VALORIZACIÓN DE OBRA N° 0 -
01 DE LA OBRA
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA
UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
03 DE LA ADMINISTRACION DE LA OBRA
INSPECTOR: Ing. Luciano Bautista Checasaca
RESIDENTE: Ing. Ze Carlos Mamani Florez
FECHA DE REINICIO: 7/9/2019
PLAZO CONTRACTUAL: 300 DIAS CALENDARIOS
FECHA DE CULMINACIÓN: 5/3/2020
GOBIERNO REGIONAL DE MADRE DE DIOS
GERENCIA GENERAL REGIONAL
RESUMEN DE LA VALORIZACIÓN
VALORIZACIÓN DE OBRA N° 0 -
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
VALORIZACION
CONCEPTO SÍMBOLO PRESUPUESTO PRIMERA VALORIZACION TOTAL SALDO POR %
APROBADO Nro. 01 ACUMULADO VALORIZAR SALDO
ETAPA -2017
VALORIZACIÓN DEL MES - CONTRACTUAL V_C #REF! #REF! #REF! Err:509 #REF!
OBRAS PROVISIONALES - -
ESTRUCTURAS 705,469.52 74,004.21 Err:509 Err:509 Err:509 Err:509
LABORATORIO DE BIOTECNOLOGIA - -
ESTRUCTURAS #REF! - #REF! #REF! #REF! #REF!
ARQUITECTURA #REF! - #REF! #REF! #REF! #REF!
INSTALACIONES SANITARIAS #REF! - #REF! #REF! #REF! #REF!
INSTALACIONES ELECTRICAS #REF! - #REF! #REF! #REF! #REF!
SALA DE ORDEÑO - -
ESTRUCTURAS #REF! 41,538.08 - 41,538.08 #REF! #REF!
ARQUITECTURA #REF! 18,238.31 - 18,238.31 #REF! #REF!
INSTALACIONES SANITARIAS #REF! 2,592.30 - 2,592.30 #REF! #REF!
INSTALACIONES ELECTRICAS #REF! - - - #REF! #REF!
VIVIENDA PERSONAL - -
ESTRUCTURAS #REF! - #REF! #REF! #REF! #REF!
ARQUITECTURA #REF! - #REF! #REF! #REF! #REF!
INSTALACIONES SANITARIAS #REF! - #REF! #REF! #REF! #REF!
INSTALACIONES ELECTRICAS #REF! - #REF! #REF! #REF! #REF!
VIVIENDA PERSONAL - -
ESTRUCTURAS #REF! - #REF! #REF! #REF! #REF!
ARQUITECTURA #REF! - #REF! #REF! #REF! #REF!
INSTALACIONES SANITARIAS #REF! - #REF! #REF! #REF! #REF!
INSTALACIONES ELECTRICAS #REF! - #REF! #REF! #REF! #REF!
SALA DE ORDEÑO - - - -
ESTRUCTURAS #REF! 30,128.24 - 30,128.24 #REF! #REF!
ARQUITECTURA #REF! 11,260.79 - 11,260.79 #REF! #REF!
INSTALACIONES SANITARIAS #REF! 2,372.18 - 2,372.18 #REF! #REF!
TANQUE ELEVADO - - - -
ESTRUCTURAS #REF! 13,333.38 - 13,333.38 #REF! #REF!
ARQUITECTURA #REF! 1,666.37 - 1,666.37 #REF! #REF!
OBRAS EXTERIORES - - - -
INSTALACIONES SANITARIAS #REF! 5,593.73 - 5,593.73 #REF! #REF!
VALORIZACIÓN DEL MES - PARTIDAS V_PN #REF! 182,012.93 - 182,012.93 #REF! #REF!
NUEVAS (ADICIONAL N° 01)
SALA DE ORDEÑO - - - -
ESTRUCTURAS #REF! 32,887.67 - 32,887.67 #REF! #REF!
ARQUITECTURA #REF! 2,851.57 - 2,851.57 #REF! #REF!
INSTALACIONES SANITARIAS #REF! 11,914.27 - 11,914.27 #REF! #REF!
INSTALACIONES ELECTRICAS #REF! - - - #REF! #REF!
RESUMEN DE LA VALORIZACIÓN
VALORIZACIÓN DE OBRA N° 0 -
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
VALORIZACION
CONCEPTO SÍMBOLO PRESUPUESTO PRIMERA VALORIZACION TOTAL SALDO POR %
APROBADO Nro. 01 ACUMULADO VALORIZAR SALDO
ETAPA -2017
OBRAS EXTERIORES - - - -
INSTALACIONES SANITARIAS #REF! 43,711.43 - 43,711.43 #REF! #REF!
COMEDOR - - - -
ESTRUCTURAS 101,875.49 - - - 101,875.49 100.00%
ARQUITECTURA 60,890.25 - - - 60,890.25 100.00%
INSTALACIONES SANITARIAS 20,909.93 - - - 20,909.93 100.00%
INSTALACIONES ELECTRICAS 19,800.00 - - - 19,800.00 100.00%
VIVIENDA PASANTES - - - -
ESTRUCTURAS #REF! - - - #REF! #REF!
VALORIZACIÓN DEL MES - DEDUCTIVOS
(ADICIONAL N° 01) V_PN -166,005.50 - - - -166,005.50 100.00%
SALA DE ORDEÑO - - -
ESTRUCTURAS -15,702.86 - - - -15,702.86 100.00%
ARQUITECTURA -5,910.53 - - - -5,910.53 100.00%
INSTALACIONES SANITARIAS -1,669.30 - - - -1,669.30 100.00%
TANQUE ELEVADO - - - -
ESTRUCTURAS -2,238.00 - - - -2,238.00 100.00%
INSTALACIONES SANITARIAS -1,111.44 - - - -1,111.44 100.00%
OBRAS EXTERIORES - - - -
ESTRUCTURAS -66,293.68 - - - -66,293.68 100.00%
INSTALACIONES SANITARIAS -73,079.69 - - - -73,079.69 100.00%
VALORIZACIÓN DEL MES - MAYORES V_MM - - #REF! #REF! #REF! 0.00%
METRADOS (ADICIONAL N° 02)
MAYORES METRADOS, PARTIDAS NUEVAS Y DEDUCTIVOS SÓLO ESTAN SIENDO MENCIONADOS HASTA QUE SE APRUEBE EL EXPEDIENTE DE AMPLIACIÓN DE PRESUPUESTO
COMPARACIÓN DE AVANCE FÍSICO CON AVANCE PROGRAMADO SEGÚN POA 2018 (CD+GG = S/. 2,012,364.12)
AVANCE SEGUNDA
AVANCE ETAPA ACUMULADO SALDO
MES N° 01
PORCENTAJE DE AVANCE MENSUAL #REF! -
PORCENTAJE DE AVANCE ACUMULADO #REF! #REF! #REF!
AVANCE MENSUAL PROGRAMADO #REF! -
AVANCE ACUMULADO PROGRAMADO #REF! #REF! #REF!
COMPARACIÓN DE AVANCE FÍSICO CON AVANCE PROGRAMADO SEGÚN PROYECTO TOTAL (CD+GG = S/. 2,656,393.47)
AVANCE SEGUNDA
AVANCE AVANCE ACUM. ETAPA ACUMULADO SALDO
PRIMERA ETAPA
MES N° 01
PORCENTAJE DE AVANCE MENSUAL #REF! #REF! -
PORCENTAJE DE AVANCE ACUMULADO #REF! #REF! #REF! #REF!
AVANCE MENSUAL PROGRAMADO #REF! #REF! -
AVANCE ACUMULADO PROGRAMADO #REF! #REF! #REF! #REF!
GOBIERNO REGIONAL DE MADRE DE DIOS
GERENCIA GENERAL REGIONAL
VALORIZACIÓN DE OBRA N° 0 -
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE
DIOS"
PRESUPUESTO 2018
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
EXP. TECNICO EXP. TECNICO EXP. TECNICO PPTO ADICIONAL PPTO ADICIONAL TOTAL PRESUPUESTO PRESUPUESTO TOTAL
CONCEPTO SÍMBOLO APROBADO MODIFICADO I MODIFICADO II Nro. 01 - MM Nro. 01 - PN
DEDUCTIVO
EJECUTADO 2018 EXP MOD III
DESCRIPCIÓN V_C 1,930,788.29 1,930,788.29 #REF! #REF! #REF! #REF! -580,099.26 #REF! #REF!
OBRAS PROVISIONALES
CONSTRUCCIÓN NUEVA -
SALA DE ORDEÑO 115,533.89 115533.89 #REF! #REF! #REF! #REF! -153,783.41 #REF! #REF!
AMPLIACIÓN Y REFACCIÓN - -
AMPLIACION Y REFACCION DE AMBIENTES 45,368.15 45368.15 45,368.15 - #REF! -80,068.68 #REF! #REF!
BLOQUE ADMINISTRATIVO
AMPLIACION Y REFACCION DE AMBIENTES
94,787.46 94787.46 94,787.46 - - - 94,787.46 94,787.46
BLOQUE ELABORACIÓN DE LACTEOS
OBRAS EXTERIORES - -
TANQUE ELEVADO 74,462.92 74462.92 #REF! #REF! #REF! #REF! -78,903.86 #REF! #REF!
RED DE AGUA FRIA 40,233.32 40,233.32 #REF! #REF! #REF! #REF! -50,162.35 #REF! #REF!
RED DE DESAGÜES 32,594.38 32,594.38 #REF! #REF! #REF! -33,741.25 #REF! #REF!
TANQUE SEPTICO Y POZO PERCOLADOR 74,807.69 74,807.69 #REF! #REF! #REF! #REF! -23,038.56 #REF! #REF!
TOTAL COSTO DIRECTO CD 1,930,788.29 1,930,788.29 #REF! #REF! #REF! #REF! -580,099.26 #REF! #REF!
GASTOS GENERALES (14.40 %) GG 244,947.30 244,947.30 #REF! #REF! #REF! #REF! -83,512.41 #REF! #REF!
UTILIDAD U 96,539.41 - - - - - - - -
IGV (18%) I 409,009.50 409,666.92 455,525.03 - - - - - -
COSTO DEL EXPEDIENTE TECNICO CET - - 10,000.00 - - - -10,000.00 - 10,000.00
SUB TOTAL ST=CD+GG+U+I+C 2,681,284.50 2,585,402.51 #REF! #REF! #REF! #REF! -673,611.67 #REF! #REF!
ET
COSTO DE SUPERVISIÓN (4.76 %) CS 92,882.00 95,882.00 #REF! #REF! #REF! #REF! -32,039.23 #REF! #REF!
COSTO DE LIQUIDACIÓN CL 30,097.00 30,097.00 30,097.00 - - - - - 30,097.00
PRESUPUESTO TOTAL PT=ST+CS+CL 2,804,263.51 2,711,381.51 #REF! #REF! #REF! #REF! -705,650.90 #REF! #REF!
Item Descripcion presupuesto Ejecutado 2017 saldo 2017 Observaciones
01 Mayores Metrados #REF! 64,354.69 #REF! ejecutado 2017
02 Partidas nuevas #REF! 182,012.93 #REF! ejecutado 2017
03 Deductivo #REF! #REF!
04 Total Costo Directo 2017 #REF! #REF! #REF!
05 Gastos Generales #REF! 11,569.12 #REF!
06 Sub Total #REF! #REF! #REF!
07 Costo de supervisión #REF! 4,372.56 #REF!
08 Presupuesto Total #REF! #REF! #REF!
01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGU 182,812.74 112,696.52 61.65% 54,585.31 29.86% 167,281.82 91.50% 15,530.91 8.50%
01.01 OBRAS PROVISIONALES 114,600.24 67,729.52 59.10% 31,339.81 27.35% 99,069.32 86.45% 15,530.91 13.55%
01.01.01 CONSTRUCIONES PROVICIONALES 47,210.77 40,142.63 85.03% 7,068.14 14.97% 47,210.77 100.00% 0.00 0.00%
01.01.01.01 OFICINAS Y ALMACEN DE OBRA m2 100.00 265.12 26,512.00 100.00 26,512.00 100.00% 0.00 0.00% 100.00 26,512.00 100.00% 0.00 0.00 0.00%
01.01.01.02 CASETA DE GUARDIANIA m2 4.00 122.24 488.96 4.00 488.96 100.00% 0.00 0.00% 4.00 488.96 100.00% 0.00 0.00 0.00%
01.01.01.03 VESTUARIO m2 20.00 122.24 2,444.80 20.00 2,444.80 100.00% 0.00 0.00% 20.00 2,444.80 100.00% 0.00 0.00 0.00%
01.01.01.04 SERVICIO HIGIENICO m2 18.00 122.24 2,200.32 6.00 733.44 33.33% 12.00 1,466.88 66.67% 18.00 2,200.32 100.00% 0.00 0.00 0.00%
01.01.01.05 CERCO PERIMETRICO m 1,213.61 11.89 14,429.82 742.52 8,828.56 61.18% 471.09 5,601.26 38.82% 1,213.61 14,429.82 100.00% 0.00 0.00 0.00%
01.01.01.06 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M und 1.00 1,134.87 1,134.87 1.00 1,134.87 100.00% 0.00 0.00% 1.00 1,134.87 100.00% 0.00 0.00 0.00%
01.01.02 INSTALACIONES PROVICIONALES 10,000.00 10,000.00 100.00% 0.00 0.00% 10,000.00 100.00% 0.00 0.00%
01.01.02.01 AGUA Y DESAGUE PARA LA CONSTRUCCION mes 10.00 500.00 5,000.00 10.00 5,000.00 100.00% 0.00 0.00% 10.00 5,000.00 100.00% 0.00 0.00 0.00%
01.01.02.02 INSTALACION PROVICIONAL DE SUMINISTRO DE ENERGIA EL mes 10.00 500.00 5,000.00 10.00 5,000.00 100.00% 0.00 0.00% 10.00 5,000.00 100.00% 0.00 0.00 0.00%
01.01.03 TRABAJOS PRELIMINARES 11,800.94 1,558.65 13.21% 10,242.29 86.79% 11,800.94 100.00% 0.00 0.00%
01.01.03.01 LIMPIEZA DE TERRENO MANUAL m2 10,261.69 1.15 11,800.94 1,355.35 1,558.65 13.21% 8,906.34 10,242.29 86.79% 10,261.69 11,800.94 100.00% 0.00 0.00 0.00%
01.01.04 DESMONTAJES 9,634.08 2,640.81 27.41% 6,993.27 72.59% 9,634.08 100.00% 0.00 0.00%
01.01.04.01 DESMONTAJE DE LUMINARIAS Y APARATOS ELECTRICOS und 67.00 6.62 443.54 63.00 417.06 94.03% 4.00 26.48 5.97% 67.00 443.54 100.00% 0.00 0.00 0.00%
01.01.04.02 DESMONTAJE DE PUERTAS DE MADERA m2 43.50 9.07 394.55 27.00 244.89 62.07% 16.50 149.66 37.93% 43.50 394.55 100.00% 0.00 0.00 0.00%
01.01.04.03 DESMONTAJE DE VENTANAS DE MADERA m2 53.58 11.34 607.60 8.00 90.72 14.93% 45.58 516.88 85.07% 53.58 607.60 100.00% 0.00 0.00 0.00%
01.01.04.04 DESMONTAJE DE TABIQUERIA PARA BAÑO m2 19.60 10.33 202.47 6.00 61.98 30.61% 13.60 140.49 69.39% 19.60 202.47 100.00% 0.00 0.00 0.00%
01.01.04.05 RETIRO DE MUEBLES Y EQUIPOS glb 4.00 26.34 105.36 1.00 26.34 25.00% 3.00 79.02 75.00% 4.00 105.36 100.00% 0.00 0.00 0.00%
01.01.04.06 TRASLADO Y ENTREGA DE MATERIAL DESMONTADO glb 4.00 1,799.82 7,199.28 1.00 1,799.82 25.00% 3.00 5,399.46 75.00% 4.00 7,199.28 100.00% 0.00 0.00 0.00%
01.01.04.08 DESMONTAJE DE PERGOLAS DE ESTRUCTURA METALICA m2 58.13 11.72 681.28 0.00 0.00 0.00% 58.13 681.28 100.00% 58.13 681.28 100.00% 0.00 0.00 0.00%
01.01.05 DEMOLICIONES 8,688.21 5,609.13 64.56% 1,813.55 20.87% 7,422.67 85.43% 1,265.54 14.57%
01.01.05.01 DEMOLICION DE MUROS DE BLOQUETA DE CONCRETO e=15cm m2 46.10 6.18 284.90 42.33 261.60 91.82% 3.77 23.30 8.18% 46.10 284.90 100.00% 0.00 0.00 0.00%
01.01.05.02 DEMOLICION DE MUROS DE BLOQUETA DE CONCRETO e=20 c m2 106.56 9.60 1,022.98 67.27 645.79 63.13% 23.78 228.29 22.32% 91.05 874.08 85.44% 15.51 148.90 14.56%
01.01.05.03 DEMOLICION DE PISO DE CONCRETO DE 0.15 M. m2 460.00 4.14 1,904.40 333.70 1,381.52 72.54% 13.44 55.64 2.92% 347.14 1,437.16 75.47% 112.86 467.24 24.53%
01.01.05.04 DEMOLICION DE VEREDA DE 0.15M m2 105.00 4.95 519.75 82.47 408.23 78.54% 18.25 90.34 17.38% 100.72 498.56 95.92% 4.28 21.19 4.08%
01.01.05.05 ELIMINACION DE MATERIAL EXCEDENTE MAQUINARIA VOLQUE m3 162.59 17.91 2,911.99 162.59 2,911.99 100.00% 0.00 0.00% 162.59 2,911.99 100.00% 0.00 0.00 0.00%
01.01.05.06 DEMOLICION DE LOSA DE CONCRETO, e=20cm m2 19.79 68.45 1,354.63 0.00 0.00 0.00% 19.79 1,354.63 100.00% 19.79 1,354.63 100.00% 0.00 0.00 0.00%
01.01.05.07 DEMOLICION DE CONCRETO ARMADO m3 28.66 24.06 689.56 0.00 0.00 0.00% 2.55 61.35 8.90% 2.55 61.35 8.90% 26.11 628.21 91.10%
01.01.06 TRAZO, NIIVELES Y REPLANTEO 7,707.86 4,795.13 62.21% 2,912.73 37.79% 7,707.86 100.00% 0.00 0.00%
01.01.06.01 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 925.55 2.62 2,424.94 870.26 2,280.08 94.03% 55.29 144.86 5.97% 925.55 2,424.94 100.00% 0.00 0.00 0.00%
01.01.06.02 REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION m2 1,828.00 2.89 5,282.92 870.26 2,515.05 47.61% 957.74 2,767.87 52.39% 1,828.00 5,282.92 100.00% 0.00 0.00 0.00%
01.01.07 MOVIMIENTO DE TIERRAS 17,127.70 2,983.17 17.42% 1,787.20 10.43% 4,770.37 27.85% 12,357.32 72.15%
01.01.07.01 CORTE DE TERRENO CON MAQUINARIA m3 160.00 3.55 568.00 130.54 463.42 81.59% 29.46 104.58 18.41% 160.00 568.00 100.00% 0.00 0.00 0.00%
01.01.07.02 ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA m3 200.00 10.27 2,054.00 156.65 1,608.80 78.33% 43.35 445.20 21.68% 200.00 2,054.00 100.00% 0.00 0.00 0.00%
01.01.07.03 PERFILADO Y COMPACTADO COM MATERIAL PROPIO m2 870.26 3.08 2,680.40 206.70 636.64 23.75% 401.76 1,237.42 46.17% 608.46 1,874.06 69.92% 261.80 806.34 30.08%
01.01.07.04 MEJORAMIENTO DE SUB RASANTE e=0.20 m (AFIRMADO, C m2 477.13 23.47 11,198.17 11.34 266.15 2.38% 0.00 0.00% 11.34 266.15 2.38% 465.79 10,932.02 97.62%
01.01.07.05 ESCARIFICADO, PERFILADO, Y COMPACTADO DE LA SUB-RA m2 871.01 0.72 627.13 11.34 8.16 1.30% 0.00 0.00% 11.34 8.16 1.30% 859.67 618.96 98.70%
01.01.08 EXPLANACIONES 2,430.68 0.00 0.00% 522.63 21.50% 522.63 21.50% 1,908.05 78.50%
01.01.08.01 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO m3 239.24 10.16 2,430.68 0.00 0.00 0.00% 51.44 522.63 21.50% 51.44 522.63 21.50% 187.80 1,908.05 78.50%
01.02 SEGURIDAD Y SALUD 68,212.50 44,967.00 65.92% 23,245.50 34.08% 68,212.50 100.00% 0.00 0.00%
01.02.01 ELABORACION E IMPLEMENTACION Y ADMINISTRACION DE PLA 65,087.50 41,842.00 64.29% 23,245.50 35.71% 65,087.50 100.00% 0.00 0.00%
01.02.01.01 ELABORACION E IMPLEMENTACION Y ADMINISTRACION DE P glb 2.00 4,500.00 9,000.00 1.00 4,500.00 50.00% 1.00 4,500.00 50.00% 2.00 9,000.00 100.00% 0.00 0.00 0.00%
01.02.01.02 EQUIPOS DE PROTECCION INDIVIDUAL glb 1.50 28,990.00 43,485.00 1.00 28,990.00 66.67% 0.50 14,495.00 33.33% 1.50 43,485.00 100.00% 0.00 0.00 0.00%
01.02.01.03 EQUIPOS DE PROTECCION COLECTIVA glb 1.00 4,350.00 4,350.00 1.00 4,350.00 100.00% 0.00 0.00% 1.00 4,350.00 100.00% 0.00 0.00 0.00%
01.02.01.04 SEÑALIZACION TEMPORAL DE SEGURIDAD glb 2.50 2,600.00 6,500.00 1.00 2,600.00 40.00% 1.50 3,900.00 60.00% 2.50 6,500.00 100.00% 0.00 0.00 0.00%
01.02.01.05 CAPACITACION EN SEGURIDAD Y SALUD mes 10.00 175.25 1,752.50 8.00 1,402.00 80.00% 2.00 350.50 20.00% 10.00 1,752.50 100.00% 0.00 0.00 0.00%
01.02.02 RECURSOS PARA RESPUESTA ANTE EMERGENCIAS EN SEGURIDAD 3,125.00 3,125.00 100.00% 0.00 0.00% 3,125.00 100.00% 0.00 0.00%
01.02.02.01 RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEG glb 1.00 3,125.00 3,125.00 1.00 3,125.00 100.00% 0.00 0.00% 1.00 3,125.00 100.00% 0.00 0.00 0.00%
02 ESTRUCTURAS 1,171,623.43 877,004.95 74.85% 286,828.29 24.48% 1,163,833.29 99.34% 0.00 7,790.14 0.66%
02.01 BLOQUE 01 527,651.15 424,220.29 80.40% 103,336.18 19.58% 527,556.53 99.98% 0.00 94.62 0.02%
02.01.01 MOVIMIENTO DE TIERRAS 62,901.46 49,116.91 78.09% 13,784.54 21.91% 62,901.46 100.00% 0.00 0.00%
02.01.01.01 EXCAVACION MANUAL DE ZANJAS m3 556.79 34.96 19,465.38 415.06 14,510.50 74.55% 141.73 4,954.88 25.45% 556.79 19,465.38 100.00% 0.00 0.00 0.00%
02.01.01.02 RELLENO Y COMPACTADO C/ MATERIAL PROPIO m3 183.38 40.36 7,401.22 183.38 7,401.22 100.00% 0.00 0.00% 183.38 7,401.22 100.00% 0.00 0.00 0.00%
02.01.01.03 ELIMINACION DE MATERIAL EXCEDENTE D=50M m3 554.45 24.47 13,567.39 278.02 6,803.15 50.14% 276.43 6,764.24 49.86% 554.45 13,567.39 100.00% 0.00 0.00 0.00%
02.01.01.04 ELIMINACION DE MAT. EXEDENTE Y DESMONTE CON EQUIPO m3 347.80 20.05 6,973.39 278.02 5,574.30 79.94% 69.78 1,399.09 20.06% 347.80 6,973.39 100.00% 0.00 0.00 0.00%
02.01.01.05 ENTIBADO DE TERRENO m2 464.59 33.35 15,494.08 444.61 14,827.74 95.70% 19.98 666.33 4.30% 464.59 15,494.08 100.00% 0.00 0.00 0.00%
INFORME FISICO DE OBRA
COSTO DIRECTO 4,538,172.31 1,768,425.90 38.97% 666,332.26 14.68% 2,434,758.25 53.65% 2,103,414.16 46.35%
GASTOS GENERALES (16%) 705,469.52 274,905.95 38.97% 103,582.91 14.68% 378,488.87 53.65% 326,980.66 46.35%
SUB TOTAL 5,243,641.83 2,043,331.85 38.97% 769,915.17 14.68% 2,813,247.13 53.65% 2,430,394.82 46.35%
GASTOS DE SUPERVISION (4.90%) 254,283.34 99,088.62 38.97% 37,336.00 14.68% 136,424.62 53.65% 117,858.72 46.35%
GASTOS DE LIQUIDACION (1.40%) 61,700.89 0.00% 0.00% 0.00% 61,700.89 100.00%
GASTOS DE ELABORACION EXPEDIENTE 181,878.00 178,894.00 98.36% 0.00% 178,894.00 98.36% 2,984.00 1.64%
EQUIPAMIENTO 1,062,970.00 145,720.00 13.71% 0.00% 145,720.00 13.71% 917,250.00 86.29%
CAPACITACION Y SENCIBILIZACION 25,000.00 0.00% 0.00% 0.00% 25,000.00 100.00%
IMPACTO AMBIENTAL 15,000.00 0.00% 0.00% 0.00% 15,000.00 100.00%
PRESUPUESTO TOTAL 6,844,474.06 2,467,034.47 36.04% 807,251.17 11.79% 3,274,285.75 47.84% 3,570,188.43 52.16%
UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS
VALORIZACION MAYORES METRADOSNº 13 - AGOSTO 2019
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
RESIDENTE: Ing. Ze Carlos Mamani Florez
INSPECTOR: Ing. Luciano Bautista Checasaca
PRESUPUESTO AVANCES ANTERIOR AVANCES ACTUAL AVANCES ACUMULADO SALDO POR EJECUTAR
Item Descripción
Und. Metrado Precio Parcial Metrado Parcial % Metrado Parcial % Metrado Parcial % Metrado Parcial %
1 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD.
1.01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES
01.01.03 TRABAJOS PRELIMINARES
01.01.03.01 LIMPIEZA DE TERRENO MANUAL m2 63.88 1.15 73.46 63.88 73.46 100.00% 0.00 0.00% 63.88 73.46 100.00% 0.00 0.00 0.00%
01.01.04 REMOCIONES
01.01.04.02 DESMONTAJE DE PUERTAS DE MADERA m2 3.84 9.07 34.83 0.00 0.00 0.00% 3.84 34.83 100.00% 3.84 34.83 100.00% 0.00 0.00 0.00%
01.01.04.03 DESMONTAJE DE VENTANA DE MADERA m2 58.41 11.34 662.37 56.61 641.96 96.92% 1.80 20.41 3.08% 58.41 662.37 100.00% 0.00 0.00 0.00%
01.01.05 DEMOLICIONES
01.01.05.01 DEMOLICION DE MURO DE BLOQUETA DE CONCRETO, e=15cm m2 17.97 6.18 111.05 17.97 111.05 100.00% 0.00 0.00% 17.97 111.05 100.00% 0.00 0.00 0.00%
01.01.05.05 ELIMINACION DE MATERIAL EXCEDENTE MAQUINARIA VOLQUETE m3 12.28 17.91 219.93 12.28 219.93 100.00% 0.00 0.00% 12.28 219.93 100.00% 0.00 0.00 0.00%
01.01.06 TRAZO NIVEL YREPLANTEO
01.01.06.01 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 308.00 2.62 806.96 308.00 806.96 100.00% 0.00 0.00% 308.00 806.96 100.00% 0.00 0.00 0.00%
01.01.06.02 REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION m2 778.66 2.89 2,250.33 778.66 2,250.33 100.00% 0.00 0.00% 778.66 2,250.33 100.00% 0.00 0.00 0.00%
01.01.07 MOVIMIENTO DE TIERRAS
01.01.07.01 CORTE DE TERRENO CON MAQUINARIA m3 80.34 3.55 285.21 80.34 285.21 100.00% 0.00 0.00% 80.34 285.21 100.00% 0.00 0.00 0.00%
01.01.07.02 ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA m3 150.13 10.27 1,541.84 150.13 1,541.84 100.00% 0.00 0.00% 150.13 1,541.84 100.00% 0.00 0.00 0.00%
01.02.01 ELABORACION E IMPLEMENTACION Y ADMINISTRACION DE PLAN DE SEGURIDAD EN EL TRABAJO
01.02.01.05 CAPACITACION EN SEGURIDAD Y SALUD mes 1.00 175.25 175.25 1.00 175.25 100.00% 0.00 0.00% 1.00 175.25 100.00% 0.00 0.00 0.00%
02 ESTRUCTURAS
02.01 BLOQUE 01
02.01.03 OBRAS DE CONCRETO ARMADO
02.01.03.03 SOBRECIMIENTOS ARMADOS
02.01.03.03.02 SOBRECIMIENTOS ARMADOS, CONCRETO F'C=175KG/CM2 m3 0.55 375.90 206.75 0.01 3.76 1.82% 0.54 202.99 98.18% 0.55 206.75 100.00% 0.00 0.00 0.00%
02.01.03.03.03 SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO m2 47.09 41.72 1,964.59 16.64 694.22 35.34% 30.45 1,270.37 64.66% 47.09 1,964.59 100.00% 0.00 0.00 0.00%
02.01.03.05 COLUMNETAS
02.01.03.05.03 COLUMNETAS, ACERO FY=4200 KG/CM2 . kg 91.42 5.11 467.16 91.42 467.16 100.00% 0.00 0.00% 91.42 467.16 100.00% 0.00 0.00 0.00%
02.01.03.06 VIGAS
02.01.03.06.01 VIGAS, CONCRETO F'C=210 KG/CM2 m3 0.51 415.47 211.89 0.00 0.00 0.00% 0.51 211.89 100.00% 0.51 211.89 100.00% 0.00 0.00 0.00%
02.01.03.06.03 VIGAS, ACERO FY=4200 KG/CM2 . kg 65.88 5.11 336.65 65.88 336.65 100.00% 0.00 0.00% 65.88 336.65 100.00% 0.00 0.00 0.00%
02.01.03.05.04 CURADO DE CONCRETO m2 29.20 3.02 88.18 0.00 0.00 0.00% 29.20 88.18 100.00% 29.20 88.18 100.00% 0.00 0.00 0.00%
02.01.03.07 VIGUETAS DE ARRIOSTRE
02.01.03.07.02 VIGUETAS DE ARRIOSTRE, ENCOFRADO Y DESENCOFRADO m2 1.86 35.76 66.51 1.86 66.51 100.00% 0.00 0.00% 1.86 66.51 100.00% 0.00 0.00 0.00%
02.01.03.07.03 VIGUETAS DE ARRIOSTRE, ACERO FY=4200 KG/CM2 . kg 950.35 5.11 4,856.27 68.90 352.08 7.25% 881.45 4,504.19 92.75% 950.35 4,856.27 100.00% 0.00 0.00 0.00%
02.01.03.09 LOSA MACIZA
02.01.03.09.04 CURADO DE CONCRETO m2 2.82 3.02 8.52 0.00 0.00 0.00% 2.82 8.52 100.00% 2.82 8.52 100.00% 0.00 0.00 0.00%
02.01.03.10 OVALINES
02.01.03.10.03 OVALINES, ACERO FY=4200 KG/CM2 kg 427.39 5.11 2,183.96 0.00 0.00 0.00% 427.39 2,183.96 100.00% 427.39 2,183.96 100.00% 0.00 0.00 0.00%
2.02 BLOQUE 02
02.02.01 MOVIMIENTO DE TIERRAS
02.02.01.01 EXCAVACION MANUAL DE ZANJAS m3 0.41 34.96 14.33 0.41 14.33 100.00% 0.00 0.00% 0.41 14.33 100.00% 0.00 0.00 0.00%
02.02.01.02 RELLENO Y COMPACTADO C/ MATERIAL PROPIO m3 27.39 40.36 1,105.46 27.39 1,105.46 100.00% 0.00 0.00% 27.39 1,105.46 100.00% 0.00 0.00 0.00%
02.02.01.03 ELIMINACION DE MATERIAL EXCEDENTE D=50M m3 10.35 24.47 253.26 10.35 253.26 100.00% 0.00 0.00% 10.35 253.26 100.00% 0.00 0.00 0.00%
02.02.03.09 BEBEDERO EN COMEDOR
02.02.03.09.02 BEBEDERO
02.02.03.09.02.01 BEBEDERO, CONCRETO F'C= 210 KG/CM2 m3 2.85 415.18 1,184.92 0.00 0.00 0.00% 2.85 1,184.92 100.00% 2.85 1,184.92 100.00% 0.00 0.00 0.00%
02.02.03.09.02.02 BEBEDERO, ENCOFRADO Y DESENCOFRADO m2 25.10 32.99 828.05 0.00 0.00 0.00% 25.10 828.05 100.00% 25.10 828.05 100.00% 0.00 0.00 0.00%
03 ARQUITECTURA
03.01 BLOQUE 01 AREA ADMINISTRATIVA - COCINA - SERVICIOS
03.01.03 REVOQUES Y REVESTIMIENTO
03.01.03.03 TARRAJEO EN EXTERIORES IMPERMEABILIZANTE MEZCLA CEMENTO-ARENA 1:5 m2 14.20 24.76 351.59 0.00 0.00 0.00% 14.20 351.59 100.00% 14.20 351.59 100.00% 0.00 0.00 0.00%
03.01.03.08 BRUÑAS
03.01.03.08.01 BRUÑAS VERTICALES DE 1CM, EXTERIOR E INTERIOR, según diseño. m 205.90 10.64 2,190.78 149.58 1,591.53 72.65% 56.32 599.24 27.35% 205.90 2,190.78 100.00% 0.00 0.00 0.00%
03.01.04 CIELORRASOS
03.01.04.01 CIELORASO CON MEZCLA EN SUPERFIICIE INFERIOR DE LOSA m2 41.41 60.10 2,488.74 0.00 0.00 0.00% 41.41 2,488.74 100.00% 41.41 2,488.74 100.00% 0.00 0.00 0.00%
03.01.05 PISOS Y PAVIMENTOS
03.01.05.01 FALSO PISO
UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS
VALORIZACION MAYORES METRADOSNº 13 - AGOSTO 2019
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
RESIDENTE: Ing. Ze Carlos Mamani Florez
INSPECTOR: Ing. Luciano Bautista Checasaca
PRESUPUESTO AVANCES ANTERIOR AVANCES ACTUAL AVANCES ACUMULADO SALDO POR EJECUTAR
Item Descripción
Und. Metrado Precio Parcial Metrado Parcial % Metrado Parcial % Metrado Parcial % Metrado Parcial %
03.01.05.01.01 FALSO PISO DE CONCRETO f'c= 175 kg/cm2 e= 10 cm. m2 296.30 40.73 12,068.30 22.00 896.06 7.42% 274.30 11,172.24 92.58% 296.30 12,068.30 100.00% 0.00 0.00 0.00%
03.01.05.04.02 VEREDAS
03.01.05.04.02.03 ENCOFRADO Y DESENCOFRADO DE VEREDA m2 7.67 70.30 539.20 7.67 539.20 100.00% 0.00 0.00% 7.67 539.20 100.00% 0.00 0.00 0.00%
03.01.06 ZOCALOS Y CONTRAZOCALOS
03.01.06.02 ZOCALOS
03.01.06.02.01 CONTRA ZÓCALO DE CERAMICO NACIONAL 20 X 30 m 300.90 27.57 8,295.81 300.90 8,295.81 100.00% 0.00 0.00% 300.90 8,295.81 100.00% 0.00 0.00 0.00%
03.01.06.02.02 CERAMICO NACIONAL EN OVALINES DE 0.60 X 0.60 M m2 0.71 22.23 15.78 0.00 0.00 0.00% 0.71 15.78 100.00% 0.71 15.78 100.00% 0.00 0.00 0.00%
03.02.03 REVOQUES Y REVESTIMIENTO
03.02.03.02 TARRAJEO EN EXTERIORES IMPERMEABILIZANTE MEZCLA CEMENTO-ARENA 1:5 m2 18.00 22.60 406.80 18.00 406.80 100.00% 0.00 0.00% 18.00 406.80 100.00% 0.00 0.00 0.00%
03.02.03.07 EMPORADO Y SOLAQUEO DE ESTRUCTURAS CARAVISTA m2 104.62 25.08 2,623.89 0.00 0.00 0.00% 104.62 2,623.89 100.00% 104.62 2,623.89 100.00% 0.00 0.00 0.00%
03.02.05 PISOS Y PAVIMENTOS
03.02.05.05 SARDINELES DE CONCRETO
03.02.05.05.02 ENCOFRADO Y DESENCOFRADO DE SARDINELES m 32.65 21.32 696.10 0.00 0.00 0.00% 32.65 696.10 100.00% 32.65 696.10 100.00% 0.00 0.00 0.00%
04 INSTALACIONES SANITARIAS
04.01 BLOQUE 01
04.01.01 BLOQUE 01 - COCINA
04.01.01.02.02 RED DE DISTRIBUCION
04.01.01.02.02.01 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS m 39.95 2.62 104.67 39.95 104.67 100.00% 0.00 0.00% 39.95 104.67 100.00% 0.00 0.00 0.00%
04.01.01.02.02.02 EXCAVACION MANUAL EN TIERRA COMPACTA m 39.95 34.96 1,396.65 39.95 1,396.65 100.00% 0.00 0.00% 39.95 1,396.65 100.00% 0.00 0.00 0.00%
04.01.01.02.02.03 REFINE Y NIVELACION Y COMPACTACION m 39.95 2.04 81.50 39.95 81.50 100.00% 0.00 0.00% 39.95 81.50 100.00% 0.00 0.00 0.00%
04.01.01.02.02.04 CAMA DE APOYO PARA TUBERIA CON MISMO MAT. ZARANDEADO m 39.95 5.13 204.94 39.95 204.94 100.00% 0.00 0.00% 39.95 204.94 100.00% 0.00 0.00 0.00%
04.01.01.02.02.07 TUBERIA PVC SAP DE 1" C- 10 C/R m 2.97 7.53 22.36 2.97 22.36 100.00% 0.00 0.00% 2.97 22.36 100.00% 0.00 0.00 0.00%
04.01.01.02.02.08 TUBERIA PVC SAP DE 1 1/4" C- 10 C/R m 0.24 8.58 2.06 0.24 2.06 100.00% 0.00 0.00% 0.24 2.06 100.00% 0.00 0.00 0.00%
04.01.01.02.02.10 TUBERIA PVC SAP DE 2" C- 10 C/R m 16.00 10.35 165.60 16.00 165.60 100.00% 0.00 0.00% 16.00 165.60 100.00% 0.00 0.00 0.00%
04.01.01.02.02.13 RELLENO COMPACTADO DE ZANJAS PARA TUBERIAS m 16.00 6.84 109.44 16.00 109.44 100.00% 0.00 0.00% 16.00 109.44 100.00% 0.00 0.00 0.00%
04.01.01.03 SISTEMA DE DESAGUE
04.01.01.03.02 RED DE DESAGUE
04.01.01.03.02.01 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS m 7.00 2.62 18.34 7.00 18.34 100.00% 0.00 0.00% 7.00 18.34 100.00% 0.00 0.00 0.00%
04.01.01.03.02.02 EXCAVACION MANUAL EN TIERRA COMPACTA m 7.00 34.96 244.72 7.00 244.72 100.00% 0.00 0.00% 7.00 244.72 100.00% 0.00 0.00 0.00%
04.01.01.03.02.03 REFINE Y NIVELACION Y COMPACTACION m 7.00 2.04 14.28 7.00 14.28 100.00% 0.00 0.00% 7.00 14.28 100.00% 0.00 0.00 0.00%
04.01.01.03.02.04 CAMA DE APOYO PARA TUBERIA CON MISMO MAT. ZARANDEADO m 7.00 5.13 35.91 7.00 35.91 100.00% 0.00 0.00% 7.00 35.91 100.00% 0.00 0.00 0.00%
04.01.01.03.02.05 TUBERIA PVC SAL 4" m 26.70 15.72 419.72 7.00 110.04 26.22% 19.70 309.68 73.78% 26.70 419.72 100.00% 0.00 0.00 0.00%
04.01.02 BLOQUE 1-B COCINA
04.01.02.02 SISTEMA DE AGUA FRIA
04.01.02.02.02 RED DE DISTRIBUCION
04.01.02.02.02.10 TUBERIA PVC SAP DE 2" C- 10 C/R m 47.54 10.35 492.04 0.00 0.00 0.00% 47.54 492.04 100.00% 47.54 492.04 100.00% 0.00 0.00 0.00%
04.01.02.02.03 VALVULAS DE CONTROL
04.01.02.02.03.01 SUMINISTRO Y ACCESORIO DE VALVULA DE CONTROL 1" und 4.00 173.50 694.00 0.00 0.00 0.00% 4.00 694.00 100.00% 4.00 694.00 100.00% 0.00 0.00 0.00%
04.01.02.03 SISTEMA DE DESAGUE
04.01.02.03.02 RED DE DESAGUE
04.01.02.03.02.06 TUBERIA PVC SAL 2" m 6.32 10.62 67.12 0.00 0.00 0.00% 6.32 67.12 100.00% 6.32 67.12 100.00% 0.00 0.00 0.00%
04.01.02.03.02.08 INSTALACION DE ACCESORIOS PARA DESAGUES und 24.00 34.86 836.64 0.00 0.00 0.00% 24.00 836.64 100.00% 24.00 836.64 100.00% 0.00 0.00 0.00%
04.01.03.02 SISTEMA DE AGUA FRIA
04.01.03.02.02 RED DE DISTRIBUCION
04.01.03.02.02.03 REFINE Y NIVELACION Y COMPACTACION m 9.07 2.04 18.50 9.07 18.50 100.00% 0.00 0.00% 9.07 18.50 100.00% 0.00 0.00 0.00%
04.01.03.02.02.04 CAMA DE APOYO PARA TUBERIA CON MISMO MAT. ZARANDEADO m 9.07 5.13 46.53 9.07 46.53 100.00% 0.00 0.00% 9.07 46.53 100.00% 0.00 0.00 0.00%
04.01.03.02.02.06 TUBERIA PVC SAP DE 3/4" C- 10 C/R m 8.24 7.50 61.80 8.24 61.80 100.00% 0.00 0.00% 8.24 61.80 100.00% 0.00 0.00 0.00%
04.01.03.02.02.09 TUBERIA PVC SAP DE 1 1/2" C- 10 C/R m 2.54 13.18 33.48 2.54 33.48 100.00% 0.00 0.00% 2.54 33.48 100.00% 0.00 0.00 0.00%
04.01.03.03 SISTEMA DE DESAGUE
04.01.03.03.02 RED DE DESAGUE
04.01.03.03.02.06 TUBERIA PVC SAL 3" m 76.27 14.41 1,099.05 76.27 1,099.05 100.00% 0.00 0.00% 76.27 1,099.05 100.00% 0.00 0.00 0.00%
04.02.01 SISTEMA DE DESAGUE
04.03 OBRAS EXTERIORES
04.03.01 CISTERNA DE CONCRETO
04.03.01.01 SUMINISTRO DE BOMBAS Y ACCESORIOS
04.03.01.01.02 SUMINISTRO E INSTALACION DE TUBERIA DE PVC - SAP DE 4" C-10 DE SUCCION m 17.70 16.54 292.76 0.00 0.00 0.00% 17.70 292.76 100.00% 17.70 292.76 100.00% 0.00 0.00 0.00%
UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS
VALORIZACION MAYORES METRADOSNº 13 - AGOSTO 2019
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
RESIDENTE: Ing. Ze Carlos Mamani Florez
INSPECTOR: Ing. Luciano Bautista Checasaca
PRESUPUESTO AVANCES ANTERIOR AVANCES ACTUAL AVANCES ACUMULADO SALDO POR EJECUTAR
Item Descripción
Und. Metrado Precio Parcial Metrado Parcial % Metrado Parcial % Metrado Parcial % Metrado Parcial %
4.04 BLOQUE OBRAS EXTERIORES
04.04.02 SISTEMA DE AGUA FRIA
04.04.02.01 BEBEDERO Y RIEGO
04.04.02.01.01 RED DE DISTRIBUCION
04.04.02.01.01.05 TUBERIA PVC SAP DE 3/4" C- 10 C/R m 18.81 7.50 141.08 18.80 141.00 99.95% 0.01 0.08 0.05% 18.81 141.08 100.00% 0.00 0.00 0.00%
04.04.02.01.01.07 INSTALACION DE ACCESORIOS... und 18.00 21.34 384.12 18.00 384.12 100.00% 0.00 0.00% 18.00 384.12 100.00% 0.00 0.00 0.00%
04.04.02.01.01.09 PRUEBA HIDRAULICA m 3.12 1.16 3.62 3.12 3.62 100.00% 0.00 0.00% 3.12 3.62 100.00% 0.00 0.00 0.00%
04.04.03 SISTEMA DE DESAGUE
04.04.03.02 RED DE DESAGUE
04.04.03.02.07 TUBERIA PVC SAL 2" m 10.00 10.62 106.20 0.00 0.00 0.00% 10.00 106.20 100.00% 10.00 106.20 100.00% 0.00 0.00 0.00%
4.05 CISTERNA DE CONCRETO
04.05.01 TRABAJOS PRELIMINARES
04.05.01.01 LIMPIEZA DE TERRENO MANUAL m2 9.30 1.15 10.70 0.00 0.00 0.00% 9.30 10.70 100.00% 9.30 10.70 100.00% 0.00 0.00 0.00%
04.05.01.02 TRAZO, NIVELES Y REPLANTEO m2 11.38 4.33 49.28 0.00 0.00 0.00% 11.38 49.28 100.00% 11.38 49.28 100.00% 0.00 0.00 0.00%
04.05.03 OBRAS DE CONCRETO SIMPLE
04.05.03.01 SOLADO DE 2" F'C=100 KG/CM2 m2 12.18 33.55 408.64 12.18 408.64 100.00% 0.00 0.00% 12.18 408.64 100.00% 0.00 0.00 0.00%
04.05.04 OBRAS DE CONCRETO ARMADO
04.05.04.02 MURO DE TANQUE CISTERNA
04.05.04.02.03 ACERO DE REFUERZO FY=4200 KG/CM2 PARA MUROS kg 10.00 5.32 53.20 10.00 53.20 100.00% 0.00 0.00% 10.00 53.20 100.00% 0.00 0.00 0.00%
4.07 DRENAJE PLUVIAL
04.07.01 TRABAJOS PRELIMINARES
04.07.01.02 TRAZO, NIVELES Y REPLANTEO m2 35.86 4.33 155.27 35.86 155.27 100.00% 0.00 0.00% 35.86 155.27 100.00% 0.00 0.00 0.00%
04.07.04.01 CANAL DE CONCRETO
04.07.04.01.01 BASE, MURO DE CANAL DE CONCRETO F'C =175 KG/CM2 m3 10.57 630.70 6,669.09 7.81 4,928.36 73.90% 2.76 1,740.73 26.10% 10.57 6,669.09 100.00% 0.00 0.00 0.00%
04.07.04.01.02 BASE Y MURO DE CANAL, ENCOFRADO Y DESENCOFRADO m2 80.38 45.66 3,670.15 57.54 2,627.28 71.58% 22.84 1,042.87 28.42% 80.38 3,670.15 100.00% 0.00 0.00 0.00%
04.07.04.02 TAPA DE CONCRETO
04.07.04.02.03 TAPA DE CONCRETO TIPO REJILLA PREFABRICADO und 8.00 45.00 360.00 8.00 360.00 100.00% 0.00 0.00% 8.00 360.00 100.00% 0.00 0.00 0.00%
5 INSTALACIONES ELECTRICAS
5.01 BLOQUE 01
05.01.03 SALIDA DE TOMACORRIENTES
05.01.03.01 SALIDA TOMACORRIENTE DOBLE CON TIERRA CON PLACA DE ALUMINIO (PARED) A 0. pto 11.00 27.59 303.49 0.00 0.00 0.00% 11.00 303.49 100.00% 11.00 303.49 100.00% 0.00 0.00 0.00%
05.01.03.02 SALIDA TOMACORRIENTE DOBLE CON TIERRA A 1.10m SNPT pto 43.00 73.59 3,164.37 47.00 3,458.73 109.30% 0.00 0.00% 47.00 3,458.73 109.30% -4.00 -294.36 -9.30%
05.01.03.03 SALIDA DE TOMACORRIENTE BIPOLAR DOBLE A 1.8 m SNPT und 6.00 27.22 163.32 6.00 163.32 100.00% 0.00 0.00% 6.00 163.32 100.00% 0.00 0.00 0.00%
05.01.04 CANALES Y TUBERIAS
05.01.04.19 TUBERIA EMPOTRADA PVC SAP 15mm m 239.40 10.09 2,415.55 0.00 0.00 0.00% 239.40 2,415.55 100.00% 239.40 2,415.55 100.00% 0.00 0.00 0.00%
05.01.04.23 CURVA PVC SAP PARA INSTALACIONES ELECTRICAS 15 mm und 26.00 4.76 123.76 0.00 0.00 0.00% 26.00 123.76 100.00% 26.00 123.76 100.00% 0.00 0.00 0.00%
05.01.12 PERGOLAS
05.01.12.01 SALIDA DE ALUMBRADO
05.01.12.01.02 SALIDA INTERRUPTOR UNIPOLAR SIMPLE CON PLACA METALICA TIPO PLANCHA pto 2.00 29.13 58.26 0.00 0.00 0.00% 2.00 58.26 100.00% 2.00 58.26 100.00% 0.00 0.00 0.00%
05.01.12.02 CANALES Y TUBERIAS
05.01.12.02.01 TUBERIA EMPOTRADA PVC SAP 20mm m 34.79 9.26 322.16 0.00 0.00 0.00% 34.79 322.16 100.00% 34.79 322.16 100.00% 0.00 0.00 0.00%
05.01.13 PICADO Y RESANADO EN MUROS
05.01.13.01 PICADO Y RESANADO EN MUROS m 195.04 32.18 6,276.39 0.00 0.00 0.00% 195.04 6,276.39 100.00% 195.04 6,276.39 100.00% 0.00 0.00 0.00%
6 OBRAS EXTERIORES
06.01 PAVIMENTOS
06.01.01 TRABAJOS PRELIMINARES
06.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 99.76 1.15 114.72 0.00 0.00 0.00% 99.76 114.72 100.00% 99.76 114.72 100.00% 0.00 0.00 0.00%
06.01.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 176.00 7.57 1,332.32 0.00 0.00 0.00% 176.00 1,332.32 100.00% 176.00 1,332.32 100.00% 0.00 0.00 0.00%
06.01.02 MOVIMIENTO DE TIERRAS
06.01.02.01 CORTE DE MATERIAL COMPACTADO m3 2.32 2.48 5.75 0.00 0.00 0.00% 2.32 5.75 100.00% 2.32 5.75 100.00% 0.00 0.00 0.00%
06.01.02.02 RELLENO CON MATERIAL PROPIO m3 101.66 6.31 641.47 0.00 0.00 0.00% 101.66 641.47 100.00% 101.66 641.47 100.00% 0.00 0.00 0.00%
06.01.02.03 PERFILADO Y COMPACTADO EN SUBRASANTE m2 0.00 3.49 0.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00%
06.01.02.04 ELIMINACION MATERIAL EXCEDENTE m3 2.44 24.47 59.71 0.00 0.00 0.00% 2.44 59.71 100.00% 2.44 59.71 100.00% 0.00 0.00 0.00%
06.01.04 ESTACIONAMIENTO
06.01.04.01 SUB - BASE DE 0.20 M. m2 131.75 82.80 10,908.73 0.00 0.00 0.00% 131.75 10,908.73 100.00% 131.75 10,908.73 100.00% 0.00 0.00 0.00%
06.01.04.05 ACERO DE REFUERZO FY=4200 KG/CM2 kg 535.04 4.65 2,487.94 0.00 0.00 0.00% 535.04 2,487.94 100.00% 535.04 2,487.94 100.00% 0.00 0.00 0.00%
UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS
VALORIZACION MAYORES METRADOSNº 13 - AGOSTO 2019
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
RESIDENTE: Ing. Ze Carlos Mamani Florez
INSPECTOR: Ing. Luciano Bautista Checasaca
PRESUPUESTO AVANCES ANTERIOR AVANCES ACTUAL AVANCES ACUMULADO SALDO POR EJECUTAR
Item Descripción
Und. Metrado Precio Parcial Metrado Parcial % Metrado Parcial % Metrado Parcial % Metrado Parcial %
6.02 VEREDAS
06.02.01 TRABAJOS PRELIMINARES
06.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 965.33 0.98 946.02 863.40 846.13 89.44% 101.93 99.89 10.56% 965.33 946.02 100.00% 0.00 0.00 0.00%
06.02.01.02 TRAZO, NIVELES Y REPLANTEO INICIAL m2 1,071.40 2.32 2,485.65 969.40 2,249.01 90.48% 102.00 236.64 9.52% 1,071.40 2,485.65 100.00% 0.00 0.00 0.00%
06.02.02 MOVIMIENTO DE TIERRAS
06.02.02.01 REFINE Y NIVELACION EN TERRENO NORMAL m2 924.23 6.06 5,600.83 811.72 4,919.02 87.83% 112.51 681.81 12.17% 924.23 5,600.83 100.00% 0.00 0.00 0.00%
06.02.02.02 CONFORMACION Y COMPACTACION MANUAL DE SUBRASANTE m2 924.23 3.47 3,207.08 811.72 2,816.67 87.83% 112.51 390.41 12.17% 924.23 3,207.08 100.00% 0.00 0.00 0.00%
06.02.02.03 AFIRMADO E=0.10 M. En veredas. m3 462.70 22.47 10,396.87 451.45 10,144.08 97.57% 11.25 252.79 2.43% 462.70 10,396.87 100.00% 0.00 0.00 0.00%
06.02.03 OBRAS DE CONCRETO SIMPLE
06.02.03.02 VEREDAS, ENCOFRADO Y DESENCOFRADO m2 15.69 29.36 460.66 0.00 0.00 0.00% 15.69 460.66 100.00% 15.69 460.66 100.00% 0.00 0.00 0.00%
06.02.03.04 BRUÑAS EN VEREDAS m 78.62 6.69 525.97 0.00 0.00 0.00% 78.62 525.97 100.00% 78.62 525.97 100.00% 0.00 0.00 0.00%
06.03 PERGOLAS
06.03.03 OBRAS DE CONCRETO ARMADO
06.03.03.02 COLUMNAS
06.03.03.02.02 COLUMNAS, ENCOFRADO Y DESENCOFRADO m2 37.06 56.91 2,109.08 37.06 2,109.08 100.00% 0.00 0.00% 37.06 2,109.08 100.00% 0.00 0.00 0.00%
UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS
VALORIZACION MAYORES METRADOSNº 13 - AGOSTO 2019
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
RESIDENTE: Ing. Ze Carlos Mamani Florez
INSPECTOR: Ing. Luciano Bautista Checasaca
PRESUPUESTO AVANCES ANTERIOR AVANCES ACTUAL AVANCES ACUMULADO SALDO POR EJECUTAR
Item Descripción
Und. Metrado Precio Parcial Metrado Parcial % Metrado Parcial % Metrado Parcial % Metrado Parcial %
06.03.03.03 VIGAS
06.03.03.03.03 VIGAS, ACERO FY=4200 KG/CM2 . kg 85.58 5.11 437.31 85.58 437.31 100.00% 0.00 0.00% 85.58 437.31 100.00% 0.00 0.00 0.00%
06.05 OTROS OBRAS EXTERIORES (CONTINGENCIA)
06.05.01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES
06.05.01.02 DESMONTAJES Y DEMOLICIONES
06.05.01.02.02 DEMOLICIONES
06.05.01.02.02.01 DEMOLICION DE VEREDA DE 0.15M. m2 4.80 8.43 40.46 0.00 0.00 0.00% 4.80 40.46 100.00% 4.80 40.46 100.00% 0.00 0.00 0.00%
06.05.01.02.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 4.88 11.28 55.05 0.00 0.00 0.00% 4.88 55.05 100.00% 4.88 55.05 100.00% 0.00 0.00 0.00%
06.05.02 ESTRUCTURAS
06.05.02.01 MOVIMIENTO DE TIERRAS
06.05.02.01.01 EXCAVACION COLUMNAS METALICAS CONTINGENCIA m3 8.11 34.96 283.53 0.00 0.00 0.00% 8.11 283.53 100.00% 8.11 283.53 100.00% 0.00 0.00 0.00%
06.05.02.03 ESTRUCTURAS METALICA Y COBERTURA
06.05.02.03.01 COLUMNA CUADRADA TM 4"X4"X3MM m 35.00 45.54 1,593.90 0.00 0.00 0.00% 35.00 1,593.90 100.00% 35.00 1,593.90 100.00% 0.00 0.00 0.00%
06.05.02.03.02 CORREA METALICA TM 2"X2"X3 MM m 192.50 37.54 7,226.45 0.00 0.00 0.00% 192.50 7,226.45 100.00% 192.50 7,226.45 100.00% 0.00 0.00 0.00%
06.05.02.03.03 ESTRUCTURA METALICA TM-17 und 5.00 1,643.99 8,219.95 0.00 0.00 0.00% 5.00 8,219.95 100.00% 5.00 8,219.95 100.00% 0.00 0.00 0.00%
06.05.03 ARQUITECTURA
06.05.03.02 PISOS
06.05.03.02.01 TAPA DE MADERA EN CANAL DE AGUA PLUVIAL ANCHO=0.60 m 42.00 12.28 515.76 0.00 0.00 0.00% 42.00 515.76 100.00% 42.00 515.76 100.00% 0.00 0.00 0.00%
06.05.03.02.02 LISTONES DE MADERA EN CANAL DE AGUA PLUVIAL m 9.00 15.09 135.81 0.00 0.00 0.00% 9.00 135.81 100.00% 9.00 135.81 100.00% 0.00 0.00 0.00%
06.05.04 INSTALACIONES ELECTRICAS
06.05.04.01 SALIDA DE ALUMBRADO
06.05.04.01.01 SALIDA PARA CENTRO DE LUZ EN TECHOS pto 5.00 20.90 104.50 0.00 0.00 0.00% 5.00 104.50 100.00% 5.00 104.50 100.00% 0.00 0.00 0.00%
COSTO DIRECTO 140,811.00 61,103.53 43.39% 80,001.82 56.82% 141,105.36 100.21% -294.36 -0.21%
GASTOS GENERALES (16%) 21,889.40 9,498.69 43.39% 12,436.47 56.82% 21,935.16 100.21% -47.10 -0.22%
SUB TOTAL 162,700.40
GASTOS DE SUPERVISION (4.90%) 7,889.94 460.63 5.84% 603.09 7.64% 1,063.72 13.48% -16.73 -0.21%
PRESUPUESTO TOTAL 170,590.34 71,062.84 41.66% 93,041.38 54.54% 164,104.23 96.20% -358.19 -0.21%
UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS OFICINA UNIVERSITARIA DE INFRAESTRUCTURA
FICHA TECNICA Nº 13
INFORME: AGOSTO 2019 META N° :0007 0006, 0060, 0065 AÑO FISCAL : 2019
OBRA : : "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
SITUACIÓN ACTUAL
EN EJECUCION
UBICACIÓN COORDENADAS
LOCALIDAD PUERTO MALDONADO LATITUD °´"S
DISTRITO TAMBOPATA LONGITUD °´"O
PROVINCIA TAMBOPATA ALTURA 380
REGION MADRE DE DIOS
DESCRIPCION DE LA OBRA
El proyecto "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZÓNICA DE MADRE DE DIOS" tiene como objetivo brindar atención en el Comedor Universitario
con una Moderna Adecuada Infraestructura que se cuente con la última y alta tecnología para el preparado y servicio de alimentos y pueda albergar o servir a un número mayor de estudiantes.
ACTAS RESOLUCIONES
ENTREGA DE TERRENO 7/11/2017 APROBACIÓN DE EXPEDIENTE TÉCNICO Y ASIG. PPTARIA. RESOL N° 242-2017-UMANAD-R
ASIGNACIONES PRESUPUESTALES
VALORIZACIÓN DE OBRA
Re-Programado Fisico Ejecutado Financiero Ejecutado
N° de Mes del Monto % Ejecución % Monto Porcentaje % Monto Porcentaje %
Informe Informe S/. Programada Acumulado S/. de Ejecución Acumulado S/. de Ejecución Acumulado
Setiembre 2017 13,335.60 0.29%
octubre 2017 11,058.85 0.24%
noviembre 2017 74,692.12 1.65%
diciembre 2017 1,880.43 0.04%
febrero 2019 36,838.60 0.81%
marzo 2019 21,566.55 0.48%
abril 2019 28,987.06 0.64%
mayo 2019 39,921.08 0.88%
junio 2019 46,909.77 1.03%
julio 2019 80,298.04 1.77%
agosto 2019 80,001.82 1.76%
VALORIZACIÓN DE OBRA
Re-Programado Fisico Ejecutado Financiero Ejecutado
N° de Mes del % Ejecución % Porcentaje % Porcentaje %
Monto Monto Monto
Informe Informe Programada Acumulado de Ejecución Acumulado de Ejecución Acumulado
Setiembre 2017 0.00%
octubre 2017 0.00%
noviembre 2017 0.00%
diciembre 2017 0.00%
febrero 2019 8,969.27 0.20%
marzo 2019 23,500.24 0.52%
abril 2019 75,985.69 1.67%
mayo 2019 23,421.54 0.52%
junio 2019 16,501.24 0.36%
julio 2019 28,929.87 0.64%
agosto 2019 0.00 0.00%
CONTROL DE AVANCE
3,621,139.80
3,341,386.51
4,000,000.00
3,141,941.81
2,954,661.88
2,770,584.37
3,500,000.00
2,673,686.97
2,559,816.63
3,000,000.00
1,946,227.43
2,500,000.00
1,768,426.81
1,625,555.38
2,434,757.24
1,492,344.95
1,461,829.24
1,404,658.45
1,347,778.11
1,280,074.79
2,000,000.00
1,217,217.21
1,768,424.98
854,296.54
1,500,000.00
841,782.29
1,625,554.30
1,492,343.89
627,760.64
1,404,658.40
1,347,778.11
1,217,217.21 1,280,074.79
357,806.07
1,000,000.00
248,170.13
841,782.29
92,773.03
37,508.52
28,110.44
-6,500.00
-4,000.00
-4,000.00
500,000.00 627,760.64
357,806.07
- 92,773.03
- - - 28,110.44
Marzo-Inicio (Finanaciero)
Agosto 2017
Setiembre 2017
Diciembre 2017
Marzo 2019
Abril 2019
Junio 2019
Agosto 2019
Setiembre 2019
Noviembre 2019
Mayo 2017
Octubre 2017
Noviembre 2017
Mayo 2019
Julio 2019
Octubre 2019
-
-
Marzo-Inicio (Finanaciero) -4
-
Mayo 2017 -4
-
Junio 2017 -6
Agosto 2017
92,773.03
Setiembre 2017
357,806.07
Octubre 2017
Noviembre 2017
Diciembre 2017
Marzo 2019
Abril 2019
Mayo 2019
Junio 2019
Julio 2019
Agosto 2019
Setiembre 2019
Octubre 2019
Noviembre 2019
FOTOGRAFIAS DEL ESTADO ACTUAL DE LA OBRA
_____________________ _____________________
Residente de Obra Vº Bº Supervisor de Obra
DESCRIPCION : DESCRIPCION :
TARRAJEO EN MUROS INTERIORES BLOQUE 1 COLOCADO DE ESTRUCTURAS METALICAS BLOQUE 1
CONCLUCIONES:
* Fisicamente se tiene un avance de 15.60% equivalente a S/. 708,066.42; mayores metrados 1.31% equivalente a S/. 59,271.00.
* Finanacieramente se tiene un gasto de S/. 409,133.28 (13.00%) respecto a CD+GG con el reporte a nivel de devengado.
………………………………… …………………………………
RESIDENTE DE OBRA SUPERVISOR DE OBRA
RESUMEN DE VALORIZACION FISICA DE OBRA
CORRESPONDIENTE AL MES DE AGOSTO 2019
N° 13
OBRA:
Fte.Fto. Recursos Ordinarios
Ppto. : S/.6,844,474.06
Fecha Reinicio 43510: -280Ad de mmmm de yyyy
Fecha Finalización 43799: -280Ad de mmmm de yyyy - Residente de Obra : Ing. ZE CARLOS MAMANI FLOREZ
Días de Paralización 409 días - Supervisor de Obra : Ing. LUCIANO BAUTISTA CHECASACA
- Periodo : AGOSTO 2019
Nueva Fecha de Térmi43799: -280Ad de mmmm de yyyy
1 EJECUCION ACTUAL 4,538,172.31 1,768,425.90 38.97% 666,332.26 14.68% 2,434,758.25 53.65% 2,103,414.16 46.35%
2 MAYORES METRADOS 140,811.00 61,103.53 43.39% 80,001.82 56.82% 141,105.36 100.21%
3 PARTIDAS ADICIONALES 0.00 - 0.00% - 0.00% - 0.00%
4 DEDUCTIVOS - - -
COSTO TOTAL 4,678,983.31 1,829,529.43 39.10% 746,334.08 15.95% 2,575,863.61 55.05% 2,103,119.70 44.95%
CONTROL DE AVANCE, CURVA S
CONTROL DE AVANCE
PROGRAMADO VS. EJECUTADO
3,852,988.01
3,621,139.80
4,000,000.00
3,341,386.51
3,360,345.48
3,141,941.81
2,954,661.88
3,500,000.00
2,770,584.37
2,673,686.97
2,559,816.63
3,000,000.00
1,946,227.43
2,500,000.00
1,768,426.81
2,434,757.24
1,625,555.38
1,492,344.95
1,461,829.24
2,000,000.00
1,404,658.45
1,347,778.11
1,280,074.79
1,217,217.21
1,768,424.98
1,625,554.30
1,500,000.00
1,492,343.89
357,806.07 854,296.54
841,782.29
1,404,658.40
1,347,778.11
1,280,074.79
1,217,217.21
627,760.64
1,000,000.00
841,782.29
248,170.13
92,773.03
500,000.00 627,760.64
37,508.52
28,110.44
-6,500.00
-4,000.00
-4,000.00
357,806.07
- 92,773.03
- - - 28,110.44
Marzo-Inicio (Finanaciero)
Setiembre 2017
Octubre 2017
Noviembre 2017
Diciembre 2017
Marzo 2019
Abril 2019
Setiembre 2019
Octubre 2019
Noviembre 2019
Mayo 2017
Junio 2017
Mayo 2019
Junio 2019
Julio 2019
Agosto 2019
GOBIERNO REGIONAL DE MADRE DE DIOS
GERENCIA REGIONAL DE DESARROLLO ECONOMICO
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
MAYORES METRADOS
6 SALA DE ORDEÑO- ESTRUCTURAS
6.01 TRABAJOS PRELIMINARES
06.01.01 LIMPIEZA DE TERRENO MANUAL m2 181.36 1.25 226.70 181.36 1.25 226.70 0.00 1.25 0.00
06.01.02 TRAZO, NIVELES Y REPLANTEO INICIAL m2 181.36 4.49 814.31 181.36 4.49 814.31 0.00 4.49 0.00
06.01.03 COLOCACION DE NIVELES DURANTE LA OBRA m2 181.36 8 1,450.88 181.36 8.00 1,450.88 0.00 8.00 0.00
6.02 MOVIMIENTO DE TIERRAS
06.02.01 EXCAVACION DE ZANJAS m3 40.21 36.64 1,473.29 40.21 36.64 1,473.29 0.00 36.64 0.00
06.02.02 RELLENO Y COMPACTADO C/ MATERIAL PROPIO m3 30.78 28.68 882.77 30.78 28.68 882.77 0.00 28.68 0.00
06.02.03 ACARREO INTERNO MAT. PROCED. DE EXCAVACIONES Dprom=30M m3 60 18.68 1,120.80 60.00 18.68 1,120.80 0.00 18.68 0.00
06.02.04 ELIMINACION MATERIAL EXCEDENTE CON MAQUINARIA VOLQUETE 15M3 V=30KM/h D=3KM m3 15.64 8.49 132.78 15.64 8.49 132.78 0.00 8.49 0.00
06.02.05 NIVELACION Y APISONADO PARA FALSO PISO O PISO m2 200.59 2.77 555.63 200.59 2.77 555.63 0.00 2.77 0.00
06.02.06 RELLENO CON AFIRMADO DE e=4" (100% COMPACTACION) m3 7.09 82.11 582.16 7.09 82.11 582.16 0.00 82.11 0.00
6.03 OBRAS DE CONCRETO SIMPLE
06.03.01 SOLADO DE 2" F'C=100 KG/CM2 m2 12.96 22.99 297.95 12.96 22.99 297.95 0.00 22.99 0.00
06.03.02 CIMIENTO CORRIDO F'c=140 kg/cm2 m3 4 323.43 1,293.72 4.00 323.43 1,293.72 0.00 323.43 0.00
6.04 OBRAS DE CONCRETO ARMADO
06.04.01 ZAPATAS
06.04.01.01 ZAPATAS, CONCRETO F'C=210 KG/CM2 m3 5.18 364.4 1,887.59 5.18 364.40 1,887.59 0.00 364.40 0.00
06.04.01.02 ZAPATAS, ACERO FY=4200KG/CM2 kg 158.8 4.91 779.71 158.80 4.91 779.71 0.00 4.91 0.00
06.04.02 VIGAS DE CIMENTACION
06.04.02.01 VIGAS DE CIMENTACION, CONCRETO F'C= 210 KG/CM2 m3 1.5 388.8 583.20 1.50 388.80 583.20 0.00 388.80 0.00
06.04.02.02 VIGAS DE CIMENTACION, ENCOFRADO Y DESENCOFRADO m2 19.84 59.96 1,189.61 19.84 59.96 1,189.61 0.00 59.96 0.00
06.04.02.03 VIGAS DE CIMENTACION, ACERO FY=4200 KG/CM2. kg 209.33 5.04 1,055.02 209.33 5.04 1,055.02 0.00 5.04 0.00
06.04.03 COLUMNAS
06.04.03.01 COLUMNAS, CONCRETO F'C=210 KG/CM2 m3 2.51 535.03 1,342.93 2.51 535.03 1,342.93 0.00 535.03 0.00
06.04.03.02 COLUMNAS, ENCOFRADO Y DESENCOFRADO m2 37.36 62.05 2,318.19 37.36 62.05 2,318.19 0.00 62.05 0.00
06.04.03.03 COLUMNAS, ACERO FY=4200 KG/CM2. kg 534.96 5.13 2,744.34 534.96 5.13 2,744.34 0.00 5.13 0.00
06.04.04 VIGAS
06.04.04.03 VIGAS, ACERO FY=4200 KG/CM2. kg 176.88 4.98 880.86 176.88 4.98 880.86 0.00 4.98 0.00
06.04.05 COLUMNETAS
06.04.05.01 COLUMNETAS, CONCRETO F'C= 175 KG/CM2 m3 0.6 399.85 239.91 0.60 399.85 239.91 0.00 399.85 0.00
06.04.05.02 COLUMNETAS, ENCOFRADO Y DESENCOFRADO m2 15.22 51.96 790.83 15.22 51.96 790.83 0.00 51.96 0.00
06.04.05.03 COLUMNETAS, ACERO FY=4200 KG/CM2 kg 134.19 4.85 650.82 134.19 4.85 650.82 0.00 4.85 0.00
GOBIERNO REGIONAL DE MADRE DE DIOS
GERENCIA REGIONAL DE DESARROLLO ECONOMICO
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
PARTIDAS NUEVAS
06 SALA DE ORDEÑO ESTRUCTURAS
06.03 CONCRETO SIMPLE
06.03.04 SOBRECIMIENTO CONCRETO f'c=175kg/cm2 m3 1.64 405.05 664.28 1.64 405.05 664.28 0.00 405.05 0.00
06.03.05 ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTO m2 21.92 51.67 1,132.61 21.92 51.67 1,132.61 0.00 51.67 0.00
06.03.06 FALSO PISO CONCRETO F'C=175 KG/CM2 E=4" m2 60.63 46.77 2,835.67 60.63 46.77 2,835.67 0.00 46.77 0.00
06.03.07 FALSO PISO CONCRETO F'C=175 KG/CM2 E=6" m2 169.8 52.17 8,858.47 169.80 52.17 8,858.47 0.00 52.17 0.00
06.03.08 PEDESTAL DE CONCRETO F'C=175 KG/CM2 E=8" m2 5.34 62.41 333.27 5.34 62.41 333.27 0.00 62.41 0.00
06.04. CONCRETO ARMADO
06.04.07 VIGUETA DE AMARRE
06.04.07.01 CONCRETO F'C=175KG/CM2 m3 0.25 405.05 101.26 0.25 405.05 101.26 0.00 405.05 0.00
06.04.07.02 ENCOFRADO Y DESENCOFRADO EN VIGUETA m2 4.28 51.67 221.15 4.28 51.67 221.15 0.00 51.67 0.00
06.04.07.03 VIGUETAS, ACERO f'y=4200 kg/cm2 kg 361.49 4.91 1,774.92 361.49 4.91 1,774.92 0.00 4.91 0.00
06.04.08 MURO DE CONCRETO
06.04.08.01 MURO DE CONCRETO, CONCRETO f'c=210kg/cm2 m3 6.75 394 2,659.50 6.75 394.00 2,659.50 0.00 394.00 0.00
06.04.08.02 MURO DE CONCRETO ENCOFRADO Y DESENCOFRADO m2 75.81 51.67 3,917.10 75.81 51.67 3,917.10 0.00 51.67 0.00
06.04.08.03 MURO DE CONCRETO, ACERO f'y=4200 kg/cm2 kg 310.07 4.91 1,522.44 310.07 4.91 1,522.44 0.00 4.91 0.00
06.05 ESTRUCTURAS DE MADERA Y COBERTURA
06.05.03 TIJERAL TIPO A und 4 2216.75 8,867.00 4.00 2,216.75 8,867.00 0.00 2,216.75 0.00
08 INSTALACIONES SANITARIAS
08.01 RED DE AGUA FRIA
08.01.07 SUMINISTRO E INSTALACION DE APARATOS Y ACCESORIOS SANITARIOS
08.01.07.02 COLOCACION DE APARATOS Y ACCESORIOS SANITARIOS glb 1 450 450.00 0.00 450.00 0.00 1.00 450.00 450.00 0%
08.04 TRATAMIENTO DE AGUAS SERVIDAS
GOBIERNO REGIONAL DE MADRE DE DIOS
GERENCIA REGIONAL DE DESARROLLO ECONOMICO
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
75% 0% 0% 0% 0%
80% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
30% 1,392.00 40% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
% SETIEMBRE % OCTUBRE % NOVIEMBRE % DICIEMBRE %
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
0% 9,351.36 100% 0% 0% 0%
0% 15,731.11 100% 0% 0% 0%
50% 7,223.99 50% 0% 0% 0%
0% 3,426.71 100% 0% 0% 0%
0% 2,266.50 100% 0% 0% 0%
50% 284.79 50% 0% 0% 0%
0% 1,504.09 100% 0% 0% 0%
0% 2,054.05 100% 0% 0% 0%
0% 1,124.07 100% 0% 0% 0%
0% 1,402.88 100% 0% 0% 0%
0% 891.38 100% 0% 0% 0%
0% 791.81 100% 0% 0% 0%
0% 2,936.51 100% 0% 0% 0%
0% 0% 2,254.69 100% 0% 0%
0% 0% 8,706.92 100% 0% 0%
0% 0% 1,315.39 100% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
% SETIEMBRE % OCTUBRE % NOVIEMBRE % DICIEMBRE %
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
0% 1,706.57 100% 0% 0%
0% 4,329.60 100% 0% 0% 0%
0% 4,298.34 100% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
0% 97.86 100% 0% 0% 0%
0% 610.72 100% 0% 0% 0%
0% 68.72 100% 0% 0% 0%
0% 8,172.52 100% 0% 0% 0%
0% 1,474.85 100% 0% 0% 0%
100% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
30% 0% 0% 0% 0%
30% 0% 0% 0% 0%
30% 0% 0% 0% 0%
30% 0% 0% 0% 0%
30% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
% SETIEMBRE % OCTUBRE % NOVIEMBRE % DICIEMBRE %
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
0% 97.86 100% 0% 0% 0%
0% 610.72 100% 0% 0% 0%
0% 68.72 100% 0% 0% 0%
0% 8,172.52 100% 0% 0% 0%
0% 1,474.85 100% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
50% 0% 0% 0% 0%
50% 0% 0% 0% 0%
% SETIEMBRE % OCTUBRE % NOVIEMBRE % DICIEMBRE %
100% 0% 0% 0% 0%
50% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
20% 329.12 20% 329.12 20% 329.12 20% 0%
80% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
0% 0% 28,926.00 100% 0% 0%
0% 0% 3,518.85 100% 0% 0%
0% 4,719.92 100% 0% 0% 0%
0% 296.95 100% 0% 0% 0%
0% 0% 13,743.85 50% 13,743.85 50% 0%
0% 0% 1,337.79 100% 0% 0%
0% 0% 15,621.42 100% 0% 0%
0% 0% 7,472.29 100% 0% 0%
0% 0% 0% 16,212.00 100% 0%
0% 0% 0% 1,277.15 100% 0%
0% 0% 0% 2,498.58 100% 0%
0% 0% 0% 129.56 100% 0%
0% 0% 0% 1,611.84 100% 0%
0% 0% 0% 48.04 100% 0%
0% 2,332.12 100% 0% 0% 0%
0% 120.07 100% 0% 0% 0%
0% 3,564.59 100% 0% 0% 0%
0% 522.53 100% 0% 0% 0%
0% 298.55 100% 0% 0% 0%
0% 0% 3,830.40 100% 0% 0%
0% 0% 943.61 100% 0% 0%
0% 0% 370.16 100% 0% 0%
0% 0% 32.39 100% 0% 0%
0% 0% 12.01 100% 0% 0%
0% 1,967.91 100% 0% 0% 0%
0% 2,735.77 100% 0% 0% 0%
0% 912.87 100% 0% 0% 0%
0% 2,375.70 100% 0% 0% 0%
0% 850.04 100% 0% 0% 0%
0% 249.11 100% 0% 0% 0%
0% 526.55 100% 0% 0% 0%
0% 419.27 100% 0% 0% 0%
0% 140.53 100% 0% 0% 0%
0% 650.98 100% 0% 0% 0%
0% 0% 3,742.53 100% 0% 0%
0% 0% 80.53 100% 0% 0%
0% 0% 4,837.81 100% 0% 0%
0% 0% 517.48 100% 0% 0%
0% 0% 2,860.26 100% 0% 0%
0% 0% 1,413.96 100% 0% 0%
0% 0% 0% 2,125.80 100% 0%
0% 0% 0% 695.63 100% 0%
0% 0% 0% 287.00 100% 0%
0% 0% 0% 462.70 100% 0%
0% 0% 0% 97.17 100% 0%
0% 0% 0% 70.08 100% 0%
0% 0% 0% 48.04 100% 0%
0% 0% 8,772.60 100% 0% 0%
0% 1,967.91 100% 0% 0% 0%
0% 2,735.77 100% 0% 0% 0%
0% 912.87 100% 0% 0% 0%
0% 2,375.70 100% 0% 0% 0%
0% 850.04 100% 0% 0% 0%
% SETIEMBRE % OCTUBRE % NOVIEMBRE % DICIEMBRE %
0% 249.11 100% 0% 0% 0%
0% 526.55 100% 0% 0% 0%
0% 419.27 100% 0% 0% 0%
0% 140.53 100% 0% 0% 0%
0% 650.98 100% 0% 0% 0%
0% 0% 3,742.53 100% 0% 0%
0% 0% 80.53 100% 0% 0%
0% 0% 4,837.81 100% 0% 0%
0% 0% 517.48 100% 0% 0%
0% 0% 2,860.26 100% 0% 0%
0% 0% 1,413.96 100% 0% 0%
0% 0% 0% 2,125.80 100% 0%
0% 0% 0% 695.63 100% 0%
0% 0% 0% 287.00 100% 0%
0% 0% 0% 462.70 100% 0%
0% 0% 0% 97.17 100% 0%
0% 0% 0% 70.08 100% 0%
0% 0% 0% 48.04 100% 0%
0% 0% 8,772.60 100% 0% 0%
0% 1,461.22 100% 0% 0% 0%
0% 0% 554.67 100% 0% 0%
0% 0% 28.76 100% 0% 0%
0% 0% 3,685.26 100% 0% 0%
0% 0% 2,112.19 100% 0% 0%
0% 0% 0% 3,231.00 100% 0%
0% 0% 0% 229.60 100% 0%
0% 0% 0% 370.16 100% 0%
0% 0% 0% 129.56 100% 0%
0% 0% 0% 48.04 100% 0%
0% 0% 107.40 100% 0% 0%
0% 0% 315.98 100% 0% 0%
0% 0% 261.89 100% 0% 0%
0% 0% 659.44 100% 0% 0%
0% 0% 31.64 100% 0% 0%
0% 0% 4,574.06 100% 0% 0%
0% 0% 166.11 100% 0% 0%
0% 0% 1,114.03 100% 0% 0%
0% 0% 0% 1,820.00 100% 0%
0% 0% 0% 205.05 100% 0%
0% 0% 0% 3,524.40 100% 0%
0% 0% 0% 1,739.07 100% 0%
0% 0% 0% 114.80 100% 0%
0% 0% 0% 185.08 100% 0%
0% 0% 0% 64.78 100% 0%
0% 0% 0% 24.02 100% 0%
0% 0% 0% 219.82 100% 0%
0% 0% 0% 286.88 100% 0%
0% 0% 0% 135.49 100% 0%
0% 0% 0% 386.21 100% 0%
0% 0% 0% 234.42 100% 0%
0% 0% 7,736.56 100% 0% 0%
100% 0% 0% 0% 0%
% SETIEMBRE % OCTUBRE % NOVIEMBRE % DICIEMBRE %
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
0% 1,585.33 100% 0% 0% 0%
0% 267.48 100% 0% 0% 0%
0% 0% 270.82 100% 0% 0%
0% 0% 1,128.95 100% 0% 0%
0% 0% 57.52 100% 0% 0%
0% 0% 189.84 100% 0% 0%
0% 0% 97.52 100% 0% 0%
0% 0% 461.40 100% 0% 0%
0% 0% 966.00 100% 0% 0%
0% 0% 935.00 100% 0% 0%
0% 0% 289.85 100% 0% 0%
0% 0% 92.54 100% 0% 0%
0% 0% 32.39 100% 0% 0%
0% 0% 0% 495.45 100% 0%
0% 0% 0% 87.53 100% 0%
0% 0% 0% 88.52 100% 0%
0% 0% 0% 92.23 100% 0%
0% 1,830.41 100% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
0% 0% 904.41 100% 0% 0%
0% 0% 461.79 100% 0% 0%
0% 0% 54.97 100% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
% SETIEMBRE % OCTUBRE % NOVIEMBRE % DICIEMBRE %
100% 0% 0% 0% 0%
0% 79.40 100% 0% 0% 0%
0% 195.08 100% 0% 0% 0%
0% 1,249.36 100% 0% 0% 0%
0% 225.36 100% 0% 0% 0%
0% 225.36 100% 0% 0% 0%
0% 971.85 100% 0% 0% 0%
0% 280.08 100% 0% 0% 0%
0% 675.96 100% 0% 0% 0%
0% 468.78 100% 0% 0% 0%
0% 245.42 100% 0% 0% 0%
0% 0% 645.15 100% 0% 0%
0% 0% 861.00 100% 0% 0%
0% 0% 4,785.00 100% 0% 0%
0% 0% 1,305.94 100% 0% 0%
0% 297.45 100% 0% 0% 0%
0% 267.30 100% 0% 0% 0%
0% 971.85 100% 0% 0% 0%
0% 366.90 100% 0% 0% 0%
0% 115.64 100% 0% 0% 0%
0% 289.28 100% 0% 0% 0%
0% 882.00 100% 0% 0% 0%
0% 87.09 100% 0% 0% 0%
0% 61.16 100% 0% 0% 0%
0% 62.32 100% 0% 0% 0%
0% 119.67 100% 0% 0% 0%
0% 150.40 100% 0% 0% 0%
0% 26.33 100% 0% 0% 0%
0% 684.96 100% 0% 0% 0%
% SETIEMBRE % OCTUBRE % NOVIEMBRE % DICIEMBRE %
0% 178.70 100% 0% 0% 0%
0% 0% 0% 153.64 100% 0%
% SETIEMBRE % OCTUBRE % NOVIEMBRE % DICIEMBRE %
0% 0% 1,501.28 100% 0% 0%
0% 0% 1,866.31 100% 0% 0%
0% 0% 171.98 100% 0% 0%
0% 0% 303.04 100% 0% 0%
0% 0% 262.19 100% 0% 0%
0% 0% 436.05 100% 0% 0%
0% 97.54 100% 0% 0% 0%
0% 178.48 100% 0% 0% 0%
0% 75.12 100% 0% 0% 0%
0% 75.12 100% 0% 0% 0%
0% 88.35 100% 0% 0% 0%
0% 75.93 100% 0% 0% 0%
0% 23.34 100% 0% 0% 0%
0% 157.20 100% 0% 0% 0%
0% 36.06 100% 0% 0% 0%
0% 140.24 100% 0% 0% 0%
0% 0% 215.05 100% 0% 0%
0% 0% 287.00 100% 0% 0%
0% 0% 435.00 100% 0% 0%
0% 0% 230.46 100% 0% 0%
0% 58.65 100% 0% 0% 0%
0% 1,096.45 100% 0% 0% 0%
0% 35.11 100% 0% 0% 0%
0% 43.29 100% 0% 0% 0%
0% 665.13 100% 0% 0% 0%
% SETIEMBRE % OCTUBRE % NOVIEMBRE % DICIEMBRE %
0% 49.75 100% 0% 0% 0%
0% 133.84 100% 0% 0% 0%
0% 104.35 100% 0% 0% 0%
0% 38.05 100% 0% 0% 0%
0% 99.15 100% 0% 0% 0%
0% 89.10 100% 0% 0% 0%
0% 88.35 100% 0% 0% 0%
0% 122.30 100% 0% 0% 0%
0% 57.82 100% 0% 0% 0%
0% 144.64 100% 0% 0% 0%
0% 126.00 100% 0% 0% 0%
0% 29.03 100% 0% 0% 0%
0% 61.16 100% 0% 0% 0%
0% 15.58 100% 0% 0% 0%
0% 39.89 100% 0% 0% 0%
0% 26.33 100% 0% 0% 0%
0% 28.54 100% 0% 0% 0%
0% 71.48 100% 0% 0% 0%
0% 0% 0% 1,501.28 100% 0%
0% 0% 0% 1,371.17 100% 0%
0% 0% 0% 232.56 100% 0%
0% 0% 0% 171.98 100% 0%
0% 0% 0% 606.08 100% 0%
0% 0% 0% 262.19 100% 0%
0% 97.54 100% 0% 0% 0%
0% 178.48 100% 0% 0% 0%
0% 75.12 100% 0% 0% 0%
0% 75.12 100% 0% 0% 0%
0% 88.35 100% 0% 0% 0%
0% 75.93 100% 0% 0% 0%
0% 23.34 100% 0% 0% 0%
0% 157.20 100% 0% 0% 0%
% SETIEMBRE % OCTUBRE % NOVIEMBRE % DICIEMBRE %
0% 36.06 100% 0% 0% 0%
0% 140.24 100% 0% 0% 0%
0% 0% 215.05 100% 0% 0%
0% 0% 287.00 100% 0% 0%
0% 0% 435.00 100% 0% 0%
0% 0% 230.46 100% 0% 0%
0% 58.65 100% 0% 0% 0%
0% 1,096.45 100% 0% 0% 0%
0% 35.11 100% 0% 0% 0%
0% 43.29 100% 0% 0% 0%
0% 665.13 100% 0% 0% 0%
0% 49.75 100% 0% 0% 0%
0% 133.84 100% 0% 0% 0%
0% 104.35 100% 0% 0% 0%
0% 38.05 100% 0% 0% 0%
0% 99.15 100% 0% 0% 0%
0% 89.10 100% 0% 0% 0%
0% 88.35 100% 0% 0% 0%
0% 122.30 100% 0% 0% 0%
0% 57.82 100% 0% 0% 0%
0% 144.64 100% 0% 0% 0%
0% 126.00 100% 0% 0% 0%
0% 29.03 100% 0% 0% 0%
0% 61.16 100% 0% 0% 0%
0% 15.58 100% 0% 0% 0%
0% 39.89 100% 0% 0% 0%
0% 26.33 100% 0% 0% 0%
0% 28.54 100% 0% 0% 0%
0% 71.48 100% 0% 0% 0%
0% 0% 0% 1,501.28 100% 0%
0% 0% 0% 1,371.17 100% 0%
0% 0% 0% 232.56 100% 0%
0% 0% 0% 171.98 100% 0%
0% 0% 0% 606.08 100% 0%
0% 0% 0% 262.19 100% 0%
0% 0% 0% 9.11 100% 0%
0% 170.38 100% 0% 0% 0%
0% 5.46 100% 0% 0% 0%
0% 6.73 100% 0% 0% 0%
0% 103.35 100% 0% 0% 0%
0% 6.81 100% 0% 0% 0%
0% 16.49 100% 0% 0% 0%
0% 11.53 100% 0% 0% 0%
0% 8.18 100% 0% 0% 0%
0% 97.54 100% 0% 0% 0%
0% 89.24 100% 0% 0% 0%
0% 148.26 100% 0% 0% 0%
0% 23.34 100% 0% 0% 0%
0% 62.88 100% 0% 0% 0%
0% 16.72 100% 0% 0% 0%
0% 73.12 100% 0% 0% 0%
0% 0% 55.00 100% 0% 0%
0% 0% 76.82 100% 0% 0%
0% 17.35 100% 0% 0% 0%
0% 324.26 100% 0% 0% 0%
0% 10.38 100% 0% 0% 0%
0% 12.80 100% 0% 0% 0%
0% 196.71 100% 0% 0% 0%
0% 8.13 100% 0% 0% 0%
0% 82.78 100% 0% 0% 0%
0% 12.94 100% 0% 0% 0%
0% 0% 62.60 100% 0% 0%
0% 15.33 100% 0% 0% 0%
0% 0% 0% 1,965.37 100% 0%
0% 0% 0% 1,987.58 100% 0%
0% 0% 0% 2,619.20 100% 0%
0% 0% 0% 2,659.81 100% 0%
0% 0% 0% 343.96 100% 0%
0% 0% 0% 610.47 100% 0%
0% 0% 0% 441.60 100% 0%
% SETIEMBRE % OCTUBRE % NOVIEMBRE % DICIEMBRE %
0% 0% 0% 262.19 100% 0%
0% 2,665.88 100% 0% 0% 0%
0% 250.00 100% 0% 0% 0%
0% 577.65 100% 0% 0% 0%
0% 319.28 100% 0% 0% 0%
0% 691.36 100% 0% 0% 0%
0% 300.00 100% 0% 0% 0%
0% 174.17 100% 0% 0% 0%
0% 0% 158.80 100% 0% 0%
0% 0% 500.14 100% 0% 0%
0% 0% 23.02 100% 0% 0%
0% 0% 209.44 100% 0% 0%
0% 0% 52.30 100% 0% 0%
0% 0% 5,784.59 100% 0% 0%
% SETIEMBRE % OCTUBRE % NOVIEMBRE % DICIEMBRE %
0% 1,231.10 100% 0% 0% 0%
0% 76.00 100% 0% 0% 0%
0% 663.51 100% 0% 0% 0%
0% 301.56 100% 0% 0% 0%
0% 0% 5,574.53 100% 0% 0%
0% 0% 0% 0% 1,409.11 100%
0% 0% 8,500.00 100% 0% 0%
0% 0% 16,580.00 100% 0% 0%
% SETIEMBRE % OCTUBRE % NOVIEMBRE % DICIEMBRE %
0% 0% 0% 0% 16,580.00 100%
0% 0% 0% 0% 35,610.00 100%
0% 0% 8,065.45 100% 0% 0%
0% 0% 1.00 100% 0% 0%
0% 0% 1,417.99 100% 0% 0%
0% 0% 600.04 100% 0% 0%
0% 0% 1,428.65 100% 0% 0%
0% 0% 0% 370.16 100% 0%
0% 570.62 100% 0% 0% 0%
0% 218.10 100% 0% 0% 0%
0% 0% 1,500.42 100% 0% 0%
% SETIEMBRE % OCTUBRE % NOVIEMBRE % DICIEMBRE %
0% 0% 0% 0% 0%
0% 199.33 100% 0% 0% 0%
0% 0% 425.13 100% 0% 0%
0% 0% 1,362.52 100% 0% 0%
0% 0% 17,821.84 100% 0% 0%
0% 0% 8,263.70 100% 0% 0%
0% 0% 3,531.15 100% 0% 0%
0% 0% 0% 1,486.60 100% 0%
0% 0% 0% 2,091.08 100% 0%
0% 0% 0% 774.18 100% 0%
0% 0% 0% 565.22 100% 0%
0% 0% 0% 450.00 100% 0%
% SETIEMBRE % OCTUBRE % NOVIEMBRE % DICIEMBRE %
0% 0% 1,371.58 100% 0% 0%
0% 0% 3,919.45 100% 0% 0%
0% 0% 1,391.92 100% 0% 0%
0% 0% 0% 0% 2,928.13 100%
0% 0% 0% 0% 10,200.96 100%
0% 0% 0% 80.00 100% 0%
0% 0% 0% 45.00 100% 0%
0% 0% 0% 9.00 100% 0%
0% 0% 0% 10.00 100% 0%
0% 0% 14,257.63 100% 0% 0%
0% 0% 3,715.67 100% 0% 0%
0% 0% 2,929.60 100% 0% 0%
0% 0% 523.26 100% 0% 0%
0% 0% 909.12 100% 0% 0%
0% 0% 1,048.76 100% 0% 0%
% SETIEMBRE % OCTUBRE % NOVIEMBRE % DICIEMBRE %
0% 0% 781.53 100% 0% 0%
0% 288.44 100% 0% 0% 0%
0% 0% 1,464.07 100% 0% 0%
0% 0% 5,597.97 100% 0% 0%
0% 0% 45.00 100% 0% 0%
0% 0% 9.00 100% 0% 0%
0% 0% 15.00 100% 0% 0%
0% 0% 0% 345.95 100% 0%
0% 0% 0% 521.66 100% 0%
0% 0% 0% 71.56 100% 0%
0% 0% 0% 754.61 100% 0%
% SETIEMBRE % OCTUBRE % NOVIEMBRE % DICIEMBRE %
100% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 585.34 100% 0% 0%
0% 0% 1,415.62 100% 0% 0%
0% 0% 0% 0% 3,569.76 100%
0% 0% 0% 0% 929.28 100%
0% 0% 0% 0% 636.32 100%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
% SETIEMBRE % OCTUBRE % NOVIEMBRE % DICIEMBRE %
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
0% 9,044.61 100% 0% 0% 0%
0% 7,367.88 100% 0% 0% 0%
0% 4,423.56 100% 0% 0% 0%
0% 3,662.79 100% 0% 0% 0%
0% 6,164.15 100% 0% 0% 0%
0% 5,260.32 100% 0% 0% 0%
0% 107.96 100% 0% 0% 0%
0% 243.17 100% 0% 0% 0%
0% 55.44 100% 0% 0% 0%
0% 0% 336.64 100% 0% 0%
0% 0% 969.73 100% 0% 0%
0% 0% 158.52 100% 0% 0%
0% 0% 8,801.11 100% 0% 0%
0% 0% 876.74 100% 0% 0%
0% 0% 1,515.57 100% 0% 0%
0% 0% 86.28 100% 0% 0%
0% 0% 7,977.50 100% 0% 0%
0% 0% 951.88 100% 0% 0%
0% 0% 884.21 100% 0% 0%
0% 0% 0% 1,013.40 100% 0%
0% 0% 0% 4,080.00 100% 0%
0% 0% 0% 1,434.50 100% 0%
0% 0% 0% 721.63 100% 0%
0% 0% 0% 1,056.32 100% 0%
0% 0% 0% 172.20 100% 0%
0% 0% 0% 277.62 100% 0%
0% 0% 0% 97.17 100% 0%
0% 0% 0% 70.08 100% 0%
0% 0% 0% 36.03 100% 0%
0% 28.81 100% 0% 0% 0%
0% 538.61 100% 0% 0% 0%
0% 17.25 100% 0% 0% 0%
0% 21.27 100% 0% 0% 0%
0% 326.73 100% 0% 0% 0%
0% 12.53 100% 0% 0% 0%
0% 0% 16.49 100% 0% 0%
0% 0% 28.61 100% 0% 0%
0% 0% 13.82 100% 0% 0%
0% 0% 97.54 100% 0% 0%
0% 0% 89.24 100% 0% 0%
0% 74.13 100% 0% 0% 0%
0% 23.34 100% 0% 0% 0%
0% 62.88 100% 0% 0% 0%
0% 16.72 100% 0% 0% 0%
0% 73.12 100% 0% 0% 0%
0% 0% 55.00 100% 0% 0%
0% 0% 76.82 100% 0% 0%
0% 40.87 100% 0% 0% 0%
% SETIEMBRE % OCTUBRE % NOVIEMBRE % DICIEMBRE %
0% 763.94 100% 0% 0% 0%
0% 24.46 100% 0% 0% 0%
0% 30.16 100% 0% 0% 0%
0% 463.43 100% 0% 0% 0%
0% 16.49 100% 0% 0% 0%
0% 46.23 100% 0% 0% 0%
0% 54.28 100% 0% 0% 0%
0% 51.15 100% 0% 0% 0%
0% 23.35 100% 0% 0% 0%
0% 88.35 100% 0% 0% 0%
0% 72.32 100% 0% 0% 0%
0% 62.60 100% 0% 0% 0%
0% 81.05 100% 0% 0% 0%
0% 30.24 100% 0% 0% 0%
0% 15.33 100% 0% 0% 0%
0% 0% 1,965.37 100% 0% 0%
0% 0% 1,987.58 100% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%
70% 525.40 30% 0% 0% 0%
70% 1,358.79 30% 0% 0% 0%
0% 6,739.04 100% 0% 0% 0%
0% 3,472.73 100% 0% 0% 0%
0% 982.39 100% 0% 0% 0%
% SETIEMBRE % OCTUBRE % NOVIEMBRE % DICIEMBRE %
0% 1,695.17 100% 0% 0% 0%
0% 3,486.07 100% 0% 0% 0%
0% 2,700.63 100% 0% 0% 0%
0% 57.25 100% 0% 0% 0%
0% 5,377.05 100% 0% 0% 0%
0% 10,150.76 100% 0% 0% 0%
0% 8,915.94 100% 0% 0% 0%
0% 2,733.79 100% 0% 0% 0%
0% 6,939.42 100% 0% 0% 0%
0% 6,637.05 100% 0% 0% 0%
0% 755.72 100% 0% 0% 0%
0% 1,702.21 100% 0% 0% 0%
0% 400.27 100% 0% 0% 0%
0% 0% 454.07 100% 0% 0%
0% 0% 2,482.50 100% 0% 0%
0% 0% 428.44 100% 0% 0%
0% 0% 29,177.55 100% 0% 0%
0% 0% 3,414.00 100% 0% 0%
0% 0% 25,568.40 100% 0% 0%
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
PRESUPUESTO BASE
Metrado Precio Uni. Parcial
ITEM DESCRIPCION UND.
Base (S/.) (S/.)
CONTRACTUAL
01 MODULO 1: OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES-ESTRUCTURAS
1.01 OBRAS PROVISIONALES
01.01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M und 1.00 1,515.29 1,515.29
01.01.02 CAMPAMENTO PROVISIONAL DE LA OBRA (OFICINAS, ALMACEN, SSHH, CASETA DE GUARDIANIA) GLB 1.00 22,302.32 22,302.32
01.01.03 AGUA PARA LA CONSTRUCCION GLB 1.00 2,400.00 2,400.00
01.01.04 ENERGIA ELECTRICA PROVISIONAL PARA LA CONSTRUCCION GLB 1.00 1,400.00 1,400.00
01.01.05 LIMPIEZA GENERAL AL FINALIZAR OBRA GLB 1.00 2,801.40 2,801.40
01.01.06 TRANSPORTE DE MATERIALES A OBRA (GLOBAL) GLB 1.00 20,000.00 20,000.00
1.02 IMPLEMENTACION Y ADMINISTRACION DE SEGURIDAD Y SALUD
01.02.01 EQUIPOS DE PROTECCION INDIVIDUAL GLB 1.00 16,350.00 16,350.00
01.02.02 EQUIPOS DE PROTECCION COLECTIVA GLB 1.00 2,217.20 2,217.20
01.02.03 SEÑALIZACION TEMPORAL DE SEGURIDAD GLB 1.00 3,468.00 3,468.00
01.02.04 RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD DURANTE EL TRABAJO GLB 1.00 1,550.00 1,550.00
1.03 DEMOLICIONES DE BLOQUES EXISTENTES
01.03.01 DESMONTAJES
01.03.01.01 DESMONTAJE DE PUERTA DE MADERA m2 67.90 12.76 866.40
01.03.01.02 DESMONTAJE DE VENTANA DE MADERA m2 73.03 7.96 581.32
01.03.01.03 DESMONTAJE DE TABIQUE DE MADERA - ENTABLADO 1 CARA m2 705.37 10.26 7,237.10
01.03.01.04 DESMONTAJE DE PISO DE MADERA - ENTABLADO 1 CARA m2 120.80 6.73 812.98
01.03.01.05 DESMONTAJE DE COBERTURA DE CALAMINAS INCLUYE CORREAS DE MADERA m2 682.77 3.52 2,403.35
01.03.02 DESMONTAJE DE TIJERAL DE MADERA
01.03.02.01 DESMONTAJE DE TIJERALES DE MADERA (L=3-5M) und 3.00 56.19 168.57
01.03.02.02 DESMONTAJE DE TIJERALES DE MADERA (L=9-12M) und 23.00 74.87 1,722.01
01.03.02.03 DESMONTAJE DE COLUMNAS DE MADERA (6"x6") und 70.00 7.47 522.90
01.03.02.04 TRASLADO Y ENTREGA DE MATERIAL DESMONTADO GLB 1.00 1,616.81 1,616.81
1.04 DEMOLICIONES
01.04.01 DEMOLICION MANUAL DE SOBRECIMIENTO m3 3.84 74.71 286.89
01.04.02 DEMOLICION DE PISO DE CONCRETO DE 0.10 M. m2 328.30 7.32 2,403.16
01.04.03 DEMOLICION DE VEREDA DE 0.15 M. m2 67.80 8.80 596.64
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
PRESUPUESTO BASE
Metrado Precio Uni. Parcial
ITEM DESCRIPCION UND.
Base (S/.) (S/.)
02.03.02 CIMIENTO CORRIDO F'c=140 kg/cm2 m3 39.48 323.43 12,769.02
02.03.03 CONCRETO EN SOBRECIMIENTO F'C= 175 KG/CM2 m3 12.08 399.85 4,830.19
02.03.04 SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO m2 134.37 35.07 4,712.36
02.03.05 FALSO PISO e= 4" (10CM.) 1:6 C:H m2 334.50 43.31 14,487.20
2.04 OBRAS DE CONCRETO ARMADO
02.04.01 ZAPATAS
02.04.01.01 ZAPATAS, CONCRETO F'C=210 KG/CM2 m3 18.83 364.40 6,861.65
02.04.01.02 ZAPATAS, ACERO FY=4200KG/CM2 kg 394.71 4.91 1,938.03
02.04.02 VIGAS DE CIMENTACION
02.04.02.01 VIGAS DE CIMENTACION, CONCRETO F'C= 210 KG/CM2 m3 1.99 388.80 773.71
02.04.02.02 VIGAS DE CIMENTACION, ENCOFRADO Y DESENCOFRADO m2 15.88 59.96 952.16
02.04.02.03 VIGAS DE CIMENTACION, ACERO FY=4200 KG/CM2. kg 257.69 5.04 1,298.76
02.04.02.04 VIGAS DE CIMENTACION, BASE CON POLIESTILENO EXPANDIDO (TECNOPORT) m2 0.96 17.14 16.45
02.04.03 COLUMNAS
02.04.03.01 COLUMNAS, CONCRETO F'C=210 KG/CM2 m3 12.53 535.03 6,703.93
02.04.03.02 COLUMNAS, ENCOFRADO Y DESENCOFRADO m2 165.52 62.05 10,270.52
02.04.03.03 COLUMNAS, ACERO FY=4200 KG/CM2. kg 1,880.29 5.13 9,645.89
02.04.04 VIGAS
02.04.04.01 VIGAS, CONCRETO F'C=210 KG/CM2 m3 22.85 409.25 9,351.36
02.04.04.02 VIGAS, ENCOFRADO Y DESENCOFRADO m2 239.84 65.59 15,731.11
02.04.04.03 VIGAS, ACERO FY=4200 KG/CM2. kg 2,901.20 4.98 14,447.98
02.04.05 COLUMNETAS
02.04.05.01 COLUMNETAS, CONCRETO F'C= 175 KG/CM2 m3 8.57 399.85 3,426.71
02.04.05.02 COLUMNETAS, ENCOFRADO Y DESENCOFRADO m2 43.62 51.96 2,266.50
02.04.05.03 COLUMNETAS, ACERO FY=4200 KG/CM2 kg 117.44 4.85 569.58
02.04.06 LOSA ALIGERADA
02.04.06.01 LOSA ALIGERADA, CONCRETO F'C=210 KG/CM2 m3 3.63 414.35 1,504.09
02.04.06.02 LOSA ALIGERADA, ENCOFRADO Y DESENCOFRADO m2 40.95 50.16 2,054.05
02.04.06.03 LOSA ALIGERADA, ACERO FY=4200 KG/CM2. kg 234.67 4.79 1,124.07
02.04.06.04 LOSA ALIGERADA, LADRILLO DE CONCRETO PARA TECHO DE 20X30X15 und 512.00 2.74 1,402.88
02.04.07 ESCALERAS
02.04.07.01 ESCALERAS, CONCRETO F'C=210 KG/CM2 m3 1.80 495.21 891.38
02.04.07.02 ESCALERAS, ENCOFRADO Y DESENCOFRADO m2 8.95 88.47 791.81
02.04.07.03 ESCALERAS, ACERO FY=4200 KG/CM2. kg 595.64 4.93 2,936.51
02.04.08 MUEBLE DE CONCRETO
02.04.08.01 MUEBLE DE CONCRETO, CONCRETO F'c= 175KG/CM2 m3 5.76 391.44 2,254.69
02.04.08.02 MUEBLE DE CONCRETO, ENCOFRADO Y DESENCOFRADO m2 105.50 82.53 8,706.92
02.04.08.03 MUEBLE DE CONCRETO, ACERO FY=4200 KG/CM2. kg 172.85 7.61 1,315.39
2.05 ESTRUCTURA DE MADERA Y COBERTURA
02.05.01 TIJERALES DE MADERA (TIPO-4) L=10.60 m CON CARTELAS 3/16" Y PERNOS DE 1/8" und 9.00 2,564.12 23,077.08
02.05.02 TIJERALES DE MADERA (TIPO-5) L=10.60 m CON CARTELAS 3/16" Y PERNOS DE 1/8" und 3.00 2,516.44 7,549.32
02.05.03 TIJERALES DE MADERA (TIPO-6) L=4.25 m CON CARTELAS 3/16" Y PERNOS DE 1/8" und 1.00 1,864.14 1,864.14
02.05.04 TIJERALES DE MADERA (TIPO-7) L=4.25 m CON CARTELAS 3/16" Y PERNOS DE 1/8" und 4.00 1,915.93 7,663.72
02.05.05 CORREAS DE 2"X3" ML 637.30 11.38 7,252.47
2.06 MUROS Y TABIQUES DE ALBAÑILERIA
02.06.01 MURO DE CABEZA CON LADRILLO DE ARCILLA 9X13X24 (CON ALAMBRE N°8 C/3 HILADAS) m2 314.35 151.91 47,752.91
02.06.02 MURO DE SOGA CON LADRILLO DE ARCILLA 9x13x24 CM (CON ALAMBRE N°8 C/3 HILADAS) m2 306.10 93.86 28,730.55
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
PRESUPUESTO BASE
Metrado Precio Uni. Parcial
ITEM DESCRIPCION UND.
Base (S/.) (S/.)
06.02.01 EXCAVACION DE ZANJAS m3 20.98 36.64 768.71
06.02.02 RELLENO Y COMPACTADO C/ MATERIAL PROPIO m3 7.79 28.68 223.42
06.02.03 ACARREO INTERNO MAT. PROCED. DE EXCAVACIONES Dprom=30M m3 16.49 18.68 308.03
06.02.04 ELIMINACION MATERIAL EXCEDENTE CON MAQUINARIA VOLQUETE 15M3 V=30KM/h D=3KM m3 16.49 8.49 140.00
06.02.05 NIVELACION Y APISONADO PARA FALSO PISO O PISO m2 74.80 2.77 207.20
06.02.06 RELLENO CON AFIRMADO DE e=4" (100% COMPACTACION) m3 11.22 82.11 921.27
6.03 OBRAS DE CONCRETO SIMPLE
06.03.01 SOLADO DE 2" F'C=100 KG/CM2 m2 9.20 22.99 211.51
06.03.02 CIMIENTO CORRIDO F'c=140 kg/cm2 m3 6.34 323.43 2,050.55
06.03.03 FALSO PISO e= 4" (10CM.) 1:6 C:H m2 74.80 43.31 3,239.59
6.04 OBRAS DE CONCRETO ARMADO
06.04.01 ZAPATAS
06.04.01.01 ZAPATAS, CONCRETO F'C=210 KG/CM2 m3 3.68 364.40 1,340.99
06.04.01.02 ZAPATAS, ACERO FY=4200KG/CM2 kg 79.99 4.91 392.75
06.04.02 VIGAS DE CIMENTACION
06.04.02.01 VIGAS DE CIMENTACION, CONCRETO F'C= 210 KG/CM2 m3 2.39 388.80 929.23
06.04.02.02 VIGAS DE CIMENTACION, ENCOFRADO Y DESENCOFRADO m2 31.84 59.96 1,909.13
06.04.02.03 VIGAS DE CIMENTACION, ACERO FY=4200 KG/CM2. kg 268.25 5.04 1,351.98
06.04.02.04 VIGAS DE CIMENTACION, BASE CON POLIESTILENO EXPANDIDO (TECNOPORT) m2 0.60 17.14 10.28
06.04.03 COLUMNAS
06.04.03.01 COLUMNAS, CONCRETO F'C=210 KG/CM2 m3 3.28 535.03 1,754.90
06.04.03.02 COLUMNAS, ENCOFRADO Y DESENCOFRADO m2 42.64 62.05 2,645.81
06.04.03.03 COLUMNAS, ACERO FY=4200 KG/CM2. kg 461.95 5.13 2,369.80
06.04.04 VIGAS
06.04.04.01 VIGAS, CONCRETO F'C=210 KG/CM2 m3 7.73 409.25 3,163.50
06.04.04.02 VIGAS, ENCOFRADO Y DESENCOFRADO m2 84.72 65.59 5,556.78
06.04.04.03 VIGAS, ACERO FY=4200 KG/CM2. kg 847.12 4.98 4,218.66
06.04.05 COLUMNETAS
06.04.05.01 COLUMNETAS, CONCRETO F'C= 175 KG/CM2 m3 0.49 399.85 195.93
06.04.05.02 COLUMNETAS, ENCOFRADO Y DESENCOFRADO m2 8.45 51.96 439.06
06.04.05.03 COLUMNETAS, ACERO FY=4200 KG/CM2 kg 21.74 4.85 105.44
06.04.06 MUEBLE DE CONCRETO
06.04.06.01 MUEBLE DE CONCRETO, CONCRETO F'c= 175KG/CM2 m3 0.28 391.44 109.60
06.04.06.02 MUEBLE DE CONCRETO, ENCOFRADO Y DESENCOFRADO m2 3.60 82.53 297.11
06.04.06.03 MUEBLE DE CONCRETO, ACERO FY=4200 KG/CM2. kg 8.41 7.61 64.00
6.05 ESTRUCTURA DE MADERA Y COBERTURA
06.05.01 TIJERALES DE MADERA (TIPO-3) L=5.70 m CON CARTELAS 3/16" Y PERNOS DE 1/8" und 6.00 1,884.21 11,305.26
06.05.02 CORREAS DE 2"X3" ML 146.50 11.38 1,667.17
6.06 MUROS Y TABIQUES DE ALBAÑILERIA
06.06.01 MURO DE SOGA CON LADRILLO DE ARCILLA 9x13x24 CM (CON ALAMBRE N°8 C/3 HILADAS) m2 84.54 93.86 7,934.92
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
PRESUPUESTO BASE
Metrado Precio Uni. Parcial
ITEM DESCRIPCION UND.
Base (S/.) (S/.)
10.03.02 CIMIENTO CORRIDO F'c=140 kg/cm2 m3 7.74 323.43 2,503.35
10.03.03 CONCRETO EN SOBRECIMIENTO F'C= 175 KG/CM2 m3 2.32 399.85 927.65
10.03.04 SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO m2 30.96 35.07 1,085.77
10.03.05 FALSO PISO e= 4" (10CM.) 1:6 C:H m2 66.95 43.31 2,899.60
10.04 OBRAS DE CONCRETO ARMADO
10.04.01 ZAPATAS
10.04.01.01 ZAPATAS, CONCRETO F'C=210 KG/CM2 m3 3.97 364.40 1,446.67
10.04.01.02 ZAPATAS, ACERO FY=4200KG/CM2 kg 86.03 4.91 422.41
10.04.02 VIGAS DE CIMENTACION
10.04.02.01 VIGAS DE CIMENTACION, CONCRETO F'C= 210 KG/CM2 m3 2.96 388.80 1,150.85
10.04.02.02 VIGAS DE CIMENTACION, ENCOFRADO Y DESENCOFRADO m2 23.70 59.96 1,421.05
10.04.02.03 VIGAS DE CIMENTACION, ACERO FY=4200 KG/CM2. kg 241.62 5.04 1,217.76
10.04.02.04 VIGAS DE CIMENTACION, BASE CON POLIESTILENO EXPANDIDO (TECNOPORT) m2 0.98 17.14 16.80
10.04.03 COLUMNAS
10.04.03.01 COLUMNAS, CONCRETO F'C=210 KG/CM2 m3 3.44 535.03 1,840.50
10.04.03.02 COLUMNAS, ENCOFRADO Y DESENCOFRADO m2 54.94 62.05 3,409.03
10.04.03.03 COLUMNAS, ACERO FY=4200 KG/CM2. kg 511.62 5.13 2,624.61
10.04.04 VIGAS
10.04.04.01 VIGAS, CONCRETO F'C=210 KG/CM2 m3 4.17 409.25 1,706.57
10.04.04.02 VIGAS, ENCOFRADO Y DESENCOFRADO m2 66.01 65.59 4,329.60
10.04.04.03 VIGAS, ACERO FY=4200 KG/CM2. kg 863.12 4.98 4,298.34
10.04.05 COLUMNETAS
10.04.05.01 COLUMNETAS, CONCRETO F'C= 175 KG/CM2 m3 0.76 399.85 303.89
10.04.05.02 COLUMNETAS, ENCOFRADO Y DESENCOFRADO m2 13.20 51.96 685.87
10.04.05.03 COLUMNETAS, ACERO FY=4200 KG/CM2 kg 33.22 4.85 161.12
10.04.06 MUEBLE DE CONCRETO
10.04.06.01 MUEBLE DE CONCRETO, CONCRETO F'c= 175KG/CM2 m3 0.25 391.44 97.86
10.04.06.02 MUEBLE DE CONCRETO, ENCOFRADO Y DESENCOFRADO m2 7.40 82.53 610.72
10.04.06.03 MUEBLE DE CONCRETO, ACERO FY=4200 KG/CM2. kg 9.03 7.61 68.72
10.05 ESTRUCTURA DE MADERA Y COBERTURA
10.05.01 TIJERALES DE MADERA (TIPO-102) L=7.60 m CON CARTELAS 3/16" Y PERNOS DE 1/8" und 4.00 2,043.13 8,172.52
10.05.02 CORREAS DE 2"X3" ML 129.60 11.38 1,474.85
10.06 MUROS Y TABIQUES DE ALBAÑILERIA
10.06.01 MURO DE SOGA CON LADRILLO DE ARCILLA 9x13x24 CM (CON ALAMBRE N°8 C/3 HILADAS) m2 124.01 93.86 11,639.58
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
PRESUPUESTO BASE
Metrado Precio Uni. Parcial
ITEM DESCRIPCION UND.
Base (S/.) (S/.)
26.04.01.01 ZAPATAS, CONCRETO F'C=210 KG/CM2 m3 3.97 364.40 1,446.67
26.04.01.02 ZAPATAS, ACERO FY=4200KG/CM2 kg 86.03 4.91 422.41
26.04.02 VIGAS DE CIMENTACION
26.04.02.01 VIGAS DE CIMENTACION, CONCRETO F'C= 210 KG/CM2 m3 2.96 388.80 1,150.85
26.04.02.02 VIGAS DE CIMENTACION, ENCOFRADO Y DESENCOFRADO m2 23.70 59.96 1,421.05
26.04.02.03 VIGAS DE CIMENTACION, ACERO FY=4200 KG/CM2. kg 241.62 5.04 1,217.76
26.04.02.04 VIGAS DE CIMENTACION, BASE CON POLIESTILENO EXPANDIDO (TECNOPORT) m2 0.98 17.14 16.80
26.04.03 COLUMNAS
26.04.03.01 COLUMNAS, CONCRETO F'C=210 KG/CM2 m3 3.44 535.03 1,840.50
26.04.03.02 COLUMNAS, ENCOFRADO Y DESENCOFRADO m2 54.94 62.05 3,409.03
26.04.03.03 COLUMNAS, ACERO FY=4200 KG/CM2. kg 511.62 5.13 2,624.61
26.04.04 VIGAS
26.04.04.01 VIGAS, CONCRETO F'C=210 KG/CM2 m3 4.17 409.25 1,706.57
26.04.04.02 VIGAS, ENCOFRADO Y DESENCOFRADO m2 66.01 65.59 4,329.60
26.04.04.03 VIGAS, ACERO FY=4200 KG/CM2. kg 863.12 4.98 4,298.34
26.04.05 COLUMNETAS
26.04.05.01 COLUMNETAS, CONCRETO F'C= 175 KG/CM2 m3 0.76 399.85 303.89
26.04.05.02 COLUMNETAS, ENCOFRADO Y DESENCOFRADO m2 13.20 51.96 685.87
26.04.05.03 COLUMNETAS, ACERO FY=4200 KG/CM2 kg 33.22 4.85 161.12
26.04.06 MUEBLE DE CONCRETO
26.04.06.01 MUEBLE DE CONCRETO, CONCRETO F'c= 175KG/CM2 m3 0.25 391.44 97.86
26.04.06.02 MUEBLE DE CONCRETO, ENCOFRADO Y DESENCOFRADO m2 7.40 82.53 610.72
26.04.06.03 MUEBLE DE CONCRETO, ACERO FY=4200 KG/CM2. kg 9.03 7.61 68.72
26.05 ESTRUCTURA DE MADERA Y COBERTURA
26.05.01 TIJERALES DE MADERA (TIPO-102) L=7.60 m CON CARTELAS 3/16" Y PERNOS DE 1/8" und 4.00 2,043.13 8,172.52
26.05.02 CORREAS DE 2"X3" ML 129.60 11.38 1,474.85
26.06 MUROS Y TABIQUES DE ALBAÑILERIA
26.06.01 MURO DE SOGA CON LADRILLO DE ARCILLA 9x13x24 CM (CON ALAMBRE N°8 C/3 HILADAS) m2 124.01 93.86 11,639.58
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
PRESUPUESTO BASE
Metrado Precio Uni. Parcial
ITEM DESCRIPCION UND.
Base (S/.) (S/.)
30.02.03.02 DEMOLICION DE PISO DE CONCRETO DE 0.10 M. m2 37.25 7.32 272.67
30.02.03.03 DEMOLICION DE VEREDA DE 0.15 M. m2 3.55 8.80 31.24
30.02.03.04 DEMOLICION DE ESTRUCTURAS DE CONCRETO ARMADO m3 1.03 224.11 230.83
30.02.04 TRABAJOS PRELIMINARES
30.02.04.01 LIMPIEZA DE TERRENO MANUAL m2 205.70 1.25 257.13
30.02.04.02 TRAZO, NIVELES Y REPLANTEO INICIAL m2 205.70 4.49 923.59
30.02.04.03 COLOCACION DE NIVELES DURANTE LA OBRA m2 205.70 8.00 1,645.60
30.02.05 MOVIMIENTO DE TIERRAS
30.02.05.01 EXCAVACION DE ZANJAS m3 9.67 36.64 354.31
30.02.05.02 RELLENO Y COMPACTADO C/ MATERIAL PROPIO m3 4.13 28.68 118.45
30.02.05.03 ACARREO INTERNO MAT. PROCED. DE EXCAVACIONES Dprom=30M m3 6.92 18.68 129.27
30.02.05.04 ELIMINACION MATERIAL EXCEDENTE CON MAQUINARIA VOLQUETE 15M3 V=30KM/h D=3KM m3 6.92 8.49 58.75
30.02.05.05 NIVELACION Y APISONADO PARA FALSO PISO O PISO m2 12.00 2.77 33.24
30.02.06 OBRAS DE CONCRETO SIMPLE
30.02.06.01 SOLADO f´c=100 KG/CM2 e=10CM m2 7.68 30.76 236.24
30.02.06.02 CIMIENTO CORRIDO F'c=140 kg/cm2 m3 1.80 323.43 582.17
30.02.06.03 CONCRETO EN SOBRECIMIENTO F'C= 175 KG/CM2 m3 0.36 399.85 143.95
30.02.06.04 SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO m2 4.76 35.07 166.93
30.02.07 OBRAS DE CONCRETO ARMADO
30.02.07.01 ZAPATAS
30.02.07.01.01 ZAPATAS, CONCRETO F'C=210 KG/CM2 m3 1.33 364.40 484.65
30.02.07.01.02 ZAPATAS, ACERO FY=4200KG/CM2 kg 28.51 4.91 139.98
30.02.07.02 VIGAS DE CIMENTACION
30.02.07.02.01 VIGAS DE CIMENTACION, CONCRETO F'C= 210 KG/CM2 m3 0.92 388.80 357.70
30.02.07.02.02 VIGAS DE CIMENTACION, ENCOFRADO Y DESENCOFRADO m2 12.32 59.96 738.71
30.02.07.02.03 VIGAS DE CIMENTACION, ACERO FY=4200 KG/CM2. kg 141.90 5.04 715.18
30.02.07.02.04 VIGAS DE CIMENTACION, BASE CON POLIESTILENO EXPANDIDO (TECNOPORT) m2 2.43 17.14 41.65
30.02.07.03 COLUMNAS
30.02.07.03.01 COLUMNAS, CONCRETO F'C=210 KG/CM2 m3 1.11 535.03 593.88
30.02.07.03.02 COLUMNAS, ENCOFRADO Y DESENCOFRADO m2 22.14 62.05 1,373.79
30.02.07.03.03 COLUMNAS, ACERO FY=4200 KG/CM2. kg 215.57 5.13 1,105.87
30.02.07.04 VIGAS
30.02.07.04.01 VIGAS, CONCRETO F'C=210 KG/CM2 m3 2.57 409.25 1,051.77
30.02.07.04.02 VIGAS, ENCOFRADO Y DESENCOFRADO m2 40.71 65.59 2,670.17
30.02.07.04.03 VIGAS, ACERO FY=4200 KG/CM2. kg 484.39 4.98 2,412.26
30.02.08 ESTRUCTURA DE MADERA Y COBERTURA
30.02.08.01 TIJERALES DE MADERA (TIPO-10) L=4.15 m CON CARTELAS 3/16" Y PERNOS DE 1/8" und 5.00 1,783.20 8,916.00
30.02.08.02 TIJERALES DE MADERA (TIPO-11) L=3.05 m CON CARTELAS 3/16" Y PERNOS DE 1/8" und 4.00 1,484.49 5,937.96
30.02.08.03 TIJERALES DE MADERA (TIPO-12) L=2.15 m CON CARTELAS 3/16" Y PERNOS DE 1/8" und 2.00 1,463.52 2,927.04
30.02.08.04 CORREAS DE 2"X3" ML 144.40 11.38 1,643.27
30.02.09 MUROS Y TABIQUES DE ALBAÑILERIA
30.02.09.01 MURO DE SOGA CON LADRILLO DE ARCILLA 9x13x24 CM (CON ALAMBRE N°8 C/3 HILADAS) m2 35.23 93.86 3,306.69
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
PRESUPUESTO BASE
Metrado Precio Uni. Parcial
ITEM DESCRIPCION UND.
Base (S/.) (S/.)
34.01.03 OBRAS DE CONCRETO SIMPLE
34.01.03.01 SOLADO DE 2" F'C=100 KG/CM2 m2 31.58 22.99 726.02
34.01.04 OBRAS DE CONCRETO ARMADO
34.01.04.01 PLATEA DE CIMENTACION
34.01.04.01.01 PLATEA DE CIMENTACION, CONCRETO F'C=210 KG/CM2 m3 15.79 401.04 6,332.42
34.01.04.01.02 PLATEA DE CIMENTACION, ACERO FY=4200KG/CM2 kg 615.59 4.91 3,022.55
34.01.04.02 COLUMNAS
34.01.04.02.01 COLUMNAS, CONCRETO F'C=210 KG/CM2 m3 6.26 535.03 3,349.29
34.01.04.02.02 COLUMNAS, ENCOFRADO Y DESENCOFRADO m2 62.64 62.05 3,886.81
34.01.04.02.03 COLUMNAS, ACERO FY=4200 KG/CM2. kg 659.00 5.13 3,380.67
34.01.04.03 VIGAS
34.01.04.03.01 VIGAS, CONCRETO F'C=210 KG/CM2 m3 3.60 418.65 1,507.14
34.01.04.03.02 VIGAS, ENCOFRADO Y DESENCOFRADO m2 37.76 59.36 2,241.43
34.01.04.03.03 VIGAS, ACERO FY=4200 KG/CM2. kg 554.82 4.98 2,763.00
34.01.04.04 CUBA DE CONCRETO
34.01.04.04.01 CUBA DE CONCRETO EN TECHO, CONCRETO F'C=210 KG/CM2 CARAVISTA CON ADITIVO IMPERMEABILIZANTE m3 9.24 780.33 7,210.25
34.01.04.04.02 CUBA DE CONCRETO EN TECHO, ENCOFRADO Y DESENCOFRADO m2 72.60 83.18 6,038.87
34.01.04.04.03 CUBA DE CONCRETO EN TECHO, ACERO FY=4200 KG/CM2. kg 813.51 4.98 4,051.28
OBRAS EXTERIORES
ESTRUCTURAS gbl 1.00 66,293.68 66,293.68
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
PRESUPUESTO BASE
Metrado Precio Uni. Parcial
ITEM DESCRIPCION UND.
Base (S/.) (S/.)
03.06.06 SUMINISTRO Y COLOCACION DE CANTONERA DE ALUMINIO DE 2" X 1.20 M (SEGUN DETALLES) m 15.20 40.77 619.70
PROTECCION Y SUJECION PARA EXTREMO DE CUBIERTA CON CUMBRERA TERMOACUSTICA Y ANGULO DE 2"x2"x2mm
03.06.07 m 44.45 64.41 2,863.02
(INC PINTURA ESMALTE Y ANTICORROSIVO)(SEGUN DETALLES)
3.07 CERRAJERIA
03.07.01 BISAGRA DE BRONCE ALUMINIZADAS DE 4" und 89.00 14.35 1,277.15
03.07.02 CERRADURA NACIONAL DE 3 GOLPES PARA PUERTA und 27.00 92.54 2,498.58
03.07.03 MANIJA DE BRONCE PARA PUERTAS und 4.00 32.39 129.56
03.07.04 CERRADURA DE PERILLA CON SEGURIDAD PARA BAÑO Y OFICINAS pza 23.00 70.08 1,611.84
03.07.05 PICAPORTE 3" PARA PUERTAS und 4.00 12.01 48.04
3.08 PINTURA
03.08.01 PINTURA EN MUROS EXTERIORES AL LATEX SATINADO 2 MANOS m2 285.22 9.24 2,635.43
03.08.02 PINTURA EN MUROS INTERIORES AL LATEX SATINADO 2 MANOS m2 930.76 8.49 7,902.15
03.08.03 PINTURA EN ESCALERA AL LATEX SATINADO 2 MANOS m2 13.23 9.67 127.93
03.08.04 PINTURA EN COLUMNAS Y PLACAS AL LATEX SATINADO 2 MANOS m2 66.71 9.89 659.76
03.08.05 PINTURA EN VIGAS AL LATEX SATINADO 2 MANOS m2 238.25 9.88 2,353.91
03.08.06 PINTURA EN DERRAMES AL LATEX SATINADO 2 MANOS m 249.55 4.27 1,065.58
03.08.07 PINTURA EN CIELORASOS AL LATEX m2 42.55 7.87 334.87
3.09 CUBIERTAS
03.09.01 COBERTURA DE PLANCHA ONDULADA TERMOACUSTICA DE COLOR DE 2.00x1.05x3mm, CON ALT. DE ONDA = 38mm m2 499.02 76.63 38,239.90
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
PRESUPUESTO BASE
Metrado Precio Uni. Parcial
ITEM DESCRIPCION UND.
Base (S/.) (S/.)
07.07.04 PINTURA EN VIGAS AL LATEX SATINADO 2 MANOS m2 81.17 9.88 801.96
07.07.05 PINTURA EN DERRAMES AL LATEX SATINADO 2 MANOS CUBIERTAS m 102.00 4.27 435.54
7.08 CUBIERTAS
07.08.01 COBERTURA DE PLANCHA ONDULADA TERMOACUSTICA DE COLOR DE 2.00x1.05x3mm, CON ALT. DE ONDA = 38mm m2 121.60 76.63 9,318.21
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
PRESUPUESTO BASE
Metrado Precio Uni. Parcial
ITEM DESCRIPCION UND.
Base (S/.) (S/.)
27.01.05 VESTIDURA DE DERRAMES a=0.15 C:A 1:5 e=1.50cm. m 63.20 13.45 850.04
27.01.06 BRUÑAS VERTICALES DE 1" m 33.80 7.37 249.11
27.01.07 JUNTA DE DILATACION VERTICAL DE 15 C.M. CON TECNORPORT e=1" m 66.15 7.96 526.55
27.01.08 TARRAJEO PRIMARIO RAYADO CON CEMENTO-ARENA PARA ZOCALOS m2 21.78 19.25 419.27
27.01.09 TARRAJEO PRIMARIO RAYADO CON CEMENTO-ARENA PARA MESA DE CONCRETO m2 7.40 18.99 140.53
27.01.10 REVESTIMIENTO DE MUEBLE DE CONCRETO CON CERÁMICO DE 20X30CM COLOR CLARO m2 7.40 87.97 650.98
27.02 CIELORRASOS
27.02.01 CIELO RASO DE FORRO PVC (INC EMPARRILLADO PARA SOPORTE DE DE 2"X2") m2 86.15 62.91 5,419.70
27.02.02 FRISO DE FORRO PVC (INC EMPARRILLADO PARA SOPORTE DE DE 2"X2") m 21.60 29.72 641.95
27.03 PISOS Y PAVIMENTOS
VEREDA DE CONCRETO F'C= 175 KG/CM2. h=10m, ACABADO SEMIPULIDO Y BRUÑADO (INC. UÑA LATERAL DE
27.03.01 m2 60.50 61.86 3,742.53
PROTECCIÓN DE h=0.2)
27.03.02 JUNTAS DE DILATACIÓN HORIZONTAL + SELLO ASFALTICO e=1" c/4m m 5.60 14.38 80.53
27.03.03 PISO DE CERAMICO DE 30X30CM COLOR CLARO m2 66.95 72.26 4,837.81
27.04 ZOCALOS Y CONTRAZOCALOS
27.04.01 CONTRAZOCALO CEMENTO PULIDO S/COLOREAR H=40cm EXTERIOR m 33.80 15.31 517.48
27.04.02 CONTRAZOCALO DE MAYOLICA BLANCA DE .15 X .20 M. m 61.75 46.32 2,860.26
27.04.03 ZOCALO DE CERÁMICO DE 20X30 COLOR CLARO m2 21.78 64.92 1,413.96
27.05 CARPINTERIA DE MADERA
27.05.01 PUERTA DE MADERA QUINILLA MACHIHEMBRADA + MARCO (INC. SELLADO Y BARNIZADO) m2 10.92 350.00 3,822.00
27.06 CARPINTERIA METALICA Y ALUMINIO
27.06.01 VENTANA DE ALUMINIO, CON VIDRIOS PAVONADO E INCOLORO DE 6 mm Y BARRAS DE SEGURIDAD DE ACERO LISO Ø1/2" m2 11.81 180.00 2,125.80
PROTECCION Y SUJECION PARA EXTREMO DE CUBIERTA CON CUMBRERA TERMOACUSTICA Y ANGULO DE 2"x2"x2mm
27.06.02 m 10.80 64.41 695.63
(INC PINTURA ESMALTE Y ANTICORROSIVO)(SEGUN DETALLES)
27.07 CERRAJERIA
27.07.01 BISAGRA DE BRONCE ALUMINIZADAS DE 4" und 20.00 14.35 287.00
27.07.02 CERRADURA NACIONAL DE 3 GOLPES PARA PUERTA und 5.00 92.54 462.70
27.07.03 MANIJA DE BRONCE PARA PUERTAS und 3.00 32.39 97.17
27.07.04 CERRADURA DE PERILLA CON SEGURIDAD PARA BAÑO Y OFICINAS pza 1.00 70.08 70.08
27.07.05 PICAPORTE 3" PARA PUERTAS und 4.00 12.01 48.04
27.08 PINTURA
27.08.01 PINTURA EN MUROS EXTERIORES AL LATEX SATINADO 2 MANOS m2 84.97 9.24 785.12
27.08.02 PINTURA EN MUROS INTERIORES AL LATEX SATINADO 2 MANOS m2 138.17 8.49 1,173.06
27.08.03 PINTURA EN COLUMNAS Y PLACAS AL LATEX SATINADO 2 MANOS m2 31.50 9.89 311.54
27.08.04 PINTURA EN VIGAS AL LATEX SATINADO 2 MANOS m2 66.01 9.88 652.18
27.08.05 PINTURA EN DERRAMES AL LATEX SATINADO 2 MANOS m 63.20 4.27 269.86
27.09 CUBIERTAS
27.09.01 COBERTURA DE PLANCHA ONDULADA TERMOACUSTICA DE COLOR DE m2 114.48 76.63 8,772.60
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
PRESUPUESTO BASE
Metrado Precio Uni. Parcial
ITEM DESCRIPCION UND.
Base (S/.) (S/.)
31.01.05 CARPINTERIA METALICA Y ALUMINIO
31.01.05.02 VENTANA DE ALUMINIO, CON VIDRIOS PAVONADO E INCOLORO DE 6 mm Y BARRAS DE SEGURIDAD DE ACERO LISO Ø1/2" m2 17.95 180.00 3,231.00
31.01.06 CERRAJERIA
31.01.06.01 BISAGRA DE BRONCE ALUMINIZADAS DE 4" und 16.00 14.35 229.60
31.01.06.02 CERRADURA NACIONAL DE 3 GOLPES PARA PUERTA und 4.00 92.54 370.16
31.01.06.03 MANIJA DE BRONCE PARA PUERTAS und 4.00 32.39 129.56
31.01.06.04 PICAPORTE 3" PARA PUERTAS und 4.00 12.01 48.04
31.01.07 PINTURA
31.01.07.02 PINTURA EN MUROS INTERIORES AL LATEX SATINADO 2 MANOS m2 12.65 8.49 107.40
31.01.07.05 PINTURA EN DERRAMES AL LATEX SATINADO 2 MANOS m 74.00 4.27 315.98
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
PRESUPUESTO BASE
Metrado Precio Uni. Parcial
ITEM DESCRIPCION UND.
Base (S/.) (S/.)
35.01.01.01 TARRAJEO EXTERIOR EN MUROS C:A 1:5 e=1.50 cm. m2 37.16 23.16 860.63
35.01.01.02 TARRAJEO EN COLUMNAS - PLACAS C:A 1:5 e=1.50 cm m2 8.85 28.98 256.47
35.01.01.03 TARRAJEO EN VIGAS C:A 1/5, e=1.50 cm m2 8.96 35.99 322.47
35.01.01.04 VESTIDURA DE DERRAMES a=0.15 C:A 1:5 e=1.50cm. m 21.60 13.45 290.52
35.01.01.05 BRUÑAS VERTICALES DE 1" m 31.95 7.37 235.47
35.01.01.06 JUNTA DE DILATACION VERTICAL DE 15 C.M. CON TECNORPORT e=1" m 15.60 7.96 124.18
35.01.02 CIELORRASOS
35.01.02.01 CIELO RASO DE FORRO PVC (INC EMPARRILLADO PARA SOPORTE DE DE 2"X2") m2 25.20 62.91 1,585.33
35.01.02.02 FRISO DE FORRO PVC (INC EMPARRILLADO PARA SOPORTE DE DE 2"X2") m 9.00 29.72 267.48
35.01.03 PISOS Y PAVIMENTOS
35.01.03.01 PISOS INTERIORES DE CONCRETO - ACABADOS C:A 1:4 DE E=2" SEMI-PULIDO Y BRUÑADO m2 9.10 29.76 270.82
VEREDA DE CONCRETO F'C= 175 KG/CM2. h=10m, ACABADO SEMIPULIDO Y BRUÑADO (INC. UÑA LATERAL DE
35.01.03.02 PROTECCIÓN DE h=0.2) m2 18.25 61.86 1,128.95
35.01.03.03 JUNTAS DE DILATACIÓN HORIZONTAL + SELLO ASFALTICO e=1" c/4m m 4.00 14.38 57.52
35.01.04 ZOCALOS Y CONTRAZOCALOS
35.01.04.01 CONTRAZOCALO CEMENTO PULIDO S/COLOREAR H=40cm EXTERIOR m 12.40 15.31 189.84
35.01.04.02 CONTRAZOCALO CEMENTO PULIDO S/COLOREAR H=10 cm INTERIOR m 11.50 8.48 97.52
35.01.05 CARPINTERIA METALICA Y ALUMINIO
35.01.05.01 PUERTA METALICA PARA CASETA GRUPO ELECTROGENO 0.80x2.00m m2 2.16 213.61 461.40
35.01.05.02 VENTANA DE ALUMINIO CON VIDIROS PAVONADO E INCOLORO DE 6mm m2 6.90 140.00 966.00
REJA DE SEGURIDAD CON TUBERIA CUADRADA DE 2"x2" h=2.40m - SEGÚN DISEÑO (INC DOS MANOS DE PINTURA
35.01.05.03 ESMALTE Y ANTICORROSIVO) m2 8.50 110.00 935.00
PROTECCION Y SUJECION PARA EXTREMO DE CUBIERTA CON CUMBRERA TERMOACUSTICA Y ANGULO DE 2"x2"x2mm
35.01.05.04 m 4.50 64.41 289.85
(INC PINTURA ESMALTE Y ANTICORROSIVO)(SEGUN DETALLES)
35.01.06 CERRAJERIA
35.01.06.01 CERRADURA NACIONAL DE 3 GOLPES PARA PUERTA und 1.00 92.54 92.54
35.01.06.02 MANIJA DE BRONCE PARA PUERTAS und 1.00 32.39 32.39
35.01.07 PINTURA
35.01.07.01 PINTURA EN MUROS EXTERIORES AL LATEX SATINADO 2 MANOS m2 53.62 9.24 495.45
35.01.07.02 PINTURA EN COLUMNAS Y PLACAS AL LATEX SATINADO 2 MANOS m2 8.85 9.89 87.53
35.01.07.03 PINTURA EN VIGAS AL LATEX SATINADO 2 MANOS m2 8.96 9.88 88.52
35.01.07.04 PINTURA EN DERRAMES AL LATEX SATINADO 2 MANOS m 21.60 4.27 92.23
35.01.08 CUBIERTAS
35.01.08.01 COBERTURA DE PLANCHA ONDULADA TERMOACUSTICA DE COLOR DE 2.00x1.05x3mm, CON ALT. DE ONDA = 38mm m2 29.70 61.63 1,830.41
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
PRESUPUESTO BASE
Metrado Precio Uni. Parcial
ITEM DESCRIPCION UND.
Base (S/.) (S/.)
04.01.02.04 RELLENO Y COMPACTADO DE ZANJA, HASTA 1.00 m CON MATERIAL PROPIO m 99.10 33.34 3,303.99
04.01.02.05 ACARREO MATERIAL EXCEDENTE HASTA UN DISTANCIA PROMEDIO DE 30 M m3 9.91 19.98 198.00
04.01.03 TUBERIAS Y ACCESORIOS
TUBERIA PVC SAP DE 1" C- 10 C/R m 2.00 11.87 23.74
04.01.03.01 TUBERIA PVC SAP DE 3/4" C- 10 C/R m 48.70 6.64 323.37
04.01.03.02 TUBERIA PVC SAP DE 1/2" C- 10 C/R m 68.85 5.59 384.87
04.01.03.03 PRUEBA HIDRAULICA Y DESINFECCIÓN m 119.55 1.41 168.57
04.01.04 VALVULAS
VALVULA COMPUERTA DE 1" und 1.00 79.40 79.40
04.01.04.01 VALVULA COMPUERTA DE 3/4" und 2.00 97.54 195.08
04.01.04.02 VALVULA COMPUERTA DE 1/2" und 14.00 89.24 1,249.36
04.01.05 SALIDAS DE AGUA FRIA
04.01.05.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" - INODORO pto 3.00 75.12 225.36
04.01.05.02 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" - LAVATORIO pto 3.00 75.12 225.36
04.01.05.03 SALIDA DE DESAGUE TUB PVC 2" - LAVADERO DE ACERO INOXIDABLE pto 11.00 88.35 971.85
04.01.06 ACCESORIOS VARIOS
04.01.06.01 REDUCCION PVC SAP 3/4" - 1/2" und 12.00 23.34 280.08
04.01.06.02 CODO PVC U.R. SAP 1/2"X90° und 43.00 15.72 675.96
04.01.06.03 TEE PVC U.R. SAP 3/4" und 13.00 36.06 468.78
04.01.06.04 TEE PVC U.R. SAP 1/2" und 7.00 35.06 245.42
04.01.07 SUMINISTRO E INSTALACION DE APARATOS Y ACCESORIOS SANITARIOS
04.01.07.01 INODORO TIPO SIFON JET COLOR BLANCO (SIN COLOCACION) pza 3.00 215.05 645.15
04.01.07.02 LAVATORIO DE LOSA TIPO OVALIN BLANCO COMERCIAL (SIN COLOCACION) pza 3.00 287.00 861.00
04.01.07.03 LAVADERO DE ACERO INOXIDABLE pza 11.00 435.00 4,785.00
04.01.07.04 COLOCACION DE APARATOS Y ACCESORIOS SANITARIOS pza 17.00 76.82 1,305.94
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
PRESUPUESTO BASE
Metrado Precio Uni. Parcial
ITEM DESCRIPCION UND.
Base (S/.) (S/.)
04.02.05.07 CODO DE 90° "X2" pza 48.00 14.27 684.96
04.02.05.08 CODO DE 45°X2" pza 10.00 17.87 178.70
4.03 SISTEMA DE AGUA DE LLUVIA
04.03.01 TUBERIA PVC-SAP 4" DE DESCARGA PLUVIAL DE TECHO m 68.00 93.83 6,380.44
04.03.02 CANALETA SEMICIRCULAR PLANCHA GALVANIZADA m 80.50 63.48 5,110.14
04.03.03 CODO PVC SAP DE Ø4" x 90° PARA AGUAS PLUVIALES pza 32.00 37.88 1,212.16
04.03.04 CAJA DE REGISTRO DE DESAGUE 12" X 24" C/TAPA DE CONCRETO pza 5.00 262.19 1,310.95
04.03.05 ABRAZADERA DE FIJACION DE TUBO (Máx Ý3") pza 40.00 29.07 1,162.80
04.03.06 MANDIL PROTECTOR PARA TUBO PVC (Máx Ý 2" und 8.00 85.99 687.92
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
PRESUPUESTO BASE
Metrado Precio Uni. Parcial
ITEM DESCRIPCION UND.
Base (S/.) (S/.)
08.02.05 ACCESORIOS VARIOS
08.02.05.02 YEE DE 4"X2" pza 3.00 30.58 91.74
08.02.05.03 YEE DE 2"X2" pza 1.00 15.58 15.58
08.02.05.06 TEE PVC DE 2"* 2" und 1.00 26.33 26.33
08.02.05.07 CODO DE 90° "X2" pza 6.00 14.27 85.62
08.02.05.08 CODO DE 45°X2" pza 2.00 17.87 35.74
8.03 SISTEMA DE AGUA DE LLUVIA
08.03.01 TUBERIA PVC-SAP 4" DE DESCARGA PLUVIAL DE TECHO m 16.00 93.83 1,501.28
08.03.03 CANALETA SEMICIRCULAR PLANCHA GALVANIZADA m 29.40 63.48 1,866.31
08.03.04 MANDIL PROTECTOR PARA TUBO PVC (Máx Ý 2" und 2.00 85.99 171.98
08.03.05 CODO PVC SAP DE Ø4" x 90° PARA AGUAS PLUVIALES pza 8.00 37.88 303.04
08.03.06 CAJA DE REGISTRO DE DESAGUE 12" X 24" C/TAPA DE CONCRETO pza 1.00 262.19 262.19
08.03.02 ABRAZADERA DE FIJACION DE TUBO (Máx Ý3") pza 15.00 29.07 436.05
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
PRESUPUESTO BASE
Metrado Precio Uni. Parcial
ITEM DESCRIPCION UND.
Base (S/.) (S/.)
12.02.02.04 RELLENO Y COMPACTADO DE ZANJA, HASTA 1.00 m CON MATERIAL PROPIO m 19.95 33.34 665.13
12.02.02.05 ACARREO MATERIAL EXCEDENTE HASTA UN DISTANCIA PROMEDIO DE 30 M m3 2.49 19.98 49.75
12.02.03 TUBERIAS
12.02.03.01 TUBERIA PVC SAL Ø2" m 12.45 10.75 133.84
12.02.03.02 TUBERIA PVC SAL Ø 4" m 10.20 10.23 104.35
12.02.03.03 PRUEBA HIDRAULICA+ESCORRENTIA DE TUB. P/DESAGUE m 22.65 1.68 38.05
12.02.04 SALIDAS DE DESAGUES
12.02.04.01 SALIDA DE DESAGUE TUB PVC 4" - INODORO pto 1.00 99.15 99.15
12.02.04.02 SALIDA DE DESAGUE TUB PVC 2" - LAVATORIO pto 1.00 89.10 89.10
12.02.04.03 SALIDA DE DESAGUE TUB PVC 2" - LAVADERO DE ACERO INOXIDABLE pto 1.00 88.35 88.35
12.02.04.04 SALIDA DE TUBERIA DE VENTILACION PVC 2 pto 1.00 122.30 122.30
12.02.04.05 REGISTRO DE BRONCE ROSCADO DE 2" pza 1.00 57.82 57.82
12.02.04.06 REGISTRO DE BRONCE ROSCADO DE 4" pza 2.00 72.32 144.64
12.02.04.07 SUMIDERO DE BRONCE 2" und 2.00 63.00 126.00
12.02.05 ACCESORIOS VARIOS
12.02.05.01 YEE DE 4"X4" pza 1.00 29.03 29.03
12.02.05.02 YEE DE 4"X2" pza 2.00 30.58 61.16
12.02.05.03 YEE DE 2"X2" pza 1.00 15.58 15.58
12.02.05.04 TEE PVC DE 4"* 4" und 1.00 39.89 39.89
12.02.05.06 TEE PVC DE 2"* 2" und 1.00 26.33 26.33
12.02.05.07 CODO DE 90° "X2" pza 2.00 14.27 28.54
12.02.05.08 CODO DE 45°X2" pza 4.00 17.87 71.48
12.03 SISTEMA DE AGUA DE LLUVIA
12.03.01 TUBERIA PVC-SAP 4" DE DESCARGA PLUVIAL DE TECHO m 16.00 93.83 1,501.28
12.03.02 CANALETA SEMICIRCULAR PLANCHA GALVANIZADA m 21.60 63.48 1,371.17
12.03.03 ABRAZADERA DE FIJACION DE TUBO (Máx Ý3") pza 8.00 29.07 232.56
12.03.04 MANDIL PROTECTOR PARA TUBO PVC (Máx Ý 2" und 2.00 85.99 171.98
12.03.05 CODO PVC SAP DE Ø4" x 90° PARA AGUAS PLUVIALES pza 16.00 37.88 606.08
12.03.06 CAJA DE REGISTRO DE DESAGUE 12" X 24" C/TAPA DE CONCRETO pza 1.00 262.19 262.19
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
PRESUPUESTO BASE
Metrado Precio Uni. Parcial
ITEM DESCRIPCION UND.
Base (S/.) (S/.)
28.01.06.02 CODO PVC U.R. SAP 1/2"X90° und 10.00 15.72 157.20
28.01.06.03 TEE PVC U.R. SAP 3/4" und 1.00 36.06 36.06
28.01.06.04 TEE PVC U.R. SAP 1/2" und 4.00 35.06 140.24
28.01.07 SUMINISTRO E INSTALACION DE APARATOS Y ACCESORIOS SANITARIOS
28.01.07.01 INODORO TIPO SIFON JET COLOR BLANCO (SIN COLOCACION) pza 1.00 215.05 215.05
28.01.07.02 LAVATORIO DE LOSA TIPO OVALIN BLANCO COMERCIAL (SIN COLOCACION) pza 1.00 287.00 287.00
28.01.07.03 LAVADERO DE ACERO INOXIDABLE pza 1.00 435.00 435.00
28.01.07.04 COLOCACION DE APARATOS Y ACCESORIOS SANITARIOS pza 3.00 76.82 230.46
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
PRESUPUESTO BASE
Metrado Precio Uni. Parcial
ITEM DESCRIPCION UND.
Base (S/.) (S/.)
32.01.01.06 CAJA DE REGISTRO DE DESAGUE 12" X 24" C/TAPA DE CONCRETO pza 6.00 262.19 1,573.14
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
PRESUPUESTO BASE
Metrado Precio Uni. Parcial
ITEM DESCRIPCION UND.
Base (S/.) (S/.)
32.02.02.05 CODO PVC-SAP 4" * 90 und 16.00 27.60 441.60
32.02.02.06 CAJA DE REGISTRO DE DESAGUE 12" X 24" C/TAPA DE CONCRETO pza 1.00 262.19 262.19
36.01 TANQUE ELEVADO DE 15 M3-INSTALACIONES SANITARIAS
36.01.01 VARIOS
36.01.01.01 ESCALERA TUB F.GVZDO. C/PARANTES DE 1" X PELDAÑOS DE 3/4" m 14.00 190.42 2,665.88
36.01.01.02 TAPA METÁLICA 0.80 x 0.80m ( SEGUN DISEÑO) und 1.00 250.00 250.00
36.01.01.03 ABRAZADERA METALICA DE FIJACION DE TUBERIA PVC DE Ø1 1/2" @1.50 M pza 15.00 38.51 577.65
36.01.01.04 ABRAZADERA METALICA DE FIJACION DE TUBERIA PVC DE Ø 2" @1.50 M pza 8.00 39.91 319.28
36.01.01.05 TUBERIA FIE.GALVANIZADO PESADO C-40 1 1/2" I/ELEM.UNION+ 2%DESP. m 29.45 37.74 1,111.44
36.01.01.06 TUBERIA VENTILACION DE FIE.GALVANIZADO PESADO C-40 2" I/ELEM.UNION+ 2%DESP. m 17.70 39.06 691.36
36.01.01.07 SUMINISTRO E INSTALACION DE ACCESORIOS DE TANQUE ELEVADO GLB 1.00 1,767.66 1,767.66
36.01.01.08 SUMINISTRO E INSTALACION DE ACCESORIOS DE HIPOCLORADOR DE PVC GLB 1.00 300.00 300.00
36.01.01.09 PRUEBA HIDRAULICA Y DESINFECCION DE TANQUES GLB 1.00 243.39 243.39
36.01.01.10 HIPOCLORADOR DE FLUJO DIFUSION und 1.00 174.17 174.17
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
PRESUPUESTO BASE
Metrado Precio Uni. Parcial
ITEM DESCRIPCION UND.
Base (S/.) (S/.)
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
PRESUPUESTO BASE
Metrado Precio Uni. Parcial
ITEM DESCRIPCION UND.
Base (S/.) (S/.)
13.01.01 INSTALACION ELECTRICA GLOBAL - BLOQUE 3 est 1.00 16,580.00 16,580.00
MAYORES METRADOS
6 SALA DE ORDEÑO- ESTRUCTURAS
6.01 TRABAJOS PRELIMINARES
06.01.01 LIMPIEZA DE TERRENO MANUAL m2 181.36 1.25 226.70
06.01.02 TRAZO, NIVELES Y REPLANTEO INICIAL m2 181.36 4.49 814.31
06.01.03 COLOCACION DE NIVELES DURANTE LA OBRA m2 181.36 8.00 1,450.88
6.02 MOVIMIENTO DE TIERRAS
06.02.01 EXCAVACION DE ZANJAS m3 40.21 36.64 1,473.29
06.02.02 RELLENO Y COMPACTADO C/ MATERIAL PROPIO m3 30.78 28.68 882.77
06.02.03 ACARREO INTERNO MAT. PROCED. DE EXCAVACIONES Dprom=30M m3 60.00 18.68 1,120.80
06.02.04 ELIMINACION MATERIAL EXCEDENTE CON MAQUINARIA VOLQUETE 15M3 V=30KM/h D=3KM m3 15.64 8.49 132.78
06.02.05 NIVELACION Y APISONADO PARA FALSO PISO O PISO m2 200.59 2.77 555.63
06.02.06 RELLENO CON AFIRMADO DE e=4" (100% COMPACTACION) m3 7.09 82.11 582.16
6.03 OBRAS DE CONCRETO SIMPLE
06.03.01 SOLADO DE 2" F'C=100 KG/CM2 m2 12.96 22.99 297.95
06.03.02 CIMIENTO CORRIDO F'c=140 kg/cm2 m3 4.00 323.43 1,293.72
6.04 OBRAS DE CONCRETO ARMADO
06.04.01 ZAPATAS
06.04.01.01 ZAPATAS, CONCRETO F'C=210 KG/CM2 m3 5.18 364.40 1,887.59
06.04.01.02 ZAPATAS, ACERO FY=4200KG/CM2 kg 158.80 4.91 779.71
06.04.02 VIGAS DE CIMENTACION
06.04.02.01 VIGAS DE CIMENTACION, CONCRETO F'C= 210 KG/CM2 m3 1.50 388.80 583.20
06.04.02.02 VIGAS DE CIMENTACION, ENCOFRADO Y DESENCOFRADO m2 19.84 59.96 1,189.61
06.04.02.03 VIGAS DE CIMENTACION, ACERO FY=4200 KG/CM2. kg 209.33 5.04 1,055.02
06.04.03 COLUMNAS
06.04.03.01 COLUMNAS, CONCRETO F'C=210 KG/CM2 m3 2.51 535.03 1,342.93
06.04.03.02 COLUMNAS, ENCOFRADO Y DESENCOFRADO m2 37.36 62.05 2,318.19
06.04.03.03 COLUMNAS, ACERO FY=4200 KG/CM2. kg 534.96 5.13 2,744.34
06.04.04 VIGAS
06.04.04.03 VIGAS, ACERO FY=4200 KG/CM2. kg 176.88 4.98 880.86
06.04.05 COLUMNETAS
06.04.05.01 COLUMNETAS, CONCRETO F'C= 175 KG/CM2 m3 0.60 399.85 239.91
06.04.05.02 COLUMNETAS, ENCOFRADO Y DESENCOFRADO m2 15.22 51.96 790.83
GOBIERNO REGIONAL DE MADRE DE DIOS
GERENCIA REGIONAL DE DESARROLLO ECONOMICO
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
PRESUPUESTO BASE
Metrado Precio Uni. Parcial
ITEM DESCRIPCION UND.
Base (S/.) (S/.)
06.04.05.03 COLUMNETAS, ACERO FY=4200 KG/CM2 kg 134.19 4.85 650.82
6.05 ESTRUCTURA DE MADERA Y COBERTURA
06.05.02 CORREAS DE 2"X3" ML ML 320.70 11.38 3,649.57
6.06 MUROS Y TABIQUES DE ALBAÑILERIA
06.06.01 MURO DE SOGA CON LADRILLO DE ARCILLA 9x13x24 CM (CON ALAMBRE N°8 C/3 HILADAS) m2 33.93 93.86 3,184.67
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
PRESUPUESTO BASE
Metrado Precio Uni. Parcial
ITEM DESCRIPCION UND.
Base (S/.) (S/.)
44.02.01 TRABAJOS PRELIMINARES
44.02.01.01 TRAZO Y REPLANTEO RED DE DESAGUES m 57.64 2.94 169.46
PARTIDAS NUEVAS
06 SALA DE ORDEÑO ESTRUCTURAS
06.03 CONCRETO SIMPLE
06.03.04 SOBRECIMIENTO CONCRETO f'c=175kg/cm2 m3 1.64 405.05 664.28
06.03.05 ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTO m2 21.92 51.67 1,132.61
06.03.06 FALSO PISO CONCRETO F'C=175 KG/CM2 E=4" m2 60.63 46.77 2,835.67
06.03.07 FALSO PISO CONCRETO F'C=175 KG/CM2 E=6" m2 169.80 52.17 8,858.47
06.03.08 PEDESTAL DE CONCRETO F'C=175 KG/CM2 E=8" m2 5.34 62.41 333.27
06.04. CONCRETO ARMADO
06.04.07 VIGUETA DE AMARRE
06.04.07.01 CONCRETO F'C=175KG/CM2 m3 0.25 405.05 101.26
06.04.07.02 ENCOFRADO Y DESENCOFRADO EN VIGUETA m2 4.28 51.67 221.15
06.04.07.03 VIGUETAS, ACERO f'y=4200 kg/cm2 kg 361.49 4.91 1,774.92
06.04.08 MURO DE CONCRETO
06.04.08.01 MURO DE CONCRETO, CONCRETO f'c=210kg/cm2 m3 6.75 394.00 2,659.50
06.04.08.02 MURO DE CONCRETO ENCOFRADO Y DESENCOFRADO m2 75.81 51.67 3,917.10
06.04.08.03 MURO DE CONCRETO, ACERO f'y=4200 kg/cm2 kg 310.07 4.91 1,522.44
06.05 ESTRUCTURAS DE MADERA Y COBERTURA
06.05.03 TIJERAL TIPO A und 4.00 2,216.75 8,867.00
08 INSTALACIONES SANITARIAS
08.01 RED DE AGUA FRIA
08.01.07 SUMINISTRO E INSTALACION DE APARATOS Y ACCESORIOS SANITARIOS
08.01.07.02 COLOCACION DE APARATOS Y ACCESORIOS SANITARIOS glb 1.00 450.00 450.00
GOBIERNO REGIONAL DE MADRE DE DIOS
GERENCIA REGIONAL DE DESARROLLO ECONOMICO
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
PRESUPUESTO BASE
Metrado Precio Uni. Parcial
ITEM DESCRIPCION UND.
Base (S/.) (S/.)
08.04 TRATAMIENTO DE AGUAS SERVIDAS
08.04.01 LINEA DE CONDUCCION DE RESIDUOS
08.04.01.01 TRABAJOS PRELIMINARES
08.04.01.01.01 TRAZO Y REPLANTEO DE REDES DE AGUA m 113.70 2.94 334.28
08.04.01.02 MOVIMIENTO DE TIERRAS
08.04.01.02.01 EXCAVACION MANUAL TN. HASTA 1.0M m 113.70 54.96 6,248.95
08.04.01.02.02 REFINE Y NIVELACION ZANJA T.N m 113.70 1.76 200.11
08.04.01.02.03 PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO, E= 10cm. m 113.70 2.17 246.73
08.04.02 LAGUNA DE OXIDACION
08.04.02.01 TRABAJOS PRELIMINARES
08.04.02.01.01 TRAZO, NIVELES Y REPLANTEO INICIAL m2 100.00 4.49 449.00
08.04.02.02 MOVIMIENTO DE TIERRAS
08.04.02.02.01 EXCAVACION DE ZANJAS CON MMAQUINARIA m3 120.00 36.96 4,435.20
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
PRESUPUESTO BASE
Metrado Precio Uni. Parcial
ITEM DESCRIPCION UND.
Base (S/.) (S/.)
30.01.09 COBERTURAS
30.01.09.01 CALAMINA METALICA 0.80X3.60M m2 232.02 25.37 5,886.35
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
PRESUPUESTO BASE
Metrado Precio Uni. Parcial
ITEM DESCRIPCION UND.
Base (S/.) (S/.)
34.02.03.01 SOLADO DE 2" f'c=100 kg/cm2 m2 2.16 22.99 49.66
34.02.03.02 CIMIENTO CORRIDO F'C=140 Kg/Cm2 m3 2.49 323.43 805.34
34.02.03.03 SOBRECIMIENTO F'C=175 Kg/Cm2 m3 1.09 382.60 417.03
34.02.03.04 FALSO PISO CONCRETO F'C=175 KG/CM2 E=4" m2 16.71 46.77 781.53
34.02.04 OBRAS DE CONCRETO ARMADO
34.02.04.01 ZAPATAS
34.02.04.01.01 ZAPATAS, CONCRETO f'C=210 kg/cm2 m3 0.86 369.60 317.86
34.02.04.01.02 ZAPATAS, ACERO f'y=4200 kg/cm2 kg 22.52 4.91 110.57
34.02.04.02 COLUMNAS
34.02.04.02.01 COLUMNA CONCRETO F'C=175 Kg/Cm2 m3 0.46 382.60 176.00
34.02.04.02.02 COLUMNAS, ENCOFRADO Y DESENCOFRADO m2 12.24 62.05 759.49
34.02.04.02.03 COLUMNAS, ACERO f'y=4200 kg/cm2 kg 76.20 5.13 390.91
34.02.04.03 VIGAS
34.02.04.03.01 VIGAS CONCRETO F'C=175 Kg/Cm2 m3 0.41 382.60 156.87
34.02.04.03.02 VIGAS, ENCOFRADO Y DESENCOFRADO m2 8.21 65.59 538.49
34.02.04.03.03 VIGAS, ACERO f'y=4200 kg/cm2 kg 63.69 4.98 317.18
34.02.04.04 ALBAÑILERIA
34.02.04.04.01 MURO DE SOGA CON LADRILLO DE ARCILLA 9X13X24 cm (CON ALAMBRE N° 8 C/3 HILADAS) m2 32.90 78.49 2,582.32
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
PRESUPUESTO BASE
Metrado Precio Uni. Parcial
ITEM DESCRIPCION UND.
Base (S/.) (S/.)
44.01.03.05 SUMINISTRO E INSTALALACION DE TUBERIA DE PVC 1 1/2" m 153.66 10.90 1,674.89
44.01.06 CAJA DE REGISTRO
44.01.06.01 CAJA DE REGISTRO PARA RED DE AGUA und 7.00 83.62 585.34
44.02 RED DE DESAGUE
44.02.01 MOVIMIENTO DE TIERRAS
44.02.01.01 ELIMINACION MATERIAL EXCEDENTE CON MAQUINARIA VOLQUETE 15M3 V=30 KM/h D=3KM m3 192.23 8.49 1,632.03
44.02.04 CAJA DE REGISTRO
44.02.04.01 CAJA DE CONEXION DE DESAGUE 12"X24" DE CONCRETO und 7.00 83.62 585.34
44.03 TANQUE SEPTICO
44.03.04 OBRAS DE CONCRETO ARMADO
44.03.04.01 TANQUE SEPTICO
44.03.04.01.01 TANQUE SEPTICO CONCRETO F'C=175 Kg/Cm2 m3 14.88 382.60 5,693.09
44.03.05 INSTALACIONES SANITARIAS
44.03.05.01 TUBERIAS Y ACCESORIOS
44.03.05.01.01 SUMINISTRO E INSTALALACION DE TUBERIA DE PVC 6" m 10.00 29.50 295.00
44.03.05.01.02 SUMINISTRO E INSTALALACION DE TUBERIA DE PVC 6" CRIBADA m 18.00 29.84 537.12
44.03.05.01.03 TEE PVC 6" und 8.00 51.81 414.48
44.03.05.01.04 CODO PVC PVC 4" SAL und 4.00 11.81 47.24
44.03.05.01.05 CODO PVC PVC 6" SAL und 4.00 36.81 147.24
44.03.06 ZANJAS DE INFILTRACION
44.03.06.01 FILTRO DE PIEDRA DE 1" m3 44.40 80.40 3,569.76
44.03.06.02 FILTRO DE PIEDRA DE 1/2" m3 13.20 70.40 929.28
44.03.06.03 TAPA METALICA DE 0.60X0.60M und 4.00 159.08 636.32
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
PRESUPUESTO BASE
Metrado Precio Uni. Parcial
ITEM DESCRIPCION UND.
Base (S/.) (S/.)
18.04.03.03 MURO DE CONTENCION, ACERO FY=4200 KG/CM2 kg 877.69 5.04 4,423.56
18.04.04 COLUMNAS
18.04.04.01 COLUMNAS, CONCRETO F'C=210 KG/CM2 m3 6.96 535.03 3,723.81
18.04.04.02 COLUMNAS, ENCOFRADO Y DESENCOFRADO m2 94.08 62.05 5,837.66
18.04.04.03 COLUMNAS, ACERO FY=4200 KG/CM2. kg 1,082.93 5.13 5,555.43
18.04.05 VIGAS
18.04.05.01 VIGAS, CONCRETO F'C=210 KG/CM2 m3 8.95 409.25 3,662.79
18.04.05.02 VIGAS, ENCOFRADO Y DESENCOFRADO m2 93.98 65.59 6,164.15
18.04.05.03 VIGAS, ACERO FY=4200 KG/CM2. kg 1,056.29 4.98 5,260.32
18.04.06 COLUMNETAS
18.04.06.01 COLUMNETAS, CONCRETO F'C= 175 KG/CM2 m3 0.27 399.85 107.96
18.04.06.02 COLUMNETAS, ENCOFRADO Y DESENCOFRADO m2 4.68 51.96 243.17
18.04.06.03 COLUMNETAS, ACERO FY=4200 KG/CM2 kg 11.43 4.85 55.44
18.04.07 MUEBLE DE CONCRETO
18.04.07.01 MUEBLE DE CONCRETO, CONCRETO F'c= 175KG/CM2 m3 0.86 391.44 336.64
18.04.07.02 MUEBLE DE CONCRETO, ENCOFRADO Y DESENCOFRADO m2 11.75 82.53 969.73
18.04.07.03 MUEBLE DE CONCRETO, ACERO FY=4200 KG/CM2. kg 20.83 7.61 158.52
18.05 ESTRUCTURA DE MADERA Y COBERTURA
18.05.01 TIJERALES DE MADERA (TIPO-8) L=7.85 m CON CARTELAS 3/16" Y PERNOS DE 1/8" und 9.00 1,965.53 17,689.77
18.05.02 CORREAS DE 2"X3" ML 229.60 11.38 2,612.85
18.06 MUROS Y TABIQUES DE ALBAÑILERIA
18.06.01 MURO DE SOGA CON LADRILLO DE ARCILLA 9x13x24 CM (CON ALAMBRE N°8 C/3 HILADAS) m2 60.50 93.86 5,678.53
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
PRESUPUESTO BASE
Metrado Precio Uni. Parcial
ITEM DESCRIPCION UND.
Base (S/.) (S/.)
19.07 CERRAJERIA
19.07.01 BISAGRA DE BRONCE ALUMINIZADAS DE 4" und 12.00 14.35 172.20
19.07.02 CERRADURA NACIONAL DE 3 GOLPES PARA PUERTA und 3.00 92.54 277.62
19.07.03 MANIJA DE BRONCE PARA PUERTAS und 3.00 32.39 97.17
19.07.04 CERRADURA DE PERILLA CON SEGURIDAD PARA BAÑO Y OFICINAS pza 1.00 70.08 70.08
19.07.05 PICAPORTE 3" PARA PUERTAS und 3.00 12.01 36.03
19.08 PINTURA
19.08.01 PINTURA EN MUROS EXTERIORES AL LATEX SATINADO 2 MANOS m2 70.67 9.24 652.99
19.08.02 PINTURA EN MUROS INTERIORES AL LATEX SATINADO 2 MANOS m2 65.36 8.49 554.91
19.08.03 PINTURA EN ESCALERA AL LATEX SATINADO 2 MANOS m2 14.34 9.67 138.67
19.08.04 PINTURA EN COLUMNAS Y PLACAS AL LATEX SATINADO 2 MANOS m2 53.40 9.89 528.13
19.08.05 PINTURA EN VIGAS AL LATEX SATINADO 2 MANOS m2 66.23 9.88 654.35
19.08.06 PINTURA EN DERRAMES AL LATEX SATINADO 2 MANOS m 36.20 4.27 154.57
19.09 CUBIERTAS
19.09.01 COBERTURA DE PLANCHA ONDULADA TERMOACUSTICA DE COLOR DE 2.00x1.05x3mm, CON ALT. DE ONDA = 38mm m2 172.20 76.63 13,195.69
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
PRESUPUESTO BASE
Metrado Precio Uni. Parcial
ITEM DESCRIPCION UND.
Base (S/.) (S/.)
20.02.03.01 TUBERIA PVC SAL Ø2" m 4.30 10.75 46.23
20.02.03.02 TUBERIA PVC SAL Ø3" m 4.60 11.80 54.28
20.02.03.03 TUBERIA PVC SAL Ø 4" m 5.00 10.23 51.15
20.02.03.04 PRUEBA HIDRAULICA+ESCORRENTIA DE TUB. P/DESAGUE m 13.90 1.68 23.35
20.02.04 SALIDAS DE DESAGUES
20.02.04.01 SALIDA DE DESAGUE TUB PVC 2" - LAVADERO DE ACERO INOXIDABLE pto 1.00 88.35 88.35
20.02.04.02 REGISTRO DE BRONCE ROSCADO DE 4" pza 1.00 72.32 72.32
20.02.04.03 SUMIDERO DE BRONCE 2" und 1.00 62.60 62.60
20.02.04.04 SUMIDERO DE BRONCE 3" pto 1.00 81.05 81.05
20.02.05 ACCESORIOS VARIOS
20.02.05.01 YEE DE 4"X2" pza 1.00 30.24 30.24
20.02.05.02 YEE DE 2"X2" pza 1.00 15.33 15.33
20.02.06 VARIOS
20.02.06.01 CANALETA RECTANGULAR DE CONCRETO PARA TALLERES CON REJILLA m 11.10 177.06 1,965.37
20.02.06.02 TRAMPA DE GRASAS DE 0.60 X 1.00M (INC. ACCESORIOS SEGUN DETALLES) pza 1.00 1,987.58 1,987.58
20.03 SISTEMA DE AGUA DE LLUVIA
20.03.01 TUBERIA PVC-SAP 4" DE DESCARGA PLUVIAL DE TECHO m 117.60 81.85 9,625.56
20.03.02 CANALETA SEMICIRCULAR PLANCHA GALVANIZADA m 32.80 63.48 2,082.14
20.03.03 MANDIL PROTECTOR PARA TUBO PVC (Máx Ý 2" und 2.00 85.99 171.98
20.03.04 ABRAZADERA DE FIJACION DE TUBO (Máx Ý3") pza 8.00 29.07 232.56
20.03.05 CODO PVC-SAP 4" * 90 und 32.00 27.60 883.20
20.03.06 CAJA DE REGISTRO DE DESAGUE 12" X 24" C/TAPA DE CONCRETO pza 2.00 262.19 524.38
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
PRESUPUESTO BASE
Metrado Precio Uni. Parcial
ITEM DESCRIPCION UND.
Base (S/.) (S/.)
14.04.03.01 COLUMNAS, CONCRETO F'C=210 KG/CM2 m3 10.05 535.03 5,377.05
14.04.03.02 COLUMNAS, ENCOFRADO Y DESENCOFRADO m2 163.59 62.05 10,150.76
14.04.03.03 COLUMNAS, ACERO FY=4200 KG/CM2. kg 1,738.00 5.13 8,915.94
14.04.04 VIGAS
14.04.04.01 VIGAS, CONCRETO F'C=210 KG/CM2 m3 6.68 409.25 2,733.79
14.04.04.02 VIGAS, ENCOFRADO Y DESENCOFRADO m2 105.80 65.59 6,939.42
14.04.04.03 VIGAS, ACERO FY=4200 KG/CM2. kg 1,332.74 4.98 6,637.05
14.04.05 COLUMNETAS
14.04.05.01 COLUMNETAS, CONCRETO F'C= 175 KG/CM2 m3 1.89 399.85 755.72
14.04.05.02 COLUMNETAS, ENCOFRADO Y DESENCOFRADO m2 32.76 51.96 1,702.21
14.04.05.03 COLUMNETAS, ACERO FY=4200 KG/CM2 kg 82.53 4.85 400.27
14.04.06 MUEBLE DE CONCRETO
14.04.06.01 MUEBLE DE CONCRETO, CONCRETO F'c= 175KG/CM2 m3 1.16 391.44 454.07
14.04.06.02 MUEBLE DE CONCRETO, ENCOFRADO Y DESENCOFRADO m2 30.08 82.53 2,482.50
14.04.06.03 MUEBLE DE CONCRETO, ACERO FY=4200 KG/CM2. kg 56.30 7.61 428.44
14.05 ESTRUCTURA DE MADERA Y COBERTURA
14.05.01 TIJERALES DE MADERA (TIPO-1) L=7.2 m CON CARTELAS 3/16" Y PERNOS DE 1/8" und 15.00 1,945.17 29,177.55
14.05.02 CORREAS DE 2"X3" ML 300.00 11.38 3,414.00
14.06 MUROS Y TABIQUES DE ALBAÑILERIA
14.06.01 MURO DE SOGA CON LADRILLO DE ARCILLA 9x13x24 CM (CON ALAMBRE N°8 C/3 HILADAS) m2 272.41 93.86 25,568.40
DEDUCTIVOS
06 SALA DE ORDEÑO - ESTRUCTURAS
6.03 OBRAS DE CONCRETO SIMPLE
06.03.03 FALSO PISO e= 4" (10CM.) 1:6 C:H m2 -74.80 43.31 -3,239.59
6.04 OBRAS DE CONCRETO ARMADO
06.04.02 VIGAS DE CIMENTACION
06.04.02.04 VIGAS DE CIMENTACION, BASE CON POLIESTILENO EXPANDIDO ( TECNOPORT ) m2 -0.60 17.14 -10.28
06.04.04 VIGAS
06.04.04.01 VIGAS, CONCRETO F'C=210 KG/CM2 m3 -0.76 409.25 -311.03
06.04.04.02 VIGAS, ENCOFRADO Y DESENCOFRADO m2 -5.58 65.59 -365.99
06.04.06 MUEBLE DE CONCRETO
06.04.06.01 MUEBLE DE CONCRETO, CONCRETO F'C= 175 KG/CM2 m3 -0.28 391.44 -109.60
06.04.06.02 MUEBLE DE CONCRETO, ENCOFRADO Y DESENCOFRADO m2 -3.60 82.53 -297.11
06.04.06.03 MUEBLE DE CONCRETO, ACERO FY=4200 KG/CM2 kg -8.41 7.61 -64.00
6.05 ESTRUCTURA DE MADERA Y COBERTURA
06.05.01 TIJERALES DE MADERA (TIPO-3) L=5.70 m CON CARTELAS 3/16" Y PERNOS DE1 /8" und -6.00 1,884.21 -11,305.26
7 SALA DE ORDEÑO- ARQUITECTURA
7.01 REVOQUES Y ENLUCIDOS
07.01.01 TARRAJEO EXTERIOR EN MUROS C:A 1:5 e=1.50 cm. m2 -12.52 23.16 -289.96
07.01.04 TARRAJEO EN VIGAS C:A 1/5, e=1.50 cm m2 -2.03 35.99 -73.06
07.01.08 TARRAJEO PRIMARIO RAYADO CON CEMENTO-ARENA PARA MESA DE CONCRETO m2 -3.60 18.99 -68.36
07.01.09 REVESTIMIENTO DE MUEBLE DE CONCRETO CON CERÁMICO DE 20X30CM COLOR CLARO m2 -3.60 87.97 -316.69
7.03 PISOS Y PAVIMENTOS
07.03.03 PISO DE CERAMICO DE 30X30CM COLOR CLARO m2 -25.47 72.26 -1,840.46
7.04 ZOCALOS Y CONTRAZOCALOS
07.04.01 CONTRAZOCALO CEMENTO PULIDO S/COLOREAR H=40cm EXTERIOR m -0.77 15.31 -11.79
07.04.02 CONTRAZOCALO CEMENTO PULIDO S/COLOREAR H=10 cm INTERIOR m -10.70 8.53 -91.27
7.05 CARPINTERIA METALICA Y ALUMINIO
PUERTA METALICA CORREDIZA SOBRE RIELES CON TUBO DE F.N. DE 2"x2"x3/16 Y TUBO DE F.N. DE 2"x4"x3/16" CON
07.05.01 m2 -1.00 800.00 -800.00
ACCESORIOS DE SEGURIDAD ( INC.DOS MANOS DE PINTURA ESMALTE Y ANTICORROSIVO)
07.05.02 PUERTA METALICA 1.0x 2.60m UNA HOJA BATIENTE EXTERIOR INC. BISAGRAS Y CERRADURA und -1.00 750.00 -750.00
07.05.03 PUERTA METALICA 0.9x 2.60m UNA HOJA BATIENTE EXTERIOR INC. BISAGRAS Y CERRADURA und -2.00 700.00 -1,400.00
7.06 CERRAJERIA
07.06.02 MANIJA DE BRONCE PARA PUERTAS und -3.00 32.39 -97.17
GOBIERNO REGIONAL DE MADRE DE DIOS
GERENCIA REGIONAL DE DESARROLLO ECONOMICO
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
PRESUPUESTO BASE
Metrado Precio Uni. Parcial
ITEM DESCRIPCION UND.
Base (S/.) (S/.)
07.06.03 PICAPORTE 3" PARA PUERTAS und -3.00 12.01 -36.03
7.07 PINTURA
07.07.01 PINTURA EN MUROS EXTERIORES AL LATEX SATINADO 2 MANOS m2 -12.52 9.24 -115.68
07.07.04 PINTURA EN VIGAS AL LATEX SATINADO 2 MANOS m2 -2.03 9.88 -20.06
08.01.04 VALVULAS
08.01.04.02 VALVULA COMPUERTA DE 1/2" und -1.00 89.24 -89.24
08.01.05 SALIDAS DE AGUA FRIA
08.01.05.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" - LAVATORIO pto -2.00 75.12 -150.24
08.01.05.02 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" - GRIFO PARA RIEGO pto -1.00 71.93 -71.93
08.01.06 ACCESORIOS VARIOS
08.01.06.01 REDUCCION PVC SAP 3/4" - 1/2" und -1.00 23.34 -23.34
08.01.06.02 CODO PVC U.R. SAP 1/2"X90° und -6.00 15.72 -94.32
08.01.06.03 TEE PVC U.R. SAP 1/2" und -3.00 35.06 -105.18
08.01.07 SUMINISTRO E INSTALACION DE APARATOS Y ACCESORIOS SANITARIOS
08.01.07.01 LAVADERO DE ACERO INOXIDABLE pza -2.00 435.00 -870.00
8.02 RED DE DESAGUES
08.02.04 SALIDAS DE DESAGUES
08.02.04.01 SALIDA DE DESAGUE TUB PVC 2" - LAVADERO DE ACERO INOXIDABLE pto pto -3.00 88.35 -265.05
34 MODULO: TANQUE ELEVADO -ESTRUCTURAS
34.01 TANQUE ELEVADO DE 25M3 - ESTRUCTURAS
34.01.02 MOVIMIENTO DE TIERRAS
34.01.02.03 ACARREO INTERNO MATERIAL PROCEDENTE DE EXCAVACIONES m3 -8.73 21.98 -191.89
34.01.02.04 ELIMINACION MATERIAL EXCEDENTE CON MAQUINARIA VOLQUETE 15M3 V=30KM/h D=3KM m3 -8.73 8.49 -74.12
34.01.03 OBRAS DE CONCRETO SIMPLE
34.01.03.01 SOLADO DE 2" F'C=100 KG/CM2 m2 -6.58 22.99 -151.27
34.01.04 OBRAS DE CONCRETO ARMADO
34.01.04.01 PLATEA DE CIMENTACION
34.01.04.01.01 PLATEA DE CIMENTACION CONCRETO 210KG POR CM2 m3 -4.54 401.04 -1,820.72
36 MODULO TANQUE ELEVADO INST SANITARIAS
36.01 TANQUE ELEVADO 25M3 INSTALACIONES SANITARIAS
36.01.01 VARIOS
36.01.01.05 TUBERIA DE FIERRO GALVANIZADO PESADO C-40 1 1/2" M -29.45 37.74 -1,111.44
44 MODULO: OBRAS EXTERIORES- INST SANITARIAS
44.01 RED DE AGUA FRIA
44.01.01 TRABAJOS PRELIMINARES
44.01.01.01 TRAZO Y REPLANTEO DE REDES DE AGUA m -210.95 2.94 -620.19
44.01.02 MOVIMIENTO DE TIERRAS
44.01.02.01 EXCAVACION DE ZANJAS MANUAL TN Ø 4"-6", HASTA 1.0 M m -703.95 26.17 -18,422.37
44.01.02.02 REFINE Y NIVELACION ZANJA TERR.NORMAL"C" PARA TUB. 4"-6" m -703.95 1.76 -1,238.95
44.01.02.03 PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO, E=10CM. m -210.95 2.17 -457.76
44.01.02.04 RELLENO Y COMPACTADO C/ MATERIAL PROPIO m3 -5.90 18.48 -109.03
44.01.02.05 ELIMINACION MATERIAL CARGUIO MANUAL VOLQUETE 6M3 V=30KM/h D=5KM m3 -7.37 17.21 -126.84
44.01.03 TUBERIAS Y ACCESORIOS
44.01.03.01 SUMINISTRO DE TUBERIA PVC SAP DE 2" C- 10 C/R m -254.15 6.55 -1,664.68
44.01.03.02 INSTALACION DE TUBERIA PCV P/ AGUA POTABLE DN 50/75 m -254.15 0.40 -101.66
44.01.03.03 TUBERIA PVC SAP DE 1" C- 10 C/R m -269.80 11.87 -3,202.53
44.01.03.04 PRUEBA HIDRAULICA Y DESINFECCION m -210.95 1.41 -297.44
44.01.04 VALVULAS
44.01.04.03 CAJA DE VALVULA DE C° SIMPLE 0.30 x 0.30 M. EN PEDESTAL (SEGUN DISEÑO) und -2.00 308.87 -617.74
44.01.05 ACCESORIOS VARIOS
44.01.05.05 VALVULA AIRE AUTOMATICA 1/2" und -2.00 35.00 -70.00
44.03 TANQUE SEPTICO Y POZO PERCOLADOR
44.03.01 TRABAJOS PRELIMINARES
44.03.01.01 LIMPIEZA DE TERRENO MANUAL m2 0.00 1.25 0.00
GOBIERNO REGIONAL DE MADRE DE DIOS
GERENCIA REGIONAL DE DESARROLLO ECONOMICO
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
UBICACIÓN : TAMBOPATA - TAMBOPATA - MADRE DE DIOS
PRESUPUESTO BASE
Metrado Precio Uni. Parcial
ITEM DESCRIPCION UND.
Base (S/.) (S/.)
44.03.01.02 TRAZO, NIVELES Y REPLANTEO m2 0.00 4.49 0.00
44.03.01.03 COLOCACION DE NIVELES DURANTE LA OBRA m2 0.00 8.00 0.00
44.03.02 MOVIMIENTO DE TIERRAS
44.03.02.01 NIVELACION DE TERRENO m2 0.00 2.74 0.00
44.03.02.02 EXCAVACION DE ZANJAS m3 -18.59 36.64 -681.14
44.03.02.04 ACARREO INTERNO MAT. PROCED. DE EXCAVACIONES Dprom=30M m3 -38.42 18.68 -717.69
44.03.02.05 ELIMINACION MATERIAL EXCEDENTE CON MAQUINARIA VOLQUETE 15M3 V=30KM/h D=3KM m3 -38.42 8.49 -326.19
44.03.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
44.03.03.01 SOLADO f´c=100 KG/CM2 e=10CM m2 -43.75 30.76 -1,345.75
44.03.04 OBRA DE CONCRETO ARMADO
44.03.04.01 TANQUE SEPTICO
44.03.04.01.01 TANQUE SEPTICO CONCRETO 210KG /CM2 m3 -31.91 588.96 -18,793.71
44.03.04.01.02 TANQUE SEPTICO ENCOFRADO Y DESENCOFRADO m2 -93.52 63.21 -5,911.40
44.03.04.01.03 TANQUE SEPTICO ACERO FY =4200KG/CM2 KG -2,298.97 4.98 -11,448.87
44.03.04.02 POZO PERCOLADOR
44.03.04.02.01 POZO PERCOLADOR.- CONCRETO 210 kg/cm2 m3 -2.14 588.96 -1,260.37
44.03.04.02.02 POZO PERCOLADOR - ENCOFRADO Y DESENCOFRADO m2 -24.69 63.21 -1,560.65
44.03.04.02.03 POZO PERCOLADOR - ACERO FY=4200 KG/CM2 kg -199.19 4.98 -991.97
44.03.04.05 CAJA DE REGISTRO
44.04.04.05.01 CAJA DE REGISTRO DE DESAGUE 12" X 24" C/TAPA DE CONCRETO pza -1.00 262.19 -262.19
44.03.04.06 COLOCACION DE TUBERIA TANQUE SEPTICO - POZO PERCOLADOR
44.03.04.06.01 EXCAVACION DE ZANJAS MANUAL TN Ø 2"-6", HASTA 1.0 M m -9.60 54.96 -527.62
44.03.04.06.02 REFINE Y NIVELACION ZANJA TERR.NORMAL"C" PARA TUB. 2"-6" m -9.60 1.76 -16.90
44.03.04.06.03 PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO, E=10CM. m -9.60 2.17 -20.83
44.03.04.06.04 RELLENO Y COMPACTADO DE ZANJA, HASTA 1.00 m CON MATERIAL PROPIO m -9.60 33.34 -320.06
44.03.04.06.05 ACARREO MATERIAL EXCEDENTE HASTA UN DISTANCIA PROMEDIO DE 30 M m3 -8.74 21.98 -192.11
44.03.04.06.06 RELLENO GRANULAR CON PIEDRA SELECCIONADA DE 1 1/2"- 2" m3 -7.10 82.21 -583.69
44.03.04.06.07 TUBERIA PVC SAL Ø 4" m -13.80 10.23 -141.17
44.03.04.07 VARIOS
44.03.04.07.02 TAPA DE FIERRO (0.80X0.80) und -2.00 286.97 -573.94
44.03.04.07.03 TAPA DE FIERRO CIRCULAR D=0.40m und -2.00 60.00 -120.00
44.03.04.07.04 TAPA METÁLICA 0.70 x 0.70m PARA TANQUE SEPTICO ( SEGUN DISEÑO) und -3.00 80.00 -240.00
44.03.04.07.05 ESCALERA TUB F.GVZDO. C/PARANTES DE 1" X PELDAÑOS DE 3/4" m -0.60 190.42 -114.25
MODULO OBRAS EXTERIORES - ESTRUCTURAS
BRETES PARA MANEJO Y COLECCIÓN DE SEMEN
BRETES PARA MANEJO Y COLECCIÓN DE SEMEN Glb -1.00 12,121.61 -12,121.61
MODULO OBRAS EXTERIORES - ESTRUCTURAS
ESTERCOLERO
ESTERCOLERO Glb -1.00 7,508.83 -7,508.83
MODULO OBRAS EXTERIORES - ESTRUCTURAS
SILO PARA FORRAJE
SILO PARA FORRAJE Glb -1.00 24,448.41 -24,448.41
MODULO OBRAS EXTERIORES - ESTRUCTURAS
TORILES
TORILES Glb -1.00 22,214.83 -22,214.83
OBRA: “MEJORAMIENTO DE LA PRESTACION DE SERVICIOS TECNOLOGICOS DEL CENTRO DE DESARROLLO GANADERO (CEDEGA) DEL GOBIERNO REGIONAL DE MADRE DE DIOS PARA INCREMENTAR
LA PRODUCTIVIDAD Y PRODUCCION DEL GANADO VACUNO EN LA REGIÓN MADRE DE DIOS”.
ELABORACIÓN DE
CODIGO ESPECIFICA DE GASTOS COSTO DIRECTO GASTOS EXPEDIENTE GASTOS DE LIQUIDACIÓN COSTO TOTAL
GENERALES TÉCNICO SUPERVISIÓN
TOTAL COSTO DEL PROYECTO 1,741,999.58 250,782.22 0.00 94,783.38 0.00 2,087,565.18
OBRA: “MEJORAMIENTO DE LA PRESTACION DE SERVICIOS TECNOLOGICOS DEL CENTRO DE DESARROLLO GANADERO (CEDEGA) DEL GOBIERNO REGIONAL DE MADRE DE DIOS PARA INCREMENTAR
LA PRODUCTIVIDAD Y PRODUCCION DEL GANADO VACUNO EN LA REGIÓN MADRE DE DIOS”.
ELABORACIÓN DE
CODIGO ESPECIFICA DE GASTOS COSTO DIRECTO GASTOS EXPEDIENTE GASTOS DE LIQUIDACIÓN COSTO TOTAL
GENERALES TÉCNICO SUPERVISIÓN
TOTAL COSTO DEL PROYECTO #REF! #REF! 10,000.00 #REF! 30,097.00 #REF!
PRESUPUESTO 2018
OBRA: "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL COMEDOR UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL AMAZONICA DE MADRE DE DIOS"
PRESUPUESTO VALORIZACION VALORIZACION VALORIZACION VALORIZACION VALORIZACION VALORIZACION VALORIZACION TOTAL SALDO POR %
CONCEPTO SÍMBOLO APROBADO
PRIMERA
Nro. 01 Nro. 02 Nro. 03 Nro. 04 Nro. 05 Nro. 06 ACUMULADO EJECUTAR SALDO
ETAPA -2017
VALORIZACIÓN DEL MES - MAYORES METRADOS V_MM #REF! 64,354.69 - - - - - - 64,354.69 #REF! #REF!
VALORIZACIÓN DEL MES - PARTIDAS NUEVAS V_PN #REF! 182,012.93 - - - - - - 182,012.93 #REF! #REF!
TCD=V_C+V_MM
TOTAL COSTO DIRECTO #REF! 580,099.26 - - - - - - 580,099.26 #REF! #REF!
+V_PN+V_D
GASTOS GENERALES (14.40 %) GG #REF! 83,512.41 - - - - - - 83,512.41 #REF! #REF!
COSTO DEL EXPEDIENTE TECNICO CET 10,000.00 10,000.00 10,000.00 -
COSTO DE SUPERVISION CS 118,428.90 24,028.86 24,028.86 94,400.04
COSTO DE LIQUIDACIÓN CL 30,097.00 - - 30,097.00