PROYECTO "REPARACION DE PAVIMENTO; EN EL (LA) PRINCIPALES CALLES DEL DISTRITO DE OTUZCO, PROVINCIA DE OTUZCO, DEPARTAMENTO LA LIBERTAD"
UBICACIÓN LA LIBERTAD-OTUZCO
FECHA CORRESPONDIENTE AL MES DE JUNIO DEL 2022 VALORIZACION CORRESPONDIENTE AL 01 AL 30 DE JUNIO 2022
Item Descripción Und. Metrado Precio S/. Parcial S/. CANTIDAD IMPORTE % CANTIDAD IMPORTE % CANTIDAD IMPORTE % CANTIDAD IMPORTE %
01 IMPLEMENTACION COVID-19 S/. 16,094.41 S/. 12,073.94 S/. 2,010.24 S/. 14,084.18 S/. 2,010.23
01.01 ACTIVIDADES DE PREVENCION FRENTE AL COVID-19 S/. 3,089.11 S/. 2,319.96 S/. 384.58 S/. 2,704.54 S/. 384.57
01.01.01 ADECUACION DEL PLAN DE VIGILANCIA, PREVENCION Y
CONTROL DEL COVID-19, DE ACUERDO A LAS CONDICIONES glb 1.00 S/. 285.81 S/. 285.81 0.75 S/. 214.36 75.0% 0.13 S/ 35.73 12.5% 0.88 S/. 250.09 87.5% 0.13 S/. 35.72 12.5%
REALES DEL TRABAJO
01.01.02 LIMPIEZA Y DESINFECCION EN OBRA
mes 8.00 S/. 46.41 S/. 371.28 6.00 S/. 278.46 75.0% 1.00 S/ 46.41 12.5% 7.00 S/. 324.87 87.5% 1.00 S/. 46.41 12.5%
01.01.03 EVALUACION DE LA CONDICION DE SALUD DEL TRABAJADOR
und 60.00 S/. 0.40 S/. 24.00 45.00 S/. 18.00 75.0% 7.50 S/ 3.00 12.5% 52.50 S/. 21.00 87.5% 7.50 S/. 3.00 12.5%
01.01.04 EQUIPAMIENTO PARA EL LAVADO DE DESINFECCION DE
MANOS und 1.00 S/. 12.50 S/. 12.50 1.00 S/. 12.50 100.0% 0.00 S/ - 0.0% 1.00 S/. 12.50 100.0% 0.00 S/. - 0.0%
01.01.05 INSUMOS PARA EL LAVADO DE DESINFECCION DE MANOS
mes 8.00 S/. 238.62 S/. 1,908.96 6.00 S/. 1,431.72 75.0% 1.00 S/ 238.62 12.5% 7.00 S/. 1,670.34 87.5% 1.00 S/. 238.62 12.5%
01.01.06 SENSIBILIZACION DE LA PREVENCION DEL CONTAGIO COVID-
19 EN OBRA mes 8.00 S/. 7.50 S/. 60.00 6.00 S/. 45.00 75.0% 1.00 S/ 7.50 12.5% 7.00 S/. 52.50 87.5% 1.00 S/. 7.50 12.5%
01.01.07 MEDIDAS PREVENTIVAS COLECTIVAS
glb 1.00 S/. 160.00 S/. 160.00 0.75 S/. 120.00 75.0% 0.13 S/ 20.00 12.5% 0.88 S/. 140.00 87.5% 0.13 S/. 20.00 12.5%
01.01.08 MEDIDAS DE PROTECCION PERSONAL
mes 8.00 S/. 19.69 S/. 157.52 6.00 S/. 118.14 75.0% 1.00 S/ 19.69 12.5% 7.00 S/. 137.83 87.5% 1.00 S/. 19.69 12.5%
01.01.09 IDENTIFICACION DE SINTOMATOLOGIA COVID-19 AL
INGRESO AL TRABAJO mes 8.00 S/. 12.00 S/. 96.00 6.00 S/. 72.00 75.0% 1.00 S/ 12.00 12.5% 7.00 S/. 84.00 87.5% 1.00 S/. 12.00 12.5%
01.01.10 VIGILANCIA DE LA SALUD DEL TRABAJADOR EN EL CONTEXTO
DEL COVID -19 mes 8.00 S/. 1.63 S/. 13.04 6.00 S/. 9.78 75.0% 1.00 S/ 1.63 12.5% 7.00 S/. 11.41 87.5% 1.00 S/. 1.63 12.5%
02 OBRAS PROVISIONALES S/. 2,958.72 S/. 558.72 S/. - S/. 558.72 S/. 2,400.00
02.01 ALQUILER DE ALMACEN mes 8.00 S/. 300.00 S/. 2,400.00 0.00 S/. - 0.0% 0.00 S/ - 0.0% 0.00 S/. - 0.0% 8.00 S/. 2,400.00 100.0%
02.02 CARTEL DE OBRA 2.40X3.60 und 1.00 S/. 558.72 S/. 558.72 1.00 S/. 558.72 100.0% 0.00 S/ - 0.0% 1.00 S/. 558.72 100.0% 0.00 S/. - 0.0%
03.01 TRABAJOS PRELIMINARES S/. 367.88 S/. 367.88 S/. - S/. 367.88 S/. -0.00
03.01.01 TRAZO, NIVELES Y REPLANTEO m2 549.07 S/. 0.67 S/. 367.88 549.07 S/. 367.88 100.0% 0.00 S/ - 0.0% 549.07 S/. 367.88 100.0% 0.00 S/. -0.00 0.0%
03.02 PAVIMENTO DE CONCRETO RIGIDO S/. 64,514.31 0.00 S/. 64,514.32 S/. - 0.00 S/. 64,514.32 S/. -0.02
03.02.01 DEMOLICION DE VEREDA DE CONCRETO E=15 CM m2 549.07 S/. 9.12 S/. 5,007.52 549.07 S/. 5,007.52 100.0% 0.00 S/ - 0.0% 549.07 S/. 5,007.52 100.0% 0.00 S/. -0.00 0.0%
03.02.02 ELIMINACION DE MATERIAL EXCEDENTE DM=10 km m3 102.95 S/. 10.31 S/. 1,061.41 102.95 S/. 1,061.42 100.0% 0.00 S/ - 0.0% 102.95 S/. 1,061.42 100.0% 0.00 S/. -0.01 0.0%
03.02.03 PERFILADO Y COMPACTADO DE SUB-RASANTE m2 549.07 S/. 3.37 S/. 1,850.37 549.07 S/. 1,850.37 100.0% 0.00 S/ - 0.0% 549.07 S/. 1,850.37 100.0% 0.00 S/. -0.00 0.0%
03.02.04 CONCRETO LOSAS f'c= 245 kg/cm2 E=0.13M m2 549.07 S/. 74.26 S/. 40,773.94 549.07 S/. 40,773.94 100.0% 0.00 S/ - 0.0% 549.07 S/. 40,773.94 100.0% 0.00 S/. -0.00 0.0%
03.02.05 ENCOFRADO Y DESENCOFRADO EN PAVIMENTO RIGIDO m2 53.82 S/. 64.30 S/. 3,460.63 53.82 S/. 3,460.63 100.0% 0.00 S/ - 0.0% 53.82 S/. 3,460.63 100.0% 0.00 S/. -0.00 0.0%
03.02.06 JUNTAS ASFALTICAS EN PAVIMENTO H=0.10 E=1" m 538.20 S/. 22.65 S/. 12,190.23 538.20 S/. 12,190.23 100.0% 0.00 S/ - 0.00% 538.20 S/. 12,190.23 100.0% 0.00 S/. - 0.0%
VALORIZACION DE OBRA N°07 - POR ADMINISTRACION DIRECTA
PROYECTO "REPARACION DE PAVIMENTO; EN EL (LA) PRINCIPALES CALLES DEL DISTRITO DE OTUZCO, PROVINCIA DE OTUZCO, DEPARTAMENTO LA LIBERTAD"
UBICACIÓN LA LIBERTAD-OTUZCO
FECHA CORRESPONDIENTE AL MES DE JUNIO DEL 2022 VALORIZACION CORRESPONDIENTE AL 01 AL 30 DE JUNIO 2022
03.02.07 CURADO DE CONCRETO DE PAVIMENTO RIGIDO m2 549.07 S/. 0.31 S/. 170.21 549.07 S/. 170.21 100.0% 0.00 S/ - 0.0% 549.07 S/. 170.21 100.0% 0.00 S/. 0.00 0.0%
03.03 VEREDAS S/. 8,335.64 S/. 8,005.36 S/. - S/. 8,005.36 S/. 330.29
03.03.01 DEMOLICION DE VEREDA DE CONCRETO E=15 CM m2 125.40 S/. 3.91 S/. 490.31 120.43 S/. 470.88 96.0% 0.00 S/ - 0.0% 120.43 S/. 470.88 96.0% 4.97 S/. 19.43 4.0%
03.03.02 VEREDAS LATERALES DE PAVIMENTO H=0.15 m2 125.40 S/. 56.31 S/. 7,061.27 120.43 S/. 6,781.41 96.0% 0.00 S/ - 0.0% 120.43 S/. 6,781.41 96.0% 4.97 S/. 279.86 4.0%
03.03.03 JUNTAS ASFALTICAS EN PAVIMENTO H=0.10 E=1" m 32.90 S/. 22.65 S/. 745.19 31.60 S/. 715.74 96.0% 0.00 S/ - 0.0% 31.60 S/. 715.74 96.0% 1.30 S/. 29.45 4.0%
03.03.04 CURADO DE CONCRETO DE PAVIMENTO RIGIDO m2 125.40 S/. 0.31 S/. 38.87 120.43 S/. 37.33 96.0% 0.00 S/ - 0.0% 120.43 S/. 37.33 96.0% 4.97 S/. 1.54 4.0%
03.04 VARIOS S/. 423.10 S/. 132.5 S/. - S/. 132.50 S/. 290.60 68.7%
03.04.01 PINTURA EN SARDINELES m2 43.06 S/. 5.91 S/. 254.48 0.00 S/. - 0.0% S/ - 0.0% 0.00 S/. - 0.0% 43.06 S/. 254.48 100.0%
03.04.02 LIMPIEZA GENERAL DE LA OBRA m2 674.47 S/. 0.25 S/. 168.62 530.00 S/. 132.50 78.6% 0.00 S/ - 0.0% 530.00 S/. 132.50 78.6% 144.47 S/. 36.12 21.4%
04 CALLE TRUJILLO C6 HASTA C11 Y C2 - PAVIMENTO RIGIDO S/. 180,440.68 S/. 173,783 S/. - S/. 173,782.56 S/. 6,658.11
04.01 TRABAJOS PRELIMINARES S/. 843.76 S/. 809.07 S/. - S/. 809.07 S/. 34.69
04.01.01 TRAZO, NIVELES Y REPLANTEO m2 1,259.34 S/. 0.67 S/. 843.76 1207.56 S/. 809.07 95.9% 0.00 S/ - 0.0% 1207.56 S/. 809.07 95.9% 51.78 S/. 34.69 4.1%
04.02 PAVIMENTO DE CONCRETO RIGIDO S/. 146,215.25 S/. 140,193.63 S/. - S/. 140,193.63 S/. 6,021.61
04.02.01 DEMOLICION DE PAVIMENTO DE CONCRETO E=15 CM m2 1,259.34 S/. 9.12 S/. 11,485.18 1207.56 S/. 11,012.95 95.9% 0.00 S/ - 0.0% 1207.56 S/. 11,012.95 95.9% 51.78 S/. 472.23 4.1%
04.02.02 ELIMINACION DE MATERIAL EXCEDENTE DM=10 km m3 236.13 S/. 10.31 S/. 2,434.50 226.42 S/. 2,334.36 95.9% 0.00 S/ - 0.0% 226.42 S/. 2,334.36 95.9% 9.71 S/. 100.14 4.1%
04.02.03 PERFILADO Y COMPACTADO DE SUB-RASANTE m2 1,259.34 S/. 3.37 S/. 4,243.98 1207.56 S/. 4,069.48 95.9% 0.00 S/ - 0.0% 1207.56 S/. 4,069.48 95.9% 51.78 S/. 174.50 4.1%
04.02.04 CONCRETO LOSAS f'c= 245 kg/cm2 E=0.13M m2 1,259.34 S/. 74.26 S/. 93,518.59 1207.56 S/. 89,673.41 95.9% 0.00 S/ - 0.0% 1207.56 S/. 89,673.41 95.9% 51.78 S/. 3,845.18 4.1%
04.02.05 ENCOFRADO Y DESENCOFRADO EN PAVIMENTO RIGIDO m2 117.41 S/. 64.30 S/. 7,549.46 112.50 S/. 7,233.75 95.8% 0.00 S/ - 0.0% 112.50 S/. 7,233.75 95.8% 4.91 S/. 315.71 4.2%
04.02.06 JUNTAS ASFALTICAS EN PAVIMENTO H=0.10 E=1" m 1,174.09 S/. 22.65 S/. 26,593.14 1125.62 S/. 25,495.34 95.9% 0.00 S/ - 0.0% 1125.62 S/. 25,495.34 95.9% 48.47 S/. 1,097.80 4.1%
04.02.07 CURADO DE CONCRETO DE PAVIMENTO RIGIDO m2 1,259.34 S/. 0.31 S/. 390.40 1207.56 S/. 374.34 95.9% 0.00 S/ - 0.0% 1207.56 S/. 374.34 95.9% 51.78 S/. 16.06 4.1%
04.03 VEREDAS S/. 32,392.36 S/. 32,392.36 S/. - S/. 32,392.36 S/. -
04.03.01 DEMOLICION DE VEREDA DE CONCRETO E=15 CM m2 477.37 S/. 3.91 S/. 1,866.52 477.37 S/. 1,866.52 100.0% 0.00 S/ - 0.0% 477.37 S/. 1,866.52 100.0% 0.00 S/. - 0.0%
04.03.02 VEREDAS LATERALES DE PAVIMENTO H=0.15 m2 477.37 S/. 56.31 S/. 26,880.70 477.37 S/. 26,880.70 100.0% 0.00 S/ - 0.0% 477.37 S/. 26,880.70 100.0% 0.00 S/. - 0.0%
04.03.03 JUNTAS ASFALTICAS EN PAVIMENTO H=0.10 E=1" m 154.40 S/. 22.65 S/. 3,497.16 154.40 S/. 3,497.16 100.0% 0.00 S/ - 0.0% 154.40 S/. 3,497.16 100.0% 0.00 S/. - 0.0%
04.03.04 CURADO DE CONCRETO DE PAVIMENTO RIGIDO m2 477.37 S/. 0.31 S/. 147.98 477.37 S/. 147.98 100.0% 0.00 S/ - 0.0% 477.37 S/. 147.98 100.0% 0.00 S/. - 0.0%
04.04 VARIOS S/. 989.31 S/. 387.50 S/. - S/. 387.50 S/. 601.81
04.04.01 PINTURA EN SARDINELES m2 93.93 S/. 5.91 S/. 555.13 0.00 S/. - 0.0% S/ - 0.0% 0.00 S/. - 0.0% 93.93 S/. 555.13 100.0%
04.04.02 LIMPIEZA GENERAL DE LA OBRA m2 1,736.71 S/. 0.25 S/. 434.18 1550.00 S/. 387.50 89.2% 0.00 S/ - 0.0% 1550.00 S/. 387.50 89.2% 186.71 S/. 46.68 10.8%
05 CALLE CASERES C2 HASTA LA C6 - PAVIMENTO RIGIDO S/. 168,313.83 S/. 159,954 S/. - S/. 159,954.5 S/. 8,359.39
05.01 TRABAJOS PRELIMINARES S/. 871.37 S/. 828.53 S/. - S/. 828.53 S/. 42.84 4.9%
VALORIZACION DE OBRA N°07 - POR ADMINISTRACION DIRECTA
PROYECTO "REPARACION DE PAVIMENTO; EN EL (LA) PRINCIPALES CALLES DEL DISTRITO DE OTUZCO, PROVINCIA DE OTUZCO, DEPARTAMENTO LA LIBERTAD"
UBICACIÓN LA LIBERTAD-OTUZCO
FECHA CORRESPONDIENTE AL MES DE JUNIO DEL 2022 VALORIZACION CORRESPONDIENTE AL 01 AL 30 DE JUNIO 2022
05.01.01 TRAZO, NIVELES Y REPLANTEO m2 1,300.55 S/. 0.67 S/. 871.37 1236.61 S/. 828.53 95.1% 0.00 S/ - 0.0% 1236.61 S/. 828.53 95.1% 63.94 S/. 42.84 4.9%
05.02 PAVIMENTO DE CONCRETO RIGIDO S/. 140,368.73 S/. 132,550 S/. - S/. 132,549.5 S/. 7,819.20
05.02.01 DEMOLICION DE PAVIMENTO DE CONCRETO E=15 CM m2 1,300.55 S/. 9.12 S/. 11,861.02 1236.61 S/. 11,277.88 95.1% 0.00 S/ - 0.0% 1236.61 S/. 11,277.88 95.1% 63.94 S/. 583.14 4.9%
05.02.02 ELIMINACION DE MATERIAL EXCEDENTE DM=10 km m3 243.85 S/. 10.31 S/. 2,514.09 231.86 S/. 2,390.52 95.1% 0.00 S/ - 0.0% 231.86 S/. 2,390.52 95.1% 11.99 S/. 123.57 4.9%
05.02.03 PERFILADO Y COMPACTADO DE SUB-RASANTE m2 1,300.55 S/. 3.37 S/. 4,382.85 1236.61 S/. 4,167.38 95.1% 0.00 S/ - 0.0% 1236.61 S/. 4,167.38 95.1% 63.94 S/. 215.47 4.9%
05.02.04 CONCRETO LOSAS f'c= 245 kg/cm2 E=0.13M m2 1,300.55 S/. 74.26 S/. 96,578.84 1236.61 S/. 91,830.66 95.1% 0.00 S/ - 0.0% 1236.61 S/. 91,830.66 95.1% 63.94 S/. 4,748.18 4.9%
05.02.05 ENCOFRADO Y DESENCOFRADO EN PAVIMENTO RIGIDO m2 84.69 S/. 64.30 S/. 5,445.57 66.30 S/. 4,263.09 78.3% 0.00 S/ - 0.0% 66.30 S/. 4,263.09 78.3% 18.39 S/. 1,182.48 21.7%
05.02.06 JUNTAS ASFALTICAS EN PAVIMENTO H=0.10 E=1" m 846.94 S/. 22.65 S/. 19,183.19 805.15 S/. 18,236.65 95.1% 0.00 S/ - 0.0% 805.15 S/. 18,236.65 95.1% 41.79 S/. 946.54 4.9%
05.02.07 CURADO DE CONCRETO DE PAVIMENTO RIGIDO m2 1,300.55 S/. 0.31 S/. 403.17 1236.61 S/. 383.35 95.1% 0.00 S/ - 0.0% 1236.61 S/. 383.35 95.1% 63.94 S/. 19.82 4.9%
05.03 VEREDAS S/. 26,248.89 S/. 26,248.89 S/. - S/. 26,248.89 S/. -
05.03.01 DEMOLICION DE VEREDA DE CONCRETO E=15 CM m2 396.98 S/. 3.91 S/. 1,552.19 396.98 S/. 1,552.19 100.0% 0.00 S/ - 0.0% 396.98 S/. 1,552.19 100.0% 0.00 S/. 0.00 0.0%
05.03.02 VEREDAS LATERALES DE PAVIMENTO H=0.15 m2 396.98 S/. 56.31 S/. 22,353.94 396.98 S/. 22,353.94 100.0% 0.00 S/ - 0.0% 396.98 S/. 22,353.94 100.0% 0.00 S/. 0.00 0.0%
05.03.03 JUNTAS ASFALTICAS EN PAVIMENTO H=0.10 E=1" m 98.00 S/. 22.65 S/. 2,219.70 98.00 S/. 2,219.70 100.0% 0.00 S/ - 0.0% 98.00 S/. 2,219.70 100.0% 0.00 S/. - 0.0%
05.03.04 CURADO DE CONCRETO DE PAVIMENTO RIGIDO m2 396.98 S/. 0.31 S/. 123.06 396.98 S/. 123.06 100.0% 0.00 S/ - 0.0% 396.98 S/. 123.06 100.0% 0.00 S/. 0.00 0.0%
05.04 VARIOS S/. 824.84 S/. 328 S/. - S/. 327.50 S/. 497.34
05.04.01 PINTURA EN SARDINELES m2 67.76 S/. 5.91 S/. 400.46 0.00 S/. - 0.0% 0.00 S/ - 0.0% 0.00 S/. - 0.0% 67.76 S/. 400.46 100.0%
05.04.02 LIMPIEZA GENERAL DE LA OBRA m2 1,697.53 S/. 0.25 S/. 424.38 1310.00 S/. 327.50 77.2% 0.00 S/ - 0.0% 1310.00 S/. 327.50 77.2% 387.53 S/. 96.88 22.8%
06 CALLE LIMA C1, C2, C3 Y C10 - PAVIMENTO RIGIDO S/. 279,433.58 S/. 25,506 S/. 59,252 S/. 84,758 S/. 194,675.42
06.01 TRABAJOS PRELIMINARES S/. 1,581.88 S/. 1,091.46 69.0% S/. 158.83 S/. 1,250.29 0.00 S/. 331.59 21.0%
06.01.01 TRAZO, NIVELES Y REPLANTEO m2 2,361.01 S/. 0.67 S/. 1,581.88 1629.05 S/. 1,091.46 69.0% 237.06 S/ 158.83 10.0% 1866.11 S/. 1,250.29 79.0% 494.90 S/. 331.59 21.0%
06.02 PAVIMENTO DE CONCRETO RIGIDO S/. 244,969.17 S/. 18,006 S/. 37,275 S/. 55,281 S/. 189,688.12
06.02.01 DEMOLICION DE PAVIMENTO DE CONCRETO E=15 CM m2 2,361.01 S/. 9.12 S/. 21,532.41 1629.05 S/. 14,856.94 69.0% 237.06 S/ 2,161.99 10.0% 1866.11 S/. 17,018.93 79.0% 494.90 S/. 4,513.48 21.0%
06.02.02 ELIMINACION DE MATERIAL EXCEDENTE DM=10 km m3 442.69 S/. 10.31 S/. 4,564.13 305.45 S/. 3,149.16 69.0% 44.45 S/ 458.27 10.0% 349.90 S/. 3,607.43 79.0% 92.79 S/. 956.71 21.0%
06.02.03 PERFILADO Y COMPACTADO DE SUB-RASANTE m2 2,361.01 S/. 3.37 S/. 7,956.60 0.00 S/. - 0.0% 1036.58 S/ 3,493.27 43.9% 1036.58 S/. 3,493.27 43.9% 1,324.43 S/. 4,463.33 56.1%
06.02.04 CONCRETO LOSAS f'c= 245 kg/cm2 E=0.13M m2 2,361.01 S/. 74.26 S/. 175,328.60 0.00 S/. - 0.0% 400.36 S/ 29,730.73 17.0% 400.36 S/. 29,730.73 17.0% 1,960.65 S/. 145,597.87 83.0%
06.02.05 ENCOFRADO Y DESENCOFRADO EN PAVIMENTO RIGIDO m2 119.86 S/. 64.30 S/. 7,707.00 0.00 S/. - 0.0% 20.32 S/ 1,306.58 17.0% 20.32 S/. 1,306.58 17.0% 99.54 S/. 6,400.42 83.0%
06.02.06 JUNTAS ASFALTICAS EN PAVIMENTO H=0.10 E=1" m 1,198.61 S/. 22.65 S/. 27,148.52 0.00 S/. - 0.0% 0.00 S/ - 0.0% 0.00 S/. - 0.0% 1,198.61 S/. 27,148.52 100.0%
06.02.07 CURADO DE CONCRETO DE PAVIMENTO RIGIDO m2 2,361.01 S/. 0.31 S/. 731.91 0.00 S/. - 0.0% 400.36 S/ 124.11 17.0% 400.36 S/. 124.11 17.0% 1,960.65 S/. 607.80 83.0%
06.03 VEREDAS S/. 31,606.13 S/. 6,409 S/. 21,818.07 S/. 28,227 S/. 3,379.31
06.03.01 DEMOLICION DE VEREDA DE CONCRETO E=15 CM m2 478.75 S/. 3.91 S/. 1,871.91 358.24 S/. 1,400.72 74.8% 120.51 S/ 471.19 25.2% 478.75 S/. 1,871.91 100.0% 0.00 S/. - 0.0%
VALORIZACION DE OBRA N°07 - POR ADMINISTRACION DIRECTA
PROYECTO "REPARACION DE PAVIMENTO; EN EL (LA) PRINCIPALES CALLES DEL DISTRITO DE OTUZCO, PROVINCIA DE OTUZCO, DEPARTAMENTO LA LIBERTAD"
UBICACIÓN LA LIBERTAD-OTUZCO
FECHA CORRESPONDIENTE AL MES DE JUNIO DEL 2022 VALORIZACION CORRESPONDIENTE AL 01 AL 30 DE JUNIO 2022
06.03.02 VEREDAS LATERALES DE PAVIMENTO H=0.15 m2 478.75 S/. 56.31 S/. 26,958.41 88.45 S/. 4,980.62 18.5% 377.0 S/ 21,230.00 78.8% 465.47 S/. 26,210.62 97.2% 13.28 S/. 747.80 2.8%
06.03.03 JUNTAS ASFALTICAS EN PAVIMENTO H=0.10 E=1" m 116.00 S/. 22.65 S/. 2,627.40 0.00 S/. - 0.0% 0.00 S/ - 0.0% 0.00 S/. - 0.0% 116.00 S/. 2,627.40 100.0%
06.03.04 CURADO DE CONCRETO DE PAVIMENTO RIGIDO m2 478.75 S/. 0.31 S/. 148.41 88.45 S/. 27.42 18.5% 377.02 S/ 116.88 78.8% 465.47 S/. 144.30 97.2% 13.28 S/. 4.12 2.8%
06.04.01 PINTURA EN SARDINELES m2 95.89 S/. 5.91 S/. 566.71 0.00 S/. - 0.0% 0.00 S/ - 0.0% 0.00 S/. - 0.0% 95.89 S/. 566.71 100.0%
06.04.02 LIMPIEZA GENERAL DE LA OBRA m2 2,838.76 S/. 0.25 S/. 709.69 0.00 S/. - 0.0% 0.00 S/ - 0.0% 0.00 S/. - 0.0% 2,838.76 S/. 709.69 100.0%
07 CALLE JUNIN C2 Y C3 - PAVIMENTO RIGIDO S/. 56,660.48 S/. 56,424.72 S/. - S/. 56,424.72 S/. 235.76
07.01 TRABAJOS PRELIMINARES S/. 328.76 S/. 328.76 S/. - S/. 328.76 S/. 0.00
07.01.01 TRAZO, NIVELES Y REPLANTEO m2 490.69 S/. 0.67 S/. 328.76 490.69 S/. 328.76 100.0% 0.00 S/ - 0.0% 490.69 S/. 328.76 100.0% 0.00 S/. 0.00 0.0%
07.02 PAVIMENTO DE CONCRETO RIGIDO S/. 56,008.41 S/. 56,008.46 S/. - S/. 56,008.46 S/. -0.05
07.02.01 DEMOLICION DE PAVIMENTO DE CONCRETO E=15 CM m2 490.69 S/. 9.12 S/. 4,475.09 490.69 S/. 4,475.09 100.0% 0.00 S/ - 0.0% 490.69 S/. 4,475.09 100.0% 0.00 S/. 0.00 0.0%
07.02.02 ELIMINACION DE MATERIAL EXCEDENTE DM=10 km m3 92.00 S/. 10.31 S/. 948.52 92.00 S/. 948.57 100.0% 0.00 S/ - 0.0% 92.00 S/. 948.57 100.0% 0.00 S/. -0.05 0.0%
07.02.03 PERFILADO Y COMPACTADO DE SUB-RASANTE m2 490.69 S/. 3.37 S/. 1,653.63 490.69 S/. 1,653.63 100.0% 0.00 S/ - 0.0% 490.69 S/. 1,653.63 100.0% 0.00 S/. -0.00 0.0%
07.02.04 CONCRETO LOSAS f'c= 245 kg/cm2 E=0.13M m2 490.69 S/. 74.26 S/. 36,438.64 490.69 S/. 36,438.64 100.0% 0.00 S/ - 0.0% 490.69 S/. 36,438.64 100.0% 0.00 S/. -0.00 0.0%
07.02.05 ENCOFRADO Y DESENCOFRADO EN PAVIMENTO RIGIDO m2 42.44 S/. 64.30 S/. 2,728.89 42.44 S/. 2,728.89 100.0% 0.00 S/ - 0.0% 42.44 S/. 2,728.89 100.0% 0.00 S/. 0.00 0.0%
07.02.06 JUNTAS ASFALTICAS EN PAVIMENTO H=0.10 E=1" m 424.35 S/. 22.65 S/. 9,611.53 424.35 S/. 9,611.53 100.0% 0.00 S/ - 0.0% 424.35 S/. 9,611.53 100.0% 0.00 S/. -0.00 0.0%
07.02.07 CURADO DE CONCRETO DE PAVIMENTO RIGIDO m2 490.69 S/. 0.31 S/. 152.11 490.69 S/. 152.11 100.0% 0.00 S/ - 0.0% 490.69 S/. 152.11 100.0% 0.00 S/. 0.00 0.0%
07.03 VARIOS S/. 323.31 S/. 87.50 S/. - S/. 87.50 S/. 235.81
07.03.01 PINTURA EN SARDINELES m2 33.95 S/. 5.91 S/. 200.64 0.00 S/. - 0.0% 0.00 S/ - 0.0% 0.00 S/. - 0.0% 33.95 S/. 200.64 100.0%
07.03.02 LIMPIEZA GENERAL DE LA OBRA m2 490.69 S/. 0.25 S/. 122.67 350.00 S/. 87.50 71.3% 0.00 S/ - 0.0% 350.00 S/. 87.50 71.3% 140.69 S/. 35.17 28.7%
08 CALLE SAN MARTIN C3 - PAVIMENTO RIGIDO S/. 33,073.00 S/. 32,967 S/. - S/. 32,966.98 S/. 106.02
08.01 TRABAJOS PRELIMINARES S/. 153.40 S/. 153.40 100.0% S/. - S/. 153.40 S/. 0.00
08.01.01 TRAZO, NIVELES Y REPLANTEO m2 228.96 S/. 0.67 S/. 153.40 228.96 S/. 153.40 100.0% 0.00 S/ - 0.0% 228.96 S/. 153.40 100.0% 0.00 S/. 0.00 0.0%
08.02 PAVIMENTO DE CONCRETO RIGIDO S/. 26,588.28 S/. 26,588.28 S/. - S/. 26,588.28 S/. -
08.02.01 DEMOLICION DE PAVIMENTO DE CONCRETO E=15 CM m2 228.96 S/. 9.12 S/. 2,088.12 228.96 S/. 2,088.12 100.0% 0.00 S/ - 0.0% 228.96 S/. 2,088.12 100.0% 0.00 S/. - 0.0%
08.02.02 ELIMINACION DE MATERIAL EXCEDENTE DM=10 km m3 42.93 S/. 10.31 S/. 442.61 42.93 S/. 442.61 100.0% 0.00 S/ - 0.0% 42.93 S/. 442.61 100.0% 0.00 S/. - 0.0%
08.02.03 PERFILADO Y COMPACTADO DE SUB-RASANTE m2 228.96 S/. 3.37 S/. 771.60 228.96 S/. 771.60 100.0% 0.00 S/ - 0.0% 228.96 S/. 771.60 100.0% 0.00 S/. - 0.0%
08.02.04 CONCRETO LOSAS f'c= 245 kg/cm2 E=0.13M m2 228.96 S/. 74.26 S/. 17,002.57 228.96 S/. 17,002.57 100.0% 0.00 S/ - 0.0% 228.96 S/. 17,002.57 100.0% 0.00 S/. - 0.0%
08.02.05 ENCOFRADO Y DESENCOFRADO EN PAVIMENTO RIGIDO m2 21.36 S/. 64.30 S/. 1,373.45 21.36 S/. 1,373.45 100.0% 0.00 S/ - 0.0% 21.36 S/. 1,373.45 100.0% 0.00 S/. - 0.0%
08.02.06 JUNTAS ASFALTICAS EN PAVIMENTO H=0.10 E=1" m 213.64 S/. 22.65 S/. 4,838.95 213.64 S/. 4,838.95 100.0% 0.00 S/ - 0.0% 213.64 S/. 4,838.95 100.0% 0.00 S/. - 0.0%
VALORIZACION DE OBRA N°07 - POR ADMINISTRACION DIRECTA
PROYECTO "REPARACION DE PAVIMENTO; EN EL (LA) PRINCIPALES CALLES DEL DISTRITO DE OTUZCO, PROVINCIA DE OTUZCO, DEPARTAMENTO LA LIBERTAD"
UBICACIÓN LA LIBERTAD-OTUZCO
FECHA CORRESPONDIENTE AL MES DE JUNIO DEL 2022 VALORIZACION CORRESPONDIENTE AL 01 AL 30 DE JUNIO 2022
08.02.07 CURADO DE CONCRETO DE PAVIMENTO RIGIDO m2 228.96 S/. 0.31 S/. 70.98 228.96 S/. 70.98 100.0% 0.00 S/ - 0.0% 228.96 S/. 70.98 100.0% 0.00 S/. - 0.0%
08.03 VEREDAS S/. 6,150.30 S/. 6,150.30 S/. - S/. 6,150.30 S/. -0.00
08.03.01 DEMOLICION DE VEREDA DE CONCRETO E=15 CM m2 91.13 S/. 3.91 S/. 356.32 91.13 S/. 356.32 100.0% 0.00 S/ - 0.0% 91.13 S/. 356.32 100.0% 0.00 S/. -0.00 0.0%
08.03.02 VEREDAS LATERALES DE PAVIMENTO H=0.15 m2 91.13 S/. 56.31 S/. 5,131.53 91.13 S/. 5,131.53 100.0% 0.00 S/ - 0.0% 91.13 S/. 5,131.53 100.0% 0.00 S/. 0.00 0.0%
08.03.03 JUNTAS ASFALTICAS EN PAVIMENTO H=0.10 E=1" m 28.00 S/. 22.65 S/. 634.20 28 S/. 634.20 100.0% 0.00 S/ - 0.0% 28.00 S/. 634.20 100.0% 0.00 S/. - 0.0%
08.03.04 CURADO DE CONCRETO DE PAVIMENTO RIGIDO m2 91.13 S/. 0.31 S/. 28.25 91.13 S/. 28.25 100.0% 0.00 S/ - 0.0% 91.13 S/. 28.25 100.0% 0.00 S/. 0.00 0.0%
08.04 VARIOS S/. 181.02 S/. 75.00 S/. - S/. 75.00 S/. 106.02
08.04.01 PINTURA EN SARDINELES m2 17.09 S/. 5.91 S/. 101.00 0 S/. - 0.0% 0.00 S/ - 0.0% 0.00 S/. - 0.0% 17.09 S/. 101.00 100.0%
08.04.02 LIMPIEZA GENERAL DE LA OBRA m2 320.09 S/. 0.25 S/. 80.02 300 S/. 75.00 93.7% 0.00 S/ - 0.0% 300.00 S/. 75.00 93.7% 20.09 S/. 5.02 6.3%
09.01 TRABAJOS PRELIMINARES S/. 431.24 S/. 396.37 S/. 34.87 S/. 431.24 S/. -0.00
09.01.01 TRAZO, NIVELES Y REPLANTEO m2 643.64 S/. 0.67 S/. 431.24 591.6 S/. 396.37 91.9% 52.04 S/ 34.87 8.1% 643.64 S/. 431.24 100.0% 0.00 S/. -0.00 0.0%
09.02 PAVIMENTO DE CONCRETO RIGIDO S/. 71,977.23 S/. 65,824.36 S/. 575.20 S/. 66,399.56 S/. 5,577.66
09.02.01 DEMOLICION DE PAVIMENTO DE CONCRETO E=15 CM m2 643.64 S/. 9.12 S/. 5,870.00 591.6 S/. 5,395.39 91.9% 52.04 S/ 474.60 8.1% 643.64 S/. 5,869.99 100.0% 0.00 S/. 0.01 0.0%
09.02.02 ELIMINACION DE MATERIAL EXCEDENTE DM=10 km m3 120.68 S/. 10.31 S/. 1,244.21 110.925 S/. 1,143.64 91.9% 9.76 S/ 100.60 8.1% 120.68 S/. 1,244.24 100.0% 0.00 S/. -0.03 0.0%
09.02.03 PERFILADO Y COMPACTADO DE SUB-RASANTE m2 643.64 S/. 3.37 S/. 2,169.07 591.6 S/. 1,993.69 91.9% 0.00 S/ - 0.0% 591.60 S/. 1,993.69 91.9% 52.04 S/. 175.38 8.1%
09.02.04 CONCRETO LOSAS f'c= 245 kg/cm2 E=0.13M m2 643.64 S/. 74.26 S/. 47,796.71 591.6 S/. 43,932.22 91.9% 0.00 S/ - 0.0% 591.60 S/. 43,932.22 91.9% 52.04 S/. 3,864.49 8.1%
09.02.05 ENCOFRADO Y DESENCOFRADO EN PAVIMENTO RIGIDO m2 50.54 S/. 64.30 S/. 3,249.72 46.40 S/. 2,983.52 91.8% 0.00 S/ - 0.0% 46.40 S/. 2,983.52 91.8% 4.14 S/. 266.20 8.2%
09.02.06 JUNTAS ASFALTICAS EN PAVIMENTO H=0.10 E=1" m 505.43 S/. 22.65 S/. 11,447.99 450 S/. 10,192.50 89.0% 0.00 S/ - 0.0% 450.00 S/. 10,192.50 89.0% 55.43 S/. 1,255.49 11.0%
09.02.07 CURADO DE CONCRETO DE PAVIMENTO RIGIDO m2 643.64 S/. 0.31 S/. 199.53 591.6 S/. 183.40 91.9% 0.00 S/ - 0.0% 591.60 S/. 183.40 91.9% 52.04 S/. 16.13 8.1%
09.03 VEREDAS S/. 17,831.51 S/. 15,743.03 S/. 94.93 S/. 15,837.96 S/. 1,993.56
09.03.01 DEMOLICION DE VEREDA DE CONCRETO E=15 CM m2 270.08 S/. 3.91 S/. 1,056.01 238.57 S/. 932.81 88.3% 24.28 S/ 94.93 9.0% 262.85 S/. 1,027.74 97.3% 7.23 S/. 28.27 2.7%
09.03.02 VEREDAS LATERALES DE PAVIMENTO H=0.15 m2 270.08 S/. 56.31 S/. 15,208.20 238.57 S/. 13,433.88 88.3% 0.00 S/ - 0.0% 238.57 S/. 13,433.88 88.3% 31.51 S/. 1,774.32 11.7%
09.03.03 JUNTAS ASFALTICAS EN PAVIMENTO H=0.10 E=1" m 65.50 S/. 22.65 S/. 1,483.58 57.5 S/. 1,302.38 87.8% 0.00 S/ - 0.0% 57.50 S/. 1,302.38 87.8% 8.00 S/. 181.20 12.2%
09.03.04 CURADO DE CONCRETO DE PAVIMENTO RIGIDO m2 270.08 S/. 0.31 S/. 83.72 238.57 S/. 73.96 88.3% 0.00 S/ - 0.0% 238.57 S/. 73.96 88.3% 31.51 S/. 9.76 11.7%
09.04 VARIOS S/. 467.37 S/. 192.50 S/ - S/. 192.50 S/. 274.87
09.04.01 PINTURA EN SARDINELES m2 40.43 S/. 5.91 S/. 238.94 0 S/. - 0.0% 0.00 S/ - 0.0% 0.00 S/. - 0.0% 40.43 S/. 238.94 100.0%
09.04.02 LIMPIEZA GENERAL DE LA OBRA m2 913.72 S/. 0.25 S/. 228.43 770 S/. 192.50 84.3% 0.00 S/ - 0.0% 770.00 S/. 192.50 84.3% 143.72 S/. 35.93 15.7%
PROYECTO "REPARACION DE PAVIMENTO; EN EL (LA) PRINCIPALES CALLES DEL DISTRITO DE OTUZCO, PROVINCIA DE OTUZCO, DEPARTAMENTO LA LIBERTAD"
UBICACIÓN LA LIBERTAD-OTUZCO
FECHA CORRESPONDIENTE AL MES DE JUNIO DEL 2022 VALORIZACION CORRESPONDIENTE AL 01 AL 30 DE JUNIO 2022
10.01 TRABAJOS PRELIMINARES S/. 471.69 S/. 471.69 S/. - S/. 471.69 S/. -
10.01.01 TRAZO, NIVELES Y REPLANTEO m2 704.02 S/. 0.67 S/. 471.69 704.02 S/. 471.69 100.0% 0.00 S/ - 0.0% 704.02 S/. 471.69 100.0% 0.00 S/. - 0.0%
10.02 PAVIMENTO DE CONCRETO RIGIDO S/. 82,060.29 S/. 82,060.29 S/. - S/. 82,060.29 S/. -0.01
10.02.01 DEMOLICION DE PAVIMENTO DE CONCRETO E=15 CM m2 704.02 S/. 9.12 S/. 6,420.66 704.02 S/. 6,420.66 100.0% 0.00 S/ - 0.0% 704.02 S/. 6,420.66 100.0% 0.00 S/. 0.00 0.0%
10.02.02 ELIMINACION DE MATERIAL EXCEDENTE DM=10 km m3 121.57 S/. 10.31 S/. 1,253.39 121.57 S/. 1,253.39 100.0% 0.00 S/ - 0.0% 121.57 S/. 1,253.39 100.0% 0.00 S/. -0.00 0.0%
10.02.03 PERFILADO Y COMPACTADO DE SUB-RASANTE m2 704.02 S/. 3.37 S/. 2,372.55 704.02 S/. 2,372.55 100.0% 0.00 S/ - 0.0% 704.02 S/. 2,372.55 100.0% 0.00 S/. -0.00 0.0%
10.02.04 CONCRETO LOSAS f'c= 245 kg/cm2 E=0.13M m2 704.02 S/. 74.26 S/. 52,280.53 704.02 S/. 52,280.53 100.0% 0.00 S/ - 0.0% 704.02 S/. 52,280.53 100.0% 0.00 S/. -0.00 0.0%
10.02.05 ENCOFRADO Y DESENCOFRADO EN PAVIMENTO RIGIDO m2 67.11 S/. 64.30 S/. 4,315.17 67.11 S/. 4,315.17 100.0% 0.00 S/ - 0.0% 67.11 S/. 4,315.17 100.0% 0.00 S/. 0.00 0.0%
10.02.06 JUNTAS ASFALTICAS EN PAVIMENTO H=0.10 E=1" m 671.07 S/. 22.65 S/. 15,199.74 671.07 S/. 15,199.74 100.0% 0.00 S/ - 0.0% 671.07 S/. 15,199.74 100.0% 0.00 S/. -0.00 0.0%
10.02.07 CURADO DE CONCRETO DE PAVIMENTO RIGIDO m2 704.02 S/. 0.31 S/. 218.25 704.02 S/. 218.25 100.0% 0.00 S/ - 0.0% 704.02 S/. 218.25 100.0% 0.00 S/. -0.00 0.0%
10.03 VEREDAS S/. 26,097.66 S/. 24,579.05 S/. - S/. 24,579.05 S/. 1,518.60
10.03.01 DEMOLICION DE VEREDA DE CONCRETO E=15 CM m2 388.12 S/. 3.91 S/. 1,517.55 365.52 S/. 1,429.18 94.2% 0.00 S/ - 0.0% 365.52 S/. 1,429.18 94.2% 22.60 S/. 88.37 5.8%
10.03.02 VEREDAS LATERALES DE PAVIMENTO H=0.15 m2 388.12 S/. 56.31 S/. 21,855.04 365.52 S/. 20,582.43 94.2% 0.00 S/ - 0.0% 365.52 S/. 20,582.43 94.2% 22.60 S/. 1,272.61 5.8%
10.03.03 JUNTAS ASFALTICAS EN PAVIMENTO H=0.10 E=1" m 115.00 S/. 22.65 S/. 2,604.75 108.35 S/. 2,454.13 94.2% 0.00 S/ - 0.0% 108.35 S/. 2,454.13 94.2% 6.65 S/. 150.62 5.8%
10.03.04 CURADO DE CONCRETO DE PAVIMENTO RIGIDO m2 388.12 S/. 0.31 S/. 120.32 365.52 S/. 113.31 94.2% 0.00 S/ - 0.0% 365.52 S/. 113.31 94.2% 22.60 S/. 7.01 5.8%
10.04 VARIOS S/. 570.43 S/. 202.50 S/. - S/. 202.50 S/. 367.93 64.5%
10.04.01 PINTURA EN SARDINELES m2 50.32 S/. 5.91 S/. 297.39 0 S/. - 0.0% 0.00 S/ - 0.0% 0.00 S/. - 0.0% 50.32 S/. 297.39 100.0%
10.04.02 LIMPIEZA GENERAL DE LA OBRA m2 1,092.14 S/. 0.25 S/. 273.04 810 S/. 202.50 74.2% 0.00 S/ - 0.0% 810.00 S/. 202.50 74.2% 282.14 S/. 70.54 25.8%
11 CALLE SANTA RITA C4,C5 Y C6 - PAVIMENTO RIGIDO S/. 139,133.27 S/. 98,982 S/. 18,671.06 S/. 117,653.31 S/. 21,479.97
11.01 TRABAJOS PRELIMINARES S/. 670.68 S/. 558 S/. - S/. 558 S/. 112.57
11.01.01 TRAZO, NIVELES Y REPLANTEO m2 1,001.01 S/. 0.67 S/. 670.68 833.00 S/. 558.11 83.2% 0.00 S/ - 0.0% 833.00 S/. 558.11 83.2% 168.01 S/. 112.57 16.8%
11.01 PAVIMENTO DE CONCRETO RIGIDO S/. 113,480.89 S/. 78,618 S/. 15,815.36 S/. 94,433 S/. 19,047.43
11.01.01 DEMOLICION DE PAVIMENTO DE CONCRETO E=15 CM m2 1,001.01 S/. 9.12 S/. 9,129.21 833.00 S/. 7,596.96 83.2% 0.00 S/ - 0.0% 833.00 S/. 7,596.96 83.2% 168.01 S/. 1,532.25 16.8%
11.01.02 ELIMINACION DE MATERIAL EXCEDENTE DM=10 km m3 187.69 S/. 10.31 S/. 1,935.08 156.19 S/. 1,610.29 83.2% 0.00 S/ - 0.0% 156.19 S/. 1,610.29 83.2% 31.50 S/. 324.79 16.8%
11.01.03 PERFILADO Y COMPACTADO DE SUB-RASANTE m2 1,001.01 S/. 3.37 S/. 3,373.40 833 S/. 2,807.21 83.2% 0.00 S/ - 0.0% 833.00 S/. 2,807.21 83.2% 168.01 S/. 566.19 16.8%
11.01.04 CONCRETO LOSAS f'c= 245 kg/cm2 E=0.13M m2 1,001.01 S/. 74.26 S/. 74,335.00 833 S/. 61,858.58 83.2% 0.00 S/ - 0.0% 833.00 S/. 61,858.58 83.2% 168.01 S/. 12,476.42 16.8%
11.01.05 ENCOFRADO Y DESENCOFRADO EN PAVIMENTO RIGIDO m2 83.90 S/. 64.30 S/. 5,394.77 69.78 S/. 4,486.85 83.2% 0.00 S/ - 0.0% 69.78 S/. 4,486.85 83.2% 14.12 S/. 907.92 16.8%
11.01.06 JUNTAS ASFALTICAS EN PAVIMENTO H=0.10 E=1" m 838.99 S/. 22.65 S/. 19,003.12 0 S/. - 0.0% 698.25 S/ 15,815.36 83.2% 698.25 S/. 15,815.36 83.2% 140.74 S/. 3,187.76 16.8%
11.01.07 CURADO DE CONCRETO DE PAVIMENTO RIGIDO m2 1,001.01 S/. 0.31 S/. 310.31 833 S/. 258.23 83.2% 0.00 S/ - 0.0% 833.00 S/. 258.23 83.2% 168.01 S/. 52.08 16.8%
11.02 VEREDAS S/. 24,246.41 S/. 19,806.02 S/. 2,643.03 S/. 22,449.05 S/. 1,797.36
VALORIZACION DE OBRA N°07 - POR ADMINISTRACION DIRECTA
PROYECTO "REPARACION DE PAVIMENTO; EN EL (LA) PRINCIPALES CALLES DEL DISTRITO DE OTUZCO, PROVINCIA DE OTUZCO, DEPARTAMENTO LA LIBERTAD"
UBICACIÓN LA LIBERTAD-OTUZCO
FECHA CORRESPONDIENTE AL MES DE JUNIO DEL 2022 VALORIZACION CORRESPONDIENTE AL 01 AL 30 DE JUNIO 2022
11.02.01 DEMOLICION DE VEREDA DE CONCRETO E=15 CM m2 353.42 S/. 3.91 S/. 1,381.87 327.21 S/. 1,279.39 92.6% 0.00 S/ - 0.0% 327.21 S/. 1,279.39 92.6% 26.21 S/. 102.48 7.4%
11.02.02 VEREDAS LATERALES DE PAVIMENTO H=0.15 m2 353.42 S/. 56.31 S/. 19,901.08 327.21 S/. 18,425.20 92.6% 0.00 S/ - 0.0% 327.21 S/. 18,425.20 92.6% 26.21 S/. 1,475.89 7.4%
11.02.03 JUNTAS ASFALTICAS EN PAVIMENTO H=0.10 E=1" m 126.00 S/. 22.65 S/. 2,853.90 0 S/. - 0.0% 116.69 S/ 2,643.03 92.6% 116.69 S/. 2,643.03 92.6% 9.31 S/. 210.87 7.4%
11.02.04 CURADO DE CONCRETO DE PAVIMENTO RIGIDO m2 353.42 S/. 0.31 S/. 109.56 327.21 S/. 101.44 92.6% 0.00 S/ - 0.0% 327.21 S/. 101.44 92.6% 26.21 S/. 8.13 7.4%
11.03 VARIOS S/. 735.29 S/. - S/. 212.67 S/. 212.67 S/. 522.61
11.03.01 PINTURA EN SARDINELES m2 67.12 S/. 5.91 S/. 396.68 0 S/. - 0.0% 0.00 S/ - 0.0% 0.00 S/. - 0.0% 67.12 S/. 396.68 100.0%
11.03.02 LIMPIEZA GENERAL DE LA OBRA m2 1,354.43 S/. 0.25 S/. 338.61 0 S/. - 0.0% 850.69 S/ 212.67 62.8% 850.69 S/. 212.67 62.8% 503.74 S/. 125.94 37.2%
12 CALLE INDEPENDENCIA C3 HASTA C6 - PAVIMENTO RIGIDO S/. 149,144.88 S/. 99,139 S/. 49,423.21 S/. 148,562 S/. 582.91
12.01 TRABAJOS PRELIMINARES S/. 700.16 S/. 700.16 S/. - S/. 700.16 S/. -
12.01.01 TRAZO, NIVELES Y REPLANTEO m2 1,045.02 S/. 0.67 S/. 700.16 1045.02 S/. 700.16 100.0% 0.00 S/ - 0.0% 1045.02 S/. 700.16 100.0% 0.00 S/. - 0.0%
12.02 PAVIMENTO DE CONCRETO RIGIDO S/. 117,488.69 S/. 71,109.28 S/. 46,379.40 S/. 117,488.68 S/. -
12.02.01 DEMOLICION DE PAVIMENTO DE CONCRETO E=15 CM m2 1,045.02 S/. 9.12 S/. 9,530.58 1045.02 S/. 9,530.58 100.0% 0.00 S/ - 0.0% 1045.02 S/. 9,530.58 100.0% 0.00 S/. - 0.0%
12.02.02 ELIMINACION DE MATERIAL EXCEDENTE DM=10 km m3 192.94 S/. 10.31 S/. 1,989.21 192.94 S/. 1,989.21 100.0% 0.00 S/ - 0.0% 192.94 S/. 1,989.21 100.0% 0.00 S/. - 0.0%
12.02.03 PERFILADO Y COMPACTADO DE SUB-RASANTE m2 1,045.02 S/. 3.37 S/. 3,521.72 716.83 S/. 2,415.72 68.6% 328.19 S/ 1,106.00 31.4% 1045.02 S/. 3,521.72 100.0% 0.00 S/. - 0.0%
12.02.04 CONCRETO LOSAS f'c= 245 kg/cm2 E=0.13M m2 1,045.02 S/. 74.26 S/. 77,603.19 716.83 S/. 53,231.80 68.6% 328.19 S/ 24,371.39 31.4% 1045.02 S/. 77,603.19 100.0% 0.00 S/. - 0.0%
12.02.05 ENCOFRADO Y DESENCOFRADO EN PAVIMENTO RIGIDO m2 84.32 S/. 64.30 S/. 5,421.78 57.85 S/. 3,719.76 68.6% 26.47 S/ 1,702.02 31.4% 84.32 S/. 5,421.78 100.0% 0.00 S/. - 0.0%
12.02.06 JUNTAS ASFALTICAS EN PAVIMENTO H=0.10 E=1" m 843.19 S/. 22.65 S/. 19,098.25 0 S/. - 0.0% 843.19 S/ 19,098.25 100.0% 843.19 S/. 19,098.25 100.0% 0.00 S/. - 0.0%
12.02.07 CURADO DE CONCRETO DE PAVIMENTO RIGIDO m2 1,045.02 S/. 0.31 S/. 323.96 716.83 S/. 222.22 68.6% 328.19 S/ 101.74 31.4% 1045.02 S/. 323.96 100.0% 0.00 S/. - 0.0%
12.03 VEREDAS S/. 30,183.21 S/. 27,329.30 S/. 2,853.90 S/. 30,183.20 S/. -
11.03.01 DEMOLICION DE VEREDA DE CONCRETO E=15 CM m2 451.50 S/. 3.91 S/. 1,765.37 451.50 S/. 1,765.37 100.0% 0.00 S/ - 0.0% 451.50 S/. 1,765.37 100.0% 0.00 S/. - 0.0%
11.03.02 VEREDAS LATERALES DE PAVIMENTO H=0.15 m2 451.50 S/. 56.31 S/. 25,423.97 451.5 S/. 25,423.97 100.0% 0.00 S/ - 0.0% 451.50 S/. 25,423.97 100.0% 0.00 S/. - 0.0%
11.03.03 JUNTAS ASFALTICAS EN PAVIMENTO H=0.10 E=1" m 126.00 S/. 22.65 S/. 2,853.90 0 S/. - 0.0% 126.00 S/ 2,853.90 100.0% 126.00 S/. 2,853.90 100.0% 0.00 S/. - 0.0%
11.03.04 CURADO DE CONCRETO DE PAVIMENTO RIGIDO m2 451.50 S/. 0.31 S/. 139.97 451.5 S/. 139.97 100.0% 0.00 S/ - 0.0% 451.50 S/. 139.97 100.0% 0.00 S/. - 0.0%
11.04 VARIOS S/. 772.82 S/. - S/. 189.91 S/. 189.91 S/. 582.91
11.04.01 PINTURA EN SARDINELES m2 67.46 S/. 5.91 S/. 398.69 0 S/. - 0.0% 0.00 S/ - 0.0% 0.00 S/. - 0.0% 67.46 S/. 398.69 100.0%
11.04.02 LIMPIEZA GENERAL DE LA OBRA m2 1,496.52 S/. 0.25 S/. 374.13 0 S/. - 0.0% 759.63 S/ 189.91 50.8% 759.63 S/. 189.91 50.8% 736.89 S/. 184.22 49.2%
13 CALLE SANTA ROSA C6 Y C7, C1 Y C2- PAVIMENTO RIGIDO S/. 82,330.68 S/. - S/. 3,343.00 S/. 3,343.00 S/. 78,987.69
13.01 TRABAJOS PRELIMINARES S/. 420.19 S/. - 0.0% S/. 203.71 S/. 203.71 S/. 216.48 51.5%
13.01.01 TRAZO, NIVELES Y REPLANTEO m2 627.15 S/. 0.67 S/. 420.19 0 S/. - 0.0% 304.04 S/ 203.71 48.5% 304.04 S/. 203.71 48.5% 323.11 S/. 216.48 51.5%
13.02 PAVIMENTO DE CONCRETO RIGIDO S/. 69,225.51 S/. - S/. 2,772.84 S/. 2,772.84 S/. 66,452.66
VALORIZACION DE OBRA N°07 - POR ADMINISTRACION DIRECTA
PROYECTO "REPARACION DE PAVIMENTO; EN EL (LA) PRINCIPALES CALLES DEL DISTRITO DE OTUZCO, PROVINCIA DE OTUZCO, DEPARTAMENTO LA LIBERTAD"
UBICACIÓN LA LIBERTAD-OTUZCO
FECHA CORRESPONDIENTE AL MES DE JUNIO DEL 2022 VALORIZACION CORRESPONDIENTE AL 01 AL 30 DE JUNIO 2022
13.02.01 DEMOLICION DE PAVIMENTO DE CONCRETO E=15 CM m2 627.15 S/. 9.12 S/. 5,719.61 0 S/. - 0.0% 304.04 S/ 2,772.84 48.5% 304.04 S/. 2,772.84 48.5% 323.11 S/. 2,946.76 51.5%
13.02.02 ELIMINACION DE MATERIAL EXCEDENTE DM=10 km m3 117.59 S/. 10.31 S/. 1,212.35 0 S/. - 0.0% 0.00 S/ - 0.0% 0.00 S/. - 0.0% 117.59 S/. 1,212.35 100.0%
13.02.03 PERFILADO Y COMPACTADO DE SUB-RASANTE m2 627.15 S/. 3.37 S/. 2,113.50 0 S/. - 0.0% 0.00 S/ - 0.0% 0.00 S/. - 0.0% 627.15 S/. 2,113.50 100.0%
13.02.04 CONCRETO LOSAS f'c= 245 kg/cm2 E=0.13M m2 627.15 S/. 74.26 S/. 46,572.16 0 S/. - 0.0% 0.00 S/ - 0.0% 0.00 S/. - 0.0% 627.15 S/. 46,572.16 100.0%
13.02.05 ENCOFRADO Y DESENCOFRADO EN PAVIMENTO RIGIDO m2 46.13 S/. 64.30 S/. 2,966.16 0 S/. - 0.0% 0.00 S/ - 0.0% 0.00 S/. - 0.0% 46.13 S/. 2,966.16 100.0%
13.02.06 JUNTAS ASFALTICAS EN PAVIMENTO H=0.10 E=1" m 461.25 S/. 22.65 S/. 10,447.31 0 S/. - 0.0% 0.00 S/ - 0.0% 0.00 S/. - 0.0% 461.25 S/. 10,447.31 100.0%
13.02.07 CURADO DE CONCRETO DE PAVIMENTO RIGIDO m2 627.15 S/. 0.31 S/. 194.42 0 S/. - 0.0% 0.00 S/ - 0.0% 0.00 S/. - 0.0% 627.15 S/. 194.42 100.0%
13.03 VEREDAS S/. 12,263.82 S/. - S/. 366.45 S/. 366.45 S/. 11,897.38
13.03.01 DEMOLICION DE VEREDA DE CONCRETO E=15 CM m2 185.17 S/. 3.91 S/. 724.01 0 S/. - 0.0% 93.72 S/ 366.45 50.6% 93.72 S/. 366.45 50.6% 91.45 S/. 357.57 49.4%
13.03.02 VEREDAS LATERALES DE PAVIMENTO H=0.15 m2 185.17 S/. 56.31 S/. 10,426.92 0 S/. - 0.0% 0.00 S/ - 0.0% 0.00 S/. - 0.0% 185.17 S/. 10,426.92 100.0%
13.03.03 JUNTAS ASFALTICAS EN PAVIMENTO H=0.10 E=1" m 46.60 S/. 22.65 S/. 1,055.49 0 S/. - 0.0% 0.00 S/ - 0.0% 0.00 S/. - 0.0% 46.60 S/. 1,055.49 100.0%
13.03.04 CURADO DE CONCRETO DE PAVIMENTO RIGIDO m2 185.17 S/. 0.31 S/. 57.40 0 S/. - 0.0% 0.00 S/ - 0.0% 0.00 S/. - 0.0% 185.17 S/. 57.40 100.0%
13.05.01 PINTURA EN SARDINELES m2 36.90 S/. 5.91 S/. 218.08 0 S/. - 0.0% 0.00 S/ - 0.0% 0.00 S/. - 0.0% 36.90 S/. 218.08 100.0%
13.05.02 LIMPIEZA GENERAL DE LA OBRA m2 812.32 S/. 0.25 S/. 203.08 0 S/. - 0.0% 0.00 S/ - 0.0% 0.00 S/. - 0.0% 812.32 S/. 203.08 100.0%
COSTO DIRECTO S/. 1,381,131.88 S/. 921,878.53 S/. 133,404.36 S/. 1,055,282.88 S/. 325,848.97
GASTOS GENERALES 10% S/. 138,113.19 S/. 92,187.85 S/. 13,340.44 S/. 105,528.29 S/. 32,584.90
COSTO TOTAL S/. 1,519,245.07 S/. 1,014,066.38 S/. 146,744.79 S/. 1,160,811.17 S/. 358,433.87
AVANCE FISICO
76.39%
EJECUTADO
SITUACIÓN ADELANTADA
DIFERENCIA 0.19%