Está en la página 1de 3

MAXIMOS Y MINIMOS

1,000 UNIDADES 1,500 UNIDADES 2,000 UNIDADES 3,000 UNIDADES


CLASIFICACION CONCEPTO IMPORTE P.U. IMPORTE P.U. IMPORTE P.U. IMPORTE P.U.
V MATERIA PRIMA $9,000 9 $13,500 9 $18,000 9 $27,000 9
SV SUMINISTROS $4,500 4.5 $6,000 4 $7,500 3.75 $10,500 3
SV MATERIALES $600 0.6 $750 0.5 $900 0.45 $1,200 0.4
V MANO DE OBRA $15,000 15 $22,500 15 $30,000 15 $45,000 15
F SUPERVISION $12,000 12 $12,000 8 $12,000 6 $12,000 4
SV MANTENIMIENTO $6,000 6 $7,500 5 $9,000 4.5 $12,000 4
F DEPRECIACION $4,500 4.5 $4,500 3 $4,500 2.25 $4,500 1.5
SV LUZ $1,500 1.5 $1,650 1.1 $1,800 0.9 $2,100 0.7
F IMPUESTOS $3,000 3 $3,000 2 $3,000 1.5 $3,000 1
SV OTROS $500 0.5 $6,000 4 $700 0.35 $900 0.3

Para fijo se pasa el importe y se divide entre unidades


Para variables se multiplica el precio unitario por las unidades
Para SV se realiza la tabla restando máximo a mínimo y después se hacen la operación del último renglón de izquierda a derecha y de arriba abajo.

Cálculos para SV

Suministros para suministros importe y P.U 3000 uni


Niveles Volumen Costo
max 2000 7500
Min 1000 4500
Unidades= max-min 1000 3000
3000/1000=3 costo variable 3*2000=6000 7500-6000=1500
unitario 3*3000=9000 9000+1500=10500
costo variable total costo fijo total
Suministros para materiales importe y P.U 3000 uni
Niveles Volumen Costo
max 2000 900
Min 1000 600
Unidades= max-min 1000 300
0.3*2000=600 900-600=300
300/1000=0.3 costo variable
0.3*3000=900 900+300=1200
unitario
costo variable total costo fijo total
Suministros para Manenimiento importe y P.U 3000 uni
Niveles Volumen Costo
max 2000 9000
Min 1000 6000
Unidades= max-min 1000 3000
3*2000=6000 9000-6000=3000
3000/1000=3 costo variable
3*3000=9000 9000+3000=12000
unitario
costo variable total costo fijo total
Suministros para Luz importe y P.U 3000 uni
Niveles Volumen Costo
max 2000 1800
Min 1000 1500
Unidades= max-min 1000 300
0.3*2000=600 1800-600=1200
300/1000=0.3 costo variable
0.3*3000=900 900+1200=2100
unitario
costo variable total costo fijo total
Suministros para otros importe y P.U 3000 uni
Niveles Volumen Costo
max 2000 700
Min 1000 500
Unidades= max-min 1000 200
0.2*2000=400 700-400=300
200/1000=0.2 costo variable
0.2*3000=600 600+300=900
unitario
costo variable total costo fijo total

800 UNIDADES 1,700 2,300 2,600 2,800 3,500


UNIDADES UNIDADES UNIDADES UNIDADES UNIDADES
CLASIFICACION CONCEPTO IMPORTE P.U. IMPORTE P.U. IMPORTE P.U. IMPORTE P.U. IMPORTE P.U. IMPORTE P.U.
SV MANTENIMIENTO $4,000 5 $4,500 2.64 $5,000 2.17 $7,000 2.69 $9,000 3.21 $25,500 2.83
F DEPRECIACION $5,000 6.25 $5,000 2.94 $5,000 2.17 $5,000 1.92 $5,000 1.78 $5,000 1.42
SV LUZ $2,500 3.12 $4,000 2.35 $4,600 2 $5,500 2.11 $7,000 2.5 $16,450 2.35
V MATERIA PRIMA $6,000 7.5 $12,750 7.5 $17,250 7.5 $19,500 7.5 $21,000 7.5 $26,250 7.5
DIRECTA
SV MANO DE OBRA $3,200 4 $4,200 2.47 $6,200 2.69 $7,300 2.80 $9,000 3.21 $26,980 2.99
INDIRECTA
F SUPERVISION $3,000 3.75 $3,000 1.76 $3,000 1.30 $3,000 1.15 $3,000 1.07 $3,000 0.85
SV TELEFONO $1,500 1.87 $2,000 1.17 $3,000 1.30 $3,800 1.46 $4,500 1.60 $7,050 2.35
F RENTA $2,000 2.5 $2,000 1.17 $2,000 0.86 $2,000 0.76 $2,000 0.71 $2,000 0.57
V MANO DE OBRA $8,000 10 $17,000 10
Suministros para MANO DE OBRA INDIRECTA importe y P.U 3500 unidades
$23,000 10 $26,000 10 $28,000 10 $35,000 10
DIRECTA
Niveles Volumen Costo
SV MATERIALES $7,000 8.75 $12,000 7.05 $14,000 6.08 $15,000 5.76 $16,000 5.71 $12,200 0.76
max INDIRECTOS 2800 9000
Min 800 3200
Unidades= max-min 2000 5800 Cálculos para SV
5800/2000 = 2.9 costo variable 2.9*2800=8120 9000-8120=880
Suministros para mantenimiento importe y P.U 3500 unidades
unitario 2.9*9000=26100 26100+880=26980
Niveles Volumen Costo
costo variable total costo fijo total
max 2800 9000
PU = 26980/9000 = 2.99
Min 800 4000
Suministros para TELEFONO importe y P.U 3500 unidades
Unidades= max-min 2000 5000
Niveles Volumen Costo
5000/2000 = 2.5costo variable 2.5*2800=7000 9000-7000=3000
max 2800 4500
unitario 2.5*9000=22500 22500+3000=25500
Min 800 1500
costo variable total costo fijo total
Unidades= max-min 2000 3000
PU = 25500/9000 = 2.83
1.5*2800=4200 4500-4200=300
3000/2000=1.5 costoSuministros
variable para LUZ importe y P.U 3500 unidades
1.5*4500=6750 6750+300=7050
unitario
Niveles Volumen Costo
costo variable total costo fijo total
max 2800 7000
PU =7050/4500=1.56
Min 800 2500
Suministrso para MATERIALES INDIRECTOS importe y P.U 3500 unidades
Unidades= max-min 2000 4500
Niveles Volumen Costo
2.25*2800=6300 7000-6300=700
4500/2000=2.25
Maxcosto variable 2800 16000
2.25*7000=15750 15750+700=16450
unitario
Min 800 7000
costo variable total costo fijo total
Unidades = max – min 2000 9000
PU =16450/7000=2.35
1.5*2800=4200 16000-4200=11800
3000/2000 = 1.5 costo variable
1.5*16000=24000 24000+11800=12200
unitario
costo variable total costo fijo total
PU = 12200/16000 = 0.76