3.
00
3.
B Ø 3/8" @ 0.30
BARANDA TUBO FIERRO BARANDA TUBO FIERRO
2 Ø 3/4"
GALVANIZADO Ø=3" GALVANIZADO Ø=3"
45.
Ø 5/8" @ 0.25
000
Ø 5/8" @ 0.25
000
45.
°
0.30
3 Ø 3/4" Ø 1" @ 0.175
Ø 5/8" @ 0.25
DRENAJE PLUVIALP.V.C Ø 3"
X0.25
5.05
5.65
Ø 5/8"
A A 2.60
0.25
0.40
0.30
0.40
EJE DE QUEBRADA
ACERO LONGITUDINAL LOSA Ø
5/8" 7.80
7.14
B
SECCIÓN LONGITUDINAL
ACERO LONGITUDINAL SARDINEL Ø ESC. 1/50
5.80
3/4"
7.00
0.20
0.20
7.60
7.14
PERFORACION Ø 1.5 cm @ 0.15 cm
PLANTA
3"
Ø
ESC 1:50
C
PV
ACERO TRANSVERSAL SARDINEL Ø
IA
ER
3/4"
B
TU
Ø 3/8" @ 0.30
2Ø 3/4"
muro
Ø 5/8" @ 0.25Ø 1" @ 0.175
ESPECIFICACIONES TECNICAS
TALUD DE CORTE
TUB DETALLE T - TUB. DRENAJE
3:1
OBRAS DE CONCRETO SIMPLE ER
IA PVC ESC 1/25
Ø3
SUB-ZAPATA : f'c= 140 kg/cm2 + 30 % P.G "
LOSA Y SARDINELES
: 4.00 cm. (Al acero) ESC 1/50
Ú
CAPACIDAD PORTANTE SUELO :
UBICACIÒN PROYECTO:
LÀMINA
0.40
ACERO LONGITUDINAL ZAPATA
Ø 1/2"@ 0.20 Ø3/8"@ 0.20
SUPERIOR Ø 5/8"
0.30
0.70
SUPERIOR Ø 5/8" 3.82
2.82
0.25
0.30
0.30
1.21 2.15
0.50
02
0.40
0.40
Ø5/8"@ 0.35
1.
49 5.65 Ø 3/4"@ 0.20
C
91
1.
0.40
0.40
0.
0.
° 2.81
000 2.61 Ø 1/2"@ 0.30
45.
92
6.60
VARIABLE
Ø 3/4"@ 0.30
0.
5.00
2.00
2r.5;03.5
Ø 5/8"@ 0.25
; 0@
0r2.0;03.0
@
5; 02.70@
2;/"0.15;7@01.215;1@
3.82
;/"08.@
2.82
Ø318@
Ø1@
Ø3/8"@ 0.30
70
2.
3.
00
C
0.30
3.
2.50
ACERO TRANSVERSAL ZAPATA ACERO TRANSVERSAL ZAPATA
2.00
Ø5/8"@ 0.40
0.25
SUPERIOR Ø 5/8" Ø5/8"@ 0.30
1.30
SUPERIOR Ø 5/8"
Ø5/8"@ 0.40
3.
0.60
0.25
0.60
0.25 0.25 0.25
0.10
0.10
5.05 Ø5/8"@ 0.40
0.25 Ø5/8"@ 0.40
A 0.30 0.60 Ø 5/8"@ 0.25
0.50 Ø 5/8"@ 0.25 5.47
1.90 2.92
0.50 3.90
2.90 3.90
0.54
0.63
0.25 ACERO HORIZONTAL PANTALLA
0.30 5.05 0.30 CARA ANTERIOR Ø 1/2" 0.8 CARA
2.92 6
ANTERIOR
CARA Ø 1/2"
CARA ANTERIOR Ø 5/8"
0.25
0.40
5.47 ANTERIOR
1.20
CARA POSTERIOR Ø 3/8" Ø 1/2"
CARA CARA CARA
ANTERIOR
2.44
2.92 POSTERIOR Ø ANTERIOR Ø
3/8" 5/8" CARA POSTERIOR Ø 1/2" Ø 3/4"
6.10
6.11
VARIABLE
1.24
VARIABLE
Tubo de drenaje
PVC SAL Ø3" 5.47
6.70 CARA
6.00
POSTERIOR Ø
3/4"
3.05
5.60
2.55
4.80
3.56
0.40
0.10
0.60
SOLADO
ELEVACION FRONTAL
ESCALA: 1/50 Ø3/4"@ 0.20
6.00
5.60
LONGITUDES DE TRASLAPES
ESPECIFICACIONES TECNICAS ESPECIFICACIONES
6.00
Ø3/8" = 0.35 m. Ø5/8"@ 0.13
2.50
PONTON Ø1/2" = 0.45 m.
CONCRETO : Ø 3/4"@ 0.10
4.80
LUZ LIBRE 6.00 m Ø5/8" = 0.55 m
ANCHO UTIL 4.40 m
Ø3/4" = 0.70 m.
- LOSA Y SARDINEL F'C= 280 KG/CM2
SOBRECARGA HL93
= 1.20 m.
CONCRETO ESTRIBO Co. Ao. F'C=210 KG/CM2
ACERO : - FY = 4200 KG/CM2
2.00
0.60
0.10
VIGAS DE BORDEY LOSA F'C=280KG/CM2 Ø5/8"@ 0.20
RECUBRIMIENTOS - LOSA Y SARDINEL r = 3 cm
ACERO Fy=4200 KG/CM2
4.80
RECUBRIMIENTO PANTALLA Y ZAPATA CONCRETO : F'c = 210 kf / cm2
LOSA 4.00 CM. CONCRETO PARA SOLADO : C:H = 1 : 10 REFUERZO PRINCIPAL EN ESTRIBOS
0.60
0.60
VIGAS DE BORDE 5.00 CM. ACERO : Fy = 4200 kg / cm2 ESCALA: 1/50
0.10
0.10
DESENCOFRADO DE FONDO DE VIGAS DE BORDE 21 DIAS. B LI C A D E L P
PÚ ER
RE
RECUBRIMIENTOS
MUNICIPALIDAD DISTRITAL
Ú
28 DIAS. ZAPATAS = 7.5 cm
TRAFICO