Documentos de Académico
Documentos de Profesional
Documentos de Cultura
ESTRUCTURA
ACABADOS
PISO 1
INSTALACIONES SANITARIAS
INSTALACIONES ELÉCTRICAS
TOTAL
PRESUPUESTO
ESTRUCTURA
ACABADOS
PISO 2
INSTALACIONES SANITARIAS
INSTALACIONES ELÉCTRICAS
TOTAL
ESTRUCTURA
ACABADOS
PISO 3
INSTALACIONES SANITARIAS
INSTALACIONES ELÉCTRICAS
TOTAL
COSTO TOTAL
ETAPAS COSTO TOTAL %
ESTRUCTURA S/. 142,835.42 63%
ACABADOS S/. 63,616.18 28% S/. 1.00
INSTALACIONES SANITARIAS S/. 7,671.71 3%
INSTALACIONES ELÉCTRICAS S/. 12,031.58 5%
TOTAL S/. 226,154.89 49%
ESTRUCTURA S/. 39,854.01 35%
ACABADOS S/. 55,036.54 48%
INSTALACIONES SANITARIAS S/. 7,671.71 7%
INSTALACIONES ELÉCTRICAS S/. 12,031.58 10%
TOTAL S/. 114,593.84 25%
ESTRUCTURA S/. 42,157.91 36%
ACABADOS S/. 56,498.31 48%
INSTALACIONES SANITARIAS S/. 7,671.71 6%
INSTALACIONES ELÉCTRICAS S/. 12,031.58 10%
TOTAL S/. 118,359.51 26%
COSTO TOTAL S/. 459,108.24 100%
ESTRUCTURA S/. 224,847.34
OBRAS PROVISIONALES
OBRAS PRELIMINARES
MOVIMIENTOS DE TIERRA
CONCRETO SIMPLE
CONCRETO ARMADO
(ZAPATAS)
CONCRETO ARMADO
(VIGAS DE CIMENTACIÓN)
CONCRETO ARMADO
(VIGAS)
CONCRETO ARMADO
(PLACAS)
CONCRETO ARMADO
(LOSAS ALIGERADAS)
CONCRETO ARMADO
(LOSA MACIZA)
CONCRETO ARMADO
(ESCALERAS)
CONCRETO ARMADO
(CISTERNA)
ALBAÑILERIA
REVOQUES
PISOS
ZOCALOS
CONTRAZOCALOS
CONTRAPISO
PISO 1 ACABADOS
CARPINTERIA DE MADERA
CARPINTERIA METALICA
VENTANAS Y MAMPARAS
PINTURAS
INSTALACIONES
PISO 1 INSTALAC
ELÉCTRICAS
INSTALACIONES
PISO 1 INSTALAC
SANITARIAS
CONCRETO ARMADO
(VIGAS)
CONCRETO ARMADO
(PLACAS)
CONCRETO ARMADO
(LOSA MACIZA)
CONCRETO ARMADO
(ESCALERAS)
ALBAÑILERIA
REVOQUES
PISOS
ZOCALOS
CARPINTERIA DE MADERA
CARPINTERIA METALICA
VENTANAS Y MAMPARAS
PINTURAS
INSTALACIONES
PISO 2 INSTALAC
ELÉCTRICAS
INSTALACIONES
PISO 2 INSTALAC
SANITARIAS
CONCRETO ARMADO
(VIGAS)
CONCRETO ARMADO
(PLACAS)
CONCRETO ARMADO
(LOSA MACIZA)
CONCRETO ARMADO
(ESCALERAS)
ALBAÑILERIA
REVOQUES
PISOS
ZOCALOS
CARPINTERIA DE MADERA
CARPINTERIA METALICA
VENTANAS Y MAMPARAS
PINTURAS
INSTALACIONES
PISO 3 INSTALAC
ELÉCTRICAS
INSTALACIONES
PISO 3 INSTALAC
SANITARIAS
ACTIVIDADES
MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA Y EQUIPOS
INSTALACIONES PROVISIONALES ELECTRICAS Y SANITARIAS.
CERCO DE OBRA
OFICINA DE OBRA
COMEDOR, DUCHA , ETC
TRAZO Y REPLANTEO INICAL
SEGURIDAD DE OBRA
TRANSPORTE VERTICAL DE MATERIALES
TRANSPORTE HORIZONTAL DE MATERIALES (ACARREO).
EXCAVACION MANUAL DE ZANJAS PARA CIMIENTOS
RELLENO Y COMPACTACION CON MATERIAL PROPIO
ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA PRODUCTO DE LAS EXCAVACIONES.
CONCRETO CICLOPEO PARA CIMIENTACION 1:10 + 30% P.G
CONCRETO CICLOPEO PARA CIMIENTACION 1:10 + 25% P.G.
FALSO PISO CONCRETO f'c=100 kg/cm2
SOLADO E= 8cm
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60, PARA ZAPATAS
CONCRETO PREMEZCLADO PARA ZAPATAS f'c=210 kg/cm2.
ENCOFRADO Y DESENCOFRADO
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60, PARA VIGAS DE CIMENTACION
CONCRETO PREMEZCLADO PARA VIGAS DE CIMENTACIÓN f'c=210 kg/cm2
ENCOFRADO Y DESENCOFRADO
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60, PARA COLUMNAS
CONCRETO PREMEZCLADO PARA COLUMNAS f'c=210 kg/cm2.
ENCOFRADO Y DESENCOFRADO
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60, PARA VIGAS.
CONCRETO PREMEZCLADO PARA VIGAS f'c=210 kg/cm2.
ENCOFRADO Y DESENCOFRADO
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60, PARA PLACAS.
CONCRETO PREMEZCLADO PLACAS f'c=210 kg/cm2
ENCOFRADO Y DESENCOFRADO
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60, PARA LOSAS ALIGERADAS.
LADRILLO PARA TECHO 0.30 X 0.30 X 0.15 DE h=0.20 m.
CONCRETO PREMEZCLADO PARA LOSA ALIGERADA f'c=210 kg/cm2.
ENCOFRADO Y DESENCOFRADO
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60, PARA LOSA MACIZA.
CONCRETO PREMEZCLADO PARA LOSA MACIZA f'c=210 kg/cm2.
ENCOFRADO Y DESENCOFRADO
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60, PARA ESCALERA.
CONCRETO PREMEZCLADO PARA ESCALERA f'c=210 kg/cm2
ENCOFRADO Y DESENCOFRADO
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60, PARA CISTERNA
CONCRETO PREMEZCLADO PARA CISTERNA f'c=210 kg/cm2.
MURO LADRILLO K.K DE ARCILLA 18H ( 09x013x0.24) AMARRE DE CABEZA, JUNTA 1.5 cm. MORTERO 1:1:5
TARRAJEO DE MUROS, C:A 1:5.
TARRAJEO DE CIELO RASO, C:A 1:5.
TARRAJEO DE VIGAS Y/O COLUMNAS
TARRAJEO DE DERRAMES
PISO DE PORCELANATO HALL, PASADIZOS, DEPARTAMENTOS
PISO DE PORCELANATO PARA ESCALERA.
ZOCALO DE CERAMICA 30 X 30 EN BAÑO
ZOCALO DE CERAMICA 60 X 60 EN COCINA
CONTRAZÓCALO DE PORCELANATO H=10 CM.
CONTRAPISO DE 2"
PUERTA PRINCIPAL DE MADERA SOLIDA 0.90 X 2.10 M.
PUERTA DE DORMITORIO Y ESTAR, DE MADERA CONTRAPLACADA 0.80 X 2.10 M.
PUERTA DE BAÑO, DE MADERA CONTRAPLACADA 0.70 X 2.10 M
PUERTA LEVADIZA PARA ESTACIONAMIENTO, 6.55 X 2.20 M.
BARANDA METALICA PARA ESCALERA.
TAPA DE INSPECCION PARA AZOTEA
ESCALERA DE GATO.
VENTANAS DE VIDRIO E= 6mm.
MAMPARA DE VIDRIO TEMPLADO E= 10mm.
PUERTA DE VIDRIO TEMPLADO PARA INGRESO A EDIFICIO, 1.20 X 2.20 M
PUERTA DE VIDRIO TEMPLADO PARA INGRESO A ESTACIONAMIENTO, 1.00 X 2.20 M
PINTURA DE MUROS INTERIORES
PINTURA DE CIELO RASO.
INSTALACIONES ELECTRICAS
INSTALACIONES SANITARIAS
ACTIVIDADES
ENCOFRADO Y DESENCOFRADO
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60, PARA COLUMNAS
CONCRETO PREMEZCLADO PARA COLUMNAS f'c=210 kg/cm2.
ENCOFRADO Y DESENCOFRADO
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60, PARA VIGAS.
CONCRETO PREMEZCLADO PARA VIGAS f'c=210 kg/cm2.
ENCOFRADO Y DESENCOFRADO
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60, PARA PLACAS.
CONCRETO PREMEZCLADO PLACAS f'c=210 kg/cm2
ENCOFRADO Y DESENCOFRADO
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60, PARA LOSAS ALIGERADAS.
LADRILLO PARA TECHO 0.30 X 0.30 X 0.15 DE h=0.20 m.
CONCRETO PREMEZCLADO PARA LOSA ALIGERADA f'c=210 kg/cm2.
ENCOFRADO Y DESENCOFRADO
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60, PARA LOSA MACIZA.
CONCRETO PREMEZCLADO PARA LOSA MACIZA f'c=210 kg/cm2.
ENCOFRADO Y DESENCOFRADO
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60, PARA ESCALERA.
CONCRETO PREMEZCLADO PARA ESCALERA f'c=210 kg/cm2
MURO LADRILLO K.K DE ARCILLA 18H ( 09x013x0.24) AMARRE DE CABEZA, JUNTA 1.5 cm. MORTERO 1:1:5
TARRAJEO DE MUROS, C:A 1:5.
TARRAJEO DE CIELO RASO, C:A 1:5.
TARRAJEO DE VIGAS Y/O COLUMNAS
TARRAJEO DE DERRAMES
PISO DE PORCELANATO HALL, PASADIZOS, DEPARTAMENTOS
PISO DE PORCELANATO PARA ESCALERA.
ZOCALO DE CERAMICA 30 X 30 EN BAÑO
ZOCALO DE CERAMICA 60 X 60 EN COCINA
CONTRAZÓCALO DE PORCELANATO H=10 CM.
CONTRAPISO DE 2"
PUERTA PRINCIPAL DE MADERA SOLIDA 0.90 X 2.10 M.
PUERTA DE DORMITORIO Y ESTAR, DE MADERA CONTRAPLACADA 0.80 X 2.10 M.
PUERTA DE BAÑO, DE MADERA CONTRAPLACADA 0.70 X 2.10 M
BARANDA METALICA PARA ESCALERA.
VENTANAS DE VIDRIO E= 6mm
MAMPARA DE VIDRIO TEMPLADO E= 10mm.
PINTURA DE MUROS INTERIORES
PINTURA DE CIELO RASO.
INSTALACIONES ELECTRICAS
INSTALACIONES SANITARIAS
ACTIVIDADES
ENCOFRADO Y DESENCOFRADO
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60, PARA COLUMNAS
CONCRETO PREMEZCLADO PARA COLUMNAS f'c=210 kg/cm2.
ENCOFRADO Y DESENCOFRADO
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60, PARA VIGAS.
CONCRETO PREMEZCLADO PARA VIGAS f'c=210 kg/cm2.
ENCOFRADO Y DESENCOFRADO
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60, PARA PLACAS.
CONCRETO PREMEZCLADO PLACAS f'c=210 kg/cm2
ENCOFRADO Y DESENCOFRADO
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60, PARA LOSAS ALIGERADAS.
LADRILLO PARA TECHO 0.30 X 0.30 X 0.15 DE h=0.20 m.
CONCRETO PREMEZCLADO PARA LOSA ALIGERADA f'c=210 kg/cm2.
ENCOFRADO Y DESENCOFRADO
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60, PARA LOSA MACIZA.
CONCRETO PREMEZCLADO PARA LOSA MACIZA f'c=210 kg/cm2.
ENCOFRADO Y DESENCOFRADO
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60, PARA ESCALERA.
CONCRETO PREMEZCLADO PARA ESCALERA f'c=210 kg/cm2
MURO LADRILLO K.K DE ARCILLA 18H ( 09x013x0.24) AMARRE DE CABEZA, JUNTA 1.5 cm. MORTERO 1:1:5
TARRAJEO DE MUROS, C:A 1:5.
TARRAJEO DE CIELO RASO, C:A 1:5.
TARRAJEO DE VIGAS Y/O COLUMNAS
TARRAJEO DE DERRAMES
PISO DE PORCELANATO HALL, PASADIZOS, DEPARTAMENTOS
PISO DE PORCELANATO PARA ESCALERA.
ZOCALO DE CERAMICA 30 X 30 EN BAÑO
ZOCALO DE CERAMICA 60 X 60 EN COCINA
CONTRAZÓCALO DE PORCELANATO H=10 CM.
CONTRAPISO DE 2"
PUERTA PRINCIPAL DE MADERA SOLIDA 0.90 X 2.10 M.
PUERTA DE DORMITORIO Y ESTAR, DE MADERA CONTRAPLACADA 0.80 X 2.10 M.
PUERTA DE BAÑO, DE MADERA CONTRAPLACADA 0.70 X 2.10 M
BARANDA METALICA PARA ESCALERA.
VENTANAS DE VIDRIO E= 6mm
MAMPARA DE VIDRIO TEMPLADO E= 10mm.
PINTURA DE MUROS INTERIORES
PINTURA DE CIELO RASO.
INSTALACIONES ELECTRICAS
INSTALACIONES SANITARIAS
Und. Metrado Precio Parcial % Sub Total % Total
glb 1.00 2500.00 2500.00 22%
mes 6.00 350.00 2100.00 19%
glb 1.00 2400.00 2400.00 21% 11300.00 5%
glb 1.00 2300.00 2300.00 20%
glb 1.00 2000.00 2000.00 18%
m2 176.00 3.14 552.64 1%
mes 6.00 3800.00 22800.00 58%
39352.64 17%
mes 4.00 2400.00 9600.00 24%
mes 4.00 1600.00 6400.00 16%
m3 113.04 55.62 6287.28 52%
m3 56.62 41.97 2372.14 20% 12154.13 5%
m3 146.96 23.78 3494.71 29%
m3 26.52 195.19 5176.44 45%
m3 1.26 184.00 2439.84 21%
11535.66 5%
m3 10.52 248.96 2619.06 23%
m2 48.00 27.09 1300.32 11%
kg 442.00 4.72 2086.24 27%
7863.81 3%
m3 14.40 401.22 5777.57 73%
m2 73.33 37.10 2720.54 32%
kg 679.80 4.64 3154.27 37% 8413.72 4%
m3 6.36 399.20 2538.91 30%
m2 134.00 37.10 4971.40 30%
kg 1757.10 4.56 8188.09 50% 16337.12 7%
m3 7.96 399.20 3177.63 19%
m2 86.83 37.10 3221.38 21%
kg 1748.34 4.64 8112.30 52% 15657.02 7%
m3 10.83 399.20 4323.34 28%
m2 19.43 37.10 720.85 31%
kg 211.85 4.67 989.34 43% 2289.03 1%
m3 1.45 399.20 578.84 25%
m2 75.52 37.10 2801.79 28%
kg 477.07 4.67 2227.92 22%
9989.00 4%
und 745.33 2.76 2057.11 21%
m3 7.27 399.20 2902.18 29%
m2 6.42 37.10 238.18 18%
kg 132.01 4.67 616.49 46% 1333.71 1%
m3 1.20 399.20 479.04 36%
m2 7.94 37.10 294.57 25%
kg 96.12 4.67 448.88 38% 1174.59 1%
m3 1.08 399.20 431.14 37%
m2 28.44 37.10 1055.12 20%
kg 415.55 4.67 1940.62 38% 5171.38 2%
5171.38 2%
m3 5.45 399.20 2175.64 42%
m2 191.22 55.20 10555.34 100% 10555.34 5%
m2 346.65 26.99 9358.08 67%
m2 102.90 27.00 2778.08 20%
13975.01 6%
m2 50.00 28.29 1414.50 10%
m2 15.00 28.29 424.35 3%
m2 105.18 59.30 6237.17 79%
7867.29 3%
m2 27.87 58.49 1630.12 21%
m2 29.34 65.54 1922.94 79%
2422.89 1%
m2 7.23 69.15 499.95 21%
m 84.2 15.87 1336.25 100% 1336.25 1%
m2 98.05 30.04 2945.42 100% 2945.42 1%
und 1.00 850.00 850.00 9%
und 3.00 850.00 1650.00 18%
9000.00 4%
und 2.00 500.00 1000.00 11%
und 1.00 5500.00 5500.00 61%
m 3.65 240.00 876.00 61%
und 1.00 320.00 320.00 22% 1426.00 1%
und 1.00 230.00 230.00 16%
m2 13.90 170.00 2363.00 27%
m2 17.41 270.00 4700.70 53%
8913.70 4%
und 1.00 950.00 950.00 11%
und 1.00 900.00 900.00 10%
m2 346.65 11.61 4024.61 78%
5176.06 2%
m2 102.90 11.19 1151.45 22%
225893.06 100%
116593.72
460843.94
ETAPA PROCESOS
OBRAS PROVISIONALES
OBRAS PRELIMINARES
MOVIMIENTOS DE TIERRA
CONCRETO SIMPLE
CONCRETO ARMADO
(ZAPATAS)
CONCRETO ARMADO
(VIGAS DE CIMENTACIÓN)
CONCRETO PREMEZCLADO PARA VIGAS DE CIMENTACIÓN f'
ESTRUCTURA CONCRETO ARMADO
(COLUMNAS)
CONCRETO PREMEZCLADO PARA COLUMNAS f'c=210
CONCRETO ARMADO
(VIGAS)
CONCRETO ARMADO
(PLACAS)
CONCRETO ARMADO
(LOSAS ALIGERADAS)
CONCRETO ARMADO
(CISTERNA)
ALBAÑILERIA
REVOQUES
PISOS
ZOCALOS
CONTRAZOCALOS
CONTRAPISO
ACABADOS
CARPINTERIA DE MADERA
CARPINTERIA METALICA
VENTANAS Y MAMPARAS
PINTURAS
INSTALACIONES ELECTRICAS
INSTALACIONES SANITARIAS
TOTAL
ACTIVIDADES Und. Metrado Precio
MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA Y EQUIPOS glb 1.00 2500.00
INSTALACIONES PROVISIONALES ELECTRICAS Y SANITARIAS. mes 6.00 350.00
CERCO DE OBRA glb 1.00 2400.00
OFICINA DE OBRA glb 1.00 2300.00
COMEDOR, DUCHA , ETC glb 1.00 2000.00
TRAZO Y REPLANTEO INICAL m2 176.00 3.14
SEGURIDAD DE OBRA mes 6.00 3800.00
TRANSPORTE VERTICAL DE MATERIALES mes 4.00 2400.00
TRANSPORTE HORIZONTAL DE MATERIALES (ACARREO). mes 4.00 1600.00
EXCAVACION MANUAL DE ZANJAS PARA CIMIENTOS m3 113.04 55.62
RELLENO Y COMPACTACION CON MATERIAL PROPIO m3 56.62 41.97
NACION DE MATERIAL EXCEDENTE CON MAQUINARIA PRODUCTO DE LAS EXCAVACIONES.
m3 146.96 23.78
CONCRETO CICLOPEO PARA CIMIENTACION 1:10 + 30% P.G m3 26.52 195.19
CONCRETO CICLOPEO PARA CIMIENTACION 1:10 + 25% P.G. m3 1.26 184.00
FALSO PISO CONCRETO f'c=100 kg/cm2 m3 10.52 248.96
SOLADO E= 8cm m2 48.00 27.09
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60, PARA ZAPATAS kg 442.00 4.72
CONCRETO PREMEZCLADO PARA ZAPATAS f'c=210 kg/cm2. m3 14.40 401.22
ENCOFRADO Y DESENCOFRADO m2 73.33 37.10
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60, PARA VIGAS DE CIMENTACION
kg 679.80 4.64
CONCRETO PREMEZCLADO PARA VIGAS DE CIMENTACIÓN f'c=210 kg/cm2m3 6.36 399.20
ENCOFRADO Y DESENCOFRADO m2 319.38 37.10
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60, PARA COLUMNAS kg 3999.86 4.56
CONCRETO PREMEZCLADO PARA COLUMNAS f'c=210 kg/cm2. m3 20.03 399.20
ENCOFRADO Y DESENCOFRADO m2 242.45 37.10
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60, PARA VIGAS. kg 4858.22 4.64
CONCRETO PREMEZCLADO PARA VIGAS f'c=210 kg/cm2. m3 29.11 399.20
ENCOFRADO Y DESENCOFRADO m2 58.29 37.10
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60, PARA PLACAS. kg 630.99 4.67
CONCRETO PREMEZCLADO PLACAS f'c=210 kg/cm2 m3 4.35 399.20
ENCOFRADO Y DESENCOFRADO m2 255.62 37.10
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60, PARA LOSAS ALIGERADAS.kg 1431.21 4.67
LADRILLO PARA TECHO 0.30 X 0.30 X 0.15 DE h=0.20 m. und 2235.99 2.76
CONCRETO PREMEZCLADO PARA LOSA ALIGERADA f'c=210 kg/cm2. m3 23.84 399.20
ENCOFRADO Y DESENCOFRADO m2 13.79 37.10
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60, PARA LOSA MACIZA. kg 396.03 4.67
CONCRETO PREMEZCLADO PARA LOSA MACIZA f'c=210 kg/cm2. m3 5.80 399.20
ENCOFRADO Y DESENCOFRADO m2 26.60 37.10
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60, PARA ESCALERA. kg 413.31 4.67
CONCRETO PREMEZCLADO PARA ESCALERA f'c=210 kg/cm2 m3 4.33 399.20
ENCOFRADO Y DESENCOFRADO m2 28.44 37.10
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60, PARA CISTERNA kg 415.55 4.67
CONCRETO PREMEZCLADO PARA CISTERNA f'c=210 kg/cm2. m3 5.45 399.20
DRILLO K.K DE ARCILLA 18H ( 09x013x0.24) AMARRE DE CABEZA, JUNTA 1.5 cm.m2
MORTERO 515.75
1:1:5 55.20
TARRAJEO DE MUROS, C:A 1:5. m2 978.65 26.99
TARRAJEO DE CIELO RASO, C:A 1:5. m2 308.60 27.00
TARRAJEO DE VIGAS Y/O COLUMNAS m2 150.00 28.29
TARRAJEO DE DERRAMES m2 45.00 28.29
PISO DE PORCELANATO HALL, PASADIZOS, DEPARTAMENTOS m2 301.28 59.30
PISO DE PORCELANATO PARA ESCALERA. m2 93.61 58.49
ZOCALO DE CERAMICA 30 X 30 EN BAÑO m2 73.19 65.54
ZOCALO DE CERAMICA 60 X 60 EN COCINA m2 22.20 69.15
CONTRAZÓCALO DE PORCELANATO H=10 CM. m 236.4 15.87
CONTRAPISO DE 2" m2 294.15 30.04
PUERTA PRINCIPAL DE MADERA SOLIDA 0.90 X 2.10 M. und 3.00 850.00
PUERTA DE DORMITORIO Y ESTAR, DE MADERA CONTRAPLACADA 0.80 X 2.10 und
M. 8.00 550.00
PUERTA DE BAÑO, DE MADERA CONTRAPLACADA 0.70 X 2.10 M und 7.00 500.00
PUERTA LEVADIZA PARA ESTACIONAMIENTO, 6.55 X 2.20 M. und 1.00 5500.00
BARANDA METALICA PARA ESCALERA. m 26.35 240.00
TAPA DE INSPECCION PARA AZOTEA und 1.00 320.00
ESCALERA DE GATO. und 1.00 230.00
VENTANAS DE VIDRIO E= 6mm. m2 61.60 170.00
MAMPARA DE VIDRIO TEMPLADO E= 10mm. m2 55.91 270.00
PUERTA DE VIDRIO TEMPLADO PARA INGRESO A EDIFICIO, 1.20 X 2.20 Mund 1.00 950.00
PUERTA DE VIDRIO TEMPLADO PARA INGRESO A ESTACIONAMIENTO, 1.00 X 2.20 und M 1.00 900.00
PINTURA DE MUROS INTERIORES m2 978.63 11.61
PINTURA DE CIELO RASO. m2 308.70 11.19
TOTAL
Parcial % Sub Total % Total
2500.00 22%
2100.00 19%
2400.00 21% 11300.00 2.46%
2300.00 20%
2000.00 18%
552.64 1%
22800.00 58%
39352.64 8.55%
9600.00 24%
6400.00 16%
6287.28 52%
2372.14 20% 12154.13 2.64%
3494.71 29%
5176.44 45%
2439.84 21%
11535.66 2.51%
2619.06 23%
1300.32 11%
2086.24 27%
7863.81 1.71%
5777.57 73%
2720.54 32%
3154.27 37% 8413.72 1.83%
2538.91 30%
11849.00 31%
18239.36 48% 38084.34 8.28%
7995.98 21%
8994.90 21%
22542.14 52% 43157.75 9.38%
11620.71 27%
2162.56 32%
2946.72 43% 6845.80 1.49%
1736.52 25%
9483.50 30%
6683.75 21%
31855.51 6.92%
6171.33 19%
9516.93 30%
511.61 11%
1849.46 40% 4676.43 1.02%
2315.36 50%
986.86 21%
1930.16 42% 4645.55 1.01%
1728.54 37%
1055.12 20%
1940.62 38% 5171.38 1.12%
5171.38 1.12%
2175.64 42%
28469.40 100% 28469.40 6.19%
26413.76 66%
8332.20 21%
40262.51 8.75%
4243.50 11%
1273.05 3%
17865.90 77%
23341.15 5.07%
5475.25 23%
4796.87 76%
6332.00 1.38%
1535.13 24%
3751.668 100% 3751.668 0.82%
8836.27 100% 8836.27 1.92%
2550.00 16%
4400.00 28%
15950.00 3.47%
3500.00 22%
5500.00 34%
6324.00 92%
320.00 5% 6874.00 1.49%
230.00 3%
10472.00 38%
15095.70 55%
27417.70 5.96%
950.00 3%
900.00 3%
11361.89 77%
14816.25 3.22%
3454.35 23%
460217.55 100.00%
ETAPAS ELEMENTOS DEL COSTO
ESTRUCTURA MATERIALES
ACABADOS MATERIALES
INSTALACIONES SANITARIAS MATERIALES
INSTALACIONES ELÉCTRICAS MATERIALES
TOTAL
ESTRUCTURA MANO DE OBRA
PRESUPUESTO
ACABADOS MANO DE OBRA
INSTALACIONES SANITARIAS MANO DE OBRA
INSTALACIONES ELÉCTRICAS MANO DE OBRA
TOTAL
ESTRUCTURA CIF (EQUIPOS)
ACABADOS CIF (EQUIPOS)
INSTALACIONES SANITARIAS CIF (EQUIPOS)
INSTALACIONES ELÉCTRICAS CIF (EQUIPOS)
TOTAL
COSTO TOTAL
COSTO TOTAL %
166564.47 36.28%
109635.05 23.88%
23276.79 5.07%
11156.33 2.43%
312193.60 68%
56516.22 12.31%
29796.12 6.49%
14783.29 3.22%
10284.02 2.24%
110185.98 24%
13681.43 2.98%
21899.46 4.77%
872.31 0.19%
642.75 0.14%
36728.66 8%
459108.24 100%
ELEMENTOS DEL COSTO COSTO TOTAL
MATERIALES 312193.603
PRESUPUESTO MANO DE OBRA 110185.978
CIF (EQUIPOS) 36728.6592
TOTAL 459108.24
%
68%
24%
8%
100%