CONCRETO
PISO fc'(Kg/cm2) C1 y C2 C3 y C4 C5 C6 C7 yC8 C9 C10 C11
0.25 x 0.30 0.25x0.60 VER CLAVE

DE OBRA
6Ø1/2" 8Ø1/2" 10Ø1/2" VER CLAVE VER CLAVE VER CLAVE VER CLAVE VER CLAVE
1 Ø3/8" 1@ .05 1 Ø3/8" 1@ .05 2 Ø3/8" 1@ .05 10Ø1/2" 8Ø1/2" 10Ø1/2" 10Ø1/2" 4Ø1/2"
TODOS 210 2@.10, 3@.15 2@.10, 3@.15 2@.10, 3@.15 3 Ø3/8"@ .25 2 Ø3/8"@ .25 2 Ø3/8"@ .25 2 Ø3/8"@ .25 1 Ø1/4"@ .20
Rta @.20 Rta @.20 Rta @.20 (b) (b) (b) (b) (b)
(a) (b) (b)

.25 .30
.32 .30 .30 .25
.14 .14 .25
1.00

Evaluación Práctica
.32 .25
.25
.25 .30
.30
.60 .12 .25 .25
.17 .43
.12
.30 .30
.13 .25 .45 .30


(a) Grupo: N° 02
.15

Integrantes:
1.00

.25 .30

Participación

Huillcahuaman Ttito, Job Elías 100 %


López Quiza, Juan Carlos 100 %
Mamani Cosi, Lizbeth Eliana 100 %
Mamani Mendoza, Omar 100 %
Manuel Quispe, Joel 100 %
Mendoza Calla, Edwin Sergio 100 %
N om bre de
E m pa sta do color Gris Alumi nio

F ondo c ol or N eg ro

E m pa sta do color Gris

Docente: Rocía Patricia Vergaray Álvaro.


TRAZO Y REPLANTEO DURANTE LA OBRA
P3
C9
C-1
C-1
C-1 C-1
C-1 C-2 C-2 C-1
C-1 C-1
C-1 C-2 C-2
CERCO PERIMÉTRICO
C-1
C-1 C-1
C-1 C-2 C-2 C-1

(P2 - P1) = km 0+000 a 0+145:


C-1 C-1
C-1 C-2 C-2
C-1 C-1
C-1 C-1
C-1 C-2 C-2 C-1
C-1 C-1
C-1 C-2 C-2 C-1
C-1 C-1
C-1 C-2 C-2 P4
Largo = 145 m
C-1
C-1 C-1
C-1 C-2 C-2 C-1
C-1 C-1
C-1 C8

Ancho = 0.60 m
C-2
C-2 C7

C-1

C-1
Total = 145m x 0.60m = 87.00 m2
C-1

C-1 C-1 (P2 - P4) = km 0+145 a 0+200


Largo = 55 m
C-2
C-2

C-1
C-1

C-2
C-2

C-1
Ancho = 0.60 m
C-1 Total = 55m x 0.60m = 33.00 m2
(P4 - P3) = km 0+200 a 0+355

61.82
C-1

C-1 C-1

C-2
C-2

C-1
Largo = 155 m
Ancho = 0.60 m
C-1

C-2
C-2

C-1
C-1

C-1
Total = 155m x 0.60m = 93.00 m2
C-1

C-1
(P3 - P2) = km 0+355 a 0+421.148
Largo = 66.15 m
C-1

C-2
C-2

C-1 C11
C6

Ancho = 0.60 m
0+421.148
C-10 C-1

0"
C-1 C-1 C-1 C-1 C-1 C-2 C-2 C-1 C-1 C-1 C-1 C-2C-2 C-1 C-1 C-1 C-1 C-2 C-2 C-1 C-1 C-1 C-1 C-2C-2 C-1 C-1 C-1 C-1 C-1C-4 C3 C-3 C4 C-1 C-1 C-1 C-1 C-1 C-2C-2 C-1 C-1 C-1 C-1 C-2C-2 C-1 C-1 C5

150.00
98
°1
0'5 Total = 66.15m x 0.60m = 39.69 m2
P1
CASETA DE GUARDIANIA
0+000

Caseta de guardiania (0+100)


Largo = 2.00 m
C11 2.00
2.00
Ancho = 2.00 m
Total = 2.00m x 2.00m = 4.00 m2
1.00 1.00
1.00
1.00
2.00
2.00
Z-2 Z-1 Z-1 Z-2 ZAPATAS
1.00
1.00
1.00
1.00
Zapata 1 (Ref: 0+090 y 0+095) Zapata 1 (Ref: 0+090 y 0+095)
N° veces = 2 N° veces = 2
Largo = 1.00 m
C-4 C3 C-3 C4 C-1
Largo = 1.00 m
Ancho = 1.00 m Ancho = 1.00 m
Total = 2 x 1m x 1m = 2m2 Total = 2 x 1m x 1m = 2m2

Metrado total = 260.69 m2


Nombre de
RELLENO CON MATERIAL PROPIO
Empastado color Gris Aluminio .24

Fondo color Negro

8.80
Empastado color Gris SERVICIO NACIONAL DE CAPACITACION PARA

CIMIENTOS CORRIDOS
LA INDUSTRIA DE LA CONSTRUCCION

(P2 - P2) = km 0+000 a 0+421.148 - 10.87m (Distancia entrada principal)


Largo = 421.148m – 10.87m = 410.28m
5.25
Ancho = 0.45 m
4.00 4.00
Altura = 0.30 m
3.75

3.47 3.47 Total = 410.28 x 0.45m x 0.30m = 55.39 m3

CASETA DE GUARDIANIA
Caseta de guardiania (0+100)
.15 ÁreaR1 = N° veces x Largo x Ancho x Altura
0.67 m
Como el perfil del ÁreaR1 = 2 x 1.70m x 0.30m x 0.67m = 0.68 m2
terreno tiene una
pendiente 2%, ÁreaR2 = N° veces x Largo x Ancho x Altura
como criterio
personal se ÁreaR2 = 2 x 1.10m x 0.30m x 0.67m = 0.44 m2
considero 0.30 0.30
aprox.
R1 ZAPATAS
1.70
1.10
R2 R2 Zapata 1 (ref. 0+090)
N.= Var. R1 Área = N° veces x Área x Altura
Área = 2 x 0.84m2 x 0.50m = 0.84 m2
0.30
Zapata 2 (ref. 0+090)
0.45 0.50
.48
Área = N° veces x Área x Altura
Área = 2 x 0.84m2 x 0.50m = 0.84 m2
A = 0.84 m2
Metrado total = 58.19 m3

CORTE 1-1
Esc. 1/25
CONCRETO DE COLUMNA TIPO 1
VA-01

CANTIDAD DE COLUMNAS TIPO 1

.25 Cantidad = 93 Columnas de tipo – (C-1)

.17 ALTURA DE LA COLUMNA TIPO 1


0.30 m

2.88 m
.13 Altura = 2.88 m

CÁLCULO DEL ÁREA DE LA COLUMNA TIPO 1

6Ø Largo = 0.30 m
Ancho = 0.25 m
(a) Área = 0.30 x 0.25 = 0.075 m2

TOTAL
N.= Var. Total = Cantidad x Altura x Área
Total = 93 m x 2.88 m x 0.075 m
.45
Total = 20.088 m3

Metrado total = 20.088 m3

CORTE 1-1 CORTE 2-2


Esc. 1/25 Esc. 1/25
CONCRETO COLUMNA
TIPO C10

𝑪𝒂𝒏𝒕. = 𝟏
𝑳𝒂𝒓𝒈𝒐 = 𝟎. 𝟐𝟓 𝒎
𝑨𝒏𝒄𝒉𝒐 = 𝟏. 𝟎𝟎 𝒎
𝑨𝒍𝒕𝒖𝒓𝒂 = 𝟐. 𝟖𝟖 𝒎

𝑽𝒐𝒍𝒖𝒎𝒆𝒏 = 𝑪 ∙ 𝑳 ∙ 𝑨 ∙ 𝑯
𝑽𝒐𝒍𝒖𝒎𝒆𝒏 = 𝟏 ∙ 𝟎. 𝟐𝟓 ∙ 𝟏. 𝟎𝟎 ∙ 𝟐. 𝟖𝟖
𝑽𝒐𝒍𝒖𝒎𝒆𝒏 = 𝟎. 𝟕𝟐 𝒎𝟑
CONCRETO TOTAL DE COLUMNAS
COLUMNA C1 COLUMNA C2 COLUMNA C3 COLUMNA C4
Nro de veces = 93 Nro de veces = 40 Nro de veces = 2 Nro de veces = 2
Largo = 0.25 Largo = 0.25 Largo = 0.25 Largo = 0.25
Ancho = 0.30 Ancho = 0.30 Ancho = 0.60 Ancho = 0.60
Altura = 2.58 Altura = 2.58 Altura = 5.60 Altura = 4.35
Total = 18.00 𝑚3 Total = 7.74 𝑚3 Total = 1.68 𝑚3 Total = 1.31 𝑚3

COLUMNA C5 COLUMNA C6 COLUMNA C7 COLUMNA C8


Nro de veces = 1 Nro de veces = 1 Nro de veces = 1 Nro de veces = 1
Área = 0.68 Área = 0.68 Largo = 0.44 Largo = 0.44
Altura = 2.88 Altura = 2.88 Altura = 2.88 Altura = 2.88
Total = 1.97 𝑚3 Total = 1.97 𝑚3 Total = 1.27 𝑚3 Total = 1.27 𝑚3

COLUMNA C9 COLUMNA C10 COLUMNA C11


Nro de veces = 1 Nro de veces = 1 Nro de veces = 4
Largo = 1.00 Largo = 1.00 Largo = 0.15
Ancho = 0.25 Ancho = 0.25 Ancho = 0.30
Altura = 2.88 Altura = 2.88 Altura = 2.88
Total = 0.72 𝑚3 Total = 0.72 𝑚3 Total = 0.52 𝑚3

SUMA TOTAL DE LAS COLUMNAS


Columna C1 = 18.00 𝑚3 Columna C7 = 1.27 𝑚3
METRADO TOTAL DE LAS
Columna C2 = 7.74 𝑚3 Columna C8 = 1.27 𝑚3 COLUMNAS
Columna C3 = 1.68 𝑚3 Columna C9 = 0.72 𝑚3
Columna C4 = 1.31 𝑚3 Columna C10 = 0.72 𝑚3
Columna C5 = 1.97 𝑚3 Columna C11 = 0.52 𝑚3 TOTAL = 37.14 𝒎𝟑
Columna C6 = 1.97 𝑚3
METRADO DE ACERO (C-1)
1.- LONGITUD DE ACERO LONGITUDINAL 4.- TOTAL DE ESTRIBOS
• ∅ 1Τ2 " TotalEstrib = 5 Unid + 2 1 + 2 + 3 Unid
= 3.34𝑚 + 0.20𝑚
= 𝟑. 𝟓𝟒 𝒎 𝐓𝐨𝐭𝐚𝐥𝐄𝐬𝐭𝐫𝐢𝐛 = 𝟏𝟕 𝐔𝐧𝐢𝐝

2.- LONGITUD DE ESTRIBOS


LEstrib.= 2∗ancho + 2∗largo +(2∗gancho)
LEstrib.= 2∗(0.30−0.05) + 2∗(0.25−0.05) +(2∗0.14)
LEstrib=𝟏.𝟏𝟖 𝐦
METRADO DE ACERO EN
3.- CANTIDAD DE ESTRIBOS COLUMNAS EN KG
Nro Nro LO NG . FIERRO (Kg) PARCIAL
f
1@ 0.05 V ECES P IEZA P IEZA 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg

2@ 0.10 0.70 m
3@ 0.15 1/2" 93 6 3.54 1 1975.32
3/8" 93 17 1.18 0.56 1044.72

𝐿𝑜𝑛𝑔𝑖𝑡𝑢𝑑 𝑑𝑒 𝑙𝑎 𝑐𝑜𝑙𝑢𝑚𝑛𝑎 𝑐𝑜𝑛 𝑒𝑠𝑡𝑟𝑖𝑏𝑜𝑠


= 0.70 𝑚 ∗ 2
= 𝟏. 𝟒 𝒎
𝐿𝑜𝑛𝑔𝑖𝑡𝑢𝑑 𝑑𝑒 𝑙𝑎 𝑐𝑜𝑙𝑢𝑚𝑛𝑎 𝑐𝑜𝑛 𝑒𝑠𝑡𝑟𝑖𝑏𝑜𝑠 𝑎 𝑐𝑎𝑑𝑎 0.20
= 2.58𝑚 − 1.4 𝑚
= 𝟏. 𝟏𝟖 𝒎

1.18 m
Estrib0.20 = = 5.9 ≈ 5 Unid
0.20 m
METRADO DE ACERO (C-10)
1.- LONGITUD DE ACERO LONGITUDINAL
• ∅ 1Τ2 "
= 3.34𝑚 + 0.20𝑚
= 𝟑. 𝟓𝟒 𝒎

2.- LONGITUD DE ESTRIBOS


Largo 1−0.05
Estrib.=2∗( 3 )= 0.63 𝑚
AnchoEstrib.=(0.25−0.05)= 0.20 𝑚
LEstrib.= 2∗ancho + 2∗largo +(2∗gancho)
LEstrib = 2 ∗ 0.20 + 2 ∗ 0.63 + 2 ∗ 0.14
𝐋𝐄𝐬𝐭𝐫𝐢𝐛 = 𝟏. 𝟗𝟒 𝐦
3.- CANTIDAD DE ESTRIBOS
@ 0.25

2.58 m
TotalEstrib =
0.25 m
TotalEstrib = 10.32 ≈ 𝟏𝟎 𝐔𝐧𝐢𝐝
Nro Nro LO NG . FIERRO (Kg) PARCIAL
f
V ECES P IEZA P IEZA 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg

1/2" 1 10 3.54 1 35.40

3/8" 1 10 1.94 0.560 10.86


3/8" 1 10 1.94 0.560 10.86
METRADO DE ACERO DE TODAS LAS COLUMNAS
METRADO DE ACERO EN
SOBRECIMIENTO REFORZADO
1.- ACEROS HORIZONTALES

𝐴𝑐𝑒𝑟𝑜𝐻𝑜𝑟𝑖𝑧 = 𝑇𝑜𝑡𝑎𝑙𝑣𝑎𝑟𝑖𝑙𝑙𝑎𝑠 ∗ 𝐿𝑠𝑜𝑏𝑟𝑒𝑐𝑖𝑚𝑖𝑒𝑛𝑡𝑜 ∗ 3ൗ8 "


𝐴𝑐𝑒𝑟𝑜𝐻𝑜𝑟𝑖𝑧 = 3 ∗ 410.24 𝑚 ∗ 0.56
𝐴𝑐𝑒𝑟𝑜𝐻𝑜𝑟𝑖𝑧 = 689.2 𝑘𝑔

2.- ACEROS VERTICALES


𝐿𝑠𝑜𝑏𝑟𝑒𝑐𝑖𝑚𝑖𝑒𝑛𝑡𝑜
𝐴𝑐𝑒𝑟𝑜𝑉𝑒𝑟𝑡𝑖 =
0.25
𝐴𝑐𝑒𝑟𝑜𝑉𝑒𝑟𝑡𝑖 = 1640 𝑈𝑛𝑖𝑑

2.- LARGO DE ACEROS VERTICALES

𝐿𝐴𝑐.𝑉𝑒𝑟 = 0.40 𝑚 + 1.23 𝑚 + 0.10 𝑚 + 0.03 𝑚

f
Nro Nro 𝐿𝐴𝑐.𝑉𝑒𝑟 = 1.8 𝑚
LO NG . FIERRO (Kg) PARCIAL
V ECES P IEZA P IEZA 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
ACERO HORIZONTAL 3/8" 1 3 410.24 0.56 689.20
ACERO VERTICAL 3/8" 1 1640 1.8 0.56 1653.12
Encofrado sobrecimiento Sobrecimiento armado
Encofrado sobrecimiento armado (m2)
Sobrecimientos (interior y exterior) Comunes
Cantidad de elementos = 2
N° veces = 19
Largo = 16.02
Altura = 0.60

C.elemxN°vecesLxAxA

Total= 365.26

Sobrecimiento (interior y exterior) Demas distancias


Cantidad de elementos = 2
N° veces = 1 Para hallar este largo fue la suma
de diversas distancias diferentes
Largo = 67.79 encontradas y sumadas en una
Altura = 0.60 sola.

C.elemxN°vecesLxAxA

Total= 81.35

Sumando ambos resultados tenemos


446.60 𝑚2
Vigas
Concreto vigas Concreto en vigas F'c=210 kg/cm2

Vigas de cerco perimétrico común


Cantidad de elementos = 1
N° veces = 66
Largo = 2.03
Altura = 0.30 C.elemxN°vecesLxAxA
Ancho = 0.25
Total = 10.049

Viga esquina inferior derecha Viga esquina superior derecha Viga esquina superior izquierda
Cantidad de elementos = 1 Cantidad de elementos = 1 Cantidad de elementos = 1
N° veces = 1 N° veces = 1 N° veces = 1
Largo = 1.87 Largo = 4.26 Largo = 3.93
Altura = 0.30 Altura = 0.30 Altura = 0.30
Ancho = 0.25 Ancho = 0.25 Ancho = 0.25
Total = 0.140 Total = 0.320 Total = 0.295

Viga entrada
Entre las columnas C-4 y C-3 Entre las columnas C-3 y C-3
Cantidad de elementos = 1 Cantidad de elementos = 1 La suma total de
N° veces = 2 N° veces = 2 todos los resultados
Largo = 1.80 Largo = 4.20 obtenidos será:
Altura = 0.30 Altura = 0.30 11.70 𝑚3
Ancho = 0.25 Ancho = 0.25
Total = 0.270 Total = 0.630
VIGA VA-01(ACERO)
AV. FERNANDO BELAUNDE TERRY (0+000 A 0+088.6)
Entre estas progresivas, se encuentran 15 vigas en total, las cuales serán usadas como referencia para el calculo de
acero.
Distancias de la viga:
Largo = 2,53 m. Ancho = 0,15 m.
Altura = 0,30 m. Largo = 2,53 – 2 x (0,25 ancho de columna) = 2,03
Acero longitudinal :
Acero de 1/2”
Cantidad de elementos: 4
Numero de veces: 15
Medidas por pieza:
Distancia a: = 2,53-(0,025+0,025) = 2,48 m. 0,025 m.: Recubrimiento en vigas de
confinamiento.
Distancia b: = 0,20 m. 0,20 m.: Long. mínima de gancho “L” de acero de 1/2”.
Distancia c: = 0,20 m. 0,20 m.: Long. mínima de gancho “L” de acero de 1/2”.
Long. por pieza:
a+b+c = 2,48+0,20+0,20 = 2,88 m.
Longitud por diámetro:
Cant. elementos x Num. Veces x Dist. por Pieza = 4 x 15 x 2,88 = 172,8 m.
Estribos:
Acero de 1/4”
Cantidad de elementos(estribos): = (10+(2,03-0,9)/0,2)-1 = 14,65 = 15
10: Cant. de estribos distribuídos(1@,05 4@,10) a cada extremo de la viga.
2,03: Dist. de viga descontando el ancho de columna(2,53-(0,25+0,25)).
0,9: Distancia ocupada por los estribos distribuídos(,05+,10+,10+,10+,10=,45). A cada
extremo.
Medida por pieza:
Distancia a: = 0,30-(0,025+0,025) = 2,48 m.
Distancia b: = 0,15-(0,025+0,025) = 0,10 m.
Distancia c: = 0,09 m. 0,09 m.: Gancho de estribo 135° de acero de 1/4”.
Long. por pieza:
1/2 172, 19,
” Long. 8 N° de 2 Peso en kg 1,02 Peso total 176,256 2 x (a+b+c) = 2 x (2,48 x 0,10 x 0,09) = 0,88 m.
total por varilla por metro por Total 225,756 kg Long. por diámetro:
1/4 diámetro 198, s lineal diámetro
22 0,25 49,5 Cant. elementos x Num. Veces x Dist. por Pieza = 15 x 15 x 0,88 = 198,0 m.
” 0
VIGA VA-01(ENCOFRADO)
AV. FERNANDO BELAUNDE TERRY (0+000 A 0+088.6)

Entre estas progresivas, se encuentran 15 vigas en total, las cuales serán usadas como referencia para el
calculo del encofrado

Distancias de la viga:
Largo = 2,53 m. Ancho = 0,15 m.
Altura = 0,30 m. Largo = 2,53 – 2 x (0,25 ancho de columna) = 2,03

Tapa interior:

Cantidad de elementos: 1
Numero de veces: 15
Medidas por pieza:
Largo: = 2,53-(0,25+0,25) = 2,03 m.
Alto: = 0,30 m.
Parcial: = 1 x 15 x 2,03 x 0,30 = 9,135 m2
Tapa exterior:

Cantidad de elementos: 1
Numero de veces: 15
Medidas por pieza:
Largo: = 2,53-(0,25+0,25) = 2,03 m.
Alto: = 0,30 m.
Parcial: = 1 x 15 x 2,03 x 0,30 = 9,135 m2
Total de encofrado en vigas:
Parcial de tapa interior + Parcial de tapa exterior
9,135 m + 9,135 m = 18,27 m2
METRADO DE MURO DE LADRILLO KK
SOGA CARA VISTA

ALBAÑILERIA, TARRAJEOS, ETC


Item DESCRIPCIÓN UNID. Cant. de Medidas TOTAL (M2,M3)
Nro de veces TOTAL
Elem. Largo Ancho Altura (UND. PTO, ETC)
07 MUROS Y TABIQUES DE ALBAÑILERIA
07.01 MUROS DE LADRILLO KK SOGA CARA VISTA m2 378.12
CERCO PERIMETRICO 1 68 2.58 2.03 356.14 378.12
1 2 4.26 2.58 21.98

M Metros cuadrados 1 m2
L Longitud de ladrillo 0.24 m
JH Espesor junta horizontal 0.015 m
H Altura del ladrillo 0.09 m
JV Espesor junta vertical 0.015 m
CL Cantidad de ladrillo 37 m2

Se considera el 5% de desperdicio
CL 39
CL TOTAL 14747 Unid