.02 4.66 433.47 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 93.02 433.47 100.00%
01.08.04.02 TORRES DE ELEVACION
01.08.04.02.01 CONCRETO F'c = 210 Kg/cm2 EN TORRES m3 3.05 569.93 1,738.29 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.05 1,738.29 100.00%
01.08.04.02.02 ENCOFRADO Y DESENCOFRADO EN TORRES m2 24.40 48.01 1,171.44 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 24.40 1,171.44 100.00%
01.08.04.02.03 ACERO DE REFUERZO fy=4,200 kg/cm2 EN TORRES kg 458.70 4.66 2,137.54 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 458.70 2,137.54 100.00%
01.08.05 REVOQUES, ENLUCIDOS Y MOLDURAS
01.08.05.01 TARRAJEO EN TORRES m2 20.20 57.34 1,158.27 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.20 1,158.27 100.00%
01.08.06 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
01.08.06.01 SUMINISTRO E INSTALACION DE TUBERIAS
01.08.06.01.01 SUMINISTRO E INSTALACION DE TUBERIA HDPE D= 3" m 66.73 18.27 1,219.16 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 66.73 1,219.16 100.00%
01.08.06.01.02 SUMINISTRO E INSTALACION DE TUBERIA F°G° DE D=4" - PARA PROTECCION m 49.00 48.33 2,368.17 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 49.00 2,368.17 100.00%
01.08.06.02 SUMINISTRO E INSTALACION DE ACCESORIOS
01.08.06.02.01 SUMINISTRO E INSTALACION DE CODO 45° HDPE DE D=3" und 4.00 28.22 112.88 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 112.88 100.00%
01.08.07 OTROS
01.08.07.01 SUMINISTRO E INSTALACION DE CABLE DE ACERO TORON DE 1/2" m 62.50 27.75 1,734.38 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 62.50 1,734.38 100.00%
01.08.07.02 SUMINISTRO E INSTALACION DE PENDOLAS DE ACERO LISO DE 1/2" und 49.00 80.01 3,920.49 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 49.00 3,920.49 100.00%
01.08.07.03 SUMINISTRO E INSTALACION DE VARILLA DE ANCLAJE DE 1/2" X 30" und 2.00 20.83 41.66 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 41.66 100.00%
VALORIZACION DE OBRA N° 002 - OCTUBRE 2021
OBRA: "MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO EN EL CC.NN. NUEVA JERUSALEN, DISTRITO DE TROMPETEROS, PROVINCIA DE LORETO, REGION LORETO"
ENTIDAD: PROGRAMA NACIONAL DE SANEAMIENTO RURAL -PNSR
LOCALIDAD: LORETO - LORETO - TROMPETEROS
FECHA: SETIEMBRE - 2021
PLAZO DE EJEC.: 225 DIAS CALENDARIO (7 MESES Y MEDIO)
PRESUPUESTO AVANCES
SALDO DE OBRA
PART. DESCRIPCIÓN Und. Metrado Precio U. Parcial ACUMULADO ANTERIOR MES ACTUAL ACUMULADO ACTUAL
Base S/. S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
01.08.07.04 SUMINISTRO E INSTALACION DE TEMPLADOR DE 1/2" und 2.00 24.97 49.94 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 49.94 100.00%
01.08.07.05 SUMINISTRO E INSTALACION DE GRAMPAS PLANAS und 4.00 21.80 87.20 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 87.20 100.00%
01.08.07.06 SUMINISTRO E INSTALACION DE GRAMPAS EN "U" und 49.00 24.69 1,209.81 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 49.00 1,209.81 100.00%
01.08.07.07 SUMINISTRO E INSTALACION DE APOYO PARA CABLE PRINCIPAL EN TORRE und 2.00 74.88 149.76 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 149.76 100.00%
01.08.07.08 SUMINISTRO E INSTALACION DE PROTECCION DE F°G° EN TORRE DE D=4" und 2.00 18.90 37.80 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 37.80 100.00%
01.08.07.09 SUMINISTRO E INSTALACION DE ABRAZADERA METALICA DE D=1" und 2.00 44.57 89.14 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 89.14 100.00%
01.08.07.10 SUMINISTRO E INSTALACION DE ABRAZADERA METALICA DE D=4" und 49.00 16.67 816.83 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 49.00 816.83 100.00%
01.09 TANQUES ELEVADOS
01.09.01 TANQUE ELEVADO V = 17m3 - REHABILITADO
01.09.01.01 OBRAS PRELIMINARES
01.09.01.01.01 DESMONTAJE DE TUBERIAS EXISTENTES glb 1.00 215.46 215.46 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 215.46 100.00%
01.09.01.01.02 DESMONTAJE DE ESCALERA EXISTENTE glb 1.00 359.09 359.09 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 359.09 100.00%
01.09.01.01.03 DESMONTAJE DE TAPA EXISTENTE glb 1.00 143.64 143.64 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 143.64 100.00%
01.09.01.01.04 REMOCION DE TARRAJEO EN TANQUE ELEVADO m2 222.48 34.53 7,682.23 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 222.48 7,682.23 100.00%
01.09.01.02 REVOQUES, ENLUCIDOS Y MOLDURAS
01.09.01.02.01 CUBA
01.09.01.02.01.01 TARRAJEO EN INTERIOR CON IMPERMEABILZANTE
01.09.01.02.01.01.01TARRAJEO CON IMPERMEABILZANTE EN MUROS LATERALES e=1.5 CM -1:5 (1bls c m2 5.42 26.21 142.06 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.42 142.06 100.00%
01.09.01.02.01.01.02TARRAJEO CON IMPERMEABILZANTE EN LOSA INFERIOR e= 1.5 CM -1:5 (1bls cemem2 5.76 26.21 150.97 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.76 150.97 100.00%
01.09.01.02.01.02 TARRAJEO EN EXTERIORES
01.09.01.02.01.02.01TARRAJEO EN LOSA SUPERIOR - 1:5 (1 bls. cemento x 5 arena) m2 10.81 35.99 389.05 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.81 389.05 100.00%
01.09.01.02.01.02.02TARRAJEO EN MUROS LATERALES - 1:5 (1 bls. cemento x 5 arena) m2 36.86 46.43 1,711.41 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 36.86 1,711.41 100.00%
01.09.01.02.01.02.03TARRAJEO EN LOSA INFERIOR - 1:5 (1 bls. cemento x 5 arena) m2 7.67 39.52 303.12 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.67 303.12 100.00%
01.09.01.02.01.03 COLUMNAS
01.09.01.02.01.03.01TARRAJEO EN COLUMNAS - 1:5 (1 bls. cemento x 5 arena) m2 72.96 39.52 2,883.38 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 72.96 2,883.38 100.00%
01.09.01.02.01.03.02VESTIDURA DE ARISTAS - 1:5 (1 bls. cemento x 5 arena) m 89.60 19.33 1,731.97 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 89.60 1,731.97 100.00%
01.09.01.02.01.04 VIGAS
01.09.01.02.01.04.01TARRAJEO EN VIGAS - 1:5 (1 bls. cemento x 5 arena) m2 63.46 39.52 2,507.94 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 63.46 2,507.94 100.00%
01.09.01.02.01.04.02VESTIDURA DE ARISTAS - 1:5 (1 bls. cemento x 5 arena) m 150.08 19.33 2,901.05 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 150.08 2,901.05 100.00%
01.09.01.03 PINTURA
01.09.01.03.01 PINTURA ESMALTE EN CUBA (02 MANOS) m2 53.43 11.28 602.69 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 53.43 602.69 100.00%
01.09.01.03.02 PINTURA ESMALTE EN COLUMNAS (02 MANOS) m2 72.96 11.28 822.99 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 72.96 822.99 100.00%
01.09.01.03.03 PINTURA ESMALTE EN VIGAS (02 MANOS) m2 61.09 11.28 689.10 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 61.09 689.10 100.00%
01.09.01.04 CARPINTERIA METALICA
01.09.01.04.01 ESCALERA TIPO GATO DE ACERO INOXIDABLE EN CUBA und 1.00 123.75 123.75 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 123.75 100.00%
01.09.01.04.02 ESCALERA TIPO GATO CONN CANASTILLA DE PROTECCION und 1.00 2,614.31 2,614.31 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 2,614.31 100.00%
01.09.01.04.03 MONTAJE DE ESCALERA DE GATO und 2.00 499.67 999.34 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 999.34 100.00%
01.09.01.04.04 TAPA METALICA DE 0.60 X 0.70 M C/PLANCHA ESTRIADA DE E=1/8" E und 1.00 490.77 490.77 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 490.77 100.00%
01.09.01.04.05 TAPA METALICA DE 0.60 X 0.45 M C/PLANCHA ESTRIADA DE E=1/8" EN und 1.00 377.89 377.89 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 377.89 100.00%
01.09.01.04.06 BARANDA METALICA DE F°N° DE D=2" - H=1.00M m 54.68 86.96 4,754.97 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 54.68 4,754.97 100.00%
01.09.01.05 SUMINISTRO E INSTALACION DE TUBERIAS, VALVULAS COMPUERTA Y ACCESORIOS
01.09.01.05.01 SUMINISTRO E INSTALACION DE TUBERIAS DE F°G°
01.09.01.05.01.01 SUMINISTRO E INSTALACION DE TUBERIA F°G° DE D=4" - LIMPIEZA Y m 15.64 48.33 755.88 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 15.64 755.88 100.00%
01.09.01.05.01.02 SUMINISTRO E INSTALACION DE TUBERIA F°G° DE D=3" - LINEA DE A m 14.68 45.13 662.51 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.68 662.51 100.00%
01.09.01.05.01.03 SUMINISTRO E INSTALACION DE TUBERIA F°G° DE D=2" - LINEA DE IM m 18.65 34.78 648.65 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.65 648.65 100.00%
SUMINISTRO E INSTALACION DE ACCESORIOS
01.09.01.05.02
01.09.01.05.02.01 SUMINISTRO E INSTALACION DE CLORINADOR EN LINEA und 1.00 539.29 539.29 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 539.29 100.00%
01.09.01.05.02.02 SUMINISTRO E INSTALACION DE TUBERIA DE VENTILACION F°G° DE D= und 2.00 40.58 81.16 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 81.16 100.00%
01.09.01.05.02.03 SUMINISTRO E INSTALACION DE TEE DE F°G° DE D=4" und 1.00 53.08 53.08 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 53.08 100.00%
01.09.01.05.02.04 SUMINISTRO E INSTALACION DE TEE DE F°G° DE D=2" und 2.00 23.42 46.84 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 46.84 100.00%
01.09.01.05.02.05 SUMINISTRO E INSTALACION DE CODO 90° DE F°G° DE D=4" und 5.00 48.84 244.20 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.00 244.20 100.00%
01.09.01.05.02.06 SUMINISTRO E INSTALACION DE CODO 90° DE F°G° D=3" und 3.00 34.44 103.32 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 103.32 100.00%
01.09.01.05.02.07 SUMINISTRO E INSTALACION DE CODO 90° DE F°G° D=2" und 7.00 19.18 134.26 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.00 134.26 100.00%
01.09.01.05.02.08 SUMINISTRO E INSTALACION DE CANASTILLA DE BRONCE DE D=3" und 1.00 61.55 61.55 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 61.55 100.00%
01.09.01.05.02.09 SUMINISTRO E INSTALACION DE BRIDA ROMPE AGUA O DE ANCLAJE D und 2.00 45.19 90.38 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 90.38 100.00%
01.09.01.05.02.10 SUMINISTRO E INSTALACION DE BRIDA ROMPE AGUA O DE ANCLAJE D und 1.00 44.13 44.13 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 44.13 100.00%
01.09.01.05.02.11 SUMINISTRO E INSTALACION DE BRIDA ROMPE AGUA O DE ANCLAJE D und 3.00 40.67 122.01 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 122.01 100.00%
01.09.01.05.02.12 SUMINISTRO E INSTALACION DE UNION ROSCADA DE F°G° DE D=4" und 1.00 89.12 89.12 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 89.12 100.00%
01.09.01.05.02.13 SUMINISTRO E INSTALACION DE UNION ROSCADA DE F°G° DE D=3" und 1.00 72.12 72.12 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 72.12 100.00%
VALORIZACION DE OBRA N° 002 - OCTUBRE 2021
OBRA: "MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO EN EL CC.NN. NUEVA JERUSALEN, DISTRITO DE TROMPETEROS, PROVINCIA DE LORETO, REGION LORETO"
ENTIDAD: PROGRAMA NACIONAL DE SANEAMIENTO RURAL -PNSR
LOCALIDAD: LORETO - LORETO - TROMPETEROS
FECHA: SETIEMBRE - 2021
PLAZO DE EJEC.: 225 DIAS CALENDARIO (7 MESES Y MEDIO)
PRESUPUESTO AVANCES
SALDO DE OBRA
PART. DESCRIPCIÓN Und. Metrado Precio U. Parcial ACUMULADO ANTERIOR MES ACTUAL ACUMULADO ACTUAL
Base S/. S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
01.09.01.05.02.14 SUMINISTRO E INSTALACION DE UNION ROSCADA DE F°G° DE D=2" und 2.00 54.72 109.44 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 109.44 100.00%
01.09.01.05.02.15 SUMINISTRO E INSTALACION DE ABRAZADERA METALICA D=4" und 9.00 16.67 150.03 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.00 150.03 100.00%
01.09.01.05.02.16 SUMINISTRO E INSTALACION DE ABRAZADERA METALICA D=3" und 8.00 15.85 126.80 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 126.80 100.00%
01.09.01.05.02.17 SUMINISTRO E INSTALACION DE ABRAZADERA METALICA D=2" und 9.00 15.72 141.48 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.00 141.48 100.00%
01.09.01.05.02.18 SUMINISTRO E INSTALACION DE TRANSICION DE F°G° A PVC DE D=4" und 1.00 61.89 61.89 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 61.89 100.00%
01.09.01.05.02.19 SUMINISTRO E INSTALACION DE TRANSICION DE F°G° A PVC DE D=3" und 1.00 31.05 31.05 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 31.05 100.00%
01.09.01.05.02.20 SUMINISTRO CAJA DE VALVULA DE CONCRETO SIMPLE + TAPA C. ARM und 1.00 540.22 540.22 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 540.22 100.00%
01.09.01.05.02.21 SUMINISTRO CAJA DE CLORINADOR DE CONCRETO SIMPLE und 1.00 171.64 171.64 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 171.64 100.00%
01.09.01.05.03 SUMINISTRO E INSTALACION DE VALVULAS DE COMPUERTAS DE BRONCE
01.09.01.05.03.01 SUMINISTRO E INSTALACION DE VALVULA DE COMPUERTA DE BRONCE und 1.00 322.21 322.21 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 322.21 100.00%
01.09.01.05.03.02 SUMINISTRO E INSTALACION DE VALVULA DE COMPUERTA DE BRONCE und 1.00 245.62 245.62 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 245.62 100.00%
01.09.01.05.03.03 SUMINISTRO E INSTALACION DE VALVULA DE COMPUERTA DE BRONCE und 4.00 233.26 933.04 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 933.04 100.00%
01.09.01.05.04 PRUEBA HIDRAULICA Y DESINFECCION DE TANQUE ELEVADO
01.09.01.05.04.01 PRUEBA HIDRAULICA Y DESINFECCION EN TANQUE ELEVADO DE V=17 und 1.00 177.60 177.60 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 177.60 100.00%
01.09.02 TANQUE ELEVADO V = 13m3 - PROYECTADO
01.09.02.01 OBRAS PRELIMINARES
01.09.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 43.96 1.41 61.98 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 43.96 61.98 100.00%
01.09.02.01.02 TRAZO, NIVELES Y REPLANTEO m 21.44 1.07 22.94 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 21.44 22.94 100.00%
01.09.02.02 MOVIMIENTO DE TIERRAS
01.09.02.02.01 EXCAVACION MANUAL EN TERRENO NORMAL m3 60.02 56.31 3,379.73 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 60.02 3,379.73 100.00%
01.09.02.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO SELECCIONADO m3 35.42 58.99 2,089.43 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 35.42 2,089.43 100.00%
01.09.02.02.03 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO MEJORADO m3 12.86 96.20 1,237.13 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.86 1,237.13 100.00%
ELIMINACION DE MATERIAL EXCEDENTE MANUAL HASTA UNA DISTANCIA PROMEDIO 30 ml.
01.09.02.02.04 m3 31.99 25.60 818.94 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 31.99 818.94 100.00%
01.09.02.03 OBRAS DE CONCRETO SIMPLE
01.09.02.03.01 SOLADO DE CONCRETO C:H 1:10 E=4" m2 21.44 37.11 795.64 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 21.44 795.64 100.00%
01.09.02.03.02 DADO DE CONCRETO 0.15Mx0.15Mx0.05 M PARA CLORINADOR und 1.00 0.86 0.86 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 0.86 100.00%
01.09.02.04 OBRAS DE CONCRETO ARMADO
01.09.02.04.01 PLATEA DE CIMENTACION
CONCRETO F'c = 210 Kg/cm2 EN PLATEA DE CIMENTACION
01.09.02.04.01.01 m3 10.72 437.02 4,684.85 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.72 4,684.85 100.00%
01.09.02.04.01.02 ACERO DE REFUERZO fy=4,200 kg/cm2 EN PLATEA DE CIMENTACION kg 807.17 4.66 3,761.41 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 807.17 3,761.41 100.00%
01.09.02.04.02 COLUMNAS
01.09.02.04.02.01 CONCRETO F'c = 210 Kg/cm2 EN COLUMNAS m3 7.16 569.93 4,080.70 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.16 4,080.70 100.00%
01.09.02.04.02.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS. m2 69.06 64.21 4,434.34 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 69.06 4,434.34 100.00%
01.09.02.04.02.03 ACERO DE REFUERZO fy=4,200 kg/cm2 EN COLUMNAS kg 1,056.36 4.66 4,922.64 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1,056.36 4,922.64 100.00%
01.09.02.04.03 VIGAS
CONCRETO F'c = 210 Kg/cm2 EN VIGAS
01.09.02.04.03.01 m3 4.02 448.08 1,801.28 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.02 1,801.28 100.00%
ENCOFRADO Y DESENCOFRADO EN VIGAS
01.09.02.04.03.02 m2 34.14 64.21 2,192.13 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 34.14 2,192.13 100.00%
01.09.02.04.03.03 ACERO DE REFUERZO fy=4,200 kg/cm2 EN VIGAS kg 644.74 4.66 3,004.49 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 644.74 3,004.49 100.00%
01.09.02.04.04 CUBA
01.09.02.04.04.01 LOSA INFERIOR
CONCRETO F'c = 210 Kg/cm2 EN LOSA INFERIOR
01.09.02.04.04.01.01 m3 1.26 569.92 718.10 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.26 718.10 100.00%
01.09.02.04.04.01.02 ENCOFRADO Y DESENCOFRADO EN LOSA DE FONDO m2 6.30 48.01 302.46 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.30 302.46 100.00%
01.09.02.04.04.01.03 ACERO DE REFUERZO fy=4,200 kg/cm2 EN LOSA INFERIOR kg 141.09 4.66 657.48 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 141.09 657.48 100.00%
01.09.02.04.04.02 MUROS
01.09.02.04.04.02.01 CONCRETO F'c = 210 Kg/cm2 EN MUROS m3 5.20 569.93 2,963.64 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.20 2,963.64 100.00%
01.09.02.04.04.02.02 ENCOFRADO Y DESENCOFRADO EN MUROS m2 52.00 48.01 2,496.52 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 52.00 2,496.52 100.00%
01.09.02.04.04.02.03 ACERO DE REFUERZO fy=4,200 kg/cm2 EN MUROS kg 520.47 4.66 2,425.39 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 520.47 2,425.39 100.00%
01.09.02.04.04.03 LOSA SUPERIOR
CONCRETO F'c = 210 Kg/cm2 EN LOSA SUPERIOR
01.09.02.04.04.03.01 m3 1.61 569.93 917.59 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.61 917.59 100.00%
01.09.02.04.04.03.02 ENCOFRADO Y DESENCOFRADO EN LOSA SUPERIOR m2 11.42 48.01 548.27 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.42 548.27 100.00%
01.09.02.04.04.03.03 ACERO DE REFUERZO fy=4,200 kg/cm2 EN LOSA SUPERIOR kg 74.54 4.66 347.36 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 74.54 347.36 100.00%
01.09.02.05 REVOQUES, ENLUCIDOS Y MOLDURAS
01.09.02.05.01 CUBA
01.09.02.05.01.01 TARRAJEO EN INTERIOR CON IMPERMEABILZANTE
01.09.02.05.01.01.01 TARRAJEO CON IMPERMEABILZANTE EN MUROS LATERALES e=1.5 CM -m2 24.33 26.21 637.69 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 24.33 637.69 100.00%
01.09.02.05.01.01.02 TARRAJEO CON IMPERMEABILZANTE EN LOSA INFERIOR e= 1.5 CM -1:5 m2 8.47 26.21 222.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.47 222.00 100.00%
01.09.02.05.01.02 TARRAJEO EN EXTERIORES
01.09.02.05.01.02.01 TARRAJEO EN LOSA SUPERIOR - 1:5 (1 bls. cemento x 5 arena) m2 11.53 35.99 414.96 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.53 414.96 100.00%
01.09.02.05.01.02.02 TARRAJEO EN MUROS LATERALES - 1:5 (1 bls. cemento x 5 arena) m2 29.66 46.43 1,377.11 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 29.66 1,377.11 100.00%
VALORIZACION DE OBRA N° 002 - OCTUBRE 2021
OBRA: "MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO EN EL CC.NN. NUEVA JERUSALEN, DISTRITO DE TROMPETEROS, PROVINCIA DE LORETO, REGION LORETO"
ENTIDAD: PROGRAMA NACIONAL DE SANEAMIENTO RURAL -PNSR
LOCALIDAD: LORETO - LORETO - TROMPETEROS
FECHA: SETIEMBRE - 2021
PLAZO DE EJEC.: 225 DIAS CALENDARIO (7 MESES Y MEDIO)
PRESUPUESTO AVANCES
SALDO DE OBRA
PART. DESCRIPCIÓN Und. Metrado Precio U. Parcial ACUMULADO ANTERIOR MES ACTUAL ACUMULADO ACTUAL
Base S/. S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
01.09.02.05.01.02.03 TARRAJEO EN LOSA INFERIOR - 1:5 (1 bls. cemento x 5 arena) m2 6.30 39.52 248.98 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.30 248.98 100.00%
01.09.02.05.02 COLUMNAS
01.09.02.05.02.01 TARRAJEO EN COLUMNAS - 1:5 (1 bls. cemento x 5 arena) m2 58.82 39.52 2,324.57 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 58.82 2,324.57 100.00%
01.09.02.05.02.02 VESTIDURA DE ARISTAS - 1:5 (1 bls. cemento x 5 arena) m 73.52 19.33 1,421.14 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 73.52 1,421.14 100.00%
01.09.02.05.03 VIGAS
01.09.02.05.03.01 TARRAJEO EN VIGAS - 1:5 (1 bls. cemento x 5 arena) m2 42.17 39.52 1,666.56 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 42.17 1,666.56 100.00%
01.09.02.05.03.02 VESTIDURA DE ARISTAS - 1:5 (1 bls. cemento x 5 arena) m 100.40 19.33 1,940.73 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 100.40 1,940.73 100.00%
01.09.02.06 PINTURA
01.09.02.06.01 PINTURA ESMALTE EN CUBA (02 MANOS) m2 47.48 11.28 535.57 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 47.48 535.57 100.00%
01.09.02.06.02 PINTURA ESMALTE EN COLUMNAS (02 MANOS) m2 58.82 11.28 663.49 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 58.82 663.49 100.00%
01.09.02.06.03 PINTURA ESMALTE EN VIGAS (02 MANOS) m2 42.17 11.28 475.68 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 42.17 475.68 100.00%
01.09.02.07 CARPINTERIA METALICA
01.09.02.07.01 ESCALERA TIPO GATO DE ACERO INOXIDABLE EN CUBA und 1.00 123.75 123.75 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 123.75 100.00%
01.09.02.07.02 ESCALERA TIPO GATO CON CANASTILLA DE PROTECCION und 1.00 2,614.31 2,614.31 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 2,614.31 100.00%
01.09.02.07.03 MONTAJE DE ESCALERA DE GATO und 2.00 499.67 999.34 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 999.34 100.00%
01.09.02.07.04 TAPA METALICA DE 0.60 X 0.70 M C/PLANCHA ESTRIADA DE E=1/8" E und 1.00 490.77 490.77 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 490.77 100.00%
01.09.02.07.05 TAPA METALICA DE 0.60 X 0.45 M C/PLANCHA ESTRIADA DE E=1/8" EN und 1.00 377.89 377.89 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 377.89 100.00%
01.09.02.07.06 BARANDA METALICA DE F°N° DE D=2" - H=1.00M m 41.57 86.96 3,614.93 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 41.57 3,614.93 100.00%
01.09.02.08 SUMINISTRO E INSTALACION DE TUBERIAS, VALVULAS COMPUERTA Y ACCESORIOS
01.09.02.08.01 SUMINISTRO E INSTALACION DE TUBERIAS DE F°G°
01.09.02.08.01.01 SUMINISTRO E INSTALACION DE TUBERIA F°G° DE D=4" - LIMPIEZA Y m 13.23 48.33 639.41 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.23 639.41 100.00%
01.09.02.08.01.02 SUMINISTRO E INSTALACION DE TUBERIA F°G° DE D=3" - LINEA DE A m 12.25 45.13 552.84 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.25 552.84 100.00%
01.09.02.08.01.03 SUMINISTRO E INSTALACION DE TUBERIA F°G° DE D=2 1/2" - LINEA D m 16.07 29.29 470.69 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.07 470.69 100.00%
01.09.02.08.02 SUMINISTRO E INSTALACION DE ACCESORIOS
01.09.02.08.02.01 SUMINISTRO E INSTALACION DE CLORINADOR EN LINEA und 1.00 539.29 539.29 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 539.29 100.00%
01.09.02.08.02.02 SUMINISTRO E INSTALACION DE JUNTA WATER STOP NEOPRENE DE 6" m 12.44 18.96 235.86 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.44 235.86 100.00%
01.09.02.08.02.03 SUMINISTRO E INSTALACION DE TUBERIA DE VENTILACION F°G° DE D=2" und 2.00 40.58 81.16 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 81.16 100.00%
01.09.02.08.02.04 SUMINISTRO E INSTALACION DE TEE DE F°G° DE D=4" und 1.00 53.08 53.08 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 53.08 100.00%
01.09.02.08.02.05 SUMINISTRO E INSTALACION DE TEE DE F°G° DE D=1 1/2" und 1.00 16.64 16.64 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 16.64 100.00%
01.09.02.08.02.06 SUMINISTRO E INSTALACION DE CODO 90° DE F°G° DE D=4" und 5.00 48.84 244.20 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.00 244.20 100.00%
01.09.02.08.02.07 SUMINISTRO E INSTALACION DE CODO 90° DE F°G° DE D=3" und 4.00 34.44 137.76 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 137.76 100.00%
01.09.02.08.02.08 SUMINISTRO E INSTALACION DE CODO 90° DE F°G° D=1 1/2" und 7.00 14.94 104.58 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.00 104.58 100.00%
01.09.02.08.02.09 SUMINISTRO E INSTALACION DE CANASTILLA DE BRONCE DE D=3" und 1.00 61.55 61.55 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 61.55 100.00%
01.09.02.08.02.10 SUMINISTRO E INSTALACION DE BRIDA ROMPE AGUA O DE ANCLAJE DE D=4" und 2.00 45.19 90.38 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 90.38 100.00%
01.09.02.08.02.11 SUMINISTRO E INSTALACION DE BRIDA ROMPE AGUA O DE ANCLAJE DE D=3" und 1.00 44.13 44.13 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 44.13 100.00%
01.09.02.08.02.12 SUMINISTRO E INSTALACION DE BRIDA ROMPE AGUA O DE ANCLAJE DE D=2" und 2.00 40.67 81.34 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 81.34 100.00%
01.09.02.08.02.13 SUMINISTRO E INSTALACION DE BRIDA ROMPE AGUA O DE ANCLAJE DE D=1 1/2 und 1.00 38.84 38.84 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 38.84 100.00%
01.09.02.08.02.14 SUMINISTRO E INSTALACION DE ABRAZADERA METALICA DE D=4" und 8.00 16.67 133.36 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 133.36 100.00%
01.09.02.08.02.15 SUMINISTRO E INSTALACION DE ABRAZADERA METALICA D=3" und 8.00 15.85 126.80 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 126.80 100.00%
01.09.02.08.02.16 SUMINISTRO E INSTALACION DE ABRAZADERA METALICA D=1 1/2" und 8.00 15.72 125.76 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 125.76 100.00%
01.09.02.08.02.17 SUMINISTRO E INSTALACION DE UNION ROSCADA DE F°G° DE D=4" und 3.00 89.12 267.36 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 267.36 100.00%
01.09.02.08.02.18 SUMINISTRO E INSTALACION DE UNION ROSCADA DE F°G° DE D=3" und 3.00 72.12 216.36 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 216.36 100.00%
01.09.02.08.02.19 SUMINISTRO E INSTALACION DE UNION ROSCADA DE F° G° DE 1 1/2" und 3.00 21.52 64.56 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 64.56 100.00%
01.09.02.08.02.20 SUMINISTRO E INSTALACION DE TRANSICION DE F°G° A PVC DE D=4" und 1.00 61.89 61.89 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 61.89 100.00%
01.09.02.08.02.21 SUMINISTRO E INSTALACION DE TRANSICION DE F°G° A PVC DE D=3" und 1.00 31.05 31.05 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 31.05 100.00%
01.09.02.08.02.22 SUMINISTRO CAJA DE VALVULA DE CONCRETO SIMPLE + TAPA C. ARMADO 1.15 und 1.00 540.22 540.22 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 540.22 100.00%
01.09.02.08.02.23 SUMINISTRO CAJA DE CLORINADOR DE CONCRETO SIMPLE und 1.00 171.64 171.64 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 171.64 100.00%
01.09.02.08.03 SUMINISTRO E INSTALACION DE VALVULAS DE COMPUERTAS DE BRONCE
01.09.02.08.03.01 SUMINISTRO E INSTALACION DE VALVULA DE COMPUERTA DE BRONCE DE D=4" und 1.00 322.21 322.21 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 322.21 100.00%
01.09.02.08.03.02 SUMINISTRO E INSTALACION DE VALVULA DE COMPUERTA DE BRONCE DE D=3" und 2.00 245.62 491.24 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 491.24 100.00%
01.09.02.08.03.03 SUMINISTRO E INSTALACION DE VALVULA DE COMPUERTA DE BRONCE DE D=1 1/und 4.00 158.73 634.92 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 634.92 100.00%
01.09.02.09 PRUEBAS Y DESINFECCION DE TANQUE ELEVADO
01.09.02.09.01 PRUEBA HIDRAULICA Y DESINFECCION EN TANQUE ELEVADO DE V=13.00M3 und 1.00 177.60 177.60 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 177.60 100.00%
01.10 LINEAS DE ADUCCION (L1 = 7.72M - L2 = 16.89M)
01.10.01 OBRAS PRELIMINARES
01.10.01.01 LIMPIEZA DE TERRENO MANUAL m2 24.61 1.41 34.70 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 24.61 34.70 100.00%
01.10.01.02 TRAZO, NIVELES Y REPLANTEO m 24.61 1.07 26.33 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 24.61 26.33 100.00%
01.10.01.03 CINTA SEÑALIZADORA PARA LIMITE DE SEGURIDAD m 24.61 0.28 6.89 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 24.61 6.89 100.00%
01.10.02 MOVIMIENTO DE TIERRAS
VALORIZACION DE OBRA N° 002 - OCTUBRE 2021
OBRA: "MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO EN EL CC.NN. NUEVA JERUSALEN, DISTRITO DE TROMPETEROS, PROVINCIA DE LORETO, REGION LORETO"
ENTIDAD: PROGRAMA NACIONAL DE SANEAMIENTO RURAL -PNSR
LOCALIDAD: LORETO - LORETO - TROMPETEROS
FECHA: SETIEMBRE - 2021
PLAZO DE EJEC.: 225 DIAS CALENDARIO (7 MESES Y MEDIO)
PRESUPUESTO AVANCES
SALDO DE OBRA
PART. DESCRIPCIÓN Und. Metrado Precio U. Parcial ACUMULADO ANTERIOR MES ACTUAL ACUMULADO ACTUAL
Base S/. S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
01.10.02.01 EXCAVACION DE ZANJA MANUAL P/AGUA TUB.D=3" EN TERRENO NORMAL A=0. m 24.61 19.31 475.22 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 24.61 475.22 100.00%
01.10.02.02 REFINE Y NIVELACION DE ZANJAS P/TUB. D=3" A=0.50M m 24.61 0.87 21.41 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 24.61 21.41 100.00%
01.10.02.03 RELLENO DE CAMA DE ARENA SOBRE LA CLAVE DEL TUBO Y LATERALES DE TUB m 24.61 12.15 299.01 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 24.61 299.01 100.00%
01.10.02.04 RELLENO DE CAMA DE ARENA SOBRE LA CLAVE DEL TUBO Y LATERALES DE TUB m 24.61 9.45 232.56 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 24.61 232.56 100.00%
01.10.02.05 ELIMINACION DE MATERIAL EXCEDENTE MANUAL A UNA DISTANCIA PROMEDIO 3 m3 10.80 25.60 276.48 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.80 276.48 100.00%
01.10.03 SUMINISTRO E INSTALACION DE TUBERIA PVC-SP/C-10
01.10.03.01 SUMINISTRO E INSTALACION DE TUBERIA PVC-SP D=3" C-10 m 24.61 15.01 369.40 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 24.61 369.40 100.00%
01.10.04 SUMINISTRO E INSTALACION DE ACCESORIOS
01.10.04.01 SUMINISTRO E INSTALACION DE TEE DE D=3" PVC-SP und 2.00 14.32 28.64 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 28.64 100.00%
01.10.04.02 DADO DE CONCRETO PARA ANCLAJE DE ACCESORIOS F´c = 140 Kg/cm2 und 2.00 59.75 119.50 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 119.50 100.00%
01.11 REDES DE DISTRIBUCION DE AGUA POTABLE (L =3076.4 M)
01.11.01 OBRAS PRELIMINARES
01.11.01.01 LIMPIEZA DE TERRENO MANUAL m2 3,076.40 1.41 4,337.72 2,768.76 3,903.95 90.00% 307.64 433.77 10.00% 3,076.40 4,337.72 100.00% 0.00 0.00 0.00%
01.11.01.02 TRAZO, NIVELES Y REPLANTEO m 3,076.40 1.07 3,291.75 2,768.76 2,962.57 90.00% 307.64 329.17 10.00% 3,076.40 3,291.75 100.00% 0.00 0.00 0.00%
01.11.01.03 CINTA SEÑALIZADORA PARA LIMITE DE SEGURIDAD m 6,152.80 0.28 1,722.78 5,537.52 1,550.51 90.00% 615.28 172.28 10.00% 6,152.80 1,722.78 100.00% 0.00 0.00 0.00%
01.11.02 MOVIMIENTO DE TIERRAS
01.11.02.01 EXCAVACION MANUAL DE TERRENO NORMAL PARA ZANJA A=0.50M H=0.70M m 3,076.40 19.73 60,697.37 2,768.76 54,627.63 90.00% 307.64 6,069.74 10.00% 3,076.40 60,697.37 100.00% 0.00 0.00 0.00%
01.11.02.02 REFINE Y NIVELACION DE ZANJAS P/TUB. PVC-SP A=0.50M m 3,076.40 0.87 2,676.47 2,768.76 2,408.82 90.00% 307.64 267.65 10.00% 3,076.40 2,676.47 100.00% 0.00 0.00 0.00%
01.11.02.03 RELLENO DE CAMA DE ARENA SOBRE LA CLAVE DEL TUBO Y LATERALES-TUBERI m 597.08 11.12 6,639.53 537.37 5,975.55 90.00% 59.71 663.98 10.00% 597.08 6,639.53 100.00% 0.00 0.00 0.00%
01.11.02.04 RELLENO DE CAMA DE ARENA SOBRE LA CLAVE DEL TUBO Y LATERALES-TUBERIAm 1,278.01 10.87 13,891.97 1,150.21 12,502.78 90.00% 127.80 1,389.19 10.00% 1,278.01 13,891.97 100.00% 0.00 0.00 0.00%
01.11.02.05 RELLENO DE CAMA DE ARENA SOBRE LA CLAVE DEL TUBO Y LATERALES-TUBERI m 1,201.31 10.75 12,914.08 1,081.18 11,622.69 90.00% 120.13 1,291.40 10.00% 1,201.31 12,914.08 100.00% 0.00 0.00 0.00%
01.11.02.06 RELLENO Y COMPACTADO CON MATERIAL PROPIO SELECCIONADO - TUBERIA D m 597.08 10.00 5,970.80 537.37 5,373.70 90.00% 59.71 597.10 10.00% 597.08 5,970.80 100.00% 0.00 0.00 0.00%
01.11.02.07 RELLENO Y COMPACTADO CON MATERIAL PROPIO SELECCIONADO - TUBERIA D=m 1,278.01 10.60 13,546.91 1,150.21 12,192.23 90.00% 127.80 1,354.68 10.00% 1,278.01 13,546.91 100.00% 0.00 0.00 0.00%
01.11.02.08 RELLENO Y COMPACTADO CON MATERIAL PROPIO SELECCIONADO - TUBERIA D m 1,201.31 10.93 13,130.32 1,081.18 11,817.30 90.00% 120.13 1,313.02 10.00% 1,201.31 13,130.32 100.00% 0.00 0.00 0.00%
ELIMINACION DE MATERIAL EXCEDENTE MANUAL A UNA DISTANCIA
01.11.02.09
PROMEDIO 30 ml.
m3 1,269.46 25.60 32,498.18 1,142.51 29,248.26 90.00% 126.95 3,249.92 10.00% 1,269.46 32,498.18 100.00% 0.00 0.00 0.00%
01.11.03 SUMINISTRO E INSTALACION DE TUBERIA PVC-SP/C-10
01.11.03.01 SUMINISTRO E INSTALACION DE TUBERIA PVC SP Ø 2" C-10 m 597.08 10.90 6,508.17 537.37 5,857.33 90.00% 59.71 650.84 10.00% 597.08 6,508.17 100.00% 0.00 0.00 0.00%
01.11.03.02 SUMINISTRO E INSTALACION DE TUBERIA PVC SP Ø 1 1/2" C-10 m 1,278.01 7.62 9,738.44 1,081.18 8,238.59 84.60% 196.83 1,499.84 15.40% 1,278.01 9,738.44 100.00% 0.00 0.00 0.00%
01.11.03.03 SUMINISTRO E INSTALACION DE TUBERIA PVC SP Ø 1" C-10 m 1,201.31 6.63 7,964.69 1,081.18 7,168.22 90.00% 120.13 796.46 10.00% 1,201.31 7,964.69 100.00% 0.00 0.00 0.00%
01.11.03.04 DOBLE PRUEBA HIDRAULICA Y DESINFECCION m 3,076.40 1.77 5,445.23 2,768.76 4,900.71 90.00% 307.64 544.52 10.00% 3,076.40 5,445.23 100.00% 0.00 0.00 0.00%
01.11.04 SUMINISTRO E INSTALACION DE ACCESORIOS PVC
01.11.04.01 SUMINISTRO E INSTALACION DE TEE DE D=2" PVC-SP und 6.00 15.18 91.08 5.00 75.90 83.33% 1.00 15.18 16.67% 6.00 91.08 100.00% 0.00 0.00 0.00%
01.11.04.02 SUMINISTRO E INSTALACION DE TEE DE D=1 1/2" PVC-SP und 11.00 14.23 156.53 10.00 142.30 90.91% 1.00 14.23 9.09% 11.00 156.53 100.00% 0.00 0.00 0.00%
01.11.04.03 SUMINISTRO E INSTALACION DE CODO 90° DE PVC-SP D=2" und 5.00 20.00 100.00 4.00 80.00 80.00% 1.00 20.00 20.00% 5.00 100.00 100.00% 0.00 0.00 0.00%
01.11.04.04 SUMINISTRO E INSTALACION DE CODO 90° DE PVC-SP D=1 1/2" und 2.00 9.03 18.06 2.00 18.06 100.00% 0.00 0.00% 2.00 18.06 100.00% 0.00 0.00 0.00%
01.11.04.05 SUMINISTRO E INSTALACION DE CODO 45° DE PVC-SP D=2" und 1.00 17.78 17.78 1.00 17.78 100.00% 0.00 0.00% 1.00 17.78 100.00% 0.00 0.00 0.00%
01.11.04.06 SUMINISTRO E INSTALACION DE CODO 45° DE PVC-SP D=1 1/2" und 5.00 13.29 66.45 4.00 53.16 80.00% 1.00 13.29 20.00% 5.00 66.45 100.00% 0.00 0.00 0.00%
01.11.04.07 SUMINISTRO E INSTALACION DE CODO 45° DE PVC-SP D=1" und 1.00 8.68 8.68 1.00 8.68 100.00% 0.00 0.00% 1.00 8.68 100.00% 0.00 0.00 0.00%
01.11.04.08 SUMINISTRO E INSTALACION DE CODO 22.5° DE PVC-SP D=2" und 2.00 13.38 26.76 2.00 26.76 100.00% 0.00 0.00% 2.00 26.76 100.00% 0.00 0.00 0.00%
01.11.04.09 SUMINISTRO E INSTALACION DE CODO 22.5° DE PVC-SP D=1 1/2" und 5.00 13.38 66.90 4.00 53.52 80.00% 1.00 13.38 20.00% 5.00 66.90 100.00% 0.00 0.00 0.00%
01.11.04.10 SUMINISTRO E INSTALACION DE CODO 22.5° DE PVC-SP D=1" und 5.00 8.68 43.40 4.00 34.72 80.00% 1.00 8.68 20.00% 5.00 43.40 100.00% 0.00 0.00 0.00%
01.11.04.11 SUMINISTRO E INSTALACION DE TAPON D=2" PVC-SP und 2.00 9.63 19.26 2.00 19.26 100.00% 0.00 0.00% 2.00 19.26 100.00% 0.00 0.00 0.00%
01.11.04.12 SUMINISTRO E INSTALACION DE TAPON D=1 1/2" PVC-SP und 1.00 9.63 9.63 1.00 9.63 100.00% 0.00 0.00% 1.00 9.63 100.00% 0.00 0.00 0.00%
01.11.04.13 SUMINISTRO E INSTALACION DE TAPON D=1" PVC-SP und 16.00 7.75 124.00 14.00 108.50 87.50% 2.00 15.50 12.50% 16.00 124.00 100.00% 0.00 0.00 0.00%
01.11.04.14 SUMINISTRO E INSTALACION DE REDUCCION DE PVC - Ø 3" x Ø 2" und 4.00 10.16 40.64 4.00 40.64 100.00% 0.00 0.00% 4.00 40.64 100.00% 0.00 0.00 0.00%
01.11.04.15 SUMINISTRO E INSTALACION DE REDUCCION DE PVC - Ø 2" x Ø 1 1/2" und 7.00 11.42 79.94 6.00 68.52 85.71% 1.00 11.42 14.29% 7.00 79.94 100.00% 0.00 0.00 0.00%
01.11.04.16 SUMINISTRO E INSTALACION DE REDUCCION DE PVC - Ø 2" x Ø 1" und 1.00 17.36 17.36 1.00 17.36 100.00% 0.00 0.00% 1.00 17.36 100.00% 0.00 0.00 0.00%
01.11.04.17 SUMINISTRO E INSTALACION DE REDUCCION DE PVC - Ø 1 1/2" x Ø 1" und 17.00 15.03 255.51 15.00 225.45 88.24% 2.00 30.06 11.76% 17.00 255.51 100.00% 0.00 0.00 0.00%
01.11.04.18 DADO DE CONCRETO PARA ANCLAJE DE ACCESORIOS F´c = 140 Kg/cm2 und 91.00 59.75 5,437.25 82.00 4,899.50 90.11% 9.00 537.75 9.89% 91.00 5,437.25 100.00% 0.00 0.00 0.00%
01.11.05 SUMINISTRO E INSTALACION DE VALVULAS
01.11.05.01 SUMINISTRO E INSTALACION DE VALVULA DE COMPUERTA DE BRONCE DE D=2" und 5.00 250.58 1,252.90 4.00 1,002.32 80.00% 0.00 0.00% 4.00 1,002.32 80.00% 1.00 250.58 20.00%
01.11.05.02 SUMINISTRO E INSTALACION DE VALVULA DE COMPUERTA DE BRONCE DE D=1 1und 2.00 170.25 340.50 2.00 340.50 100.00% 0.00 0.00% 2.00 340.50 100.00% 0.00 0.00 0.00%
01.11.05.03 SUMINISTRO E INSTALACION DE VALVULA DE PURGA DE BRONCE D=1 1/2" EN T und 1.00 237.73 237.73 1.00 237.73 100.00% 0.00 0.00% 1.00 237.73 100.00% 0.00 0.00 0.00%
01.11.05.04 SUMINISTRO E INSTALACION DE VALVULA DE PURGA DE BRONCE D=1" EN und 2.00 151.38 302.76 2.00 302.76 100.00% 0.00 0.00% 2.00 302.76 100.00% 0.00 0.00 0.00%
01.11.06 CAMARAS PARA VALVULAS Y SIMILARES
01.11.06.01 CAMARA DE CONCRETO ARMADO PARA VALVULA DE AGUA DE 0.60x0.60x0 und 10.00 333.68 3,336.80 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.00 3,336.80 100.00%
01.11.06.02 DADO DE CONCRETO PARA ANCLAJE DE ACCESORIOS F´c = 140 Kg/cm2 und 10.00 59.75 597.50 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.00 597.50 100.00%
01.12 CONEXIONES DOMICILIARIAS DE AGUA POTABLE (101 UND)
01.12.01 TRABAJOS PRELIMINARES
VALORIZACION DE OBRA N° 002 - OCTUBRE 2021
OBRA: "MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO EN EL CC.NN. NUEVA JERUSALEN, DISTRITO DE TROMPETEROS, PROVINCIA DE LORETO, REGION LORETO"
ENTIDAD: PROGRAMA NACIONAL DE SANEAMIENTO RURAL -PNSR
LOCALIDAD: LORETO - LORETO - TROMPETEROS
FECHA: SETIEMBRE - 2021
PLAZO DE EJEC.: 225 DIAS CALENDARIO (7 MESES Y MEDIO)
PRESUPUESTO AVANCES
SALDO DE OBRA
PART. DESCRIPCIÓN Und. Metrado Precio U. Parcial ACUMULADO ANTERIOR MES ACTUAL ACUMULADO ACTUAL
Base S/. S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
01.12.01.01 TRAZO, NIVELES Y REPLANTEO m 605.00 1.07 647.35 0.00 0.00% 305.00 326.35 50.41% 305.00 326.35 50.41% 300.00 321.00 49.59%
01.12.01.02 CINTA SEÑALIZADORA PARA LIMITE DE SEGURIDAD m 1,210.00 0.28 338.80 0.00 0.00% 605.00 169.40 50.00% 605.00 169.40 50.00% 605.00 169.40 50.00%
01.12.02 MOVIMIENTO DE TIERRAS
01.12.02.01 EXCAVACION DE ZANJA MANUAL P/AGUA TUB.CONEX. DOM. EN TERRENO m 605.00 15.35 9,286.75 0.00 0.00% 302.50 4,643.38 50.00% 302.50 4,643.38 50.00% 302.50 4,643.38 50.00%
01.12.02.02 REFINE Y NIVELACION DE ZANJAS P/TUB. DE FORRO D=2" A=0.50M CONEX m 605.00 0.87 526.35 0.00 0.00% 302.50 263.18 50.00% 302.50 263.18 50.00% 302.50 263.18 50.00%
01.12.02.03 RELLENO DE CAMA DE ARENA SOBRE LA CLAVE DEL TUBO Y LATERALES m 605.00 9.44 5,711.20 0.00 0.00% 302.50 2,855.60 50.00% 302.50 2,855.60 50.00% 302.50 2,855.60 50.00%
01.12.02.04 RELLENO DE ZANJA C/MAT. PROPIO SELEC. EN TUB. DE FORRO D=2" H=0 m 605.00 5.83 3,527.15 0.00 0.00% 302.50 1,763.58 50.00% 302.50 1,763.58 50.00% 302.50 1,763.58 50.00%
ELIMINACION DE MATERIAL EXCEDENTE MANUAL HASTA UNA DISTANCIA PROMEDIO 30 ml.
01.12.02.05 m3 78.65 25.60 2,013.44 0.00 0.00% 39.33 1,006.85 50.01% 39.33 1,006.85 50.01% 39.32 1,006.59 49.99%
01.12.03 CONEXIONES DOMICILIARIAS EN RED MATRIZ
01.12.03.01 CONEXIONES DOMICILIARIAS EN RED MATRIZ D= 2"
01.12.03.01.01 SUMINISTRO E INSTALACION DE CONEXIONES DOMICILIARIAS
01.12.03.01.01.01 SUMINISTRO E INSTALACION DE CONEXIONES DOMICILIARIAS LARGAS Dund 7.00 255.24 1,786.68 0.00 0.00% 7.00 1,786.68 100.00% 7.00 1,786.68 100.00% 0.00 0.00 0.00%
01.12.03.01.01.02 SUMINISTRO E INSTALACION DE CONEXIONES DOMICILIARIAS CORTAS Dund 22.00 217.88 4,793.36 0.00 0.00% 22.00 4,793.36 100.00% 22.00 4,793.36 100.00% 0.00 0.00 0.00%
01.12.03.02 CONEXIONES DOMICILIARIAS EN RED MATRIZ D= 1 1/2"
01.12.03.02.01 SUMINISTRO E INSTALACION DE CONEXIONES DOMICILIARIAS
01.12.03.02.01.01 SUMINISTRO E INSTALACION DE CONEXIONES DOMICILIARIAS LARGAS Dund 8.00 254.70 2,037.60 0.00 0.00% 8.00 2,037.60 100.00% 8.00 2,037.60 100.00% 0.00 0.00 0.00%
01.12.03.02.01.02 SUMINISTRO E INSTALACION DE CONEXIONES DOMICILIARIAS CORTAS Dund 28.00 217.60 6,092.80 0.00 0.00% 28.00 6,092.80 100.00% 28.00 6,092.80 100.00% 0.00 0.00 0.00%
01.12.03.03 CONEXIONES DOMICILIARIAS EN RED MATRIZ D= 1"
01.12.03.03.01 SUMINISTRO E INSTALACION DE CONEXIONES DOMICILIARIAS
01.12.03.03.01.01 SUMINISTRO E INSTALACION DE CONEXIONES DOMICILIARIAS LARGAS Dund 5.00 248.01 1,240.05 0.00 0.00% 5.00 1,240.05 100.00% 5.00 1,240.05 100.00% 0.00 0.00 0.00%
01.12.03.03.01.02 SUMINISTRO E INSTALACION DE CONEXIONES DOMICILIARIAS CORTAS Dund 31.00 210.91 6,538.21 0.00 0.00% 31.00 6,538.21 100.00% 31.00 6,538.21 100.00% 0.00 0.00 0.00%
01.12.03.04 PRUEBAS HIDRAULICA Y DESINFECCION EN CONEXIONES
01.12.03.04.01 DOBLE PRUEBA HIDRAULICA Y DESINFECCION m 605.00 1.77 1,070.85 0.00 0.00% 305.00 539.85 50.41% 305.00 539.85 50.41% 300.00 531.00 49.59%
01.13 MITIGACION AMBIENTAL
01.13.01 PLAN DE PATICIPACION CIUDADANA
01.13.01.01 CAPACITACION AMBIENTAL und 2.00 905.85 1,811.70 1.00 905.85 50.00% 0.00 0.00 0.00% 1.00 905.85 50.00% 1.00 905.85 50.00%
01.13.01.02 CAPACITACION EN PROTECCION A LA FUENTE und 2.00 905.85 1,811.70 1.00 905.85 50.00% 0.00 0.00 0.00% 1.00 905.85 50.00% 1.00 905.85 50.00%
01.13.02 MEDIDAS DE MITIGACION
01.13.02.01 ADQUISICIÓN DE CINTAS DE SEGURIDAD glb 2.00 91.42 182.84 1.00 91.42 50.00% 0.00 0.00 0.00% 1.00 91.42 50.00% 1.00 91.42 50.00%
01.13.02.02 IMPLEMENTACION DE KITS ANTIDERRAME und 2.00 275.19 550.38 1.00 275.19 50.00% 0.00 0.00 0.00% 1.00 275.19 50.00% 1.00 275.19 50.00%
01.13.02.03 RIEGO ANTIPOLVO und 30.00 20.87 626.10 2.00 41.74 6.67% 0.00 0.00 0.00% 2.00 41.74 6.67% 28.00 584.36 93.33%
01.13.02.04 PRESENTACION DE INFORMES AL MVCS und 2.00 550.37 1,100.74 0.00 0.00% 1.00 550.37 50.00% 1.00 550.37 50.00% 1.00 550.37 50.00%
01.13.03 PROGRAMA DE MANEJO DE RESIDUOS SÓLIDOS Y LÍQUIDOS
01.13.03.01 IMPLEMENTACION DE CILINDROS PROVISIONALES PARA ALMACENAR RESIDglb 1.00 274.44 274.44 0.50 137.22 50.00% 0.00 0.00 0.00% 0.50 137.22 50.00% 0.50 137.22 50.00%
01.13.03.02 IMPLEMENTACION DE CASETA DE HOYO SECO VENTILADO mes 2.00 1,366.27 2,732.54 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 2,732.54 100.00%
01.13.03.03 IMPLEMENTACION DE MICRORELLENO glb 1.00 2,910.85 2,910.85 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 2,910.85 100.00%
01.13.04 PROGRAMA DE SEGUIMIENTO Y CONTROL
01.13.04.01 MONITOREO DE CALIDAD DE AIRE und 1.00 1,208.10 1,208.10 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 1,208.10 100.00%
01.13.04.02 MONITOREO DE AGUA und 1.00 917.29 917.29 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 917.29 100.00%
01.13.04.03 MONITOREO DE RUIDO AMBIENTAL und 1.00 370.98 370.98 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 370.98 100.00%
01.13.04.04 LOGISTICA DE MONITOREO (Aire, Agua y Ruido) und 1.00 3,405.49 3,405.49 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 3,405.49 100.00%
01.13.05 PLAN DE CONTINGENCIAS
01.13.05.01 ADQUISICIÓN DE ESTACION DE EMERGENCIA und 2.00 339.39 678.78 1.00 339.39 50.00% 0.00 0.00 0.00% 1.00 339.39 50.00% 1.00 339.39 50.00%
01.13.05.02 SUMINISTRO DE BOTIQUINES und 2.00 32.10 64.20 1.00 32.10 50.00% 1.00 32.10 50.00% 2.00 64.20 100.00% 0.00 0.00 0.00%
01.13.05.03 REPOSICION DE MEDICAMENTOS mes 5.00 91.73 458.65 0.00 0.00% 3.00 275.19 60.00% 3.00 275.19 60.00% 2.00 183.46 40.00%
01.13.05.04 COLOCACION DE LETREROS DE SEGURIDAD und 10.00 56.65 566.50 2.00 113.30 20.00% 0.00 0.00 0.00% 2.00 113.30 20.00% 8.00 453.20 80.00%
01.13.05.05 COLOCACION DE TRANQUERAS und 2.00 82.98 165.96 1.00 82.98 50.00% 0.00 0.00 0.00% 1.00 82.98 50.00% 1.00 82.98 50.00%
01.13.05.06 CAPACITACION A TRABAJADORES EN TEMAS AMBIENTALES Y SEGURIDAD mes 5.00 882.90 4,414.50 1.00 882.90 20.00% 1.00 882.90 20.00% 2.00 1,765.80 40.00% 3.00 2,648.70 60.00%
01.13.06 PROGRAMA DE CIERRE
01.13.06.01 DESMONTAJE DE OBRAS PROVISIONALES glb 1.00 373.42 373.42 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 373.42 100.00%
01.13.06.02 MANEJO DE RESIDUOS DE OBRA m3 6.00 400.00 2,400.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 2,400.00 100.00%
01.14 INSTALACIONES ELECTRICAS Y ELECTROMECANICAS
01.14.01 ESTRUCTURA DE SOPORTE PARA PANELES
01.14.01.01 OBRAS PRELIMINARES
01.14.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 65.23 1.41 91.97 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 65.23 91.97 100.00%
01.14.01.01.02 TRAZO, NIVELES Y REPLANTEO m2 43.90 1.07 46.97 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 43.90 46.97 100.00%
01.14.01.02 ESTRUCTURA
01.14.01.02.01 MOVIMIENTO DE TIERRAS
01.14.01.02.01.01 EXCAVACION MANUAL EN TERRENO NORMAL m3 0.97 56.31 54.62 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.97 54.62 100.00%
VALORIZACION DE OBRA N° 002 - OCTUBRE 2021
OBRA: "MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO EN EL CC.NN. NUEVA JERUSALEN, DISTRITO DE TROMPETEROS, PROVINCIA DE LORETO, REGION LORETO"
ENTIDAD: PROGRAMA NACIONAL DE SANEAMIENTO RURAL -PNSR
LOCALIDAD: LORETO - LORETO - TROMPETEROS
FECHA: SETIEMBRE - 2021
PLAZO DE EJEC.: 225 DIAS CALENDARIO (7 MESES Y MEDIO)
PRESUPUESTO AVANCES
SALDO DE OBRA
PART. DESCRIPCIÓN Und.
Metrado Precio U. Parcial ACUMULADO ANTERIOR MES ACTUAL ACUMULADO ACTUAL
Base S/. S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
ELIMINACION DE MATERIAL EXCEDENTE MANUAL HASTA UNA DISTANCIA PROMEDIO 30 ml.
01.14.01.02.01.02 m3 1.26 25.60 32.26 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.26 32.26 100.00%
01.14.01.02.02 OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=140 KG/CM2 EN DADO DE CONCRETO (0.30x0.30x0.80m)
01.14.01.02.02.01 m3 1.24 295.30 366.17 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.24 366.17 100.00%
01.14.01.02.02.02 ENCOFRADO Y DESENCOFRADO EN DADO DE CONCRETO m2 4.32 27.84 120.27 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.32 120.27 100.00%
01.14.01.03 CARPINTERIA METALICA
01.14.01.03.01 SUMINISTRO E INSTALACION DE TUBERIA F°G° DE D=3" e= 3mm EN P m 71.76 63.22 4,536.67 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 71.76 4,536.67 100.00%
01.14.01.03.02 SUMINISTRO E INSTALACION DE TUBERIA F°G° DE D=3" e= 3mm EN VIGA m 24.00 80.87 1,940.88 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 24.00 1,940.88 100.00%
01.14.01.03.03 SUMINISTRO E INSTALACION DE TUBERIA F°G° DE D=1 1/2" e= 2.5mm m 89.13 58.63 5,225.69 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 89.13 5,225.69 100.00%
01.14.01.03.04 SUMINISTRO E INSTALACION DE COBERTURA DE CALAMINA LISA e= 6 m2 47.54 50.42 2,396.97 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 47.54 2,396.97 100.00%
01.14.01.03.05 SUMINISTRO E INSTALACION DE PUNTO DE FIJACION DE PANEL SOLAR und 224.00 88.88 19,909.12 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 224.00 19,909.12 100.00%
01.14.01.03.06 ANDAMIO METALICO PARA SOPORTE DE BATERIAS 1.85x2.25 M - EN und 2.00 887.67 1,775.34 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 1,775.34 100.00%
01.14.01.03.07 ANDAMIO METALICO PARA SOPORTE DE BATERIAS 1.85x1.60 M - EN CI und 1.00 724.13 724.13 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 724.13 100.00%
01.14.02 SISTEMA DE UTILIZACION EN BAJA TENSION - INSTALACIONES ELECTRICAS INTERIORES
01.14.02.01 OBRAS PRELIMINARES
01.14.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 567.12 1.41 799.64 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 567.12 799.64 100.00%
01.14.02.01.02 TRAZO, NIVELES Y REPLANTEO m2 374.39 1.07 400.60 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 374.39 400.60 100.00%
01.14.02.02 MOVIMIENTO DE TIERRAS
01.14.02.02.01 EXCAVACION DE POZO PARA PUESTA A TIERRA m3 16.39 56.31 922.92 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.39 922.92 100.00%
01.14.02.02.02 EXCAVACION DE ZANJA MANUAL P/TUB. EN TERRENO NORMAL A=0.40M m 885.95 13.41 11,880.59 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 885.95 11,880.59 100.00%
01.14.02.02.03 REFINE Y NIVELACION DE ZANJAS P/TUB. A=0.40M m 885.95 0.69 611.31 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 885.95 611.31 100.00%
01.14.02.02.04 RELLENO DE CAMA DE ARENA PARA TUBERIA A=0.40M E=0.20M m 885.95 5.18 4,589.22 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 885.95 4,589.22 100.00%
01.14.02.02.05 RELLENO DE ZANJA C/MAT. PROPIO SELEC. EN TUB. A=0.40M H=0.40M m 885.95 9.32 8,257.05 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 885.95 8,257.05 100.00%
ELIMINACION DE MATERIAL EXCEDENTE MANUAL HASTA UNA DISTANCIA PROMEDIO 30 ml.
01.14.02.02.06 m3 116.74 25.60 2,988.54 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 116.74 2,988.54 100.00%
01.14.02.03 TUBERIAS Y DUCTOS
01.14.02.03.01 CINTA SEÑALIZADORA PARA LIMITE DE SEGURIDAD m 1,771.90 0.28 496.13 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1,771.90 496.13 100.00%
01.14.02.03.02 TUBERIA PVC P/INST. ELECT. D=20mm m 895.87 10.32 9,245.38 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 895.87 9,245.38 100.00%
01.14.02.03.03 TUBERIA PVC P/INST. ELECT. D=25mm m 257.28 11.63 2,992.17 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 257.28 2,992.17 100.00%
01.14.02.03.04 SUMINISTRO E INSTALACION DE LADRILLO DE 6 HUECOS 10x15x25 AS m 886.00 30.15 26,712.90 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 886.00 26,712.90 100.00%
01.14.02.04 CABLES Y CONDUCTORES
01.14.02.04.01 CONDUCTOR DE Cu 2x16MM2 NYY - CONEXION DE PANELES SOLARES m 233.84 27.28 6,379.16 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 233.84 6,379.16 100.00%
01.14.02.04.02 CONDUCTOR DE Cu 2x16MM2 THW-90 - CONEXION CAJA DE CONEXIO m 2.00 27.28 54.56 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 54.56 100.00%
01.14.02.04.03 CONDUCTOR DE Cu 2x16MM2 THW-90 - PARA INVERSOR HIBRIDO A TTE m 2.00 27.28 54.56 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 54.56 100.00%
01.14.02.04.04 CONDUCTOR DE Cu 2x50MM2 THW-90 - PARA INVERSOR HIBRIDO A BAT m 20.18 52.89 1,067.32 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.18 1,067.32 100.00%
01.14.02.04.05 CONDUCTOR DE Cu 2x50MM2 THW-90 - PARA BATERIAS A INVERSOR HI m 20.30 52.89 1,073.67 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.30 1,073.67 100.00%
01.14.02.04.06 CONDUCTOR DE Cu 2x6MM2 THW-90 - PARA GENERADOR A TABLERO m 3.46 15.54 53.77 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.46 53.77 100.00%
01.14.02.04.07 CONDUCTOR DE Cu 2x6MM2 THW-90 - TABLERO DE TRANSFERENCA E m 12.24 15.54 190.21 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.24 190.21 100.00%
01.14.02.04.08 CONDUCTOR DE Cu 2x6MM2 THW-90 - TABLERO DE ELECTROBOMBAS TB m 3.20 24.08 77.06 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.20 77.06 100.00%
01.14.02.04.09 CONDUCTOR DE Cu 2x10MM2+1x10MM2 NMX - CABLE VULCANIZADO m 70.55 27.28 1,924.60 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 70.55 1,924.60 100.00%
01.14.02.04.10 CONDUCTOR DE Cu 2x2.5MM2 NYY - SENSOR PARA CISTERNA m 742.47 10.20 7,573.19 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 742.47 7,573.19 100.00%
01.14.02.04.11 CONDUCTOR DE Cu 2x2.5MM2 NYY - SENSOR PARA TANQUE ELEVADO m 177.33 10.20 1,808.77 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 177.33 1,808.77 100.00%
01.14.02.04.12 CONDUCTOR DE Cu 1x25MM2 - CABLE DESNUDO PARA PARARRAYO m 50.06 45.74 2,289.74 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 50.06 2,289.74 100.00%
01.14.02.04.13 CONDUCTOR DE Cu 2x4MM2 THW-90+1x2.5MM2 THW-90 - PARA ALUMB m 10.15 14.47 146.87 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.15 146.87 100.00%
01.14.02.04.14 CONDUCTOR DE Cu 2x4MM2 NYY+1x2.5MM2 NYY - PARA ALUMBRADO P m 40.56 14.47 586.90 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 40.56 586.90 100.00%
01.14.02.04.15 CONDUCTOR DE Cu 2x4MM2 THW-90+1x2.5MM2 THW-90 - PARA INTERR m 10.03 14.47 145.13 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.03 145.13 100.00%
01.14.02.04.16 CONDUCTOR DE Cu 2x4MM2 THW-90 - PARA TOMACORRIENTE m 9.37 10.20 95.57 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.37 95.57 100.00%
01.14.02.04.17 CONDUCTOR DE Cu 2x4MM2 THW-90+1x2.5MM2 THW-90 - PARA ELEC m 13.11 14.47 189.70 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.11 189.70 100.00%
01.14.02.05 CAJA DE BUZONES DE REGISTRO
01.14.02.05.01 CAJA CUADRADA DE BUZON DE CONCRETO DE 0.60x0.60M pto 31.00 248.71 7,710.01 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 31.00 7,710.01 100.00%
01.14.02.06 TABLEROS Y SUB TABLEROS
01.14.02.06.01 TABLERO GENERAL (TG) und 2.00 865.76 1,731.52 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 1,731.52 100.00%
01.14.02.06.02 TABLERO DE TRANSFERENCIA ELECTRICA MANUAL (TTE) und 2.00 505.02 1,010.04 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 1,010.04 100.00%
01.14.02.06.03 TABLERO DE CONTROL DE ELECTROBOMBA SUMERGIBLE (TB-1) und 1.00 1,718.49 1,718.49 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 1,718.49 100.00%
01.14.02.06.04 TABLERO DE CONTROL DE ELECTROBOMBA CENTRIFUGA (TB-2) und 1.00 1,822.56 1,822.56 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 1,822.56 100.00%
01.14.02.07 SISTEMA DE FOTOVOLTAICOS
01.14.02.07.01 SUMINISTRO E INSTALACION DE PANEL SOLARES DE (330Wpico) und 28.00 1,691.92 47,373.76 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 28.00 47,373.76 100.00%
01.14.02.07.02 SUMINISTRO E INSTALACION DE BATERIA TIPO GEL (12V DC/200Ah) und 36.00 1,873.50 67,446.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 36.00 67,446.00 100.00%
01.14.02.07.03 SUMINISTRO E INSTALACION DE INVERSOR HIBRIDO (40 AMP. 58VDC) Pot und 2.00 25,185.91 50,371.82 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 50,371.82 100.00%
01.14.02.07.04 SUMINISTRO E INSTALACION LUMINRIA PARA DOS LAMPARAS DE 70W und 2.00 1,756.95 3,513.90 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 3,513.90 100.00%
01.14.02.07.05 SUMINISTRO E INSTALACION LUMINRIA PARA UNA LAMPARA DE 70W I und 1.00 1,198.92 1,198.92 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 1,198.92 100.00%
VALORIZACION DE OBRA N° 002 - OCTUBRE 2021
OBRA: "MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO EN EL CC.NN. NUEVA JERUSALEN, DISTRITO DE TROMPETEROS, PROVINCIA DE LORETO, REGION LORETO"
ENTIDAD: PROGRAMA NACIONAL DE SANEAMIENTO RURAL -PNSR
LOCALIDAD: LORETO - LORETO - TROMPETEROS
FECHA: SETIEMBRE - 2021
PLAZO DE EJEC.: 225 DIAS CALENDARIO (7 MESES Y MEDIO)
PRESUPUESTO AVANCES
SALDO DE OBRA
PART. DESCRIPCIÓN Und. Metrado Precio U. Parcial ACUMULADO ANTERIOR MES ACTUAL ACUMULADO ACTUAL
Base S/. S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
01.14.02.08 SALIDA DE PARED - INTERRUPTORES
01.14.02.08.01 SALIDA DE PARED P/INTERRUPTOR SIMPLE, CAJA RECTANGULAR pto 6.00 57.98 347.88 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 347.88 100.00%
01.14.02.08.02 SUMINISTRO E INSTALACION DE INTERRUPTOR DIFERENCIAL DE 30A und 8.00 372.44 2,979.52 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 2,979.52 100.00%
01.14.02.09 SALIDA PARA CENTRO DE LUZ
01.14.02.09.01 SALIDA P/LAMPARA AHORRADORA, CAJA OCT. PARED pto 3.00 62.13 186.39 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 186.39 100.00%
01.14.02.10 SALIDA PARA TOMACORRIENTE
01.14.02.10.01 SALIDA P/TOMACORRIENTE, CAJA RECTANGULAR PARED pto 2.00 63.17 126.34 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 126.34 100.00%
01.14.02.11 PUESTA A TIERRA
01.14.02.11.01 SUMINISTRO E INSTALACION DE EQUIPO DE PUESTA A TIERRA (PAT - 1,2 pto 9.00 2,226.83 20,041.47 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.00 20,041.47 100.00%
01.14.02.12 EQUIPOS ELECTROMECANICOS Y DE NIVEL
01.14.02.12.01 SUMINISTRO E INSTALACION DE GENERADOR ELECTRICO PARA EL SIS und 1.00 4,193.36 4,193.36 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 4,193.36 100.00%
01.14.02.12.02 SUMINISTRO E INSTALACION DE GENERADOR ELECTRICO PARA EL SIST und 1.00 1,162.76 1,162.76 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 1,162.76 100.00%
01.14.02.12.03 SUMINISTRO E INSTALACION DE ELECTROBOMBA SUMERGIBLE MONOFA und 1.00 4,202.77 4,202.77 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 4,202.77 100.00%
01.14.02.12.04 SUMINISTRO E INSTALACION DE ELECTROBOMBA CENTRIFUGA MONOFA und 2.00 761.62 1,523.24 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 1,523.24 100.00%
01.14.02.12.05 SUMINISTRO E INSTALACION DE ELECTROBOMBA CENTRIFUGA MONOFASund 2.00 761.62 1,523.24 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 1,523.24 100.00%
01.14.02.12.06 SUMINISTRO E INSTALACION DE CAMISETA DE ENFRIAMIENTO PARA und 1.00 775.69 775.69 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 775.69 100.00%
01.14.02.12.07 SUMINISTRO E INSTALACION DE SENSOR DE NIVEL DE AGUA EN CISTE und 1.00 110.35 110.35 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 110.35 100.00%
01.14.02.12.08 SUMINISTRO E INSTALACION DE SENSOR DE NIVEL DE AGUA EN TANQ und 2.00 110.35 220.70 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 220.70 100.00%
01.14.02.13 PARARAYO
01.14.02.13.01 SUMINISTRO E INSTALACION DE EQUIPO DE PARARRAYO TIPO PENTA und 3.00 2,627.79 7,883.37 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 7,883.37 100.00%
01.14.02.13.02 SUMINISTRO E INSTALACION DE POSTE DE C.A.C 8/300 und 2.00 1,463.36 2,926.72 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 2,926.72 100.00%
01.14.02.14 PRUEBAS ELECTRICAS FINALES
01.14.02.14.01 PRUEBAS DE AISLAMIENTO und 1.00 410.16 410.16 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 410.16 100.00%
01.14.02.14.02 PRUEBAS DE RESISTIVIDAD DE PUESTA A TIERRA und 9.00 284.40 2,559.60 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.00 2,559.60 100.00%
01.14.02.14.03 PRUEBAS DE CONTINUIDAD DE INSTALACIONES INTERIORES und 1.00 252.06 252.06 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 252.06 100.00%
01.15 MONITOREO ARQUELOGICO
01.15.01 MONITOREO ARQUEOLOGICO glb 1.00 6,134.49 6,134.49 0.20 1,226.90 20.00% 0.20 1,226.90 20.00% 0.40 2,453.80 40.00% 0.60 3,680.69 60.00%
SISTEMAS DE DISPOSICION DE EXCRETAS (97 UND. DOMICILIARIAS, 01 UND.
01
PUESTO DE SALUD Y 03 UND. INST. EDUCATIVAS)
01.01 TRANSPORTE Y MOVILIZACIONES DE MATERIALES, EQUIPOS, MAQUINARIAS Y HERRAMIENTAS
01.01.01 TRANSPORTE DE MATERIALES
UBS ARRASTRE Y HERRAMIENTAS
HIDRÁULICO CON BIODIGESTOR-YUBS
POZO DE PERCOLACIÓN glb 1.00 491,083.10 491,083.10 0.12 58,929.97 12.00% 0.50 245,541.55 50.00% 0.62 304,471.52 62.00% 0.38 186,611.58 38.00%
01.02 (97 UND DOMICILIARAS Y 01 UND. PUESTO DE SALUD)
01.02.01 OBRAS PRELIMINARES
01.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 1,811.78 1.41 2,554.61 0.00 0.00% 905.90 1,277.32 50.00% 905.90 1,277.32 50.00% 905.88 1,277.29 50.00%
01.02.01.02 TRAZO, NIVELES Y REPLANTEO. m2 518.18 0.79 409.36 0.00 0.00% 259.09 204.68 50.00% 259.09 204.68 50.00% 259.09 204.68 50.00%
01.02.02 ESTRUCTURAS
01.02.02.01 MOVIMIENTO DE TIERRAS
01.02.02.01.01 EXCAVACION MANUAL EN TERRENO NORMAL. m3 155.23 55.24 8,574.91 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 155.23 8,574.91 100.00%
01.02.02.01.02 RELLENO COMPACTADO CON MATERIAL PROPIO SELECCIONADO m3 31.55 58.99 1,861.13 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 31.55 1,861.13 100.00%
01.02.02.01.03 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO MEJORADO m3 10.53 96.20 1,012.99 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.53 1,012.99 100.00%
ELIMINACION DE MATERIAL EXCEDENTE MANUAL A UNA DISTANCIA
01.02.02.01.04
PROMEDIO 30 ml.
m3 160.79 25.60 4,116.22 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 160.79 4,116.22 100.00%
01.02.02.02 OBRAS DE CONCRETO SIMPLE
01.02.02.02.01 CONCRETO EN CIMIENTOS CORRIDOS F´C = 140 KG/CM2 m3 103.49 350.59 36,282.56 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 103.49 36,282.56 100.00%
01.02.02.03 OBRAS DE CONCRETO ARMADO
01.02.02.03.01 SOBRECIMIENTO
01.02.02.03.01.01 CONCRETO F'c = 175 Kg/cm2 EN SOBRECIMIENTO m3 26.15 498.35 13,031.85 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 26.15 13,031.85 100.00%
01.02.02.03.01.02 ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTO m2 357.50 48.01 17,163.58 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 357.50 17,163.58 100.00%
01.02.02.03.01.03 ACERO DE REFUERZO fy=4,200 kg/cm2 EN SOBRECIMIENTO kg 1,848.91 4.66 8,615.92 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1,848.91 8,615.92 100.00%
01.02.02.04 ESTRUCTURA DE MADERA
01.02.02.04.01 SUMINISTRO E INST.DE PARANTE DE MADERA DE 3"x3" - QUINILLA O SIMILAR. p2 3,014.27 6.88 20,738.18 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3,014.27 20,738.18 100.00%
01.02.02.04.02 SUMINISTRO E INST. LISTONES DE MADERA P/SOPORTE DE PARED DE 3"x2"-QUI p2 2,390.52 6.88 16,446.78 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2,390.52 16,446.78 100.00%
01.02.02.04.03 SUMINISTRO E INSTALACION DE VIGA DE MADERA DE 3"x2" - QUINILLA O SIMILA p2 2,122.05 7.43 15,766.83 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2,122.05 15,766.83 100.00%
01.02.02.04.04 SUMINISTRO E INSTALACION DE CORREAJES DE MADERA 2"x2" - QUINILLA O SI und 1,527.23 6.88 10,507.34 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1,527.23 10,507.34 100.00%
01.02.02.04.05 SUMINISTRO E INSTALACION DE ARRIOSTRES DE MADERA 3"x2" - QUINILLA O S p2 762.01 6.88 5,242.63 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 762.01 5,242.63 100.00%
01.02.02.04.06 SUMINISTRO E INSTALACION DE CARTELAS INC/PERNOS und 784.00 8.32 6,522.88 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 784.00 6,522.88 100.00%
01.02.03 ARQUITECTURA
01.02.03.01 MUROS Y TABIQUES DE ALBAÑILERIA
01.02.03.01.01 MURO EXTERIOR E INTERIOR DE MADERA MACHIHEMBRADA QUINILLA O SIMILARm2 2,362.26 41.68 98,459.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2,362.26 98,459.00 100.00%
01.02.03.02 CARPINTERIA DE MADERA
VALORIZACION DE OBRA N° 002 - OCTUBRE 2021
OBRA: "MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO EN EL CC.NN. NUEVA JERUSALEN, DISTRITO DE TROMPETEROS, PROVINCIA DE LORETO, REGION LORETO"
ENTIDAD: PROGRAMA NACIONAL DE SANEAMIENTO RURAL -PNSR
LOCALIDAD: LORETO - LORETO - TROMPETEROS
FECHA: SETIEMBRE - 2021
PLAZO DE EJEC.: 225 DIAS CALENDARIO (7 MESES Y MEDIO)
PRESUPUESTO AVANCES
SALDO DE OBRA
PART. DESCRIPCIÓN Und. Metrado Precio U. Parcial ACUMULADO ANTERIOR MES ACTUAL ACUMULADO ACTUAL
Base S/. S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
01.02.03.02.01 SUMINSTRO E INST. PUERTA DE MADERA MACHIHEM. 0.75x1.80M -INC. MARCO und 98.00 251.74 24,670.52 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 98.00 24,670.52 100.00%
01.02.03.02.02 SUMINISTRO E INST. VENTANA DE MADERA QUIN. O SIMILAR CON MALLA MET. D und 98.00 72.22 7,077.56 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 98.00 7,077.56 100.00%
01.02.03.02.03 SUMINISTRO E INST.VENTANA DE MADERA QUIN. O SIMILAR CON MALLA MET. DE und 98.00 56.22 5,509.56 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 98.00 5,509.56 100.00%
01.02.03.03 COBERTURAS
01.02.03.03.01 COBERTURA OPACA ONDA 100 DE FIBRA VEGETAL DE 2.00x0.95 M E=3 MM m2 843.49 56.24 47,437.88 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 843.49 47,437.88 100.00%
01.02.03.04 CERRAJERIA
01.02.03.04.01 SUMINISTRO E INSTALACION DE CERRADURA TIPO PERILLA und 98.00 28.24 2,767.52 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 98.00 2,767.52 100.00%
01.02.03.04.02 SUMINISTRO E INSTALACION DE BISAGRA ALUMINIZADO DE 3"x2" und 294.00 19.08 5,609.52 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 294.00 5,609.52 100.00%
01.02.03.05 SARDINELES
01.02.03.05.01 SARDINEL DE DUCHA F'C=175 KG/CM2 H=0.10M m 117.60 37.57 4,418.23 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 117.60 4,418.23 100.00%
01.02.03.06 PISOS
01.02.03.06.01 FALSO PISO DE CEMENTO E=2" m2 210.70 17.30 3,645.11 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 210.70 3,645.11 100.00%
01.02.03.06.02 CONTRAPISO DE CEMENTO SEMIPULIDO E= 2" m2 252.84 28.86 7,296.96 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 252.84 7,296.96 100.00%
01.02.03.06.03 VEREDA DE CEMENTO FROTACHADO E=2" m2 164.64 40.83 6,722.25 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 164.64 6,722.25 100.00%
01.02.03.06.04 CERAMICO EN PARED COLOR GRIS 15x30 CM m2 502.74 81.70 41,073.86 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 502.74 41,073.86 100.00%
01.02.03.07 PINTURA
01.02.03.07.01 PINTURA BARNIZ EN MURO EXTERIOR - 02 manos m2 1,732.15 10.24 17,737.22 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1,732.15 17,737.22 100.00%
01.02.03.07.02 PINTURA BARNIZ EN PUERTA CONTRAPLACADA - 02 manos m2 132.30 13.30 1,759.59 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 132.30 1,759.59 100.00%
01.02.03.07.03 PINTURA BARNIZ EN VENTANAS - 02 manos m2 60.03 13.30 798.40 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 60.03 798.40 100.00%
01.02.04 INSTALACIONES SANITARIAS
01.02.04.01 APARATOS SANITARIOS Y ACCESORIOS
01.02.04.01.01 SUMINISTRO E INSTALACION DE INODORO CERAMICO CON TANQUE INC./ACC und 98.00 229.00 22,442.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 98.00 22,442.00 100.00%
01.02.04.01.02 SUMINISTRO E INSTALACION DE DUCHA CROMADA 1 LLAVE INC./ACCESORIOS und 98.00 100.82 9,880.36 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 98.00 9,880.36 100.00%
01.02.04.01.03 SUMINISTRO E INSTALACION DE GRIFO DE BRONCE STANDARD - LLAVE DE 1/2 und 98.00 28.45 2,788.10 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 98.00 2,788.10 100.00%
01.02.04.02 SISTEMA DE AGUA FRIA
01.02.04.02.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" C-10 pto 294.00 31.06 9,131.64 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 294.00 9,131.64 100.00%
01.02.04.02.02 SUMINISTRO E INSTALACION DE TUBERIA PVC-SAP DE 1/2" C-10 m 2,672.46 6.20 16,569.25 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2,672.46 16,569.25 100.00%
01.02.04.02.03 SUMINISTRO E INSTALACION DE CODO DE PVC D=1/2"x 90° C-10 und 196.00 7.66 1,501.36 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 196.00 1,501.36 100.00%
01.02.04.02.04 SUMINISTRO E INSTALACION DE TEE DE PVC D=1/2"x1/2" C-10 und 196.00 8.59 1,683.64 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 196.00 1,683.64 100.00%
01.02.04.02.05 SUMINISTRO E INSTALACION DE VALVULA COMPUERTA DE BRONCE DE 1/2" (IN und 98.00 69.41 6,802.18 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 98.00 6,802.18 100.00%
01.02.04.03 DESAGUE Y VENTILACION
01.02.04.03.01 SALIDAS DE DESAGUE EN INTERIOR
01.02.04.03.01.01 SALIDA DE DESAGUE DE 2" pto 392.00 63.91 25,052.72 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 392.00 25,052.72 100.00%
01.02.04.03.01.02 SALIDA DE DESAGUE DE 4" pto 98.00 90.48 8,867.04 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 98.00 8,867.04 100.00%
01.02.04.03.02 SUMINISTRO E INSTALACION DE ACCESORIOS EN REDES EN INTERIOR
01.02.04.03.02.01 SUMINISTRO E INSTALACION DE TUBERIA PVC SAL DE Ø 2" m 457.66 6.33 2,896.99 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 457.66 2,896.99 100.00%
01.02.04.03.02.02 SUMINISTRO E INSTALACION DE TUBERIA PVC SAL DE Ø 4" m 283.22 7.78 2,203.45 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 283.22 2,203.45 100.00%
01.02.04.03.02.03 SUMINISTRO E INSTALACION DE YEE PVC-SAL DE D=4" und 294.00 19.00 5,586.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 294.00 5,586.00 100.00%
01.02.04.03.02.04 SUMINISTRO E INSTALACION DE CODO D=4" DE 45° PVC-SAL und 98.00 12.15 1,190.70 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 98.00 1,190.70 100.00%
01.02.04.03.02.05 SUMINISTRO E INSTALACION DE REDUCCION DE PVC - SAL Ø 4" A Ø 2" und 294.00 9.49 2,790.06 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 294.00 2,790.06 100.00%
01.02.04.03.02.06 SUMINISTRO E INSTALACION DE SOMBRERO DE VENTILACION DE D=2" und 98.00 14.37 1,408.26 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 98.00 1,408.26 100.00%
01.02.04.03.02.07 SUMINISTRO E INSTALACION DE SUMIDERO CROMADO DE 2" und 196.00 24.04 4,711.84 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 196.00 4,711.84 100.00%
01.02.04.03.02.08 SUMINISTRO E INSTALACION DE ABRAZADERA METALICA D=2" und 294.00 24.92 7,326.48 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 294.00 7,326.48 100.00%
01.02.04.03.02.09 SUMINISTRO E INSTALACION DE CODO SANITARIO DE 4" A 2" und 98.00 10.48 1,027.04 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 98.00 1,027.04 100.00%
01.02.05 LAVADERO MULTIPLE DE CONCRETO ARMADO
01.02.05.01 OBRAS DE CONCRETO ARMADO
01.02.05.01.01 CONCRETO F'c = 175 Kg/cm2 - LAVADERO MULTIPLE m3 17.66 498.35 8,800.86 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 17.66 8,800.86 100.00%
01.02.05.01.02 ENCOFRADO Y DESENCOFRADO EN LAVADERO MULTIPLE m2 318.99 48.01 15,314.71 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 318.99 15,314.71 100.00%
01.02.05.01.03 ACERO DE REFUERZO fy=4,200 kg/cm2 - LAVADERO MULTIPLE kg 775.45 4.66 3,613.60 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 775.45 3,613.60 100.00%
01.02.05.02 REVOQUES, ENLUCIDOS Y MOLDURAS
01.02.05.02.01 TARRAJEO CON CEMENTO PULIDO EN LAVADERO MULTIPLE m2 284.49 29.61 8,423.75 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 284.49 8,423.75 100.00%
SISTEMA DE TRATAMIENTO PARA UBS ARRASTRE HIDRÁULICO (97 UND.
01.02.06
DOMICILIARAS Y 01 UND. PUESTO DE SALUD)
01.02.06.01 REDES COLECTORAS - EXTERIOR
01.02.06.01.01 OBRAS PRELIMINARES
01.02.06.01.02 TRAZO, NIVELES Y REPLANTEO m 240.10 1.07 256.91 0.00 0.00% 144.06 154.14 60.00% 144.06 154.14 60.00% 96.04 102.76 40.00%
01.02.06.01.03 MOVIMIENTO DE TIERRAS
01.02.06.01.03.01 EXCAVACION DE ZANJA MANUAL P/DESAGUE TUB. DE 4" EN TERRENO NORMAL m 240.10 19.31 4,636.33 0.00 0.00% 144.06 2,781.80 60.00% 144.06 2,781.80 60.00% 96.04 1,854.53 40.00%
01.02.06.01.03.02 REFINE Y NIVELACION DE ZANJAS P/TUB. D=4" A=0.50M m 240.10 0.87 208.89 0.00 0.00% 144.06 125.33 60.00% 144.06 125.33 60.00% 96.04 83.55 40.00%
01.02.06.01.03.03 RELLENO DE CAMA DE ARENA DEL TUBO Y LATERALES - TUBERIA 4" A=0.50M H m 240.10 3.25 780.33 0.00 0.00% 144.06 468.20 60.00% 144.06 468.20 60.00% 96.04 312.13 40.00%
VALORIZACION DE OBRA N° 002 - OCTUBRE 2021
OBRA: "MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO EN EL CC.NN. NUEVA JERUSALEN, DISTRITO DE TROMPETEROS, PROVINCIA DE LORETO, REGION LORETO"
ENTIDAD: PROGRAMA NACIONAL DE SANEAMIENTO RURAL -PNSR
LOCALIDAD: LORETO - LORETO - TROMPETEROS
FECHA: SETIEMBRE - 2021
PLAZO DE EJEC.: 225 DIAS CALENDARIO (7 MESES Y MEDIO)
PRESUPUESTO AVANCES
SALDO DE OBRA
PART. DESCRIPCIÓN Und. Metrado Precio U. Parcial ACUMULADO ANTERIOR MES ACTUAL ACUMULADO ACTUAL
Base S/. S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
01.02.06.01.03.04 RELLENO DE ZANJA C/MAT. PROPIO SELEC. EN TUB. DE 4" A=0.50M H=0.60M m 240.10 17.47 4,194.55 0.00 0.00% 144.06 2,516.73 60.00% 144.06 2,516.73 60.00% 96.04 1,677.82 40.00%
01.02.06.01.03.05 ELIMINACION DE MATERIAL EXCEDENTE MANUAL A UNA DISTANCIA PROMEDIO m3 15.61 25.60 399.62 0.00 0.00% 9.38 240.13 60.09% 9.38 240.13 60.09% 6.23 159.49 39.91%
01.02.06.01.04 TUBERIA DE REDES DE DESAGUE
01.02.06.01.04.01 SUMINISTRO E INSTALACION DE TUBERIA DE PVC-SAL Ø 4" m 367.50 7.78 2,859.15 0.00 0.00% 36.75 285.92 10.00% 36.75 285.92 10.00% 330.75 2,573.24 90.00%
01.02.06.01.05 CAMARA DE INSPECCION
01.02.06.01.05.01 CAJA DE REGISTRO DE12" x 24" - INC. PANTALLA INTERMEDIA Y TAPA DE INSP und 196.00 121.18 23,751.28 0.00 0.00% 20.00 2,423.60 10.20% 20.00 2,423.60 10.20% 176.00 21,327.68 89.80%
01.02.06.01.05.02 SUMINISTRO E INSTALACION DE CAJA DE EVACUACION DE LODOS DE 80x80 C und 98.00 203.64 19,956.72 0.00 0.00% 10.00 2,036.40 10.20% 10.00 2,036.40 10.20% 88.00 17,920.32 89.80%
01.02.06.02 TANQUE SEPTICO BIODIGESTOR DE PVC
01.02.06.02.01 OBRAS PRELIMINARES
01.02.06.02.01.01 LIMPIEZA DEL TERRENO MANUAL. m2 238.42 1.38 329.02 0.00 0.00% 238.42 329.02 100.00% 238.42 329.02 100.00% 0.00 0.00 0.00%
01.02.06.02.01.02 TRAZO, NIVELES Y REPLANTEO. m2 103.57 0.79 81.82 0.00 0.00% 103.57 81.82 100.00% 103.57 81.82 100.00% 0.00 0.00 0.00%
01.02.06.02.02 MOVIMIENTO DE TIERRAS
01.02.06.02.02.01 EXCAVACION MANUAL PARA BIODIGESTOR DE PVC m3 136.95 55.24 7,565.12 0.00 0.00% 13.69 756.24 10.00% 13.69 756.24 10.00% 123.26 6,808.88 90.00%
01.02.06.02.02.02 NIVELACION Y APISONADO MANUAL m2 103.57 1.76 182.28 0.00 0.00% 10.36 18.23 10.00% 10.36 18.23 10.00% 93.21 164.05 90.00%
01.02.06.02.02.03 RELLENO CON MATERIAL PROPIO ZARANDEADO PARA BIODIGESTORES DE PV m3 47.69 58.99 2,813.23 0.00 0.00% 4.77 281.38 10.00% 4.77 281.38 10.00% 42.92 2,531.85 90.00%
01.02.06.02.02.04 ELIMINACION DE MATERIAL EXCEDENTE MANUAL A UNA DISTANCIA PROMEDIO 3 m3 178.04 25.60 4,557.82 0.00 0.00% 17.80 455.68 10.00% 17.80 455.68 10.00% 160.24 4,102.14 90.00%
01.02.06.02.03 OBRAS DE CONCRETO SIMPLE
01.02.06.02.03.01 DADO DE CONCRETO F´c = 140 Kg/cm2 m3 0.78 404.41 315.44 0.00 0.00% 0.08 32.35 10.26% 0.08 32.35 10.26% 0.70 283.09 89.74%
01.02.06.02.04 VARIOS
01.02.06.02.04.01 SUMINISTRO Y COLOC. DE BIODIGESTOR AUTOLIMPIANTE INC./ACCESORIOS -6 und 98.00 1,292.78 126,692.44 0.00 0.00% 10.00 12,927.80 10.20% 10.00 12,927.80 10.20% 88.00 113,764.64 89.80%
01.02.06.02.04.02 SUMINISTRO Y COLOCACION DE FILTRO DE GRAVA DE Ø 1/2" m3 0.25 165.73 41.43 0.00 0.00% 0.03 4.97 12.00% 0.03 4.97 12.00% 0.22 36.46 88.00%
01.02.06.03 POZO DE PERCOLACION
01.02.06.03.01 OBRAS PRELIMINARES
01.02.06.03.01.01 LIMPIEZA DEL TERRENO MANUAL. m2 372.53 1.38 514.09 0.00 0.00% 372.53 514.09 100.00% 372.53 514.09 100.00% 0.00 0.00 0.00%
01.02.06.03.01.02 TRAZO, NIVELES Y REPLANTEO. m2 173.18 0.79 136.81 0.00 0.00% 173.18 136.81 100.00% 173.18 136.81 100.00% 0.00 0.00 0.00%
01.02.06.03.02 MOVIMIENTO DE TIERRAS
01.02.06.03.02.01 EXCAVACION MANUAL DE POZO DE PERCOLACION H=<2.44M m3 405.24 55.24 22,385.46 0.00 0.00% 243.14 13,431.05 60.00% 243.14 13,431.05 60.00% 162.10 8,954.40 40.00%
01.02.06.03.02.02 ELIMINACION DE MATERIAL EXCEDENTE MANUAL A UNA DISTANCIA PROMEDIO 3 m3 526.81 25.60 13,486.34 0.00 0.00% 316.09 8,091.90 60.00% 316.09 8,091.90 60.00% 210.72 5,394.43 40.00%
01.02.06.03.03 OBRAS DE CONCRETO ARMADO
01.02.06.03.03.01 LOSA SUPERIOR DE POZO
01.02.06.03.03.01.01CONCRETO F'c = 175 Kg/cm2 EN LOSA SUPERIOR m3 15.06 538.95 8,116.59 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 15.06 8,116.59 100.00%
01.02.06.03.03.01.02ENCOFRADO Y DESENCOFRADO EN LOSA SUPERIOR. m2 150.15 53.77 8,073.57 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 150.15 8,073.57 100.00%
01.02.06.03.03.01.03ACERO DE REFUERZO fy=4,200 kg/cm2 EN LOSA SUPERIOR kg 998.82 4.66 4,654.50 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 998.82 4,654.50 100.00%
01.02.06.03.04 MATERIAL FILTRANTE
01.02.06.03.04.01 SUMINISTRO Y COLOCACION DE FILTRO DE GRAVA DE Ø 1/2" - FONDO DE POZ m3 7.70 165.73 1,276.12 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.70 1,276.12 100.00%
01.02.06.03.04.02 SUMINISTRO Y COLOCACION DE FILTRO DE GRAVA DE Ø 2" A 3" m3 133.97 132.68 17,775.14 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 133.97 17,775.14 100.00%
01.02.06.03.05 VARIOS
01.02.06.03.05.01 CONCRETO F'c=100 kg/cm2 - ANILLO DE LOSA INFERIOR m3 9.62 377.81 3,634.53 0.00 0.00% 0.96 362.70 9.98% 0.96 362.70 9.98% 8.66 3,271.83 90.02%
01.02.06.03.05.02 MURO DE CABEZA LADRILLO TUBULAR 12 x15 x 24 m2 593.09 73.89 43,823.42 0.00 0.00% 59.31 4,382.42 10.00% 59.31 4,382.42 10.00% 533.78 39,441.00 90.00%
01.02.06.03.05.03 TAPA DE CONCRETO ARMADO DE 0.60 x 0.60 M und 98.00 132.50 12,985.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 98.00 12,985.00 100.00%
01.02.06.03.05.04 SUMINISTRO Y COLOCACIÓN DE VENTILACION DE 4" EN POZO DE PERCOLACI und 98.00 23.43 2,296.14 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 98.00 2,296.14 100.00%
01.02.06.03.05.05 SUMINISTRO E INSTALACION DE CODO 90° DE D=4", PVC -SAL und 98.00 12.15 1,190.70 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 98.00 1,190.70 100.00%
UBS ARRASTRE HIDRÁULICO CON BIODIGESTOR Y POZO DE PERCOLACIÓN
01.03
(03 UND. INSTITUCIONES EDUCATIVAS)
01.03.01 OBRAS PRELIMINARES
01.03.01.01 LIMPIEZA DE TERRENO MANUAL m2 103.90 1.41 146.50 0.00 0.00% 103.90 146.50 100.00% 103.90 146.50 100.00% 0.00 0.00 0.00%
01.03.01.02 TRAZO, NIVELES Y REPLANTEO. m2 28.00 0.79 22.12 0.00 0.00% 28.00 22.12 100.00% 28.00 22.12 100.00% 0.00 0.00 0.00%
01.03.02 ESTRUCTURAS
01.03.02.01 MOVIMIENTO DE TIERRAS
01.03.02.01.01 EXCAVACION MANUAL EN TERRENO NORMAL. m3 7.27 55.24 401.59 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.27 401.59 100.00%
01.03.02.01.02 RELLENO COMPACTADO CON MATERIAL PROPIO SELECCIONADO m3 1.61 58.99 94.97 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.61 94.97 100.00%
01.03.02.01.03 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO MEJORADO m3 0.43 96.20 41.37 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.43 41.37 100.00%
ELIMINACION DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO 30
01.03.02.01.04
ml.
m3 7.36 25.60 188.42 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.36 188.42 100.00%
01.03.02.02 OBRAS DE CONCRETO SIMPLE
01.03.02.02.01 CONCRETO EN CIM IENTOS CORRIDOS F´C = 140 KG/CM2 m3 5.04 350.59 1,766.97 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.04 1,766.97 100.00%
01.03.02.03 OBRAS DE CONCRETO ARMADO
01.03.02.03.01 SOBRECIMIENTO
01.03.02.03.01.01 CONCRETO F'c = 175 Kg/cm2 EN SOBRECIMIENTO m3 1.24 498.35 617.95 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.24 617.95 100.00%
01.03.02.03.01.02 ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTO m2 17.03 48.01 817.61 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 17.03 817.61 100.00%
VALORIZACION DE OBRA N° 002 - OCTUBRE 2021
OBRA: "MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO EN EL CC.NN. NUEVA JERUSALEN, DISTRITO DE TROMPETEROS, PROVINCIA DE LORETO, REGION LORETO"
ENTIDAD: PROGRAMA NACIONAL DE SANEAMIENTO RURAL -PNSR
LOCALIDAD: LORETO - LORETO - TROMPETEROS
FECHA: SETIEMBRE - 2021
PLAZO DE EJEC.: 225 DIAS CALENDARIO (7 MESES Y MEDIO)
PRESUPUESTO AVANCES
SALDO DE OBRA
PART. DESCRIPCIÓN Und. Metrado Precio U. Parcial ACUMULADO ANTERIOR MES ACTUAL ACUMULADO ACTUAL
Base S/. S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
01.03.02.03.01.03 ACERO DE REFUERZO fy=4,200 kg/cm2 EN SOBRECIMIENTO kg 89.53 4.66 417.21 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 89.53 417.21 100.00%
01.03.02.04 ESTRUCTURA DE MADERA
01.03.02.04.01 SUMINISTRO E INSTALACION DE PARANTE DE MADERA DE 3"x3" - QUINILLA O SI p2 184.55 6.88 1,269.70 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 184.55 1,269.70 100.00%
01.03.02.04.02 SUMINISTRO E INSTALACION DE LISTONES DE MADERA PARA SOPORTE DE PARE p2 106.40 6.88 732.03 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 106.40 732.03 100.00%
01.03.02.04.03 SUMINISTRO E INSTALACION DE VIGA DE MADERA DE 3"x2" - QUINILLA O SIMILA p2 102.36 7.43 760.53 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 102.36 760.53 100.00%
01.03.02.04.04 SUMINISTRO E INSTALACION DE CORREAJES DE MADERA 2"x2" - QUINILLA O SI und 71.36 6.88 490.96 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 71.36 490.96 100.00%
01.03.02.04.05 SUMINISTRO E INSTALACION DE ARRIOSTRES DE MADERA 3"x2" - QUINILLA O S p2 38.85 6.88 267.29 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 38.85 267.29 100.00%
01.03.02.04.06 SUMINISTRO E INSTALACION DE CARTELAS INC/PERNOS und 48.00 8.32 399.36 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 48.00 399.36 100.00%
01.03.03 ARQUITECTURA
01.03.03.01 MUROS Y TABIQUES DE ALBAÑILERIA
01.03.03.01.01 MURO EXTERIOR E INTERIOR DE MADERA MACHIHEMBRADA QUINILLA O SIMILARm2 89.57 41.68 3,733.28 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 89.57 3,733.28 100.00%
01.03.03.02 CARPINTERIA DE MADERA
01.03.03.02.01 SUMINISTRO E INSTALACION DE PUERTA MACHIHEMBRADA 0.75x1.80 M - INC. und 6.00 251.74 1,510.44 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 1,510.44 100.00%
01.03.03.02.02 SUMINISTRO E INSTALACION DE VENTANA DE MADERA QUINILLA O SIMILAR CON und 3.00 57.73 173.19 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 173.19 100.00%
01.03.03.02.03 SUMINISTRO E INSTALACION DE VENTANA DE MADERA QUINILLA O SIMILAR CON und 6.00 56.22 337.32 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 337.32 100.00%
01.03.03.03 COBERTURAS
01.03.03.03.01 COBERTURA OPACA ONDA 100 DE FIBRA VEGETAL DE 2.00x0.95 M E=3 MM m2 39.41 56.24 2,216.42 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 39.41 2,216.42 100.00%
01.03.03.04 CERRAJERIA
01.03.03.04.01 SUMINISTRO E INSTALACION DE CERRADURA TIPO PERILLA und 6.00 28.24 169.44 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 169.44 100.00%
01.03.03.04.02 SUMINISTRO E INSTALACION DE BISAGRA ALUMINIZADO DE 3"x2" und 18.00 19.08 343.44 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.00 343.44 100.00%
01.03.03.05 SARDINELES
01.03.03.05.01 SARDINEL DE URINARIO F'C=175 KG/CM2 H=0.20M m 3.60 59.63 214.67 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.60 214.67 100.00%
01.03.03.06 PISOS
01.03.03.06.01 FALSO PISO DE CEMENTO E=2" m2 8.64 17.30 149.47 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.64 149.47 100.00%
01.03.03.06.02 CONTRAPISO DE CEMENTO SEMIPULIDO E= 2" m2 10.61 28.86 306.20 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.61 306.20 100.00%
01.03.03.06.03 VEREDA DE CEMENTO FROTACHADO E=2" m2 11.85 40.83 483.84 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.85 483.84 100.00%
01.03.03.06.04 CERAMICO EN PARED COLOR GRIS 15x30 CM m2 7.20 81.70 588.24 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.20 588.24 100.00%
01.03.03.07 PINTURA
01.03.03.07.01 PINTURA BARNIZ EN MURO EXTERIOR - 02 manos m2 75.53 10.24 773.43 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 75.53 773.43 100.00%
01.03.03.07.02 PINTURA BARNIZ EN PUERTA CONTRAPLACADA - 02 manos m2 8.10 13.30 107.73 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.10 107.73 100.00%
01.03.03.07.03 PINTURA BARNIZ EN VENTANAS - 02 manos m2 2.42 13.30 32.19 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.42 32.19 100.00%
01.03.04 INSTALACIONES SANITARIAS
01.03.04.01 APARATOS SANITARIOS Y ACCESORIOS
01.03.04.01.01 SUMINISTRO E INSTALACION DE INODORO CERAMICO CON TANQUE INC ACCE und 6.00 229.00 1,374.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 1,374.00 100.00%
01.03.04.01.02 SUMINISTRO E INSTALACION DE GRIFO DE BRONCE STANDARD - LLAVE DE 1/2" und 12.00 28.45 341.40 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.00 341.40 100.00%
01.03.04.02 SISTEMA DE AGUA FRIA
01.03.04.02.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" C-10 pto 21.00 31.06 652.26 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 21.00 652.26 100.00%
01.03.04.02.02 SUMINISTRO E INSTALACION DE TUBERIA PVC-SAP DE 1/2" C-10 m 115.68 6.20 717.22 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 115.68 717.22 100.00%
01.03.04.02.03 SUMINISTRO E INSTALACION DE CODO DE PVC D=1/2"x 90° C-10 und 30.00 7.66 229.80 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 30.00 229.80 100.00%
01.03.04.02.04 SUMINISTRO E INSTALACION DE TEE DE PVC D=1/2"x1/2" C-10 und 18.00 8.59 154.62 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.00 154.62 100.00%
01.03.04.02.05 SUMINISTRO E INSTALACION DE VALVULA COMPUERTA DE BRONCE DE 1/2" (IN und 6.00 69.41 416.46 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 416.46 100.00%
01.03.04.03 DESAGUE Y VENTILACION
01.03.04.03.01 SALIDAS DE DESAGUE EN INTERIOR
01.03.04.03.01.01 SALIDA DE DESAGUE DE 2" pto 21.00 63.91 1,342.11 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 21.00 1,342.11 100.00%
01.03.04.03.01.02 SALIDA DE DESAGUE DE 4" pto 6.00 90.48 542.88 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 542.88 100.00%
01.03.04.03.02 SUMINISTRO E INSTALACION DE ACCESORIOS EN REDES EN INTERIOR
01.03.04.03.02.01 SUMINISTRO E INSTALACION DE TUBERIA Ø 2" PVC-SAL m 25.41 6.33 160.85 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 25.41 160.85 100.00%
01.03.04.03.02.02 SUMINISTRO E INSTALACION DE TUBERIA Ø 4" PVC-SAL m 14.04 7.78 109.23 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.04 109.23 100.00%
01.03.04.03.02.03 SUMINISTRO E INSTALACION DE YEE PVC-SAL DE D=4" und 15.00 19.00 285.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 15.00 285.00 100.00%
01.03.04.03.02.04 SUMINISTRO E INSTALACION DE CODO D=4" DE 45° PVC-SAL und 12.00 12.15 145.80 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.00 145.80 100.00%
01.03.04.03.02.05 SUMINISTRO E INSTALACION DE REDUCCION DE PVC - SAL Ø 4" A Ø 2" und 15.00 9.49 142.35 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 15.00 142.35 100.00%
01.03.04.03.02.06 SUMINISTRO E INSTALACION DE SOMBRERO DE VENTILACION DE D=2" und 6.00 14.37 86.22 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 86.22 100.00%
01.03.04.03.02.07 SUMINISTRO E INSTALACION DE SUMIDERO CROMADO DE 2" und 12.00 24.04 288.48 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.00 288.48 100.00%
01.03.04.03.02.08 SUMINISTRO E INSTALACION DE ABRAZADERA METALICA D=2". und 18.00 24.92 448.56 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.00 448.56 100.00%
01.03.04.03.02.09 SUMINISTRO E INSTALACION DE CODO SANITARIO DE 4" A 2" und 6.00 10.48 62.88 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 62.88 100.00%
01.03.05 LAVADERO MULTIPLE DE CONCRETO ARMADO
01.03.05.01 OBRAS DE CONCRETO ARMADO
01.03.05.01.01 CONCRETO F'c = 175 Kg/cm2 - LAVADERO MULTIPLE m3 1.34 498.35 667.79 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.34 667.79 100.00%
01.03.05.01.02 ENCOFRADO Y DESENCOFRADO EN LAVADERO MULTIPLE m2 18.45 48.01 885.78 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.45 885.78 100.00%
VALORIZACION DE OBRA N° 002 - OCTUBRE 2021
OBRA: "MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO EN EL CC.NN. NUEVA JERUSALEN, DISTRITO DE TROMPETEROS, PROVINCIA DE LORETO, REGION LORETO"
ENTIDAD: PROGRAMA NACIONAL DE SANEAMIENTO RURAL -PNSR
LOCALIDAD: LORETO - LORETO - TROMPETEROS
FECHA: SETIEMBRE - 2021
PLAZO DE EJEC.: 225 DIAS CALENDARIO (7 MESES Y MEDIO)
PRESUPUESTO AVANCES
SALDO DE OBRA
PART. DESCRIPCIÓN Und. Metrado Precio U. Parcial ACUMULADO ANTERIOR MES ACTUAL ACUMULADO ACTUAL
Base S/. S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
01.03.05.01.03 ACERO DE REFUERZO fy=4,200 kg/cm2 - LAVADERO MULTIPLE kg 42.19 4.66 196.61 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 42.19 196.61 100.00%
01.03.05.02 REVOQUES, ENLUCIDOS Y MOLDURAS
01.03.05.02.01 TARRAJEO CON CEMENTO PULIDO EN LAVADERO MULTIPLE m2 24.39 29.61 722.19 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 24.39 722.19 100.00%
01.03.06 SISTEMA DE TRATAMIENTO PARA UBS ARRASTRE HIDRÁULICO (03 UND. INSTITUCIONES EDUCATIVAS)
01.03.06.01 REDES COLECTORAS - EXTERIOR
01.03.06.01.01 OBRAS PRELIMINARES
01.03.06.01.01.01 TRAZO, NIVELES Y REPLANTEO m2 14.70 1.07 15.73 0.00 0.00% 14.70 15.73 100.00% 14.70 15.73 100.00% 0.00 0.00 0.00%
01.03.06.01.02 MOVIMIENTO DE TIERRAS
01.03.06.01.02.01 EXCAVACION DE ZANJA MANUAL P/DESAGUE TUB. DE 4" EN TERRENO NORMAL m 14.70 19.31 283.86 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.70 283.86 100.00%
01.03.06.01.02.02 REFINE Y NIVELACION DE ZANJAS P/TUB. D=4" A=0.50M m 14.70 0.87 12.79 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.70 12.79 100.00%
01.03.06.01.02.03 RELLENO DE CAMA DE ARENA DEL TUBO Y LATERALES - TUBERIA 4" A=0.50M H m 14.70 3.25 47.78 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.70 47.78 100.00%
01.03.06.01.02.04 RELLENO DE ZANJA C/MAT. PROPIO SELEC. EN TUB. DE 4" A=0.50M H=0.60M m 14.70 17.47 256.81 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.70 256.81 100.00%
ELIMINACION DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO 30
01.03.06.01.02.05
ml.
m3 0.96 25.60 24.58 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.96 24.58 100.00%
01.03.06.01.03 TUBERIA DE REDES DE DESAGUE
01.03.06.01.03.01 SUMINISTRO E INSTALACION DE TUBERIA Ø 4" PVC-SAL m 22.50 7.78 175.05 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 22.50 175.05 100.00%
01.03.06.01.04 CAMARA DE INSPECCION
01.03.06.01.04.01 CAJA DE REGISTRO DE12" x 24" - INC. PANTALLA INTERMEDIA Y TAPA DE INSP und 12.00 121.18 1,454.16 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.00 1,454.16 100.00%
SUMINISTRO E INSTALACION DE CAJA DE EVACUACION DE LODOS DE 80x60
01.03.06.01.04.02
CM
und 6.00 203.64 1,221.84 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 1,221.84 100.00%
01.03.06.02 TANQUE SEPTICO BIODIGESTOR DE PVC
01.03.06.02.01 OBRAS PRELIMINARES
01.03.06.02.02 LIMPIEZA DEL TERRENO MANUAL. m2 19.80 1.38 27.32 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 19.80 27.32 100.00%
01.03.06.02.01.02 TRAZO, NIVELES Y REPLANTEO. m2 9.91 0.79 7.83 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.91 7.83 100.00%
01.03.06.02.02 MOVIMIENTO DE TIERRAS
01.03.06.02.02.01 EXCAVACION MANUAL PARA BIODIGESTOR DE PVC m3 15.33 55.24 846.83 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 15.33 846.83 100.00%
01.03.06.02.02.02 NIVELACION Y APISONADO MANUAL m2 9.91 1.76 17.44 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.91 17.44 100.00%
01.03.06.02.02.03 RELLENO CON MATERIAL PROPIO ZARANDEADO PARA BIODIGESTORES DE PV m3 6.36 58.99 375.18 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.36 375.18 100.00%
ELIMINACION DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO 30
01.03.06.02.02.04
ml.
m3 19.93 25.60 510.21 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 19.93 510.21 100.00%
01.03.06.02.03 OBRAS DE CONCRETO SIMPLE
01.03.06.02.03.01 DADO DE CONCRETO F´c = 140 Kg/cm2 m3 0.05 404.41 20.22 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.05 20.22 100.00%
01.03.06.02.04 VARIOS
SUMINISTRO Y COLOCACIÓN DE BIODIGESTOR AUTOLIMPIANTE INC./ACCES-
01.03.06.02.04.01
300Lts
und 6.00 1,527.60 9,165.60 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 9,165.60 100.00%
01.03.06.02.04.02 SUMINISTRO Y COLOCACION DE FILTRO DE GRAVA DE Ø 1/2" m3 0.02 165.73 3.31 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.02 3.31 100.00%
01.03.06.03 POZO DE PERCOLACION
01.03.06.03.01 OBRAS PRELIMINARES
01.03.06.03.02 LIMPIEZA DEL TERRENO MANUAL. m2 22.81 1.38 31.48 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 22.81 31.48 100.00%
01.03.06.03.01.02 TRAZO, NIVELES Y REPLANTEO. m2 10.60 0.79 8.37 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.60 8.37 100.00%
01.03.06.03.02 MOVIMIENTO DE TIERRAS
01.03.06.03.02.01 EXCAVACION MANUAL DE POZO DE PERCOLACION H=<2.44M m3 24.81 55.24 1,370.50 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 24.81 1,370.50 100.00%
ELIMINACION DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO 30
01.03.06.03.02.02
ml.
m3 32.25 25.60 825.60 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 32.25 825.60 100.00%
01.03.06.03.03 OBRAS DE CONCRETO ARMADO
01.03.06.03.03.01 LOSA SUPERIOR DE POZO
01.03.06.03.03.01.01CONCRETO F'c = 175 Kg/cm2 EN LOSA SUPERIOR m3 0.92 538.95 495.83 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.92 495.83 100.00%
01.03.06.03.03.01.02ENCOFRADO Y DESENCOFRADO EN LOSA SUPERIOR. m2 9.19 53.77 494.15 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.19 494.15 100.00%
01.03.06.03.03.01.03ACERO DE REFUERZO fy=4,200 kg/cm2 EN LOSA SUPERIOR kg 61.15 4.66 284.96 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 61.15 284.96 100.00%
01.03.06.03.04 MATERIAL FILTRANTE
SUMINISTRO Y COLOCACION DE FILTRO DE GRAVA DE Ø 1/2" - FONDO DE
01.03.06.03.04.01
POZO
m3 0.47 165.73 77.89 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.47 77.89 100.00%
01.03.06.03.04.02 SUMINISTRO Y COLOCACION DE FILTRO DE GRAVA DE Ø 2" A 3" m3 8.20 132.68 1,087.98 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.20 1,087.98 100.00%
01.03.06.03.05 VARIOS
01.03.06.03.05.01 CONCRETO F'c=100 kg/cm2 - ANILLO DE LOSA INFERIOR m3 0.59 377.81 222.91 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.59 222.91 100.00%
01.03.06.03.05.02 MURO DE CABEZA LADRILLO TUBULAR 12 x15 x 24 m2 36.31 73.89 2,682.95 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 36.31 2,682.95 100.00%
01.03.06.03.05.03 TAPA DE CONCRETO ARMADO DE 0.60 x 0.60 M und 6.00 132.50 795.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 795.00 100.00%
01.03.06.03.05.04 SUMINISTRO Y COLOCACIÓN DE VENTILACION DE 4" EN POZO DE PERCOLADO und 6.00 23.43 140.58 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 140.58 100.00%
01.03.06.03.05.05 SUMINISTRO E INSTALACION DE CODO D=4" DE 90° PVC-SAL und 6.00 12.15 72.90 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 72.90 100.00%
01 MEDIDAS PREVENTIVAS Y ADECUACIONES, DURANTE LA EJECUCIÓN DE OBRAS
ELABORACIÓN DE PLANES (CONCORDANTE A PROTOCOLOS SANITARIOS: R.M.
01.01
N° 448-2020-MINSA / R.M. N° 087-2020-VIVIENDA)
VALORIZACION DE OBRA N° 002 - OCTUBRE 2021
OBRA: "MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO EN EL CC.NN. NUEVA JERUSALEN, DISTRITO DE TROMPETEROS, PROVINCIA DE LORETO, REGION LORETO"
ENTIDAD: PROGRAMA NACIONAL DE SANEAMIENTO RURAL -PNSR
LOCALIDAD: LORETO - LORETO - TROMPETEROS
FECHA: SETIEMBRE - 2021
PLAZO DE EJEC.: 225 DIAS CALENDARIO (7 MESES Y MEDIO)
PRESUPUESTO AVANCES
SALDO DE OBRA
PART. DESCRIPCIÓN Und. Metrado Precio U. Parcial ACUMULADO ANTERIOR MES ACTUAL ACUMULADO ACTUAL
Base S/. S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
01.01.01 PLAN PARA LA VIGILANCIA, PREVENCION Y CONTROL DE COVID-19 EN EL TRA glb 1.00 4,000.00 4,000.00 0.25 1,000.00 25.00% 0.25 1,000.00 25.00% 0.50 2,000.00 50.00% 0.50 2,000.00 50.00%
EVALUACIÓN DE LA CONDICIÓN DE SALUD DEL TRABAJADOR, PREVIO A LA
01.02
REINCORPORACIÓN DE LA OBRA
01.02.01 EVALUACION DE SALUD DEL TRABAJADOR PREVIO A LA INCORPORACION A LA glb 1.00 10,800.00 10,800.00 0.25 2,700.00 25.00% 0.25 2,700.00 25.00% 0.50 5,400.00 50.00% 0.50 5,400.00 50.00%
01.03 IMPLEMENTACIÓN Y/O EQUIPAMIENTO DEL TÓPICO DE SALUD
01.03.01 IMPLEMENTACION DE TOPICO PARA LA VIGILANCIA DE SALUD DEL TRABAJADO glb 1.00 11,030.00 11,030.00 0.25 2,757.50 25.00% 0.25 2,757.50 25.00% 0.50 5,515.00 50.00% 0.50 5,515.00 50.00%
01.04 SUMINISTRO E INSTALACION DE LAVADEROS PREFABRICADOS
01.04.01 SUMINSTRO E INSTALACION DE LAVADEROS METALICOS CON PEDAL PREFAB und 8.00 1,539.81 12,318.48 4.00 6,159.24 50.00% 2.00 3,079.62 25.00% 6.00 9,238.86 75.00% 2.00 3,079.62 25.00%
01.05 ADECUACIONES DE AMBIENTE DE TRABAJO
01.05.01 ADECUACION DE AMBIENTES DE TRABAJO (COMEDOR, AMBIENTE DE SALUD Y glb 1.00 5,720.00 5,720.00 1.00 5,720.00 100.00% 0.00 0.00% 1.00 5,720.00 100.00% 0.00 0.00 0.00%
01.05.02 ADECUACION DE SS.HH. glb 1.00 515.00 515.00 1.00 515.00 100.00% 0.00 0.00% 1.00 515.00 100.00% 0.00 0.00 0.00%
01.06 SEÑALETICA Y DEMARCACION DE OBRA
01.06.01 SEÑALIZACION IMFORMATIVA REFERIDA AL COVID-19 und 6.00 1,646.03 9,876.18 3.00 4,938.09 50.00% 2.00 3,292.06 33.33% 5.00 8,230.15 83.33% 1.00 1,646.03 16.67%
01.06.02 DEMARCACION Y SEÑALIZACION DURANTE LA EJECUCION DE LA OBRA glb 1.00 1,270.00 1,270.00 1.00 1,270.00 100.00% 0.00 0.00% 1.00 1,270.00 100.00% 0.00 0.00 0.00%
02 MEDIDAS DE MITIGACION
02.01 ACCIONES DE CONTROL PREVIO
02.01.01 SALUD OCUPACIONAL DE OBRA mes 6.70 4,900.00 32,830.00 1.00 4,900.00 14.93% 1.00 4,900.00 14.93% 2.00 9,800.00 29.85% 4.70 23,030.00 70.15%
02.02 ACCIONES DE IMPLEMENTACION DE VESTUARIOS DE BIOSEGURIDAD
02.02.01 EQUIPOS E IMPLEMENTOS DE SEGURIDAD mes 6.70 6,860.00 45,962.00 1.00 6,860.00 14.93% 1.00 6,860.00 14.93% 2.00 13,720.00 29.85% 4.70 32,242.00 70.15%
02.03 ACCIONES DE DESINFECCION EN AMBIENTES DE TRABAJO
02.03.01 DESINFECCION PERIODICA DE AMBIENTES mes 6.70 4,616.36 30,929.61 1.00 4,616.36 14.93% 1.00 4,616.36 14.93% 2.00 9,232.72 29.85% 4.70 21,696.89 70.15%
02.04 FLETE
02.04.01 FLETE TERRESTRE glb 1.00 800.00 800.00 0.25 200.00 25.00% 0.30 240.00 30.00% 0.55 440.00 55.00% 0.45 360.00 45.00%
02.04.02 FLETE FLUVIAL glb 1.00 4,500.00 4,500.00 0.25 1,125.00 25.00% 0.30 1,350.00 30.00% 0.55 2,475.00 55.00% 0.45 2,025.00 45.00%
CURVA S
PROGRAMADO ACUMULADO - EJECUTADO ACUMULADO
PROYECTO :
“MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO EN LA CCNN DE NUEVA JERUSALEN,
DISTRITO DE TROMPETEROS - LORETO – LORETO”
VALORIZACIÓN
VALORIZACION VALORIZACION VALORIZACION FISICO
DIAS PROGRAMADA VALORIZACION
MES PERIODO (*) PROGRAMADA PROGRAMADA EJECUTADA PROGRAMADO
EJECUTADOS SEGÚN DIAS EJECUTADA
(*) ACUMULADA ACUMULADA AL 80%
EJECUTADOS
Chart Title
90.00%
80.00%
70.00%
60.00%
50.00%
Axis Title 40.00%
30.00%
20.00%
10.00%
0.00%
inicio 43161 43191 43221 43252 43282 43313
Axis Title
PROGRAMA NACIONAL DE SANEAMIENTO RURAL
0
ACUMUL. VALORIZAC. VALORIZAC. VALORIZAC. VALORIZAC. VALORIZAC. VALORIZAC. ACUMULADO SALDO POR
Item Descripción SUB-TOTAL
ANTERIOR Nº 01 Nº 02 Nº 03 Nº 04 Nº 05 Nº 06 ACTUAL VALORIZAR
01 AGUA 4,157,925.44 351,096.68 328,869.61 131,252.07 810,385.46 0.00 0.00 1,621,603.82 2,536,321.62
02 UBS #REF! 672,716.25 1,088,241.34 0.00 #REF! #REF! #REF!
03 INSTALACIONES ELECTRICAS #REF! 0.00 0.00 0.00 #REF! #REF! #REF!
04 CAPACITACION SOCIAL #REF! 0.00 51,641.51 4,545.32 #REF! #REF! #REF!
RESUMEN OBRA
#REF! 0.00 1,023,812.93 1,468,752.46 135,797.39 #REF! 0.00 0.00 #REF! #REF!
SUB-TOTAL S/. #REF! 0.00 1,023,812.93 1,468,752.46 135,797.39 #REF! 0.00 0.00 #REF! #REF!
IGV 18/ 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL #REF! 0.00 1,023,812.93 1,468,752.46 135,797.39 #REF! 0.00 0.00 #REF! #REF!
FECHA Oct-22
V
AMORTIZACI ON A
C
Zapatas BLOQUE F
Z-01 5 1.80 1.80 1.65 26.73 m3
Z-02 3 2.00 2.20 1.65 21.78 m3
Z-03 5 1.80 2.20 1.65 32.67 m3
Z-04 4 1.40 2.20 1.65 20.33 m3
Z-05 2 1.40 1.80 1.65 8.32 109.83 m3
04.03.00 Sobrecimientos
04.03.01 Sobrecimientos Concreto 1:8 + 25% PM.
Descripcion Cant largo ancho altura Volumen Sub total TOTAL Und.
BLOQUE C
Sobre vigas de conexión
Eje 5 1 24.05 0.15 1.05 3.79 m3
Eje 7 1 18.03 0.15 1.05 2.84 m3
eje A, 1 1.15 0.20 0.95 0.22 m3
1 2.55 0.20 1.05 0.54 m3
Eje B 1 4.50 0.15 1.05 0.71 m3
Eje D 1 5.20 0.20 1.05 1.09 m3
Eje F 1 3.27 0.20 1.05 0.69 m3
eje G 1 4.22 0.20 1.05 0.89 m3
Eje I 1 4.90 0.20 1.05 1.03 11.78 m3
BLOQUE D
Sobre vigas de conexión m3
Eje 8 1 4.40 0.20 1.05 0.92 m3
Eje 9 1 5.20 0.20 1.05 1.09 m3
Eje 13 2 2.95 0.20 1.05 1.24 m3
Eje A 1 13.18 0.15 1.05 2.08 m3
Eje C 1 11.75 0.15 1.05 1.85 7.18 m3
BLOQUE E
Sobre vigas de conexión
Eje 14 2 2.95 0.20 1.05 1.24 m3
Eje 16 1 4.05 0.15 1.05 0.64 m3
Eje 19 2 3.10 0.20 1.05 1.30 m3
Eje 21 1 6.05 0.20 1.05 1.27 m3
Ejes G, I entre los ejes 14-15 2 2.53 0.15 1.05 0.80 m3
Ejes G, I entre los ejes 15-16 1 4.38 0.15 1.05 0.69 m3
Ejes G, I entre los ejes 16-17 2 2.70 0.15 1.05 0.85 m3
Ejes G, I entre los ejes 17-18 2 4.38 0.15 1.05 1.38 m3
Ejes G, I entre los ejes 18-19 2 2.70 0.15 1.05 0.85 m3
Ejes G, I entre los ejes 19-20 2 4.38 0.15 1.05 1.38 m3
Ejes G, I entre los ejes 20-21 2 2.58 0.15 1.05 0.81 11.20 m3
TOTAL 30.16 M3
05.01.00 Zapatas
05.01.01 Zapatas - Concreto f'c=210 Kg/cm2
BLOQUE E
Ubicación Cant largo ancho altura Volumen Sub total TOTAL Und.
Z-01 4 1.80 1.80 0.50 6.48 m3
Z-02 8 2.00 2.20 0.50 17.60 m3
Z-03 5 1.80 2.20 0.50 9.90 m3
Z-04 2 1.40 2.20 0.50 3.08 m3
Z-05 1 1.40 1.80 0.50 1.26 m3
38.32 38.32 m3
BLOQUE F
Ubicación Cant largo ancho altura Volumen Sub total TOTAL Und.
Z-01 5 1.80 1.80 0.50 8.10 m3
Z-02 3 2.00 2.20 0.50 6.60 m3
Z-03 5 1.80 2.20 0.50 9.90 m3
Z-04 4 1.40 2.20 0.50 6.16 m3
Z-05 2 1.40 1.80 0.50 2.52 33.28 m3
33.28 m3
TOTAL 71.60 M2
ZAPATAS
5/8" 1.70 10.00 4.00 105.40
Z01
5/8" 1.70 10.00 4.00 105.40
5/8" 1.90 12.00 8.00 282.72
Z02
5/8" 2.10 11.00 8.00 286.44
5/8" 1.70 12.00 5.00 158.10
Z03
5/8" 2.10 10.00 5.00 162.75
5/8" 1.30 12.00 2.00 48.36
Z04
5/8" 2.10 8.00 2.00 52.08
5/8" 1.30 10.00 1.00 20.15
Z05
5/8" 1.70 8.00 1.00 21.08
SUB TOTAL 0.00 0.00 0.00 1242.48 0.00 0.00
METRADO TOTAL 1242.48 Kg
BLOQUE F
N° PIEZAS N° ELEM.
ELEMENTO DESCRICION f LONG 1/4" 3/8" 1/2" 5/8" 3/4" 1"
IGUALES IGUALES
ZAPATAS
5/8" 1.70 10.00 5.00 131.75
Z01
5/8" 1.70 10.00 5.00 131.75
5/8" 1.90 12.00 3.00 106.02
Z02
5/8" 2.10 11.00 3.00 107.42
5/8" 1.70 12.00 5.00 158.10
Z03
5/8" 2.10 10.00 5.00 162.75
5/8" 1.30 12.00 4.00 96.72
Z04
5/8" 2.10 8.00 4.00 104.16
5/8" 1.30 10.00 2.00 40.30
Z05
5/8" 1.70 8.00 2.00 42.16
SUB TOTAL 0.00 0.00 0.00 1081.13 0.00 0.00
METRADO TOTAL 1081.13 Kg
TOTAL 2323.61 KG
BLOQUE D
Ubicación Cant. largo ancho altura Volumen Sub total TOTAL Und.
Eje 8 2 2.95 0.25 0.40 0.59 m3
Eje 9 2 3.10 0.25 0.40 0.62 m3
Eje 11 1 6.50 0.25 0.50 0.81 m3
Eje 13 2 2.95 0.25 0.40 0.59 m3
Eje A (8-9) 1 3.18 0.25 0.40 0.32 m3
Eje C (8-9) 1 3.18 0.25 0.40 0.32 m3
Eje A 1 10.43 0.25 0.50 1.30 m3
Eje C 1 10.43 0.25 0.50 1.30 5.85 m3
BLOQUE E
Eje 14 2 2.95 0.25 0.40 0.59 m3
Eje 16 2 3.10 0.25 0.40 0.62 m3
Eje 19 2 3.10 0.25 0.40 0.62 m3
Eje 21 2 2.95 0.25 0.40 0.59 m3
Ejes G, I entre los ejes 14-15 2 2.88 0.25 0.40 0.58 m3
Ejes G, I entre los ejes 15-16 2 3.05 0.25 0.40 0.61 m3
Ejes G, I entre los ejes 16-17 2 3.05 0.25 0.40 0.61 m3
Ejes G, I entre los ejes 17-18 2 3.05 0.25 0.40 0.61 m3
Ejes G, I entre los ejes 18-19 2 3.05 0.25 0.40 0.61 m3
Ejes G, I entre los ejes 19-20 2 3.05 0.25 0.40 0.61 m3
Ejes G, I entre los ejes 20-21 2 2.93 0.25 0.50 0.73 m3
Ejes H 1 6.78 0.25 0.50 0.85 7.62 m3
TOTAL 13.47 m3
bloque D
Ubicación Cant. largo ancho altura Área Sub total TOTAL Und.
TOTAL 1975.90 KG
05.03.00 Columnas
05.03.01 Columnas - concreto f'c=210 Kg/cm2
BLOQUE A
Ubicación Cant Area en cad altura Volumen Sub total TOTAL Und.
Primer Nivel
C-01 4 0.16 3.95 2.53 m3
C-02 4 0.13 3.95 2.01 m3
C-04 2 0.06 3.95 0.47 5.01 m3
Segundo Nivel m3
C-01 4 0.16 2.70 1.73 m3
C-02 4 0.13 2.70 1.38 m3
C-04 2 0.06 2.70 0.32 3.43 m3
BLOQUE B
Primer Nivel
C-01 4 0.16 3.95 2.53 m3
C-02 8 0.13 3.95 4.11 m3
C-03 4 0.06 3.95 0.95 m3
C-04 2 0.06 3.95 0.47 m3
C-05 3 0.09 3.95 1.07 m3
C-06 1 0.10 3.95 0.40 9.42 m3
Segundo Nivel
C-01 4 0.16 2.70 1.73 m3
C-02 8 0.13 2.70 2.81 m3
C-03 4 0.06 2.70 0.65 m3
C-04 2 0.06 2.70 0.32 m3
C-05 3 0.09 2.70 0.73 m3
C-06 1 0.10 2.70 0.27 6.43 m3
BLOQUE C
Primer Nivel
C-01 4 0.16 3.95 2.53 m3
C-02 14 0.13 3.95 7.05 m3
C-03 3 0.06 3.95 0.71 m3
C-04 2 0.06 3.95 0.47 10.76 m3
BLOQUE D
Primer Nivel
C-01 4 0.16 3.95 2.53 m3
C-02 8 0.13 3.95 4.03 m3
C-03 1 0.06 3.95 0.24 m3
C-04 2 0.06 3.95 0.47 7.27 m3
BLOQUE E
Primer Nivel
C-01 4 0.16 3.95 2.53 m3
C-02 12 0.13 3.95 6.04 m3
C-03 2 0.06 3.95 0.47 m3
C-04 2 0.06 5.95 0.71 9.75 m3
TOTAL 52.07 m3
total 679.62 m2
05.03.03 Columnas - acero f'y=4200 Kg/cm2
BLOQUE E
N° PIEZAS N° ELEM.
ELEMENTO DESCRICION f LONG 1/4" 3/8" 1/2" 5/8" 3/4" 1"
IGUALES IGUALES
5/8" 8.85 7.00 4.00 384.09
1/2" 8.65 4.00 4.00 141.17
C-01
3/8" 1.28 75.00 4.00 222.72
3/8" 1.28 75.00 4.00 222.72
C-3
C-4
C-3
C-4
TOTAL 7185.88 KG
05.04.00 Placas
05.04.01 Placas - concreto f'c=210 Kg/cm2
BLOQUE A
Ubicación Cant Area en cad altura Volumen Sub total TOTAL Und.
P-1 2 0.10 3.95 0.79 m3
0.79 0.79 m3
BLOQUE B
P-1 8 0.10 3.95 3.16 m3
3.16 3.16 m3
BLOQUE C
P-1 8 0.10 3.95 3.16 m3
3.16 3.16 m3
BLOQUE D
P-1 5 0.10 3.95 1.98 m3
1.98 1.98 m3
BLOQUE E
P-1 6 0.10 3.95 2.37 m3
2.37 2.37 m3
TOTAL 11.46 M3
05.05.00 Vigas
05.05.01 Vigas -Concreto f'c=210 Kg/cm2
BLOQUE A
Ubicación Cant largo ancho altura Volumen Sub total TOTAL Und.
Primer Nivel
Ejes 1,4 4 2.95 0.20 0.50 1.18 m3
Ejes 2,3 2 6.50 0.25 0.60 1.95 m3
Ejes I,K (1-2, 3-4) 4 2.88 0.20 0.50 1.15 m3
Ejes I,K (2-3) 2 3.05 0.20 0.50 0.61 m3
Ejes I,K (voladizo) 2 1.80 0.20 0.35 0.25 m3
Ejes J' (1-2, 3-4) 2 3.28 0.30 0.20 0.39 m3
Ejes J' (2-3) 1 3.25 0.30 0.20 0.20 m3
Ejes J' (voladizo) 1 1.80 0.25 0.35 0.16 5.89 m3
BLOQUE B
Primer Nivel
Eje 5,7 2 21.23 0.20 0.50 4.25 m3
Eje 6 1 18.77 0.30 0.20 1.13 m3
1 3.78 0.20 0.17 0.13 m3
Eje 7 (volado) 1 22.95 0.20 0.20 0.92 m3
eje I',P 4 2.95 0.20 0.50 1.18 m3
2 1.90 0.20 0.35 0.27 m3
Ejes J,K, M, N 8 3.10 0.25 0.50 3.10 m3
8 1.90 0.25 0.35 1.33 m3
Ejes L;O 2 6.50 0.25 0.60 1.95 m3
2 1.90 0.25 0.35 0.33 14.59 m3
BLOQUE C
Primer Nivel
Eje 5,7 16 3.05 0.20 0.50 4.88 m3
Eje 6 1 24.65 0.30 0.20 1.48 m3
Eje 7 (volado) 1 17.80 0.20 0.20 0.71 m3
Eje A,H' 4 2.95 0.20 0.50 1.18 m3
Ejes B,C,E,H 4 6.50 0.25 0.60 3.90 m3
2 1.90 0.25 0.35 0.33 m3
Ejes D, F, G 6 3.10 0.25 0.50 2.33 m3
1 1.90 0.25 0.35 0.17 14.98 m3
BLOQUE D
Primer Nivel
Ejes 8,9,13 4 6.80 0.20 0.50 2.72 m3
Ejes 10,11,12 3 3.50 0.25 0.50 1.31 m3
3 3.00 0.25 0.60 1.35 m3
3 1.90 0.25 0.35 0.50 m3
Ejes A, C 2 14.60 0.20 0.50 2.92 m3
Eje B 1 16.15 0.30 0.20 0.97 m3
Eje D 1 16.80 0.20 0.20 0.67 10.44 m3
TOTAL 45.90 M3
TOTAL 519.03 m2
BLOQUE B
PRIMER NIVEL
5/8" 26.15 4.00 1.00 162.13
1/2" 26.15 2.00 1.00 53.35
V-1, EJE 5 1/2" 1.85 2.00 1.00 3.77
3/8" 0.00 0.00 0.00 0.00
3/8" 1.28 175.00 1.00 129.92
V-1, EJE 16 Y
19 en escala-cartelier
V-1, EJE 16 Y
19 en escala-cartelier
V-1, EJE 16 Y
19 en escala-cartelier
5/8" 0.00
1/2" 0.00
1/2" 0.00
V-1, EJE 7
3/8" 0.00
5/8" 0.00
3/8" 0.00
V-1, EJE 16 Y
19 en escala-cartelier
TOTAL 7665.86 KG
05.06.00 Losa Aligerada
05.06.01 Losa Aligerada - Concreto f'c=210 Kg/cm2
BLOQUE A
Ubicación Cantid. largo ancho altura Volumen Sub total TOTAL Und.
Losa 4 3.25 3.27 0.05 2.13 m3
2 3.25 3.25 0.05 1.06 m3
2 3.25 1.60 0.05 0.52 3.71 m3
Viguetas 32 3.27 0.10 0.15 1.57 m3
16 3.25 0.10 0.15 0.78 m3
16 1.60 0.10 0.15 0.38 2.73 m3
6.44 m3
BLOQUE B
Ubicación Cantid. largo ancho altura Volumen Sub total TOTAL Und.
Losa 2 2.53 3.10 0.05 0.78 m3
10 3.28 3.10 0.05 5.08 m3
1 3.78 1.70 0.05 0.32 m3
1 2.53 1.70 0.05 0.21 m3
5 3.28 1.70 0.05 1.39 7.78 m3
Viguetas 16 2.53 0.10 0.15 0.61 m3
80 3.28 0.10 0.15 3.94 m3
4 3.78 0.10 0.15 0.23 m3
4 2.53 0.10 0.15 0.15 m3
20 3.28 0.10 0.15 0.98 5.90 m3
13.68 m3
BLOQUE C
Ubicación Cantid. largo ancho altura Volumen Sub total TOTAL Und.
Losa 16 3.25 3.28 0.05 8.53 m3
5 3.25 1.70 0.05 1.38 m3
1 1.70 1.13 0.05 0.10 10.00 m3
Viguetas 128 3.28 0.10 0.15 6.30 m3
5 1.13 0.10 0.15 0.08 m3
25 3.28 0.10 0.15 1.23 7.60 m3
17.60 m3
BLOQUE D
Ubicación Cantid. largo ancho altura Volumen Sub total TOTAL Und.
Losa 2 3.58 3.25 0.05 1.16 m3
8 2.95 3.25 0.05 3.84 m3
1 3.58 1.70 0.05 0.30 m3
4 3.25 1.70 0.05 1.11 6.41 m3
Viguetas 20 3.58 0.10 0.15 1.07 m3
80 3.25 0.10 0.15 3.90 4.97 m3
11.38 m3
TOTAL 49.10 M3
TOTAL 557.78 M3
05.06.03 Losa aligerada - acero f'y=4200 Kg/cm2
BLOQUE A
1/2" 13.40 16.00 1.00 218.69
1/2" 1.50 16.00 1.00 24.48
1/2" 2.45 32.00 1.00 79.97
Primer nivel
1/2" 3.30 16.00 1.00 53.86
temperatura 1/4" 7.20 51.00 1.00 91.80
temperatura 1/4" 12.50 30.00 1.00 93.75
SUB TOTAL 185.55 0.00 376.99 0.00 0.00 0.00
METRADO TOTAL 562.54 Kg
BLOQUE B
1/2" 21.80 16.00 1.00 355.78
1/2" 1.55 16.00 1.00 25.30
1/2" 2.45 64.00 1.00 159.94
1/2" 1.30 16.00 1.00 21.22
1/2" 2.15 16.00 1.00 35.09
temperatura 1/4" 9.10 82.00 1.00 186.55
temperatura 1/4" 20.30 37.00 1.00 187.78
temperatura 1/4" 3.98 9.00 1.00 8.96
temperatura 1/4" 1.90 17.00 1.00 8.08
Primer nivel
Primer nivel
Primer nivel
TOTAL 4,190.21 KG
Ubicación Cantid. Area ancho u/m2 Total Sub total TOTAL UND
1 128.12 8.33 1,067.20 1,067.20 UND
1,067.20 UND
02.01.02 EXCAVACIONES
02.01.02.01 EXCAVACION MANUAL PARA CIMIENTOS Y ZAPATAS 332.96
02.01.03 CORTES
02.01.03.01 CORTE DE MATERIAL CON MAQUINARIA 291.54
02.01.03.02 RELLENO Y APISONADO CON MATERIAL PROPIO 193.14
02.01.04 RELLENOS
02.01.04.01 RELLENO CON MATERIAL DE PRESTAMO 89.00
02.01.05 ELIMINACION DE MATERIAL EXCEDENTE
02.01.05.01 ACARREO MANUAL DE MATERIAL EXCEDENTE C/N CARRETILLA D=30m 174.77
02.01.05.02 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO HASTA 05 km 365.62
02.02 CONCRETO SIMPLE
02.02.01 CIMIENTOS CORRIDOS
0.00
TOTAL 32.62
PLANTA DE CIMENTACIÓN
TIPO 1-1
Eje C - D/ 7 -8 1 3.75 0.30 0.60 0.68
Eje 1 / B - C 1 2.87 0.30 0.60 0.52
Eje 1 / C - D 1 2.87 0.30 0.60 0.52
Eje 6 / B - C 1 2.87 0.30 0.60 0.52
Eje 6 / C - D 1 2.87 0.30 0.60 0.52
Eje 9 / B - C 1 2.87 0.30 0.60 0.52
Eje 9 / C - D 1 2.87 0.30 0.60 0.52
TIPO 2-2
Eje 4 / B - C 1 2.87 0.30 0.60 0.52
Eje 4 / C - D 1 3.27 0.30 0.60 0.59
Eje 13 / B - C 1 2.87 0.30 0.60 0.52
Eje 13 / C - D 1 3.27 0.30 0.60 0.59
TIPO 3-3
Eje D / 1 - 2 1 3.17 0.30 0.60 0.57
Eje D / 2 - 3 1 3.30 0.30 0.60 0.59
Eje D / 3 - 4 1 3.30 0.30 0.60 0.59
Eje D / 4 - 5 1 3.30 0.30 0.60 0.59
Eje D / 5 - 6 1 3.47 0.30 0.60 0.62
Eje D / 9 - 10 1 3.47 0.30 0.60 0.62
Eje D / 10 - 11 1 3.30 0.30 0.60 0.59
Eje D / 11 - 12 1 3.30 0.30 0.60 0.59
Eje D / 12 - 13 1 3.30 0.30 0.60 0.59
Eje D / 13 - 14 1 3.30 0.30 0.60 0.59
Eje D / 14 - 15 1 3.47 0.30 0.60 0.62
Eje B / 1 - 2 1 3.37 0.30 0.60 0.61
Eje B / 2 - 3 1 3.70 0.30 0.60 0.67
Eje B / 3 - 4 1 3.70 0.30 0.60 0.67
Eje B / 4 - 5 1 3.70 0.30 0.60 0.67
Eje B / 5 - 6 1 3.70 0.30 0.60 0.67
Eje B / 9 - 10 1 3.70 0.30 0.60 0.67
Eje B / 10 - 11 1 3.70 0.30 0.60 0.67
Eje B / 11 - 12 1 3.70 0.30 0.60 0.67
Eje B / 12 - 13 1 3.70 0.30 0.60 0.67
Eje B / 13 - 14 1 3.70 0.30 0.60 0.67
Eje B / 14 - 15 1 3.70 0.30 0.60 0.67
Eje 15 / B - C 1 2.87 0.30 0.60 0.52
Eje 15 / C - D 1 3.37 0.30 0.60 0.61
TIPO 4-4 0.00
Eje 14 - 16 / B -D 1 2.32 0.40 0.60 0.56
1 2.00 0.40 0.60 0.48
1 1.51 0.40 0.60 0.36
1 7.78 0.40 0.60 1.87
1 1.40 0.40 0.60 0.34
1 2.13 0.40 0.60 0.51
1 2.89 0.40 0.60 0.69
1 0.42 0.40 0.60 0.10
TIPO 5-5
Eje 7 - 8 / B -D 1 2.08 0.40 0.60 0.50
1 2.84 0.40 0.60 0.68
1 1.00 0.40 0.60 0.24
CASETA CONTROL
TIPO 7 - 7
Eje 3 / A - B 1 3.61 0.45 0.60 0.97
Eje A / 2 - 3 1 3.77 0.45 0.60 1.02
Eje B / 2 - 3 1 3.77 0.45 0.60 1.02
TIPO 8 - 8 0.00
Eje 2 - 3 / A - B 1 3.56 0.40 0.60 0.85
1 1.67 0.40 0.60 0.40
1 1.65 0.40 0.60 0.40
0.00
0.00
0.00
TOTAL 32.01
02.02.02 SOBRECIMIENTO
02.02.02.01 CONCRETO 1:8+25% PM PARA SOBRECIMIENTOS
02.02.02.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO
FORMULA : 01 ESTRUCTURAS
PARTIDAS : 01.05.01 (01.05.01.03 / 01.05.01.04) SOBRECIMIENTOS METRADO : Wilmer Becerra
FECHA: AGO. 2013
DENOMINACION CEMENTO HORMIGON 1:8+25% P.G T.MAX=3"(TIP.) ENCOF.Y DESENCOF. NORMAL - SOBRECIMIENTOS
Nº DE
CANT. LARGO ANCHO ALTO TOTAL (M3) ALTO LONG. TOTAL (M2)
VECES
TIPO 5-5
Eje 7 - 8 / B -D 1 2.08 0.15 0.30 0.09 2 0.35 2.08 1.46
1 2.84 0.15 0.30 0.13 2 0.35 2.84 1.99
1 1.00 0.15 0.30 0.05 2 0.35 1.00 0.70
TIPO 6-6
Eje 7 / B - C 1 2.55 0.25 0.80 0.51 2 0.35 2.55 1.79
Eje 7 / C - D 1 2.55 0.25 0.80 0.51 2 0.35 2.55 1.79
Eje 8 / B - C 1 2.55 0.25 0.80 0.51 2 0.35 2.55 1.79
Eje 8 / C - D 1 2.55 0.25 0.80 0.51 2 0.35 2.55 1.79
02.02.03 RAMPAS
02.02.03.01 EXCAVACION MANUAL PARA RAMPAS
02.02.03.02 CONCRETO EN RAMPAS 140 KG/CM2
02.02.03.03 ENCOFRADO Y DESENCOFRADO NORMAL
02.02.03.04 ACERO FY= 4200 KG/CM2
02.02.03.05 BRUÑAS
CONSORCIO NATIVIDAD
"COLEGIO
VIRGEN DE
NATIVIDAD
PROYECTO:
CCOYABAMB
A - CCAPI -
PARURO "
FORMULA : 01 ESTRUCTURAS
PARTIDAS : 01.05.02 ( 01.05.02.02 / 01.05.02.03/01.05.02.04 ) RAMPAS
EJE A (ZONA BAÑO) 1 1.70 1.00 0.10 0.17 2 0.10 1.70 0.34
DE LA CASETA A LOS MODULOS 1 49.59 1.80 0.10 8.93 2 0.10 49.59 9.92
AL LADO CONSTRUCCION EXISTENTE 1 2.00 1.68 0.15 0.50 2 0.15 2.00 0.60
1 4.20 1.56 0.15 0.98 2 0.15 4.20 1.26
MALLA DE TEMPERATURA 1
1
1
1
LADO VEREDA EJE 01 1 11.50 1.20 0.15 2.07 2 0.15 11.50 3.45
MALLA DE TEMPERATURA 1
1
CONSORCIO NATIVIDAD
PROYECTO : "COLEGIO VIRGEN DE NATIVIDAD CCOYABAMBA - CCAPI - PARURO "
FORMULA : 01 ESTRUCTURAS
PARTIDAS : 01.05.02 (01.05.02.01) EXCAVACION MANUAL DE TERRENO
DENOMINACION
CANT. LARGO ANCHO ALTO TOTAL (M3)
EJE A (ZONA BAÑO) 1 1.70 1.00 0.30 0.51
DE LA CASETA A LOS MODULOS 1 49.59 1.80 0.30 26.78
AL LADO CONSTRUCCION ANTIGUA 1 2.00 1.68 0.30 1.01
1 4.20 1.56 0.30 1.97
LADO VEREDA EJE 01 1 11.50 1.20 0.15 2.07
0.00
0.00
0.00
TOTAL 32.34
CONSORCIO NATIVIDAD
"COLEGIO VIRGEN
DE NATIVIDAD
CCOYABAMBA -
CCAPI - PARURO "
PROYECTO :
FORMULA : 01 ESTRUCTURAS
PARTIDA : 01.05.02 (01.05.02.05) BRUÑAS METRADO : Wilmer Becerra
FECHA : AGO. 2013
TOTAL
DESCRIPCION CANTIDAD DIMENSIONES
(M)
LONGITUD
EJE A (ZONA BAÑO) 17 1.00 17.00
DE LA CASETA A LOS MODULOS 375 1.60 600.00
AL LADO CONSTRUCCION ANTIGUA 20 1.68 33.60
42 1.56 65.52
LADO VEREDA EJE 01 115 1.20 138.00
0.00
0.00
0.00
0.00
TOTAL 854.12
02.02.04 ATRIUN
02.02.04.01 EXCAVACION MANUAL DEL TERRENO
02.02.04.02 COMPACTACION MANUAL DEL TERRENO
02.02.04.03 BASE GRANULAR PARA VEREDA DE 0.20 CM
02.02.04.04 MURO DE CONCRETO SIMPLE
02.02.04.04.01 CONCRETO FC = 175 kg/cm2
02.02.04.04.02 ENCOFRADO Y DESENCOFRADO PARA MUROS RECTOS
02.02.04.05 MUROS REFORZADOS
02.02.04.05.01 CONCRETO FC= 175 KG/CM2
02.02.04.05.02 ENCOFRADO Y DESENCOFRADO PARA MUROS RECTOS
02.02.04.05.03 ACERO FY= 4200 KG/CM2
02.02.04.06 JUNTAS PARA LOSAS RIGIDAS
CONSORCIO NATIVIDAD
PROYECTO : "COLEGIO VIRGEN DE NATIVIDAD CCOYABAMBA - CCAPI - PARURO "
FORMULA : 01 ESTRUCTURAS
PARTIDAS : 01.05.03 (01.05.03.01) EXCAVACION MANUAL DE TERRENO
DENOMINACION
CANT. LARGO ANCHO ALTO TOTAL (M3)
ATRIO 1 16.25 3.05 0.50 24.78
ZAPATA FRONTAL 1 16.25 1.00 0.25 4.06
ZAPATA LATERAL 2 2.66 0.50 0.25 0.67
ZAPATA FRONTAL EN VEREDA 1 5.16 1.00 0.25 1.29
MURO FRONTAL 1 16.25 1.40 0.20 4.55
MURO LATERAL 2 2.66 1.40 0.20 1.49
MURO FRONTAL EN VEREDA 1 5.16 1.40 0.20 1.44
TOTAL 38.28
FORMULA : 01 ESTRUCTURAS
PARTIDAS : 01.05.03 (01.05.03.02) COMPACTACION MANUAL DE TERRENO
DENOMINACION
CANT. LARGO ANCHO ALTO TOTAL (M2)
FORMULA : 01 ESTRUCTURAS
PARTIDAS : 01.05.03 (01.05.03.03) BASE GRANULAR PARA VEREDAS DE 0.20 M
DENOMINACION
CANT. LARGO ANCHO ALTO TOTAL (M3)
0.00
ATRIO 1 16.25 2.65 0.20 8.61
0.00
0.00
0.00
0.00
TOTAL 8.61
CONSORCIO NATIVIDAD
PROYECTO :
"COLEGIO VIRGEN DE NATIVIDAD CCOYABAMBA - CCAPI - PARURO "
FORMULA : 01 ESTRUCTURAS
PARTIDAS : 01.05.03.04 MURO DE CONCRETO SIMPLE METRADO : Wilmer Becerra
FECHA: AGO. 2013
CONCRETO f'c=175 kg/cm2 ENCOFRADO Y DESENCOFRADO
DENOMINACION Nº DE
CANT. LARGO ANCHO ALTO TOTAL (M3) ALTO LONG. TOTAL (M2)
VECES
1 16.25 0.45 0.30 2.19 1 1.20 16.25 19.50
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
TOTAL 2.19 TOTAL 19.50
CONSORCIO NATIVIDAD
FORMULA : 01 ESTRUCTURAS
PARTIDAS : 01.05.03.05 MURO DE CONCRETO REFORZADO
MURO FRONTAL EN VEREDA 1 5.16 1.40 0.20 1.44 2 1.40 2.66 7.45
ACERO HORIZONTAL 2
ACERO VERTICAL 2
CONSORCIO NATIVIDAD
PROYECTO :
"COLEGIO VIRGEN DE NATIVIDAD CCOYABAMBA - CCAPI - PARURO "
FORMULA : 01 ESTRUCTURAS
PARTIDAS : 01.05.03.06 JUNTAS METRADO : Wilmer Becerra
FECHA : AGO. 2013
DIMENSIONES TOTAL
DESCRIPCION CANTIDAD
LONGITUD (M)
JUNTAS ATRIO 5 2.65 13.25
0.00
0.00
0.00
0.00
0.00
TOTAL 13.25
02.02.05 SARDINELES
02.02.05.01 CONCRETO 175 KG/CM2 PARA SARDINELES
02.02.05.02 ENCOFRADO Y DESENCOFRADO PARA SARDINELES
02.02.05.03 ACERO FY= 4200 KG/CM2
PROYECTO: "COLEGIO VIRGEN DE NATIVIDAD CCOYABAMBA - CCAPI - PARURO "
SARDINEL
TRAMO 01 1 3.40 0.68 0.15 0.35 2 0.68 3.40 4.62
TRAMO 02 1 3.52 0.68 0.15 0.36 2 0.68 3.52 4.79
TRAMO 03 1 14.88 0.68 0.15 1.52 2 0.68 14.88 20.24
SARDINEL TIPO II
ZAPATA 1 7.61 1.00 0.25 1.90
ACERO TRANSVERSAL 1
ACERO LONGITUDINAL 1
MURO 1 7.61 1.40 0.20 2.13 2 1.40 7.61 21.31
ACERO HORIZONTAL 1
ACERO VERTICAL 1
SARDINEL TIPO II
ZAPATA 1 12.78 1.20 0.25 3.83
ACERO TRANSVERSAL 1
ACERO LONGITUDINAL 1
MURO 1 12.78 1.40 0.20 3.58 2 1.40 12.78 35.78
ACERO HORIZONTAL 1
ACERO VERTICAL 1
TOTAL 2.00
CONSORCIO NATIVIDAD
PROYECTO:
"COLEGIO VIRGEN DE NATIVIDAD CCOYABAMBA - CCAPI - PARURO "
FORMULA : 01 ESTRUCTURAS
PARTIDAS : 01.06.02 ( 01.06.02.01 / 01.06.02.02 / 01.06.02.03 ) VIGAS DE CIMENTACION
CONCRETO f'c=175 kg/cm2 PARA VIG. DE CIMENT. ENCOF. Y DESENCOF. - VIG. CIMENT. ACERO fy=4200 kg/cm2 GRADO 60
DENOMINACION Nº DE Nº DE
CANT. LARGO ANCHO ALTO TOTAL M3 ALTO LONG. TOTAL M2
VECES VECES
0.00 0.00
0.00 0.00 TOTAL POR DIAM. EN M.
0.00 0.00 TOTAL POR DIAM. EN KG.
TOTAL 12.66 TOTAL 84.24 TOTAL GENERAL EN KG.
02.03.03 COLUMNAS
02.03.03.01 CONCRETO f'c=210 kg/cm2 PARA COLUMNAS
02.03.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS
02.03.03.03 ACERO fy=4200 kg/cm2 GRADO 60
CONSORCIO NATIVIDAD
PROYECTO:
"COLEGIO VIRGEN DE NATIVIDAD CCOYABAMBA - CCAPI - PARURO "
FORMULA : 01 ESTRUCTURAS
PARTIDAS : 01.06.03 ( 01.06.03.01 / 01.06.03.02 / 01.06.03.03 ) COLUMNAS
CONCRETO f'c=210 kg/cm2 PARA COLUMNAS ENCOF. Y DESENCOF. - COLUMNAS ACERO fy=4200 kg/cm2 GRADO 60
DENOMINACION Nº DE Nº DE
CANT. LARGO ANCHO ALTO TOTAL M3 PERIM. ALTO TOTAL M2
VECES VECES
0.00 0.00
0.00 0.00 TOTAL POR DIAM. EN M.
0.00 0.00 TOTAL POR DIAM. EN KG.
TOTAL 7.18 TOTAL 128.82 TOTAL GENERAL EN KG.
02.03.04 VIGAS
02.03.04.01 PRIMER PISO
02.03.04.01.01 CONCRETO f'c=210 kg/cm2 PARA VIGAS
02.03.04.01.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS
02.03.04.01.03 ACERO fy=4200 kg/cm2 GRADO 60
02.03.04.02 SEGUNDO PISO
02.03.04.03 CONCRETO FC= 210 KG/ CM2
02.03.04.04 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS
02.03.04.05 ACERO FY= 4200 KG/CM2
02.03.05 RAMPAS
02.03.05.01 CONCRETO f'c=210 kg/cm2 PARA MUROS REFORZADOS
02.03.05.02 ENCOFRADO Y DESENCOFRADO PARA MUROS RECTOS
02.03.05.03 ACERO fy=4200 kg/cm2 GRADO 60
02.03.06 TIMPANO
02.03.06.01 CONCRETO FC= 210 KG/ CM2
02.03.06.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS
02.03.06.03 ACERO FY= 4200 KG/CM2
CONSORCIO NATIVIDAD
PROYECTO:
"COLEGIO VIRGEN DE NATIVIDAD CCOYABAMBA - CCAPI - PARURO "
FORMULA : 01 ESTRUCTURAS
PARTIDAS : 01.06.04 ( 01.06.04.01 / 01.06.04.02 / 01.06.04.03 ) VIGAS
CONCRETO F'C = 210 Kg/cm2 - VIGAS ENCOF. Y DESENCOF. - VIGAS ACERO FY = 4,200 KG/CM2
DENOMINACION Nº DE Nº DE
CANT. LARGO ANCHO ALTO TOTAL M3 LARGO PERIM. TOTAL M2
VECES VECES
0.00 0.00
TECHO PRIMER NIVEL 0.00 0.00
Eje D / 1-6 (VIGA 103 (25X40)) 5 4.00 0.25 0.40 2.00 5 4.00 0.80 16.00
ACERO LONGITUDINAL 1
1
ESTRIBOS 6
Eje C - D / 7 - 8 (VIGA 103 (25X40)) 1 4.00 0.25 0.40 0.40 1 4.00 1.05 4.20
ACERO LONGITUDINAL 1
1
ESTRIBOS 1
Eje B / 1-6 (VIGA 103 (25X40)) 5 4.00 0.25 0.40 2.00 5 4.00 0.80 16.00
Eje B / 7 - 8 (VIGA 103 (25X40)) 1 4.00 0.25 0.40 0.40 1 4.00 1.05 4.20
ACERO LONGITUDINAL 1
1
ESTRIBOS 1
Eje B / 9 - 15 (VIGA 103 (25X40)) 6 4.00 0.25 0.40 2.40 5 4.00 0.80 16.00
ACERO LONGITUDINAL 1
1
ESTRIBOS 6
VIGA A / 1 - 6 (VIGA 104 (20X40)) 5 4.00 0.20 0.40 1.60 5 4.00 1.00 20.00
VIGA A / 9 - 15 (VIGA 104 (20X40)) 6 4.00 0.20 0.40 1.92 6 4.00 1.00 24.00
ACERO LONGITUDINAL 1
ESTRIBOS 6
0.00 0.00
VIGA 102 (25X40) EJES 1,4,6,9,13 Y 15 6 7.40 0.30 0.60 7.99 6 7.40 1.20 53.28
6 2.15 0.30 0.60 2.32 6 2.10 1.50 18.90
ACERO LONGITUDINAL 6
0.00 0.00 6
0.00 0.00 6
6
6
ESTRIBOS 0.00 0.00 6
0.00 0.00
VIGA 101 (30X60) EJES 2,3,5,10,11,12 Y 14 7 7.40 0.30 0.60 9.32 7 7.40 1.20 62.16
7 2.13 0.30 0.60 2.68 7 2.13 1.50 22.37
ACERO LONGITUDINAL 7
7
0.00 0.00 7
0.00 0.00 7
0.00 0.00 7
ESTRIBOS 7
VIGA 105 (25X60) EJES 7 y 8 2 6.36 0.25 0.60 1.91 2 6.36 1.20 15.26
2 2.13 0.25 0.60 0.64 2 2.13 1.45 6.18
0.00 0.00
ACERO LONGITUDINAL 0.00 0.00 2
0.00 0.00 2
0.00 0.00 2
0.00 0.00 2
ESTRIBOS 0.00 0.00 2
0.00 0.00
VIGA 106 (30X20) 1 3.75 0.30 0.20 0.23 2 3.75 0.70 5.25
ACERO LONGITUDINAL 0.00 0.00 1
ESTRIBOS 0.00 0.00 1
0.00 0.00
RAMPA
VIGA 104 (20X40) 1 1.50 0.20 0.40 0.12 2 1.50 1.00 3.00
1 2.13 0.20 0.40 0.17 2 2.13 1.00 4.26
ACERO LONGITUDINAL 1
1
ESTRIBOS 1
1
VIGA 107 (30X60) B, C y D 3 1.50 0.30 0.60 0.81 2 1.50 1.50 4.50
ACERO LONGITUDINAL 3
3
ESTRIBOS 3
ACERO LONGITUDINAL 1
1
ESTRIBOS 6
Eje C - D / 7 - 8 (VT 103 (25X40)) 1 4.00 0.25 0.40 0.40 1 4.00 1.05 4.20
ACERO LONGITUDINAL 1
1
ESTRIBOS 1
Eje B / 1-6 (VT 103 (25X40)) 5 4.00 0.25 0.40 2.00 5 4.00 0.80 16.00
Eje B / 7 - 8 (VT 103 (25X40)) 1 4.00 0.25 0.40 0.40 1 4.00 1.05 4.20
ACERO LONGITUDINAL 1
1
ESTRIBOS 1
Eje B / 9 - 15 (VT 103 (25X40)) 6 4.00 0.25 0.40 2.40 5 4.00 0.80 16.00
ACERO LONGITUDINAL 1
1
ESTRIBOS 6
VIGA A / 1 - 6 (VT 104 (20X40)) 5 4.00 0.20 0.40 1.60 5 4.00 1.00 20.00
VIGA A / 7 - 8 (VT 104 (20X40)) 1 4.00 0.20 0.40 0.32 1 4.00 1.00 4.00
ACERO LONGITUDINAL 1
ESTRIBOS 1
VIGA A / 9 - 15 (VT 104 (20X40)) 6 4.00 0.20 0.40 1.92 6 4.00 1.00 24.00
0.00 0.00
ACERO LONGITUDINAL 0.00 0.00 1
ESTRIBOS 0.00 0.00 6
0.00 0.00
VT 102 (25X40) EJES 1,4,6,9,13 Y 15 6 7.40 0.25 0.50 5.55 6 7.40 1.00 44.40
6 2.13 0.25 0.50 1.60 6 2.13 1.25 15.98
ACERO LONGITUDINAL 6
0.00 0.00 6
0.00 0.00 6
6
6
ESTRIBOS 0.00 0.00 6
0.00 0.00
VIGA 101 (30X60) EJES 2,3,5,10,11,12 Y 14 7 7.40 0.25 0.50 6.48 7 7.40 1.00 51.80
7 2.13 0.25 0.50 1.86 7 2.13 1.25 18.64
0.00 0.00
ACERO LONGITUDINAL 0.00 0.00 7
0.00 0.00 7
0.00 0.00 7
0.00 0.00 7
0.00 0.00 7
ESTRIBOS 0.00 0.00 7
0.00 0.00
CASETA CONTROL 0.00 0.00
VT 110 (25X40) 3 3.61 0.25 0.40 1.08 3 3.61 1.05 11.37
ACERO LONGITUDINAL 0.00 0.00 3
ESTRIBOS 0.00 0.00 3
2 2.65 0.25 0.40 0.53 2 2.65 1.05 5.57
ACERO LONGITUDINAL 0.00 0.00 2
ESTRIBOS 0.00 0.00 2
2 3.75 0.25 0.40 0.75 2 3.75 1.05 7.88
ACERO LONGITUDINAL 0.00 0.00 2
ESTRIBOS 0.00 0.00 2
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00 TOTAL POR DIAM. EN M.
0.00 0.00 TOTAL POR DIAM. EN KG.
TOTAL 70.60 TOTAL 587.60 TOTAL GENERAL EN KG.
CONSORCIO NATIVIDAD
PROYECTO:
"COLEGIO VIRGEN DE NATIVIDAD CCOYABAMBA - CCAPI - PARURO "
FORMULA : 01 ESTRUCTURAS
PARTIDAS : 01.06.05 ( 01.06.05.01 / 01.06.05.02 / 01.06.05.03 ) RAMPA SEGUNDO PISO
CONCRETO F'C = 210 Kg/cm2 - ESCALERA ENCOF. Y DESENCOF. - ESCALERA ACERO FY = 4,200 KG/CM2
DENOMINACION Nº DE Nº DE
CANT. LARGO ANCHO ALTO TOTAL M3 ALTO LONG. TOTAL M2
VECES VECES
CONSORCIO NATIVIDAD
METRADO:
PROYECTO: "COLEGIO VIRGEN DE NATIVIDAD CCOYABAMBA - CCAPI - PARURO " FECHA :
METRADO ALIGERADO
A,B,C,D,E,F,H,I,J,K,L
1/2 '' 4.00 m. 4.00
1/2 '' 4.10 m. 24.00
1/2 '' 1.35 m. 8.00
3/8 '' 20.60 m. 17 195.76
3/8 '' 22.10 m. 4 49.42
3/8 '' 24.60 m. 21 288.78
3/8 '' 4.00 m. 4 8.94
1/2 '' 20.60 m. 17.00
1/2 '' 24.60 m. 21.00
1/2 '' 22.10 m. 4.00
02.03.08 ESCALERAS
02.03.08.01 CONCRETO f'c=210 kg/cm2 PARA ESCALERAS
02.03.08.02 ENCOFRADO Y DESENCOFRADO PARA ESCALERAS
02.03.08.03 ACERO fy=4200 kg/cm2 GRADO 60
CONSORCIO NATIVIDAD
PROYECTO:
"COLEGIO VIRGEN DE NATIVIDAD CCOYABAMBA - CCAPI - PARURO "
FORMULA : 01 ESTRUCTURAS
PARTIDAS : 01.06.07 ( 01.06.07.01 / 01.06.07.02 / 01.06.07.03 ) ESCALERA
CONCRETO F'C = 210 Kg/cm2 - ESCALERA ENCOF. Y DESENCOF. - ESCALERA ACERO FY = 4,200 KG/CM2
DENOMINACION Nº DE Nº DE
CANT. LARGO ANCHO ALTO TOTAL M3 ALTO LONG. TOTAL M2
VECES VECES
02.03.09 COLUMNETAS
02.03.09.01 CONCRETO FC= 175 KG/CM2
02.03.09.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS
02.03.09.03 ACERO FY= 4200 KG/CM2
02.04 ESTRUCTURA METALICAS
02.04.01 TIJERALES
02.04.01.01 TIJERAL METALICO TIPO I
02.04.01.02 TIJERALES METALICOS TIPO II
02.04.01.03 TIJERAL METALICO TIPO III
02.04.02 CORREAS
02.04.02.01 CORREAS METALICAS DE TUBO CUADRADO
02.04.03 COBERTURAS
02.04.03.01 COBERTURA DE TEJA FIBRAFORTE DE 1.14 X 0.72 CM
CONSORCIO NATIVIDAD
PROYECTO:
"COLEGIO VIRGEN DE NATIVIDAD CCOYABAMBA - CCAPI - PARURO "
FORMULA : 01 ESTRUCTURAS
PARTIDAS : 01.06.08 ( 01.06.08.01 / 01.06.08.02 / 01.06.08.03 ) COLUMNETAS
CONCRETO f'c=210 kg/cm2 PARA COLUMNAS ENCOF. Y DESENCOF. - COLUMNAS ACERO fy=4200 kg/cm2 GRADO 60
DENOMINACION Nº DE Nº DE
CANT. LARGO ANCHO ALTO TOTAL M3 PERIM. ALTO TOTAL M2
VECES VECES
SEGUNDO NIVEL
CA(COLUMNETAS DE CONFINAMIENTO)
Eje D / 1 - 2 2 2.85 0.15 0.15 0.13 2 0.75 2.85 4.28
2 1.85 0.15 0.15 0.08 2 0.75 1.85 2.78
1 3.17 0.15 0.15 0.07 1 0.75 3.17 2.38
ACERO LONGITUDINAL 0.00 0.00 2
0.00 0.00 2
0.00 0.00 1
ESTRIBOS 0.00 0.00 1
0.00 0.00
Eje D / 2 - 5 6 1.95 0.15 0.15 0.26 8 0.75 1.95 11.70
6 0.90 0.15 0.15 0.12 8 0.75 0.90 5.40
3 3.30 0.15 0.15 0.22 3 0.75 3.30 7.43
ACERO LONGITUDINAL 0.00 0.00 6
0.00 0.00 6
0.00 0.00 3
ESTRIBOS 0.00 0.00 3
0.00 0.00
0.00 0.00
Eje D / 5 - 6 2 2.85 0.15 0.15 0.13 2 0.75 2.85 4.28
2 1.95 0.15 0.15 0.09 2 0.75 1.95 2.93
1 3.47 0.15 0.15 0.08 1 0.75 3.47 2.60
ACERO LONGITUDINAL 0.00 0.00 2
0.00 0.00 2
0.00 0.00 1
ESTRIBOS 0.00 0.00 1
DEPOSITO MAT. DIDACTICO 2 0.50 0.15 0.15 0.02 2 0.75 0.65 0.98
2 2.35 0.15 0.15 0.11 2 0.75 2.35 3.53
1 2.87 0.15 0.15 0.06 1 0.75 2.87 2.15
ACERO LONGITUDINAL 0.00 0.00 2
0.00 0.00 2
0.00 0.00 1
ESTRIBOS 0.00 0.00 1
0.00 0.00
COLUMNETAS INTERIORES 15 2.85 0.15 0.15 0.96 15 0.75 3.00 33.75
ACERO LONGITUDINAL 0.00 0.00 15
ESTRIBOS 0.00 0.00 15
0.00 0.00
CORREDOR DE CIRCULACION 15 1.05 0.15 0.15 0.35 15 0.50 1.05 7.88
ACERO LONGITUDINAL 0.00 0.00 15
ESTRIBOS 0.00 0.00 15
0.00 0.00
0.00 0.00
0.00 0.00 TOTAL POR DIAM. EN M.
0.00 0.00 TOTAL POR DIAM. EN KG.
TOTAL 11.51 TOTAL 372.66 TOTAL GENERAL EN KG.
METRADO: Wilmer Becerra
FECHA : AGO. 2013
ACERO FY = 4,200 KG/CM2 LONGITUD TOTAL
DIAM. CANT. LONG. 6mm 1/4" 8mm 3/8" 12mm 1/2" 5/8" 3/4" 1"
0.222 0.250 0.395 0.560 0.888 0.994 1.552 2.235 3.973
TOTAL POR DIAM. EN M. 0.00 138.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL POR DIAM. EN KG. 0.00 34.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL GENERAL EN KG. 34.58
REFORZADO METRADO: Wilmer Becerra
FECHA : AGO. 2013
ACERO FY = 4,200 KG/CM2 LONGITUD TOTAL
6mm 1/4" 8mm 3/8" 12mm 1/2" 5/8" 3/4" 1"
DIAM. CANT. LONG.
0.222 0.250 0.395 0.560 0.888 0.994 1.552 2.235 3.973
TOTAL POR DIAM. EN M. 0.00 0.00 0.00 155.50 0.00 248.10 0.00 0.00 0.00
TOTAL POR DIAM. EN KG. 0.00 0.00 0.00 87.08 0.00 246.61 0.00 0.00 0.00
TOTAL GENERAL EN KG. 333.69
METRADO: Wilmer Becerra
FECHA : AGO. 2013
ACERO FY = 4,200 KG/CM2 LONGITUD TOTAL
6mm 1/4" 8mm 3/8" 12mm 1/2" 5/8" 3/4" 1"
DIAM. CANT. LONG.
0.222 0.250 0.395 0.560 0.888 0.994 1.552 2.235 3.973
TOTAL POR DIAM. EN M. 0.00 0.00 0.00 101.95 0.00 200.57 0.00 0.00 0.00
TOTAL POR DIAM. EN KG. 0.00 0.00 0.00 57.09 0.00 199.37 0.00 0.00 0.00
TOTAL GENERAL EN KG. 256.46
112.75
111.00
101.75
99.00
22.20
36.90
34.80
59.20
59.40
0.00
0.00
0.00
TOTAL POR DIAM. EN M. 0.00 0.00 0.00 796.32 0.00 0.00 292.80 146.40 0.00
TOTAL POR DIAM. EN KG. 0.00 0.00 0.00 445.94 0.00 0.00 454.43 327.20 0.00
TOTAL GENERAL EN KG. 1227.57
TOTAL POR DIAM. EN M. 0.00 0.00 0.00 1655.54 0.00 0.00 1728.00 0.00 0.00
TOTAL POR DIAM. EN KG. 0.00 0.00 0.00 927.10 0.00 0.00 2681.86 0.00 0.00
TOTAL GENERAL EN KG. 3608.96
TOTAL POR DIAM. EN M. 0.00 0.00 0.00 5328.40 0.00 939.22 1695.66 506.60 0.00
TOTAL POR DIAM. EN KG. 0.00 0.00 0.00 2983.90 0.00 933.58 2631.66 1132.25 0.00
TOTAL GENERAL EN KG. 7681.39
TOTAL POR DIAM. EN M. 0.00 0.00 0.00 67.50 0.00 117.00 0.00 0.00 0.00
TOTAL POR DIAM. EN KG. 0.00 0.00 0.00 37.80 0.00 116.30 0.00 0.00 0.00
TOTAL GENERAL EN KG. 154.10
Wilmer Becerra
AGO. 2013
0.05
0.15
ENCOFR. LADRILLOS
TOTAL TOTAL
(M2) UND.
26.46 #DIV/0!
6.85 #DIV/0!
26.46 #DIV/0!
6.85 #DIV/0!
26.46 #DIV/0!
6.85 #DIV/0!
26.46 #DIV/0!
6.85 #DIV/0!
26.46 #DIV/0!
6.85 #DIV/0!
6.94 #DIV/0!
4.95
26.46 #DIV/0!
6.85 #DIV/0!
26.46 #DIV/0!
6.85 #DIV/0!
26.46 #DIV/0!
6.85 #DIV/0!
26.46 #DIV/0!
6.85 #DIV/0!
26.46 #DIV/0!
6.85 #DIV/0!
26.46 #DIV/0!
6.85 #DIV/0!
2.34 #DIV/0!
380.64 #DIV/0!
1/2" TOTAL
122.02 122.02
469.19 469.19
15.89 15.89
97.71 97.71
10.72 10.72
195.76
49.42
288.78
8.94
347.75 347.75
512.98 512.98
87.78 87.78
261.90
67.77
6.16
3.33
TOTAL 2,546.10
TOTAL POR DIAM. EN M. 0.00 0.00 0.00 0.00 0.00 336.42 0.00 0.00 0.00
TOTAL POR DIAM. EN KG. 0.00 0.00 0.00 0.00 0.00 334.40 0.00 0.00 0.00
TOTAL GENERAL EN KG. 334.40
3/8 4 3.00
1/4 20 0.54
TOTAL POR DIAM. EN M. 0.00 1843.02 0.00 2025.32 0.00 0.00 0.00 0.00 0.00
TOTAL POR DIAM. EN KG. 0.00 460.76 0.00 1134.18 0.00 0.00 0.00 0.00 0.00
TOTAL GENERAL EN KG. 1594.94
CRONOGRAMA FISICO VALORIZADO DE AVANCE DE OBRA
PROYECTO: “MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO EN LA CCNN DE NUEVA JERUSALEN, DISTRITO DE TROMPETEROS - LORETO – LORETO”
MESES
ITEM DESCRIPCION / ESQUEMA UNIDAD COSTO TIEMPO MAYO JUNIO JULIO AGOSTO SEPTIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE ENERO FEBRERO
30 DIAS 30 DIAS 31 DIAS 31 DIAS 30 DIAS 31 DIAS 30 DIAS 31 DIAS 31 DIAS 25 DIAS
01 ESTRUCTURAS 653,105.83 60,155.29 81,764.87 72,750.57 85,888.31 54,742.54 103,914.21 46,373.87 76,551.07 61,052.24 9,912.89
10 MESES 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
02 ARQUITECTURA 477,481.38 0.00 0.00 9,646.92 0.00 54,314.89 71,933.28 161,191.39 88,829.90 75,459.00 16,106.00
04 MESES 1.00 1.00 1.00 1.00 1.00 1.00 1.00
03 INSTALACIONES ELECTRICAS 59,128.57 0.00 0.00 0.00 0.00 13,453.52 0.00 0.00 6,588.87 12,467.32 26,618.86
05 MESES 1.00 1.00 1.00 1.00
04 INSTALACIONES SANITARIAS 76,919.68 10,258.99 2,022.50 2,022.50 2,022.50 5,877.79 2,022.50 4,714.14 8,861.74 21,838.20 17,278.82
08 MESES 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
05 CERCO PERIMETRICO 458,544.49 0.00 0.00 0.00 85,108.95 88,169.58 55,579.64 58,551.60 56,209.02 65,201.46 49,724.25
10 MESES 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
VALORIZACION MENSUAL 70,414.28 83,787.36 84,419.99 173,019.76 216,558.31 233,449.63 270,831.00 237,040.60 236,018.22 256,072.40
TOTAL COSTO DIRECTO 1,861,611.54 3.78% 4.50% 4.53% 9.29% 11.63% 12.54% 14.55% 12.73% 12.68% 13.76%
% ACUMULADO 3.78% 8.28% 12.81% 22.10% 33.73% 46.27% 60.82% 73.55% 86.23% 99.99%
GASTOS GENERALES 10.00% 186,161.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Gastos Generales Fijos 0.15% 2,790.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Gastos Generales Variables 9.85% 183,370.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
UTILIDAD 10.00% 186,161.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
SUB TOTAL 2,233,933.84 70,414.28 83,787.36 84,419.99 173,019.76 216,558.31 233,449.63 270,831.00 237,040.60 236,018.22 256,072.40
IMPUESTOS (IGV) 18.00% 402,108.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PRESUPUESTO DE OBRA A CONTRATAR 2,636,041.93 70,414.28 83,787.36 84,419.99 173,019.76 216,558.31 233,449.63 270,831.00 237,040.60 236,018.22 256,072.40
PRESUPUESTO TOTAL 2,694,696.75 70,414.28 83,787.36 84,419.99 173,019.76 216,558.31 233,449.63 270,831.00 237,040.60 236,018.22 256,072.40
% 2.67% 3.18% 3.20% 6.56% 8.22% 8.86% 10.27% 8.99% 8.95% 363.67%
% ACUMULADO 2.67% 5.85% 9.05% 15.61% 23.83% 32.69% 42.96% 51.95% 60.90% 424.57%
AVANCE FISICO
AVANCE FISICO OTRAS CONSTRUCCIONES
RUTA CRITICA
MESES
ITEM DESCRIPCION / ESQUEMA UNIDAD METRADO COSTO
MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10
ESTRUCTURAS 653,105.83
OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD
OBRAS PROVISIONALES
CONSTRUCCIONES PROVISIONALES
ALMACEN, OFICINA Y GUARDIANIA m2 68.00 58.64 3,987.52
CARTEL DE OBRA und 1.00 790.33 790.33
CERCO CON ARPILLERA m 50.00 11.34 567.00
OBRAS PRELIMINARES
AGUA PARA LA CONSTRUCCIÓN glb 1.00 1,000.01 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.01
ENERGIA ELECTRICA PARA LA CONSTRUCCION mes 10.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
LIMPIEZA DE TERRENO
LIMPIEZA DE TERRENO MANUAL m2 778.67 0.78 607.36
LIMPIEZA PERMANENTE DE OBRA mes 10.00 577.58 577.58 577.58 577.58 577.58 577.58 577.58 577.58 577.58 577.58 577.58
DEMOLICIONES Y DESMONTAJES
DEMOLICION ESTRUCTURA DE ADOBE m2 20.00 20.98 419.60
DESMONTAJE DE TECHO m2 24.00 14.44 346.56
TRAZO
TRAZO, NIVELACIÓN Y REPLANTEO PRELIMINAR m2 1,840.00 1.09 2,005.60
TRAZO, NIVELACIÓN DURANTE EL PROCESO CONSTRUC m2 887.66 0.99 878.78
PRUEBAS DE CONTROL DE CALIDAD
DISEÑO DE MEZCLA und 3.00 400.00 1,200.00
PRUEBA DE CONTROL DE CALIDAD PARA CONCRETO und 48.00 25.00 1,200.00
MOVIMIENTO DE TIERRAS
NIVELACION DE TERRENO
NIVELACION Y COMPACTADO PARA FALSO PISO m2 331.33 8.52 2,822.93
EXCAVACIONES
EXCAVACION MANUAL PARA CIMIENTOS Y ZAPATAS m3 332.96 23.61 7,861.19
CORTES
CORTE DE MATERIAL CON MAQUINARIA m3 291.54 7.55 2,201.13
RELLENO Y APISONADO CON MATERIAL PROPIO m3 193.14 31.85 3,075.75 3,075.76
RELLENOS
RELLENO CON MATERIAL DE PRESTAMO m3 89.00 55.48 4,937.72
ELIMINACION DE MATERIAL EXCEDENTE
ACARREO MANUAL DE MATERIAL EXCEDENTE C/N CARR m3 174.77 16.04 2,803.31
ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO HA m3 364.62 20.44 7,452.83
CONCRETO SIMPLE
CIMIENTOS CORRIDOS
SUB ZAPATAS m3 68.12 211.09 7,189.73 7,189.73
CIMIENTOS CORRIDOS MEZCLA 1:10 + 30% PG m3 31.97 222.97 3,564.18 3,564.18
SOBRECIMIENTO
CONCRETO 1:8+25% PM PARA SOBRECIMIENTOS m3 10.46 282.04 2,950.14
ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBREC m2 14.68 33.73 495.16
RAMPAS
EXCAVACION MANUAL PARA RAMPAS m3 32.33 32.09 1,037.47
CONCRETO EN RAMPAS 140 KG/CM2 m3 12.65 294.20 3,721.63
ENCOFRADO Y DESENCOFRADO NORMAL m2 15.57 33.73 525.18
ACERO FY= 4200 KG/CM2 kg 34.58 5.29 182.93
BRUÑAS m 854.12 3.44 2,938.17
ATRIUN
EXCAVACION MANUAL DEL TERRENO m3 38.28 12.03 460.51
COMPACTACION MANUAL DEL TERRENO m2 43.06 39.02 1,680.20
BASE GRANULAR PARA VEREDA DE 0.20 CM m2 8.61 38.07 327.78
MURO DE CONCRETO SIMPLE
CONCRETO FC = 175 kg/cm2 m3 2.19 331.31 725.57
ENCOFRADO Y DESENCOFRADO PARA MUROS RECTO m2 19.50 39.66 773.37
MUROS REFORZADOS
CONCRETO FC= 175 KG/CM2 m3 13.50 331.51 4,475.39
ENCOFRADO Y DESENCOFRADO PARA MUROS RECTO m2 67.84 39.66 2,690.53
ACERO FY= 4200 KG/CM2 kg 333.69 5.29 1,765.22
JUNTAS PARA LOSAS RIGIDAS m 13.25 5.85 77.51
SARDINELES
CONCRETO 175 KG/CM2 PARA SARDINELES m3 13.67 313.06 4,279.53
ENCOFRADO Y DESENCOFRADO PARA SARDINELES m2 86.74 32.92 2,855.48
ACERO FY= 4200 KG/CM2 kg 256.46 5.29 1,356.67
BASE PARA MASTIL
BASE DE CONCRETO PARA MASTIL und 2.00 353.50 707.00
CONCRETO ARMADO
ZAPATAS
CONCRETO f'c=210 kg/cm2 PARA ZAPATAS m3 65.08 408.37 16,576.72 7,000.00 3,000.00
ACERO fy=4200 kg/cm2 GRADO 60 kg 2,013.15 5.29 10,649.56
VIGAS DE CIMENTACIÓN
CONCRETO FC= 210 KG/ CM2 m3 27.47 408.37 7,217.92 2,000.00 2,000.00
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS DE m2 183.36 32.16 4,896.86 1,000.00
ACERO fy=4200 kg/cm2 GRADO 60 kg 2,693.83 5.29 10,250.36 4,000.00
COLUMNAS
CONCRETO f'c=210 kg/cm2 PARA COLUMNAS m3 41.59 426.57 7,096.42 7,096.42 3,548.21
ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 274.20 32.91 3,609.57 3,609.57 1,804.78
ACERO fy=4200 kg/cm2 GRADO 60 kg 8,070.11 5.29 15,076.35 2,000.00 17,076.35 8,538.18
VIGAS
PRIMER PISO
CONCRETO f'c=210 kg/cm2 PARA VIGAS m3 41.68 448.06 18,675.14
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 336.37 45.81 6,409.11 7,000.00 2,000.00
ACERO fy=4200 kg/cm2 GRADO 60 kg 4,650.56 5.29 10,601.46 12,000.00 2,000.00
SEGUNDO PISO
CONCRETO FC= 210 KG/ CM2 m3 28.93 471.01 13,626.32
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 251.21 45.81 11,507.93
ACERO FY= 4200 KG/CM2 kg 3,030.85 5.29 8,033.20 8,000.00
RAMPAS
CONCRETO f'c=210 kg/cm2 PARA MUROS REFORZADOS m3 2.66 448.06 1,191.84
ENCOFRADO Y DESENCOFRADO PARA MUROS RECTOS m2 20.79 39.66 824.53
ACERO fy=4200 kg/cm2 GRADO 60 kg 154.10 5.29 815.19
TIMPANO
CONCRETO FC= 210 KG/ CM2 m3 1.75 447.90 783.83
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 33.96 52.19 1,772.37
ACERO FY= 4200 KG/CM2 kg 495.62 5.29 2,621.83
LOSAS ALIGERADAS
CONCRETO f'c=210 kg/cm2 PARA LOSAS ALIGERADAS m3 32.15 448.06 14,405.13
ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS AL m2 380.53 45.23 15,211.37 2,000.00
ACERO fy=4200 kg/cm2 GRADO 60 kg 2,546.11 5.29 13,468.92
LADRILLO DE 15 X 20 X 30 PARA TECHO ALIGERADO und 3,125.00 2.78 8,687.50
ESCALERAS
CONCRETO f'c=210 kg/cm2 PARA ESCALERAS m3 4.18 410.80 1,717.14
ENCOFRADO Y DESENCOFRADO PARA ESCALERAS m2 8.39 40.76 341.98
ACERO fy=4200 kg/cm2 GRADO 60 kg 334.40 5.29 1,768.98
COLUMNETAS
CONCRETO FC= 175 KG/CM2 m3 11.55 341.01 3,938.67
ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 372.44 32.91 12,257.00
ACERO FY= 4200 KG/CM2 kg 1,594.93 5.29 8,437.18
ESTRUCTURA METALICAS
TIJERALES
TIJERAL METALICO TIPO I und 24.00 1,714.71 41,153.04
TIJERALES METALICOS TIPO II und 3.00 1,428.44 4,285.32
TIJERAL METALICO TIPO III und 3.00 798.48 2,395.44
CORREAS
CORREAS METALICAS DE TUBO CUADRADO m 740.62 23.76 17,597.13
COBERTURAS
COBERTURA DE TEJA FIBRAFORTE DE 1.14 X 0.72 CM m2 572.49 58.59 33,542.19
VARIOS
TANQUE SEPTICO
TRABAJOS PRELIMINARES
LIMPIEZA MANUAL DE TERRENO m 9.25 3.85 35.61
TRAZO Y REPLANTEO PRELIMINAR m2 9.25 4.72 43.66
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DEL TERRENO m3 24.96 12.03 300.27
RELLENO Y APISONADO CON MATERIAL PROPIO m3 3.00 9.63 28.89
ACARREO MANUAL DE MATERIAL EXCEDENTE C/N CA m3 16.18 16.04 259.53
CONCRETO ARMADO
LOSA DE PISO TANQUE SEPTICO
CONCRETO FC= 175 KG/CM2 m3 1.57 345.45 542.36
ACERO FY= 4200 KG/CM2 kg 94.09 5.29 497.74
LOSA TECHO TANQUE SEPTICO
CONCRETO FC= 210 KG/ CM2 m3 1.39 447.90 622.58
ENCOFRADO Y DESNCOFRADO PARA LOSAS m2 8.17 37.25 304.33
ACERO FY= 4200 KG/CM2 kg 94.09 5.25 493.97
TAPA DE CONCRETO
CONCRETO FC= 175 KG/CM2 m3 0.18 345.45 62.18
ENCOFRADO Y DESENCOFRADO m2 1.08 32.91 35.54
ACERO FY= 4200 KG/CM2 kg 7.39 5.29 39.09
MUROS REFORZADOS
CONCRETO FC= 210 KG/ CM2 m3 4.58 447.90 2,051.38
ENCOFRADO Y DESENCOFRADO EN MUROS m2 30.50 32.91 1,003.76
ACERO FY= 4200 KG/CM2 kg 266.33 5.29 1,408.89
TARRAJEO Y REVOQUES
TARRALEJO EN MUROS INTERIORES MEZCLA C:A 1.5 m2 15.00 32.10 481.50
ACCESORIOS
ACCESORIO DE PVC SAP PARA TANQUE SEPTICO glb 1.00 142.47 142.47
ZANJA DE INFILTRACION
TRABAJOS PRELIMINARES
LIMPIEZA MANUAL DE TERRENO m 45.00 3.85 173.25
TRAZO Y REPLANTEO PRELIMINAR m2 60.00 4.72 283.20
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DEL TERRENO m3 12.00 12.03 144.36
RELLENO Y APISONADO CON MATERIAL PROPIO m3 8.00 9.63 77.04
ACARREO MANUAL DE MATERIAL EXCEDENTE C/N CA m3 6.00 16.04 96.24
ZANJA DE INFILTRACION
ZANJA DE INFILTRACION m 90.00 72.70 6,543.00
RESERVORIO APOYADO
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DEL TERRENO m3 0.64 12.03 7.70
COMPACTACION MANUAL DEL TERRENO m2 1.84 39.02 71.80
BASE GRANULAR DE 0.20 CM m3 0.37 38.07 14.09
CONCRETO ARMADO DE RESERVORIO APOYADO
CONCRETO FC= 175 KG/CM2 m3 2.59 345.45 894.72
ENCOFRADO Y DESENCOFRADO m2 18.38 32.91 604.89
ACERO FY= 4200 KG/CM2 kg 140.69 5.29 744.25
FLETE TERRESTRE
TRANSPORTE DE EQUIPO Y MAQUINARIA glb 1.00 7,084.75 7,084.75
FLETE CUSCO - CCOYABAMBA est 1.00 91,353.37 9,135.34 9,135.34 9,135.34 9,135.34 9,135.34 9,135.34 9,135.34 9,135.34 9,135.34 9,135.30
ARQUITECTURA 477,481.38
MUROS Y TABIQUES DE ALBAÑILERIA
MURO DE LADRILLO KK SOGA C:A, 1:4 m2 842.07 55.92 9,835.42 18,835.42 9,000.00 9,417.71
MURO DE LADRILLO KK CABEZA C:A, 1:4 m2 75.24 105.29 3,168.81 3,168.81 1,584.40
PARAPETO CON LADRILLO KK m2 55.90 57.74 1,291.07 1,291.07 645.53
MURO DE SISTEMA DRYWALL m2 18.53 58.74 1,088.45
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO EN INTERIORES MEZCLA C:A, 1:5 m2 1,024.87 23.38 7,188.44 16,773.02
TARRAJEO EN EXTERIORES MEZCLA C:A, 1:5 m2 403.56 24.69 2,989.17 6,974.73
TARRAJEO DE COLUMNAS m2 366.34 30.03 3,300.36 7,700.83
TARRAJEO DE VIGAS m2 402.94 30.03 3,630.09 8,470.20
VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VA m 462.14 15.52 2,151.72 5,020.69
TARRAJEO EN ESCALERAS m2 82.62 30.65 759.69 1,772.61
TARRAJEO DE MURO DE CONCRETO DE ATRIUN m2 40.00 26.33 315.96 737.24
CIELORRASOS
CIELORRASO CON TARRAJEO DE CEMENTO SOBRE LOSA m2 387.57 27.68 3,218.38 7,509.56
CIELO RASO SUSPENDIDO CON PERFILES METALICOS Y m2 439.62 53.31 7,030.84 16,405.30
PISOS Y PAVIMENTOS
FALSO PISO MEZCLA 1:8, E = 4" m2 331.33 30.33 10,049.24
CONTRAPISO DE 40 MM m2 608.71 28.08 17,092.58
PISO ENTABLADO MACHIEMBRADO m2 218.48 109.30 4,775.97 19,103.89
PISO CERAMICO m2 383.66 50.46 3,871.90 15,487.59
PISOS DE CEMENTO PULIDO S/ COLOREAR m2 36.26 25.39 184.13 736.51
PISOS DE CEMENTO FROTACHADO Y BRUÑADO S/COLOREA m2 200.29 25.39 1,017.07 4,068.29
VEREDAS
EXCAVACION MANUAL PARA VEREDAS m3 24.00 8.02 192.48
COMPACTACION DE VEREDAS m2 160.00 5.78 924.80
CONCRETO FC= 140 KG/CM2 PARA VEREDAS m2 214.85 45.38 9,749.89
ENCOFRADO Y DESENCOFRADO PARA VEREDAS m2 50.00 31.02 1,551.00
JUNTAS PARA VEREDAS m 60.00 7.66 459.60
ZOCALOS Y CONTRAZOCALOS
ZOCALOS
ZOCALO INTERIOR DE CERAMICO 20*30cm. m2 96.28 49.35 1,425.43 3,325.99
CONTRAZOCALOS 0.00
CONTRAZOCALO DE MADERA H=10CM m 124.11 21.71 808.33 1,886.10
CONTRAZOCALO DE CEMENTO PULIDO m 201.31 11.15 673.38 1,571.22
CONTRAZOCALO DE CERAMICO 10*40cm. m 202.85 9.90 602.46 1,405.75
COBERTURAS
COBERTURA DE PLANCHA DE POLICARBONATO m2 42.56 59.70 2,540.83
CARPINTERIA DE MADERA
PUERTA DE MADERA AGUANO TABLERO REBAJADO m2 49.32 347.43 8,567.62 8,567.62
PUERTA CONTRAPLACADAS m2 17.45 192.94 1,683.40 1,683.40
COLOCACION DE PUERTAS DE MADERA und 23.00 55.02 632.73 632.73
CARPINTERIA METALICA Y HERRERIA
VENTANA DE ALUMINIO SEGUN DISEÑO m2 124.80 234.99 14,663.38 14,663.38
PUERTA METALICA SEGUN DISEÑO m2 16.80 400.00 3,360.00 3,360.00
BARANDA METALICA DIAM 2" , SEGÚN DISEÑO m 99.74 51.84 2,585.26 2,585.26
DIVISION METALICA EN SS HH und 4.00 245.00 490.00 490.00
BARRA DE APOYO A MINUSVALIDO DE ACERO und 2.00 201.48 201.48 201.48
ASTA DE BANDERA und 2.00 287.42 287.42 287.42
CERRAJERIA 0.00 0.00
BISAGRA CAPUCHINA 4"X4" ALUMINIO PESADO pza 69.00 14.12 487.14 487.14
BISAGRA CAPUCHINA 2 1/2"X2" ALUMINIO PESADO pza 168.00 13.12 1,102.08 1,102.08
CERRADURA CON MANIJA DE 4" DE DOS GOLPES pza 16.00 90.36 722.88 722.88
CERRADURA DE EMBUTIR PTA INTERIOR und 5.00 75.95 189.88 189.88
VIDRIOS, CRISTALES Y SIMILARES
VIDRIO DOBLE INCOLORO CRUDO m2 124.80 27.48 1,714.75 1,714.75
PINTURA
PINTURA DE CIELORASOS C-LATEX - 2 MANOS m2 498.10 11.49 5,723.17
PINTURA EN MUROS INTERIORES m2 1,024.87 10.86 11,130.09
PINTURA EN MUROS EXTERIORES m2 403.56 11.66 4,705.51
PINTURA EN COLUMNAS m2 366.34 10.05 3,681.72
PINTURA EN VIGAS m2 402.94 10.05 4,049.55
PINTURA EN PUERTAS m2 119.62 14.98 1,791.91
PINTURA DE CONTRAZOCALO C/ESMALTE m2 201.31 11.80 2,375.46
PINTURA ANTICOR. Y ESMALTE 2 MANOS EN CARP. METAL m 99.74 11.71 1,167.96
VARIOS
PATIO DE HONOR
CORTE DE MATERIAL CON MAQUINARIA m3 570.00 7.55 4,303.50
RELLENO Y APISONADO CON MATERIAL PROPIO m3 350.00 9.63 3,370.50
ACARREO MANUAL DE MATERIAL EXCEDENTE C/N CARR m3 123.00 16.04 1,972.92
CONCRETO SIMPLE 140 KG/CM2 PARA LOSA m2 1,000.00 80.53 32,212.00 32,212.00 16,106.00
ENCOFRADO Y DESNCOFRADO PARA LOSAS m2 70.00 37.25 1,303.75 1,303.75
PINTURA Y SEÑALIZACION EN PATIO DE HONOR Y DEPO m 256.00 3.82 488.96 488.96
JUNTAS PARA LOSAS RIGIDAS m 620.00 5.85 1,813.50 1,813.50
ANCLAJES DE POSTE DE VOLEY Y ARCOS EN CONCRETO und 10.00 75.17 751.70
PROVISION Y COLOCACION DE ARCOS DE FULBITO und 2.00 1,910.16 3,820.32
PROVISION Y COLOCACION DE NET DE VOLEY und 1.00 338.66 338.66
JARDINERAS DE 0.40 X 0.40 und 2.00 600.00 1,200.00
MESA DE CONCRETO ARMADO
MESA DE CONCRETO ARMADO C/ REVS. DE MAYOLICA und 2.00 600.00 1,200.00
INSTALACIONES ELECTRICAS 59,128.57
SALIDA DE CENTRO DE LUZ
SALIDA PARA CENTRO DE LUZ, TECHO Y PARED pto 108.00 13.94 1,505.52
TOMACORRIENTES
SALIDA DE TOMACORRIENTE DOBLE CON LINEA A TIERRA pto 64.00 29.16 1,866.24
SALIDA DE TOMACORRIENTE DOBLE PARA COMPUTADORA pto 40.00 38.66 1,546.40
SALIDA DE INTERRUPTORES
INTERRUPTOR UNIPOLAR SIMPLE pto 17.00 27.86 473.62
INTERRUPTOR BIPOLAR DOBLE pto 14.00 24.18 338.52
INTERRUPTOR UNIPOLAR TRIPLE und 2.00 31.98 63.96
INTERRUPTOR DE CONMUTACION pto 2.00 34.68 69.36
SALIDA PARA TELECOMUNICACIONES Y SEÑALES
SALIDA PARA TELEFONIA pto 5.00 36.36 181.80
SALIDA PARA INTERNET pto 42.00 29.46 1,237.32
CANALES Y TUBERIAS
TUBERIA EMPOTRADA PVC SAP 50 MM m 12.00 8.40 100.80
TUBERIA EMPOTRADA PVC SAP 40 MM m 10.00 8.20 82.00
TUBERIA EMPOTRADA PVC SAP 20 MM m 940.00 4.12 3,872.80
CURVA PVC SAP 50 MM und 4.00 3.77 15.08
CURVA PVC SAP 40 MM und 4.00 3.27 13.08
CURVA PVC SAP 20 MM und 500.00 3.27 1,635.00
UNION PVC SAP 40 MM und 2.00 3.27 6.54
UNION PVC SAP 25 MM und 2.00 2.97 5.94
UNION PVC SAP 20 MM und 500.00 2.77 1,385.00
CABLES Y/O CONDUCTORES
CABLE N2XOH 3 X 1 X 25 mm 2 m 70.00 26.54 928.90 928.90
CABLE N2XOH 1 X 25 mm 2 m 70.00 7.54 263.90 263.90
CABLE N2XOH 3 X 1 X 16 MM 2 m 30.00 19.47 292.05 292.05
CABLE N2XOH 1 X 16 MM 2 m 30.00 6.54 98.10 98.10
CABLE N2XOH 1 X 6 mm2 m 80.00 11.38 455.20 455.20
CABLE NH-80 1 X 4 mm2 m 960.00 2.61 1,252.80 1,252.80
CABLE NH-80 1 X 2.5 MM2 m 910.00 2.21 1,005.55 1,005.55
CABLE Cu DESNUDO 1 X 25 MM m 24.00 11.43 137.16 137.16
CABLE Cu DESNUDO 1 X 50 MM m 22.07 21.93 242.00 242.00
CAJAS DE PASO
CAJA DE PASO DE 100 X 100 mm und 5.00 37.36 186.80
CAJA DE PASO DE 200 X 200 mm und 1.00 52.36 52.36
TABLEROS
TABLERO GENERAL TG - METAL ( 18 POLOS) ENGRAMPE und 1.00 1,279.52 255.90 1,023.62
0.00
PROGRAMADO EJECUTADO
COSTO DIRECTO 617,676.61 #NAME?
GASTOS GENERALES FIJOS 0.135% 835.93 #NAME?
GASTOS GENERALES VARIABLES 23.328% 144,090.37 #NAME?
UTILIDAD 10.00% 61,767.66 #NAME?
SUB TOTAL 824,370.57 #NAME?
FACTOR DE RELACION 100.00% 824,370.57 #NAME?
0.00
PROGRAMADO EJECUTADO
COSTO DIRECTO 291,392.01 #REF!
GASTOS GENERALES FIJOS 0.135% 394.36 #REF!
GASTOS GENERALES VARIABLES 23.328% 67,975.35 #REF!
UTILIDAD 10.00% 29,139.20 #REF!
SUB TOTAL 388,900.92 #REF!
FACTOR DE RELACION 100.00% 388,900.92 #REF!
0.00
PROGRAMADO EJECUTADO
COSTO DIRECTO 77,749.07 #REF!
GASTOS GENERALES FIJOS 0.135% 105.22 #REF!
GASTOS GENERALES VARIABLES 23.328% 18,137.15 #REF!
UTILIDAD 10.00% 7,774.91 #REF!
SUB TOTAL 103,766.35 #REF!
FACTOR DE RELACION 100.00% 103,766.35 #REF!
0.00
PROGRAMADO EJECUTADO
COSTO DIRECTO 10,275.00 #REF!
GASTOS GENERALES FIJOS 0.135% 13.91 #REF!
GASTOS GENERALES VARIABLES 23.328% 2,396.93 #REF!
UTILIDAD 10.00% 1,027.50 #REF!
SUB TOTAL 13,713.34 #REF!
FACTOR DE RELACION 100.00% 13,713.34 #REF!
TOTAL
PROGRAMADO EJECUTADO
COSTO DIRECTO 997,092.69 #REF!
GASTOS GENERALES FIJOS 0.135% 1,349.42 #REF!
GASTOS GENERALES VARIABLES 23.328% 232,599.80 #REF!
UTILIDAD 10.00% 99,709.27 #REF!
SUB TOTAL 1,330,751.18 #REF!
FACTOR DE RELACION 100.00% 1,330,751.17 #REF!
PROGRAMA NACIONAL DE SANEAMIENTO RURAL
0
0 0
PROYECTOS DE INVERSIÓN
DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO ESPECIFICO PARA MATERIALES
Obra: “MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO EN LA CCNN DE NUEVA JERUSALEN, DISTRITO DE TROMPETEROS - LORETO – LORETO”
Contratista: CONSTRUCTORA C y C S.A.C
Supervisor: ING° GUSTAVO PADILLA PINEDO
Ubicación: CCNN NUEVA JERUSALEN - TROMPETEROS - LORETO - LORETO
Mes Valoriz.: Oct-22
Pago Adel.: Jul-14
Am = Ci x V x Ima/Imo
D = Am x ( Imr - Ima / Imo )
Donde :
V = Valorización del Mes
Ci = Coeficiente de Incidencia del material Utilizado
D = Deducción de reintegro que no corresponde
Am = Monto Amortizado en Valorizaciones
Imr = Indice del material al mes del reajuste Julio INDICE DE Julio
Ima = Indice del material al mes del adelanto Julio INDICE DE Julio
Imo = Indice del material al mes del P.B. SET 2013 INDICE DE SET
ESTRUCTURAS
03 Jul-14 Err:509 #REF! 31,383.84 410.96 410.96 410.96 31,383.84 Err:509 Err:509
TOTAL Err:509
03 Jul-14 Err:509 #REF! 36,864.70 685.08 685.08 682.35 36,717.80 Err:509 Err:509
TOTAL Err:509
03 Jul-14 Err:509 #REF! 52,169.33 344.06 344.06 311.97 47,303.57 Err:509 Err:509
TOTAL Err:509
DEDUCCION TOTAL (ESTRUCTURAS) - MAYO - 2014
ARQUITECTURA
03 Jul-14 Err:509 #REF! 68,250.00 410.96 410.96 410.96 68,250.00 Err:509 Err:509
TOTAL Err:509
03 Jul-14 Err:509 #REF! 42,069.08 280.14 280.14 277.01 41,599.04 Err:509 Err:509
TOTAL Err:509
03 Jul-14 Err:509 #REF! 60,494.54 826.37 826.37 826.29 60,488.68 Err:509 Err:509
TOTAL Err:509
03 Jul-14 Err:509 #REF! 46,626.44 313.47 313.47 311.97 46,403.33 Err:509 Err:509
TOTAL Err:509
DEDUCCION TOTAL (ARQUITECTURA) - JULIO - 2014 Err:509
INSTALACIONES ELECTRICAS
03 Jul-14 #REF! #REF! 14,012.23 354.66 354.66 347.86 13,743.57 #REF! #REF!
TOTAL #REF!
INSTALACIONES SANITARIAS
03 Jul-14 Err:509 #REF! 10,919.22 380.12 380.12 364.53 10,471.39 Err:509 Err:509
TOTAL Err:509
03 Jul-14 Err:509 #REF! 21,837.54 410.96 410.96 410.96 21,837.54 Err:509 Err:509
TOTAL Err:509
03 Jul-14 Err:509 #REF! 38,403.42 685.08 685.08 682.35 38,250.38 Err:509 Err:509
TOTAL Err:509
03 Jul-14 Err:509 #REF! 52,169.33 344.06 344.06 311.97 47,303.57 Err:509 Err:509
TOTAL Err:509
ESTRUCTURAS
- - -
TOTAL Jul-14 #NAME? - -
- -
TOTAL Jul-14 #NAME? - -
GOBIERNO REGIONAL DEL CUSCO
GERENCIA GENERAL REGIONAL
1 May-14
2 Jun-14
Hormigon 23.54 70.00 1,647.80 685.08 682.35 1,654.39 1,654.39 8,073.75 - 6,419.36
Hormigon clasificado #NAME? 85.00 #NAME? 685.08 682.35 #NAME? #NAME? 18,795.54 - #NAME?
Piedra de 3 #NAME? 70.00 #NAME? 685.08 682.35 #NAME? #NAME? 1,140.93 - #NAME?
Piedra de 6 2.07 2.00 4.14 685.08 682.35 4.16 4.16 2,405.56 - 2,401.40
3 Jul-14
Piedra Ckancada de 1/2 685.08 682.35 2,448.41 2,448.41
Piedra de 8 7.50 75.00 562.50 685.08 682.35 564.75 564.75 1,170.79 -
arena gruesa 685.08 682.35 1,452.51 1,452.51
Material de prestamo - 25.00 - 685.08 682.35 - - 1,377.22 -
TOTAL - -
TOTAL Jul-14 #NAME? - #NAME?
ARQUITECTURA
CERCO PERIMETRICO
1 May-14
LADRILLO KK TIPO IV 8.5X11X23 CM 10,760.00 0.72 7,747.20 596.89 587.10 7,876.39 7,876.39 35,869.27 27,992.88
ACERO CORRUGADO - - - 596.89 596.89 - - - -
2 Jun-14
TOTAL May-14 - -
TOTAL Jun-14 7,876.39 - 27,992.88
TRIPLAY DE 15 MM #REF! 80.50 #REF! 313.47 311.97 #REF! #REF! 38,944.82 #REF!
PINTURA ESMALTE - 38.00 - 313.47 311.97 - - 29.20 - 29.20
3 Jul-14
- -
TOTAL Jul-14 #REF! - #REF!
Componente Bloque A
Ubicación: Dist. : Wanchaq Prov. : Cusco Dpto.: Cusco
GERENCIA REGIONAL DE INFRAESTRUCTURA MEJORAMIENTO DE LOS SERVICIOS DEL CENTRO EDUCATIVO BASICO
SUB GERENCIA DE ESTUDIOS DE INVERSIÓN ESPECIAL DON JOSE DE SAN MARTIN
Componente Bloque A
Ubicación: Dist. : Wanchaq Prov. : Cusco Dpto.: Cusco
02.03.00 Demoliciones
Componente Bloque A
Ubicación: Dist. : Wanchaq Prov. : Cusco Dpto.: Cusco
Componente Bloque A
Ubicación: Dist. : Wanchaq Prov. : Cusco Dpto.: Cusco
Componente Bloque A
Ubicación: Dist. : Wanchaq Prov. : Cusco Dpto.: Cusco
Zapatas
Z-01 3 1.80 1.80 1.65 16.04 m3
Z-03 7 1.80 2.20 1.65 45.74 61.78 m3
Cimientos corridos
Interiores 1 11.05 0.40 0.95 4.20 4.20 m3
Vigas de conexión
Eje 1 estre los ejes I-J-K 2 1.65 0.60 1.10 2.18 m3
Eje 4 estre los ejes I-J-K 2 1.25 0.60 1.10 1.65 m3
Eje I-K, entre los ejes (1,2 - 3,4) 4 1.65 0.60 1.10 4.36 m3
Eje I-K, entre los ejes (1,3) 2 1.70 0.60 1.10 2.24 10.43 m3
76.41 m3
Componente Bloque A
Ubicación: Dist. : Wanchaq Prov. : Cusco Dpto.: Cusco
Componente Bloque A
Ubicación: Dist. : Wanchaq Prov. : Cusco Dpto.: Cusco
05.03.00 Columnas
05.03.01 Columnas - concreto f'c=210 Kg/cm2
Ubicación Cant Area en cad altura Volumen Sub total TOTAL Und.
Primer Nivel
C-01 4 0.16 3.95 2.53 m3
C-02 4 0.13 3.95 2.01 m3
C-04 2 0.06 3.95 0.47 5.01 m3
Segundo Nivel m3
C-01 4 0.16 3.65 2.34 m3
C-02 4 0.13 3.65 1.86 m3
C-04 2 0.06 3.65 0.44 4.64 m3
Remate en Punta m3
C-04 2 0.06 2.00 0.24 0.24 m3
m3
9.89 m3
124.88 m2
05.04.00 Placas
05.04.01 Placas - concreto f'c=210 Kg/cm2
Ubicación Cant Area en cad altura Volumen Sub total TOTAL Und.
P-1 2 0.10 3.95 0.79 m3
0.79 0.79 m3
Componente Bloque A
Ubicación: Dist. : Wanchaq Prov. : Cusco Dpto.: Cusco
05.05.00 Vigas
05.05.01 Vigas -Concreto f'c=210 Kg/cm2
Ubicación Cant largo ancho altura Volumen Sub total TOTAL Und.
Primer Nivel
Ejes 1,4 4 2.95 0.20 0.50 1.18 m3
Ejes 2,3 2 6.50 0.25 0.60 1.95 m3
Ejes I,K (1-2, 3-4) 4 2.88 0.20 0.50 1.15 m3
Ejes I,K (2-3) 2 3.05 0.20 0.50 0.61 m3
Ejes I,K (voladizo) 2 1.80 0.20 0.35 0.25 m3
Ejes J' (1-2, 3-4) 2 3.28 0.30 0.20 0.39 m3
Ejes J' (2-3) 1 3.25 0.30 0.20 0.20 m3
Ejes J' (voladizo) 1 1.80 0.25 0.35 0.16 5.89 m3
Segundo Nivel
Ejes 1,4 4 2.95 0.20 0.50 1.18 m3
Ejes 1,4 (timpanos) 4 2.95 0.20 0.30 0.71 m3
Ejes 2,3 2 6.50 0.25 0.60 1.95 m3
Ejes 2,3 (voladizo) 4 0.90 0.25 0.35 0.32 m3
Ejes I,K (1-2, 3-4) 4 2.88 0.20 0.50 1.15 m3
Ejes I,K (2-3) 2 3.05 0.25 0.50 0.76 m3
Ejes I,K (voladizo) 2 1.80 0.20 0.35 0.25 m3
Ejes J' (1-2, 3-4) 2 3.28 0.25 0.50 0.82 m3
Ejes J' (2-3) 1 3.25 0.25 0.50 0.41 m3
Ejes J' (voladizo) 1 1.80 0.25 0.35 0.16 7.71 m3
13.60 m3
Componente Bloque A
Ubicación: Dist. : Wanchaq Prov. : Cusco Dpto.: Cusco
05.07.00 Columnetas
05.07.01 Columnetas -Concreto f'c=210 Kg./cm2
Ubicación Cant largo ancho altura Volumen Sub total TOTAL Und.
Primer nivel
eje 1 2 0.15 0.20 2.00 0.12 m3
eje I 6 0.15 0.15 1.10 0.15 m3
eje k 4 0.15 0.15 1.10 0.10 0.37 m3
Segundo nivel
eje I 6 0.15 0.15 1.10 0.15 m3
eje k 6 0.15 0.15 1.10 0.15 0.30 m3
0.67 m3
05.08.00 Viguetas
05.08.01 Viguetas -Concreto f'c=210 Kg./cm2
Ubicación Cant largo ancho altura Volumen Sub total TOTAL Und.
Primer nivel
eje 1 1 2.60 0.20 0.15 0.08 m3
eje I entre 1y2 1 1.65 0.15 0.15 0.04 m3
eje I,k entre 2y3 2 2.70 0.15 0.15 0.12 m3
eje I ,k entre 3y4 2 2.53 0.15 0.15 0.11 0.35 m3
Segundo nivel
eje I ,k entre 1,2 y3,4 4 2.53 0.15 0.15 0.23 m3
eje I,k entre 2y3 2 2.70 0.15 0.15 0.12 0.35 m3
0.70 m3
GERENCIA REGIONAL DE INFRAESTRUCTURA MEJORAMIENTO DE LOS SERVICIOS DEL CENTRO EDUCATIVO BASICO
SUB GERENCIA DE ESTUDIOS DE INVERSIÓN ESPECIAL DON JOSE DE SAN MARTIN
Componente Bloque A
Ubicación: Dist. : Wanchaq Prov. : Cusco Dpto.: Cusco
05.09.00 Canaleta
05.09.01 Canaleta - Concreto f'c=210 Kg/cm2
Ubicación Cantid. largo Area cad altura Volumen Sub total TOTAL Und.
nivel de techos 2 13.40 0.17 4.56 4.56 4.56 m3
06.09.00 Limahoyas
Ubicación Cant largo ancho altura Area Sub total TOTAL Und.
Bloque A 0.00 0.00 m2
0.00 m2
06.10.00 Limatezas
Ubicación Cant largo ancho altura Area Sub total TOTAL Und.
Bloque A 1 17.50 17.50 m2
17.50 m2
GERENCIA REGIONAL DE INFRAESTRUCTURA MEJORAMIENTO DE LOS SERVICIOS DEL CENTRO EDUCATIVO BASICO
SUB GERENCIA DE ESTUDIOS DE INVERSIÓN ESPECIAL DON JOSE DE SAN MARTIN
Componente : Bloque E
Ubicación: Dist. : Wanchaq Prov. : Cusco Dpto.: Cusco
Zapatas
Z-01 4 1.80 1.80 1.65 21.38 m3
Z-02 8 2.00 2.20 1.65 58.08 m3
Z-03 5 1.80 2.20 1.65 32.67 m3
Z-04 2 1.40 2.20 1.65 10.16 m3
Z-05 1 1.40 1.80 1.65 4.16 126.45 m3
Cimientos corridos
Interiores 1 14.00 0.40 0.95 5.32 5.32 m3
Vigas de conexión
Ejes 14, 21 4 2.95 0.60 1.10 7.79 m3
Ejes 16, 19 4 3.10 0.60 1.10 8.18 m3
Ejes G, I entre los ejes 14-15 2 1.55 0.60 1.10 2.05 m3
Ejes G, I entre los ejes 15-17, 18-20 8 1.60 0.60 1.10 8.45 m3
Ejes G, I entre los ejes 17-18 2 1.50 0.60 1.10 1.98 m3
Ejes G, I entre los ejes 20-21 2 1.25 0.60 1.10 1.65 m3
Eje H 1 4.85 0.60 1.10 3.20 33.30 m3
165.07 m3
Componente : Bloque E
Ubicación: Dist. : Wanchaq Prov. : Cusco Dpto.: Cusco
Vigas de Conexión
Ejes 14, 21 4 2.95 0.25 2.95 m2
Ejes 16, 19 4 3.10 0.25 3.10 m2
Ejes G, I entre los ejes 14-15 2 1.55 0.25 0.78 m2
Ejes G, I entre los ejes 15-17, 18-20 8 1.60 0.25 3.20 m2
Ejes G, I entre los ejes 17-18 2 1.50 0.25 0.75 m2
Ejes G, I entre los ejes 20-21 2 1.25 0.25 0.63 m2
Eje H 1 4.85 0.25 1.21 12.62 m2
89.26 m2
04.03.00 Sobrecimientos
04.03.01 Sobrecimientos Concreto 1:8 + 25% PM.
Descripcion Cant largo ancho altura Volumen Sub total TOTAL Und.
Sobre vigas de conexión
Eje 14 2 2.95 0.20 1.05 1.24 m3
Eje 16 1 4.05 0.15 1.05 0.64 m3
Eje 19 2 3.10 0.20 1.05 1.30 m3
Eje 21 1 6.05 0.20 1.05 1.27 m3
Ejes G, I entre los ejes 14-15 2 2.53 0.15 1.05 0.80 m3
Ejes G, I entre los ejes 15-16 1 4.38 0.15 1.05 0.69 m3
Ejes G, I entre los ejes 16-17 2 2.70 0.15 1.05 0.85 m3
Ejes G, I entre los ejes 17-18 2 4.38 0.15 1.05 1.38 m3
Ejes G, I entre los ejes 18-19 2 2.70 0.15 1.05 0.85 m3
Ejes G, I entre los ejes 19-20 2 4.38 0.15 1.05 1.38 m3
Ejes G, I entre los ejes 20-21 2 2.58 0.15 1.05 0.81 11.21 m3
Sobre cimientos corridos
Eje 17 1 4.63 0.15 0.60 0.42 m3
Interiores 1 9.38 0.15 0.60 0.84 1.26 m3
12.47 m3
Componente : Bloque E
Ubicación: Dist. : Wanchaq Prov. : Cusco Dpto.: Cusco
05.03.00 Columnas
05.03.01 Columnas - concreto f'c=210 Kg/cm2
Ubicación Cant Area en cad altura Volumen Sub total TOTAL Und.
C-01 4 0.16 7.60 4.86 m3
C-02 12 0.13 7.60 11.63 m3
C-03 2 0.06 7.60 0.91
C-04 2 0.06 9.60 1.15 18.55 m3
18.55 m3
GERENCIA REGIONAL DE INFRAESTRUCTURA MEJORAMIENTO DE LOS SERVICIOS DEL CENTRO EDUCATIVO BASICO
SUB GERENCIA DE ESTUDIOS DE INVERSIÓN ESPECIAL DON JOSE DE SAN MARTIN
Componente : Bloque E
Ubicación: Dist. : Wanchaq Prov. : Cusco Dpto.: Cusco
05.04.00 Placas
05.04.01 Placas - concreto f'c=210 Kg/cm2
Ubicación Cant Area en cad altura Volumen Sub total TOTAL Und.
P-1 6 0.10 3.95 2.37 m3
2.37 2.37 m3
05.05.00 Vigas
05.05.01 Vigas -Concreto f'c=210 Kg/cm2
Ubicación Cant largo ancho altura Volumen Sub total TOTAL Und.
Primer Nivel
Ejes 14, 21 4 2.95 0.20 0.50 1.18 m3
Ejes 16, 19 4 3.10 0.20 0.50 1.24 m3
Ejes 15, 17, 18, 20 4 6.50 0.25 0.60 3.90 m3
Ejes 14... 21 (Volado 1.90) 8 1.90 0.25 0.35 1.33 m3
Ejes G, I 2 21.65 0.20 0.50 4.33 m3
Eje I (volado) 1 22.85 0.20 0.20 0.91 m3
Ejes H' 1 22.85 0.30 0.20 1.37 14.26 m3
Segundo Nivel
Ejes 14, 21 (timpanos) 4 2.95 0.20 0.30 0.71 m3
Ejes 14, 21 4 2.95 0.20 0.50 1.18 m3
Ejes 15, 16, 17, 18,19, 20 6 6.50 0.25 0.60 5.85 m3
Ejes 14... 21 (Volado 0.90) 8 0.90 0.25 0.35 0.63 m3
Ejes 14... 21 (Volado 1.90) 8 1.90 0.25 0.35 1.33 m3
Ejes G, I 2 21.65 0.20 0.50 4.33 m3
Ejes H' 1 22.85 0.25 0.50 2.86 16.89 m3
31.15 m3
Componente : Bloque E
Ubicación: Dist. : Wanchaq Prov. : Cusco Dpto.: Cusco
344.80 m2
GERENCIA REGIONAL DE INFRAESTRUCTURA MEJORAMIENTO DE LOS SERVICIOS DEL CENTRO EDUCATIVO BASICO
SUB GERENCIA DE ESTUDIOS DE INVERSIÓN ESPECIAL DON JOSE DE SAN MARTIN
Componente : Bloque E
Ubicación: Dist. : Wanchaq Prov. : Cusco Dpto.: Cusco
05.07.00 Columnetas
05.07.01 Columnetas -Concreto f'c=210 Kg./cm2
Ubicación Cant largo ancho altura Volumen Sub total TOTAL Und.
Primer nivel
Ejes G, I 24 0.15 0.15 1.10 0.59 m3
Ejes G, I (16-17) 4 0.15 0.15 2.00 0.18 0.77 m3
Segundo nivel
Ejes G, I 24 0.15 0.15 1.10 0.59 m3
Ejes G, I (16-17) 4 0.15 0.15 2.00 0.18 0.77 m3
1.54 m3
05.08.00 Viguetas
05.08.01 Viguetas -Concreto f'c=210 Kg./cm2
Ubicación Cant largo ancho altura Volumen Sub total TOTAL Und.
Primer nivel
Ejes G, I entre los ejes 14-15 2 2.53 0.15 0.15 0.11 m3
Ejes G, I entre los ejes 15-16 1 4.38 0.15 0.15 0.10 m3
Ejes G, I entre los ejes 16-17 2 2.70 0.15 0.15 0.12 m3
Ejes G, I entre los ejes 17-18 1 4.38 0.15 0.15 0.10 m3
Ejes G, I entre los ejes 18-19 2 2.70 0.15 0.15 0.12 m3
Ejes G, I entre los ejes 19-20 1 4.38 0.15 0.15 0.10 m3
Ejes G, I entre los ejes 20-21 2 2.58 0.15 0.15 0.12 0.77 m3
GERENCIA REGIONAL DE INFRAESTRUCTURA MEJORAMIENTO DE LOS SERVICIOS DEL CENTRO EDUCATIVO BASICO
SUB GERENCIA DE ESTUDIOS DE INVERSIÓN ESPECIAL DON JOSE DE SAN MARTIN
Componente : Bloque E
Ubicación: Dist. : Wanchaq Prov. : Cusco Dpto.: Cusco
Segundo nivel m3
Ejes G, I entre los ejes 14-15 2 2.53 0.15 0.15 0.11 m3
Ejes G, I entre los ejes 15-16 1 4.38 0.15 0.15 0.10 m3
Ejes G, I entre los ejes 16-17 2 2.70 0.15 0.15 0.12 m3
Ejes G, I entre los ejes 17-18 1 4.38 0.15 0.15 0.10 m3
Ejes G, I entre los ejes 18-19 2 2.70 0.15 0.15 0.12 m3
Ejes G, I entre los ejes 19-20 1 4.38 0.15 0.15 0.10 m3
Ejes G, I entre los ejes 20-21 2 2.58 0.15 0.15 0.12 0.77 m3
1.54 m3
05.09.00 Canaleta
05.09.01 Canaleta - Concreto f'c=210 Kg/cm2
Ubicación Cantid. largo Area cad altura Volumen Sub total TOTAL Und.
nivel de techos 2 24.75 0.17 8.42 8.42 8.42 m3
Componente : Bloque E
Ubicación: Dist. : Wanchaq Prov. : Cusco Dpto.: Cusco
06.10.00 Limahoyas
Ubicación Cant largo ancho altura Area Sub total TOTAL Und.
Bloque E 1 24.80 24.80 m2
24.80 m2
METRADO DE MATERIALES EMPLEADOS EN EL MES (JULIO - 2014)
ESTRUCTURAS
02.02.01.01
PARTIDA AGUA RESUMEN
CANTIDAD TOTAL
TOTAL PRECIO UNIT. REAL
INDICE DESCRIPCION UTILIZADA UTILIZADA
INSUMOS CANTIDAD PRECIO METRADO TOTAL
AGUA 500.005 2 0.1 50.00 21 Cemento Portland Tipo I #NAME? 19.60 #NAME?
3 Acero Corrugado 0.00
Acero corrugado #NAME? 3.00 #NAME?
PARTIDA Relleno con material de prestamo Alambre # 8 #NAME? 4.50 #NAME?
INSUMOS CANTIDAD PRECIO METRADO TOTAL Alambre # 16 #NAME? 4.40 #NAME?
MATERIAL DE PRESTAMO 1 25 0.00 0.00 clavos de 3 #NAME? 4.00 #NAME?
38 Hormigón
Hormigon 23.54 70.00 1647.80
Hormigon clasificado #NAME? 85.00 #NAME?
Piedra de 3 #NAME? 70.00 #NAME?
PARTIDA 02.02.01. Sub Zapatas Piedra de 6 2.07 2.00 4.14
INSUMOS CANTIDAD PRECIO METRADO TOTAL Piedra de 8 7.50 75.00 562.50
CEMENTO 4 19.6 #NAME? #NAME? Material de prestamo 0.00 25.00 0.00
HORMIGON 0.65 70 4.60 2.99 PIEDRA CHANCADA DE 1/2" 0.00 0.00
PIEDRA MEDIANA DE 6" 0.45 75 4.60 2.07 45 Madera Nacional Encof. Y carp
Madera corriente #NAME? 3.00 #NAME?
PARTIDA 02.02.01. Cimientos corridos
INSUMOS CANTIDAD PRECIO METRADO TOTAL
CEMENTO 4 19.6 #NAME? #NAME?
HORMIGON 0.87 70 15.00 13.05
PIEDRA GRANDE DE 8" 0.5 75 15.00 7.50
SOBRECIEMIENTO
ZAPATAS
VIGAS DE CONEXIÓN
COLUMNAS
VIGAS
LOSA ALIGERADA
º Ladrillo kk de Soga
INSUMOS CANTIDAD PRECIO METRADO TOTAL
ARENA GRUESA 0.04 80 240 9.60
LADRILLO KK 40 0.72 240 9,600.00
CEMENTO 0.24 19.6 240 57.60
240
RESUMEN
FECHA Oct-22
V
AMORTIZACI ON A
C
OBRA
“MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO EN LA CCNN DE NUEVA
JERUSALEN, DISTRITO DE TROMPETEROS - LORETO – LORETO”
10.00%
GASTOS GENERALES 10% 336,655.27 #REF! #REF! #REF! #REF! #REF!
UTILIDAD 7% 7.00% 235,658.69 #REF! #REF! #REF! #REF! #REF!
SUB TOTAL 3,938,866.64 #REF! #REF! #REF! #REF! #REF!
I.G.V. 18.00% 708,996.00 #REF! #REF! #REF! #REF! #REF!
TOTAL 4,647,862.64 #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
FÓRMULA 0.00
UBICACIÓN Comunidad.:Collana Condes - Distrito: Santo Tomas - Prov.:Chumbivilcas - Dpto.:CUSCO
CONTRATISTA ODIN INGENIEROS SCRL
SUPERVISOR Ing. Hilmer Romainville Yturriaga
PERIODO feb-15
FORMULA 1 0
01 OBRAS PROVISIONALES Y PRELIMINARES
01.01 FLETE TERRESTRE (TRANSPORTE DE MATERIALES)
01.01.01 Flete Terrestre Cusco - Collana Conde glb 0.10
01.01.02 Movilización y desmovilización de equipos glb 0.20
01.02 CONSTRUCCIONES PROVISIONALES
01.02.01 Almacen, Oficina y Guardiania m2 112.00
01.02.02 Cartel de identificacion de obra de 4.80m x 3.60m und 0.00
01.02.03 Servicios higienicos und 0.00
01.02.04 Cerco perimetrico con arpillera m 0.00
01.03 INSTALACIONES PROVISIONALES
01.03.01 Agua para la construccion mes 0.00
01.03.02 Energía eléctrica para la construcción mes 0.00
01.04 TRABAJOS PRELIMINARES
01.04.01 Limpieza de terreno manual m2 1,969.91
01.04.02 Trazo y replanteo preliminar m2 489.37
01.04.03 Trazo y replanteo durante la ejecución de obra mes 0.00
01.04.04 Limpieza permanente en obra mes 0.50
01.04.05 Remoción de Cobertura de Calamina m2 97.95
01.04.06 Remoción de Estructuras de Tijerales de madera en techos m2 114.51
01.04.07 Remoción de Puerta y ventanas de madera und 9.00
01.04.08 Demolición de Aulas de adobe incl. cimientos y techo con maquinaria m3 282.98
02 ESTRUCTURAS
02.01 MOVIMIENTO DE TIERRAS
02.01.01 Corte de terreno con maquinaria m3 100.97
02.01.02 Excavacion para cimientos y zapatas m3 0.00
02.01.03 Relleno con Material de Prestamo m3 0.00
02.01.04 Acarreo de material excedente (d=40m) m3 0.00
02.01.05 Eliminacion de material excedente (5 Km) m3 0.00
02.01.06 Colocacion de Material de afirmado e =4" m2 0.00
02.01.07 Relleno con material propio seleccionado m3 0.00
02.02 OBRAS DE CONCRETO SIMPLE
02.02.01 SOLADOS
02.02.01.01 Solado cemento - hormigón 1:12 e=10 cm m2 0.00
02.02.02 CIMIENTOS CORRIDOS
02.02.02.01 Cimiento corrido CºCº C:H 1:10 + 30% PG m3 0.00
02.02.02.02 Encofrado y Desencofrado en Cimientos m2 0.00
02.02.03 SOBRECIMIENTOS
02.02.03.01 Sobrecimiento concreto 1:8+25%PM m3 0.00
02.02.03.02 Encofrado en sobrecimientos m2 0.00
02.02.04 FALSA ZAPATA
02.02.04.01 Falza Zapata C:H 1:12 + 50% PG m3 0.00
02.03 CONCRETO ARMADO
02.03.01 ZAPATAS
02.03.01.01 Concreto en zapatas f'c=210 kg/cm2 m3 0.00
02.03.01.02 Acero f`y=4200 kg/cm2 en zapatas kg 0.00
02.03.02 VIGAS DE CONEXION
02.03.02.01 Viga de Conexion - Concreto f'c= 210 kg/cm2 m3 0.00
02.03.02.02 Viga de Conexion - Encofrado y desencofrado m2 0.00
02.03.02.03 Viga de Conexion - Acero f'y=4200 kg/cm2 kg 0.00
02.03.03 COLUMNAS
02.03.03.01 Columnas - Concreto f'c=210 kg/cm2 m3 0.00
02.03.03.02 Columnas - Encofrado y desencofrado m2 0.00
02.03.03.03 Columnas - Acero f`y=4200 kg/cm2 kg 0.00
02.03.04 VIGAS
PART. DESCRIPCIÓN Und. METRADO
FÓRMULA 0.00
UBICACIÓN Comunidad.:Collana Condes - Distrito: Santo Tomas - Prov.:Chumbivilcas - Dpto.:CUSCO
CONTRATISTA ODIN INGENIEROS SCRL
SUPERVISOR Ing. Hilmer Romainville Yturriaga
PERIODO feb-15
FÓRMULA 0.00
UBICACIÓN Comunidad.:Collana Condes - Distrito: Santo Tomas - Prov.:Chumbivilcas - Dpto.:CUSCO
CONTRATISTA ODIN INGENIEROS SCRL
SUPERVISOR Ing. Hilmer Romainville Yturriaga
PERIODO feb-15
ASENTADO DE SARDINLES
ASENTADO DE SARDINELES
PANEL FOTOGRAFICO
VALORIZACION DE OBRA N° 10 - OCTUBRE 2022
BACEADO DE LOSAS
TRAZO Y REPLANTEO
PANEL FOTOGRAFICO
VALORIZACION DE OBRA N° 10 - OCTUBRE 2022