DOSIFICACION EN VOLUMEN POR M3 DE CONCRETO

W/C Cemento Agregado fino Agregado grueso


f'c (kg/cm2)
315 0.45 11.3 0.4 0.62
0.5 10.2 0.42 0.62
DISEÑO DE
280 10.4 0.42 0.62 MEZCLA
245 9.6 0.42 0.62
210 9.3 0.53 0.76
175 8.3 0.56 0.76
140 Factor 7.6 0.57 0.76
140 kg/cm2+ C°=.6,
4.56 0.342 0.456 PIEDRA 0.45
40% PM PM=.45
175 kg/cm2 ,
0.1 0.83 0.056 0.076
e=0.10 m
175 kg/cm2 , 0.14999993
1.245 0.084 0.114 UTILIZADOS
e=0.15 m
EN EL
210 kg/cm2 , PROYECTO
0.2 1.86 0.106 0.152
e=0.20 m
100 kg/cm2 ,
0.1 0.67 0.057 0.076
e=0.10 m
140 kg/cm2+ C°=.3,
2.28 0.171 0.228 PIEDRA 0.75
70% PM PM=.75

Rmto (m3/dia) COSTO/M3


CONCRETO F'C=140 KG/CM2.+ 40 % P.M. 9 375.39
SOLADO EN ESTRUCTURAS, E=4", f'c=100 KG/CM2 120 371.60
CONCRETO F'C=210 KG/CM2. PARA MURO DE CONTENCION 18 406.26
LOSA DE CONCRETO F'C=210 KG/CM2, E=0.20 M EN CALZADA. 100 409.50
LOSA DE CONCRETO F'C=175 KG/CM2, E=0.15 m(PASAJES) 115 403.60
CONCRETO F'C=175 KG/CM2 EN SARDINEL 18 386.71
VEREDA: CONCRETO F'C=175 KG/CM2, e=0.10m, INC. ACABADO Y 160 396.4
CONCRETO F'C= 210 KG/CM2 EN ESTRUCTURAS. 20 397.37
EMBOQUILLADO DE PIEDRA, F'C=140 KG/CM2. 10 336.01
CONCRETO SIMPLE FC=140 KG/CM2 (PREPARADO MANUALMENTE 8 356.55
CONCRETO F'C=140 KG/CM2 PARA ANCLAJES Y/O DADOS 18 341.8

Rendimiento de autohormigonera
capacidad 3 m3 50 a 70 m3/dia, conforme a la distancia de recorrido
capacidad 1 m3 25 a 30 m3/dia, conforme a la distancia de recorrido
1.33

0.798

0.133

0.399