PL-01
TANQUE DE 3 Ø 5/8"
POLIETILENO
Estribo :Ø"3/8
CAP.= 5000 Lts. 3 @ ,05. 4 @ ,10. R @ .20 A/E
1 C-1 C-1
N.V.T.= + 7.90 .40
Estribo :Ø"3/8
VA (0.40 x 0.40)
.40 3 Ø 5/8"
SECCION 1-1
ESC : 1/25 PL-01 PL-01
COLUMNA
(0.40 x 0.40)
COLUMNA
N.V.T.= +4.60 3 Ø 5/8"
(0.40 x 0.40)
2° NIVEL
2 C-1 C-1
3 Ø 5/8"
Estribo :Ø"3/8
3 @ ,05. 4 @ ,10. R @ .20 A/E PL-01
Estribo :Ø"3/8
ESCALERA METALICA TIPO
GATO PARANTE DE F°G° Ø 2"
2Ø3/4"
A B
Ø3/8" 3 a.05, 4@.10, R @.20 A/E ESPECIFICACIONES TECNICAS
SECCION 2-2 1.00.- DE LOS MATERIALES
ESC : 1/25
01. CONCRETO SIMPLE
SOLADO f'c = 100 Kg/cm2.
C-1 C-1
COLUMNA 02. CONCRETO ARMADO
(0.40 x 0.40) PLATEA DE CIMENTACION f'c = 210 Kg/cm2
1 VP (0.40 x 0.40) VIGAS
COLUMNAS
f'c = 210 Kg/cm2
f'c = 210 Kg/cm2
N.V.T.= +1.20 3 Ø 5/8" PLATAFORMA f'c = 210 Kg/cm2
VP (0.40 x 0.40)
3.00.- RECUBRIMIENTOS
VP (0.40 x 0.40)
3 Ø 5/8" PLATEA DE CIMENTACION = 7.5 cm.
COLUMNAS = 4.00 cm.
VIGAS = 4.00 cm.
PLATAFORMA = 5.00 cm.
5.00.- ACERO
N.T.N.= 0.00 - ACERO CORRUGADO- Grado 60 : fy = 4200 Kg/cm2.
- EMPALMES DE FIERRO
-VIGAS : As (-) : Tercio Central
N.V.T.= + 1.20
As (+) : a L/4
-COLUMNAS : A 2L/3 (Tramo Central)
3 @ ,05. 4 @ ,10.
1° NIVEL
Estribo :Ø"3/8
R @ .20 A/E
6.00.- NORMAS
- R. N. E. ( Normas E-020, E-030, E-050, E-060)
MURO PROTECTOR DE TUBERIA
Estribo :Ø"3/8
@ .20 A/E
PLATEA DE
CIMENTACION
Ø 1/2" Ø 0.20
2 VP (0.40 x 0.40)
Estribo :Ø"3/8 Ø 1/2" Ø 0.20
DETALLE DE PÓRTICO
ESC: 1/25
CUADRO DE VIGAS
E1
Vigas y Columnas .......3Días
ESC : 1/25 (PORTICO EN PLANTA - CIMENTACION - DETALLES )
UBICACION: ESCALA:
NOJE CONTRATISTAS
GENERALES S.A.C LOCALIDAD: PUERTO ALEGRE INDICADA
DISTRITO: EL PORVENIR - PELEJO
ACAD: FECHA:
PROVINCIA: SAN MARTIN
REGION: SAN MARTIN HVINFAMAC SAC JULIO 2022