REAJUSTES (R)
CONTRATO PRINCIPAL 664,064.05 75,664.11 739,728.16
AMORTIZACIONES (A)
POR ADELANTO EN EFECTIVO 660,992.24 63,698.61 724,690.85
POR ADELANTO PARA MATERIALES 883,606.51 89,995.22 973,601.73
--------------------- --------------------- ------------------
TOTAL DE AMORTIZACIONES 1,544,598.76 153,693.83 1,698,292.59
1º 33,912.15 1,972.04 3,391.22 0.00 0.00 0.00 32,492.97 32,492.97 32,492.97 0.20% 0.20%
2º 290,615.57 20,566.18 29,061.56 391.51 0.00 0.00 281,728.68 281,728.68 281,728.68 1.73% 1.93%
3º 880,193.65 65,357.56 88,019.37 1,671.14 120,261.79 2,441.23 733,157.69 733,157.69 733,157.69 5.43% 7.36%
4º 912,685.67 83,395.44 91,268.57 3,214.06 124,906.21 6,278.06 770,414.22 770,414.22 770,414.22 5.43% 12.79%
5º 922,677.43 95,127.28 92,267.74 4,187.12 131,348.53 7,097.39 782,903.93 782,903.93 782,903.93 5.49% 18.28%
6º 804,462.84 85,057.68 80,446.28 3,867.83 113,429.04 9,718.44 682,058.93 682,058.93 682,058.93 4.79% 23.07%
7-I 1,149,994.20 121,891.76 114,999.42 5,548.77 165,355.92 14,167.46 971,814.39 971,814.39 971,814.39 6.84% 29.91%
7-II 28,540.94 3,175.67 2,854.09 142.43 3,027.56 312.89 25,379.64 25,379.64 25,379.64 0.17% 30.08%
8º 672,003.98 78,700.71 67,200.40 3,936.71 95,063.99 11,570.04 572,933.55 572,933.55 572,933.55 4.00% 34.08%
9º 914,835.93 108,819.72 91,483.59 5,525.74 130,213.48 24,468.83 771,964.01 771,964.01 771,964.01 3.79% 37.87%
10º 636,986.14 75,664.11 63,698.61 3,831.64 89,995.22 16,646.22 538,478.56 538,478.56 538,478.56 0.00% 37.87%
11º 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 37.87%
12º 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 37.87%
13º 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 37.87%
Err:508
TOTAL 7,246,908.50 739,728.16 Err:508 32,316.95 973,601.73 92,700.56 6,163,326.57 0.00 6,163,326.57 6,163,326.57
MAYORES METRADOS
1º 1,937.71 215.09 0.00 0.00 0.00 0.00 2,152.80 0.00 2,152.80 2,152.80 0.012% 0.012%
01 INFRAESTRUCTURA ELECTRICA
01.01 TRABAJOS PRELIMINARES
01.01.01 TRANSPORTE DE MATERIALES, EQUIPOS LIVIANOS Y HERRAMIENTAS - LOCAL ton 30.19 0.00 30.19 100.00
01.01.02 MOVILIZACION Y DESMOVILIZACION DE EQUIPO PESADO DE RODAMIENTO PROPIO-ELECTRICAS mes 5.00 0.00 2.00 40.00
01.02 SISTEMA ELECTRICO DE MEDIA TENSION 0.00
01.02.01 JR. FRANCISCO DE ORELLANA 0.00
01.02.01.01 DESMONTAJE DE ESTRUCTURA DE ALINEAMIENTO DE C.A.C. 13/300 und 3.00 0.00
01.02.02 JR. LUIS SCAVINO 0.00
01.02.02.01 DESMONTAJE DE ESTRUCTURA DE ALINEAMIENTO DE C.A.C. 13/300 und 7.00 0.00
01.02.02.02 DESMONTAJE DE MENSULAS und 9.00 0.00
01.02.02.03 DESMONTAJE DE AISLADORES TIPO PIN und 6.00 0.00
01.02.02.04 DESMONTAJE DE AISLADORES TIPO SUSPENSION und 3.00 0.00
01.02.02.05 DESMONTAJE DE RETENIDA SIMPLE und 2.00 0.00
01.02.02.06 POSTE DE C.A.C. DE 13/300 und 1.00 0.00
01.02.02.07 INSTALACION DE MENSULAS und 9.00 0.00
01.02.02.08 INSTALACION DE AISLADORES TIPO PIN und 6.00 0.00
01.02.02.09 INSTALACION DE AISLADORES TIPO SUSPENCION und 3.00 0.00
01.02.02.10 INSTALACION DE RETENIDA SIMPLE und 2.00 0.00
01.02.02.11 INSTALACION DE POZO DE TIERRRA DE RED und 3.00 0.00
01.02.02.12 ELIMINACION DE MATERIAL EXCEDENTE und 7.00 0.00
01.02.02.13 DERECHOS DE CORTE Y CONEXIÓN MEDIA TENSION- LUIS SCAVINO GLB 1.00 0.00
01.02.03 JR. JOSE DEL CARMEN CABREJOS 0.00
01.02.03.01 DESMONTAJE DE ESTRUCTURA DE ALINEAMIENTO DE C.A.C. 13/300 und 4.00 0.00
01.02.03.02 ELIMINACION DE MATERIAL EXCEDENTE und 7.00 0.00
01.02.04 PJE. CABO SOPLIN 0.00
01.02.04.01 DESMONTAJE DE ESTRUCTURA DE ALINEAMIENTO DE C.A.C. 13/300 und 1.00 0.00
01.02.04.02 DESMONTAJE DE MENSULAS und 3.00 0.00
01.02.04.03 DESMONTAJE DE AISLADORES TIPO SUSPENSION und 3.00 0.00
01.02.04.04 DESMONTAJE DE SECCIONADORES TIPO CUT OUT und 3.00 0.00
01.02.04.05 DESMONTAJE DE RETENIDA SIMPLE und 2.00 0.00
01.02.04.06 POSTE DE C.A.C. DE 13/300 und 1.00 0.00
01.02.04.07 INSTALACION DE MENSULAS und 3.00 0.00
01.02.04.08 INSTALACION DE RETENIDA SIMPLE und 2.00 0.00
01.02.04.09 INSTALACION DE POZO DE TIERRRA DE RED und 1.00 0.00
01.02.04.10 ELIMINACION DE MATERIAL EXCEDENTE und 1.00 0.00
01.02.04.11 DERECHOS DE CORTE Y CONEXIÓN MEDIA TENSION- PASAJE CABO SOPLIN GLB 1.00 0.00
01.02.05 JR. RODOLFO ESPINAR 0.00
01.02.05.01 DESMONTAJE DE ESTRUCTURA DE ALINEAMIENTO DE C.A.C. 13/300 und 2.00 0.00
01.02.05.02 DESMONTAJE DE ESTRUCTURA DE ALINEAMIENTO DE C.A.C. 13/400 und 2.00 0.00
01.02.05.03 DESMONTAJE DE MENSULAS und 12.00 0.00
01.02.05.04 DESMONTAJE DE AISLADORES TIPO PIN und 12.00 0.00
01.02.05.05 DESMONTAJE DE PARARRAYOS und 3.00 0.00
01.02.05.06 DESMONTAJE DE SECCIONADORES TIPO CUT OUT und 3.00 0.00
01.02.05.07 DESMONTAJE DE TRANSFORMADOR und 1.00 0.00
01.02.05.08 DESMONTAJE DE TABLERO ELECTRICO und 1.00 0.00
01.02.05.09 POSTE DE C.A.C. DE 13/300 und 2.00 0.00
01.02.05.10 POSTE DE C.A.C. DE 13/400 und 2.00 0.00
01.02.05.11 INSTALACION DE MENSULAS und 12.00 0.00
01.02.05.12 INSTALACION DE AISLADORES TIPO PIN und 12.00 0.00
01.02.05.13 MONTAJE DE PARARRAYOS und 3.00 0.00
01.02.05.14 MONTAJE DE SECCIONADORES TIPO CUT OUT und 3.00 0.00
01.02.05.15 MONTAJE DE TRANSFORMADOR und 1.00 0.00
01.02.05.16 MONTAJE DE TABLERO ELECTRICO und 1.00 0.00
01.02.05.17 INSTALACION DE POZO DE TIERRRA DE RED und 2.00 0.00
01.02.05.18 INSTALACION DE POZO DE TIERRA DE SUBESTACION und 2.00 0.00
01.02.05.19 ELIMINACION DE MATERIAL EXCEDENTE und 4.00 0.00
01.02.05.20 DERECHOS DE CORTE Y CONEXIÓN MEDIA TENSION - JR. RODOLFO ESPINAR GLB 1.00 0.00
01.03 SISTEMA ELECTRICO DE BAJA TENSION 0.00
01.03.01 JR. FRANCISCO DE ORELLANA 0.00
01.03.01.01 DESMONTAJE DE POSTE DE 8 M und 1.00 0.00 1.00 100.00
01.03.01.02 EXCAVACION DE HOYOS PARA POSTE DE CONCRETO DE 8 M und 1.00 0.00 1.00 100.00
01.03.01.03 REUBICACION DE ACCESORIOS POSTES BAJA TENSION 8/300 und 1.00 0.00 1.00 100.00
01.03.01.04 POSTE DE C.A.C. DE 8/300 und 1.00 0.00
01.03.01.05 DERECHOS DE CORTE Y CONEXIÓN BAJA TENSION - JR. FRANCISCO DE ORELLANA GLB 1.00 0.00
01.03.02 JR. CABALLO COCHA 0.00
01.03.02.01 DESMONTAJE DE POSTE DE 8 M und 4.00 0.00 4.00 100.00
01.03.02.02 EXCAVACION DE HOYOS PARA POSTE DE CONCRETO DE 8 M und 4.00 0.00 4.00 100.00
01.03.02.03 REUBICACION DE ACCESORIOS POSTES BAJA TENSION 8/300 und 4.00 0.00 4.00 100.00
01.03.02.04 MONTAJE DE POSTE DE C.A.C. DE 8 M. und 2.00 0.00 2.00 100.00
01.03.02.05 POSTE DE C.A.C. DE 8/200 und 1.00 0.00
01.03.02.06 POSTE DE C.A.C. DE 8/300 und 1.00 0.00
01.03.02.07 REUBICACION DE RETENIDA und 2.00 0.00
01.03.02.08 REUBICACION POZO DE PUESTA A TIERRA und 1.00 0.00
01.03.02.09 ELIMINACION DE MATERIAL EXCEDENTE und 2.00 0.00
RESUMEN DE METRADOS Pág. 18
OBRA: “MEJORAMIENTO DE LAS PRINCIPALES VIAS Y VEREDIZACION DEL BARRIO EL DORADO, DISTRITO DE CALLERIA, PROVINCIA DE CORONEL PORTILLO -
UCAYALI”
OBRA
“MEJORAMIENTO DE LAS PRINCIPALES VIAS Y VEREDIZA
: BARRIO EL DORADO, DISTRITO DE CALLERIA, PROVIN
CORONEL PORTILLO - UCAYALI”
ES
21
21
ILA
mpliación = 0 Días
102 Días
VALORIZ. Nº 07 VALORIZ. Nº 07
VALORIZ. Nº 08 VALORIZ. Nº 09 VALORIZ. Nº 10 VALORIZ. Nº 11 VALORIZ. Nº 12 TOTAL SALDO POR
PERIODO-I PERIODO-II
SIN IGV SIN IGV SIN IGV SIN IGV SIN IGV SIN IGV SIN IGV VALORIZADO VALORIZAR
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUM. ANTERIOR AVANCE ACUM. ACTUAL SALDO POR VALORIZAR
ITEM SUB PRESUUESTO Y/O FORMULA POLINOMICA
UND CANT. PARCIAL C. DIRECTO VAL. (S/.) % VAL. (S/.) % VAL. (S/.) % VAL. (S/.) %
01 F.P. Nº 01 OBRAS CIVILES GLB 1.00 13,544,443.89 13,544,443.89 515,661.36 3.81 5,296,892.21 39.11 5,812,553.57 42.91 7,731,890.32 57.09%
02 F.P. Nº 02 INFRAESTRUCTURA ELECTRICA GLB 1.00 149,757.24 149,757.24 0.00 0.00 34,986.16 23.36 34,986.16 23.36 114,771.08 76.64%
03 F.P. Nº 03 INFRAESTRUCTURA DE TELEFONIA GLB 1.00 57,456.83 57,456.83 0.00 0.00 23,561.07 41.01 23,561.07 41.01 33,895.76 58.99%
04 F.P. Nº 04 PLAN COVID - 19 GLB 1.00 187,924.48 187,924.48 12,648.08 6.73 126,758.93 67.45 139,407.01 74.18 48,517.47 25.82%
APROBACIONES:
Pág. 30 de 68
VALORIZACION DE AVANCE DE OBRA10.00
DEL CONTRATO PRINCIPAL
OBRA: “MEJORAMIENTO DE LAS PRINCIPALES VIAS Y VEREDIZACION DEL BARRIO EL DORADO, DISTRITO DE CALLERIA, PROVINCIA DE CORONEL PORTILLO - UCAYALI”
ENTIDAD: GOBIERNO REGIONAL UCAYALI CONTRATO: Nº 014-2021-GRH/GGR Fecha: 19-05-2021
CONTRATISTA:CONSORCIO VIAS EL DORADO MONTO DEL CONTRATO: S/. 16,807,045.61
SUPERVISOR: ING. JULIO ENRIQUE MENDOZA FLORES INICIO DE OBRA: 6/23/2021
RESIDENTE: ING. JUAN MANUEL TORRES DEL AGUILA
FECHA: 31-March-2022 TERMINO CONTRACTUAL: 6/17/2022
F.P. Nº 01 OBRAS CIVILES VENCIMIENTO PLAZO VIGENTE 7/11/2022
Pág. 31 de 68
VALORIZACION DE AVANCE DE OBRA10.00
DEL CONTRATO PRINCIPAL
OBRA: “MEJORAMIENTO DE LAS PRINCIPALES VIAS Y VEREDIZACION DEL BARRIO EL DORADO, DISTRITO DE CALLERIA, PROVINCIA DE CORONEL PORTILLO - UCAYALI”
ENTIDAD: GOBIERNO REGIONAL UCAYALI CONTRATO: Nº 014-2021-GRH/GGR Fecha: 19-05-2021
CONTRATISTA:CONSORCIO VIAS EL DORADO MONTO DEL CONTRATO: S/. 16,807,045.61
SUPERVISOR: ING. JULIO ENRIQUE MENDOZA FLORES INICIO DE OBRA: 6/23/2021
RESIDENTE: ING. JUAN MANUEL TORRES DEL AGUILA
FECHA: 31-March-2022 TERMINO CONTRACTUAL: 6/17/2022
F.P. Nº 01 OBRAS CIVILES VENCIMIENTO PLAZO VIGENTE 7/11/2022
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMUL. ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
ITEM DESCRIPCION
UND CANT. P.U. PARCIAL MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) %
04.10 BOMBEO DE AGUAS RESIDUALES hm 120.00 111.44 13,372.80 20.00 2,228.80 16.67 47.00 5,237.68 39.17 67.00 7,466.48 55.83 53.00 5,906.32 44.17%
05 PAVIMENTOS
BASE GRANULAR DE 0.20 M. HORMIGON : TIERRA 80%:20%
05.01 C/EQUIPO PESADO m2 ### 22.00 437,416.10 1,320.53 29,051.66 6.64 13,156.92 289,452.25 66.17 14,477.45 318,503.91 72.81 5,405.10 118,912.19 27.19%
05.02 PAVIMENTO DE CONCRETO ARMADO
EXCAVACION MANUAL DEBAJO DEL PAVIMENTO EN
05.02.01 INTERSECCIONES DE CALLES m3 77.28 46.06 3,559.52 1.16 53.43 1.50 19.21 884.63 24.85 20.37 938.06 26.35 56.91 2,621.45 73.65%
ELIMINACION DE MATERIAL EXCEDENTE HASTA 30.00 MT
05.02.02 (A MANO USANDO CARRETILLA) m3 100.46 34.55 3,470.89 1.50 51.83 1.49 24.96 862.33 24.84 26.46 914.16 26.34 74.00 2,556.74 73.66%
CONCRETO F'C=245 KG/CM2 (AF:AG) DEBAJO DE
05.02.03 PAVIMENTO EN INTERSECCIONES DE CALLES m3 77.28 623.20 48,160.90 1.16 722.91 1.50 18.57 11,570.39 24.02 19.73 12,293.31 25.53 57.55 35,867.59 74.47%
ENCOFRADO Y DESENCOFRADO DE LOSAS EN
05.02.04 PAVIMENTOSDE
PAVIMENTO RIGIDO
CONCRETO F'C= 245 KG/CM2 E=0.175 M m2 884.02 62.16 54,950.68 24.96 1,551.51 2.82 835.76 51,950.84 94.54 860.72 53,502.36 97.36 23.30 1,448.33 2.64%
05.02.05 (AG:AF) m2 ### 100.24 1,876,331.41 655.40 65,697.30 3.50 11,424.64 ### 61.03 12,080.04 ### 64.54 6,638.35 665,428.20 35.46%
05.02.06 FIBRAS DE POLIPROPILENO kg 1,965.43 33.97 66,765.66 68.82 2,337.82 3.50 1,205.00 40,933.85 61.31 1,273.82 43,271.67 64.81 691.61 23,493.99 35.19%
ACERO GRADO 60 Fy=4200 Kg/cm2 CORRUGADO Ø 1/2" @
05.02.07 0.75m L=0.70m, BASTONES EN JUNTAS kg 4,038.57 5.38 21,727.51 356.13 1,915.98 8.82 2,058.90 11,076.88 50.98 2,415.03 12,992.86 59.80 1,623.54 8,734.65 40.20%
ACERO GRADO 36 Fy=2520 Kg/cm2 LISO Ø 1" @ 0.30m
05.02.08 L=0.45m, C/TUB + PINT., BASTONES EN JUNTAS kg 2,207.99 6.80 15,014.33 28.61 194.55 1.30 1,702.03 11,573.83 77.09 1,730.64 11,768.38 78.38 477.35 3,245.95 21.62%
ACERO GRADO 60 Fy=4200 Kg/cm2 CORRUGADO EN
05.02.09 PAVIMENTOS DE CONCRETO kg ### 5.38 479,355.42 3,062.49 16,476.20 3.44 54,195.25 291,570.45 60.83 57,257.74 308,046.64 64.26 31,841.78 171,308.78 35.74%
05.02.10 CURADO DE CONCRETO CON CURADOR TIPO MEMBRANA m2 ### 1.12 20,964.60 655.40 734.05 3.50 11,424.64 12,795.60 61.03 12,080.04 13,529.64 64.54 6,638.35 7,434.95 35.46%
COLOCACIÓN DE GEOTEXTIL NO TEJIDO
05.02.11 ANTICONTAMINANTE DE 200 gr/cm2 m2 ### 5.61 163,498.91 1,365.94 7,662.92 4.69 12,772.70 71,654.86 43.83 14,138.64 79,317.78 48.51 15,005.55 84,181.12 51.49%
05.02.12 COLOCACION DE GEOMALLA EXTRUIDA 20KN m2 ### 7.19 461,320.25 3,109.88 22,360.04 4.85 25,977.55 186,778.61 40.49 29,087.43 209,138.65 45.33 35,073.94 252,181.60 54.67%
05.03 JUNTASTIPO 1 DE ALABEO Y CONSTRUCCIÓN
JUNTA
LONGITUDINAL E=6 MM. H=50 MM. (SELLO DE
05.03.01 ELASTOMERICO EN CALIENTE) m 2,234.74 11.13 24,872.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,234.74 24,872.66 100.00%
JUNTA TIPO 2 DE CONTRACCION E=6 MM. H=50 MM.
05.03.02 (CORTE Y SELLO DE ELASTOMERICO EN CALIENTE) m 3,945.80 12.49 49,283.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,945.80 49,283.04 100.00%
JUNTA TIPO 3 DE DILATACIÓN E=12.5 MM. H=50 MM.
05.03.03 (TECKNOPORT+SELLO DE ELASTOMERICO EN CALIENTE) m 357.00 17.38 6,204.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 357.00 6,204.66 100.00%
JUNTA TIPO 4 DE EXPANSIÓN E=12.5 MM. H=50 MM.
05.03.04 (TECKNOPORT+SELLO
JUNTA TIPO 5 DE ALABEODE Y
ELASTOMERICO EN CALIENTE)
CONSTRUCCIÓN m 4,478.70 17.38 77,839.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,478.70 77,839.81 100.00%
LONGITUDINAL E=6 MM. H=50 MM. (SELLO DE
05.03.05 ELASTOMERICO
JUNTA TIPO 6 DEEN CALIENTE)Y TRANSICIÓN E=12.5 MM.
DILATACIÓN m 2,077.92 11.13 23,127.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,077.92 23,127.25 100.00%
H=50 MM. (TECKNOPORT+SELLO DE ELASTOMERICO EN
05.03.06 CALIENTE) m 381.91 17.82 6,805.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 381.91 6,805.64 100.00%
JUNTA TIPO 7 DE CONSTRUCCIÓN E=6 MM. H=50 MM.
05.03.07 (SELLO DE ELASTOMERICO EN CALIENTE) m 538.21 11.13 5,990.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 538.21 5,990.28 100.00%
06 MARTILLOS
06.01 TRAZO NIVEL Y REPLANTEO m2 781.09 5.36 4,186.64 49.04 262.85 6.28 0.00 0.00 0.00 49.04 262.85 6.28 732.05 3,923.79 93.72%
06.02 CORTE DE TERRENO MANUAL m3 156.22 46.06 7,195.49 9.81 451.85 6.28 0.00 0.00 0.00 9.81 451.85 6.28 146.41 6,743.64 93.72%
06.03 EXCAVACION MANUAL EN UÑAS DE MARTILLOS m3 35.72 46.06 1,645.26 1.90 87.51 5.32 0.00 0.00 0.00 1.90 87.51 5.32 33.82 1,557.75 94.68%
COMPACTACION Y CONFORMACION C/EQUIPO LIVIANO DE
06.04 SUB RASANTE PARA MARTILLOS m2 781.09 8.85 6,912.65 49.04 434.00 6.28 0.00 0.00 0.00 49.04 434.00 6.28 732.05 6,478.64 93.72%
ELIMINACION DE MATERIAL EXCEDENTE HASTA 30.00 MT
06.05 (A MANO USANDO CARRETILLA) m3 249.52 34.55 8,620.92 15.22 525.85 6.10 0.00 0.00 0.00 15.22 525.85 6.10 234.30 8,095.07 93.90%
BASE GRANULAR DE 4" H : T (80%+20%) C/EQUIPO LIVIANO
06.06 PARA MARTILLOS m2 781.09 20.14 15,731.15 49.04 987.67 6.28 0.00 0.00 0.00 49.04 987.67 6.28 732.05 14,743.49 93.72%
06.07 ENCOFRADO Y DESENCOFRADO DE MARTILLOS m2 333.40 53.30 17,770.22 17.72 944.48 5.31 0.00 0.00 0.00 17.72 944.48 5.31 315.68 16,825.74 94.69%
MARTILLO DE CONCRETO F'C= 175 KG/CM2 E=4"
06.08 FROTACHADO Y BRUÑADO (C:H) m2 781.09 55.98 43,725.42 49.04 2,745.26 6.28 0.00 0.00 0.00 49.04 2,745.26 6.28 732.05 40,980.16 93.72%
06.09 CONCRETO F'C=175 KG/CM2 EN UÑAS DE MARTILLOS (C:H) m3 35.72 488.34 17,443.50 1.90 927.85 5.32 0.00 0.00 0.00 1.90 927.85 5.32 33.82 16,515.66 94.68%
Pág. 32 de 68
VALORIZACION DE AVANCE DE OBRA10.00
DEL CONTRATO PRINCIPAL
OBRA: “MEJORAMIENTO DE LAS PRINCIPALES VIAS Y VEREDIZACION DEL BARRIO EL DORADO, DISTRITO DE CALLERIA, PROVINCIA DE CORONEL PORTILLO - UCAYALI”
ENTIDAD: GOBIERNO REGIONAL UCAYALI CONTRATO: Nº 014-2021-GRH/GGR Fecha: 19-05-2021
CONTRATISTA:CONSORCIO VIAS EL DORADO MONTO DEL CONTRATO: S/. 16,807,045.61
SUPERVISOR: ING. JULIO ENRIQUE MENDOZA FLORES INICIO DE OBRA: 6/23/2021
RESIDENTE: ING. JUAN MANUEL TORRES DEL AGUILA
FECHA: 31-March-2022 TERMINO CONTRACTUAL: 6/17/2022
F.P. Nº 01 OBRAS CIVILES VENCIMIENTO PLAZO VIGENTE 7/11/2022
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMUL. ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
ITEM DESCRIPCION
UND CANT. P.U. PARCIAL MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) %
06.10 CURADO DE CONCRETO CON CURADOR TIPO MEMBRANA m2 781.09 1.12 874.82 49.04 54.92 6.28 0.00 0.00 0.00 49.04 54.92 6.28 732.05 819.90 93.72%
JUNTA DE DILATACION E=12.5mm EN MARTILLO CON
06.11 SELLANTE ELASTOMERICO EN CALIENTE m 51.66 17.12 884.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 51.66 884.42 100.00%
06.12 RAMPA EN MARTILLOS
06.12.01 TRAZO NIVEL Y REPLANTEO m2 184.50 5.36 988.92 9.00 48.24 4.88 0.00 0.00 0.00 9.00 48.24 4.88 175.50 940.68 95.12%
06.12.02 EXCAVACION MANUAL EN UÑAS EN RAMPAS m3 8.74 46.06 402.56 0.42 19.35 4.81 0.00 0.00 0.00 0.42 19.35 4.81 8.32 383.22 95.20%
COMPACTACION Y CONFORMACION C/EQUIPO LIVIANO DE
06.12.03 SUB RASANTE EN RAMPAS m2 184.50 8.85 1,632.83 9.00 79.65 4.88 0.00 0.00 0.00 9.00 79.65 4.88 175.50 1,553.18 95.12%
ELIMINACION DE MATERIAL EXCEDENTE HASTA 30.00 MT
06.12.04 (A MANO USANDO CARRETILLA) m3 11.36 34.55 392.49 0.54 18.66 4.75 0.00 0.00 0.00 0.54 18.66 4.75 10.82 373.83 95.25%
BASE GRANULAR DE 4" H : T (80%+20%) C/EQUIPO LIVIANO
06.12.05 EN RAMPAS m2 184.50 20.14 3,715.83 9.00 181.26 4.88 0.00 0.00 0.00 9.00 181.26 4.88 175.50 3,534.57 95.12%
RAMPA DE CONCRETO F'C= 175 KG/CM2 E=4"
06.12.06 FROTACHADO Y BRUÑADO (C:H) m2 184.50 62.57 11,544.17 9.00 563.13 4.88 0.00 0.00 0.00 9.00 563.13 4.88 175.50 10,981.04 95.12%
06.12.07 CONCRETO F'C=175 KG/CM2 EN UÑAS EN RAMPAS (C:H) m3 11.36 488.34 5,547.54 0.54 263.70 4.75 0.00 0.00 0.00 0.54 263.70 4.75 10.82 5,283.84 95.25%
06.12.08 CURADO DE CONCRETO CON CURADOR TIPO MEMBRANA m2 184.50 1.12 206.64 9.00 10.08 4.88 0.00 0.00 0.00 9.00 10.08 4.88 175.50 196.56 95.12%
06.12.09 COLOCACION DE BALDOSAS PODOTÁCTILES und 574.00 204.03 117,113.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 574.00 117,113.22 100.00%
07 VEREDAS
07.01 TRAZO NIVEL Y REPLANTEO m2 6,603.54 5.36 35,394.97 642.15 3,441.92 9.72 1,382.58 7,410.63 20.94 2,024.73 10,852.55 30.66 4,578.81 24,542.42 69.34%
07.02 CORTE DEYTERRENO
RELLENO COMP. C/ CONTAMINADO
MATERIAL PROPIO MANUAL
C/EQUIPO m3 5,031.99 46.06 231,773.46 72.64 3,345.80 1.44 341.20 15,715.67 6.78 413.84 19,061.47 8.22 4,618.15 212,711.99 91.78%
07.03 LIVIANO m3 985.37 74.64 73,548.02 0.00 0.00 0.00 76.02 5,674.13 7.71 76.02 5,674.13 7.71 909.35 67,873.88 92.29%
RELLENO Y COMP. C/MATERIAL DE PRESTAMO C/EQUIPO
07.04 LIVIANO m3 4,458.33 108.44 483,461.31 30.90 3,350.80 0.69 254.12 27,556.77 5.70 285.02 30,907.57 6.39 4,173.31 452,553.74 93.61%
07.05 EXCAVACION MANUAL EN UÑAS EN VEREDAS m3 370.09 46.06 17,046.35 12.57 578.97 3.40 58.31 2,685.79 15.76 70.88 3,264.77 19.15 299.21 13,781.58 80.85%
ACARREO DE MATERIAL PROCEDENTE DE EXCAVACION
07.06 HASTA 30M USANDO CARRETILLA m3 5,741.72 23.03 132,231.81 110.77 2,551.03 1.93 572.11 13,175.76 9.96 682.88 15,726.80 11.89 5,058.84 116,505.02 88.11%
ELIMINACION DE MATERIAL EXCEDENTE A BOTADERO
07.07 D=23.18 Km (Usando Cargador y Volquete de 15m3) m3 5,741.72 22.52 129,303.53 110.77 2,494.54 1.93 558.95 12,587.62 9.73 669.72 15,082.16 11.66 5,072.00 114,221.37 88.34%
COMPACTACION Y CONFORMACION C/EQUIPO LIVIANO DE
07.08 SUB RASANTE PARA VEREDAS m2 6,603.54 8.85 58,441.33 202.55 1,792.57 3.07 976.09 8,638.40 14.78 1,178.64 10,430.96 17.85 5,424.90 48,010.37 82.15%
BASE GRANULAR DE 4" H : T (80%+20%) C/EQUIPO LIVIANO
07.09 PARA VEREDAS m2 6,603.54 20.14 132,995.30 176.63 3,557.33 2.67 952.89 19,191.20 14.43 1,129.52 22,748.53 17.10 5,474.02 110,246.76 82.90%
07.10 ENCOFRADO Y DESENCOFRADO EN VEREDA m2 2,459.94 53.30 131,114.80 90.28 4,811.92 3.67 299.49 15,962.82 12.17 389.77 20,774.74 15.84 2,070.17 110,340.06 84.16%
VEREDA DE CONCRETO F'C= 175 KG/CM2 E=4"
07.11 FROTACHADO Y BRUÑADO (C:H) m2 6,603.48 55.98 369,662.81 255.14 14,282.74 3.86 833.44 46,655.97 12.62 1,088.58 60,938.71 16.48 5,514.90 308,724.10 83.52%
07.12 CONCRETO F'C=175 KG/CM2 EN UÑAS DE VEREDAS (C:H) m3 370.09 488.34 180,729.75 12.57 6,138.43 3.40 58.31 28,475.48 15.76 70.88 34,613.91 19.15 299.21 146,115.84 80.85%
JUNTA DE CONTRACCION E=6mm EN VEREDAS CON
07.13 SELLANTE ELASTOMERICO EN CALIENTE m 1,692.14 12.49 21,134.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,692.14 21,134.83 100.00%
JUNTA DE DILATACION E=12.5mm EN VEREDAS CON
07.14 SELLANTE ELASTOMERICO EN CALIENTE m 704.06 17.12 12,053.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 704.06 12,053.51 100.00%
07.15 CURADO DE CONCRETO CON CURADOR TIPO MEMBRANA m2 6,603.54 1.12 7,395.96 255.14 285.76 3.86 570.08 638.49 8.63 825.22 924.25 12.50 5,778.32 6,471.72 87.50%
07.16 COLOCACION DE GEOMALLA EXTRUIDA 20KN m2 805.24 7.19 5,789.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 805.24 5,789.68 100.00%
08 RAMPAS
08.01 TRAZO NIVEL Y REPLANTEO m2 418.52 5.36 2,243.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 418.52 2,243.27 100.00%
08.02 EXCAVACION MANUAL EN UÑAS EN RAMPAS m3 27.39 46.06 1,261.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 27.39 1,261.58 100.00%
COMPACTACION Y CONFORMACION C/EQUIPO LIVIANO DE
08.03 SUB RASANTE EN RAMPAS m2 418.52 8.85 3,703.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 418.52 3,703.90 100.00%
ELIMINACION DE MATERIAL EXCEDENTE HASTA 30.00 MT
08.04 (A MANO USANDO CARRETILLA) m3 35.61 34.55 1,230.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 35.61 1,230.33 100.00%
BASE GRANULAR DE 4" H : T (80%+20%) C/EQUIPO LIVIANO
08.05 EN RAMPAS m2 418.52 20.14 8,428.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 418.52 8,428.99 100.00%
RAMPA DE CONCRETO F'C= 175 KG/CM2 E=4"
08.06 FROTACHADO Y BRUÑADO (C:H) m2 418.52 62.57 26,186.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 418.52 26,186.80 100.00%
08.07 CONCRETO F'C=175 KG/CM2 EN UÑAS EN RAMPAS (C:H) m3 27.39 488.34 13,375.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 27.39 13,375.63 100.00%
Pág. 33 de 68
VALORIZACION DE AVANCE DE OBRA10.00
DEL CONTRATO PRINCIPAL
OBRA: “MEJORAMIENTO DE LAS PRINCIPALES VIAS Y VEREDIZACION DEL BARRIO EL DORADO, DISTRITO DE CALLERIA, PROVINCIA DE CORONEL PORTILLO - UCAYALI”
ENTIDAD: GOBIERNO REGIONAL UCAYALI CONTRATO: Nº 014-2021-GRH/GGR Fecha: 19-05-2021
CONTRATISTA:CONSORCIO VIAS EL DORADO MONTO DEL CONTRATO: S/. 16,807,045.61
SUPERVISOR: ING. JULIO ENRIQUE MENDOZA FLORES INICIO DE OBRA: 6/23/2021
RESIDENTE: ING. JUAN MANUEL TORRES DEL AGUILA
FECHA: 31-March-2022 TERMINO CONTRACTUAL: 6/17/2022
F.P. Nº 01 OBRAS CIVILES VENCIMIENTO PLAZO VIGENTE 7/11/2022
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMUL. ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
ITEM DESCRIPCION
UND CANT. P.U. PARCIAL MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) %
08.08 CURADO DE CONCRETO CON CURADOR TIPO MEMBRANA m2 418.52 1.12 468.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 418.52 468.74 100.00%
JUNTA DE DILATACION E=12.5mm EN VEREDAS CON
08.09 SELLANTE ELASTOMERICO EN CALIENTE m 733.47 17.12 12,557.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 733.47 12,557.01 100.00%
08.10 MURO DE CONFINAMIENTO EN RAMPAS
08.10.01 TRABAJOS PRELIMINARES
08.10.01.01 TRAZO NIVEL Y REPLANTEO m2 526.55 5.36 2,822.31 5.02 26.91 0.95 0.00 0.00 0.00 5.02 26.91 0.95 521.53 2,795.40 99.05%
08.10.02 MOVIMIENTO DE TIERRAS
08.10.02.01 EXCAVACION
RELLENO MANUAL
Y COMP. C/ MATERIAL PROPIO C/EQUIPO m3 414.72 46.06 19,102.00 4.01 184.70 0.97 0.00 0.00 0.00 4.01 184.70 0.97 410.71 18,917.30 99.03%
08.10.02.02 LIVIANO m3 98.93 74.64 7,384.14 1.18 88.08 1.19 0.00 0.00 0.00 1.18 88.08 1.19 97.75 7,296.06 98.81%
REFINE Y NIVELACION MANUAL DE FONDOS
08.10.02.03 C/EXCAVACION DE h=0.15m - 0.20m m2 526.55 6.84 3,601.60 5.02 34.34 0.95 0.00 0.00 0.00 5.02 34.34 0.95 521.53 3,567.27 99.05%
MEJORAMIENTO DE SUELO CON MATERIAL DE PRESTAMO
08.10.02.04 H:T (70% : 30%) C/EQUIPO LIVIANO m3 105.31 182.50 19,219.08 1.00 182.50 0.95 0.00 0.00 0.00 1.00 182.50 0.95 104.31 19,036.58 99.05%
ACARREO DE MATERIAL PROCEDENTE DE EXCAVACION
08.10.02.05 HASTA 30M USANDO CARRETILLA m3 641.82 23.03 14,781.11 6.19 142.56 0.96 0.00 0.00 0.00 6.19 142.56 0.96 635.63 14,638.56 99.04%
ELIMINACION DE MATERIAL EXCEDENTE HASTA 30.00 MT
08.10.02.06 (A MANO USANDO CARRETILLA) m3 641.82 34.55 22,174.88 6.19 213.86 0.96 0.00 0.00 0.00 6.19 213.86 0.96 635.63 21,961.02 99.04%
08.10.03 OBRAS DE CONCRETO SIMPLE
SOLADO DE CONCRETO E =4" MEZCLA 1:12 CEMENTO-
08.10.03.01 HORMIGON m2 526.55 35.32 18,597.75 5.02 177.31 0.95 0.00 0.00 0.00 5.02 177.31 0.95 521.53 18,420.44 99.05%
08.10.04 OBRAS DE CONCRETO ARMADO
08.10.04.01 ACERO GRADO 60 Fy=4200 Kg/cm2 kg ### 5.62 122,941.83 80.46 452.19 0.37 0.00 0.00 0.00 80.46 452.19 0.37 21,795.31 122,489.64 99.63%
08.10.04.02 ENCOFRADO EN MUROS DE CONTENCION m2 1,028.65 59.06 60,752.07 10.92 644.94 1.06 0.00 0.00 0.00 10.92 644.94 1.06 1,017.73 60,107.13 98.94%
08.10.04.03 ENCOFRADO CARAVISTA EN MUROS DE CONTENCION m2 521.08 77.73 40,503.55 2.48 192.77 0.48 0.00 0.00 0.00 2.48 192.77 0.48 518.60 40,310.78 99.52%
08.10.04.04 CONCRETO F'C=210 KG/CM2 (AG:AF) m3 264.70 569.97 150,871.06 1.50 854.96 0.57 0.00 0.00 0.00 1.50 854.96 0.57 263.20 150,016.10 99.43%
08.10.04.05 DESENCOFRADO EN MUROS DE CONTENCION m2 1,549.72 7.41 11,483.43 13.40 99.29 0.86 0.00 0.00 0.00 13.40 99.29 0.86 1,536.32 11,384.13 99.14%
08.10.04.06 CURADO DE CONCRETO CON CURADOR TIPO MEMBRANA m2 1,549.72 1.12 1,735.69 13.40 15.01 0.86 0.00 0.00 0.00 13.40 15.01 0.86 1,536.32 1,720.68 99.14%
JUNTA DE DILATACIÓN CON WATER STOP ANCHO = 6"
08.10.04.07 PROVISION Y COLOCACIÓN m 126.63 20.20 2,557.93 1.80 36.36 1.42 0.00 0.00 0.00 1.80 36.36 1.42 124.83 2,521.57 98.58%
BARANDA METALICA DE TUBO GALVANIZADO D=2" x 2.5mm
08.10.04.08 x h=0.90m. SEG.DIS. I/BASE Y PINTURA m 539.58 223.80 120,758.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 539.58 120,758.00 100.00%
08.11 ESCALERAS EN RAMPAS
08.11.01 CONCRETO F'C=175
ENCOFRADO KG/CM2 (C:H)CARAVISTA EN
Y DESENCOFRADO m3 1.35 488.34 659.26 0.70 341.84 51.85 0.00 0.00 0.00 0.70 341.84 51.85 0.65 317.42 48.15%
08.11.02 ESCALERA m2 4.10 77.73 318.69 2.10 163.23 51.22 0.00 0.00 0.00 2.10 163.23 51.22 2.00 155.46 48.78%
08.11.03 ACERO GRADO 60 Fy=4200 Kg/cm2 kg 38.06 5.62 213.90 19.73 110.88 51.84 0.00 0.00 0.00 19.73 110.88 51.84 18.33 103.01 48.16%
09 CANALETAS
TRAZO NIVELDE DRENAJE PLUVIAL
Y REPLANTEO - TECHADAS
EN CANALES, DURANTE EJEC.
09.01 OBRA m 2,254.75 2.70 6,087.83 109.92 296.78 4.87 1,200.45 3,241.22 53.24 1,310.37 3,538.00 58.12 944.38 2,549.83 41.88%
09.02 EXCAVACION MANUAL PARA CANALETA EN TIERRA DURA m3 2,260.92 52.51 118,720.91 144.32 7,578.24 6.38 812.82 42,681.18 35.95 957.14 50,259.42 42.33 1,303.78 68,461.49 57.67%
09.03 REFINE Y NIVELACION
RELLENO MANUAL DE
Y COMP. C/ MATERIAL CANALC/EQUIPO
PROPIO m 2,254.75 5.25 11,837.44 109.92 577.08 4.88 1,048.67 5,505.52 46.51 1,158.59 6,082.60 51.38 1,096.16 5,754.84 48.62%
09.04 LIVIANO m3 558.42 74.64 41,680.47 5.04 376.19 0.90 206.17 15,388.53 36.92 211.21 15,764.71 37.82 347.21 25,915.75 62.18%
ELIMINACION DE MATERIAL EXCEDENTE HASTA 30.00 MT
09.05 (A MANO USANDO CARRETILLA) m3 2,213.24 34.55 76,467.44 181.06 6,255.62 8.18 673.19 23,258.71 30.42 854.25 29,514.34 38.60 1,358.99 46,953.10 61.40%
SOLADO PARA CANALETAS DE 2" MEZCLA 1:12 CEMENTO-
09.06 HORMIGON m2 2,017.37 17.65 35,606.58 148.34 2,618.20 7.35 865.12 15,269.37 42.88 1,013.46 17,887.57 50.24 1,003.91 17,719.01 49.76%
CONCRETO F´c=210 KG/CM2 EN LOSA FONDO DE
09.07 CANALETAS (AF:AG) m3 302.61 569.97 172,478.62 29.27 16,683.02 9.67 129.69 73,920.55 42.86 158.96 90,603.57 52.53 143.65 81,875.05 47.47%
CONCRETO F´c=210 KG/CM2 EN MURO DE CANALETAS DE
09.08 E<=0.15m. (AF:AG)
CONCRETO F´c=245 KG/CM2 EN TECHO DE CANALETAS m3 416.47 684.54 285,090.37 37.02 25,341.67 8.89 175.84 120,369.51 42.22 212.86 145,711.18 51.11 203.61 139,379.19 48.89%
09.09 (AF:AG) m3 352.46 610.47 215,166.26 57.81 35,291.27 16.40 109.30 66,724.37 31.01 167.11 102,015.64 47.41 185.35 113,150.61 52.59%
09.10 ENCOFRADO EN CANALETAS m2 8,448.39 53.30 450,299.19 1,210.27 64,507.39 14.33 4,184.81 223,050.37 49.53 5,395.08 287,557.76 63.86 3,053.31 162,741.42 36.14%
09.11 DESENCOFRADO EN CANALETAS m2 8,448.39 7.41 62,602.57 1,210.27 8,968.10 14.33 4,184.81 31,009.44 49.53 5,395.08 39,977.54 63.86 3,053.31 22,625.03 36.14%
09.12 ACERO GRADO 60 Fy=4200 Kg/cm2 kg ### 5.62 474,569.77 8,861.08 49,799.27 10.49 37,900.30 212,999.69 44.88 46,761.38 262,798.96 55.38 37,681.64 211,770.82 44.62%
JUNTA DE CONSTRUCCIÓN CON WATER STOP
09.13 SUMINISTRO Y COLOCACIÓN m 4,509.50 17.08 77,022.26 561.68 9,593.49 12.46 2,377.32 40,604.63 52.72 2,939.00 50,198.12 65.17 1,570.50 26,824.14 34.83%
Pág. 34 de 68
VALORIZACION DE AVANCE DE OBRA10.00
DEL CONTRATO PRINCIPAL
OBRA: “MEJORAMIENTO DE LAS PRINCIPALES VIAS Y VEREDIZACION DEL BARRIO EL DORADO, DISTRITO DE CALLERIA, PROVINCIA DE CORONEL PORTILLO - UCAYALI”
ENTIDAD: GOBIERNO REGIONAL UCAYALI CONTRATO: Nº 014-2021-GRH/GGR Fecha: 19-05-2021
CONTRATISTA:CONSORCIO VIAS EL DORADO MONTO DEL CONTRATO: S/. 16,807,045.61
SUPERVISOR: ING. JULIO ENRIQUE MENDOZA FLORES INICIO DE OBRA: 6/23/2021
RESIDENTE: ING. JUAN MANUEL TORRES DEL AGUILA
FECHA: 31-March-2022 TERMINO CONTRACTUAL: 6/17/2022
F.P. Nº 01 OBRAS CIVILES VENCIMIENTO PLAZO VIGENTE 7/11/2022
Pág. 35 de 68
VALORIZACION DE AVANCE DE OBRA10.00
DEL CONTRATO PRINCIPAL
OBRA: “MEJORAMIENTO DE LAS PRINCIPALES VIAS Y VEREDIZACION DEL BARRIO EL DORADO, DISTRITO DE CALLERIA, PROVINCIA DE CORONEL PORTILLO - UCAYALI”
ENTIDAD: GOBIERNO REGIONAL UCAYALI CONTRATO: Nº 014-2021-GRH/GGR Fecha: 19-05-2021
CONTRATISTA:CONSORCIO VIAS EL DORADO MONTO DEL CONTRATO: S/. 16,807,045.61
SUPERVISOR: ING. JULIO ENRIQUE MENDOZA FLORES INICIO DE OBRA: 6/23/2021
RESIDENTE: ING. JUAN MANUEL TORRES DEL AGUILA
FECHA: 31-March-2022 TERMINO CONTRACTUAL: 6/17/2022
F.P. Nº 01 OBRAS CIVILES VENCIMIENTO PLAZO VIGENTE 7/11/2022
Pág. 36 de 68
VALORIZACION DE AVANCE DE OBRA10.00
DEL CONTRATO PRINCIPAL
OBRA: “MEJORAMIENTO DE LAS PRINCIPALES VIAS Y VEREDIZACION DEL BARRIO EL DORADO, DISTRITO DE CALLERIA, PROVINCIA DE CORONEL PORTILLO - UCAYALI”
ENTIDAD: GOBIERNO REGIONAL UCAYALI CONTRATO: Nº 014-2021-GRH/GGR Fecha: 19-05-2021
CONTRATISTA:CONSORCIO VIAS EL DORADO MONTO DEL CONTRATO: S/. 16,807,045.61
SUPERVISOR: ING. JULIO ENRIQUE MENDOZA FLORES INICIO DE OBRA: 6/23/2021
RESIDENTE: ING. JUAN MANUEL TORRES DEL AGUILA
FECHA: 31-March-2022 TERMINO CONTRACTUAL: 6/17/2022
F.P. Nº 01 OBRAS CIVILES VENCIMIENTO PLAZO VIGENTE 7/11/2022
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMUL. ANTERIORAVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
ITEM DESCRIPCION
UND CANT. P.U. PARCIAL MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) %
11.02.04.01.0ACERO GRADO 60 Fy=4200 Kg/cm2 kg 145.80 5.62 819.40 0.00 0.00 0.00 145.80 819.40 ### 145.80 819.40 100.00 0.00 0.00 0.00%
11.02.04.01.0ENCOFRADO EN LOSA INFERIOR m2 3.52 59.06 207.89 0.00 0.00 0.00 3.52 207.89 ### 3.52 207.89 100.00 0.00 0.00 0.00%
11.02.04.01.0CONCRETO F'C=210 KG/CM2 (AG:AF) m3 2.32 569.97 1,322.33 0.00 0.00 0.00 2.32 1,322.33 ### 2.32 1,322.33 100.00 0.00 0.00 0.00%
11.02.04.01.0DESENCOFRADO EN LOSA INFERIOR m2 3.52 7.15 25.17 0.00 0.00 0.00 3.52 25.17 ### 3.52 25.17 100.00 0.00 0.00 0.00%
JUNTA DE CONSTRUCCIÓN CON WATER STOP
11.02.04.01.0SUMINISTRO Y COLOCACIÓN m 11.60 17.08 198.13 0.00 0.00 0.00 11.60 198.13 ### 11.60 198.13 100.00 0.00 0.00 0.00%
JUNTA DE DILATACIÓN CON WATER STOP ANCHO = 6"
11.02.04.01.0PROVISION Y COLOCACIÓN m 2.00 20.20 40.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 40.40 100.00%
11.02.04.01.0CURADO DE CONCRETO CON CURADOR TIPO MEMBRANA m2 11.60 1.12 12.99 0.00 0.00 0.00 11.60 12.99 ### 11.60 12.99 100.00 0.00 0.00 0.00%
11.02.04.02 MUROS LATERALES
11.02.04.02.0ACERO GRADO 60 Fy=4200 Kg/cm2 kg 281.53 5.62 1,582.20 0.00 0.00 0.00 281.53 1,582.20 ### 281.53 1,582.20 100.00 0.00 0.00 0.00%
11.02.04.02.0ENCOFRADO EN MUROS m2 36.83 59.06 2,175.18 0.00 0.00 0.00 36.83 2,175.18 ### 36.83 2,175.18 100.00 0.00 0.00 0.00%
11.02.04.02.0CONCRETO F'C=210 KG/CM2 (AG:AF) m3 3.48 569.97 1,983.50 0.00 0.00 0.00 3.48 1,983.50 ### 3.48 1,983.50 100.00 0.00 0.00 0.00%
11.02.04.02.0DESENCOFRADO EN MUROS m2 36.83 7.41 272.91 0.00 0.00 0.00 36.83 272.91 ### 36.83 272.91 100.00 0.00 0.00 0.00%
JUNTA DE DILATACIÓN CON WATER STOP ANCHO = 6"
11.02.04.02.0PROVISION Y COLOCACIÓN m 3.40 20.20 68.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.40 68.68 100.00%
11.02.04.02.0CURADO DE CONCRETO CON CURADOR TIPO MEMBRANA m2 36.83 1.12 41.25 0.00 0.00 0.00 36.83 41.25 ### 36.83 41.25 100.00 0.00 0.00 0.00%
11.02.04.03 LOSA SUPERIOR
11.02.04.03.0ACERO GRADO 60 Fy=4200 Kg/cm2 kg 295.82 5.62 1,662.51 0.00 0.00 0.00 295.82 1,662.53 ### 295.82 1,662.53 100.00 0.00 -0.02 0.00%
11.02.04.03.0ENCOFRADO EN LOSA SUPERIOR m2 13.24 60.22 797.31 0.00 0.00 0.00 13.24 797.31 ### 13.24 797.31 100.00 0.00 0.00 0.00%
11.02.04.03.0CONCRETO F´c=245 KG/CM2 (AF:AG) m3 2.32 610.47 1,416.29 0.00 0.00 0.00 2.32 1,416.29 ### 2.32 1,416.29 100.00 0.00 0.00 0.00%
11.02.04.03.0DESENCOFRADO EN LOSA SUPERIOR m2 13.24 10.73 142.07 0.00 0.00 0.00 13.24 142.07 ### 13.24 142.07 100.00 0.00 0.00 0.00%
JUNTA DE DILATACIÓN CON WATER STOP ANCHO = 6"
11.02.04.03.0PROVISION Y COLOCACIÓN m 2.00 20.20 40.40 0.00 0.00 0.00 2.00 40.40 ### 2.00 40.40 100.00 0.00 0.00 0.00%
11.02.04.03.0CURADO DE CONCRETO CON CURADOR TIPO MEMBRANA m2 11.60 1.12 12.99 0.00 0.00 0.00 11.60 12.99 ### 11.60 12.99 100.00 0.00 0.00 0.00%
11.02.04.04 CABEZALES
11.02.04.04.0ACERO GRADO 60 Fy=4200 Kg/cm2 kg 61.89 5.62 347.82 0.00 0.00 0.00 61.89 347.85 ### 61.89 347.85 100.01 0.00 -0.03 -0.01%
11.02.04.04.0ENCOFRADO EN CABEZALES m2 17.47 60.22 1,052.04 0.00 0.00 0.00 17.47 1,052.19 ### 17.47 1,052.19 100.01 0.00 -0.15 -0.01%
11.02.04.04.0CONCRETO F'C=210 KG/CM2 (AG:AF) m3 1.96 569.97 1,117.14 0.00 0.00 0.00 1.96 1,117.14 ### 1.96 1,117.14 100.00 0.00 0.00 0.00%
11.02.04.04.0DESENCOFRADO EN CABEZALES m2 17.47 10.73 187.45 0.00 0.00 0.00 17.47 187.48 ### 17.47 187.48 100.02 0.00 -0.03 -0.02%
11.02.04.04.0CURADO DE CONCRETO CON CURADOR TIPO MEMBRANA m2 17.46 1.12 19.56 0.00 0.00 0.00 17.47 19.57 ### 17.47 19.57 100.05 -0.01 -0.01 -0.05%
11.02.04.05 UÑAS
11.02.04.05.0ACERO GRADO 60 Fy=4200 Kg/cm2 kg 3.86 5.62 21.69 0.00 0.00 0.00 3.86 21.67 99.91 3.86 21.67 99.91 0.00 0.02 0.09%
11.02.04.05.0ENCOFRADO EN UÑAS m2 0.40 59.06 23.62 0.00 0.00 0.00 0.40 23.62 ### 0.40 23.62 100.00 0.00 0.00 0.00%
11.02.04.05.0CONCRETO F'C=210 KG/CM2 (AG:AF) m3 0.08 569.97 45.60 0.00 0.00 0.00 0.08 44.00 96.49 0.08 44.00 96.49 0.00 1.60 3.51%
11.02.04.05.0DESENCOFRADO EN UÑAS m2 0.40 7.15 2.86 0.00 0.00 0.00 0.40 2.86 ### 0.40 2.86 100.00 0.00 0.00 0.00%
ALCANTARILLA Nro. 03 SECC 1.80 x VAR (1.20-1.35-1.16) L=
11.03 55.26m-En Pje. Cabo Pantoja
11.03.01 TRABAJOS PRELIMINARES
11.03.01.01 LIMPIEZA
TRAZO NIVEL Y REPLANTEO
DE CAUCE AGUAS ARRIBA Y ABAJO DE m2 121.57 5.36 651.62 121.57 651.62 100.00 0.00 0.00 0.00 121.57 651.62 100.00 0.00 0.00 0.00%
11.03.01.02 ALCANTARILLAS m 30.00 13.82 414.60 30.00 414.60 100.00 0.00 0.00 0.00 30.00 414.60 100.00 0.00 0.00 0.00%
11.03.01.03 DESVIO PROVISIONAL DE CAÑO NATURAL m 60.00 16.97 1,018.20 60.00 1,018.20 100.00 0.00 0.00 0.00 60.00 1,018.20 100.00 0.00 0.00 0.00%
11.03.02 MOVIMIENTO DE TIERRAS
11.03.02.01 EXCAVACION DE ZANJA C/EQUIPO H=1.50 - 2.00 M. TN m3 82.89 12.77 1,058.51 82.89 1,058.51 100.00 0.00 0.00 0.00 82.89 1,058.51 100.00 0.00 0.00 0.00%
RELLENO Y COMP. C/MATERIAL DE PRESTAMO (ARCILLA O
11.03.02.02 LIMOS) C/ EQUIPO PESADO m3 22.10 54.80 1,211.08 22.10 1,211.08 100.00 0.00 0.00 0.00 22.10 1,211.08 100.00 0.00 0.00 0.00%
11.03.02.03 REFINE
EXCAVACION MANUAL DE
Y NIVELACIÓN EN FONDO/PAREDES
UÑAS EN LOSA DEEN CABEZAL m3 0.23 46.06 10.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.23 10.59 100.00%
11.03.02.04 EXCAVACIÓN m2 121.57 6.84 831.54 121.57 831.54 100.00 0.00 0.00 0.00 121.57 831.54 100.00 0.00 0.00 0.00%
MEJORAMIENTO DE SUELO CON MATERIAL DE PRESTAMO
11.03.02.05 H:T (80% : 20%) C/EQUIPO LIVIANO m3 24.31 186.72 4,539.16 24.31 4,539.16 100.00 0.00 0.00 0.00 24.31 4,539.16 100.00 0.00 0.00 0.00%
ACARREO DE MATERIAL PROCEDENTE DE EXCAVACION
11.03.02.06 HASTA 30M USANDO CARRETILLA m3 24.00 23.03 552.72 23.71 546.04 98.79 0.00 0.00 0.00 23.71 546.04 98.79 0.29 6.68 1.21%
ELIMINACION DE MATERIAL EXCEDENTE A BOTADERO
11.03.02.07 D=23.18 Km (Usando Cargador y Volquete de 15m3) m3 131.76 22.52 2,967.24 131.46 2,960.48 99.77 0.00 0.00 0.00 131.46 2,960.48 99.77 0.30 6.76 0.23%
Pág. 37 de 68
VALORIZACION DE AVANCE DE OBRA10.00
DEL CONTRATO PRINCIPAL
OBRA: “MEJORAMIENTO DE LAS PRINCIPALES VIAS Y VEREDIZACION DEL BARRIO EL DORADO, DISTRITO DE CALLERIA, PROVINCIA DE CORONEL PORTILLO - UCAYALI”
ENTIDAD: GOBIERNO REGIONAL UCAYALI CONTRATO: Nº 014-2021-GRH/GGR Fecha: 19-05-2021
CONTRATISTA:CONSORCIO VIAS EL DORADO MONTO DEL CONTRATO: S/. 16,807,045.61
SUPERVISOR: ING. JULIO ENRIQUE MENDOZA FLORES INICIO DE OBRA: 6/23/2021
RESIDENTE: ING. JUAN MANUEL TORRES DEL AGUILA
FECHA: 31-March-2022 TERMINO CONTRACTUAL: 6/17/2022
F.P. Nº 01 OBRAS CIVILES VENCIMIENTO PLAZO VIGENTE 7/11/2022
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMUL. ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
ITEM DESCRIPCION
UND CANT. P.U. PARCIAL MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) %
11.03.02.08 BOMBEO DE AGUAS RESIDUALES hm 48.00 111.44 5,349.12 6.00 668.64 12.50 0.00 0.00 0.00 6.00 668.64 12.50 42.00 4,680.48 87.50%
11.03.03 OBRAS DE CONCRETO SIMPLE
SOLADO DE CONCRETO E =4" MEZCLA 1:12 CEMENTO-
11.03.03.01 HORMIGON m2 121.57 35.32 4,293.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 121.57 4,293.85 100.00%
11.03.04 OBRAS DE CONCRETO ARMADO
11.03.04.01 LOSA INFERIOR
11.03.04.01.0ACERO GRADO 60 Fy=4200 Kg/cm2 kg 1,629.09 5.62 9,155.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,629.09 9,155.49 100.00%
11.03.04.01.0ENCOFRADO EN LOSA INFERIOR m2 24.34 59.06 1,437.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 24.34 1,437.52 100.00%
11.03.04.01.0CONCRETO F'C=210 KG/CM2 (AG:AF) m3 24.31 569.97 13,855.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 24.31 13,855.97 100.00%
11.03.04.01.0DESENCOFRADO EN LOSA INFERIOR m2 24.34 7.15 174.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 24.34 174.03 100.00%
JUNTA DE CONSTRUCCIÓN CON WATER STOP
11.03.04.01.0SUMINISTRO Y COLOCACIÓN m 110.52 17.08 1,887.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 110.52 1,887.68 100.00%
JUNTA DE DILATACIÓN CON WATER STOP ANCHO = 6"
11.03.04.01.0PROVISION Y COLOCACIÓN m 11.20 20.20 226.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.20 226.24 100.00%
11.03.04.01.0CURADO DE CONCRETO CON CURADOR TIPO MEMBRANA m2 121.57 1.12 136.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 121.57 136.16 100.00%
11.03.04.02 MUROS LATERALES
11.03.04.02.0ACERO GRADO 60 Fy=4200 Kg/cm2 kg 2,641.06 5.62 14,842.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,641.06 14,842.76 100.00%
11.03.04.02.0ENCOFRADO EN MUROS m2 282.10 59.06 16,660.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 282.10 16,660.83 100.00%
11.03.04.02.0CONCRETO F'C=210 KG/CM2 (AG:AF) m3 27.93 569.97 15,919.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 27.93 15,919.26 100.00%
11.03.04.02.0DESENCOFRADO EN MUROS m2 282.10 7.41 2,090.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 282.10 2,090.36 100.00%
JUNTA DE DILATACIÓN CON WATER STOP ANCHO = 6"
11.03.04.02.0PROVISION Y COLOCACIÓN m 12.58 20.20 254.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.58 254.12 100.00%
11.03.04.02.0CURADO DE CONCRETO CON CURADOR TIPO MEMBRANA m2 282.10 1.12 315.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 282.10 315.95 100.00%
11.03.04.03 LOSA SUPERIOR
11.03.04.03.0ACERO GRADO 60 Fy=4200 Kg/cm2 kg 2,861.86 5.62 16,083.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,861.86 16,083.65 100.00%
11.03.04.03.0ENCOFRADO EN LOSA SUPERIOR m2 126.86 60.22 7,639.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 126.86 7,639.51 100.00%
11.03.04.03.0CONCRETO F´c=245 KG/CM2 (AF:AG) m3 24.31 610.47 14,840.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 24.31 14,840.53 100.00%
11.03.04.03.0DESENCOFRADO EN LOSA SUPERIOR m2 126.86 10.73 1,361.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 126.86 1,361.21 100.00%
JUNTA DE DILATACIÓN CON WATER STOP ANCHO = 6"
11.03.04.03.0PROVISION Y COLOCACIÓN m 11.20 20.20 226.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.20 226.24 100.00%
11.03.04.03.0CURADO DE CONCRETO CON CURADOR TIPO MEMBRANA m2 121.57 1.12 136.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 121.57 136.16 100.00%
11.03.04.04 UÑAS
11.03.04.04.0ACERO GRADO 60 Fy=4200 Kg/cm2 kg 4.21 5.62 23.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.21 23.66 100.00%
11.03.04.04.0ENCOFRADO EN UÑAS m2 0.44 59.06 25.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.44 25.99 100.00%
11.03.04.04.0CONCRETO F'C=210 KG/CM2 (AG:AF) m3 0.07 569.97 39.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.07 39.90 100.00%
11.03.04.04.0DESENCOFRADO EN UÑAS m2 0.44 7.15 3.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.44 3.15 100.00%
ALCANTARILLA Nro. 04 SECC 2.00 x VAR (1.16-1.09-1.26)
11.04 L=79.23m-En Pje. Cabo Pantoja Km 0+032
11.04.01 TRABAJOS PRELIMINARES
11.04.01.01 LIMPIEZA
TRAZO NIVEL Y REPLANTEO
DE CAUCE AGUAS ARRIBA Y ABAJO DE m2 190.16 5.36 1,019.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 190.16 1,019.26 100.00%
11.04.01.02 ALCANTARILLAS m 30.00 13.82 414.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 30.00 414.60 100.00%
11.04.01.03 DESVIO PROVISIONAL DE CAÑO NATURAL m 80.00 16.97 1,357.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 80.00 1,357.60 100.00%
11.04.02 MOVIMIENTO DE TIERRAS
11.04.02.01 EXCAVACION DE ZANJA C/EQUIPO H=1.50 - 2.00 M. TN m3 126.77 12.77 1,618.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 126.77 1,618.85 100.00%
RELLENO Y COMP. C/MATERIAL DE PRESTAMO (ARCILLA O
11.04.02.02 LIMOS) C/ EQUIPO PESADO m3 31.69 54.80 1,736.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 31.69 1,736.61 100.00%
11.04.02.03 REFINE
EXCAVACION MANUAL DE
Y NIVELACIÓN EN FONDO/PAREDES
UÑAS EN LOSA DEEN CABEZAL m3 0.13 46.06 5.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.13 5.99 100.00%
11.04.02.04 EXCAVACIÓN m2 190.16 6.84 1,300.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 190.16 1,300.69 100.00%
MEJORAMIENTO DE SUELO CON MATERIAL DE PRESTAMO
11.04.02.05 H:T (80% : 20%) C/EQUIPO LIVIANO m3 38.03 186.72 7,100.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 38.03 7,100.96 100.00%
ACARREO DE MATERIAL PROCEDENTE DE EXCAVACION
11.04.02.06 HASTA 30M USANDO CARRETILLA m3 37.26 23.03 858.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 37.26 858.10 100.00%
ELIMINACION DE MATERIAL EXCEDENTE A BOTADERO
11.04.02.07 D=23.18 Km (Usando Cargador y Volquete de 15m3) m3 74.90 22.52 1,686.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 74.90 1,686.75 100.00%
Pág. 38 de 68
VALORIZACION DE AVANCE DE OBRA10.00
DEL CONTRATO PRINCIPAL
OBRA: “MEJORAMIENTO DE LAS PRINCIPALES VIAS Y VEREDIZACION DEL BARRIO EL DORADO, DISTRITO DE CALLERIA, PROVINCIA DE CORONEL PORTILLO - UCAYALI”
ENTIDAD: GOBIERNO REGIONAL UCAYALI CONTRATO: Nº 014-2021-GRH/GGR Fecha: 19-05-2021
CONTRATISTA:CONSORCIO VIAS EL DORADO MONTO DEL CONTRATO: S/. 16,807,045.61
SUPERVISOR: ING. JULIO ENRIQUE MENDOZA FLORES INICIO DE OBRA: 6/23/2021
RESIDENTE: ING. JUAN MANUEL TORRES DEL AGUILA
FECHA: 31-March-2022 TERMINO CONTRACTUAL: 6/17/2022
F.P. Nº 01 OBRAS CIVILES VENCIMIENTO PLAZO VIGENTE 7/11/2022
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMUL. ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
ITEM DESCRIPCION
UND CANT. P.U. PARCIAL MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) %
11.04.02.08 BOMBEO DE AGUAS RESIDUALES hm 48.00 111.44 5,349.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 48.00 5,349.12 100.00%
11.04.03 OBRAS DE CONCRETO SIMPLE
SOLADO DE CONCRETO E =4" MEZCLA 1:12 CEMENTO-
11.04.03.01 HORMIGON m2 190.16 35.32 6,716.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 190.16 6,716.45 100.00%
11.04.04 OBRAS DE CONCRETO ARMADO
11.04.04.01 LOSA INFERIOR
11.04.04.01.0ACERO GRADO 60 Fy=4200 Kg/cm2 kg 2,579.85 5.62 14,498.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,579.85 14,498.76 100.00%
11.04.04.01.0ENCOFRADO EN LOSA INFERIOR m2 34.57 59.06 2,041.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 34.57 2,041.70 100.00%
11.04.04.01.0CONCRETO F'C=210 KG/CM2 (AG:AF) m3 38.03 569.97 21,675.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 38.03 21,675.96 100.00%
11.04.04.01.0DESENCOFRADO EN LOSA INFERIOR m2 34.57 7.15 247.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 34.57 247.18 100.00%
JUNTA DE CONSTRUCCIÓN CON WATER STOP
11.04.04.01.0SUMINISTRO Y COLOCACIÓN m 158.47 17.08 2,706.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 158.47 2,706.67 100.00%
JUNTA DE DILATACIÓN CON WATER STOP ANCHO = 6"
11.04.04.01.0PROVISION Y COLOCACIÓN m 9.60 20.20 193.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.60 193.92 100.00%
11.04.04.01.0CURADO DE CONCRETO CON CURADOR TIPO MEMBRANA m2 190.16 1.12 212.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 190.16 212.98 100.00%
11.04.04.02 MUROS LATERALES
11.04.04.02.0ACERO GRADO 60 Fy=4200 Kg/cm2 kg 3,582.66 5.62 20,134.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,582.66 20,134.55 100.00%
11.04.04.02.0ENCOFRADO EN MUROS m2 386.73 59.06 22,840.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 386.73 22,840.27 100.00%
11.04.04.02.0CONCRETO F'C=210 KG/CM2 (AG:AF) m3 38.41 569.97 21,892.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 38.41 21,892.55 100.00%
11.04.04.02.0DESENCOFRADO EN MUROS m2 386.73 7.41 2,865.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 386.73 2,865.67 100.00%
JUNTA DE DILATACIÓN CON WATER STOP ANCHO = 6"
11.04.04.02.0PROVISION Y COLOCACIÓN m 9.30 20.20 187.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.30 187.86 100.00%
11.04.04.02.0CURADO DE CONCRETO CON CURADOR TIPO MEMBRANA m2 386.73 1.12 433.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 386.73 433.14 100.00%
11.04.04.03 LOSA SUPERIOR
11.04.04.03.0ACERO GRADO 60 Fy=4200 Kg/cm2 kg 4,357.45 5.62 24,488.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,357.45 24,488.87 100.00%
11.04.04.03.0ENCOFRADO EN LOSA SUPERIOR m2 197.36 60.22 11,885.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 197.36 11,885.02 100.00%
11.04.04.03.0CONCRETO F´c=245 KG/CM2 (AF:AG) m3 38.03 610.47 23,216.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 38.03 23,216.17 100.00%
11.04.04.03.0DESENCOFRADO EN LOSA SUPERIOR m2 197.36 10.73 2,117.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 197.36 2,117.67 100.00%
JUNTA DE DILATACIÓN CON WATER STOP ANCHO = 6"
11.04.04.03.0PROVISION Y COLOCACIÓN m 9.60 20.20 193.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.60 193.92 100.00%
11.04.04.03.0CURADO DE CONCRETO CON CURADOR TIPO MEMBRANA m2 190.16 1.12 212.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 190.16 212.98 100.00%
11.04.04.04 UÑAS
11.04.04.04.0ACERO GRADO 60 Fy=4200 Kg/cm2 kg 4.61 5.62 25.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.61 25.91 100.00%
11.04.04.04.0ENCOFRADO EN UÑAS m2 0.60 59.06 35.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.60 35.44 100.00%
11.04.04.04.0CONCRETO F'C=210 KG/CM2 (AG:AF) m3 0.09 569.97 51.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.09 51.30 100.00%
11.04.04.04.0DESENCOFRADO EN UÑAS m2 0.60 7.15 4.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.60 4.29 100.00%
12 MURO DE CONTENCION DE CONCRETO ARMADO
12.01 TRABAJOS PRELIMINARES
12.01.01 TRAZO NIVEL Y REPLANTEO m2 88.80 5.36 475.97 0.00 0.00 0.00 36.00 192.96 40.54 36.00 192.96 40.54 52.80 283.01 59.46%
12.02 MOVIMIENTO DE TIERRAS
CORTE DE TERRENO ACOLCHONADO C/EQUIPO PESADO
12.02.01 (Usando Retroexcavadora 110HP 1.25Yd3) m3 61.20 6.89 421.67 0.00 0.00 0.00 26.00 179.14 42.48 26.00 179.14 42.48 35.20 242.53 57.52%
RELLENO Y COMP. C/MATERIAL DE PRESTAMO (ARCILLA O
12.02.02 LIMOS) C/EQUIPO LIVIANO m3 16.80 108.44 1,821.79 0.00 0.00 0.00 8.00 867.52 47.62 8.00 867.52 47.62 8.80 954.27 52.38%
REFINE Y NIVELACION MANUAL DE FONDOS
12.02.03 C/EXCAVACION DE h=0.15m - 0.20m m2 88.80 6.84 607.39 0.00 0.00 0.00 36.00 246.24 40.54 36.00 246.24 40.54 52.80 361.15 59.46%
MEJORAMIENTO DE SUELO CON MATERIAL DE PRESTAMO
12.02.04 H:T (70% : 30%) C/EQUIPO LIVIANO m3 17.76 182.50 3,241.20 0.00 0.00 0.00 7.20 1,314.00 40.54 7.20 1,314.00 40.54 10.56 1,927.20 59.46%
ELIMINACION DE MATERIAL EXCEDENTE A BOTADERO
12.02.05 D=23.18 Km (Usando Cargador y Volquete de 15m3) m3 79.56 22.52 1,791.69 0.00 0.00 0.00 33.80 761.18 42.48 33.80 761.18 42.48 45.76 1,030.52 57.52%
12.02.06 BOMBEO DE AGUAS RESIDUALES hm 16.00 111.44 1,783.04 0.00 0.00 0.00 8.00 891.52 50.00 8.00 891.52 50.00 8.00 891.52 50.00%
12.03 OBRAS DE CONCRETO SIMPLE
SOLADO DE CONCRETO E =4" MEZCLA 1:12 CEMENTO-
12.03.01 HORMIGON m2 88.80 35.32 3,136.42 0.00 0.00 0.00 36.00 1,271.52 40.54 36.00 1,271.52 40.54 52.80 1,864.90 59.46%
Pág. 39 de 68
VALORIZACION DE AVANCE DE OBRA10.00
DEL CONTRATO PRINCIPAL
OBRA: “MEJORAMIENTO DE LAS PRINCIPALES VIAS Y VEREDIZACION DEL BARRIO EL DORADO, DISTRITO DE CALLERIA, PROVINCIA DE CORONEL PORTILLO - UCAYALI”
ENTIDAD: GOBIERNO REGIONAL UCAYALI CONTRATO: Nº 014-2021-GRH/GGR Fecha: 19-05-2021
CONTRATISTA:CONSORCIO VIAS EL DORADO MONTO DEL CONTRATO: S/. 16,807,045.61
SUPERVISOR: ING. JULIO ENRIQUE MENDOZA FLORES INICIO DE OBRA: 6/23/2021
RESIDENTE: ING. JUAN MANUEL TORRES DEL AGUILA
FECHA: 31-March-2022 TERMINO CONTRACTUAL: 6/17/2022
F.P. Nº 01 OBRAS CIVILES VENCIMIENTO PLAZO VIGENTE 7/11/2022
Pág. 40 de 68
VALORIZACION DE AVANCE DE OBRA10.00
DEL CONTRATO PRINCIPAL
OBRA: “MEJORAMIENTO DE LAS PRINCIPALES VIAS Y VEREDIZACION DEL BARRIO EL DORADO, DISTRITO DE CALLERIA, PROVINCIA DE CORONEL PORTILLO - UCAYALI”
ENTIDAD: GOBIERNO REGIONAL UCAYALI CONTRATO: Nº 014-2021-GRH/GGR Fecha: 19-05-2021
CONTRATISTA:CONSORCIO VIAS EL DORADO MONTO DEL CONTRATO: S/. 16,807,045.61
SUPERVISOR: ING. JULIO ENRIQUE MENDOZA FLORES INICIO DE OBRA: 6/23/2021
RESIDENTE: ING. JUAN MANUEL TORRES DEL AGUILA
FECHA: 31-March-2022 TERMINO CONTRACTUAL: 6/17/2022
F.P. Nº 01 OBRAS CIVILES VENCIMIENTO PLAZO VIGENTE 7/11/2022
APROBACIONES:
Pág. 41 de 68
VALORIZACION DE AVANCE DE OBRA
10.00
DEL CONTRATO PRINCIPAL
OBRA: “MEJORAMIENTO DE LAS PRINCIPALES VIAS Y VEREDIZACION DEL BARRIO EL DORADO, DISTRITO DE CALLERIA, PROVINCIA DE CORONEL PORTILLO - UCAYALI”
ENTIDAD: GOBIERNO REGIONAL UCAYALI CONTRATO: Nº 014-2021-GRH/GGR Fecha: 19-05-2021
CONTRATISTACONSORCIO VIAS EL DORADO MONTO DEL CONTRATO: S/. 16,807,045.61
SUPERVISOR: ING. JULIO ENRIQUE MENDOZA FLORES INICIO DE OBRA: 6/23/2021
RESIDENTE: ING. JUAN MANUEL TORRES DEL AGUILA
FECHA: 31-March-2022 TERMINO CONTRACTUAL: 6/17/2022
F.P. Nº 02 INFRAESTRUCTURA ELECTRICA VENCIMIENTO PLAZO VIGENTE 7/11/2022
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMUL. ANTERIORAVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
ITEM DESCRIPCION
UND CANT. P.U. PARCIAL MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) %
01 INFRAESTRUCTURA ELECTRICA
01.01 TRABAJOS PRELIMINARES
01.01.01 TRANSPORTE DE MATERIALES, EQUIPOS LIVIANOS Y HERRAMIEN ton 30.19 10.59 319.71 0.00 0.00 0.00 30.19 319.71 100.00 30.19 319.71 100.00 0.00 0.00 0.00%
01.01.02 MOVILIZACION Y DESMOVILIZACION DE EQUIPO PESADO DE ROD mes 5.00 450.00 2,250.00 0.00 0.00 0.00 2.00 900.00 40.00 2.00 900.00 40.00 3.00 1,350.00 60.00%
01.02 SISTEMA ELECTRICO DE MEDIA TENSION
01.02.01 JR. FRANCISCO DE ORELLANA
01.02.01.01 DESMONTAJE DE ESTRUCTURA DE ALINEAMIENTO DE C.A.C. 13/3 und 3.00 427.42 1,282.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 1,282.26 100.00%
01.02.02 JR. LUIS SCAVINO
01.02.02.01 DESMONTAJE DE ESTRUCTURA DE ALINEAMIENTO DE C.A.C. 13/3 und 7.00 427.42 2,991.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.00 2,991.94 100.00%
01.02.02.02 DESMONTAJE DE MENSULAS und 9.00 75.90 683.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.00 683.10 100.00%
01.02.02.03 DESMONTAJE DE AISLADORES TIPO PIN und 6.00 37.96 227.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 227.76 100.00%
01.02.02.04 DESMONTAJE DE AISLADORES TIPO SUSPENSION und 3.00 37.96 113.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 113.88 100.00%
01.02.02.05 DESMONTAJE DE RETENIDA SIMPLE und 2.00 82.87 165.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 165.74 100.00%
01.02.02.06 POSTE DE C.A.C. DE 13/300 und 1.00 1,719.25 1,719.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,719.25 100.00%
01.02.02.07 INSTALACION DE MENSULAS und 9.00 145.90 1,313.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.00 1,313.10 100.00%
01.02.02.08 INSTALACION DE AISLADORES TIPO PIN und 6.00 69.16 414.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 414.96 100.00%
01.02.02.09 INSTALACION DE AISLADORES TIPO SUSPENCION und 3.00 52.96 158.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 158.88 100.00%
01.02.02.10 INSTALACION DE RETENIDA SIMPLE und 2.00 399.34 798.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 798.68 100.00%
01.02.02.11 INSTALACION DE POZO DE TIERRRA DE RED und 3.00 361.50 1,084.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 1,084.50 100.00%
01.02.02.12 ELIMINACION DE MATERIAL EXCEDENTE und 7.00 220.57 1,543.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.00 1,543.99 100.00%
01.02.02.13 DERECHOS DE CORTE Y CONEXIÓN MEDIA TENSION- LUIS SCAVI GLB 1.00 2,500.00 2,500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 2,500.00 100.00%
01.02.03 JR. JOSE DEL CARMEN CABREJOS
01.02.03.01 DESMONTAJE DE ESTRUCTURA DE ALINEAMIENTO DE C.A.C. 13/3 und 4.00 427.42 1,709.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 1,709.68 100.00%
01.02.03.02 ELIMINACION DE MATERIAL EXCEDENTE und 7.00 220.57 1,543.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.00 1,543.99 100.00%
01.02.04 PJE. CABO SOPLIN
01.02.04.01 DESMONTAJE DE ESTRUCTURA DE ALINEAMIENTO DE C.A.C. 13/3 und 1.00 427.42 427.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 427.42 100.00%
01.02.04.02 DESMONTAJE DE MENSULAS und 3.00 75.90 227.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 227.70 100.00%
01.02.04.03 DESMONTAJE DE AISLADORES TIPO SUSPENSION und 3.00 37.96 113.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 113.88 100.00%
01.02.04.04 DESMONTAJE DE SECCIONADORES TIPO CUT OUT und 3.00 54.22 162.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 162.66 100.00%
01.02.04.05 DESMONTAJE DE RETENIDA SIMPLE und 2.00 82.87 165.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 165.74 100.00%
01.02.04.06 POSTE DE C.A.C. DE 13/300 und 1.00 1,719.25 1,719.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,719.25 100.00%
01.02.04.07 INSTALACION DE MENSULAS und 3.00 145.90 437.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 437.70 100.00%
01.02.04.08 INSTALACION DE RETENIDA SIMPLE und 2.00 399.34 798.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 798.68 100.00%
01.02.04.09 INSTALACION DE POZO DE TIERRRA DE RED und 1.00 361.50 361.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 361.50 100.00%
01.02.04.10 ELIMINACION DE MATERIAL EXCEDENTE und 1.00 220.57 220.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 220.57 100.00%
01.02.04.11 DERECHOS DE CORTE Y CONEXIÓN MEDIA TENSION- PASAJE CA GLB 1.00 2,500.00 2,500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 2,500.00 100.00%
01.02.05 JR. RODOLFO ESPINAR
01.02.05.01 DESMONTAJE DE ESTRUCTURA DE ALINEAMIENTO DE C.A.C. 13/3 und 2.00 427.42 854.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 854.84 100.00%
01.02.05.02 DESMONTAJE DE ESTRUCTURA DE ALINEAMIENTO DE C.A.C. 13/4 und 2.00 427.42 854.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 854.84 100.00%
01.02.05.03 DESMONTAJE DE MENSULAS und 12.00 75.90 910.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.00 910.80 100.00%
01.02.05.04 DESMONTAJE DE AISLADORES TIPO PIN und 12.00 37.96 455.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.00 455.52 100.00%
01.02.05.05 DESMONTAJE DE PARARRAYOS und 3.00 54.22 162.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 162.66 100.00%
01.02.05.06 DESMONTAJE DE SECCIONADORES TIPO CUT OUT und 3.00 54.22 162.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 162.66 100.00%
01.02.05.07 DESMONTAJE DE TRANSFORMADOR und 1.00 535.15 535.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 535.15 100.00%
01.02.05.08 DESMONTAJE DE TABLERO ELECTRICO und 1.00 206.05 206.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 206.05 100.00%
Pág. 42 de 68
VALORIZACION DE AVANCE DE OBRA
10.00
DEL CONTRATO PRINCIPAL
OBRA: “MEJORAMIENTO DE LAS PRINCIPALES VIAS Y VEREDIZACION DEL BARRIO EL DORADO, DISTRITO DE CALLERIA, PROVINCIA DE CORONEL PORTILLO - UCAYALI”
ENTIDAD: GOBIERNO REGIONAL UCAYALI CONTRATO: Nº 014-2021-GRH/GGR Fecha: 19-05-2021
CONTRATISTACONSORCIO VIAS EL DORADO MONTO DEL CONTRATO: S/. 16,807,045.61
SUPERVISOR: ING. JULIO ENRIQUE MENDOZA FLORES INICIO DE OBRA: 6/23/2021
RESIDENTE: ING. JUAN MANUEL TORRES DEL AGUILA
FECHA: 31-March-2022 TERMINO CONTRACTUAL: 6/17/2022
F.P. Nº 02 INFRAESTRUCTURA ELECTRICA VENCIMIENTO PLAZO VIGENTE 7/11/2022
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMUL. ANTERIORAVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
ITEM DESCRIPCION
UND CANT. P.U. PARCIAL MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) %
01.02.05.09 POSTE DE C.A.C. DE 13/300 und 2.00 1,719.25 3,438.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 3,438.50 100.00%
01.02.05.10 POSTE DE C.A.C. DE 13/400 und 2.00 1,719.25 3,438.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 3,438.50 100.00%
01.02.05.11 INSTALACION DE MENSULAS und 12.00 145.90 1,750.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.00 1,750.80 100.00%
01.02.05.12 INSTALACION DE AISLADORES TIPO PIN und 12.00 69.16 829.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.00 829.92 100.00%
01.02.05.13 MONTAJE DE PARARRAYOS und 3.00 77.19 231.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 231.57 100.00%
01.02.05.14 MONTAJE DE SECCIONADORES TIPO CUT OUT und 3.00 38.60 115.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 115.80 100.00%
01.02.05.15 MONTAJE DE TRANSFORMADOR und 1.00 547.04 547.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 547.04 100.00%
01.02.05.16 MONTAJE DE TABLERO ELECTRICO und 1.00 234.72 234.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 234.72 100.00%
01.02.05.17 INSTALACION DE POZO DE TIERRRA DE RED und 2.00 361.50 723.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 723.00 100.00%
01.02.05.18 INSTALACION DE POZO DE TIERRA DE SUBESTACION und 2.00 855.50 1,711.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 1,711.00 100.00%
01.02.05.19 ELIMINACION DE MATERIAL EXCEDENTE und 4.00 220.57 882.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 882.28 100.00%
01.02.05.20 DERECHOS DE CORTE Y CONEXIÓN MEDIA TENSION - JR. RODO GLB 1.00 5,000.00 5,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 5,000.00 100.00%
01.03 SISTEMA ELECTRICO DE BAJA TENSION
01.03.01 JR. FRANCISCO DE ORELLANA
01.03.01.01 DESMONTAJE DE POSTE DE 8 M und 1.00 316.01 316.01 0.00 0.00 0.00 1.00 316.01 100.00 1.00 316.01 100.00 0.00 0.00 0.00%
01.03.01.02 EXCAVACION DE HOYOS PARA POSTE DE CONCRETO DE 8 M und 1.00 310.50 310.50 0.00 0.00 0.00 1.00 310.50 100.00 1.00 310.50 100.00 0.00 0.00 0.00%
01.03.01.03 REUBICACION DE ACCESORIOS POSTES BAJA TENSION 8/300 und 1.00 103.75 103.75 0.00 0.00 0.00 1.00 103.75 100.00 1.00 103.75 100.00 0.00 0.00 0.00%
01.03.01.04 POSTE DE C.A.C. DE 8/300 und 1.00 973.55 973.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 973.55 100.00%
01.03.01.05 DERECHOS DE CORTE Y CONEXIÓN BAJA TENSION - JR. FRANC GLB 1.00 750.00 750.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 750.00 100.00%
01.03.02 JR. CABALLO COCHA
01.03.02.01 DESMONTAJE DE POSTE DE 8 M und 4.00 316.01 1,264.04 0.00 0.00 0.00 4.00 1,264.04 100.00 4.00 1,264.04 100.00 0.00 0.00 0.00%
01.03.02.02 EXCAVACION DE HOYOS PARA POSTE DE CONCRETO DE 8 M und 4.00 310.50 1,242.00 0.00 0.00 0.00 4.00 1,242.00 100.00 4.00 1,242.00 100.00 0.00 0.00 0.00%
01.03.02.03 REUBICACION DE ACCESORIOS POSTES BAJA TENSION 8/300 und 4.00 103.75 415.00 0.00 0.00 0.00 4.00 415.00 100.00 4.00 415.00 100.00 0.00 0.00 0.00%
01.03.02.04 MONTAJE DE POSTE DE C.A.C. DE 8 M. und 2.00 258.60 517.20 0.00 0.00 0.00 2.00 517.20 100.00 2.00 517.20 100.00 0.00 0.00 0.00%
01.03.02.05 POSTE DE C.A.C. DE 8/200 und 1.00 897.76 897.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 897.76 100.00%
01.03.02.06 POSTE DE C.A.C. DE 8/300 und 1.00 973.55 973.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 973.55 100.00%
01.03.02.07 REUBICACION DE RETENIDA und 2.00 399.34 798.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 798.68 100.00%
01.03.02.08 REUBICACION POZO DE PUESTA A TIERRA und 1.00 925.50 925.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 925.50 100.00%
01.03.02.09 ELIMINACION DE MATERIAL EXCEDENTE und 2.00 220.57 441.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 441.14 100.00%
01.03.02.10 DERECHOS DE CORTE Y CONEXIÓN BAJA TENSION - JR. CABAL GLB 1.00 750.00 750.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 750.00 100.00%
01.03.03 PJE. GUIDO BONZANO
01.03.03.01 DESMONTAJE DE POSTE DE 8 M und 3.00 316.01 948.03 0.00 0.00 0.00 2.00 632.02 66.67 2.00 632.02 66.67 1.00 316.01 33.33%
01.03.03.02 EXCAVACION DE HOYOS PARA POSTE DE CONCRETO DE 8 M und 3.00 310.50 931.50 0.00 0.00 0.00 2.00 621.00 66.67 2.00 621.00 66.67 1.00 310.50 33.33%
01.03.03.03 REUBICACION DE ACCESORIOS POSTES BAJA TENSION 8/300 und 3.00 103.75 311.25 0.00 0.00 0.00 2.00 207.50 66.67 2.00 207.50 66.67 1.00 103.75 33.33%
01.03.03.04 MONTAJE DE POSTE DE C.A.C. DE 8 M. und 2.00 258.60 517.20 0.00 0.00 0.00 2.00 517.20 100.00 2.00 517.20 100.00 0.00 0.00 0.00%
01.03.03.05 POSTE DE C.A.C. DE 8/300 und 1.00 973.55 973.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 973.55 100.00%
01.03.03.06 ELIMINACION DE MATERIAL EXCEDENTE und 1.00 220.57 220.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 220.57 100.00%
01.03.03.07 DERECHOS DE CORTE Y CONEXIÓN BAJA TENSION - PJE. GUID GLB 1.00 750.00 750.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 750.00 100.00%
01.03.04 JR. AGUSTIN CAUPER
01.03.04.01 DESMONTAJE DE POSTE DE 8 M und 4.00 316.01 1,264.04 0.00 0.00 0.00 3.00 948.03 75.00 3.00 948.03 75.00 1.00 316.01 25.00%
01.03.04.02 EXCAVACION DE HOYOS PARA POSTE DE CONCRETO DE 8 M und 4.00 310.50 1,242.00 0.00 0.00 0.00 3.00 931.50 75.00 3.00 931.50 75.00 1.00 310.50 25.00%
01.03.04.03 REUBICACION DE ACCESORIOS POSTES BAJA TENSION 8/200 und 3.00 103.75 311.25 0.00 0.00 0.00 2.00 207.50 66.67 2.00 207.50 66.67 1.00 103.75 33.33%
01.03.04.04 REUBICACION DE ACCESORIOS POSTES BAJA TENSION 8/300 und 1.00 103.75 103.75 0.00 0.00 0.00 1.00 103.75 100.00 1.00 103.75 100.00 0.00 0.00 0.00%
01.03.04.05 MONTAJE DE POSTE DE C.A.C. DE 8 M. und 2.00 258.60 517.20 0.00 0.00 0.00 2.00 517.20 100.00 2.00 517.20 100.00 0.00 0.00 0.00%
01.03.04.06 POSTE DE C.A.C. DE 8/200 und 1.00 897.76 897.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 897.76 100.00%
01.03.04.07 POSTE DE C.A.C. DE 8/300 und 1.00 973.55 973.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 973.55 100.00%
Pág. 43 de 68
VALORIZACION DE AVANCE DE OBRA
10.00
DEL CONTRATO PRINCIPAL
OBRA: “MEJORAMIENTO DE LAS PRINCIPALES VIAS Y VEREDIZACION DEL BARRIO EL DORADO, DISTRITO DE CALLERIA, PROVINCIA DE CORONEL PORTILLO - UCAYALI”
ENTIDAD: GOBIERNO REGIONAL UCAYALI CONTRATO: Nº 014-2021-GRH/GGR Fecha: 19-05-2021
CONTRATISTACONSORCIO VIAS EL DORADO MONTO DEL CONTRATO: S/. 16,807,045.61
SUPERVISOR: ING. JULIO ENRIQUE MENDOZA FLORES INICIO DE OBRA: 6/23/2021
RESIDENTE: ING. JUAN MANUEL TORRES DEL AGUILA
FECHA: 31-March-2022 TERMINO CONTRACTUAL: 6/17/2022
F.P. Nº 02 INFRAESTRUCTURA ELECTRICA VENCIMIENTO PLAZO VIGENTE 7/11/2022
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMUL. ANTERIORAVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
ITEM DESCRIPCION
UND CANT. P.U. PARCIAL MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) %
01.03.04.08 REUBICACION DE RETENIDA und 1.00 399.34 399.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 399.34 100.00%
01.03.04.09 REUBICACION POZO DE PUESTA A TIERRA und 1.00 925.50 925.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 925.50 100.00%
01.03.04.10 ELIMINACION DE MATERIAL EXCEDENTE und 1.00 220.57 220.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 220.57 100.00%
01.03.04.11 DERECHOS DE CORTE Y CONEXIÓN BAJA TENSION - JR. AUGUS GLB 1.00 750.00 750.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 750.00 100.00%
01.03.05 PJE. SARGENTO PUÑO
01.03.05.01 DESMONTAJE DE POSTE DE 8 M und 2.00 316.01 632.02 0.00 0.00 0.00 2.00 632.02 100.00 2.00 632.02 100.00 0.00 0.00 0.00%
01.03.05.02 EXCAVACION DE HOYOS PARA POSTE DE CONCRETO DE 8 M und 2.00 310.50 621.00 0.00 0.00 0.00 2.00 621.00 100.00 2.00 621.00 100.00 0.00 0.00 0.00%
01.03.05.03 REUBICACION DE ACCESORIOS POSTES BAJA TENSION 8/200 und 1.00 135.54 135.54 0.00 0.00 0.00 1.00 135.54 100.00 1.00 135.54 100.00 0.00 0.00 0.00%
01.03.05.04 REUBICACION DE ACCESORIOS POSTES BAJA TENSION 8/300 und 1.00 103.75 103.75 0.00 0.00 0.00 1.00 103.75 100.00 1.00 103.75 100.00 0.00 0.00 0.00%
01.03.05.05 MONTAJE DE POSTE DE C.A.C. DE 8 M. und 1.00 258.60 258.60 0.00 0.00 0.00 1.00 258.60 100.00 1.00 258.60 100.00 0.00 0.00 0.00%
01.03.05.06 POSTE DE C.A.C. DE 8/200 und 1.00 897.76 897.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 897.76 100.00%
01.03.05.07 REUBICACION DE RETENIDA und 1.00 399.34 399.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 399.34 100.00%
01.03.05.08 ELIMINACION DE MATERIAL EXCEDENTE und 1.00 220.57 220.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 220.57 100.00%
01.03.05.09 DERECHOS DE CORTE Y CONEXIÓN BAJA TENSION -PJE. CABO GLB 1.00 750.00 750.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 750.00 100.00%
01.03.06 PJE. CABO SOPLIN
01.03.06.01 DESMONTAJE DE POSTE DE 8 M und 2.00 316.01 632.02 0.00 0.00 0.00 2.00 632.02 100.00 2.00 632.02 100.00 0.00 0.00 0.00%
01.03.06.02 EXCAVACION DE HOYOS PARA POSTE DE CONCRETO DE 8 M und 2.00 310.50 621.00 0.00 0.00 0.00 2.00 621.00 100.00 2.00 621.00 100.00 0.00 0.00 0.00%
01.03.06.03 REUBICACION DE ACCESORIOS POSTES BAJA TENSION 8/200 und 1.00 135.54 135.54 0.00 0.00 0.00 1.00 135.54 100.00 1.00 135.54 100.00 0.00 0.00 0.00%
01.03.06.04 REUBICACION DE ACCESORIOS POSTES BAJA TENSION 8/300 und 1.00 103.75 103.75 0.00 0.00 0.00 1.00 103.75 100.00 1.00 103.75 100.00 0.00 0.00 0.00%
01.03.06.05 MONTAJE DE POSTE DE C.A.C. DE 8 M. und 1.00 258.60 258.60 0.00 0.00 0.00 1.00 258.60 100.00 1.00 258.60 100.00 0.00 0.00 0.00%
01.03.06.06 POSTE DE C.A.C. DE 8/300 und 1.00 973.55 973.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 973.55 100.00%
01.03.06.07 REUBICACION DE RETENIDA und 1.00 399.34 399.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 399.34 100.00%
01.03.06.08 ELIMINACION DE MATERIAL EXCEDENTE und 1.00 220.57 220.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 220.57 100.00%
01.03.06.09 DERECHOS DE CORTE Y CONEXIÓN BAJA TENSION -PJE. CABO S GLB 1.00 750.00 750.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 750.00 100.00%
01.03.07 JR. RODOLFO ESPINAR
01.03.07.01 DESMONTAJE DE POSTE DE 8 M und 14.00 316.01 4,424.14 0.00 0.00 0.00 2.00 632.02 14.29 2.00 632.02 14.29 12.00 3,792.12 85.71%
01.03.07.02 EXCAVACION DE HOYOS PARA POSTE DE CONCRETO DE 8 M und 14.00 310.50 4,347.00 0.00 0.00 0.00 2.00 621.00 14.29 2.00 621.00 14.29 12.00 3,726.00 85.71%
01.03.07.03 REUBICACION DE ACCESORIOS POSTES BAJA TENSION 8/200 und 10.00 135.54 1,355.40 0.00 0.00 0.00 2.00 271.08 20.00 2.00 271.08 20.00 8.00 1,084.32 80.00%
01.03.07.04 REUBICACION DE ACCESORIOS POSTES BAJA TENSION 8/300 und 4.00 103.75 415.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 415.00 100.00%
01.03.07.05 MONTAJE DE POSTE DE C.A.C. DE 8 M. und 10.00 258.60 2,586.00 0.00 0.00 0.00 2.00 517.20 20.00 2.00 517.20 20.00 8.00 2,068.80 80.00%
01.03.07.06 POSTE DE C.A.C. DE 8/200 und 3.00 897.76 2,693.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 2,693.28 100.00%
01.03.07.07 POSTE DE C.A.C. DE 8/300 und 1.00 973.55 973.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 973.55 100.00%
01.03.07.08 REUBICACION DE RETENIDA und 4.00 399.34 1,597.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 1,597.36 100.00%
01.03.07.09 REUBICACION POZO DE PUESTA A TIERRA und 2.00 925.50 1,851.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 1,851.00 100.00%
01.03.07.10 ELIMINACION DE MATERIAL EXCEDENTE und 4.00 220.57 882.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 882.28 100.00%
01.03.07.11 DERECHOS DE CORTE Y CONEXIÓN BAJA TENSION -JR. RODOLF GLB 1.00 750.00 750.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 750.00 100.00%
01.03.08 PJE. CABO PANTOJA
01.03.08.01 DESMONTAJE DE POSTE DE 8 M und 3.00 316.01 948.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 948.03 100.00%
01.03.08.02 EXCAVACION DE HOYOS PARA POSTE DE CONCRETO DE 8 M und 3.00 310.50 931.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 931.50 100.00%
01.03.08.03 REUBICACION DE ACCESORIOS POSTES BAJA TENSION 8/200 und 1.00 135.54 135.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 135.54 100.00%
01.03.08.04 REUBICACION DE ACCESORIOS POSTES BAJA TENSION 8/300 und 2.00 103.75 207.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 207.50 100.00%
01.03.08.05 MONTAJE DE POSTE DE C.A.C. DE 8 M. und 1.00 258.60 258.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 258.60 100.00%
01.03.08.06 POSTE DE C.A.C. DE 8/200 und 1.00 897.76 897.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 897.76 100.00%
01.03.08.07 POSTE DE C.A.C. DE 8/300 und 1.00 973.55 973.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 973.55 100.00%
01.03.08.08 REUBICACION DE RETENIDA und 2.00 399.34 798.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 798.68 100.00%
01.03.08.09 ELIMINACION DE MATERIAL EXCEDENTE und 1.00 220.57 220.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 220.57 100.00%
Pág. 44 de 68
VALORIZACION DE AVANCE DE OBRA
10.00
DEL CONTRATO PRINCIPAL
OBRA: “MEJORAMIENTO DE LAS PRINCIPALES VIAS Y VEREDIZACION DEL BARRIO EL DORADO, DISTRITO DE CALLERIA, PROVINCIA DE CORONEL PORTILLO - UCAYALI”
ENTIDAD: GOBIERNO REGIONAL UCAYALI CONTRATO: Nº 014-2021-GRH/GGR Fecha: 19-05-2021
CONTRATISTACONSORCIO VIAS EL DORADO MONTO DEL CONTRATO: S/. 16,807,045.61
SUPERVISOR: ING. JULIO ENRIQUE MENDOZA FLORES INICIO DE OBRA: 6/23/2021
RESIDENTE: ING. JUAN MANUEL TORRES DEL AGUILA
FECHA: 31-March-2022 TERMINO CONTRACTUAL: 6/17/2022
F.P. Nº 02 INFRAESTRUCTURA ELECTRICA VENCIMIENTO PLAZO VIGENTE 7/11/2022
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMUL. ANTERIORAVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
ITEM DESCRIPCION
UND CANT. P.U. PARCIAL MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) %
01.03.08.10 DERECHOS DE CORTE Y CONEXIÓN BAJA TENSION - JR. CABO P GLB 1.00 750.00 750.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 750.00 100.00%
01.03.09 JR. JOSE CARMEN CABREJOS
01.03.09.01 DESMONTAJE DE POSTE DE 8 M und 8.00 316.01 2,528.08 0.00 0.00 0.00 8.00 2,528.08 100.00 8.00 2,528.08 100.00 0.00 0.00 0.00%
01.03.09.02 EXCAVACION DE HOYOS PARA POSTE DE CONCRETO DE 8 M und 12.00 310.50 3,726.00 0.00 0.00 0.00 8.00 2,484.00 66.67 8.00 2,484.00 66.67 4.00 1,242.00 33.33%
01.03.09.03 REUBICACION DE ACCESORIOS POSTES BAJA TENSION 8/200 und 6.00 135.54 813.24 0.00 0.00 0.00 4.00 542.16 66.67 4.00 542.16 66.67 2.00 271.08 33.33%
01.03.09.04 REUBICACION DE ACCESORIOS POSTES BAJA TENSION 8/300 und 6.00 103.75 622.50 0.00 0.00 0.00 4.00 415.00 66.67 4.00 415.00 66.67 2.00 207.50 33.33%
01.03.09.05 MONTAJE DE POSTE DE C.A.C. DE 8 M. und 5.00 258.60 1,293.00 0.00 0.00 0.00 5.00 1,293.00 100.00 5.00 1,293.00 100.00 0.00 0.00 0.00%
01.03.09.06 POSTE DE C.A.C. DE 8/200 und 2.00 897.76 1,795.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 1,795.52 100.00%
01.03.09.07 POSTE DE C.A.C. DE 8/300 und 1.00 973.55 973.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 973.55 100.00%
01.03.09.08 REUBICACION DE RETENIDA und 4.00 399.34 1,597.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 1,597.36 100.00%
01.03.09.09 ELIMINACION DE MATERIAL EXCEDENTE und 3.00 220.57 661.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 661.71 100.00%
01.03.09.10 DERECHOS DE CORTE Y CONEXIÓN BAJA TENSION - JR. J. CAR GLB 1.00 750.00 750.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 750.00 100.00%
01.03.10 CA. PEVAS
01.03.10.01 DESMONTAJE DE POSTE DE 8 M und 1.00 316.01 316.01 0.00 0.00 0.00 1.00 316.01 100.00 1.00 316.01 100.00 0.00 0.00 0.00%
01.03.10.02 EXCAVACION DE HOYOS PARA POSTE DE CONCRETO DE 8 M und 1.00 310.50 310.50 0.00 0.00 0.00 1.00 310.50 100.00 1.00 310.50 100.00 0.00 0.00 0.00%
01.03.10.03 REUBICACION DE ACCESORIOS POSTES BAJA TENSION 8/200 und 1.00 135.54 135.54 0.00 0.00 0.00 1.00 135.54 100.00 1.00 135.54 100.00 0.00 0.00 0.00%
01.03.10.04 POSTE DE C.A.C. DE 8/200 und 1.00 897.76 897.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 897.76 100.00%
01.03.10.05 DERECHOS DE CORTE Y CONEXIÓN BAJA TENSION - CA. PEVAS GLB 1.00 750.00 750.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 750.00 100.00%
01.03.11 JR. LUIS SCAVINO
01.03.11.01 DESMONTAJE DE POSTE DE 8 M und 11.00 316.01 3,476.11 0.00 0.00 0.00 8.00 2,528.08 72.73 8.00 2,528.08 72.73 3.00 948.03 27.27%
01.03.11.02 EXCAVACION DE HOYOS PARA POSTE DE CONCRETO DE 8 M und 11.00 310.50 3,415.50 0.00 0.00 0.00 8.00 2,484.00 72.73 8.00 2,484.00 72.73 3.00 931.50 27.27%
01.03.11.03 REUBICACION DE ACCESORIOS POSTES BAJA TENSION 8/200 und 10.00 135.54 1,355.40 0.00 0.00 0.00 8.00 1,084.32 80.00 8.00 1,084.32 80.00 2.00 271.08 20.00%
01.03.11.04 REUBICACION DE ACCESORIOS POSTES BAJA TENSION 8/300 und 1.00 103.75 103.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 103.75 100.00%
01.03.11.05 MONTAJE DE POSTE DE C.A.C. DE 8 M. und 7.00 258.60 1,810.20 0.00 0.00 0.00 7.00 1,810.20 100.00 7.00 1,810.20 100.00 0.00 0.00 0.00%
01.03.11.06 POSTE DE C.A.C. DE 8/200 und 3.00 897.76 2,693.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 2,693.28 100.00%
01.03.11.07 POSTE DE C.A.C. DE 8/300 und 1.00 973.55 973.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 973.55 100.00%
01.03.11.08 REUBICACION DE RETENIDA und 1.00 399.34 399.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 399.34 100.00%
01.03.11.09 ELIMINACION DE MATERIAL EXCEDENTE und 3.00 220.57 661.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 661.71 100.00%
01.03.11.10 DERECHOS DE CORTE Y CONEXIÓN BAJA TENSION - JR. LUIS E GLB 1.00 750.00 750.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 750.00 100.00%
01.03.12 PJE. MARTIR OLAYA
01.03.12.01 DESMONTAJE DE POSTE DE 8 M und 4.00 316.01 1,264.04 0.00 0.00 0.00 4.00 1,264.04 100.00 4.00 1,264.04 100.00 0.00 0.00 0.00%
01.03.12.02 EXCAVACION DE HOYOS PARA POSTE DE CONCRETO DE 8 M und 4.00 310.50 1,242.00 0.00 0.00 0.00 4.00 1,242.00 100.00 4.00 1,242.00 100.00 0.00 0.00 0.00%
01.03.12.03 REUBICACION DE ACCESORIOS POSTES BAJA TENSION 8/200 und 3.00 103.75 311.25 0.00 0.00 0.00 3.00 311.25 100.00 3.00 311.25 100.00 0.00 0.00 0.00%
01.03.12.04 REUBICACION DE ACCESORIOS POSTES BAJA TENSION 8/300 und 1.00 103.75 103.75 0.00 0.00 0.00 1.00 103.75 100.00 1.00 103.75 100.00 0.00 0.00 0.00%
01.03.12.05 MONTAJE DE POSTE DE C.A.C. DE 8 M. und 2.00 258.60 517.20 0.00 0.00 0.00 2.00 517.20 100.00 2.00 517.20 100.00 0.00 0.00 0.00%
01.03.12.06 POSTE DE C.A.C. DE 8/200 und 1.00 897.76 897.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 897.76 100.00%
01.03.12.07 POSTE DE C.A.C. DE 8/300 und 1.00 973.55 973.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 973.55 100.00%
01.03.12.08 REUBICACION DE RETENIDA und 1.00 399.34 399.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 399.34 100.00%
01.03.12.09 ELIMINACION DE MATERIAL EXCEDENTE und 2.00 220.57 441.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 441.14 100.00%
01.03.12.10 DERECHOS DE CORTE Y CONEXIÓN BAJA TENSION - PASAJE MA GLB 1.00 750.00 750.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 750.00 100.00%
Pág. 45 de 68
VALORIZACION DE AVANCE DE OBRA
10.00
DEL CONTRATO PRINCIPAL
OBRA: “MEJORAMIENTO DE LAS PRINCIPALES VIAS Y VEREDIZACION DEL BARRIO EL DORADO, DISTRITO DE CALLERIA, PROVINCIA DE CORONEL PORTILLO - UCAYALI”
ENTIDAD: GOBIERNO REGIONAL UCAYALI CONTRATO: Nº 014-2021-GRH/GGR Fecha: 19-05-2021
CONTRATISTACONSORCIO VIAS EL DORADO MONTO DEL CONTRATO: S/. 16,807,045.61
SUPERVISOR: ING. JULIO ENRIQUE MENDOZA FLORES INICIO DE OBRA: 6/23/2021
RESIDENTE: ING. JUAN MANUEL TORRES DEL AGUILA
FECHA: 31-March-2022 TERMINO CONTRACTUAL: 6/17/2022
F.P. Nº 02 INFRAESTRUCTURA ELECTRICA VENCIMIENTO PLAZO VIGENTE 7/11/2022
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMUL. ANTERIORAVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
ITEM DESCRIPCION
UND CANT. P.U. PARCIAL MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) %
Pág. 46 de 68
VALORIZACION DE AVANCE DE OBR10.00
DEL CONTRATO PRINCIPAL
OBRA: “MEJORAMIENTO DE LAS PRINCIPALES VIAS Y VEREDIZACION DEL BARRIO EL DORADO, DISTRITO DE CALLERIA, PROVINCIA DE CORONEL PORTILLO - UCAYALI”
ENTIDAD: GOBIERNO REGIONAL UCAYALI CONTRATO: Nº 014-2021-GRH/GGR Fecha: 19-05-2021
CONTRATISTACONSORCIO VIAS EL DORADO MONTO DEL CONTRATO: S/. 16,807,045.61
SUPERVISOR: ING. JULIO ENRIQUE MENDOZA FLORES INICIO DE OBRA: 6/23/2021
RESIDENTE: ING. JUAN MANUEL TORRES DEL AGUILA
FECHA: 31-March-2022 TERMINO CONTRACTUAL: 6/17/2022
F.P. Nº 03 INFRAESTRUCTURA DE TELEFONIA VENCIMIENTO PLAZO VIGENTE 7/11/2022
01 INFRAESTRUCTURA DE TELEFONIA
01.01 JR. FRANCISCO DE ORELLANA
01.01.01 DESMONTAJE DE POSTES 9/300 und 3.00 258.69 776.07 0.00 0.00 0.00 3.00 776.07 100.00 3.00 776.07 100.00 0.00 0.00 0.00%
01.01.02 EXCAVACION DE HOYOS PARA POSTE DE CONCRETO DE 9 M und 3.00 103.64 310.92 0.00 0.00 0.00 3.00 310.92 100.00 3.00 310.92 100.00 0.00 0.00 0.00%
01.01.03 MONTAJE DE POSTES 9/300 und 2.00 257.61 515.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 515.22 100.00%
01.01.04 POSTE TELEFONICO 9/300 und 1.00 1,146.82 1,146.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,146.82 100.00%
01.01.05 REUBICACION DE ACCESORIOS Y CONDUCTORES EN POSTE DE und 3.00 937.76 2,813.28 0.00 0.00 0.00 3.00 2,813.28 100.00 3.00 2,813.28 100.00 0.00 0.00 0.00%
01.01.06 REUBICACION DE RETENIDA SIMPLE DOBLE und 1.00 477.62 477.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 477.62 100.00%
01.01.07 ELIMINACION DE MATERIAL EXCEDENTE und 1.00 220.57 220.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 220.57 100.00%
01.02 PRUEBAS Y PUESTA EN SERVICIO
01.02.01 PRUEBAS Y PUESTA EN SERVICIO GLB 1.00 677.99 677.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 677.99 100.00%
01.03 PASAJE MARTIR OLAYA
01.03.01 DESMONTAJE DE POSTES 9/300 und 1.00 258.69 258.69 0.00 0.00 0.00 1.00 258.69 100.00 1.00 258.69 100.00 0.00 0.00 0.00%
01.03.02 EXCAVACION DE HOYOS PARA POSTE DE CONCRETO DE 9 M und 1.00 103.64 103.64 0.00 0.00 0.00 1.00 103.64 100.00 1.00 103.64 100.00 0.00 0.00 0.00%
01.03.03 POSTE TELEFONICO 9/300 und 1.00 1,146.82 1,146.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,146.82 100.00%
01.03.04 REUBICACION DE ACCESORIOS Y CONDUCTORES EN POSTE DE und 1.00 937.76 937.76 0.00 0.00 0.00 1.00 937.76 100.00 1.00 937.76 100.00 0.00 0.00 0.00%
01.04 PRUEBAS Y PUESTA EN SERVICIO
01.04.01 PRUEBAS Y PUESTA EN SERVICIO GLB 1.00 677.99 677.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 677.99 100.00%
01.05 JR. LUIS SCAVINO
01.05.01 DESMONTAJE DE POSTES 9/300 und 5.00 258.69 1,293.45 0.00 0.00 0.00 5.00 1,293.45 100.00 5.00 1,293.45 100.00 0.00 0.00 0.00%
01.05.02 EXCAVACION DE HOYOS PARA POSTE DE CONCRETO DE 9 M und 5.00 103.64 518.20 0.00 0.00 0.00 5.00 518.20 100.00 5.00 518.20 100.00 0.00 0.00 0.00%
01.05.03 MONTAJE DE POSTES 9/300 und 4.00 257.61 1,030.44 0.00 0.00 0.00 4.00 1,030.44 100.00 4.00 1,030.44 100.00 0.00 0.00 0.00%
01.05.04 POSTE TELEFONICO 9/300 und 1.00 1,146.82 1,146.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,146.82 100.00%
01.05.05 REUBICACION DE ACCESORIOS Y CONDUCTORES EN POSTE DE und 5.00 937.76 4,688.80 0.00 0.00 0.00 5.00 4,688.80 100.00 5.00 4,688.80 100.00 0.00 0.00 0.00%
01.05.06 ELIMINACION DE MATERIAL EXCEDENTE und 1.00 220.57 220.57 0.00 0.00 0.00 1.00 220.57 100.00 1.00 220.57 100.00 0.00 0.00 0.00%
01.06 PRUEBAS Y PUESTA EN SERVICIO
01.06.01 PRUEBAS Y PUESTA EN SERVICIO GLB 1.00 677.99 677.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 677.99 100.00%
01.07 JR. CABALLO COCHA
01.07.01 DESMONTAJE DE POSTES 9/300 und 4.00 258.69 1,034.76 0.00 0.00 0.00 4.00 1,034.76 100.00 4.00 1,034.76 100.00 0.00 0.00 0.00%
01.07.02 EXCAVACION DE HOYOS PARA POSTE DE CONCRETO DE 9 M und 4.00 103.64 414.56 0.00 0.00 0.00 4.00 414.56 100.00 4.00 414.56 100.00 0.00 0.00 0.00%
01.07.03 MONTAJE DE POSTES 9/300 und 3.00 257.61 772.83 0.00 0.00 0.00 3.00 772.83 100.00 3.00 772.83 100.00 0.00 0.00 0.00%
01.07.04 POSTE TELEFONICO 9/300 und 1.00 1,146.82 1,146.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,146.82 100.00%
01.07.05 REUBICACION DE ACCESORIOS Y CONDUCTORES EN POSTE DE und 4.00 937.76 3,751.04 0.00 0.00 0.00 4.00 3,751.04 100.00 4.00 3,751.04 100.00 0.00 0.00 0.00%
01.07.06 ELIMINACION DE MATERIAL EXCEDENTE und 1.00 220.57 220.57 0.00 0.00 0.00 1.00 220.57 100.00 1.00 220.57 100.00 0.00 0.00 0.00%
01.08 PRUEBAS Y PUESTA EN SERVICIO
01.08.01 PRUEBAS Y PUESTA EN SERVICIO GLB 1.00 677.99 677.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 677.99 100.00%
01.09 CA. PEVAS
01.09.01 DESMONTAJE DE POSTES 9/300 und 2.00 258.69 517.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 517.38 100.00%
01.09.02 EXCAVACION DE HOYOS PARA POSTE DE CONCRETO DE 9 M und 2.00 103.64 207.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 207.28 100.00%
01.09.03 MONTAJE DE POSTES 9/300 und 2.00 257.61 515.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 515.22 100.00%
01.09.04 REUBICACION DE ACCESORIOS Y CONDUCTORES EN POSTE DE und 2.00 937.76 1,875.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 1,875.52 100.00%
01.10 PRUEBAS Y PUESTA EN SERVICIO
01.10.01 PRUEBAS Y PUESTA EN SERVICIO GLB 1.00 677.99 677.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 677.99 100.00%
01.11 PJE. GUIDO BONZANO
01.11.01 DESMONTAJE DE POSTES 9/300 und 2.00 258.69 517.38 0.00 0.00 0.00 2.00 517.38 100.00 2.00 517.38 100.00 0.00 0.00 0.00%
01.11.02 EXCAVACION DE HOYOS PARA POSTE DE CONCRETO DE 9 M und 2.00 103.64 207.28 0.00 0.00 0.00 2.00 207.28 100.00 2.00 207.28 100.00 0.00 0.00 0.00%
01.11.03 MONTAJE DE POSTES 9/300 und 1.00 257.61 257.61 0.00 0.00 0.00 1.00 257.61 100.00 1.00 257.61 100.00 0.00 0.00 0.00%
01.11.04 POSTE TELEFONICO 9/300 und 1.00 1,146.82 1,146.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,146.82 100.00%
Pág. 47 de 68
VALORIZACION DE AVANCE DE OBR10.00
DEL CONTRATO PRINCIPAL
OBRA: “MEJORAMIENTO DE LAS PRINCIPALES VIAS Y VEREDIZACION DEL BARRIO EL DORADO, DISTRITO DE CALLERIA, PROVINCIA DE CORONEL PORTILLO - UCAYALI”
ENTIDAD: GOBIERNO REGIONAL UCAYALI CONTRATO: Nº 014-2021-GRH/GGR Fecha: 19-05-2021
CONTRATISTACONSORCIO VIAS EL DORADO MONTO DEL CONTRATO: S/. 16,807,045.61
SUPERVISOR: ING. JULIO ENRIQUE MENDOZA FLORES INICIO DE OBRA: 6/23/2021
RESIDENTE: ING. JUAN MANUEL TORRES DEL AGUILA
FECHA: 31-March-2022 TERMINO CONTRACTUAL: 6/17/2022
F.P. Nº 03 INFRAESTRUCTURA DE TELEFONIA VENCIMIENTO PLAZO VIGENTE 7/11/2022
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMUL. ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
ITEM DESCRIPCION
UND CANT. P.U. PARCIAL MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) %
01.11.05 REUBICACION DE ACCESORIOS Y CONDUCTORES EN POSTE DE und 2.00 937.76 1,875.52 0.00 0.00 0.00 2.00 1,875.52 100.00 2.00 1,875.52 100.00 0.00 0.00 0.00%
01.11.06 ELIMINACION DE MATERIAL EXCEDENTE und 1.00 220.57 220.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 220.57 100.00%
01.12 PRUEBAS Y PUESTA EN SERVICIO
01.12.01 PRUEBAS Y PUESTA EN SERVICIO GLB 1.00 677.99 677.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 677.99 100.00%
01.13 JR. RODOLFO ESPINAR
01.13.01 DESMONTAJE DE POSTES 9/300 und 5.00 258.69 1,293.45 0.00 0.00 0.00 1.00 258.69 20.00 1.00 258.69 20.00 4.00 1,034.76 80.00%
01.13.02 EXCAVACION DE HOYOS PARA POSTE DE CONCRETO DE 9 M und 5.00 103.64 518.20 0.00 0.00 0.00 1.00 103.64 20.00 1.00 103.64 20.00 4.00 414.56 80.00%
01.13.03 MONTAJE DE POSTES 9/300 und 4.00 257.61 1,030.44 0.00 0.00 0.00 1.00 257.61 25.00 1.00 257.61 25.00 3.00 772.83 75.00%
01.13.04 POSTE TELEFONICO 9/300 und 5.00 1,146.82 5,734.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 5,734.10 100.00%
01.13.05 REUBICACION DE ACCESORIOS Y CONDUCTORES EN POSTE DE und 5.00 937.76 4,688.80 0.00 0.00 0.00 1.00 937.76 20.00 1.00 937.76 20.00 4.00 3,751.04 80.00%
01.13.06 ELIMINACION DE MATERIAL EXCEDENTE und 1.00 220.57 220.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 220.57 100.00%
01.14 PRUEBAS Y PUESTA EN SERVICIO
01.14.01 PRUEBAS Y PUESTA EN SERVICIO GLB 1.00 677.99 677.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 677.99 100.00%
01.15 JR. AGUSTIN CAUPER
01.15.01 DESMONTAJE DE POSTES 9/300 und 3.00 258.69 776.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 776.07 100.00%
01.15.02 EXCAVACION DE HOYOS PARA POSTE DE CONCRETO DE 9 M und 3.00 103.64 310.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 310.92 100.00%
01.15.03 MONTAJE DE POSTES 9/300 und 2.00 257.61 515.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 515.22 100.00%
01.15.04 POSTE TELEFONICO 9/300 und 1.00 1,146.82 1,146.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,146.82 100.00%
01.15.05 REUBICACION DE ACCESORIOS Y CONDUCTORES EN POSTE DE und 3.00 937.76 2,813.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 2,813.28 100.00%
01.15.06 REUBICACION DE RETENIDA SIMPLE DOBLE und 1.00 477.62 477.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 477.62 100.00%
01.15.07 ELIMINACION DE MATERIAL EXCEDENTE und 1.00 220.57 220.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 220.57 100.00%
01.16 PRUEBAS Y PUESTA EN SERVICIO
01.16.01 PRUEBAS Y PUESTA EN SERVICIO GLB 1.00 677.99 677.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 677.99 100.00%
APROBACIONES:
Pág. 48 de 68
VALORIZACION DE AVANCE DE OBRA
10.00
DEL CONTRATO PRINCIPAL
OBRA: “MEJORAMIENTO DE LAS PRINCIPALES VIAS Y VEREDIZACION DEL BARRIO EL DORADO, DISTRITO DE CALLERIA, PROVINCIA DE CORONEL PORTILLO - UCAYALI”
ENTIDAD: GOBIERNO REGIONAL UCAYALI CONTRATO: Nº 014-2021-GRH/GGR Fecha: 19-05-2021
CONTRATISTACONSORCIO VIAS EL DORADO MONTO DEL CONTRATO: S/. 16,807,045.61
SUPERVISOR:ING. JULIO ENRIQUE MENDOZA FLORES INICIO DE OBRA: 6/23/2021
RESIDENTE: ING. JUAN MANUEL TORRES DEL AGUILA
FECHA: 31-March-2022 TERMINO CONTRACTUAL: 6/17/2022
F.P. Nº 04 PLAN COVID - 19 VENCIMIENTO PLAZO VIGENTE 7/11/2022
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMUL. ANTERIOR
AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
ITEM DESCRIPCION
UND CANT. P.U. PARCIAL MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) %
APROBACIONES:
Pág. 49 de 68
GRAFICO DE CONTROL DE VALORIZACIONES Nº 10
PROGRAMADO VS EJECUTADO
OBRA: “MEJORAMIENTO DE LAS PRINCIPALES VIAS Y VEREDIZACION DEL BARRIO EL DORADO, DISTRITO DE CALLERIA, PROVINCIA DE CORONEL
PORTILLO - UCAYALI”
PROGRAMADO ACTUALIZADO
CON LA AMPLIACION DE PLAZO N° 90%
06 (SIN IGV)
83.55%
EJECUTADO (SIN IGV)
80%
69.73%
70%
AVANCE MENSUAL ACUMULADO (%)
60%
56.51%
47.12% 50%
43.12%
38.02%
40%
39.33%
PROGRAMADO VS EJECUTADO
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
I.U. BASE 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15
Nov-20 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22 Apr-22 May-22 Jun-22 Jul-22
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
I.U. BASE 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15
Nov-20 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22 Apr-22 May-22 Jun-22 Jul-22
70 218.25 218.25 218.25 218.25
72 483.40 553.99 553.99 687.70
78 533.81 555.73 555.73 622.22
80 111.04 110.37 110.37 114.44
RELACIÓN DE ÍNDICES UNIFICADOS
MO 47 MANO DE OBRA INC. LEYES SOCIALES 0.250 100.00% 632.89 633.53 633.53 633.53 633.53 653.54 653.54 653.54 653.54 653.54 650.44 650.44 - -
0.250 x MOr / MOo 0.250 0.250 0.250 0.250 0.250 0.258 0.258 0.258 0.258 0.258 0.257 0.257 - -
C 21 CEMENTO PORTLAND TIPO I 0.156 100.00% 449.56 449.56 449.56 449.56 449.56 449.56 472.84 472.84 476.29 476.29 493.74 503.23 - -
0.156 x Cr / Co 0.156 0.156 0.156 0.156 0.156 0.156 0.164 0.164 0.165 0.165 0.171 0.175 - -
H 38 HORMIGON 0.144 100.00% 927.60 986.65 986.49 999.05 1,008.49 1,013.13 1,011.88 1,011.88 1,024.68 ### 1,025.51 1,022.79 - -
0.144 x Hr / Ho 0.144 0.153 0.153 0.155 0.157 0.157 0.157 0.157 0.159 0.159 0.159 0.159 - -
A 3 ACERO DE CONSTRUCCION CORRUGADO 0.097 100.00% 578.97 767.70 796.31 802.21 819.35 818.31 798.59 798.59 794.85 810.49 831.00 811.32 - -
0.097 x Ar / Ao 0.097 0.129 0.133 0.134 0.137 0.137 0.134 0.134 0.133 0.136 0.139 0.136 - -
M 49 MAQUINARIA Y EQUIPO IMPORTADO 0.185 100.00% 342.31 363.39 379.17 383.78 401.37 405.85 400.19 400.19 403.22 407.98 396.02 392.63 - -
0.185 x Mr / Mo 0.185 0.196 0.205 0.207 0.217 0.219 0.216 0.216 0.218 0.220 0.214 0.212 - -
I 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.168 100.00% 469.45 477.31 479.79 484.63 489.40 491.36 494.23 494.23 496.00 499.88 500.07 501.62 - -
0.168 x Ir / Io 0.168 0.171 0.172 0.173 0.175 0.176 0.177 0.177 0.178 0.179 0.179 0.180 - -
FACTOR DE REAJUSTE ( K ): 1.000 1.000 1.055 1.069 1.075 1.092 1.103 1.106 1.106 1.111 1.117 1.119 1.119 - -
OBRA: “MEJORAMIENTO DE LAS PRINCIPALES VIAS Y VEREDIZACION DEL BARRIO EL
DORADO, DISTRITO DE CALLERIA, PROVINCIA DE CORONEL PORTILLO - UCAYALI”
INICIO CONTRACTUAL DE 6/23/2021
UBICACIÓNLocalid: BARRIO EL DORADO, Dist: CALLERIA, Prov: CORONEL PORTILLO, Dpto: UCAYALI TERMINO CONTRACTUAL 7/11/2022
ENTIDAD: GOBIERNO REGIONAL UCAYALI PRESUPUESTO CONTRATS/. 16,807,045.61
CONTRATISCONSORCIO VIAS EL DORADO PRESUPUESTO BASE: S/. 16,807,045.61
SUPERVISOING. JULIO ENRIQUE MENDOZA FLORES FECHA VALOR REFERENCINOVIEMBRE 2020
RESIDENTEING. JUAN MANUEL TORRES DEL AGUILA
MO 47 MANO DE OBRA INC. LEYES SOCIALES 0.224 100.00% 632.89 633.53 633.53 633.53 633.53 653.54 653.54 653.54 653.54 653.54 650.44 650.44 - -
0.224 x MOr / MOo 0.224 0.224 0.224 0.224 0.224 0.231 0.231 0.231 0.231 0.231 0.230 0.230 - -
C 21 CEMENTO PORTLAND TIPO I 0.057 100.00% 449.56 449.56 449.56 449.56 449.56 449.56 472.84 472.84 476.29 476.29 493.74 503.23 - -
0.057 x Cr / Co 0.057 0.057 0.057 0.057 0.057 0.057 0.060 0.060 0.060 0.060 0.063 0.064 - -
H 38 HORMIGON 0.147 100.00% 927.60 986.65 986.49 999.05 1,008.49 1,013.13 1,011.88 1,011.88 1,024.68 ### 1,025.51 1,022.79 - -
0.147 x Hr / Ho 0.147 0.156 0.156 0.158 0.160 0.161 0.160 0.160 0.162 0.162 0.163 0.162 - -
M 0.292
49 MAQUINARIA Y EQUIPO IMPORTADO 100.00% 342.31 363.39 379.17 383.78 401.37 405.85 400.19 400.19 403.22 407.98 396.02 392.63 - -
0.292 x Mr / Mo 0.292 0.310 0.323 0.327 0.342 0.346 0.341 0.341 0.344 0.348 0.338 0.335 - -
I 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.280 100.00% 469.45 477.31 479.79 484.63 489.40 491.36 494.23 494.23 496.00 499.88 500.07 501.62 - -
0.280 x Ir / Io 0.280 0.285 0.286 0.289 0.292 0.293 0.295 0.295 0.296 0.298 0.298 0.299 - -
FACTOR DE REAJUSTE ( K ): 1.000 1.000 1.032 1.046 1.055 1.075 1.088 1.087 1.087 1.093 1.099 1.092 1.090 - -
OBRA: “MEJORAMIENTO DE LAS PRINCIPALES VIAS Y VEREDIZACION DEL BARRIO EL
DORADO, DISTRITO DE CALLERIA, PROVINCIA DE CORONEL PORTILLO - UCAYALI”
INICIO CONTRACTUAL DE 6/23/2021
UBICACIÓNLocalid: BARRIO EL DORADO, Dist: CALLERIA, Prov: CORONEL PORTILLO, Dpto: UCAYALI TERMINO CONTRACTUAL 7/11/2022
ENTIDAD: GOBIERNO REGIONAL UCAYALI PRESUPUESTO CONTRATS/. 16,807,045.61
CONTRATISCONSORCIO VIAS EL DORADO PRESUPUESTO BASE: S/. 16,807,045.61
SUPERVISOING. JULIO ENRIQUE MENDOZA FLORES FECHA VALOR REFERENCINOVIEMBRE 2020
RESIDENTEING. JUAN MANUEL TORRES DEL AGUILA
MO 47 MANO DE OBRA 0.415 100.00% 632.89 633.53 633.53 633.53 633.53 653.54 653.54 653.54 653.54 653.54 650.44 650.44 - -
0.415 x MOr / MOo 0.415 0.415 0.415 0.415 0.415 0.429 0.429 0.429 0.429 0.429 0.427 0.427 - -
C 21 CEMENTO PORTLAND TIPO I 0.161 100.00% 449.56 449.56 449.56 449.56 449.56 449.56 472.84 472.84 476.29 476.29 493.74 503.23 - -
0.161 x Cr / Co 0.161 0.161 0.161 0.161 0.161 0.161 0.169 0.169 0.171 0.171 0.177 0.180 - -
H 38 HORMIGON 0.089 100.00% 927.60 986.65 986.49 999.05 1,008.49 1,013.13 1,011.88 1,011.88 1,024.68 ### 1,025.51 1,022.79 - -
0.089 x Hr / Ho 0.089 0.095 0.095 0.096 0.097 0.097 0.097 0.097 0.098 0.098 0.098 0.098 - -
M 49 MAQUINARIA Y EQUIPO IMPORTADO 0.168 100.00% 342.31 363.39 379.17 383.78 401.37 405.85 400.19 400.19 403.22 407.98 396.02 392.63 - -
0.168 x Mr / Mo 0.168 0.178 0.186 0.188 0.197 0.199 0.196 0.196 0.198 0.200 0.194 0.193 - -
I 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.167 100.00% 469.45 477.31 479.79 484.63 489.40 491.36 494.23 494.23 496.00 499.88 500.07 501.62 - -
0.167 x Ir / Io 0.167 0.170 0.171 0.172 0.174 0.175 0.176 0.176 0.176 0.178 0.178 0.178 - -
FACTOR DE REAJUSTE ( K ): 1.000 1.000 1.019 1.028 1.032 1.044 1.061 1.067 1.067 1.072 1.076 1.074 1.076 - -
OBRA: “MEJORAMIENTO DE LAS PRINCIPALES VIAS Y VEREDIZACION DEL BARRIO EL
DORADO, DISTRITO DE CALLERIA, PROVINCIA DE CORONEL PORTILLO - UCAYALI”
INICIO CONTRACTUAL DE 6/23/2021
UBICACIÓNLocalid: BARRIO EL DORADO, Dist: CALLERIA, Prov: CORONEL PORTILLO, Dpto: UCAYALI TERMINO CONTRACTUAL 7/11/2022
ENTIDAD: GOBIERNO REGIONAL UCAYALI PRESUPUESTO CONTRATS/. 16,807,045.61
CONTRATISCONSORCIO VIAS EL DORADO PRESUPUESTO BASE: S/. 16,807,045.61
SUPERVISOING. JULIO ENRIQUE MENDOZA FLORES FECHA VALOR REFERENCINOVIEMBRE 2020
RESIDENTEING. JUAN MANUEL TORRES DEL AGUILA
M 47 MANO DE OBRA INC. LEYES SOCIALES 0.114 100.00% 632.89 633.53 633.53 633.53 633.53 653.54 653.54 653.54 653.54 653.54 650.44 650.44 - -
0.114 x Mr / Mo 0.114 0.114 0.114 0.114 0.114 0.118 0.118 0.118 0.118 0.118 0.117 0.117 - -
A 2 ACERO DE CONSTRUCCION LISO 0.164 100.00% 606.37 795.07 824.54 830.65 839.89 821.15 802.66 802.66 812.99 827.36 821.06 800.39 - -
0.164 x Ar / Ao 0.164 0.215 0.223 0.225 0.227 0.222 0.217 0.217 0.220 0.224 0.222 0.216 - -
D 30 DOLAR (GENERAL PONDERADO) 0.089 100.00% 547.78 587.46 614.15 624.44 650.49 655.20 642.27 642.27 648.25 654.51 632.31 621.59 - -
0.089 x Dr / Do 0.089 0.095 0.100 0.101 0.106 0.106 0.104 0.104 0.105 0.106 0.103 0.101 - -
I 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.633 100.00% 469.45 477.31 479.79 484.63 489.40 491.36 494.23 494.23 496.00 499.88 500.07 501.62 - -
0.633 x Ir / Io 0.633 0.644 0.647 0.653 0.660 0.663 0.666 0.666 0.669 0.674 0.674 0.676 - -
FACTOR DE REAJUSTE ( K ): 1.000 1.000 1.068 1.084 1.093 1.107 1.109 1.105 1.105 1.112 1.122 1.116 1.110 - -
OBRA: “MEJORAMIENTO DE LAS PRINCIPALES VIAS Y VEREDIZACION DEL BARRIO EL DORADO,
DISTRITO DE CALLERIA, PROVINCIA DE CORONEL PORTILLO - UCAYALI”
UBCACION: Localid: BARRIO EL DORADO, Dist: CALLERIA, Prov: CORONEL PORTILLO, Dpto: UCAYALI
CONTRATISTA CONSORCIO VIAS EL DORADO
SUPERVISOR ING. JULIO ENRIQUE MENDOZA FLORES
RESIDENTE: ING. JUAN MANUEL TORRES DEL AGUILA
D = V x A x ( Kr / Ka - 1 ) / C
Donde V : Valorización contractual del mes sin IGV
Kr : Coeficiente de reajuste al mes de la valorización
A : Monto del adelanto directo otorgado sin IGV
Ka: Coeficiente de reajuste del mes en que se cancelo el adelanto directo
C : monto del contrato principal sin IGV S/. A/C= 0.10
FORMULA 1º
01 June-2021 25691.29 1.055 1.055 0.00
02 July-2021 256368.58 1.069 1.055 340.20
03 August-2021 830834.28 1.075 1.055 1575.04
04 September-2021 862920.47 1.092 1.055 3026.36
05 October-2021 907427.56 1.103 1.055 4128.58
06 November-2021 783629.91 1.106 1.055 3788.16
07-I Dic-I-21 1142369.27 1.106 1.055 5522.35
07-II Dic-II-21 20916.01 1.111 1.055 111.02
08 January-2022 656754.11 1.117 1.055 3859.60
09 February-2022 899586.06 1.119 1.055 5457.20
10 March-2022 621736.27 1.119 1.055 3771.67
11 April-2022 0.00 0.000 1.055 0.00
12 May-2022 0.00 0.000 1.055 0.00
13 July-2022 0.00 0.000 1.055
FORMULA 2º
01 June-2021 0.00 1.032 1.032 0.00
02 July-2021 0.00 1.046 1.032 0.00
03 August-2021 13678.54 1.055 1.032 30.49
04 September-2021 27624.02 1.075 1.032 115.10
05 October-2021 0.00 1.088 1.032 0.00
06 November-2021 880.48 1.087 1.032 4.69
07-I Dic-I-21 0.00 1.087 1.032 0.00
07-II Dic-II-21 0.00 1.093 1.032 0.00
08 January-2022 0.00 1.099 1.032 0.00
09 February-2022 0.00 0.000 1.032 0.00
10 March-2022 0.00 0.000 1.032 0.00
11 April-2022 0.00 0.000 1.032 0.00
12 May-2022 0.00 0.000 1.032 0.00
13 July-2022 0.00 0.000 1.032
UBCACION: Localid: BARRIO EL DORADO, Dist: CALLERIA, Prov: CORONEL PORTILLO, Dpto: UCAYALI
CONTRATISTA CONSORCIO VIAS EL DORADO
SUPERVISOR ING. JULIO ENRIQUE MENDOZA FLORES
RESIDENTE: ING. JUAN MANUEL TORRES DEL AGUILA
D = V x A x ( Kr / Ka - 1 ) / C
Donde V : Valorización contractual del mes sin IGV
Kr : Coeficiente de reajuste al mes de la valorización
A : Monto del adelanto directo otorgado sin IGV
Ka: Coeficiente de reajuste del mes en que se cancelo el adelanto directo
C : monto del contrato principal sin IGV S/. A/C= 0.10
FORMULA 3º
01 June-2021 0.00 1.019 1.019 0.00
02 July-2021 0.00 1.028 1.019 0.00
03 August-2021 16813.84 1.032 1.019 21.45
04 September-2021 6891.31 1.044 1.019 16.91
05 October-2021 0.00 1.061 1.019 0.00
06 November-2021 4702.58 1.067 1.019 22.15
07-I Dic-I-21 0.00 1.067 1.019 0.00
07-II Dic-II-21 0.00 1.072 1.019 0.00
08 January-2022 0.00 1.076 1.019 0.00
09 February-2022 0.00 0.000 1.019 #REF!
10 March-2022 0.00 0.000 1.019 0.00
11 April-2022 0.00 0.000 1.019 0.00
12 May-2022 0.00 0.000 1.019 0.00
13 July-2022 0.00 0.000 1.019
FORMULA 4º
01 June-2021 8220.86 1.068 1.068 0.00
02 July-2021 34246.99 1.084 1.068 51.31
03 August-2021 18866.99 1.093 1.068 44.16
04 September-2021 15249.87 1.107 1.068 55.69
05 October-2021 15249.87 1.109 1.068 58.54
06 November-2021 15249.87 1.105 1.068 52.83
07-I Dic-I-21 7624.93 1.105 1.068 26.42
07-II Dic-II-21 7624.93 1.112 1.068 31.41
08 January-2022 15249.87 1.122 1.068 77.11
09 February-2022 15249.87 1.116 1.068 68.54
10 March-2022 15249.87 1.110 1.068 59.97
11 April-2022 0.00 0.000 1.068 0.00
12 May-2022 0.00 0.000 1.068 0.00
13 July-2022 0.00 0.000 1.068
A/C= 0.10
VALORIZACION MONTO AMORTIZACION SALDO POR
No. MES VALORIZADO DEL ADELANTO AMORTIZAR
V V x ( A/C)
MATERIAL VALORIZACION MONTO ADEL.OTORGADOS COEF.INC. Ci INDICES MAXIMO ADELMONTO MAX.ADELANTO ADELANTO AMORTIZACION SALDO PORDEDUCCION
Nº INDICE VALORIZ. MONTO FECHA Coef % Incid Imo Ima Imr POR UTILIZAR UTILIZABLE UTILIZADO DEDUCIBLE Am AMORTIZAR
No. MES (1) (2) (3) (4) (5) (6) (7)=3*1 (8)=(2) *(4/5) (9) (8) - (9) 7*5/4 (9)*(6-5)/4
FORMULA Nº 1
ACERO CORRUGADO Fy=4200 KG/CM 1 Jun-2021 0.00 570000.00 Jul-2021 0.097 100.00% 578.97 796.31 767.70 0.00 414427.67 0.00 414427.67 570000.00 0.00
3 2 Jul-2021 0.00 796.31 0.00 414427.67 0.00 414427.67 0.00 570000.00 0.00
3 Aug-2021 830834.28 802.21 80590.93 414427.67 80590.93 333836.74 110844.02 459155.98 821.26
4 Sep-2021 862920.47 819.35 83703.29 333836.74 83703.29 250133.45 115124.73 344031.24 3330.96
5 Oct-2021 907427.56 818.31 88020.47 250133.45 88020.47 162112.98 121062.54 222968.70 3344.65
6 Nov-2021 783629.91 798.59 76012.10 162112.98 76012.10 86100.88 104546.34 118422.36 299.34
7-I Dec-2021 1142369.27 798.59 110809.82 86100.88 86100.88 24708.94 152406.80 -33984.44 339.07
7-II Dec-2021 20916.01 794.85 2028.85 24708.94 2028.85 -22680.09 2790.46 -36774.91 -5.12
8 Jan-2022 656754.11 810.49 63705.15 -22680.09 63705.15 -86385.24 87619.48 -124394.38 1560.25
9 Feb-2022 899586.06 831.00 87259.85 -86385.24 87259.85 -173645.09 120016.39 -244410.78 5228.33
10 Mar-2022 621736.27 811.32 60308.42 -173645.09 60308.42 -233953.51 82947.64 -327358.42 1563.52
11 Apr-2022 0.00 0.00 0.00 -233953.51 0.00 -233953.51 0.00 -327358.42 0.00
12 May-2022 0.00 0.00 0.00 -233953.51 0.00 -233953.51 0.00 -327358.42 0.00
13 Jun-2022 0.00 0.00 0.00 -233953.51 0.00 -233953.51 0.00 -327358.42 0.00
CEMENTO PORTLAND TIPO I (42.5 K 1 Jun-2021 0.00 907200.00 Jul-2021 0.156 100.00% 449.56 ### 864.26 0.00 907200.00 0.00 907200.00 907200.00 0.00
21 2 Jul-2021 0.00 449.56 0.00 907200.00 0.00 907200.00 0.00 907200.00 0.00
3 Aug-2021 830834.28 449.56 129610.15 907200.00 129610.15 777589.85 129610.15 777589.85 0.00
4 Sep-2021 862920.47 449.56 134615.59 777589.85 134615.59 642974.26 134615.59 642974.26 0.00
5 Oct-2021 907427.56 449.56 141558.70 642974.26 141558.70 501415.56 141558.70 501415.56 0.00
6 Nov-2021 783629.91 472.84 122246.27 501415.56 122246.27 379169.29 122246.27 379169.29 6330.40
7-I Dec-2021 1142369.27 472.84 178209.61 379169.29 178209.61 200959.68 178209.61 200959.68 9228.40
7-II Dec-2021 20916.01 476.29 3262.90 200959.68 3262.90 197696.78 3262.90 197696.78 194.01
8 Jan-2022 656754.11 476.29 102453.64 197696.78 102453.64 95243.14 102453.64 95243.14 6091.70
9 Feb-2022 899586.06 493.74 140335.43 95243.14 140335.43 -45092.29 140335.43 -45092.29 13791.31
10 Mar-2022 621736.27 503.23 96990.86 -45092.29 96990.86 -142083.15 96990.86 -142083.15 11579.10
11 Apr-2022 0.00 0.00 0.00 -142083.15 0.00 -142083.15 0.00 -142083.15 0.00
12 May-2022 0.00 0.00 0.00 -142083.15 0.00 -142083.15 0.00 -142083.15 0.00
13 Jun-2022 0.00 0.00 0.00 -142083.15 0.00 -142083.15 0.00 -142083.15 0.00
HORMIGON (PUESTO EN OBRA) 1 Jun-2021 0.00 955590.00 Jul-2021 0.144 100.00% 927.60 986.49 864.26 0.00 898544.62 0.00 898544.62 955590.00 0.00
38 2 Jul-2021 0.00 986.49 0.00 898544.62 0.00 898544.62 0.00 955590.00 0.00
3 Aug-2021 830834.28 999.05 119640.14 898544.62 119640.14 778904.48 127235.66 828354.34 1619.97
4 Sep-2021 862920.47 ### 124260.55 778904.48 124260.55 654643.93 132149.41 696204.93 2947.10
5 Oct-2021 907427.56 ### 130669.57 654643.93 130669.57 523974.36 138965.31 557239.62 3752.74
6 Nov-2021 783629.91 ### 112842.71 523974.36 112842.71 411131.65 120006.69 437232.93 3088.70
7-I Dec-2021 1142369.27 ### 164501.17 411131.65 164501.17 246630.48 174944.76 262288.17 4502.68
7-II Dec-2021 20916.01 ### 3011.91 246630.48 3011.91 243618.57 3203.13 259085.04 124.00
8 Jan-2022 656754.11 ### 94572.59 243618.57 94572.59 149045.98 100576.66 158508.38 3918.09
9 Feb-2022 899586.06 ### 129540.39 149045.98 129540.39 19505.59 137764.45 20743.93 5449.19
10 Mar-2022 621736.27 ### 89530.02 19505.59 89530.02 -70024.43 95213.96 -74470.03 3503.60
11 Apr-2022 0.00 0.00 0.00 -70024.43 -70024.43 -70024.43 0.00 -74470.03 0.00
12 May-2022 0.00 0.00 0.00 -70024.43 -70024.43 -70024.43 0.00 -74470.03 0.00
13 Jun-2022 0.00 0.00 0.00 -70024.43 -70024.43 -70024.43 0.00 -74470.03 0.00
TOTAL FORMULA Nº1 2432790.00 2435508.85 2976701.60 92603.25
CUADERNO DE OBRA
1/5000 del valor del
7 No tenerlo físicamente en la obra 3,361.41
contrato
total 10,084.23
PENALIDAD A CONSIDES/ 10,084.23