[rom tes
femsion: arenes
jrewsion: °
INDUSTRIAL
BLASTER REPORTE DE ENSAYO DE LIQUIDOS PENETRANTES
N° REPORTE:-OO1-PT 2019
"REGISTRO DE CALIDAD
"EMPRESA DE
a SOLUNCORS.AC. lL». soucrrapo SOT ALSO
erat PRE: 663,75
pmorecro | PROTECCION DE LA ZONA SPLASH DELOS pect ee
RISERS DE THPC -PISCO
Fase Fl Sotaira
ESTRUCTURA: ‘BALSO COLaANTE DE ALIS
TGAMTESGETT GDESPUESDETT SSNTT GWNTASSOLDADAS GFLNODGS OFORIADOS CLAMNADOS OGHARLANES
FABREANTE:CANTESCO RENOVEDOR PENETRANTE TEVELADOR
‘CORBCIONES DE ENERO
esvapo cetasurenricie | TEMPERATURADELA area APCAGION DEL PENETRANTE
Pana = Jnewovenor cota Jpormuvenzscon
ReWocIONDEL EXCESS APUCACION DEL REVELADOR VALUACION ‘eroauns aNexo
Revomnonciora PORPULVERZIGIN jurnmacin naruRa Pace
reno RevetAD9 10 Min, reno oe evALLNCIH 710K
“JUNTAS INSPECCIONADAS
rreu | coo1co asienaoo | nPo De sunTa) oIScONTINUIDAD ‘OBSERVACIONES RESULTADO
7 BALSO 1 * = ‘OREIAS DE ZANE =
2 ALSO = = ‘OREIAS DE ZANE aria
a ‘ALSO = = ‘OREIAS DE ZANE ara
a BALSO1 a = PARTE SUPERIOR, ara
= BALSOT ar PARTE SUPERIOR Tara
= BALSOT ar = PARTE SUPERIOR ari
7 BALSO 1 a = PARTE SUPERIOR ara
= ALSO = = PARTE SUPERIOR Tear
. BALSOT = PARTE SUPERIOR =
0 ‘ALSO = = PARTE SUPERIOR Taro
[OBBERVAGIONEST
DA
[c-risura (CP--POROSIOADAGRUPADA __IF-FALTADE FUSION "A-AGERTABLE
JEU-SOcAVADO EXTERNO P-POROSIDAD AISLADA R-REPARAR.
[CRITERIO DE ACEPTACION DE ACUERDO CON = ‘AWS012-2014|
[RECOMENDACIONES:
[APROBACION FINAL:
INDUSTRIAL BLASTER
20/0219
‘JUAN SULICA HERRERA
‘ASNT SNT-TCIA
teven (veer
LUGAR Y FECHA DE EXECUCION INSPECTOR NIVEL Ve" SUPERVICIONINDUSTRIAL
é BLASTER REPORTE DE ENSAYO DE LIQUIDOS PENETRANTES,
ous aes
exasione oper
revisor: °
NC REPORTES 003-PT-2039
RESTA DE CAIDA
upnesa De ‘soumcons.ac. IL». soucrrapo ‘or AED
rene, 8
sortcro | PROTECCION DELA ZONA SPLASH DE LOS) vepscomnanas cont umtvo se
FRSERS DE TPC -PiSCO
fase rts
emcae aa coxann oe
TONTAS HSPESSONADAS
ee oe ee coserncones eutavo
z waso1 | = = PARTE RIOR Tara
rn euso1 | an = PARTE SUPERIOR raves
rn easo1 | = TART GENT vara
7 aasor | a = ARTE SENTRA warms
= easo1 | a = ARTE CENTRAL arms
3 euso1 | a = ARTE CENTRAL arom
7 easo1 [=m = TART GENT ares
rn easo1 [= = ARTE CENT arias
2 easor | ae = ARTE CENT roa
= easor | =n = PARTE CENTRAL naa
* euso1 | an = TART SENTRA wares
= easo1 [om = PARTE RFEROR ras
= easo1 | an = PARTE RFEROR reas
m aasor [an = PARTE FEROR nas
= east | ae = PARTE WFEROR areas
= euso1 | =n = ARTE NEON varias
= easo1 | = = ARTE REN rvs
= easo1 | a = PARTE REEROR marae
= euso1 [=n = ARTE RERIOR areas
% aaso1 | am = PARTE BEER arms
* easo1 [a = FASE NFERIOR rae
= easo1 [an = ASE NFERIOR aro
= aasor [an = TSE NFEROR marae
asec
Leman
e-reune PFORSSDAD AGRUPIOR— F-FATAGE RGN AEP
es Soceoo exeRn0 veresaxo ASAD inert
cme00& AcEPTAGON DE AERO CON: rasan
recournoncones
[con ra
INDUSTRIAL BLASTER
20/02/19 cae
Aran
‘ane
ian PES EES wercoR weaponTOANSOLICA HERRERA
‘ASNT SHT-TC-IA
tevern(vr-er)
fax =
INDUSTRIAL [eMision: 2002/2019
BLASTER REPORTE DE ENSAYO DE LIQUIDOS PENETRANTES feraore
a
semen
oe esse — mares
arena pri
smoreoro |PROTECCION DELA ZONA SPLASH DE LOS oa
RISERS DE THPC. ISCO oes osm
es
eomore Reeioeee peated
ee
ims || sac aac | eons noone ss ES
ry casos | raw aa fee Sar RrERER cs
5 massa | on = coe a
5 susot | — an = SER =
= ease a = oe eee
: a a aacnearon oo
5 asain |mrae = mee aa
c re a estrmoe oes
5 01 oe Saran i
eae a merremrea —
a mason ees aren as
masons BAS NFER =
pCR
ra
eee Sane ane ne ee Roman
Si a eceeee eae a
Geren oc acerTAoOH OE ACUERDO CON: maaan
ee
os
INDUSTRIAL BLASTER
20/02/19
LUGAR Y FECHA DE EJECUCION
INSPECTOR NIVEL
Ve" SUPERVICIONINDUSTRIAL
BLASTER RECORD FOTOGRAFICO HOJA4 DES
1 REPORTE: 1B-001-PT-2018
conico: BALSO1
PROYECTO? eer
ESTRUCTURA: peas HERRERA
BALSO COLGANTE | PROTECCION DE LA ZONA SPLASH DE
DE ALUMINIO LOS RISERS DE TMPC - PISCO 120 de febrero de 2019RECORD FOTOGRAFICO HoJAS DES
WW REPORTE: 1B 001-PT-2018
copico: BALSO1
[Etaborado por
|JUAN SULLCA HERRERA
Fecha
ESTRUCTURA:
BALSO COLGANTE | PROTECCION DE LA ZONA SPLASH DE
DE ALUMINIO LOS RISERS DE TMPC -PISCO [ap ge etrrode 2019rom ra
[eason 20/onp2018
revson: 2
INDUSTRIAL
é BLASTER REPORTE DE ENSAYO DE LIQUIDOS PENETRANTES,
REISTRO DE CALIORD
‘BIPRESADE aS LP. soucrrano ‘OF ALO
era cannes
sroveero |PROTECCIONDELAZONA SPLASHDELOS! ermmcopman con nite >
RISERS DE TMPC - ISCO,
tse Frets
emuTORE re)
DANTESGETT UODESAIESDETT OSNT7 CWUNTASSOLDADAS GFUNDOOS OFORIADSS SLAWNAGOS GOVARLANES
‘RODUCTOR TBADOS
TABRANTE CANTERCO ‘Rewovebon od REVELADOR
CoROONES DEENA
esmoe.asurerrce | TEWPENATURADELA ‘wz {seLCACON DEL PENETRATE
SSaee wo Prenevenor cia Jrorrnvenaacon
lrewovesecaro:sum ___frenpove re si
ewocion on exces0 HPUCACON DEL REVELADOR vaLuacon creas eo
Taoncncoa PORPUNEREACION femvconaru ca ow
fnewroneve109- 1180 lrewro evasncon 7.0
JUNTAS WSPECCIONADAS
ren |coo1G0 astena00| npo be sunrA] oxscowrNUOAD ‘ObseRVACIONES ESULTADO
ni walso2 x = OREIAS OE ZAIE reareae
BAISO? = = OREIAS DE ZAIE ears
BALSO? = = OREWAS DE BALE arn
BALso2 a = PARTE SUPERIOR nee
BALSO? ar = PARTE SUPERIOR reorete
BALSO2 ra = PARTE SUPERIOR eae
BALSO? mer = PARTE SUPERIOR are
BALSO2 a = PARTE SUPERIOR Taree
ealso2 a = PARTE SUPERIOR Paro
ealso2 a a PARTE SUPERIOR earner
[cevenon
fe-risuna ‘P= POROSIDADAGRUPADA = FALTADE FUSION A AGEPTARLE
Jev-socavano ExreRNO P“POROSIOAD ABLADA R-REPARAR
[cRrTeRIo DE ACEPTAGION DE ACUERDO CON: ‘awe 012-2046
[RECOMENDAGIONES:
[APROBAGION FNAL:
INDUSTRIAL BLASTER
20/02/19,
“TOANSULLCA HERRERA
SRShT SHTTELA
‘LEVEL (VT-PT)
ican rae ne Secon INSPECTOR NIVEL ve senvaowGbiasten
REPORTE DE ENSAYO DE LIQUIDOS PENETRANTES |
[rom aes
[awsion: 20/02/2019
revision °
REPORTER -GO1.PT-2018
REGISTRO DE CALIDAD
(EAERESADE souncon sac [Lr soucrrap0 SPOT ALO
= — plore igi
CCCION DE LA ZONA SPLASH DE Los|
rovecro SION DE LA ZONA SPLASH DE LOS|omwewapsccontans —_canomnen oe so.mnounn
= rattan
aTmCTIRN aaron
TUNTAS HSPEBSIONADAS
tren |eooeo asenaoo | no oe aura) cxcoxDAD onsen resutTan0
= easor | an = TRE SIRE a
7 eaisoz | an = PARTE SUPEROR ar
= eaisoz | an = ATE OENTAL ara
aaisoz | an = ARTE CENTRAL 7
* aasoa [an — PARTE CENTRAL a
« aaisoz | an = ae CENTRAL ar
7 eaisoz | an = PARTE CENTRAL ar
n eaisoz [an = ARTE OENTRAL ve
. eaisoa [am = PARTE CENTRAL mie
= easoz | an = PARTE CENTRAL aro
= eaisoz | an = rae OENTAL a
z aaisoz | an = PARTE WFERIOR =
= eaisoa | an ms PARTE WFERIOR mea
™ aasoz [an i PARTE WFERIOR ar
= eaisoz | an = PARTE INFERIOR er
= aasoz | an = PARTE WFERIOR mora
z saison | =e = PARTE WFERIOR a
= aaisoa [am = PARTE INFERIOR 7
= eaisoz [an = PARTE INFERIOR 7
= eaisoz | an = PARTE WFERIOR a
™ eaisoz [an = TASE NFEROR 7
z aaisoa [am - EASE NFERIOR 7
= aasoa [am 7 GASE WFERIOR ar
oRSERTACONEE
7
e-reure CF PORGEOND AGRUPAOR——F-FALTADEFOSON TRE
ev socavano exo Prronosnno Macon hepa
JRTERO DE ACEPTACION DE ACUERDO CON: rs O12 ane
RECONENOAGONES
PROERCON FL
INDUSTRIAL BLASTER
20/02/19
TonnSOUCR ERRERR
ourenn reas
tanniveen
LUGAR Y FECHA DE EJECUCION INSPECTOR NIVEL
Ver SUPERVIGONINDUSTRIAL
BLASTER REPORTE DE ENSAYO DE LIQUIDOS PENETRANTES,
hom
lemisions
20/02p2019
Revision:
1W REPORTE:I6-01 FF 2019,
‘REGISTRO DE GALIDAD
EMPRESA DE souncon sc. L».soucrrape eror asm
ene ene, 13
luxrena.
anes anno 208
provecto _|PROTECCION DE LA ZONA SPLASH DE LOS
Pete rae [zonas msPeccioNADAs CconDoves De SoLDADURA
rase Pete
ESTRUCTURA Tazo coLamNTE BE ALON
TUNTAS INSPECCIONADAS.
ren [coo1c0 astona00| po ne sunrA] oxsconruoAD OoseRVACIONES REQULTADO
= waiso2 mee = BASE NFERIOR rear
= BALSO2 me = EASE INFERIOR ara
= BALSO2 mee = BASE WFERIOR ero
= Balso2 aa = EASE NFERIOR Tecra
= BALSO? ae = EASE NFERIOR era
* BALSO? mee = EASE INFERIOR Teoria
2 Balso2 ene = BASE INFERIOR earn
a Balso2 mae = EASE NFERIOR rear
2 BaLso2 vane = BASE NFERIOR rere
2 ALSO? ve = BASE INFERIOR oo
# BALSO2 mae = BASE INFERIOR oo
[SERERRTRCORES
OA
[c-risuea ‘P- POROSOAD AGRUPAOR F-FALTADE FUSION “A AGEPTARLE
Jeu" socavaD0 ExTERNO P< POROSIORO ASLADK RoREPARAR
[cRrTERIo DE ACEPTAGION DE ACUERDO CON: ‘avs 012-2016
[RECOWENDAGIONES:
[RPROBAGION A:
INDUSTRIAL BLASTER
20/02/19
=a
CER HERRERA
TOAST SHT-TC AA
‘Qanvern
LUGAR Y FECHA DE BECUGION "NSPECTOR MEL ve" senvaonINDUSTRIAL
é BLASTER RECORD FOTOGRAFICO HOJA4 DES
WW REPORTE: 1B -002-PT-2019
copico: BALSO2
Bers [Etaborado por
|.UAN SULLCA HERRERA
ESTRUCTURA: um
BALSO COLGANTE | PROTECCION DE LA ZONA SPLASH DE
DE ALUMINIO LOS RISERS DE TMPC - PISCO. 120 de febrero de 2019INDUSTRIAL
é RECORD FOTOGRAFICO HOJASDES
BLASTER
‘Ww REPORTE: 1B 002PT-2019
copico: BALSO2
PROYECTO: [Elaborado por
|JUAN SULLCA HERRERA
ESTRUCTURA: pase!
BALSO COLGANTE | PROTECCION DE LA ZONA SPLASH DE
DE ALUMINIO; LOS RISERS DE TMPC - PISCO 120 de febrero de 2019IGG SUDAMERIS®
tituto de Capacitaciones y Certificacione:
www. iecsudameris.org
Awards this Certificate to:
JUAN ARMANDO SULLCA HERRERA
In Recognition of having successfully completed an educational
course:
TRANT TESTING - II
12 Hours
According to SNT-TC-1A, 2011 Ed.
icate is issued as evidence that the required portion of
formal training has been satisfactory completed for this limited Scope.
In witness whereof we have affixed our hand and seal
This 23th day of November, 2014
CERTIFICATION NUMBER: T120605PT
INSTRUCTOR: POLH TORRES C.
A
Certification Programs Acai eePE NSDicc SUDAMERIS®
Institut ones y Certifi
www.iccsudameris.org
sording with Recommended Practice ASNT-TC
d of the contract. The employe
This Co on behalf of
1A, the contract employer's
shall be deemed revoked when conirac
on will rem
Be known that in accordance to the documentation provided to this
certification body and the examination scores below
JUAN ARMANDO SULLCA HERRERA
Has meet the established written and published requirements of ASNT
SNT-TC-1A 2011 for Level Il (limited) in
PT - PENETRANT TESTING — WELDS
EXAMINATION SCORE DATE
GENERAL 82.59% APR ~ 15 — 15
SPECIFIC 85.0% APR- 15-15
PRACTICAL 90.0.% DEC -24~14
COMPOSITE SCORE 36.0%
REQUIRED EXPERIENCE — MEETS
FORMAL TRAINING MEETS
VISUAL ACUITY EXAM MEETS
CERTIFICATION NUMBER C120605PT
VALID DATE APR = 15-15
EXPIRATION DATE ‘APR - 15-20
CERTIFICATION BODY AUSCORP $.A.C
This certificate is issued as evidence that the required examinations;
General, Practical and Specific has been satisfactory completed and
the Certification in accordance with Employer’s written practice, can
proceed.