Está en la página 1de 11

CALIBRACION DE CAUDALES MENSUALES - CHOCCORO

(METODO DE LUTZ SCHOLZ)

Cuadro Nº 5.1: Evapotranspiración Potencial


EVAPOTRANSPIRACION POTENCIAL (mm/mes)
MES ELEGIDO
Thornthwaite Hargreaves 02 Linacre Papadakis Serruto ---
Enero 53.55 109.65 118.04 62.66 125.49 --- 117.49
Febrero 45.85 92.93 102.67 57.68 108.33 --- 100.52
Marzo 50.29 97.40 113.19 58.74 105.23 --- 101.37
Abril 44.69 86.62 109.51 62.41 81.21 --- 84.00
Mayo 36.70 80.55 119.05 68.26 62.41 --- 71.61
Junio 30.11 71.17 112.06 66.50 49.72 --- 60.30
Julio 30.75 74.13 116.98 65.13 54.70 --- 64.48
Agosto 34.20 88.03 125.11 72.10 68.85 --- 78.43
Setiembre 38.72 99.34 124.91 75.18 86.98 --- 93.30
Octubre 48.45 114.02 130.31 76.61 110.41 --- 112.22
Noviembre 54.23 117.69 128.60 79.91 119.79 --- 118.80
Diciembre 53.40 114.93 125.45 70.40 123.62 --- 119.35
Total 520.94 1146.46 1425.88 815.58 1096.74 0.00 1121.87
Fuente: Elaboración propia.
Cuadro Nº 5.2
T° Med.
MES Ppmensual.
(°C)
Ene. 218.29 4.87
Feb. 195.45 4.63
Mar. 159.36 4.78
Abr. 91.46 4.39
May. 29.37 3.21
Jun. 16.76 2.54
Jul. 15.98 2.46
Ago. 20.37 2.80
Sep. 49.79 3.42
Oct. 60.64 4.36
Nov. 62.16 5.27
Dic. 156.02 4.79
Total 1075.65
Cuadro Nº 5.3

Cálculo Coef. Escorrentía - Método Turc


Temperatura Media Anual(T): 3.96
Coeficiente de Temperatura(L): 402.10
Déficit de Escurrimiento(D): 378.97
Coeficiente de Escorrentía(C): 0.65
Fuente: Elaboración propia.

Área de la Cuenca = 27.9 Km²

1º CALCULO DE LA RETENCION

Pendiente de Lámina de Retención


Área
Descripción la Cuenca Agua Anual
% mm/año Km2 m3/año
Napa Freática (Acuíferos) 31.2007 81.0 27.3 2.21E+06
Lagunas 500 0.064 3.20E+04
Nevados 0 0 0.00E+00
TOTAL 2.24E+06
CALIBRACION DE CAUDALES MENSUALES - CHOCCORO
(METODO DE LUTZ SCHOLZ)
Fuente: Elaboración propia.
Retención total = 2.2445 MMC = 80.5 mm/año
2º CALCULO DEL COEFICIENTE DE AGOTAMIENTO
CRITERIO N° 1
A= 27.87 Area (Km²)
EP = 1121.87 Evapotranspiración (mm/año)
T= 183 Días de la estación seca (días)
R= 80.5 Retención anual (mm/año)

a = 3.1249 x 1067 A-0.1144 EP-19.336 T-3.369 R-1.429 = 0.010234646

CRITERIO N° 2

Clase de Cuenca : 2
Coeficiente b : 0.030

a = - 0.00252 Ln A + 0.030 = 0.02161

Coeficiente de Agotamiento : a = 0.02161


RAZON DE AGOTAMIENTO MENSUAL: bo = e-a.t

Razón Mensual : t= 30 días

b0 = 0.523

GASTO DE RETENCION EN EL PERIODO SECO: bmes i = b0i e-a.t


Período Seco :
Mes inicial = Abril
Mes final = Octubre
Mes bmes i
Ene
Feb
Mar
Abr 1
May 2
Jun 3
Jul 4
Ago 5
Sep 6
Oct 7
Nov
Dic

ALMACENAMIENTO DURANTE LA EPOCA DE LLUVIA (VALORES EN PORCENTAJE)


Cuzco Ayacucho Junín Cajamarca Ayacucho
Mes N°
1 5 3 4 2
Ene 1 40.0 45.0 30.0 20.0 45.0
Feb 2 20.0 5.0 30.0 25.0 5.0
Mar 3 - - 5.0 35.0 -
Abr 4
May 5
Jun 6
Jul 7
Ago 8
Sep 9
Oct 10 - - 10.0 25.0 -
CALIBRACION DE CAUDALES MENSUALES - CHOCCORO
(METODO DE LUTZ SCHOLZ)
Nov 11 5.0 - - - 5.0 -
Dic 12 35.0 50.0 25.0 - 50.0
Total 100.0 100.0 100.0 100.0 100.0
Fuente: Elaboración propia.
CALIBRACION DE CAUDALES MENSUALES - CHOCCORO
(RESULTADOS AÑO PROMEDIO METODO DE LUTZ SCHOLZ)

Cuadro Nº 5.4: CAUDALES MEDIOS MENSUALES PARA EL AÑO PROMEDIO


Preciptacion Efectiva
Precip. Ai Gi Caudal Generado
N° Mes (mm) bi ai
Total (mm) PE1 PE2 PETotal (mm/mes) (mm/mes) (mm/mes) (m3/s)
1 Ene 223.67 166.57 137.27 161.38 0.00 0.00 0.45 36.23 125.15 1.35
2 Feb 200.31 143.21 113.91 138.02 0.00 0.00 0.05 4.03 134.00 1.55
3 Mar 159.73 102.57 73.05 97.34 0.67 27.11 0.00 0.00 124.44 1.30
4 Abr 100.64 45.88 24.62 42.11 0.45 18.24 0.00 0.00 60.35 0.65
5 May 28.94 5.66 3.06 5.20 0.30 12.27 0.00 0.00 17.47 0.18
6 Jun 19.16 3.78 1.89 3.45 0.20 8.25 0.00 0.00 11.70 0.13
7 Jul 16.45 3.25 1.62 2.96 0.14 5.55 0.00 0.00 8.51 0.09
8 Ago 20.41 4.03 2.01 3.67 0.09 3.74 0.00 0.00 7.41 0.08
9 Sep 49.83 12.19 6.07 11.11 0.06 2.51 0.00 0.00 13.62 0.15
10 Oct 61.25 17.73 8.37 16.08 0.04 1.69 0.00 0.00 17.77 0.19
11 Nov 67.17 21.12 9.92 19.13 0.03 1.14 0.00 0.00 20.27 0.22
12 Dic 160.09 102.92 73.40 97.69 0.00 0.00 0.50 40.25 57.44 0.60
Total 1107.65 628.91 455.19 598.14 1.98 80.50 1.00 80.51 598.13 0.54
C audal A ño Prom edio (m 3/s)

Fuente: Resultados software Lutz - Scholz v1

1.8

1.6

1.4

1.2

1.0

0.8

0.6

0.4

0.2

0.0
Ene Feb Mar Abr May Jun Jul Ago Sep Oct Nov Dic
Mes

COEFICIENTES
C= 0.540
C1 = 0.823
C2 = 0.177
C1 + C2 = 1.000

COEFICIENTES DE CORRELACION MULTIPLE

b1 = -0.130
b2 = 0.363
b3 = 0.640
S= 8.028
R^2 = 0.979
CALIBRACION DE CAUDALES MENSUALES - CHOCCORO
(RESULTADOS SERIE DE TIEMPO METODO DE LUTZ SCHOLZ)

Cuadro Nº 5.5: PRECIPITACION EFECTIVA GENERADA (mm)


Año Ene Feb Mar Abr May Jun Jul Ago Sep Oct Nov Dic Suma
1992 134.63 107.15 98.51 33.00 6.68 4.98 2.52 5.48 18.36 21.99 24.80 45.43 503.51
1993 151.10 72.20 96.68 69.06 5.25 3.39 5.59 3.93 11.75 15.48 31.93 157.53 623.88
1994 178.80 130.91 97.37 33.43 5.15 2.74 1.66 3.87 11.79 15.30 18.62 77.29 576.92
1995 159.73 122.55 97.97 26.61 5.19 2.31 2.19 3.87 11.68 17.07 23.47 105.47 578.13
1996 142.57 162.11 93.50 45.00 5.10 2.02 1.62 3.83 11.39 16.44 16.97 114.94 615.49
1997 157.12 134.54 95.60 35.70 5.34 1.99 1.81 3.90 11.78 15.25 23.79 103.21 590.03
1998 157.61 146.73 97.62 29.75 5.38 10.65 1.67 3.88 11.71 22.64 18.52 101.58 607.74
1999 152.16 142.19 97.35 39.98 5.65 2.10 1.80 3.86 11.83 15.10 19.08 90.70 581.80
2000 168.36 196.59 95.65 29.02 5.24 5.58 4.96 3.84 11.61 24.00 12.20 67.77 624.81
2001 195.21 91.64 102.75 44.12 9.10 7.27 6.10 4.06 12.20 19.11 24.48 92.74 608.78
2002 140.74 154.69 93.62 93.68 5.25 2.28 7.00 3.81 11.54 14.79 27.05 99.86 654.30
2003 135.72 146.91 93.42 64.37 5.19 1.97 1.62 3.86 11.33 15.54 13.99 118.27 612.18
Fuente: Resultados software Lutz - Scholz v1
CALIBRACION DE CAUDALES MENSUALES - CHOCCORO
(RESULTADOS SERIE DE TIEMPO METODO DE LUTZ SCHOLZ)
Cuadro Nº 5.6: SERIE DE CAUDALES GENERADOS (m3/s)
Año Ene Feb Mar Abr May Jun Jul Ago Sep Oct Nov Dic Prom.
1992 1.15 1.23 1.05 0.62 0.27 0.14 0.06 0.05 0.13 0.19 0.24 0.39 0.46
1993 1.19 0.99 0.97 0.84 0.33 0.14 0.09 0.06 0.11 0.13 0.27 1.14 0.52
1994 1.65 1.61 1.17 0.67 0.26 0.11 0.06 0.06 0.10 0.13 0.18 0.57 0.55
1995 1.31 1.41 1.11 0.60 0.23 0.10 0.05 0.04 0.09 0.15 0.23 0.78 0.51
1996 1.28 1.69 1.18 0.75 0.30 0.13 0.05 0.04 0.09 0.14 0.16 0.83 0.55
1997 1.40 1.53 1.13 0.67 0.27 0.12 0.05 0.04 0.09 0.13 0.22 0.76 0.53
1998 1.36 1.61 1.18 0.64 0.27 0.17 0.07 0.05 0.10 0.19 0.20 0.74 0.55
1999 1.32 1.56 1.16 0.70 0.28 0.12 0.05 0.04 0.10 0.13 0.18 0.67 0.53
2000 1.42 2.01 1.30 0.68 0.28 0.13 0.08 0.06 0.11 0.20 0.16 0.51 0.58
2001 1.53 1.27 1.10 0.72 0.31 0.16 0.10 0.06 0.10 0.16 0.21 0.69 0.54
2002 1.22 1.61 1.16 1.08 0.42 0.17 0.11 0.06 0.10 0.13 0.24 0.74 0.59
2003 1.22 1.56 1.13 0.86 0.34 0.14 0.05 0.04 0.09 0.14 0.15 0.84 0.55
MAX 1.652 2.007 1.303 1.079 0.416 0.174 0.107 0.064 0.135 0.200 0.275 1.138 0.586
MIN 1.148 0.993 0.969 0.601 0.233 0.098 0.047 0.039 0.090 0.128 0.147 0.386 0.460
PROM 1.337 1.507 1.137 0.737 0.295 0.137 0.068 0.050 0.102 0.152 0.202 0.722 0.537
Q (75%) 1.221 1.375 1.110 0.663 0.267 0.121 0.052 0.042 0.093 0.134 0.173 0.647 0.526
R (lt/s/km2) 43.814 49.324 39.822 23.767 9.579 4.329 1.861 1.521 3.335 4.799 6.212 23.226 18.862
Q (90%) 1.191 1.230 1.059 0.626 0.265 0.110 0.050 0.040 0.091 0.132 0.156 0.514 0.510
Q (95%) 1.170 1.121 1.016 0.614 0.251 0.104 0.049 0.039 0.090 0.130 0.152 0.452 0.487
Fuente: Resultados software Lutz - Scholz v1
CALIBRACION DE CAUDALES MENSUALES - CHOCCORO
(RESULTADOS SERIE DE TIEMPO METODO DE LUTZ SCHOLZ)

Caudal (m3/S)
Caudal Generado Serie Anual
2

Q_obs
Q_sim
1

0
e ar r l ct c
En Fe
b
Ab ay un Ju Ag
o
Se
p
No
v
Di
M M MES J O

Caudal Generado Serie Mensual


4
Caudal (m3/s)

Q_sim
3 Q_obs

0
0 20 40 60 80 100 120 140
MESES

Curva de Persistencia
7.50
Caudal (m3/s)

7.00

6.50

6.00
Q. 75%=0.526m3/s

5.50

5.00
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00
%
REPORTE DE RESULTADOS SOFTWARE LUTZ SCHOLZ V1g

PROYECTO Expediente técnico de adicional con deductivo vinculante – componente presa


“Construcción del sistema de riego laguna Ustunaccocha – Ccasanccay en el
distrito de Vinchos - Ayacucho”
Departamento: Ayacucho
Provincia: Huamanga
Distrito: Chuschi
Lugar: Choccoro
REPORTE DE RESULTADOS SOFTWARE LUTZ SCHOLZ V1g

PROYECTO Expediente técnico de adicional con deductivo vinculante – componente presa


“Construcción del sistema de riego laguna Ustunaccocha – Ccasanccay en el
distrito de Vinchos - Ayacucho”
Departamento: Ayacucho
Provincia: Huamanga
Distrito: Chuschi
Lugar: Choccoro