Documentos de Académico
Documentos de Profesional
Documentos de Cultura
RELLENOS 2 B/D1
RELLENOS 3 B/B'
RELLENOS 8 E/I
RELLENOS A 5/5´
RELLENOS B 2/2´
RELLENOS 2 D1/E
RELLENOS 2A E/I
RELLENOS I 2/3A
RELLENOS 2 I/M
RELLENOS M 2/3A
RELLENOS 3A I/M
RELLENOS E 2/3A
RELLENOS 5 B2/F
RELLENOS F 8/9
RELLENOS G 7/8
RELLENOS 7 F/H
RELLENOS 5 L/H
RELLENOS L 5/L
RELLENOS 8 G/L
RELLENOS
RELLENOS D1 2/3A
Perdida
ZONA ALTO LARGO M2 PARCIAL M2 Manos
5%
M2 TOTALES TOTAL M2
34.13 177.29
39.75
39.72
63.69
ANCHO ALTO
1.16 2.46
0.81 2.44
0.71 2.44
0.66 2.44
0.76 2.44
0.64 2.44
1.28 2.41
0.81 2.26
0.71 2.26
0.81 2.36
0.71 2.36
0.78 2.33
1.05 2.33
TOTAL
43.07
8
5
5
2
Suma
Valor total Valor parcial valor
total (m3)
8.50 6.54 51.11
0.38 0.29
2.66 2.05
1.84 1.41
0.69 0.53
1.14 0.87
2.06 1.58
2.20 1.69
2.17 1.67
1.74 1.33
1.10 0.84
2.21 1.70
4.15 3.19
3.25 2.50
1.17 0.90
1.52 1.17
1.67 1.29
5.56 4.28
2.24 1.73
4.87 3.75
0.72 6.01
0.03
0.23
0.16
0.06
0.15
0.28
0.29
0.34
0.28
0.34
0.30
0.35
0.43
0.16
0.20
0.22
0.74
0.30
0.41
0.23
Suma
Valor
total
M2
valor
total m2
54.15 148.65
94.50
ITEM EXCAVACION DE CIMIENTOS
CODIGO DESCRIPCION
1 Maquinaria
1.1. Retroexcavadora Case 580H
1.2 Camion Tolva 7 m3 (min. 5km)
2 Mano de Obra
2.1 CAPATAZ
2.1 JORNAL
LEYES SOCIALES
SUBTOTAL NETO
ITEM RELLENOS
CODIGO DESCRIPCION
1 MATERIAL
1.1. ESTABILIZADO CON FLETE 15KM
2 MAQUINARIA
2.1 PLACA COMPACTADORA 110KG
3 Mano de Obra
3.1 JORNAL OPERADOR DE PLACA
3.2 JORNAL PALERO
LEYES SOCIALES
SUBTOTAL NETO
1 MATERIALES
1.1 Hormigon premezclado H-30 25kg SC 72 $5,143.50
2 MANO DE OBRA
2.1 Concretero H/H 0.076 $14,954.04
2.2 Jornal H/H 0.02 $13,457.80
3 MAQUINARIA
3.1 BETONERA 11P ELECT. 10HP MES 0.08 $453,764.23
LEYES SOCIALES % 30% $1,405.66
PERDIDA % 5% $371,468.51
SUBTOTAL NETO
ON DE CIMIENTOS M3
UNIDAD RENDIMIENTO P. UNITARIO P. TOTAL
AL NETO $15,550.28
ELLENOS M3
UNIDAD RENDIMIENTO P. UNITARIO P. TOTAL
M3 1 $8,500 $8,500.00
AL NETO $11,006.03
M3
P. TOTAL
$370,332.00
$1,136.51
$269.16
$36,301.14
$421.70
$18,573.43
$427,033.93