CUADRO RESUMEN GENERAL DE PRECIOS

PLANTILLA FABRICACION TANQUE


PROYECTO - WATER & SLURRY TANK
PRESUPUESTO
Tank N° QTY.. DESCRIPTION QTY. CANT. PESO PRECIO UNITARIO UNIT PRICE TOTAL
UNIT. UNIT. Kg. FABRICACION MONTAJE
US$/Kg US$/Kg US$ US$
1.0 Thinckener 16,748.75
1EA 05-810-3410-014 Thickener O/F Tank Und. 1.00 4,327.47 2.12 9,158.12
2.0 Paste Plant 43,353.34
1EA 05-810-3410-003 Filter Wash Tank Und. 1.00 3,586.78 2.12 7,590.63
1EA 05-810-3410-004 Process Water Tank Und. 1.00 3,586.78 2.12 7,590.63
1EA 05-810-3410-005 Filter feed Tank Und. 1.00 8,958.45 1.96 1.18 28,172.09
3.0 Filtration Plant 43,353.34
1EA 05-810-3410-005 Filter Wash Tank Und. 1.00 3,586.78 2.12 7,590.63
1EA 05-810-3410-006 Process Wash Tank Und. 1.00 3,586.78 2.12 7,590.63
1EA 05-810-3410-014 Filter feed tank Und. 1.00 8,958.45 1.96 1.18 28,172.09

VALOR VENTA TOTAL 103,455.44


Los precios no imncluyen el IGV
MATERIALES MAQUINAS

Planchas US / KG Maquinas
Pl. hasta 5/16" (2.5mm, 1/8") 0.96 TORNO COLCHESTER
Pl. medianas 3/8" - 3/4" 0.96 TORNO INTORSA
Pl. gruesas hasta 1" @ 2" 0.95 TORNO NARDINI 350
TORNO ENCO
Pl Especial US / KG TORNO MACHSTROY
Pl. T1 3/8" - 3/4" 3.10 TORNO GRAZIANO
Pl. medianas 3/8" - 3/4" 0.94 TORNO NARDINI 500
Pl Astm 242 - Corten Tipo 1 2.40 TORNO VERTICAL DORRIES
TORNO VERTICAL JUGHENTAL
Angulos US / KG TORNO REVOLVER URASA
Livianos hasta 1/4" x 2" 0.85 FRESA UNIVERSAL # 1 145
Medianos mas de 1/4" x 2" 0.85 FRESA GRANDE # 2 115
Pesados de 3/8" x 3" a mas 0.85 FRESA UNIVERSAL # 3 321
TALADRO COLUMNA
Vigas US / KG TALDRO MEDIANO CARIMAT
Perfil < W8x31# 1.05 TALADRO RADIAL GRANDE CSEPEL
Perfil Interm 1.05 MANDRINO
Perfil > W8x55# 1.20 GENERADORA
SIERRA ELECTRICA
Vigas Prefabricadas US / KG PRENSA
Perfiles W 1.27 ROSCADORA
Perfil Interm 1.05 CORTATUBO
Perfil > W8x55# 1.20 GRUA 20TON

Canales Lac US / KG Insumos


Livianas C4x5.4# 0.90 Soldadura SMAW
Medianas C6x8.2#, C8x11.5# 0.95 Soldadura SAW
Pesada C10"x15.3# 0.95 Placas Radiograf
C10"x3"x3mm 1.00 Discos esmeril
OXIGENO BOT 10m3
Tubos US / KG Bot. Map de 32 Kg
Tu. SCH 40 hasta 1 1/2" 1.15 Kit de tintes penetrantes
Tu. SCH 40 de 2" @ 6" 1.15 Mano de obra
Tu. SCH 40 8" @ 16" 1.17 Trapo Industrial
Tu. SCH 80 2" @ 6" 1.25 Permatec

Otros US / KG
Platinas livianas 0.84
Fe liso hasta 1"Ø 0.80 PERNOS HILTI
Pl estriada 3/16 @ 1/4" 0.95 PERNO Ø1/2"
Fe Corrugado 0.72 PERNO Ø5/8"
Ø 3/8" @ 2 1/2" SAE-1020 1.60 PERNO Ø3/4"
Barra Fundida 1045 5.00 PERNO Ø7/8"
Barra SAE 1045 Ø 2" 2.00 PERNO Ø1"
OTROS MATERIALES

US$ / HM Maquinas US$ / KG


10.00 Bridas Pequeñas Clase 150# 2.50
10.00 Bridas Grandes Clase 150# 2.00
10.00 Cap Ø3"x180 Expeciales 5.00
8.00 Codos Ø3"x 90° 3.00
10.00 Codos Ø3"x 180° 3.50
8.00 Pernos Ø3/4x21/2 1.68
16.00 Empaquetaduras 1/8"x3" 8.00
25.00 Empaquetaduras 1/8"x3" 20.00
20.00
8.00
12.00
10.00
12.00
4.00
8.00
12.00
25.00
30.00
4.00
6.00
6.00
3.50
45.00

US /kg
2.50 Barandas 1.80
3.30 Parrillas 1.80
10.00 Peldaños 2.00
3.00 Escalera de Gato 1.70
30.00 Estructura de Maniobra 10.00
120.00 Montacarga 18.75
40.00 Retoques de Pintura 9.00
3.00
1.50
9.00

US / U
4.90 Elementos de Fijación 1.50
7.39
11.15
13.14
16.67
ANALISIS DE PRECIOS UNITARIOS
CLIENTE: COMPAÑÍA MINERA
PROYECTO: WATER & SLURRY TANKS FECHA 8/12/2022
OBRA FABRICACION DE TANQUES PARA AGUA Y PULPA
REFERECIA: PLANOS
ELABORADO POR: DPA

ITEM DESCRIPCION UND. CT. PESO PESO RATIO P.UNIT. P.TOT.


UNIT TOTAL $/KG US$ US$

1.0 TANK N° 05-810-3410-014

ANALISIS DE PRECIOS UNITARIOS


CLIENTE: COMPAÑÍA MINERA
PROYECTO: WATER & SLURRY TANKS 8/12/2022
PARTIDA: FABRICACION DE SILOS
SUBPARTIDA: 1.1 TANQUE
REFERENCIA: PLANO Nº CLS-96050105-2-001 y CLS-96050105-2-002
ELABORADO POR: D.P.A.
ITEM DESCRIPCION MAT. UND. CT. PESO P.MAT. AREA P.UNIT. P.TOT.
KG. US$/KG m2 US$ US$
MATERIALES 198.18
CUERPO 3.20 Ø int. 5.50 Altura 1 Unidades
1 PL 1/4 '' x 6.35 x 1.50 x 10.05 1er, 2do y 3er anillo A-36 Kg. 3 2258 0.96 90.48 2167.60
2 PL 1/4 '' x 6.35 x 1.00 x 10.05 4to anillo A-36 Kg. 1 502 0.96 20.11 481.69
FONDO
3 PL 5/16 '' x 7.94 x 3.35 x 3.35 Techo A-36 Kg. 1 550 0.96 22.45 527.91
ANILLO DE REFUERZO
4 L 4" x 1/2 '' x 14.70 Kg/m 0.40 m2/m 10.05 Angulo Rolado A-36 Kg. 1 148 0.85 8.04 125.61

PESO NETO Y AREA TOTAL 3457.36 141.07


DESPERDICIO ( 6% ) 207.45 0.96 198.18
PESO BRUTO 3664.81

INSUMOS CONSUMIBLES 150.66


Soldadura 1.5% ( 3457.36 ) 51.86 2.50 129.66
Disco de Esmeril 2.0 7.00 3.00 21.00

COSTO TOTAL DE MATERIALES US $ 3651.65


PROCESOS
CALDERERIA 485.01
Oxicorte Kg 3664.81 0.06 219.89
Rolado Kg 2759.68 0.08 220.78
Rolado de Perfiles Kg 147.78 0.30 44.34
Rolado Conico Kg 0.25 0.00
Kg 0.00
MAESTRANZA 24.00
Torno Colchester Ruedas HM 0.00 10.00 0.00
Fresa universal HM 0.00 10.00 0.00
Prensa HM 0.00 6.00 0.00
Taladro columna 5 MIN/AGUJ 35.00 AGUJ HM 3.00 8.00 24.00
LIMPIEZA Y PROTECCION SUPERFICIAL 637.31
Arenado SSPC -SP10 M2 2.50 141.07 352.68
Pintura base Amerlock 400 6 mils M2 4.04 70.54 284.63
Pintura de acabado Amercoat 370 5 mils M2 0.00 70.54 0.00
LABOR 901.21
Mano de Obra Casco 10.00 Kg/hh Hh 275.97 2759.7 3.00 827.91
Maniobras KG 3664.8 0.02 73.30
END 125.29
Tintes penetrantes al 100% L= 51.86 mts 10% Jgo 0.43 40.00 17.29
Rayos X 5% Und 9.00 12.00 108.00
SERVICIO DE TERCEROS 138.29
Embalaje KG 3457.36 0.01 34.57
Tranporte KG 3457.36 0.00 0.00
Ingenieria KG 3457.36 0.03 103.72

COSTO TOTAL DE PROCESOS US $ 2311.12

COSTO DE PRODUCCION US $. 5962.77


GASTOS GRLES + UTILIDADES 17% 1013.68
VALOR VENTA UNITARIO US$. 6976.45
CANTIDAD 1.00
VALOR VENTA TOTAL US $ 6976.45
$/ML R. GENERAL US $/ Kg. 2.02
1.10 TANQUE 3.2 Ø 5.50 H KG 1 3457.36 3457.36 2.02 6983.87 6983.87

1.20 PLATAFORMA 1 m2 KG 1 140.19 140.19 2.32 325.24 325.24

1.30 PISO DE PLATAFORMAS 1 m2 KG 1 53.76 53.76 2.51 134.94 134.94

1.40 BARANDAS Y ESCALERAS DE GATO 3.1 m 5.5 m KG 1 337.99 337.99 2.47 834.83 834.83

1.50 ACCESORIOS KG 1 338.17 338.17 2.60 879.24 879.24

THICKENER O/F TANK KG 1 4327.47 4327.47 2.12 9158.12 9158.12

2.0 TANKS 05-820-3410-003 AND 05-820-3410-004


2.10 TANQUE 3.00 Ø 4.50 H KG 1 2693.02 2693.02 2.02 5439.90 5439.90
2.20 PLATAFORMA 1.00 m2 KG 1 135.99 135.99 2.32 315.50 315.50
2.30 PISO DE PLATAFORMAS 1.00 m2 KG 1 53.76 53.76 2.51 134.94 134.94
2.40 BARANDAS Y ESCALERAS DE GATO 3.1 m 5.5 m KG 1 362.95 362.95 2.47 896.48 896.48
2.50 ACCESORIOS KG 1 341.07 341.07 2.60 886.78 886.78
FILTER AND PROCESS WASH TANK - PASTE PLANT KG 2 3586.78 7173.57 2.14 15347.18 7673.59

3.0 TANKS 05-820-3410-005 AND 05-820-3410-006


3.10 TANQUE 3.00 Ø 4.50 H KG 1 2693.02 2693.02 2.02 5439.90 5439.90
3.20 PLATAFORMA 1.00 m2 KG 1 135.99 135.99 2.32 315.50 315.50
3.30 PISO DE PLATAFORMAS 1.00 m2 KG 1 53.76 53.76 2.51 134.94 134.94
3.40 BARANDAS Y ESCALERAS DE GATO 3.1 m 5.5 m KG 1 362.95 362.95 2.47 896.48 896.48
3.50 ACCESORIOS KG 1 341.07 341.07 2.60 886.78 886.78
FILTER AND PROCESS WASH TANK - FILTRATION PLANT KG 2 3586.78 7173.57 2.14 15347.18 7673.59

ANALISIS DE PRECIOS UNITARIOS


CLIENTE: MINSUR S.A.
PROYECTO: PUCAMARCA - BARREN SOLUTION TANK FECHA 8/12/2022
OBRA FABRICACION DE TANQUES PARA AGUA Y PULPA
REFERECIA: PLANOS
ELABORADO POR: DPA

ITEM DESCRIPCION UND. CT. PESO PESO RATIO P.UNIT. P.TOT.


UNIT TOTAL $/KG US$ US$

1.0 ACERO ESTRUCTURAL

2.10 TANQUE 5.00 Ø 5.50 H KG 1 6674.66 6674.66 1.80 12014.40 12014.40

2.20 COLUMNAS Y PLATAFORMA 10.00 m2 KG 1 798.08 798.08 2.16 1723.86 1723.86

2.30 PISO DE PLATAFORMAS 10.00 m2 KG 1 480.00 480.00 2.50 1200.00 1200.00

2.40 BARANDAS Y ESCALERAS DE GATO 3.1 m 5.5 m KG 1 635.83 635.83 2.49 1583.23 1583.23

2.50 ACCESORIOS KG 1 369.87 369.87 2.91 1076.32 1076.32

FILTER FEED TANK - PASTE PLANT AND FILTRATION PLANT KG 1 8958.45 8958.45 1.96 17597.80 17597.80

36,591.51
TRANSPORTE CAMA BAJAS
CAMA BAJA 3 1200
ESCOLTA 2 320 2 DIAS 80 US$/DIA
1520
4560
TRANSPORTE 4 800 3200
7760
0.21207105069
MAT. CONSUMIBLES Doblez END

T.Penetr
Desper.

Doblez
Sold.

Oxi.
Dis.
Und./
FABRICACION DE TAQUES % % $/KG $/KG %
Ton
1.00 TANQUES SIN PUENTE
1.10 TANQUE 6.0% 1.5% 2.00 0.06 0.12 10.0%
1.20 PLATAFORMA 6.0% 2.0% 2.00 0.06 0.12 0.0%
1.30 PISO DE PLATAFORMAS
1.40 BARANDAS Y ESCALERAS DE GATO 6.0% 2.0% 2.00 0.06 0.12 0.0%
1.50 ACCESORIOS 6.0% 2.0% 2.00 0.06 0.12 0.0%

2.00 TANQUES CON PUENTE


MANO
ACABADO
END ROLADO DE OTROS GGU
SUPERFICIAL
OBRA

Pint base a 4

Pint acabado
metal blanco
Arenado al

Transporte
Maniobras

Ingenieria
Embalaje
Planchas

Perfiles

a 3 mils

Fabri.
GG +

mils
RX

Utilidad

% $/KG $/KG $/m2 $/m2 $/m2 Kg / Hh $/Kg $/Kg $/Kg $/Kg %

5.0% 0.08 0.30 2.50 4.04 0.00 10.00 0.02 0.01 0.00 0.03 17.00%
0.0% 0.08 0.30 2.50 4.04 0.00 12.00 0.02 0.01 0.00 0.03 17.00%
0.30 2.50 4.04 0.00 0.02 0.01 0.00 0.03 8.00%
0.0% 0.08 0.30 2.50 4.04 0.00 8.00 0.02 0.01 0.00 0.03 17.00%
0.0% 0.08 0.30 2.50 4.04 0.00 7.00 0.02 0.01 0.00 0.03 17.00%
RESUMEN

Precio Uni. Valor venta


Peso
Fabricacion Fabricacion

$/Kg Kg US$

2.02 3457.36 6983.87 1.73 5969.12


2.32 140.19 325.24
2.51 53.76 134.94
2.47 337.99 834.83
2.60 338.17 879.24
CUADRO RESUMEN DE PRECIOS UNITARIOS

CIA MINERA MILPO

WATER & SLURRY TANKS

OBRAS MECANICAS - MONTAJES

ITEM DESCRIPCION C. DIRECTO PESO RATIO V. VENTA

3.1 Accesorios para Tk KG 1,624.45 2,284 1.13 2,584.02

3.2 Tanque de Alimentacion a Filtro KG 5,023.12 6,675 1.20 7,990.27

Tanque Agitador KG 6,647.57 8,958 1.18 10,574.29


Mano de Obra INSUMOS END PRUEBA ALQUILER

penetrante

Hidrostatic
Soldadura
Horas por

Ayudante
Soldador

Operario

Rayos X
hombres

Grua 10

Grúa de
Camion
Esmeril
Totales

Resane
Indust.

pintura
Oficial

20 ton
Tintes
Trapo
Total
Dias

Ton
HH
dia

O2
Descripción del trabajo Peso Ctd. eficiencia GG Utilidad RATIO PESO TOTAL

a
s
3.00 MONTAJE Kg Und Hr/dia % % # Kg/u $/Kg Juego $/Kg $/Kg % % Kg/hh % % $/KG KG $
3.10 Accesorios para Tk 2284 1 10.0 3.8 1.0 1.0 2.0 1.0 5.0 190 0.40% 0.06% 1.00 2.00 0.020 1.00 0.02 0.03 10% 12.0 53.07% 6.00% 1.13 2,284 2584.02
3.20 Tanque de Alimentacion a Filtro 6675 1 10.0 7.9 2.0 2.0 1.0 1.0 6.0 477 1.00% 0.05% 1.00 2.00 0.020 1.00 0.02 0.03 10% 10% 14.0 53.07% 6.00% 1.20 6,675 7990.27

ALQUILERES US$ / DIA CONSUMIBLES US$ / Pz 121663.380719


Camion Grua 10 Ton 140.00 Bot. O2 x 10 m3 30.00
Grua de 20 Ton 400.00 Bot. Map de 32 Kg 80.00
Dobladora de Tubos 60.00 Soldadura 2.50
Grupo Electrogeno 100 Kw 250.00 Disco de esmeril 3.00
Tractor 240.00 Trapo ind 1.50
Excavadora Sobre Orugas 520.00 Tintes penetr 40.00
Trayler - Cama Baja 200.00

+
CEMPROTECH SAC
CUADRO DE PRESUPUESTO
DESCRIPCION:
CLIENTE:
REFERENCIA: VARIOS
ELABORADO: R. TINTAYA
PESOS (KG) VALORIZACI
ITEM DESCRIPCION ESPECIFIC CANTID DIMENSION AREA PESO PESO COSTO
TOTAL PINT(m2) UNITARIO TOTAL UNITARIO
MATERIALES

PLANCHAS
1 PL. 1/8" 1.50 m x 6.00 m A-36 1u 9.0 m² 0.0 m² 24.9 kg/m² 224 0.92
2 PL. 3/16" 1.00 m x 1.00 m A-36 1u 1.0 m² 0.0 m² 37.4 kg/m² 37
3 PL. 1/4" 1.20 m x 2.40 m A-36 1u 2.9 m² 0.0 m² 49.8 kg/m² 144 0.95
4 PL. 6 mm 1.50 m x 6.00 m A-36 1u 9.0 m² 1.0 m² 47.1 kg/m² 424 0.85
5 PL. 1/4" 1.50 m x 6.00 m A-36 1u 9.0 m² 0.0 m² 47.1 kg/m² 424 0.89
6 PL. 5/16" 1.20 m x 2.40 m A-36 1u 2.9 m² 0.0 m² 62.8 kg/m² 181 0.84
7 PL. 3/8" 1.20 m x 2.40 m A-36 1u 2.9 m² 0.0 m² 74.7 kg/m² 215 0.97
8 PL. 1/2" 1.20 m x 2.40 m A-36 1u 2.9 m² 0.0 m² 99.7 kg/m² 287 0.91
9 PL. 5/8" 1.00 m x 1.00 m A-36 1u 1.0 m² 0.0 m² 125.6 kg/m² 126
10 PL. 3/4" 1.20 m x 2.40 m A-36 1u 2.9 m² 0.0 m² 150.0 kg/m² 432 0.85
11 PL. 19 mm 1.20 m x 2.40 m A-36 1u 2.9 m² 0.0 m² 150.0 kg/m² 432 0.89
11 PL. 1" 1.00 m x 1.00 m A-36 1u 1.0 m² 0.0 m² 199.0 kg/m² 199
12 PL. 1½" 1.00 m x 1.00 m A-36 1u 1.0 m² 0.0 m² 298.3 kg/m² 298
13 PL. 25 mm 1.20 m x 2.40 m A-36 1u 2.9 m² 0.0 m² 196.3 kg/m² 565 0.88
14 PL. 32 mm 1.20 m x 2.40 m A-36 1u 2.9 m² 0.0 m² 251.2 kg/m² 723 0.88
15 PL. 50 mm 1.20 m x 2.40 m A-36 1u 2.9 m² 0.0 m² 392.5 kg/m² 1,130 0.88

11 PT 3/16" x 1¼" x 1.00 m A-36 1u 1.0 m 0.1 m² 1.1 kg/m 1


12 PT 1/4" x 2" x 1.00 m A-36 1u 1.0 m 0.1 m² 2.4 kg/m 2
13 PT 5/16" x 2" x 1.00 m A-36 1u 1.0 m 0.1 m² 2.4 kg/m 2
14 PT 5/16" x 2½" x 1.00 m A-36 1u 1.0 m 0.1 m² 4.0 kg/m 4
15 PT 3/8" x 2" x 1.00 m A-36 1u 1.0 m 0.1 m² 3.8 kg/m 4
16 PT 3/8" x 3" x 1.00 m A-36 1u 1.0 m 0.6 m² 5.6 kg/m 6
17 PT 1/4" x 3" x 1.00 m A-36 1u 1.0 m 0.2 m² 3.6 kg/m 4
16 PT 1/4" x 4" x 1.00 m A-36 1u 1.0 m 0.2 m² 4.8 kg/m 5

14 W4" x 13 lb/pie x 6.00 m A-36 1u 6.0 m 3.7 m² 19.4 kg/m 116


15 W6" x 15 lb/pie x 6.00 m A-36 1u 6.0 m 5.4 m² 22.4 kg/m 134
16 W6" x 20 lb/pie x 6.00 m A-36 1u 6.0 m 5.5 m² 29.8 kg/m 179
17 W6" x 25 lb/pie x 6.00 m A-36 1u 6.0 m 5.5 m² 37.3 kg/m 224
18 W8" x 15 lb/pie x 6.00 m A-36 1u 6.0 m 4.9 m² 22.4 kg/m 134
19 W8" x 18 lb/pie x 6.00 m A-36 1u 6.0 m 5.7 m² 26.9 kg/m 161
20 W8" x 24 lb/pie x 6.00 m A-36 1u 6.0 m 6.4 m² 35.8 kg/m 215
21 W8" x 31 lb/pie x 6.00 m A-36 1u 6.0 m 7.3 m² 46.3 kg/m 278
22 W8" x 40 lb/pie x 6.00 m A-36 1u 6.0 m 7.4 m² 59.7 kg/m 358
23 W10" x 15 lb/pie x 6.00 m A-36 1u 6.0 m 5.5 m² 22.4 kg/m 134
24 W10" x 22 lb/pie x 6.00 m A-36 1u 6.0 m 6.6 m² 32.8 kg/m 197
25 W10" x 26 lb/pie x 6.00 m A-36 1u 6.0 m 6.6 m² 38.8 kg/m 233
26 W10" x 33 lb/pie x 6.00 m A-36 1u 6.0 m 7.8 m² 49.2 kg/m 295
27 W10" x 45 lb/pie x 6.00 m A-36 1u 6.0 m 7.9 m² 67.1 kg/m 403
28 W10" x 49 lb/pie x 6.00 m A-36 1u 6.0 m 9.1 m² 73.1 kg/m 439
29 W12" x 26 lb/pie x 6.00 m A-36 1u 6.0 m 7.7 m² 38.8 kg/m 233
30 W12" x 30 lb/pie x 6.00 m A-36 1u 6.0 m 7.7 m² 44.8 kg/m 269
31 W12" x 35 lb/pie x 6.00 m A-36 1u 6.0 m 7.8 m² 52.2 kg/m 313
32 W12" x 40 lb/pie x 6.00 m A-36 1u 6.0 m 8.5 m² 59.7 kg/m 358
33 W12" x 53 lb/pie x 6.00 m A-36 1u 6.0 m 9.7 m² 79.1 kg/m 474
34 W12" x 65 lb/pie x 6.00 m A-36 1u 6.0 m 11.0 m² 97.0 kg/m 582
35 W14" x 22 lb/pie x 6.00 m A-36 1u 6.0 m 7.2 m² 32.8 kg/m 197
36 W14" x 30 lb/pie x 6.00 m A-36 1u 6.0 m 8.3 m² 44.8 kg/m 269
37 W14" x 34 lb/pie x 6.00 m A-36 1u 6.0 m 8.4 m² 50.7 kg/m 304
38 W14" x 38 lb/pie x 6.00 m A-36 1u 6.0 m 8.4 m² 56.7 kg/m 340
39 W14" x 43 lb/pie x 6.00 m A-36 1u 6.0 m 9.0 m² 64.2 kg/m 385
40 W14" x 61 lb/pie x 6.00 m A-36 1u 6.0 m 10.3 m² 91.0 kg/m 546
41 W14" x 82 lb/pie x 6.00 m A-36 1u 6.0 m 10.5 m² 122.3 kg/m 734
42 W16" x 26 lb/pie x 6.00 m A-36 1u 6.0 m 8.1 m² 38.8 kg/m 233
43 W16" x 36 lb/pie x 6.00 m A-36 1u 6.0 m 9.1 m² 53.7 kg/m 322
44 W16" x 40 lb/pie x 6.00 m A-36 1u 6.0 m 9.0 m² 59.7 kg/m 358
45 W16" x 45 lb/pie x 6.00 m A-36 1u 6.0 m 9.0 m² 67.1 kg/m 403
46 W16" x 50 lb/pie x 6.00 m A-36 1u 6.0 m 9.2 m² 74.6 kg/m 448
47 W16" x 57 lb/pie x 6.00 m A-36 1u 6.0 m 9.3 m² 85.0 kg/m 510
48 W16" x 67 lb/pie x 6.00 m A-36 1u 6.0 m 11.2 m² 100.0 kg/m 600
49 W18" x 55 lb/pie x 6.00 m A-36 1u 6.0 m 10.0 m² 82.1 kg/m 492
50 W21" x 62 lb/pie x 6.00 m A-36 1u 6.0 m 11.4 m² 92.5 kg/m 555
51 W21" x 73 lb/pie x 6.00 m A-36 1u 6.0 m 11.5 m² 108.9 kg/m 653
52 W24" x 68 lb/pie x 6.00 m A-36 1u 6.0 m 12.5 m² 101.5 kg/m 609
53 W33" x118 lb/pie x 6.00 m A-36 1u 6.0 m 17.0 m² 176.1 kg/m 1,056
54 W36" x120 lb/pie x 6.00 m A-36 1u 6.0 m 16.7 m² 179.0 kg/m 1,074

1 C3" x 4.1 lb/pie x 6.00 m A-36 1u 6.0 m 1.7 m² 6.1 kg/m 37


2 C3" x 5.0 lb/pie x 6.00 m A-36 1u 6.0 m 1.8 m² 7.5 kg/m 45
3 C4" x 5.4 lb/pie x 6.00 m A-36 1u 6.0 m 2.2 m² 8.1 kg/m 49
4 C6" x 8.2 lb/pie x 6.00 m A-36 1u 6.0 m 3.0 m² 12.3 kg/m 74
5 C6" x 10.5 lb/pie x 6.00 m A-36 1u 6.0 m 3.0 m² 15.8 kg/m 95
6 C8" x 11.5 lb/pie x 6.00 m A-36 1u 6.0 m 3.8 m² 17.3 kg/m 104
7 C10" x 15.3 lb/pie x 6.00 m A-36 1u 6.0 m 4.6 m² 23.0 kg/m 138
8 C12" x 20.7 lb/pie x 6.00 m A-36 1u 6.0 m 5.4 m² 31.1 kg/m 186

1 TUBO ø 1/2" x 1.00 m SCH 40 1u 1.0 m 0.1 m² 1.3 kg/m 1


2 TUBO ø 3/4" x 1.00 m SCH 40 1u 1.0 m 0.1 m² 1.7 kg/m 2
3 TUBO ø 1" x 1.00 m SCH 40 1u 1.0 m 0.1 m² 2.5 kg/m 3
4 TUBO ø 1¼" x 1.00 m SCH 40 1u 1.0 m 0.1 m² 3.4 kg/m 3
5 TUBO ø 1½" x 1.00 m SCH 40 1u 1.0 m 0.2 m² 4.0 kg/m 4
6 TUBO ø 2" x 1.00 m SCH 40 1u 1.0 m 0.2 m² 5.4 kg/m 5
7 TUBO ø 2½" x 1.00 m SCH 40 1u 1.0 m 0.2 m² 8.6 kg/m 9
8 TUBO ø 3" x 1.00 m SCH 40 1u 1.0 m 0.3 m² 11.3 kg/m 11
9 TUBO ø 4" x 1.00 m SCH 40 1u 1.0 m 0.4 m² 16.0 kg/m 16
10 TUBO ø 5" x 1.00 m SCH 40 1u 1.0 m 0.4 m² 21.7 kg/m 22
11 TUBO ø 6" x 1.00 m SCH 40 1u 1.0 m 0.5 m² 28.2 kg/m 28
12 TUBO ø 8" x 1.00 m SCH 40 1u 1.0 m 0.7 m² 42.5 kg/m 42
13 TUBO ø 10" x 1.00 m SCH 40 1u 1.0 m 0.9 m² 60.2 kg/m 60
14 TUBO ø 12" x 1.00 m SCH 40 1u 1.0 m 1.0 m² 73.7 kg/m 74
15 TUBO ø 14" x 1.00 m STD 1u 1.0 m 1.1 m² 82.5 kg/m 83
16 TUBO ø 16" x 1.00 m STD 1u 1.0 m 1.3 m² 94.5 kg/m 95
17 TUBO ø 24" x 1.00 m SCH 20 1u 1.0 m 164.0 kg/m 164
18 TUBO ø 30" x 1.00 m SCH 40 1u 1.0 m 175.0 kg/m 175

1 TUBO ø 1/2" x 1.00 m SCH 80 1u 1.0 m 0.1 m² 1.6 kg/m 2


2 TUBO ø 3/4" x 1.00 m SCH 80 1u 1.0 m 0.1 m² 2.2 kg/m 2
3 TUBO ø 1" x 1.00 m SCH 80 1u 1.0 m 0.1 m² 3.2 kg/m 3
4 TUBO ø 1¼" x 1.00 m SCH 80 1u 1.0 m 0.1 m² 4.5 kg/m 4
5 TUBO ø 1½" x 1.00 m SCH 80 1u 1.0 m 0.2 m² 5.4 kg/m 5
6 TUBO ø 2" x 1.00 m SCH 80 1u 1.0 m 0.2 m² 7.5 kg/m 7
7 TUBO ø 2½" x 1.00 m SCH 80 1u 1.0 m 0.2 m² 11.4 kg/m 11
8 TUBO ø 3" x 1.00 m SCH 80 1u 1.0 m 0.3 m² 15.3 kg/m 15
9 TUBO ø 4" x 1.00 m SCH 80 1u 1.0 m 0.4 m² 22.4 kg/m 22
10 TUBO ø 5" x 1.00 m SCH 80 1u 1.0 m 0.4 m² 31.0 kg/m 31
11 TUBO ø 6" x 1.00 m SCH 80 1u 1.0 m 0.5 m² 42.6 kg/m 43
12 TUBO ø 8" x 1.00 m SCH 80 1u 1.0 m 0.7 m² 64.7 kg/m 65

1 BRIDA Ø 3/4" x 150 # S - On SA 181 1u 0.0 m² 0.7 kg/u 1


1 BRIDA Ø 1" x 150 # S - On SA 181 1u 0.0 m² 0.9 kg/u 1
1 BRIDA Ø 1½" x 150 # S - On SA 181 1u 0.0 m² 1.4 kg/u 1
1 BRIDA Ø 2" x 150 # S - On SA 181 1u 0.0 m² 2.3 kg/u 2
1 BRIDA Ø 3" x 150 # S - On SA 181 1u 0.0 m² 4.1 kg/u 4
1 BRIDA Ø 4" x 150 # S - On SA 181 1u 0.0 m² 5.5 kg/u 5
1 BRIDA Ø 5" x 150 # S - On SA 181 1u 0.0 m² 5.9 kg/u 6
1 BRIDA Ø 6" x 150 # S - On SA 181 1u 0.0 m² 8.2 kg/u 8
1 BRIDA Ø 8" x 150 # S - On SA 181 1u 0.1 m² 12.7 kg/u 13
1 BRIDA Ø 10" x 150 # S - On SA 181 1u 0.1 m² 16.8 kg/u 17
1 BRIDA ø 12" x 150 # S - On SA 181 1u 0.1 m² 27.3 kg/u 27
1 BRIDA ø 14" x 150 # S - On SA 181 1u 0.1 m² 35.0 kg/u 35
1 BRIDA ø 16" x 150 # S - On SA 181 1u 0.1 m² 42.3 kg/u 42
1 BRIDA ø 18" x 150 # S - On SA 181 1u 0.2 m² 54.5 kg/u 55
1 BRIDA ø 20" x 150 # S - On SA 181 1u 0.2 m² 70.5 kg/u 70
1 BRIDA ø 24" x 150 # S - On SA 181 1u 0.2 m² 95.5 kg/u 95

1 BRIDA Ø 3/4" x 150 # WN SA 181 1u 0.0 m² 0.9 kg/u 1


1 BRIDA Ø 1" x 150 # WN SA 181 1u 0.0 m² 1.1 kg/u 1
1 BRIDA Ø 1½" x 150 # WN SA 181 1u 0.0 m² 1.8 kg/u 2
1 BRIDA Ø 2" x 150 # WN SA 181 1u 0.0 m² 2.7 kg/u 3
1 BRIDA Ø 3" x 150 # WN SA 181 1u 0.0 m² 5.2 kg/u 5
1 BRIDA Ø 4" x 150 # WN SA 181 1u 0.0 m² 7.3 kg/u 7
1 BRIDA Ø 5" x 150 # WN SA 181 1u 0.0 m² 9.1 kg/u 9
1 BRIDA Ø 6" x 150 # WN SA 181 1u 0.0 m² 10.9 kg/u 11
1 BRIDA Ø 8" x 150 # WN SA 181 1u 0.1 m² 19.1 kg/u 19
1 BRIDA Ø 10" x 150 # WN SA 181 1u 0.1 m² 25.0 kg/u 25
1 BRIDA Ø 12" x 150 # WN SA 181 1u 0.1 m² 38.6 kg/u 39
1 BRIDA Ø 14" x 150 # WN SA 181 1u 0.1 m² 51.8 kg/u 52
1 BRIDA Ø 16" x 150 # WN SA 181 1u 0.1 m² 64.5 kg/u 65
1 BRIDA Ø 18" x 150 # WN SA 181 1u 0.2 m² 70.5 kg/u 70
1 BRIDA Ø 20" x 150 # WN SA 181 1u 0.2 m² 77.3 kg/u 77
1 BRIDA Ø 24" x 150 # WN SA 181 1u 0.2 m² 118.2 kg/u 118

1 ANG L1" 1/8" x 1.00 m A-36 1u 1.0 m 0.1 m² 1.2 kg/m 1


2 ANG L1½" 3/16" x 1.00 m A-36 1u 1.0 m 0.2 m² 2.7 kg/m 3
3 ANG L1½" 1/4" x 1.00 m A-36 1u 1.0 m 0.2 m² 3.5 kg/m 4
4 ANG L2" 3/16" x 1.00 m A-36 1u 1.0 m 0.2 m² 3.7 kg/m 4
5 ANG L2" 1/4" x 1.00 m A-36 1u 1.0 m 0.2 m² 4.8 kg/m 5
6 ANG L2" 5/16" x 1.00 m A-36 1u 1.0 m 0.2 m² 5.9 kg/m 6
7 ANG L2½" 3/16" x 1.00 m A-36 1u 1.0 m 0.3 m² 4.6 kg/m 5
8 ANG L2½" 1/4" x 1.00 m A-36 1u 1.0 m 0.3 m² 6.2 kg/m 6
9 ANG L2½" 5/16" x 1.00 m A-36 1u 1.0 m 0.3 m² 7.5 kg/m 8
10 ANG L2½" 3/8" x 1.00 m A-36 1u 1.0 m 0.3 m² 8.9 kg/m 9

1 ANG L3" 3/16" x 1.00 m A-36 1u 1.0 m 0.3 m² 5.6 kg/m 6


2 ANG L3" 1/4" x 1.00 m A-36 1u 1.0 m 0.3 m² 7.4 kg/m 7
3 ANG L3" 5/16" x 1.00 m A-36 1u 1.0 m 0.3 m² 9.2 kg/m 9
4 ANG L3" 3/8" x 1.00 m A-36 1u 1.0 m 0.3 m² 10.8 kg/m 11

1 ANG L4" 1/4" x 1.00 m A-36 1u 1.0 m 0.4 m² 9.8 kg/m 10 0.84
2 ANG L4" 5/16" x 1.00 m A-36 1u 1.0 m 0.4 m² 12.3 kg/m 12
3 ANG L4" 3/8" x 1.00 m A-36 1u 1.0 m 0.4 m² 14.7 kg/m 15
4 ANG L4" 1/2" x 1.00 m A-36 1u 1.0 m 0.4 m² 19.2 kg/m 19
5 ANG L5" 3/8" x 1.00 m A-36 1u 1.0 m 0.5 m² 18.5 kg/m 18
6 ANG L5" 1/2" x 1.00 m A-36 1u 1.0 m 0.5 m² 24.3 kg/m 24
7 ANG L6" 3/8" x 1.00 m A-36 1u 1.0 m 0.6 m² 22.4 kg/m 22
8 ANG L6" 1/2" x 1.00 m A-36 1u 1.0 m 0.6 m² 29.4 kg/m 29

1 BARRA ø 3/8" x 1.00 m SAE 1020 1u 1.0 m 0.0 m² 0.6 kg/m 1


2 BARRA ø 1/2" x 1.00 m SAE 1020 1u 1.0 m 0.0 m² 1.0 kg/m 1
3 BARRA ø 5/8" x 1.00 m SAE 1020 1u 1.0 m 0.1 m² 1.6 kg/m 2
4 BARRA ø 3/4" x 1.00 m SAE 1020 1u 1.0 m 0.1 m² 2.3 kg/m 2
5 BARRA ø 1" x 1.00 m SAE 1020 1u 1.0 m 0.1 m² 4.0 kg/m 4
6 BARRA ø 1½" x 1.00 m SAE 1020 1u 1.0 m 0.1 m² 9.0 kg/m 9
7 BARRA ø 2" x 1.00 m SAE 1020 1u 1.0 m 0.2 m² 16.0 kg/m 16
8 BARRA ø 2½" x 1.00 m SAE 1020 1u 1.0 m 0.2 m² 25.0 kg/m 25
9 BARRA ø 3" x 1.00 m SAE 1020 1u 1.0 m 0.2 m² 36.0 kg/m 36
10 BARRA ø 3½" x 1.00 m SAE 1020 1u 1.0 m 0.3 m² 49.0 kg/m 49
11 BARRA ø 4" x 1.00 m SAE 1020 1u 1.0 m 0.3 m² 64.0 kg/m 64
12 BARRA ø 5" x 1.00 m SAE 1020 1u 1.0 m 0.4 m² 100.0 kg/m 100
13 BARRA ø 6" x 1.00 m SAE 1020 1u 1.0 m 0.5 m² 144.0 kg/m 144
12-Aug-22

PAG : 1/X

12-Aug-22

VALORIZACION
COSTO COSTO GRAN
UNITARIO TOTAL US$ TOTAL US$

$/kg 205
$/kg 0
$/kg 136
$/kg 360
$/kg 379
$/kg 153
$/kg 209
$/kg 261
$/kg 0
$/kg 369
$/kg 385
$/kg 0
$/kg 0
$/kg 496
$/kg 635
$/kg 997

$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0

$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0

$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0

$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0

$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0

$/u 0
$/u 0
$/u 0
$/u 0
$/u 0
$/u 0
$/u 0
$/u 0
$/u 0
$/u 0
$/u 0
$/u 0
$/u 0
$/u 0
$/u 0
$/u 0

$/u 0
$/u 0
$/u 0
$/u 0
$/u 0
$/u 0
$/u 0
$/u 0
$/u 0
$/u 0
$/u 0
$/u 0
$/u 0
$/u 0
$/u 0
$/u 0

$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0

$/kg 0
$/kg 0
$/kg 0
$/kg 0

$/kg 8 8.25
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0

$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
$/kg 0
CEMPRO TECH SAC.

ANALISIS DE PRECIO UNITARIO DE APLICACIÓN DE PINTURA ESTRUCTURAS

ITEM DESCRIPCCION UNID CANT

1.00 PINTADO BASE : Amecoat 68 HS a 3 mils m^2 500.00

2.00 ACABADO : Amerclock 400 a 6 mils m^2 500.00

TOTAL 500.00

ANALISIS DE PRECIO UNITARIO DE APLICACIÓN DE PINTURA TANQUES

ITEM DESCRIPCCION UNID CANT

1.00 PINTADO BASE : Amecoat 385 a 4 mils m^2 500.00

2.00 ACABADO : Amercoat 370 a 6 mils m^2 500.00

TOTAL 500.00
DE PINTURA ESTRUCTURAS

COSTO DIRECTO
P.U. Total
$/M2 US $

7.05 3524.80

4.04 2017.56

11.08 5542.36

DE PINTURA TANQUES

COSTO DIRECTO
P.U. Total
$/M2 US $

2.91 1454.26

4.86 2430.66

7.77 3884.92
CLIENTE: METSO MINERALS S.A.
OBRA: PROYECTO CERRO LINDO -Instalación - BM 14,5' x 23,5' - P3855062006

GASTOS GENERALES

TOTAL TIEMPO EJECUCION TOTAL 25 DIAS


OBRA MECANICA 25 DIAS

1.00 ADMINISTRACION DE LA OBRA


1.01 * ING. MECANICO RESIDENTE 1
Sueldo Mensual = 1,443.61 US $
Alojamiento y Alimentación Mensual = 330.00 US $
Número de meses = 0.83 Meses
Total Residente US $ 1,478.01 SUB TOTAL US $
1.05 * SUPERVISORES DE CAMPO MECANICO 0
Sueldo Mensual = 988.06 US $
Alojamiento y Alimentación Mensual = 330.00 US $
Número de meses = 0.83 Meses
Total Supervisor US $ 0.00 SUB TOTAL US $
1.07 * ADMINISTRADOR 0
Sueldo Mensual = 760.29 US $
Alojamiento y Alimentación Mensual = 330.00 US $
Número de meses = 0.83 Meses
Total Administrador US $ 0.00 SUB TOTAL US $
1.08 * ALMACENERO 1
Sueldo Mensual = 536.67 US $
Alojamiento y Alimentación Mensual = 330.00 US $
Número de meses = 0.83 Meses
Total Almacenero US $ 722.23 SUB TOTAL US $
1.09 * VIGILANTE 0
Sueldo Mensual = 651.49 US $
Alojamiento y Alimentación Mensual = 330.00 US $
Número de meses = 0.00 Meses
Total Vigilante US $ 0.00 SUB TOTAL US $
1.10 * CHOFERES 0
Sueldo Mensual = 787.08 US $
Alojamiento y Alimentación Mensual = 330.00 US $
Número de meses = 0.83 Meses
Total Choferes US $ 0.00 SUB TOTAL US $

Total Empleados 2
GASTOS GENERALES # 1 US $ .

2.00.- ALOJAMIENTO Y ALIMENTACION PERSONAL OBRERO


LIMA LOCALES TOTAL
MONTAJE MECANICO 16 0 16
Total 16 0 16
2.01 .- ALOJAMIENTO PERSONAL OBRERO MECANICO
- Numero de Personal : 16 Hombres
- Alojamiento US $/día $/día
- Número de meses 25.00 días
Total Alojamiento Obra Mecanica US $ 0.00 SUB TOTAL US $

2.02 .- ALIMENTACION PERSONAL MECANICO OBRERO


- Numero de Personal en Obra Mecánica : 16 Hombres
- Alimentacion dia US $ 0.00 $/dia
- Número de meses 0.83 Meses
Total Alimentación Obra Mecanica US $ 0.00 SUB TOTAL US $
2.05 .- ALIMENTACION PERSONAL LOCAL MECANICO
- Numero de Personal en Obra Mecánica : 0 Hombres
- Alimentacion dia US $ 0.00 $/dia
- Número de meses 0.83 Meses
Total Alimentación Obra Civil US $ 0.00 SUB TOTAL US $

GASTOS GENERALES # 2 US $ .
4.00.- OTROS GASTOS
4.01.- GASTOS ADMINISTRATIVOS E IMPREVISTOS
Gastos Administrativos - Lima Oficina 1.50% 15,954.17 US $

SUB TOTAL US $
4.02.- EXAMEN MEDICO
Costo Medico por hombre 50.00
Total Examen Medico 900.00
SUB TOTAL US $

4.03.- CHARLAS DE SEGURIDAD Jornal Cant. 1 Dias


Cant. Obreros Obra Mecanica
Operario 5.39 8 345.19
Oficial 4.11 6.4 210.43
Ayudante 3.46 1.6 44.26
SUB TOTAL US $

Nº de Bidones de Agua 20 lt/Día. 12.00


Precio unitario 3.50
SUB TOTAL US $
4.05.- COMUNICACIONES
Telefono 5 US$. / día 125.00
Fax 41.67
SUB TOTAL US $
4.04.- OTROS
Caja Chica 250.00 US $ / Mes
Equipo de seguridad 250.00 US $
SUB TOTAL US $

GASTOS GENERALES # 4 US $ .

5.00.- ALQUILERES 0.83

5.01.- ALQUILER DE UNA CAMIONETA DOBLE CABINA 1 Días Costo Alq./día


20.00 120.00
% Utlización 80.0%

5.02.- ALQUILER DE TRANSPORTE PERSONAL 1 Días Costo Alq./día


20.00 70.00
% Utlización 80.0%
5.03.- ALQUILER DE BAÑOS QUIMICOS 0 Días Costo Alq./día
25.00 4.00
% Utlización 100.0%

5.04.- ALQUILER DE CONTAINER 0 Días Costo Alq./día


25.00 10.00
% Utlización 100.0%

GASTOS GENERALES # 5 US $ .

7.00.- PLANOS DE INGENIERIA


Unidad Cant P.U
7.01.- Planos 0.0 30.00

GASTOS GENERALES # 7 US $ .

8.00.- OTROS
Unidad Cant P.U
8.01.- Movilización de Equipos y Herramientas Viaje 0.0 1500.00
8.02.- Transporte de grua Viaje 0.0 1300.00

GASTOS GENERALES # 7 US $ .

TOTAL GASTOS GENERALES US $ :


COSTO DIRECTO US $ :

% GASTOS GENERALES % :
0.83 MESES
0.83 MESES

Alimen. Diaria 5.00


Aloj. Diario 6.00

1,478.01

Alimen. Diaria 5.00


Aloj. Diario 6.00

0.00

Alimen. Diaria 5.00


Aloj. Diario 6.00

0.00

Alimen. Diaria 5.00


Aloj. Diario 6.00

722.23

Alimen. Diaria 5.00


Aloj. Diario 6.00

0.00

Alimen. Diaria 5.00


Aloj. Diario 6.00

0.00

OS GENERALES # 1 US $ . 2,200.24

0.00

0.00
0.00

TOS GENERALES # 2 US $ . 0.00

239.31

900.00

599.88

42.00

166.67

458.33

TOS GENERALES # 4 US $ . 2,406.20

MESES

Parcial
2,400.00

Parcial
1,400.00
Parcial
0.00

Parcial
0.00

TOS GENERALES # 5 US $ . 3,800.00

Parcial
0.00

TOS GENERALES # 7 US $ . 0.00

Parcial
0.00
0.00

TOS GENERALES # 7 US $ . 0.00

TOTAL GG 8,466.43

8,466.44
15,954.17

53.07%
53.07%
TIPO DE CAMBIO S/. / $ 3.40
HORAS POR MES TRABAJADAS 208.00 sueldo 1,669.31 1,443.61 1,239.03 1,239.03 1,239.03 988.06 760.29 760.29 536.67 1,052.00 986.29 920.58 1,121.87

INGENIERO INGENIERO
INGENIERO INGENIERO INGENIERO ADMINISTRADOR
ITEM DESCRIPCION MECANICO ASISTENTE SUPERVISOR TOPOGRAFO ALMACENERO CAPATAZ SOLDADOR ELECTRICISTA OPERARIO
CIVIL RESIDENTE DE SEGURIDAD AMBIENTAL OBRA
RESIDENTE MECANICO

COSTO TOTAL HORA-HOMBRE $ 8.03 $ 6.94 $ 5.96 $ 5.96 $ 5.96 $ 4.75 $ 3.66 $ 3.66 $ 2.58 $ 5.06 $ 4.74 $ 4.43 $ 5.39

DETALLE:
SUELDO BASICO S/ 3,500.00 S/ 3,000.00 S/ 2,550.00 S/ 2,550.00 S/ 2,550.00 S/ 2,000.00 S/ 1,500.00 S/ 1,500.00 S/ 1,000.00
SALARIO BASICO S/ 60.00 S/ 55.00 S/ 50.00 S/ 65.00

1 HORA-HOMBRE BASICO $ 4.95 $ 4.24 $ 3.61 $ 3.61 $ 3.61 $ 2.83 $ 2.12 $ 2.12 $ 1.41 $ 2.21 $ 2.02 $ 1.84 $ 2.39

2 OTROS INGRESOS
DOMINICAL 6.00 - - - - - - - - - 0.37 0.34 0.31 0.40
VACACIONES 365.00 0.41 0.35 0.30 0.30 0.30 0.23 0.17 0.17 0.12 0.18 0.17 0.15 0.20
CTS 365.00 0.41 0.35 0.30 0.30 0.30 0.23 0.17 0.17 0.12 0.18 0.17 0.15 0.20
GRATIFICACION 365.00 0.81 0.70 0.59 0.59 0.59 0.46 0.35 0.35 0.23 0.36 0.33 0.30 0.39
1.63 1.40 1.19 1.19 1.19 0.92 0.69 0.69 0.47 1.09 1.01 0.91 1.19

3 APORTACIONES EMPLEADOR
ESSALUD 9.00% 0.59 0.51 0.43 0.43 0.43 0.34 0.25 0.25 0.17 0.30 0.27 0.25 0.32
SEGURO DE RIESGO 1.14% 0.06 0.05 0.04 0.04 0.04 0.03 0.02 0.02 0.02 0.03 0.02 0.02 0.03
0.65 0.56 0.47 0.47 0.47 0.37 0.27 0.27 0.19 0.33 0.29 0.27 0.35

4 OTROS IMPUESTOS
SOLIDARIDAD 5.00% 0.33 0.28 0.24 0.24 0.24 0.19 0.14 0.14 0.09 0.16 0.15 0.14 0.18
SCTR 1.10% 0.07 0.06 0.05 0.05 0.05 0.04 0.03 0.03 0.02 0.04 0.03 0.03 0.04
SENATI 0.75% 0.02 0.02 0.02 0.03
0.40 0.34 0.29 0.29 0.29 0.23 0.17 0.17 0.11 0.22 0.20 0.19 0.25

5 CONSUMIBLES
Dos Unif, casco, botas, .5 casacas 60 días 60.00 $ 104.00 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22
Guantes, lentes, chaleco, 60.00 $ 84.00 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18
0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40
un par guantes por semana $ 3.00
Impermeable $ 8.00
Casaca $ 20.00
Lentes seguridad $ 6.00
Uniforme $ 20.00
Botas $ 24.00
Chaleco $ 12.00
Casco $ 6.00
Arneces $ -
TOTAL WAGE $ 8.03 $ 6.94 $ 5.96 $ 5.96 $ 5.96 $ 4.75 $ 3.66 $ 3.66 $ 2.58 $ 4.24 $ 3.93 $ 3.61 $ 4.58

7 GASTOS GENERALES
Alim. Y aloj. Empleados $ - - - - - - - - - -
Alim.y aloj.. obreros 1.00 $ 5.60 0.82 0.82 0.82 0.82
Costo Diario aloj. Empleados -
Costo diario aliment. Emplead -
Costo diario aloj. Obreros 1.00
Costo diario aliment obreros 4.60

8 EXAMEN MEDICO - - - - - - - - - - - - -
9 TRANSPORTE LIMA-OBRA - - - - - - - - - - - - - - -
10 UTILIDAD - - - - - - - - - - - - -

GASTOS GENERALES Y UTILIDAD - - - - - - - - - 0.82 0.82 0.82 0.82

HORA-HOMBRE NORMAL $ 8.03 $ 6.94 $ 5.96 $ 5.96 $ 5.96 $ 4.75 $ 3.66 $ 3.66 $ 2.58 $ 5.06 $ 4.74 $ 4.43 $ 5.39

HORA EXTRA NO APLICA NO APLICA NO APLICA NO APLICA NO APLICA NO APLICA NO APLICA NO APLICA NO APLICA 5.30 4.91 4.51 5.72
HORA EXTRA DOBLE NO APLICA NO APLICA NO APLICA NO APLICA NO APLICA NO APLICA NO APLICA NO APLICA NO APLICA 8.48 7.85 7.22 9.15
1,121.87 854.87 719.28 787.08 651.49

OPERADOR
OFICIAL AYUDANTE CHOFER VIGILANTE
equipos

$ 5.39 $ 4.11 $ 3.46 $ 3.78 $ 3.13

S/ 65.00 S/ 45.00 S/ 35.00 S/ 40.00 S/ 30.00

$ 2.39 $ 1.65 $ 1.29 $ 1.47 $ 1.10

0.40 0.28 0.21 0.25 0.18


0.20 0.14 0.11 0.12 0.09
0.20 0.14 0.11 0.12 0.09
0.39 0.27 0.21 0.24 0.18
1.19 0.83 0.64 0.73 0.54

0.32 0.22 0.17 0.20 0.15


0.03 0.02 0.01 0.02 0.01
0.35 0.24 0.18 0.22 0.16

0.18 0.12 0.10 0.11 0.08


0.04 0.03 0.02 0.02 0.02
0.03 0.02 0.01 0.02 0.01
0.25 0.17 0.13 0.15 0.11

0.22 0.22 0.22 0.22 0.22


0.18 0.18 0.18 0.18 0.18
0.40 0.40 0.40 0.40 0.40

$ 4.58 $ 3.29 $ 2.64 $ 2.97 $ 2.32

0.82 0.82 0.82 0.82 0.82

- - - - -
- - - - -
- - - - -

0.82 0.82 0.82 0.82 0.82

$ 5.39 $ 4.11 $ 3.46 $ 3.78 $ 3.13

5.72 4.12 3.30 3.71 2.89


9.15 6.59 5.28 5.93 4.63