Está en la página 1de 181

PROPONENTE PRESUPUESTO

DE OBRA
Obra: PRESUPUESTO DE OBRA CUBIERTA CORREDOR ESCUELA año2016

CUBIERTA CORREDOR ENTRADA

ITEM DESCRIPCION UND CANT. VR. UNIT VR.TOTAL

ESTRUCTURA METALICA ###

PLATINAS UN 7.00 300,000 2,100,000


VIGAS CAJON UN 7.00 240,000 1,680,000
TENSORES ML 36.00 25,000 900,000
SUPLEMENTOS VIGA CAJON UN 7.00 100,000 700,000
CAJA METALICA DE APOYO UN 7.00 35,000 245,000
PINTURA GL 1.00 400,000 400,000
ANDAMIOS GL 1.00 180,000 180,000

SUBTOTAL CUBIERTAS EDFICIO 6,205,000

CUBIERTA ###

182118 CUBIERTA TEJA TERMOACUSTICA M2 27.00 49,600 1,339,200

SUBTOTAL XIV. CUBIERTA 1,339,200

RED ACUEDUCTO EDIFICIO ###

181001 BAJANTE AGUAS LLUVIAS PVC CUADRADO CANAL ML 3.50 16,980 59,430
181004 CODO BAJANTE 45 CANAL PVC UND 3.00 7,980 23,940
181002 CANAL AMAZONAS PVC AGUAS LLUVIAS ML 3.00 19,800 59,400
181012 UNION BAJANTE CANAL AMAZONAS PVC UND 1.00 7,980 7,980
181008 TAPA EXTERNA CANAL AMAZONAS PVC UND 2.00 7,800 15,600
181006 SOPORTE CANAL AMAZONAS PVC UND 6.00 19,800 118,800

SUBTOTAL LIMPIEZA ASEO 285,150

VALOR TOTAL COSTOS DIRECTOS 7,829,350


###

COSTOS INDIRECTOS
TOTAL COSTOS DIRECTOS 7,829,350
ADMINISTRACION 12.00% 939,522
IMPREVISTOS 3.00% 234,881
UTILIDAD 5.00% 391,468
IVA SOBRE LA UTILIDAD 62,635
VALOR TOTAL PRESUPUESTO 9,457,855
ANALISIS DE PRECIOS
UNITARIOS
FECHA:

MORTERO 1:4

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
ARENA FINA M3 1.16 0 22,388.00
AGUA LTS 185 0 12.00
CEMENTO GRIS CONQUISTADOR KLS 364 0 359.60
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE HC 1.5 0 9,983.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 1 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 175,158.98

MORTERO 1:3

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
AGUA LTS 220 0 12.00
ARENA MEDIANA M3 1.09 0 22,388.00
CEMENTO GRIS CONQUISTADOR KLS 454 0 359.60
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE HC 1.5 0 9,983.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 1 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 206,375.82

MORTERO DE PEGA PARA BLOQUE

DESCRIPCION UND CANT. DESP.% PRECIO UNIT


MATERIALES
ARENA MEDIANA M3 1.1 1 22,388.00
CEMENTO GRIS CONQUISTADOR KLS 359 1 359.60
CAL HIDRATADA NARE SACO 10 KILOS KLS 78 1 550.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE HC 1.5 0 9,983.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.172 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 213,753.12

TORTA DE CARGA + MALLA LOSA ENTREPISO

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
ALAMBRE NEGRO # 18 KLS 0.04 0 2,450.00
MALLA GALLINERO 1" ROLLO DE 1.80 X 36MTS LAR ROL 0.015 5 65,600.00
PUNTILLA 2 CC LBS 0.15 0 2,378.00
MEZCLA CONCRETO 1:2:3 3100 PSI 210 MPa M3 0.025 0 184,571.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI HC 0.2 0 13,291.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.4 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 9,200.37

MEZCLA CONCRETO 1:2:3 3100 PSI - 22,0 Mpa

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
AGUA LTS 190 0 12.00
ARENA GRUESA M3 0.56 0 22,388.00
GRAVA TRITURADA DE 3/4 M3 0.84 0 32,000.00
GASOLINA CORRIENTE GLN 0.1 0 7,400.00
CEMENTO GRIS CONQUISTADOR KLS 350 0 359.60
ACEITE MOTOR 4 TIEMPOS GLN 0.006 0 45,000.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE HC 1.1 0 9,983.00
SUBTOTAL MANO DE OBRA
EQUIPO
MEZCLADORA DE 9 PIES CUBICOS DIA 0.06 0 34,200.00
HERRAMIENTA MENOR GLB 2.7 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 184,570.58

DESCONEXION DE CONTADOR DE ENERGIA

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MANO DE OBRA
M.O. ELECTRICAS 3 AYUD-1 OFI-1 PROF HC 0.1 0 69,124.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 2.5 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 9,662.40


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 12,829.20

CAMPAMENTO TABLA 9 M2

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
BALASTRO DE RIO CANTO RODADO-ARENA M3 1.17 0 19,000.00
BISAGRA 3x2" COBRIZ UND 3 0 1,475.00
CANDADO YALE 110-30 UND 1 0 17,400.00
GANCHO P/TEJA ASB. MADERA UND 8 0 261.00
GUADUA [TACO] 2.50-3M UND 12 0 2,000.00
PUNTILLA 2 CC LBS 3 0 2,378.00
TABLA 1x10x3M OTOBO UND 44 0 7,100.00
TEJA ONDULIT #6 UND 8 0 22,667.00
PORTACANDADO UND 1 0 2,750.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE-1 OFI HC 9 0 18,282.00
SUBTOTAL MANO DE OBRA
EQUIPO
VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS M3 1.17 0 6,000.00
HERRAMIENTA MENOR GLB 2 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 747,521.00


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 992,558.39

LOCALIZACION-REPLANTEO OBRA ARQUITECTON.

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
LISTON 2 x2x3M. OTOBO UND 0.11 0 3,500.00
PUNTILLA 2 CC LBS 0.02 0 2,378.00
PIOLA GRUESA 50 METROS ROL 0.06 0 2,500.00
MINERAL ROJO KLS 0.005 0 7,000.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE-1 OFI HC 0.06 0 18,282.00
M.O. TOPOGRAFIA 1 CADENERO-1 TOP HC 0.04 0 12,500.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.039 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 2,257.38


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 2,996.85

CERRAMIENTO TELA FIB.TEJIDA H=2.10M-BORD

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
GUADUA [TACO] 2.50-3M UND 0.2 0 2,000.00
PUNTILLA 2 CC LBS 0.1 0 2,378.00
ALAMBRE GALVANIZADO # 18 U KG 0.2 0 3,136.64
MALLA FIBRA TEJIDA H=2.10M VERDE 65GR/M2 M2 1 0 3,150.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI HC 0.1 13,291.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.15 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 5,909.22


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 7,845.98

DEMOL.CIMIENTO CONCRETO (CR)

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE HC 2.4 0 4,992.00
SUBTOTAL MANO DE OBRA
EQUIPO
COMPRESOR DE DOS MARTILLOS HRS 1.25 0 87,000.00
VOLQUETA 5 M3 VJE 0.26 0 40,600.00
HERRAMIENTA MENOR GLB 1.854 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 133,326.20


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 177,030.26

DEMOL.COLUMNA CONCRETO

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE HC 3.4 0 4,992.00
SUBTOTAL MANO DE OBRA
EQUIPO
COMPRESOR DE DOS MARTILLOS HRS 1.25 0 87,000.00
PULIDORA CON PIEDRA O DISCO DIA 1 0 26,000.00
VOLQUETA 5 M3 VJE 0.282 0 40,600.00
HERRAMIENTA MENOR GLB 4.749 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 168,395.90


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 223,596.21

DEMOL.CONCRETO CICLOPEO

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE HC 2.8 0 4,992.00
SUBTOTAL MANO DE OBRA
EQUIPO
COMPRESOR DE DOS MARTILLOS HRS 1.5 0 87,000.00
VOLQUETA 5 M3 VJE 0.28 0 40,600.00
SUBTOTAL EQUIPO

COSTO DIRECTO 155,845.60


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 206,932.32

DEMOL.MURO LAD. SOGA

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE HC 0.55 0 4,992.00
SUBTOTAL MANO DE OBRA
EQUIPO
VOLQUETA 5 M3 VJE 0.02 0 40,600.00
HERRAMIENTA MENOR GLB 0.078 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 3,643.40


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 4,837.18

DEMOL.ANDEN/CONTRAPISO CONC.E 7.6 A 12CM

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE HC 0.5 0 4,992.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.1 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 2,606.00


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 3,460.25

DEMOL.CIELO FALSO ESTRUCIELO

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE HC 0.5 0 4,992.00
SUBTOTAL MANO DE OBRA
EQUIPO
VOLQUETA 5 M3 VJE 0.02 0 40,600.00
HERRAMIENTA MENOR GLB 0.049 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 3,361.90


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 4,464.06

DEMOL.PISO BALDOSA+MORTERO

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE HC 0.3 0 4,992.00
SUBTOTAL MANO DE OBRA
EQUIPO
VOLQUETA 5 M3 VJE 0.023 0 40,600.00
HERRAMIENTA MENOR GLB 0.06 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 2,497.40


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 3,315.52

DEMOL.ANDEN/CONTRAPISO CONCRETO E=<7.5CM

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE HC 0.3 0 4,992.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.07 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 1,574.60


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 2,091.29
DEMOL.PLACA CONCRETO E=12.1 A 17.5 CM.

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI HC 0.12 0 13,291.00
SUBTOTAL MANO DE OBRA
EQUIPO
COMPRESOR DE DOS MARTILLOS HRS 0.12 0 87,000.00
HERRAMIENTA MENOR GLB 0.12 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 12,166.92


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 16,155.35

DESM.CUBIERTA TEJA BARRO

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE-1 OFI HC 0.35 0 18,282.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.091 0 1,100.00
ANDAMIO METALICO TUBULAR U/D 0.1 0 672.00
TABLONES 3 MTS DIA 0.1 0 520.00
SUBTOTAL EQUIPO

COSTO DIRECTO 6,618.00


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 8,787.38

DESM.ESTRUCTURA MADERA T.BARRO

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE-1 OFI HC 0.4 0 18,282.00
SUBTOTAL MANO DE OBRA
EQUIPO
VOLQUETA 5 M3 VJE 0.08 0 40,600.00
HERRAMIENTA MENOR GLB 0.153 0 1,100.00
ANDAMIO METALICO TUBULAR U/D 0.3 0 672.00
TABLONES 3 MTS DIA 0.3 0 520.00
SUBTOTAL EQUIPO

COSTO DIRECTO 11,086.70


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 14,721.32

DESM.MARCO + NAVE SENCILLA

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE HC 2 0 4,992.00
SUBTOTAL MANO DE OBRA
EQUIPO
VOLQUETA 5 M3 VJE 0.1 0 40,600.00
HERRAMIENTA MENOR GLB 0.21 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 14,275.00


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 18,954.35

DESM.REJA METALICA

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE HC 1 0 4,992.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 2 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 7,192.00


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 9,549.54

DESM.VENTANA EXISTENTE

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE HC 2.2 0 4,992.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.165 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 11,163.90


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 14,823.56

DESM. CLOSET METALICO EXISTENTE

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE HC 2.2 0 4,992.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.165 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 11,163.90


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 14,823.56

RETIRO BREAKER

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MANO DE OBRA
M.O. ELECTRICAS 1 AYUDANTE-1 OFI HC 0.05 0 18,607.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.1 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 1,040.35


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 1,380.91

RETIRO DE CABLE #16 A #10

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MANO DE OBRA
M.O. ELECTRICAS 1 AYUDANTE-1 OFI HC 0.01 0 18,607.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.1 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 296.07


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 393.03

RETIRO LAMPARA
DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MANO DE OBRA
M.O. ELECTRICAS 1 AYUDANTE-1 OFI HC 0.15 0 18,607.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.1 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 2,901.05


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 3,851.95

DESM- BARANDA-CHAMBRANA

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
SOLDADURA 6011 1/8" VARILLA KLS 0.15 0 6,199.04
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. METALISTERIA 1 AYUDANTE-1 OFI HC 1.2 0 15,949.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 2.8 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 23,148.65


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 30,737.25

LOCALIZACIÓN Y REPLANTEO DE ESTRUCTURA

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
LISTON 2 x2x3M. OTOBO UND 0.11 0 3,500.00
PUNTILLA 2 CC LBS 0.02 0 2,378.00
PIOLA GRUESA 50 METROS ROL 0.06 0 2,500.00
MINERAL ROJO KLS 0.005 0 7,000.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE-1 OFI HC 0.06 0 18,282.00
M.O. TOPOGRAFIA 1 CADENERO-1 TOP HC 0.04 0 12,500.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.039 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 2,257.38


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 2,996.85

EXCAVACIÓN MANUAL CIMENTACION SIN RETIRO

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE HC 2 0 4,992.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.1 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 10,094.00


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 13,402.81

RELLENO PERIMETRAL ESTRUCURA MAT. DEL SITIO COMPACTADO

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE HC 0.9 0 4,992.00
SUBTOTAL MANO DE OBRA
EQUIPO
VIBROCOMPACTADOR CA-15 HRS 0.07 0 72,000.00
HERRAMIENTA MENOR GLB 0.123 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 9,668.10


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 12,837.17

SOLADO LIMPIEZA E=0.05 cto-2.000 Psi

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
MEZCLA CONCRETO 1:2:3 3100 PSI 210 MPa M3 0.06 0 184,571.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI HC 0.4 0 13,291.00
SUBTOTAL MANO DE OBRA
EQUIPO
VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS M3 0.09 0 6,000.00
HERRAMIENTA MENOR GLB 0.03 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 16,963.66


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 22,524.80

ZAPATAS CONCRETO 3.000 Psi.

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
CUARTON 2"x4"x3M OTOBO UND 0.1 0 6,096.00
PUNTILLAS LBS 0.2 0 812.00
TABLA 1x10x3M OTOBO UND 0.115 0 7,100.00
MEZCLA CONCRETO 1:2:3 3100 PSI 210 MPa M3 1.05 0 184,571.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI HC 2.95 0 13,291.00
SUBTOTAL MANO DE OBRA
EQUIPO
VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS M3 1.5 0 6,000.00
HERRAMIENTA MENOR GLB 0.03 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 243,629.50


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 323,491.91

VIGA CIMENTACIÒN CONCRETO 3.000 Psi.

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
PUNTILLA 2 CC LBS 1 0 2,378.00
TABLA 1X10x3M OTOBO [2C] UND 5.5 0 8,816.00
VARETA 2"x2"x3M OTOBO UND 2.67 0 1,800.00
MEZCLA CONCRETO 1:2:3 3100 PSI 210 MPa M3 1.05 0 184,571.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE-1 OFI HC 5.9 0 18,282.00
SUBTOTAL MANO DE OBRA
EQUIPO
VIBRADOR ELECTRICO DIA 0.05 0 33,640.00
VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS M3 1.5 0 6,000.00
SUBTOTAL EQUIPO

COSTO DIRECTO 368,017.35


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 488,652.98

COLUMNA CONCRETO 3.000 Psi.

DESCRIPCION UND CANT. DESP.% PRECIO UNIT


MATERIALES
ANTISOL BLANCO KLS 2 0 5,742.00
SEPAROL DESFORMALETEANTE TARRO 15 KLS KLS 2 0 12,296.00
SIKAMENT NS SUPERPLASTIFIC TARRO DE 25 KLS KLS 0.2 0 6,728.00
CUARTON 2"x4"x3M OTOBO UND 5.67 0 6,096.00
PUNTILLA 2 CC LBS 8 0 2,378.00
TABLA 1x10x3M OTOBO UND 5 0 7,100.00
VARETA 2"x2"x3M OTOBO UND 4.33 0 1,800.00
MEZCLA CONCRETO 1:2:3 3100 PSI 210 MPa M3 1.05 0 184,571.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 3 AYUDANTE-1 OFI HC 7.6 0 23,273.00
SUBTOTAL MANO DE OBRA
EQUIPO
VIBRADOR ELECTRICO DIA 0.1 0 33,640.00
VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS M3 1.5 0 6,000.00
HERRAMIENTA MENOR GLB 0.33 0 1,100.00
TACO METALICO EXTENSION DE 2.OM A 3.30MT DIA 24 0 170.00
ANDAMIO METALICO TUBULAR U/D 4 0 672.00
SUBTOTAL EQUIPO

COSTO DIRECTO 524,473.27


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 696,395.25

VIGAS DE CUBIERTA Vcu Cto.3.000 Psi.

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
CUARTON 2"x4"x3M OTOBO UND 1.5 0 6,096.00
GUADUA [TACO] 2.50-3M UND 6 0 2,000.00
PUNTILLA 2 CC LBS 4.5 0 2,378.00
TABLA 1x10x3M OTOBO UND 4 0 7,100.00
MEZCLA CONCRETO 1:2:3 3100 PSI 210 MPa M3 1.03 0 184,571.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE-1 OFI HC 12 0 18,282.00
SUBTOTAL MANO DE OBRA
EQUIPO
VIBRADOR ELECTRICO DIA 0.3 0 33,640.00
VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS M3 1.5 0 6,000.00
HERRAMIENTA MENOR GLB 0.33 0 1,100.00
ANDAMIO METALICO TUBULAR U/D 4 0 672.00
SUBTOTAL EQUIPO

COSTO DIRECTO 491,880.13


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 653,118.26

LOSA ALIGERADA CASETON ESTERILLA DE 30 CMS

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
ALAMBRE NEGRO # 18 KLS 0.14 0 2,450.00
CUARTON 2"x4"x3M OTOBO UND 0.15 0 6,096.00
ESTERILLA GUADUA 4 MTS. ML 2.2 0 1,800.00
PUNTILLA 2 CC LBS 0.02 0 2,378.00
TABLA 1x10x3M OTOBO UND 1 0 7,100.00
VARETA 2"x2"x3M OTOBO UND 0.05 0 1,800.00
MEZCLA CONCRETO 1:2:3 3100 PSI 210 MPa M3 0.11 0 184,571.00
TORTA DE CARGA + MALLA LOSA ENTREPISO M2 1 0 9,200.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 3 AYUDANTE-1 OFI HC 1.25 0 23,273.00
SUBTOTAL MANO DE OBRA
EQUIPO
FORMALETA PARA ENTREPISO M2 0.13 0 3,765.00
VIBRADOR ELECTRICO DIA 0.02 0 33,640.00
VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS M3 0.165 0 6,000.00
HERRAMIENTA MENOR GLB 0.33 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 73,564.27


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 97,678.28

ESCALERA CONCRETO 3.000Psi.

DESCRIPCION UND CANT. DESP.% PRECIO UNIT


MATERIALES
ALAMBRE NEGRO # 18 KLS 1 0 2,450.00
CUARTON 2"x4"x3M OTOBO UND 2.5 0 6,096.00
GUADUA [TACO] 2.50-3M UND 5 0 2,000.00
PUNTILLA 2 CC LBS 0.72 0 2,378.00
TABLA 1x10x3M OTOBO UND 6.7 0 7,100.00
MEZCLA CONCRETO 1:2:3 3100 PSI 210 MPa M3 1.03 0 184,571.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 3 AYUDANTE-1 OFI HC 10 0 23,273.00
SUBTOTAL MANO DE OBRA
EQUIPO
VIBRADOR ELECTRICO DIA 0.5 0 33,640.00
VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS M3 1.5 0 6,000.00
HERRAMIENTA MENOR GLB 0.02 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 525,652.29


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 697,960.73

ACERO FIGURADO DE REFUERZO 60,000 psi. 420 Mpa.

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
ALAMBRE NEGRO # 18 KLS 0.03 0.03 2,450.00
SEGUETA SIN MARCO UND 0.03 0.03 2,552.00
HIERR.DE 60000 PSI 420 MPA KLS 1.03 0 2,242.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE HC 0.04 0 4,992.00
SUBTOTAL MANO DE OBRA

COSTO DIRECTO 2,659.04


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 3,530.63
MALLA ELECTROSOLDADA ACERO DE REFUERZO. NTC2310

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
MALLA ELEC.M-0.84 / DO84 ESPAC 15X15 1.34K/M2 KLS 1.05 0 2,800.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE-1 OFI HC 0.03 0 18,282.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.4 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 3,928.46


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 5,215.60

CARGUE Y RETIRO DE SOBRANTES EN VOLQUETA.

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE HC 0.45 0 4,992.00
SUBTOTAL MANO DE OBRA
EQUIPO
VOLQUETA 5 M3 VJE 0.28 0 40,600.00
HERRAMIENTA MENOR GLB 0.403 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 14,057.70


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 18,666.21

Columna amarre muro 0.24x0.12 culatas

DESCRIPCION UND CANT. DESP.% PRECIO UNIT


MATERIALES
PUNTILLA 2 CC LBS 0.05 0 2,378.00
TABLA 1x10x3M OTOBO UND 0.67 0 7,100.00
MEZCLA CONCRETO 1:2:3 3100 PSI 210 MPa M3 0.024 0 184,571.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 3 AYUDANTE-1 OFI HC 0.5 0 23,273.00
SUBTOTAL MANO DE OBRA
EQUIPO
VIBRADOR ELECTRICO DIA 0.01 0 33,640.00
VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS M3 0.03 0 6,000.00
HERRAMIENTA MENOR GLB 0.33 0 1,100.00
TACO METALICO EXTENSION DE 2.OM A 3.30MT DIA 1 0 170.00
ANDAMIO METALICO TUBULAR U/D 0.1 0 672.00
SUBTOTAL EQUIPO

COSTO DIRECTO 22,058.70


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 29,289.95

Cinta remate muro culata 0.12x0.15

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
PUNTILLA 2 CC LBS 0.04 0 2,378.00
TABLA 1x10x3M OTOBO UND 0.32 0 7,100.00
MEZCLA CONCRETO 1:2:3 3100 PSI 210 MPa M3 0.012 0 184,571.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 3 AYUDANTE-1 OFI HC 0.4 0 23,273.00
SUBTOTAL MANO DE OBRA
EQUIPO
VIBRADOR ELECTRICO DIA 0.01 0 33,640.00
VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS M3 0.018 0 6,000.00
HERRAMIENTA MENOR GLB 0.02 0 1,100.00
TACO METALICO EXTENSION DE 2.OM A 3.30MT DIA 1 0 170.00
ANDAMIO METALICO TUBULAR U/D 0.1 0 672.00
SUBTOTAL EQUIPO

COSTO DIRECTO 14,594.77


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 19,379.25

Losa maciza E10 Cubierta Wc.+Deposito

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
CUARTON 2"x4"x3M OTOBO UND 0.5 0 6,096.00
PUNTILLA 2 CC LBS 0.2 0 2,378.00
TABLA 1x10x3M OTOBO UND 0.67 0 7,100.00
MEZCLA CONCRETO 1:2:3 3100 PSI 210 MPa M3 0.1 0 184,571.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 3 AYUDANTE-1 OFI HC 0.7 0 23,273.00
SUBTOTAL MANO DE OBRA
EQUIPO
FORMALETA PARA ENTREPISO M2 1 0 3,765.00
VIBRADOR ELECTRICO DIA 0.02 0 33,640.00
VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS M3 0.15 0 6,000.00
HERRAMIENTA MENOR GLB 0.33 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 48,729.60


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 64,703.69

Columna amarre muro 0.24x0.12 culatas

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
PUNTILLA 2 CC LBS 0.05 0 2,378.00
TABLA 1x10x3M OTOBO UND 0.67 0 7,100.00
MEZCLA CONCRETO 1:2:3 3100 PSI 210 MPa M3 0.024 0 184,571.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 3 AYUDANTE-1 OFI HC 0.5 0 23,273.00
SUBTOTAL MANO DE OBRA
EQUIPO
VIBRADOR ELECTRICO DIA 0.01 0 33,640.00
VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS M3 0.03 0 6,000.00
HERRAMIENTA MENOR GLB 0.33 0 1,100.00
TACO METALICO EXTENSION DE 2.OM A 3.30MT DIA 1 0 170.00
ANDAMIO METALICO TUBULAR U/D 0.1 0 672.00
SUBTOTAL EQUIPO

COSTO DIRECTO 22,058.70


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 29,289.95

Cinta remate muro culata 0.12x0.15

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
PUNTILLA 2 CC LBS 0.04 0 2,378.00
TABLA 1x10x3M OTOBO UND 0.32 0 7,100.00
MEZCLA CONCRETO 1:2:3 3100 PSI 210 MPa M3 0.012 0 184,571.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 3 AYUDANTE-1 OFI HC 0.4 0 23,273.00
SUBTOTAL MANO DE OBRA
EQUIPO
VIBRADOR ELECTRICO DIA 0.01 0 33,640.00
VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS M3 0.018 0 6,000.00
HERRAMIENTA MENOR GLB 0.02 0 1,100.00
TACO METALICO EXTENSION DE 2.OM A 3.30MT DIA 1 0 170.00
ANDAMIO METALICO TUBULAR U/D 0.1 0 672.00
SUBTOTAL EQUIPO

COSTO DIRECTO 14,594.77


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 19,379.25

ACERO FIGURADO DE REFUERZO 60,000 psi. 420 Mpa.


ACERO FIGURADO DE REFUERZO 60,000 psi. 420 Mpa.

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
ALAMBRE NEGRO # 18 KLS 0.03 0.03 2,450.00
SEGUETA SIN MARCO UND 0.03 0.03 2,552.00
HIERR.DE 60000 PSI 420 MPA KLS 1.03 0 2,242.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE HC 0.04 0 4,992.00
SUBTOTAL MANO DE OBRA

COSTO DIRECTO 2,659.04


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 3,530.63

MEZCLA GROUTING 1:2:3 3100 PSI - 22,0 Mpa

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
ARENA GRUESA M3 1 0 22,388.00
GRAVA TRITURADA 3/8" M3 0.5 0 34,000.00
CEMENTO GRIS CONQUISTADOR KLS 300 0 359.60
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI HC 0.472 0 13,291.00
SUBTOTAL MANO DE OBRA
EQUIPO
MEZCLADORA DE 9 PIES CUBICOS DIA 0.08 0 34,200.00
HERRAMIENTA MENOR GLB 0.172 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 156,466.55


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 207,756.89
ACERO REFUERZO FLEJADO 6000 psi. 420 MPA

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
SOLDADURA 6011 1/8" VARILLA KLS 0.05 0 6,199.04
PINTURA ANTICORROSIVA GLN 0.004 0 31,000.00
LAM.PERF. ASTM A-36 KLS 1 0.02 1,050.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. CARP.MADERA 1 AYUDANTE-1 OFI HC 0.023 0 14,951.00
M.O. METALISTERIA 1 AYUDANTE-1 OFI HC 0.025 0 15,949.00
SUBTOTAL MANO DE OBRA
EQUIPO
SOLDADOR ELECTRICO DIA 0.009 0 27,000.00
PLUMA GRUA 500 KILOS DIA 0.02 0 37,000.00
HERRAMIENTA MENOR GLB 0.01 0 1,100.00
OXICORTE (OXIGENO-ACETILENO) DIA 0.001 0 27,000.00
ANDAMIO METALICO TUBULAR U/D 0.24 0 672.00
SUBTOTAL EQUIPO

COSTO DIRECTO 3,409.03


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 4,526.48

ESCALERILLA HIERRO GRAFILADO 1/4"

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
HIERRO ESCALERILLA 1/4" GRAFILADO L=6MTS UND 0.4 0 3,500.00
SEGUETA SIN MARCO UND 0.005 0 2,552.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE HC 0.02 4,992.00
M.O. CARP.TALLER 1 AYUDANTE-1 OFI HC 0.017 14,121.00
SUBTOTAL MANO DE OBRA
EQUIPO
SOLDADOR ELECTRICO DIA 0.005 27,000.00
SUBTOTAL EQUIPO

COSTO DIRECTO 1,887.65


COSTOS INDIRECTOS
ADMINISTRACION 0%
IMPREVISTOS 0%
UTILIDAD 0%
IVA SOBRE LA UTILIDAD 0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 1,888.00

MURO BLOQUE TEXTURIZADO 19 * 39 *. 14

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
BLOQUE PIEDRA N 14X19X39 UND 10 2 2,157.00
BLOQUE PIEDRA M 14X19X19 UND 2 2 1,341.00
BLOQUE PIEDRA T 14X19X39 UND 1.5 2 2,157.00
MORTERO DE PEGA PARA BLOQUE M3 0.014 0 213,753.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI HC 0.44 0 13,291.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.2 0 1,100.00
ANDAMIO METALICO TUBULAR U/D 0.2 0 672.00
SUBTOTAL EQUIPO

COSTO DIRECTO 37,232.23


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 49,436.65

MURO BLOQUE CONCRETO 14x19x39CM

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
BLOQUE CONCRETO N 14X19X39 UND 10 2 1,587.00
BLOQUE CONCRETO M 14X19X19 UND 2 2 881.00
BLOQUE CONCRETO T 14X19X39 UND 1.5 2 1,587.00
MORTERO DE PEGA PARA BLOQUE M3 0.015 0 213,753.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI HC 0.42 0 13,291.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.2 0 1,100.00
ANDAMIO METALICO TUBULAR U/D 0.2 0 672.00
SUBTOTAL EQUIPO

COSTO DIRECTO 29,555.66


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 39,244.46

MESON EN CONCRETO H=8.1-10CM

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
ALAMBRE NEGRO # 18 KLS 0.24 0 2,450.00
LISTON 2 x2x3M. OTOBO UND 0.6 0 3,500.00
HIERRO .3/8" 37.000 [CH] KLS 8 0 2,150.00
PUNTILLA 2 CC LBS 0.4 0 2,378.00
TABLA 1x10x3M OTOBO UND 1.1 0 7,100.00
GUADUA ML 1.1 0 1,100.00
MEZCLA CONCRETO 1:2:3 3100 PSI 210 MPa M3 0.1 0 184,571.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI HC 2 0 13,291.00
SUBTOTAL MANO DE OBRA
EQUIPO
VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS M3 0.15 0 6,000.00
HERRAMIENTA MENOR GLB 1 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 76,898.30


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 102,105.16
PUNTO AGUA FRIA ,1/2"

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
ADAP.M PRS PVC .1/2 UND 2 0 236.00
CODO GALV .1/2x90 UND 1 0 790.00
CODO PRS PVC .1/2x90ø UND 3 0 297.00
NIPLE GALV .1/2x 5 CM UND 1 0 991.00
SOLDADURA PVC 1/ 2 GLN UND 0.04 5 48,108.00
TAPON PRS PVC .1/2 R UND 1 0 173.00
TUBO PRS .1/2 RDE-13.5 ML 1.5 5 1,369.00
WAIPE KLS 0.05 5 4,000.00
LIMPIADOR PVC 112 GRMS UND 0.02 5 4,046.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. HIDROSANIT. 1 AYUDANTE-1 OFI HC 0.6 0 14,121.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.3 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 16,591.26


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 22,029.53

TUBERIA PVC 1" RDE 21

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
SOLDADURA CPVC 1/ 4 GLN UND 0.004 0 51,533.00
TUBO PRS 1 RDE-13.5 ML 1 0.02 3,612.00
LIMPIADOR PVC 760-G 1/4 GL UND 0.004 0 23,195.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. HIDROSANIT. 1 AYUDANTE-1 OFI HC 0.04 0 14,121.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.3 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 4,806.47


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 6,381.41

INSTALACION TUBERIA PRESION 1"

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MANO DE OBRA
M.O. HIDROSANIT. 1 AYUDANTE-1 OFI HC 0.13 0 14,121.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.1 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 1,945.73


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 2,583.90

TUB. PVC 3/4" RDE 21

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
SOLDADURA CPVC 1/ 4 GLN UND 0.004 0 51,533.00
TUBO PRS .3/4 RDE-11 ML 1 0.02 2,677.00
LIMPIADOR PVC 760-G 1/4 GL UND 0.004 0 23,195.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. HIDROSANIT. 1 AYUDANTE-1 OFI HC 0.04 0 14,121.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.3 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 3,871.28


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 5,139.92

INSTALACION TUBERIA PRESION 3/4"

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MANO DE OBRA
M.O. HIDROSANIT. 1 AYUDANTE-1 OFI HC 0.1 0 14,121.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.1 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 1,522.10


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 2,020.91

TUB. PVC 1/2" RDE 21

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
SOLDADURA PVC 1/ 2 GLN UND 0.004 0 48,108.00
TUBO PRS .1/2 RDE- 9 ML 1 0 1,919.00
LIMPIADOR PVC 760-G 1/4 GL UND 0.004 0 23,195.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. HIDROSANIT. 1 AYUDANTE-1 OFI HC 0.04 0 14,121.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.3 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 3,099.05


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 4,114.86
INSTALACION TUBERIA PRESION 1/2"

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MANO DE OBRA
M.O. HIDROSANIT. 1 AYUDANTE-1 OFI HC 0.083 0 14,121.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.1 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 1,282.04


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 1,702.24

CODO 90 PRESION PVC ,1/2"

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
CODO PRS PVC .1/2x90ø UND 1 0 297.00
SOLDADURA PVC 1/ 2 GLN UND 0.001 0 48,108.00
LIMPIADOR PVC 760-G 1/4 GL UND 0.001 0 23,195.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. HIDROSANIT. 1 AYUDANTE-1 OFI HC 0.01 0 14,121.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.03 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 542.50


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 721.00
CODO 90 PRESION PVC 1"

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
CODO PRS PVC 1 x90ø UND 1 0 966.00
SOLDADURA PVC 1/ 2 GLN UND 0.004 0 48,108.00
LIMPIADOR PVC 760-G 1/4 GL UND 0.004 0 23,195.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. HIDROSANIT. 1 AYUDANTE-1 OFI HC 0.07 0 14,121.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.2 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 2,459.68


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 3,266.39

CODO 90 PRESION PVC ,3/4"

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
CODO PRS PVC .3/4x90ø UND 1 0 493.00
SOLDADURA PVC 1/ 2 GLN UND 0.001 0 48,108.00
LIMPIADOR PVC 760-G 1/4 GL UND 0.001 0 23,195.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. HIDROSANIT. 1 AYUDANTE-1 OFI HC 0.01 0 14,121.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.03 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 738.50


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 981.25
CODO 90 PRESION GALV. 1/2"

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
CODO GALV .1/2x90 UND 1 0 790.00
SUBTOTAL MATERIALES

COSTO DIRECTO 790.00


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 1,048.96

TEE PRESION PVC 1"

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
SOLDADURA PVC 1/ 2 GLN UND 0.001 0 48,108.00
TEE PRS PVC 1 UND 1 0 1,344.00
LIMPIADOR PVC 760-G 1/4 GL UND 0.001 0 23,195.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. HIDROSANIT. 1 AYUDANTE-1 OFI HC 0.05 0 14,121.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.1 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 2,231.34


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 2,962.33

TEE PRESION PVC ,3/4"


DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
SOLDADURA PVC 1/ 2 GLN UND 0.001 0 48,108.00
TEE PRS PVC .3/4 UND 1 0 688.00
LIMPIADOR PVC 760-G 1/4 GL UND 0.001 0 23,195.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. HIDROSANIT. 1 AYUDANTE-1 OFI HC 0.05 0 14,121.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.1 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 1,575.34


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 2,091.29

TEE PRESION PVC ,1/2"

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
SOLDADURA PVC 1/ 2 GLN UND 0.001 0 48,108.00
TEE PRS PVC .1/2 UND 1 0 408.00
LIMPIADOR PVC 760-G 1/4 GL UND 0.001 0 23,195.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. HIDROSANIT. 1 AYUDANTE-1 OFI HC 0.01 0 14,121.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.1 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 730.50


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 970.63
VALVULA CIERRE METALICO ,1/2"

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
ADAP.M PRS PVC .1/2 UND 2 0 236.00
VALVULA C.METALICO .1/2" UND 1 0 11,889.00
CINTA TEFLON 10 MTS CARRETE DE 10 METROS UND 0.2 0 450.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. HIDROSANIT. 1 AYUDANTE-1 OFI HC 0.12 0 14,121.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.3 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 14,475.52


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 19,221.23

ADAPTADOR HEMBRA PVC PRESION ,1/2"

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
ADAP.M PRS PVC .1/2 UND 1 1 236.00
CINTA TEFLON 10 MTS CARRETE DE 10 METROS UND 0.01 0 450.00
SUBTOTAL MATERIALES
EQUIPO
HERRAMIENTA MENOR GLB 0.02 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 264.86


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 351.87

REDUCCION PVC 3/4 X ,1/2"RD-21


ITEM: 160150-1P
DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
REDUCCION PVC 3/4" X 1/2" UND 1 0 820.00
SOLDADURA PVC 1/ 2 GLN UND 0.002 0 48,108.00
LIMPIADOR PVC 760-G 1/4 GL UND 0.002 0 23,195.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. HIDROSANIT. 1 AYUDANTE-1 OFI HC 0.02 0 14,121.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.03 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 1,278.02


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 1,696.93

REDUCCION PVC 1X ,3/4"RD-21


ITEM: 160150-2P
DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
REDUCCION PVC 1" X 3/4" UND 1 0 1,560.00
SOLDADURA PVC 1/ 2 GLN UND 0.002 0 48,108.00
LIMPIADOR PVC 760-G 1/4 GL UND 0.002 0 23,195.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. HIDROSANIT. 1 AYUDANTE-1 OFI HC 0.02 0 14,121.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.03 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 2,018.02


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 2,679.50
REDUCCION PVC 1X ,1/2"RD-21

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
BUJE PRS PVC 1 x.1/2 S UND 1 0 1,344.44
SOLDADURA PVC 1/ 2 GLN UND 0.002 0 48,108.00
LIMPIADOR PVC 760-G 1/4 GL UND 0.002 0 23,195.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. HIDROSANIT. 1 AYUDANTE-1 OFI HC 0.02 0 14,121.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.03 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 1,802.46


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 2,392.70

EXCAVACION TIERRA A MANO

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE HC 1.5 0 4,992.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.168 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 7,672.80


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 10,188.21
TUBERIA PVC 2 SANITARIA (LOSA )

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
SOLDADURA PVC 1/ 2 GLN UND 0.004 0 48,108.00
TUBO SANIT PVC 2" ML 1 0.02 6,610.00
LIMPIADOR PVC 760-G 1/4 GL UND 0.004 0 23,195.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. HIDROSANIT. 2 AYUDANTE - 1 OFIC. HC 0.2 0 19,527.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.3 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 11,131.93


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 14,781.07

TUBERIA PVC 4 SANITARIA (LOSA)

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
SOLDADURA PVC 1/ 2 GLN UND 0.004 0 48,108.00
TUBO SANIT PVC 4" ML 1 0.02 13,759.00
LIMPIADOR PVC 760-G 1/4 GL UND 0.004 0 23,195.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. HIDROSANIT. 2 AYUDANTE - 1 OFIC. HC 0.2 0 19,527.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.3 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 18,282.36


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 24,274.84
CODO SANITARIO PVC 90 CC-2"

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
CODO SAN PVC 2 x90ø CXC UND 1 0 1,589.00
SOLDADURA PVC 1/ 2 GLN UND 0.004 0 48,108.00
LIMPIADOR PVC 760-G 1/4 GL UND 0.004 0 23,195.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. HIDROSANIT. 1 AYUDANTE-1 OFI HC 0.1 0 14,121.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.3 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 3,616.31


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 4,801.32

CODO SANITARIO PVC 45 CC-2"

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
CODO SAN PVC 2 x45ø CxC UND 1 0 1,902.00
SOLDADURA PVC 1/ 2 GLN UND 0.004 0 48,108.00
LIMPIADOR PVC 760-G 1/4 GL UND 0.004 0 23,195.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. HIDROSANIT. 1 AYUDANTE-1 OFI HC 0.083 0 14,121.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.3 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 3,689.25


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 4,898.26

CODO SANITARIO PVC 45 CC-4"

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
CODO SAN PVC 4 x22.5 CxC UND 1 0 6,921.00
SOLDADURA PVC 1/ 2 GLN UND 0.004 0 48,108.00
LIMPIADOR PVC 760-G 1/4 GL UND 0.004 0 23,195.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. HIDROSANIT. 1 AYUDANTE-1 OFI HC 0.1 0 14,121.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.3 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 8,948.31


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 11,881.15

YEE SANITARIA DB RED 2X3X2

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
SOLDADURA PVC 1/ 2 GLN UND 0.004 0 48,108.00
YEE SAN PVC 2x3x2 D-R UND 1 0 13,345.00
LIMPIADOR PVC 760-G 1/4 GL UND 0.004 0 23,195.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. HIDROSANIT. 1 AYUDANTE-1 OFI HC 0.1 0 14,121.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.3 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 15,372.31


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 20,410.94

YEE SANITARIA 4" X 4" X 2"

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
SUBTOTAL MATERIALES
MANO DE OBRA
SUBTOTAL- MANO DE OBRA
EQUIPO
SUBTOTAL- EQUIPO

COSTO DIRECTO -
COSTOS INDIRECTOS
ADMINISTRACION 19%
IMPREVISTOS 5%
UTILIDAD 8%
IVA SOBRE LA UTILIDAD 16%
TOTAL COSTOS INDIRECTOS:
VALOR TOTAL ITEM -

YEE SANITARIA DB. 4"

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
SOLDADURA PVC 1/ 2 GLN UND 0.004 0 48,108.00
YEE SAN PVC 4 DOB UND 1 0 25,243.00
LIMPIADOR PVC 760-G 1/4 GL UND 0.004 0 23,195.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. HIDROSANIT. 1 AYUDANTE-1 OFI HC 0.125 0 14,121.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.3 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 27,623.33


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 36,677.82

SIFON SANITARIO PVC 2"

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
SIFON SANI PVC 2" TAP UND 1 0 6,200.00
SOLDADURA PVC 1/ 2 GLN UND 0.004 0 48,108.00
LIMPIADOR PVC 760-G 1/4 GL UND 0.004 0 23,195.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. HIDROSANIT. 1 AYUDANTE-1 OFI HC 0.1 0 14,121.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.3 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 8,227.31


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 10,923.82

UNION SANITARIA PVC 4"

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
SOLDADURA PVC 1/ 2 GLN UND 0.004 0 48,108.00
UNION SAN PVC 4 UND 1 0 3,695.00
LIMPIADOR PVC 760-G 1/4 GL UND 0.004 0 23,195.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. HIDROSANIT. 1 AYUDANTE-1 OFI HC 0.1 0 14,121.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.3 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 5,722.31


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 7,597.67

BAJANTE AGUAS LLUVIAS PVC CUADRADO CANAL

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
BAJANTE PVC CUADRADO ML 1.05 0.01 16,227.00
BAJANTE PVC SOPORTE UND 1.5 0 1,456.00
TORN P/MAD 1 x 6 UND 3 0 29.00
LIMPIADOR PVC 760-G 1/4 GL UND 0.01 0 23,195.00
SOLDADURA PVC 1/ 4 GLN UND 0.01 0 48,104.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI HC 0.3 0 13,291.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.5 0 1,100.00
ANDAMIO METALICO TUBULAR U/D 0.1 0 672.00
CRUCETA ANDAMIO DIA 0.1 0 100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 24,638.54


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 32,715.67

CODO BAJANTE 45 CANAL PVC

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
CODO CANAL PVC BAJANTE UND 1 0 3,150.00
LIMPIADOR PVC 760-G 1/4 GL UND 0.02 0 23,195.00
SOLDADURA PVC 1/ 4 GLN UND 0.02 0 48,104.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI HC 0.05 0 13,291.00
SUBTOTAL MANO DE OBRA

COSTO DIRECTO 5,240.53


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 6,959.00

CANAL AMAZONAS PVC AGUAS LLUVIAS

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
CANAL PVC SOPORTE UND 2.74 0 1,915.00
TORN 1 x 6 UND 4 0 20.00
CANAL PVC AMAZONAS AGUAS LLUVIAS ML 1.03 0.03 17,800.00
LIMPIADOR PVC 760-G 1/4 GL UND 0.01 0 23,195.00
SOLDADURA PVC 1/ 4 GLN UND 0.01 0 48,104.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI HC 0.3 0 13,291.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.5 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 28,916.89


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 38,396.00

UNION BAJANTE CANAL AMAZONAS PVC

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
UNION BAJ.CANAL AMAZ.PVC UND 1 0 12,950.00
LIMPIADOR PVC 760-G 1/4 GL UND 0.01 0 23,195.00
SOLDADURA PVC 1/ 4 GLN UND 0.01 0 48,104.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE HC 0.2 0 4,992.00
SUBTOTAL MANO DE OBRA

COSTO DIRECTO 14,661.39


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 19,466.88

TAPA EXTERNA CANAL AMAZONAS PVC

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
TAPA CANAL PVC EXTERNA [P] UND 1 0 4,800.00
LIMPIADOR PVC 760-G 1/4 GL UND 0.01 0 23,195.00
SOLDADURA PVC 1/ 4 GLN UND 0.01 0 48,104.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE HC 0.2 0 4,992.00
SUBTOTAL MANO DE OBRA

COSTO DIRECTO 6,511.39


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 8,645.31

SOPORTE CANAL AMAZONAS PVC

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
TORN P/MAD 1 x 6 UND 2 0 29.00
SOPORT.CANAL AMAZONAS PVC UND 1 0 1,884.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE HC 0.2 0 4,992.00
SUBTOTAL MANO DE OBRA

COSTO DIRECTO 2,940.40


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 3,903.73

TUBERIA PVC 3 SANITARIA (LOSA)

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
SOLDADURA PVC 1/ 2 GLN UND 0.004 0 48,108.00
TUBO SANIT PVC 3 ML 1 0.02 9,873.00
LIMPIADOR PVC 760-G 1/4 GL UND 0.004 0 23,195.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. HIDROSANIT. 2 AYUDANTE - 1 OFIC. HC 0.2 0 19,527.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.3 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 14,395.58


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 19,115.01

TUBERIA PVC 4 SANITARIA (LOSA)

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
SOLDADURA PVC 1/ 2 GLN UND 0.004 0 48,108.00
TUBO SANIT PVC 4" ML 1 0.02 13,759.00
LIMPIADOR PVC 760-G 1/4 GL UND 0.004 0 23,195.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. HIDROSANIT. 2 AYUDANTE - 1 OFIC. HC 0.2 0 19,527.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.3 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 18,282.36


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 24,274.84

ENCHAPE CERAMICA 20X20 MESON

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
PEGACOR BLANCO CORONA R:30100 KLS 1.8 2 972.00
WAIPE KLS 0.1 0 4,000.00
CEMENTO BLANCO SACO DE 40 KILOS BTO 0.01 0 32,200.00
CERAMICA CORONA 20 x25 PRIMERA CALIDAD M2 0.6 1 16,400.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI HC 0.35 0 13,291.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.4 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 17,536.84


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 23,285.63

REPELLO MURO IMPERMEABLE 1:3

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
SIKA 1 UNX20 KG. IMPERMEAB R:110002 KLS 0.6 0 4,814.00
MORTERO 1:3 M3 0.03 0 206,376.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI HC 0.45 0 13,291.00
SUBTOTAL MANO DE OBRA
EQUIPO
VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS M3 0.032 0 6,000.00
HERRAMIENTA MENOR GLB 0.05 0 1,100.00
ANDAMIO METALICO TUBULAR U/D 0.1 0 672.00
SUBTOTAL EQUIPO
COSTO DIRECTO 15,374.83
COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 20,414.93

ENCHAPE CERAMICA MURO 20X20 1 CALIDAD

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
PEGACOR BLANCO CORONA R:30100 KLS 3 0.02 972.00
WAIPE KLS 0.2 0 4,000.00
CEMENTO BLANCO SACO DE 40 KILOS BTO 0.01 0 32,200.00
ENCHAPE CERAMICA EGEO 20.5 CERAMICA 20.5X20. M2 1 0.01 15,900.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI HC 0.8 0 13,291.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.05 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 30,627.97


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 40,667.86

MURETE DUCHA CERAMICA [SENCILLO]

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
AGUA LTS 2 0 12.00
CEMENTO BLANCO NARE SACO DE 25 KILOS KLS 0.2 1 820.00
LISTON 1 x2x3M. OTOBO UND 0.235 0 2,900.00
PIRAGUA ALUM. NATURAL TIRA DE 6M UND 0.33 1 6,800.00
PUNTILLA 2.1/2 CC 104 UND/LB LBS 0.06 1 2,450.00
TABLA 1x05x3M OTOBO [1C] UND 0.235 1 4,106.00
VARETA 1"x1"x3M OTOBO UND 0.2 1 1,400.00
CEMENTO GRIS CONQUISTADOR KLS 1 0 359.60
CERAMICA 30.6x30.6 TRAF.4 MANCESA M2 0.2 5 17,950.00
MEZCLA CONCRETO 1:2:3 3100 PSI 210 MPa M3 0.005 0 184,571.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALB. ACABADOS 1 AYUDANTE-1 OFI HC 1.2 0 14,951.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.2 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 27,756.55


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 36,855.75

ALISTADO PISO 5 CM

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
MORTERO 1:3 M3 0.05 0 206,376.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI HC 0.42 0 13,291.00
SUBTOTAL MANO DE OBRA
EQUIPO
VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS M3 0.075 0 6,000.00
HERRAMIENTA MENOR GLB 0.3 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 16,681.02


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 22,149.04

CERAMICA 20.01-22.50x20.01-22.50 TRAF.34

DESCRIPCION UND CANT. DESP.% PRECIO UNIT


MATERIALES
AGUA LTS 3 0 12.00
WAIPE KLS 0.1 0 4,000.00
PEGANTE CERAMICA PEGACOR-ALFALISTO KLS 4 0 900.00
CERAMICA TRAF.3 20 x20CM BLANCO O COLOR M2 1 4 15,500.00
EMBOQUILLADOR KLS 0.45 0 3,250.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALB. ACABADOS 1 AYUDANTE-1 OFI HC 0.7 0 14,951.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.05 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 32,139.20


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 42,674.17

TABLON GRESS 33x33-DILATAC.MORTERO 1-2CM

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
MARMOLINA BLANCA BTO 0.001 0 3,206.00
TABLON RUSTICO 33x33 M2 0.92 0 18,900.00
CEMENTO GRIS CONQUISTADOR KLS 1.45 0 359.60
MORTERO 1:3 M3 0.004 0 206,376.00
MORTERO 1:4 M3 0.035 0 175,159.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE HC 0.15 0 9,983.00
M.O. ALBANILERIA 1 AYUDANTE-1 OFI HC 0.8 0 13,291.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.05 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 37,053.93


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 49,200.30

LAVAMANOS COLGAR LINEA ECONOMICA

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
AGUA LTS 0.5 0 12.00
CEMENTO BLANCO NARE SACO DE 25 KILOS KLS 0.5 0 820.00
LAVAM.ACUACER [COLGA] UND 1 0 52,000.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALB. ACABADOS 1 AYUDANTE-1 OFI HC 1.25 0 14,951.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.01 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 71,115.75


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 94,427.82

ORINAL MEDIANO

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
AGUA LTS 1 0 12.00
CEMENTO BLANCO NARE SACO DE 25 KILOS KLS 1 0 820.00
ORINAL MEDIANO 6101 UND 1 0 120,000.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALB. ACABADOS 1 AYUDANTE-1 OFI HC 1.25 0 14,951.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.2 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 139,740.75


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 185,548.10

SANITARIO LINEA ECONOMICA [ACUACER] COMPLETO

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
AGUA LTS 1 0 12.00
CEMENTO BLANCO NARE SACO DE 25 KILOS KLS 1 0 820.00
MANGUERA FLEXIBLE GRIFLEX GRIVAL REF.3801400 UND 1 0 2,475.00
SANITARIO ACUACER CORONA GRIFERIA-MUEBLE- JGO 1 0 205,000.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALB. ACABADOS 1 AYUDANTE-1 OFI HC 1.3 0 14,951.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.01 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 227,754.30


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 302,411.76

SANITARIO INFANTIL CORONA

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
AGUA LTS 1 0 12.00
CEMENTO BLANCO NARE SACO DE 25 KILOS KLS 1 0 820.00
SANITARIO INFANTIL CORONA UND 1 0 274,900.00
MANGUERA FLEXIBLE GRIFLEX GRIVAL REF.3801400 UND 1 0 2,475.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALB. ACABADOS 1 AYUDANTE-1 OFI HC 1.3 0 14,951.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.01 0 1,100.00
SUBTOTAL EQUIPO
COSTO DIRECTO 297,654.30
COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 395,224.98

LAVAMANOS SOBREPONER MEZ.LINEA ECONOMICA

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
AGUA LTS 0.5 0 12.00
CEMENTO BLANCO NARE SACO DE 25 KILOS KLS 0.5 0 820.00
LAVAMANOS SOBREPONER L.ECO LINEA ECONOMI UND 1 0 83,900.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALB. ACABADOS 1 AYUDANTE-1 OFI HC 1.25 0 14,951.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.1 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 103,114.75


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 136,916.10

DUCHA SENCILLA L.PICIS (E)

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
GRIF.DUCHA SENCILLA PISCIS GRIVAL UND 1 0 23,900.00
CINTA TEFLON 10 MTS CARRETE DE 10 METROS UND 0.06 0 450.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. HIDROSANIT. 1 AYUDANTE-1 OFI HC 0.6 0 14,121.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.06 0 1,100.00
SUBTOTAL EQUIPO
COSTO DIRECTO 32,465.60
COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 43,108.35

REJILLA SOSCO 3"X2" ALUMINIO

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
AGUA LTS 0.1 0 12.00
REGILLA SOSCO 3 X2" UND 1 0 3,400.00
CEMENTO GRIS CONQUISTADOR KLS 0.1 0 359.60
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI HC 0.25 0 13,291.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.02 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 6,781.91


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 9,005.14

BARANDA-PASAM.LAM. TUB.3 x1/1x1 C.20

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
LAM.COLD ROLLED C. 20 DE 100x200CM UND 0.75 0 43,076.60
LIJA 320 AGUA PLI 3 0 850.00
SOLDADURA 6011 1/8" VARILLA KLS 0.5 0 6,199.04
ANTICORROSIVO PHCL GLN 0.06 0 37,862.40
MASILLA PLASTICA INTERIORES CUム 0.03 0 37,500.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. METALISTERIA 1 AYUDANTE-1 OFI HC 2.5 0 15,949.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 12.7 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 95,196.21


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 126,401.25

MARCO LAM. 1.01-1.5 M CAL.20 LISO S/LUCE

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
LIJA 320 AGUA PLI 1 0 850.00
SOLDADURA 6011 1/8" VARILLA KLS 0.08 0.39 6,199.04
LAM.COLL-ROLLED C.20 DE 122X244 UND 0.95 0.35 64,641.00
ANTICORROSIVO PHCL GLN 0.04 0 37,862.40
MASILLA PLASTICA INTERIORES CUム 0.02 0 37,500.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. METALISTERIA 1 AYUDANTE-1 OFI HC 1 0 15,949.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 9 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 91,085.22


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 120,942.67

PUERTA REJA TUB. GALV. 1,1/2"x1,1/2

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
LAM.COLD ROLLED C. 20 DE 100x200CM UND 1 0 43,076.60
LIJA 320 AGUA PLI 2 0 850.00
SOLDADURA 6011 1/8" VARILLA KLS 0.5 0 6,199.04
ANTICORROSIVO PHCL GLN 0.15 0 37,862.40
MASILLA PLASTICA INTERIORES CUム 0.06 0 37,500.00
TORN.PERNOS 3/8" #10 UND 4 0 33.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. METALISTERIA 1 AYUDANTE-1 OFI HC 2.5 0 15,949.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 12.5 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 109,559.98


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 145,473.77

MARCO LAM.GALV.0.70-1.0 CAL.20 PEST C/LU

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
BISAGRA 3x3" COBRIZ PAR 3 0 1,100.00
LIJA 320 AGUA PLI 1.5 0 850.00
SOLDADURA 6011 1/8" VARILLA KLS 0.1 0 6,199.04
LAM.GALVANIZADA C.20 DE 100X200CM UND 1 0 41,500.00
MASILLA PLASTICA INTERIORES CUム 0.015 0 37,500.00
ANTICORROSIVO WASH-PRIMER GLN 0.03 0 90,800.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. METALISTERIA 1 AYUDANTE-1 OFI HC 1.4 0 15,949.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 10 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 83,310.00


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 110,619.02
NAVE LAM.GALV. LLENA CAL.20 BAT PARA BAÑOS

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
LIJA 320 AGUA PLI 3 0 850.00
SOLDADURA 6011 1/8" VARILLA KLS 0.6 0 6,199.04
LAM.GALVANIZADA C.20 DE 100X200CM UND 1 0 41,500.00
MASILLA PLASTICA INTERIORES CUム 0.1 0 37,500.00
ANTICORROSIVO WASH-PRIMER GLN 0.1 0 90,800.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. METALISTERIA 1 AYUDANTE-1 OFI HC 2.5 0 15,949.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 14.6 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 116,531.92


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 154,731.19

VENTANA LAM.VIDRIO-VARILLA CAL.20 COR.

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
LAM.COLD ROLLED C. 20 DE 100x200CM UND 1.2 0 43,076.60
LIJA 320 AGUA PLI 1.5 0 850.00
VIDRIO TRANSP. 4 MM M2 1 0 24,000.00
SOLDADURA 6011 1/8" VARILLA KLS 0.15 0 6,199.04
SILICONA TRANSPARENT.11 OZ UND 0.5 0 8,950.00
ANTICORROSIVO PHCL GLN 0.2 0 37,862.40
MASILLA PLASTICA INTERIORES CUム 0.02 0 37,500.00
CIERRE 1/2 LUNA VENTANERIA UND 1 0 3,080.00
RODACHINES UND 2 0 1,800.00
VAR.REDONDA 1/2" 12MMX6M VAR 1 0 6,364.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. METALISTERIA 1 AYUDANTE-1 OFI HC 3 0 15,949.00
SUBCONTRATO CARPINTERIA ALUMINIO GLB 2.0731 0 10,000.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 1.8 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 174,296.25


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 231,430.23

CELOSIA ALUMINIO-VIDRIO

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
CHAZO PLASTICO 1/4 UND 6 0 40.00
TORN.PAMPHILLIPS 1/2" #8 UND 6 0 26.00
TORN.AVELLANADO 2" x 8 UND 6 0 51.00
MECANISMO CELOSIA UND/PAR UND 11 0 7,500.00
VIDRIO 4MM .10M*1M TIRA UND 11 0 2,100.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. METALISTERIA 1 AYUDANTE-1 OFI HC 0.8 0 15,949.00
SUBCONTRATO CARPINTERIA ALUMINIO GLB 1.2 0 10,000.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 1.56 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 132,777.20


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 176,301.31

DIV.BANO A.INOX PARAL EXTREMO 16-34CM

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
PARAL LATERAL A.INOX C.20 DE 25-30CMX1.80MTS UND 1 0 343,070.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. METALISTERIA 1 AYUDANTE-1 OFI HC 0.25 0 15,949.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 2.5 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 349,807.25


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 464,473.74

DIV.BANO A.INOX NAVE 57CM H=1.60M

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
PTA.DIV.ACERO INOX C.20 DE 55-60CMX1.50-1.60MT UND 1 0 375,603.36
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. METALISTERIA 1 AYUDANTE-1 OFI HC 0.85 0 15,949.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 3 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 392,460.01


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 521,108.39

DIV.BANO A.INOX ORINAL 96X46CM

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
DIV.ORINAL ACERO INOX C.20 .95-1.00X45-50CM UND 1 0 200,013.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. METALISTERIA 1 AYUDANTE-1 OFI HC 1 0 15,949.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 2.5 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 218,712.00


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 290,405.79

BARANDA-PASAM.ALU. TUB 1,1/2" OVAL.3x1"

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
TORN.PAMPHILLIPS 1/2" #8 UND 64 0 26.00
TUBUL.ALUM.1.1/2"X1.1/2"X6 UND 1.4 0 53,598.00
UNION 8CMX1/8" UND 16 0 3,300.00
ESCUDO ANCLAJE ALUM. 1/2" CONTRA PARED UND 2 0 9,350.00
PERF.OVALO 3"*1"*6M ALUM. UND 0.2 0 52,734.00
TAPA OVALO 3"*1" ALUMINIO UND 2 0 1,540.00
PLATINA ALUM 1.1/2x8x 1/ 8 UND 2 0 880.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. METALISTERIA 1 AYUDANTE-1 OFI HC 3.2 0 15,949.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 17 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 233,324.80


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 309,808.94

NAVE MAD.TRIPLEX 61-80 (1N-V)

DESCRIPCION UND CANT. DESP.% PRECIO UNIT


MATERIALES
BISAGRA VAIVEN # 30 PIVOTE PUERTA UND 3 0 31,900.00
LAM.TRIPLEX 4 MM. DE 122x244CM PIZANO UND 2 0 31,692.00
PEGANTE A X W MADERA GLN 0.15 0 34,607.00
VIDRIO TRANSP. 6 MM. M2 0.27 0 33,750.00
PUNTILLA 1 SC LBS 0.8 0 2,850.00
CEDRO CAQUETA PG2 10 0 4,520.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. CARP.MADERA 1 AYUDANTE-1 OFI HC 3 0 14,951.00
M.O. CARP.TALLER 1 AYUDANTE-1 OFI HC 6 0 14,121.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 6 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 357,046.55


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 474,087.01

Correas acero PHRC-220x80x2mm. Incl. Pinturas

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
PERFIL HR C220mmx 80mm-1.9 CAL.14 L= 6MTS. AC UND 0.166 0 123,007.56
THINER DISOLVENTE GLN 0.025 0 11,069.00
SOLDADURA 6011 1/8" VARILLA KLS 0.06 0 6,199.04
ANTICORROSIVO PHCL GLN 0.05 0 37,862.40
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE HC 0.025 0 9,983.00
M.O. CARP.TALLER 1 AYUDANTE-1 OFI HC 0.4 0 14,121.00
M.O. PINTURA 1 AYUDANTE-1 OFI HC 0.05 0 14,121.00
SUBTOTAL MANO DE OBRA
EQUIPO
PULIDORA CON PIEDRA O DISCO DIA 0.04 0 26,000.00
SOLDADOR ELECTRICO DIA 0.06 0 27,000.00
HERRAMIENTA MENOR GLB 0.2 0 1,100.00
ANDAMIO METALICO TUBULAR U/D 0.1 0 672.00
SUBTOTAL EQUIPO

COSTO DIRECTO 32,512.25


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 43,169.43

Tensores angulo 1.1/4*1/4

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
TUERCA GALV. 1/2" ARANDELA + TUERCA UND 2 0 300.00
HIERRO .1/2" 60.000 [12M] KLS 1 0 2,150.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI HC 0.1 0 13,291.00
M.O. METALISTERIA 1 AYUDANTE-1 OFI HC 0.008 0 15,949.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.1 0 1,100.00
ANDAMIO METALICO TUBULAR U/D 0.2 0 672.00
SUBTOTAL EQUIPO

COSTO DIRECTO 4,451.09


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 5,910.04

Correas acero PHRC-160x60x2mm. Incl. Pinturas

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
THINER DISOLVENTE GLN 0.025 0 11,069.00
SOLDADURA 6011 1/8" VARILLA KLS 0.06 0 6,199.04
ANTICORROSIVO PHCL GLN 0.05 0 37,862.40
PERFIL HR C160X 60MM-2.0MM CAL.14 ACESCO UND 0.166 0 84,599.96
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE HC 0.025 0 9,983.00
M.O. CARP.TALLER 1 AYUDANTE-1 OFI HC 0.4 0 14,121.00
M.O. PINTURA 1 AYUDANTE-1 OFI HC 0.05 0 14,121.00
SUBTOTAL MANO DE OBRA
EQUIPO
PULIDORA CON PIEDRA O DISCO DIA 0.02 0 26,000.00
SOLDADOR ELECTRICO DIA 0.06 0 27,000.00
HERRAMIENTA MENOR GLB 0.2 0 1,100.00
ANDAMIO METALICO TUBULAR U/D 0.1 0 672.00
SUBTOTAL EQUIPO

COSTO DIRECTO 25,616.59


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 34,014.26

CUBIERTA TEJA TERMOACUSTICA

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
PERFIL HR C220mmx 80mm-1.9 CAL.14 L= 6MTS. AC UND 0.166 0 123,007.56
THINER DISOLVENTE GLN 0.025 0 11,069.00
SOLDADURA 6011 1/8" VARILLA KLS 0.06 0 6,199.04
ANTICORROSIVO PHCL GLN 0.05 0 37,862.40
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE HC 0.025 0 9,983.00
M.O. CARP.TALLER 1 AYUDANTE-1 OFI HC 0.4 0 14,121.00
M.O. PINTURA 1 AYUDANTE-1 OFI HC 0.05 0 14,121.00
SUBTOTAL MANO DE OBRA
EQUIPO
PULIDORA CON PIEDRA O DISCO DIA 0.04 0 26,000.00
SOLDADOR ELECTRICO DIA 0.06 0 27,000.00
HERRAMIENTA MENOR GLB 0.2 0 1,100.00
ANDAMIO METALICO TUBULAR U/D 0.1 0 672.00
SUBTOTAL EQUIPO

COSTO DIRECTO 32,512.25


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 43,169.43
C.F.PANEL YESO S.JUNTA+VINILO

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
ALAMBRE GALVANIZADO # 10 KLS 0.1 0 3,364.00
AGUA LTS 0.02 0 12.00
CANAL 40 GUIA L.GALV 3.05M PERFILERIA ROLADA C UND 0.355 1 5,200.00
ANGULO 29X29X2440MM C.26 PERFILERIA ROLADA UND 0.55 1 3,000.00
TORN PANEL YESO 6 X 1" BOLSA DE 100 UNIDADES UND 12 0 13.50
LIJA 400 AGUA PLI 0.02 0 780.00
VINILO ACRILTEX TIPO 2 PINTUCO LTS 0.02 0 12,229.00
PERFIL OMEGA 60 2.44M C26 L=2.44M A=60MM LAMI UND 0.7 0 5,500.00
PUNTILLA 1.1/2 AC LISA LBS 0.05 0 3,600.00
PLACA YESO 12.7MM-GYPLAC 244X122M HUMEDAD UND 0.336 1 25,500.00
CINTA SELLO 2"(PANEL-YESO) CINTA DE 150 PIES 45 ROL 0.005 0.05 12,900.00
PASTA MASTIQUE(PANEL-YESO) PANELEC USO INT GLN 0.165 2 9,900.00
CHAZO EXPANDIBLE 3/8" LARGO 7CMS UND 0.5 0 600.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. CARP.TALLER 1 AYUDANTE-1 OFI HC 0.6 0 14,121.00
M.O. PINTURA 1 AYUDANTE-1 OFI HC 0.12 0 14,121.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 1.5 0 1,100.00
ANDAMIO METALICO TUBULAR U/D 0.8 0 672.00
CRUCETA ANDAMIO DIA 0.8 0 100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 31,438.88


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 41,744.71

VINILTEX [3M]

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
AGUA LTS 0.035 0 12.00
VINILO TIPO 1 BASE DE AGUA GLN 0.05 1 42,890.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. PINTURA 1 AYUDANTE-1 OFI HC 0.18 0 14,121.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.02 0 1,100.00
ANDAMIO METALICO TUBULAR U/D 0.1 0 672.00
SUBTOTAL EQUIPO

COSTO DIRECTO 4,797.34


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 6,369.46

ESMALTE BARANDA TUBO 2-3 LINEAS+PARALES

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
LIJA 400 AGUA PLI 0.45 0 780.00
ESMALTE SINTETICO MATE ALGRECO GLS 0.06 0 46,108.00
THINER DISOLVENTE GLN 0.04 0 11,069.00
ANTICORROSIVO ROJO BASE PINTURA GLN 0.012 0 19,662.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE HC 0.01 0 4,992.00
M.O. PINTURA 1 AYUDANTE-1 OFI HC 0.18 0 14,121.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.1 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 6,497.88


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 8,628.04

ESMALTE SOBRE MADERA LLENA

DESCRIPCION UND CANT. DESP.% PRECIO UNIT


MATERIALES
LIJA 400 AGUA PLI 1.05 0 780.00
THINER DISOLVENTE GLN 0.006 0 11,069.00
TAPAPOROS INCOLORO PREPARADOR SUPERFICI GLN 0.022 0 31,200.00
ESMALTE SEMIBRILLANTE A GLN 0.045 0 45,990.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. PINTURA 1 AYUDANTE-1 OFI HC 0.28 0 14,121.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.03 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 7,628.24


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 10,128.46

ESMALTE MARCO METALICO 0.70-1.00

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
LIJA 400 AGUA PLI 0.01 0 780.00
ESMALTE SINTETICO MATE ALGRECO GLS 0.1 0 46,108.00
THINER DISOLVENTE GLN 0.015 0 11,069.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. PINTURA 1 AYUDANTE-1 OFI HC 0.28 0 14,121.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.15 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 8,903.51


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 11,822.73

CERRADURA SCHLAGE BAÑO MOD. BELL WOOD


CERRADURA SCHLAGE BAÑO MOD. BELL WOOD

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
CE.SCHLAGE BAムO BELL WOOD MAD-PLATIN UND 1 0 23,500.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. METALISTERIA 1 AYUDANTE-1 OFI HC 1 0 15,949.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 3.5 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 43,299.00


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 57,492.42

CAJA ELECTRICA 0.3X0.3X0.5MT

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
ALAMBRE NEGRO # 18 KLS 0.01 5 2,450.00
HIERRO .1/2" 60.000 [12M] KLS 0.32 0 2,150.00
ANGULO 11/2 x 3/16 TIRA DE 6 METROS UND 0.4 0 40,142.00
ROCA MUERTA (SIN TRANSPORTE) M3 0.07 0 5,500.00
TABLA 1x10x3M OTOBO UND 1 0 7,100.00
SOLDADURA 6011 1/8" VARILLA KLS 0.15 0.46 6,199.04
HIERR.DE 37000 PSI 259 MPA U KLS 0.6 0 2,242.00
MEZCLA CONCRETO 1:2:3 3100 PSI 210 MPa M3 0.1 0 184,571.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE HC 1 0 4,992.00
M.O. ALBANILERIA 1 AYUDANTE-1 OFI HC 2 0 13,291.00
M.O. METALISTERIA 1 AYUDANTE-1 OFI HC 0.5 0 15,949.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 1 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 85,640.45


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 113,712.79

CAJA CONTADOR TIPO EMCALI

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
CAJA HERMETICA INTERPERIE UND 1 0 34,800.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ELECTRICAS 1 AYUDANTE-1 OFI HC 1 0 18,607.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 2 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 55,607.00


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 73,834.98

CONTADOR 2F-TRIFILAR 120/240V M.DIRECTA

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
CONTADOR 2F 120/240V ISKRA UND 1 0 237,747.80
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ELECTRICAS 2 AYUDANTE-1 OFI HC 2.5 0 25,342.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.1 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 301,212.80


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 399,950.63

ALAMBRE COBRE THW #12

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
ALAMBRE COBRE THW #12 CEAT ML 1 5 1,469.72
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ELECTRICAS 1 AYUDANTE-1 OFI HC 0.02 18,607.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.1 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 2,025.34


COSTOS INDIRECTOS
ADMINISTRACION 0%
IMPREVISTOS 0%
UTILIDAD 0%
IVA SOBRE LA UTILIDAD 0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 2,025.00

CURVA GALV. 1"

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
CURVA GALV. 1" UND 1 0 6,954.20
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ELECTRICAS 1 AYUDANTE-1 OFI HC 0.04 0 18,607.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.1 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 7,808.48


COSTOS INDIRECTOS
ADMINISTRACION 0.0%
IMPREVISTOS 0.0%
UTILIDAD 0.0%
IVA SOBRE LA UTILIDAD 0.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 7,808.00

TUBO GALV 1" X 3 MT

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
TUBO GALV. 1" X 3 MTS COLMENA UND 1 0 32,358.20
CINTA BANDIT CONJ PRIM O SECUNDAR UND 1 0 2,593.76
HEBILLA - CINTA-BANDIT CONJ PRIM O SECUNDAR UND 1 0 525.48
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ELECTRICAS 1 AYUDANTE-1 OFI HC 0.1 0 18,607.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.1 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 37,448.14


COSTOS INDIRECTOS
ADMINISTRACION 0.0%
IMPREVISTOS 0.0%
UTILIDAD 0.0%
IVA SOBRE LA UTILIDAD 0.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 37,448.00

CAPACETE GALVANIZADO 1"

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
CAPACETE GALV. 1" UND 1 0 2,273.60
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ELECTRICAS 1 AYUDANTE-1 OFI HC 0.04 0 18,607.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.1 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 3,127.88


COSTOS INDIRECTOS
ADMINISTRACION 0.0%
IMPREVISTOS 0.0%
UTILIDAD 0.0%
IVA SOBRE LA UTILIDAD 0.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 3,128.00

TUBO PVC ,3/4"

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
LIMPIADOR PVC 760-G 1/4 GL UND 0.003 2 23,195.00
SOLDADURA PVC 1/ 4 GLN UND 0.003 2 48,104.00
TUBO PVC 3/4" X 3 MTS UND 0.333 5 3,343.12
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ELECTRICAS 1 AYUDANTE-1 OFI HC 0.1 0 18,607.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.1 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 3,357.78


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 4,458.75

TUBO PVC 2"

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
LIMPIADOR PVC 760-G 1/4 GL UND 0.006 2 23,195.00
SOLDADURA PVC 1/ 4 GLN UND 0.006 2 48,104.00
TUBO PVC 2" X 3 MTS UND 0.333 5 14,026.72
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ELECTRICAS 1 AYUDANTE-1 OFI HC 0.2 0 18,607.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.1 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 9,172.18


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 12,178.58

TUBO PVC ,1/2"

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
LIMPIADOR PVC 760-G 1/4 GL UND 0.003 2 23,195.00
SOLDADURA PVC 1/ 4 GLN UND 0.003 2 48,104.00
TUBO PVC 1/2" X 3 MTS UND 0.333 5 2,553.16
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ELECTRICAS 1 AYUDANTE-1 OFI HC 0.1 0 18,607.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.1 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 3,081.57


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 4,092.28

ACOM. 3F (3 No. 4 + 1 M0. 8)

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
CABLE COBRE THW # 8 ML 1 5 4,463.68
CABLE COBRE THW # 4 ML 3 5 10,601.24
LIMPIADOR PVC 760-G 1/4 GL UND 0.006 2 23,195.00
SOLDADURA PVC 1/ 4 GLN UND 0.006 2 48,104.00
TUBO PVC 2" X 3 MTS UND 0.333 5 14,026.72
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ELECTRICAS 1 AYUDANTE-1 OFI HC 0.38 0 18,607.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.1 0 1,100.00
SUBTOTAL EQUIPO
COSTO DIRECTO 50,602.20
COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 67,189.34

SAL LAMP (C/T)

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
TERMINAL PVC 1/2" UND 2 0 190.24
LIMPIADOR PVC 760-G 1/4 GL UND 0.003 5 23,195.00
SOLDADURA PVC 1/ 4 GLN UND 0.003 5 48,104.00
TUBO PVC 1/2" X 3 MTS UND 1 5 2,553.16
CAJA OCTOGONAL PVC UND 1 0 1,173.92
ALAMBRE GALVANIZADO # 18 U KG 0.1 0 3,136.64
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ELECTRICAS 1 AYUDANTE-1 OFI HC 0.6 0 18,607.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.1 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 16,047.65


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 21,308.53

SAL LAMP (C/T/A:2#12+1#14 +PLAFON+BOMBI)

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
ALAMBRE COBRE THW #12 CEAT ML 6 10 1,469.72
TERMINAL PVC 1/2" UND 2 0 190.24
LIMPIADOR PVC 760-G 1/4 GL UND 0.003 5 23,195.00
SOLDADURA PVC 1/ 4 GLN UND 0.003 5 48,104.00
TUBO PVC 1/2" X 3 MTS UND 1 5 2,553.16
CAJA OCTOGONAL PVC UND 1 0 1,173.92
ALAMBRE GALVANIZADO # 18 U KG 0.1 0 3,136.64
CINTA AISLANTE # 33 ROLLO x 20 MTS UND 0.01 0 12,017.60
BOMBILLO 100W INCANDESCEN UND 1 0 788.80
PLAFON-BLANCO 200W LUMINEX UND 1 0 1,392.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ELECTRICAS 1 AYUDANTE-1 OFI HC 0.91 0 18,607.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.106 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 33,823.54


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 44,911.51

SAL SWITCHE (A: 2 No. 12/S1)

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
ALAMBRE COBRE THW #12 CEAT ML 10 5 1,469.72
SWITCHE SENCILLO AMBIA LUMINEX UND 1 0 6,148.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ELECTRICAS 1 AYUDANTE-1 OFI HC 0.4 0 18,607.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.1 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 29,132.86


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 38,682.80

SAL SWITCHE (A: 3 No. 12/S2)


DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
ALAMBRE COBRE THW #12 CEAT ML 15 5 1,469.72
SWITCHE DOBLE AMBIA LUMINEX UND 1 0 10,208.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ELECTRICAS 1 AYUDANTE-1 OFI HC 0.5 0 18,607.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.1 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 42,769.59


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 56,790.01

SAL SWITCHE (A: 3 No. 12/SC)

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
ALAMBRE COBRE THW #12 CEAT ML 15 5 1,469.72
SWITCHE CONMUTABLE AMBIA LUMINEX UND 1 0 7,540.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ELECTRICAS 1 AYUDANTE-1 OFI HC 0.5 0 18,607.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.1 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 40,101.59


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 53,247.44

LAMP ELECTRONICA 2 32 MFL SOBREPONER


DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
ALAMBRE GALVANIZADO # 18 U KG 0.2 0 3,136.64
LAMP MFL 2x32 ELECTRON ILUMINACIONES TECNIC UND 1 0 183,744.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ELECTRICAS 1 AYUDANTE-1 OFI HC 0.7 0 18,607.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.1 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 197,506.22


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 262,248.47

SAL TOMA 1F (A:2#12+1#14/TOMA)

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
ALAMBRE COBRE THW #12 CEAT ML 9 10 1,469.72
TOMA DOBLE P-T AMBIA LUMINEX UND 1 0 8,468.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ELECTRICAS 1 AYUDANTE-1 OFI HC 0.5 0 18,607.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.1 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 32,431.72


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 43,063.21

BREAKER 1F DESDE 15 HASTA 60 AMP


DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
BREAKER 1x 15 AMP UND 1 0 16,371.08
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ELECTRICAS 1 AYUDANTE-1 OFI HC 0.5 0 18,607.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.1 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 25,784.58


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 34,237.33

BREAKER 2F DESDE 15 HASTA 60 AMP

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
BREAKER 2x 15 AMP UND 1 0 37,381.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ELECTRICAS 1 AYUDANTE-1 OFI HC 0.6 0 18,607.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.1 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 48,655.20


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 64,604.11

TABLERO 2F 12 CTOS TQCP

DESCRIPCION UND CANT. DESP.% PRECIO UNIT


MATERIALES
TABLERO 2F-12 CTOS TBC SQUAR-D UND 1 0 218,776.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ELECTRICAS 1 AYUDANTE-1 OFI HC 2 0 18,607.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.1 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 256,100.00


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 340,049.58

VARILLA CU-CU 9/16X 2.40

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
VARILLA CU-CU 9/16 X 2.40 CODECO UND 1 0 99,113.88
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ELECTRICAS 1 AYUDANTE-1 OFI HC 0.3 0 18,607.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.1 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 104,805.98


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 139,161.41

ACARREO MATERIALES PETREOS-TIERRA-VARIOS

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

EQUIPO
VOLQUETA(ACARREO) M3K 1.3 0 812.00
SUBTOTAL EQUIPO

COSTO DIRECTO 1,055.60


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 1,402.16

CONFIGURACION-NIVELACION TERRENO

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
AGUA LTS 0.35 0 12.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE HC 0.02 0 4,992.00
SUBTOTAL MANO DE OBRA
EQUIPO
MOTONIVELADORA HRS 0.004 0 89,900.00
SUBTOTAL EQUIPO

COSTO DIRECTO 463.64


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 616.10

EMPRADIZACION

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
PRADO M2 1.1 0 2,150.00
TIERRA NEGRA M3 0.065 0 23,000.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI HC 0.12 0 13,291.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.25 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 5,729.92


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 7,608.29

RETIRO ESCOMBROS MANUAL-VOLQUETA <=10KM.

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE HC 0.45 0 4,992.00
SUBTOTAL MANO DE OBRA
EQUIPO
VOLQUETA 5 M3 VJE 0.28 0 40,600.00
HERRAMIENTA MENOR GLB 0.403 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 14,057.70


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 18,666.21

LIMPIEZA GENERAL

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE HC 0.02 0 4,992.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 1 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 1,199.84


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 1,593.36

EXCAVACION MANUAL PARA CIMENTACION

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE HC 1.5 0 4,992.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.168 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 7,672.80


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 10,188.21

RELLENO PERIMETRAL ESTRUCURA MAT. DEL SITIO COMPACTADO

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE HC 0.9 0 4,992.00
SUBTOTAL MANO DE OBRA
EQUIPO
VIBROCOMPACTADOR CA-15 HRS 0.07 0 72,000.00
HERRAMIENTA MENOR GLB 0.123 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 9,668.10


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 12,837.17

SOLADO LIMPIEZA E=0.05 cto-2.000 Psi

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
MEZCLA CONCRETO 1:2:3 3100 PSI 210 MPa M3 0.06 0 184,571.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI HC 0.4 0 13,291.00
SUBTOTAL MANO DE OBRA
EQUIPO
VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS M3 0.09 0 6,000.00
HERRAMIENTA MENOR GLB 0.03 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 16,963.66


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 22,524.80

ZAPATAS CONCRETO 3.000 Psi.

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
CUARTON 2"x4"x3M OTOBO UND 0.1 0 6,096.00
PUNTILLAS LBS 0.2 0 812.00
TABLA 1x10x3M OTOBO UND 0.115 0 7,100.00
MEZCLA CONCRETO 1:2:3 3100 PSI 210 MPa M3 1.05 0 184,571.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI HC 2.95 0 13,291.00
SUBTOTAL MANO DE OBRA
EQUIPO
VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS M3 1.5 0 6,000.00
HERRAMIENTA MENOR GLB 0.03 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 243,629.50


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 323,491.91

VIGA CIMENTACIÒN CONCRETO 3.000 Psi.

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
PUNTILLA 2 CC LBS 1 0 2,378.00
TABLA 1X10x3M OTOBO [2C] UND 5.5 0 8,816.00
VARETA 2"x2"x3M OTOBO UND 2.67 0 1,800.00
MEZCLA CONCRETO 1:2:3 3100 PSI 210 MPa M3 1.05 0 184,571.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE-1 OFI HC 5.9 0 18,282.00
SUBTOTAL MANO DE OBRA
EQUIPO
VIBRADOR ELECTRICO DIA 0.05 0 33,640.00
VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS M3 1.5 0 6,000.00
SUBTOTAL EQUIPO

COSTO DIRECTO 368,017.35


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 488,652.98

COLUMNA CONCRETO 3.000 Psi.

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
ANTISOL BLANCO KLS 2 0 5,742.00
SEPAROL DESFORMALETEANTE TARRO 15 KLS KLS 2 0 12,296.00
SIKAMENT NS SUPERPLASTIFIC TARRO DE 25 KLS KLS 0.2 0 6,728.00
CUARTON 2"x4"x3M OTOBO UND 5.67 0 6,096.00
PUNTILLA 2 CC LBS 8 0 2,378.00
TABLA 1x10x3M OTOBO UND 5 0 7,100.00
VARETA 2"x2"x3M OTOBO UND 4.33 0 1,800.00
MEZCLA CONCRETO 1:2:3 3100 PSI 210 MPa M3 1.05 0 184,571.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 3 AYUDANTE-1 OFI HC 7.6 0 23,273.00
SUBTOTAL MANO DE OBRA
EQUIPO
VIBRADOR ELECTRICO DIA 0.1 0 33,640.00
VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS M3 1.5 0 6,000.00
HERRAMIENTA MENOR GLB 0.33 0 1,100.00
TACO METALICO EXTENSION DE 2.OM A 3.30MT DIA 24 0 170.00
ANDAMIO METALICO TUBULAR U/D 4 0 672.00
SUBTOTAL EQUIPO

COSTO DIRECTO 524,473.27


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 696,395.25

VIGAS DE CUBIERTA Vcu. CTO.3000 psi.

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
CUARTON 2"x4"x3M OTOBO UND 1.5 0 6,096.00
GUADUA [TACO] 2.50-3M UND 4 0 2,000.00
PUNTILLA 2 CC LBS 3.8 0 2,378.00
TABLA 1x10x3M OTOBO UND 3.5 0 7,100.00
VARETA 2"x2"x3M OTOBO UND 1.5 0.25 1,800.00
MEZCLA CONCRETO 1:2:3 3100 PSI 210 MPa M3 1.03 0 184,571.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE-1 OFI HC 11 0 18,282.00
SUBTOTAL MANO DE OBRA
EQUIPO
VIBRADOR ELECTRICO DIA 0.3 0 33,640.00
VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS M3 1.5 0 6,000.00
HERRAMIENTA MENOR GLB 0.33 0 1,100.00
ANDAMIO METALICO TUBULAR U/D 4 0 672.00
SUBTOTAL EQUIPO

COSTO DIRECTO 467,090.28


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 620,202.10

ACERO FIGURADO DE REFUERZO 60,000 psi. 420 Mpa.

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
ALAMBRE NEGRO # 18 KLS 0.03 0.03 2,450.00
SEGUETA SIN MARCO UND 0.03 0.03 2,552.00
HIERR.DE 60000 PSI 420 MPA KLS 1.03 0 2,242.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE HC 0.04 0 4,992.00
SUBTOTAL MANO DE OBRA

COSTO DIRECTO 2,659.04


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 3,530.63

CARGUE Y RETIRO DE SOBRANTES EN VOLQUETA.

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE HC 0.45 0 4,992.00
SUBTOTAL MANO DE OBRA
EQUIPO
VOLQUETA 5 M3 VJE 0.28 0 40,600.00
HERRAMIENTA MENOR GLB 0.403 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 14,057.70


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 18,666.21
CERRADURA SCHLAGE PUERTAS SALONES

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
CE.SCHLAGE PASO MODELO GEORGIA REF:A UND 1 0 20,340.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. METALISTERIA 1 AYUDANTE-1 OFI HC 1 0 15,949.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 2.6 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 39,149.00


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 51,982.05

CERRADURA SCHLAGE

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
CE.SCHLAGE ENTRADA-APTO BELL WOOD MAD-PLA UND 1 0 29,354.00
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. METALISTERIA 1 AYUDANTE-1 OFI HC 0.5 0 15,949.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 3 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 40,628.50


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 53,947.19
REFLECTOR METAL HALIDE 25O WATIOS

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
ALAMBRE COBRE THW #12 CEAT ML 10 0 1,469.72
REFLECTOR MET-HALIDE 250 W ILUMINACION UND 1 0 620,000.00
BOMBILLO MET.HALIDE 250 W UND 1 0 61,851.20
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ELECTRICAS 3 AYUD-1 OFI-1 PROF HC 0.31 0 69,124.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 2.332 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 720,542.04


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 956,735.67

SOPORTE PARA REFLECTOR

DESCRIPCION UND CANT. DESP.% PRECIO UNIT

MATERIALES
ANGULO 11/2 x 3/16 TIRA DE 6 METROS UND 0.25 0 40,142.00
BANDA COPA DOBLE 6" CONJ PRIM Y SECUND UND 1 0 16,771.28
TORN.CARRUA 5/8 X 1 1/2 CONJ PRIM O SECUNDAR UND 3 0 1,354.88
SUBTOTAL MATERIALES
MANO DE OBRA
M.O. ELECTRICAS 3 AYUD-1 OFI-1 PROF HC 0.3 0 69,124.00
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR GLB 0.88 0 1,100.00
SUBTOTAL EQUIPO

COSTO DIRECTO 52,576.62


COSTOS INDIRECTOS
ADMINISTRACION 18.5%
IMPREVISTOS 5.0%
UTILIDAD 8.0%
IVA SOBRE LA UTILIDAD 16.0%
TOTAL COSTOS INDIRECTOS
VALOR TOTAL ITEM 69,811.75
SIS DE PRECIOS
UNITARIOS
AÑO2008

Unidad: M3
ITEM: BASICO
VALOR TOTAL

25,970.08
2,220.00
130,894.40
159,084.48

14,974.50
14,974.50

1,100.00
1,100.00

175,159.00

Unidad: M3
ITEM: BASICO
VALOR TOTAL

2,640.00
24,402.92
163,258.40
190,301.32

14,974.50
14,974.50

1,100.00
1,100.00

206,376.00

Unidad: M3
ITEM: BASICO
VALOR TOTAL
24,873.06
130,387.36
43,329.00
198,589.42

14,974.50
14,974.50

189.20
189.20

213,753.00

Unidad: M2
ITEM: BASICO
VALOR TOTAL

98.00
1,033.20
356.70
4,614.27
6,102.17

2,658.20
2,658.20

440.00
440.00

9,200.00

Unidad: M3
ITEM: BASICO
VALOR TOTAL

2,280.00
12,537.28
26,880.00
740.00
125,860.00
270.00
168,567.28
10,981.30
10,981.30

2,052.00
2,970.00
5,022.00

184,571.00

Unidad: UND
ITEM: 061218
VALOR TOTAL

6,912.40
6,912.40

2,750.00
2,750.00

9,662.00

1,787.47
483.10
772.96
123.67
3,167.20
12,829.00

UNIDAD: UND
ITEM: 100102
VALOR TOTAL

22,230.00
4,425.00
17,400.00
2,088.00
24,000.00
7,134.00
312,400.00
181,336.00
2,750.00
573,763.00

164,538.00
164,538.00

7,020.00
2,200.00
9,220.00

747,521.00

138,291.39
37,376.05
59,801.68
9,568.27
245,037.39
992,558.00

UNIDAD: M2
ITEM: 100113
VALOR TOTAL

385.00
47.56
150.00
35.00
617.56

1,096.92
500.00
1,596.92

42.90
42.90

2,257.00

417.55
112.85
180.56
28.89
739.85
2,997.00

UNIDAD: ML
ITEM: 100119
VALOR TOTAL

400.00
237.80
627.32
3,150.00
4,415.12

1,329.10
1,329.10

165.00
165.00

5,909.00

1,093.17
295.45
472.72
75.64
1,936.98
7,846.00

UNIDAD: M3
ITEM: 100201
VALOR TOTAL

11,980.80
11,980.80

108,750.00
10,556.00
2,039.40
121,345.40

133,326.00

24,665.31
6,666.30
10,666.08
1,706.57
43,704.26
177,030.00

UNIDAD: M3
ITEM: 100203
VALOR TOTAL

16,972.80
16,972.80

108,750.00
26,000.00
11,449.20
5,223.90
151,423.10

168,396.00

31,153.26
8,419.80
13,471.68
2,155.47
55,200.21
223,596.00

UNIDAD: M3
ITEM: 100205
VALOR TOTAL

13,977.60
13,977.60

130,500.00
11,368.00
141,868.00

155,846.00

28,831.51
7,792.30
12,467.68
1,994.83
51,086.32
206,932.00

UNIDAD: M2
ITEM: 100314
VALOR TOTAL

2,745.60
2,745.60

812.00
85.80
897.80

3,643.00

673.96
182.15
291.44
46.63
1,194.18
4,837.00

UNIDAD: M2
ITEM: 100401
VALOR TOTAL

2,496.00
2,496.00

110.00
110.00

2,606.00

482.11
130.30
208.48
33.36
854.25
3,460.00

UNIDAD: M2
ITEM: 100404
VALOR TOTAL

2,496.00
2,496.00

812.00
53.90
865.90

3,362.00

621.97
168.10
268.96
43.03
1,102.06
4,464.00

UNIDAD: M2
ITEM: 100407
VALOR TOTAL

1,497.60
1,497.60

933.80
66.00
999.80

2,497.00

461.95
124.85
199.76
31.96
818.52
3,316.00

Unidad: M2
ITEM: 100405
VALOR TOTAL

1,497.60
1,497.60

77.00
77.00

1,575.00

291.38
78.75
126.00
20.16
516.29
2,091.00
UNIDAD: M2
ITEM: 100415
VALOR TOTAL

1,594.92
1,594.92

10,440.00
132.00
10,572.00

12,167.00

2,250.90
608.35
973.36
155.74
3,988.35
16,155.00

UNIDAD: M2
ITEM: 100507
VALOR TOTAL

6,398.70
6,398.70

100.10
67.20
52.00
219.30

6,618.00

1,224.33
330.90
529.44
84.71
2,169.38
8,787.00

UNIDAD: M2
ITEM: 100511
VALOR TOTAL
7,312.80
7,312.80

3,248.00
168.30
201.60
156.00
3,773.90

11,087.00

2,051.10
554.35
886.96
141.91
3,634.32
14,721.00

UNIDAD: UND
ITEM: 100515
VALOR TOTAL

9,984.00
9,984.00

4,060.00
231.00
4,291.00

14,275.00

2,640.88
713.75
1,142.00
182.72
4,679.35
18,954.00

UNIDAD: M2
ITEM: 100519
VALOR TOTAL

4,992.00
4,992.00

2,200.00
2,200.00

7,192.00

1,330.52
359.60
575.36
92.06
2,357.54
9,550.00

UNIDAD: M2
ITEM: 100520
VALOR TOTAL

10,982.40
10,982.40

181.50
181.50

11,164.00

2,065.34
558.20
893.12
142.90
3,659.56
14,824.00

UNIDAD: M2
ITEM: 100520
VALOR TOTAL

10,982.40
10,982.40

181.50
181.50

11,164.00

2,065.34
558.20
893.12
142.90
3,659.56
14,824.00

UNIDAD: UND
ITEM: 172402
VALOR TOTAL

930.35
930.35

110.00
110.00

1,040.00

192.40
52.00
83.20
13.31
340.91
1,381.00

UNIDAD: ML
ITEM: 172411
VALOR TOTAL

186.07
186.07

110.00
110.00

296.00

54.76
14.80
23.68
3.79
97.03
393.00

UNIDAD: UND
ITEM: 172414
VALOR TOTAL

2,791.05
2,791.05

110.00
110.00

2,901.00

536.69
145.05
232.08
37.13
950.95
3,852.00

UNIDAD: M2
ITEM: 220307
VALOR TOTAL

929.85
929.85

19,138.80
19,138.80

3,080.00
3,080.00

23,149.00

4,282.57
1,157.45
1,851.92
296.31
7,588.25
30,737.00

UNIDAD: M2
ITEM: 100113
VALOR TOTAL

385.00
47.56
150.00
35.00
617.56

1,096.92
500.00
1,596.92

42.90
42.90

2,257.00

417.55
112.85
180.56
28.89
739.85
2,997.00

UNIDAD: M3
ITEM: 080107
VALOR TOTAL

9,984.00
9,984.00

110.00
110.00

10,094.00

1,867.39
504.70
807.52
129.20
3,308.81
13,403.00

UNIDAD: M3
ITEM: 100605
VALOR TOTAL

4,492.80
4,492.80
5,040.00
135.30
5,175.30

9,668.00

1,788.58
483.40
773.44
123.75
3,169.17
12,837.00

UNIDAD: M2
ITEM: 120210
VALOR TOTAL

11,074.26
11,074.26

5,316.40
5,316.40

540.00
33.00
573.00

16,964.00

3,138.34
848.20
1,357.12
217.14
5,560.80
22,525.00

UNIDAD: M3
ITEM: 120213
VALOR TOTAL

609.60
162.40
816.50
193,799.55
195,388.05
39,208.45
39,208.45

9,000.00
33.00
9,033.00

243,630.00

45,071.55
12,181.50
19,490.40
3,118.46
79,861.91
323,492.00

UNIDAD: M3
ITEM: 120301
VALOR TOTAL

2,378.00
48,488.00
4,806.00
193,799.55
249,471.55

107,863.80
107,863.80

1,682.00
9,000.00
10,682.00

368,017.00

68,083.15
18,400.85
29,441.36
4,710.62
120,635.98
488,653.00

UNIDAD: M3
ITEM: 130204
VALOR TOTAL
11,484.00
24,592.00
1,345.60
34,564.32
19,024.00
35,500.00
7,794.00
193,799.55
328,103.47

176,874.80
176,874.80

3,364.00
9,000.00
363.00
4,080.00
2,688.00
19,495.00

524,473.00

97,027.51
26,223.65
41,957.84
6,713.25
171,922.25
696,395.00

UNIDAD: M3
ITEM: 130411
VALOR TOTAL

9,144.00
12,000.00
10,701.00
28,400.00
190,108.13
250,353.13

219,384.00
219,384.00

10,092.00
9,000.00
363.00
2,688.00
22,143.00

491,880.00

90,997.80
24,594.00
39,350.40
6,296.06
161,238.26
653,118.00

UNIDAD: M2
ITEM: 130622
VALOR TOTAL

343.00
914.40
3,960.00
47.56
7,100.00
90.00
20,302.81
9,200.00
41,957.77

29,091.25
29,091.25

489.45
672.80
990.00
363.00
2,515.25

73,564.00

13,609.34
3,678.20
5,885.12
941.62
24,114.28
97,678.00

UNIDAD: M3
ITEM: 131206
VALOR TOTAL
2,450.00
15,240.00
10,000.00
1,712.16
47,570.00
190,108.13
267,080.29

232,730.00
232,730.00

16,820.00
9,000.00
22.00
25,842.00

525,652.00

97,245.62
26,282.60
42,052.16
6,728.35
172,308.73
697,961.00

UNIDAD: KG
ITEM: 120101
VALOR TOTAL

73.52
76.58
2,309.26
2,459.36

199.68
199.68

2,659.00

491.92
132.95
212.72
34.04
871.63
3,531.00
UNIDAD: KG
ITEM: 130106
VALOR TOTAL

2,940.00
2,940.00

548.46
548.46

440.00
440.00

3,928.00

726.68
196.40
314.24
50.28
1,287.60
5,216.00

UNIDAD: M3
ITEM: 100607
VALOR TOTAL

2,246.40
2,246.40

11,368.00
443.30
11,811.30

14,058.00

2,600.73
702.90
1,124.64
179.94
4,608.21
18,666.00

UNIDAD: ML
ITEM: 130201
VALOR TOTAL
118.90
4,757.00
4,429.70
9,305.60

11,636.50
11,636.50

336.40
180.00
363.00
170.00
67.20
1,116.60

22,059.00

4,080.92
1,102.95
1,764.72
282.36
7,230.95
29,290.00

UNIDAD: ML
ITEM: 130212
VALOR TOTAL

95.12
2,272.00
2,214.85
4,581.97

9,309.20
9,309.20

336.40
108.00
22.00
170.00
67.20
703.60

14,595.00

2,700.08
729.75
1,167.60
186.82
4,784.25
19,379.00

UNIDAD: M2
ITEM: 130702
VALOR TOTAL

3,048.00
475.60
4,757.00
18,457.10
26,737.70

16,291.10
16,291.10

3,765.00
672.80
900.00
363.00
5,700.80

48,730.00

9,015.05
2,436.50
3,898.40
623.74
15,973.69
64,704.00

UNIDAD: ML
ITEM: 130201
VALOR TOTAL

118.90
4,757.00
4,429.70
9,305.60

11,636.50
11,636.50
336.40
180.00
363.00
170.00
67.20
1,116.60

22,059.00

4,080.92
1,102.95
1,764.72
282.36
7,230.95
29,290.00

UNIDAD: ML
ITEM: 130212
VALOR TOTAL

95.12
2,272.00
2,214.85
4,581.97

9,309.20
9,309.20

336.40
108.00
22.00
170.00
67.20
703.60

14,595.00

2,700.08
729.75
1,167.60
186.82
4,784.25
19,379.00

UNIDAD: KG
ITEM: 120101
VALOR TOTAL

73.52
76.58
2,309.26
2,459.36

199.68
199.68

2,659.00

491.92
132.95
212.72
34.04
871.63
3,531.00

Unidad: M3
ITEM: ME0113
VALOR TOTAL

22,388.00
17,000.00
107,880.00
147,268.00

6,273.35
6,273.35

2,736.00
189.20
2,925.20

156,467.00

28,946.40
7,823.35
12,517.36
2,002.78
51,289.89
207,757.00
Unidad: KLS
ITEM: 120101
VALOR TOTAL

309.95
124.00
1,050.21
1,484.16

343.87
398.72
742.59

243.00
740.00
11.00
27.00
161.28
1,182.28

3,409.00

630.67
170.45
272.72
43.64
1,117.48
4,526.00

UNIDAD: ML
ITEM: 130110
VALOR TOTAL

1,400.00
12.76
1,412.76

99.84
240.05
339.89

135.00
135.00

1,888.00
-
-
-
-
-
1,890.00

UNIDAD: M2
ITEM: 140104
VALOR TOTAL

22,001.40
2,735.64
3,300.21
2,992.54
31,029.79

5,848.04
5,848.04

220.00
134.40
354.40

37,232.00

6,887.92
1,861.60
2,978.56
476.57
12,204.65
49,437.00

UNIDAD: M2
ITEM: 140107
VALOR TOTAL

16,187.40
1,797.24
2,428.11
3,206.29
23,619.04
5,582.22
5,582.22

220.00
134.40
354.40

29,556.00

5,467.86
1,477.80
2,364.48
378.32
9,688.46
39,244.00

UNIDAD: M2
ITEM: 140404
VALOR TOTAL

588.00
2,100.00
17,200.00
951.20
7,810.00
1,210.00
18,457.10
48,316.30

26,582.00
26,582.00

900.00
1,100.00
2,000.00

76,898.00

14,226.13
3,844.90
6,151.84
984.29
25,207.16
102,105.00
UNIDAD: PTO
ITEM: 160801
VALOR TOTAL

472.00
790.00
891.00
991.00
2,020.53
173.00
2,156.17
210.00
84.96
7,788.66

8,472.60
8,472.60

330.00
330.00

16,591.00

3,069.34
829.55
1,327.28
212.36
5,438.53
22,030.00

UNIDAD: ML
ITEM: 160507
VALOR TOTAL

206.13
3,612.72
92.78
3,911.63

564.84
564.84

330.00
330.00

4,806.00
889.11
240.30
384.48
61.52
1,575.41
6,381.00

UNIDAD: ML
ITEM: 160708
VALOR TOTAL

1,835.73
1,835.73

110.00
110.00

1,946.00

360.01
97.30
155.68
24.91
637.90
2,584.00

UNIDAD: ML
ITEM: 160506
VALOR TOTAL

206.13
2,677.53
92.78
2,976.44

564.84
564.84

330.00
330.00

3,871.00

716.14
193.55
309.68
49.55
1,268.92
5,140.00

UNIDAD: ML
ITEM: 160707
VALOR TOTAL

1,412.10
1,412.10

110.00
110.00

1,522.00

281.57
76.10
121.76
19.48
498.91
2,021.00

UNIDAD: ML
ITEM: 160505
VALOR TOTAL

192.43
1,919.00
92.78
2,204.21

564.84
564.84

330.00
330.00

3,099.00

573.32
154.95
247.92
39.67
1,015.86
4,115.00
UNIDAD: ML
ITEM: 160706
VALOR TOTAL

1,172.04
1,172.04

110.00
110.00

1,282.00

237.17
64.10
102.56
16.41
420.24
1,702.00

UNIDAD: UND
ITEM: 160110
VALOR TOTAL

297.00
48.10
23.19
368.29

141.21
141.21

33.00
33.00

543.00

100.46
27.15
43.44
6.95
178.00
721.00
UNIDAD: UND
ITEM: 160113
VALOR TOTAL

966.00
192.43
92.78
1,251.21

988.47
988.47

220.00
220.00

2,460.00

455.10
123.00
196.80
31.49
806.39
3,266.00

UNIDAD: UND
ITEM: 160111
VALOR TOTAL

493.00
48.10
23.19
564.29

141.21
141.21

33.00
33.00

739.00

136.72
36.95
59.12
9.46
242.25
981.00
Unidad: UND
ITEM: 162701
VALOR TOTAL

790.00
790.00

790.00

146.15
39.50
63.20
10.11
258.96
1,049.00

UNIDAD: UND
ITEM: 160128
VALOR TOTAL

48.10
1,344.00
23.19
1,415.29

706.05
706.05

110.00
110.00

2,231.00

412.74
111.55
178.48
28.56
731.33
2,962.00

UNIDAD: UND
ITEM: 160132
VALOR TOTAL

48.10
688.00
23.19
759.29

706.05
706.05

110.00
110.00

1,575.00

291.38
78.75
126.00
20.16
516.29
2,091.00

UNIDAD: UND
ITEM: 160129
VALOR TOTAL

48.10
408.00
23.19
479.29

141.21
141.21

110.00
110.00

731.00

135.24
36.55
58.48
9.36
239.63
971.00
UNIDAD: UND
ITEM: 160618
VALOR TOTAL

472.00
11,889.00
90.00
12,451.00

1,694.52
1,694.52

330.00
330.00

14,476.00

2,678.06
723.80
1,158.08
185.29
4,745.23
19,221.00

UNIDAD: UND
ITEM: 160148
VALOR TOTAL

238.36
4.50
242.86

22.00
22.00

265.00

49.03
13.25
21.20
3.39
86.87
352.00

Unidad: UND
ITEM: 160150-1P
VALOR TOTAL

820.00
96.21
46.39
962.60

282.42
282.42

33.00
33.00

1,278.00

236.43
63.90
102.24
16.36
418.93
1,697.00

Unidad: UND
ITEM: 160150-2P
VALOR TOTAL

1,560.00
96.21
46.39
1,702.60

282.42
282.42

33.00
33.00

2,018.00

373.33
100.90
161.44
25.83
661.50
2,680.00
Unidad: UND
ITEM: 160150
VALOR TOTAL

1,344.44
96.21
46.39
1,487.04

282.42
282.42

33.00
33.00

1,802.00

333.37
90.10
144.16
23.07
590.70
2,393.00

UNIDAD: M3
ITEM: 100601
VALOR TOTAL

7,488.00
7,488.00

184.80
184.80

7,673.00

1,419.51
383.65
613.84
98.21
2,515.21
10,188.00
UNIDAD: ML
ITEM: 150104
VALOR TOTAL

192.43
6,611.32
92.78
6,896.53

3,905.40
3,905.40

330.00
330.00

11,132.00

2,059.42
556.60
890.56
142.49
3,649.07
14,781.00

UNIDAD: ML
ITEM: 150110
VALOR TOTAL

192.43
13,761.75
92.78
14,046.96

3,905.40
3,905.40

330.00
330.00

18,282.00

3,382.17
914.10
1,462.56
234.01
5,992.84
24,275.00
UNIDAD: UND
ITEM: 150312
VALOR TOTAL

1,589.00
192.43
92.78
1,874.21

1,412.10
1,412.10

330.00
330.00

3,616.00

668.96
180.80
289.28
46.28
1,185.32
4,801.00

UNIDAD: UND
ITEM: 150308
VALOR TOTAL

1,902.00
192.43
92.78
2,187.21

1,172.04
1,172.04

330.00
330.00

3,689.00

682.47
184.45
295.12
47.22
1,209.26
4,898.00

UNIDAD: UND
ITEM: 150310
VALOR TOTAL

6,921.00
192.43
92.78
7,206.21

1,412.10
1,412.10

330.00
330.00

8,948.00

1,655.38
447.40
715.84
114.53
2,933.15
11,881.00

UNIDAD: UND
ITEM: 150334
VALOR TOTAL

192.43
13,345.00
92.78
13,630.21

1,412.10
1,412.10

330.00
330.00

15,372.00

2,843.82
768.60
1,229.76
196.76
5,038.94
20,411.00

UNIDAD: UND
ITEM: 000000
VALOR TOTAL

-
-
-
-
-
-

UNIDAD: UND
ITEM: 150336
VALOR TOTAL

192.43
25,243.00
92.78
25,528.21

1,765.12
1,765.12

330.00
330.00

27,623.00

5,110.26
1,381.15
2,209.84
353.57
9,054.82
36,678.00

UNIDAD: UND
ITEM: 150323
VALOR TOTAL

6,200.00
192.43
92.78
6,485.21

1,412.10
1,412.10

330.00
330.00

8,227.00

1,522.00
411.35
658.16
105.31
2,696.82
10,924.00

UNIDAD: UND
ITEM: 150332
VALOR TOTAL

192.43
3,695.00
92.78
3,980.21

1,412.10
1,412.10

330.00
330.00

5,722.00

1,058.57
286.10
457.76
73.24
1,875.67
7,598.00

UNIDAD: ML
ITEM: 181001
VALOR TOTAL

17,040.05
2,184.00
87.00
231.95
481.04
20,024.04

3,987.30
3,987.30

550.00
67.20
10.00
627.20

24,639.00

4,558.22
1,231.95
1,971.12
315.38
8,076.67
32,716.00

UNIDAD: UND
ITEM: 181004
VALOR TOTAL

3,150.00
463.90
962.08
4,575.98

664.55
664.55

5,241.00
969.59
262.05
419.28
67.08
1,718.00
6,959.00

UNIDAD: ML
ITEM: 181002
VALOR TOTAL

5,247.10
80.00
18,339.50
231.95
481.04
24,379.59

3,987.30
3,987.30

550.00
550.00

28,917.00

5,349.65
1,445.85
2,313.36
370.14
9,479.00
38,396.00

UNIDAD: UND
ITEM: 181012
VALOR TOTAL

12,950.00
231.95
481.04
13,662.99

998.40
998.40

14,661.00
2,712.29
733.05
1,172.88
187.66
4,805.88
19,467.00

UNIDAD: UND
ITEM: 181008
VALOR TOTAL

4,800.00
231.95
481.04
5,512.99

998.40
998.40

6,511.00

1,204.54
325.55
520.88
83.34
2,134.31
8,645.00

UNIDAD: UND
ITEM: 181006
VALOR TOTAL

58.00
1,884.00
1,942.00

998.40
998.40

2,940.00

543.90
147.00
235.20
37.63
963.73
3,904.00

UNIDAD: ML
ITEM: 150107
VALOR TOTAL

192.43
9,874.97
92.78
10,160.18

3,905.40
3,905.40

330.00
330.00

14,396.00

2,663.26
719.80
1,151.68
184.27
4,719.01
19,115.00

UNIDAD: ML
ITEM: 150110
VALOR TOTAL

192.43
13,761.75
92.78
14,046.96

3,905.40
3,905.40

330.00
330.00

18,282.00

3,382.17
914.10
1,462.56
234.01
5,992.84
24,275.00

UNIDAD: ML
ITEM: 190517
VALOR TOTAL

1,784.59
400.00
322.00
9,938.40
12,444.99

4,651.85
4,651.85

440.00
440.00

17,537.00

3,244.35
876.85
1,402.96
224.47
5,748.63
23,286.00

Unidad: M2
ITEM: 190118
VALOR TOTAL

2,888.40
6,191.28
9,079.68

5,980.95
5,980.95

192.00
55.00
67.20
314.20
15,375.00

2,844.38
768.75
1,230.00
196.80
5,039.93
20,415.00

UNIDAD: M2
ITEM: 190542
VALOR TOTAL

2,916.58
800.00
322.00
15,901.59
19,940.17

10,632.80
10,632.80

55.00
55.00

30,628.00

5,666.18
1,531.40
2,450.24
392.04
10,039.86
40,668.00

UNIDAD: ML
ITEM: 200213
VALOR TOTAL

24.00
165.64
681.50
2,266.44
148.47
974.55
282.80
359.60
3,769.50
922.85
9,595.35

17,941.20
17,941.20

220.00
220.00

27,757.00

5,135.05
1,387.85
2,220.56
355.29
9,098.75
36,856.00

UNIDAD: M2
ITEM: 200102
VALOR TOTAL

10,318.80
10,318.80

5,582.22
5,582.22

450.00
330.00
780.00

16,681.00

3,085.99
834.05
1,334.48
213.52
5,468.04
22,149.00

UNIDAD: M2
ITEM: 200219
VALOR TOTAL
36.00
400.00
3,600.00
16,120.00
1,462.50
21,618.50

10,465.70
10,465.70

55.00
55.00

32,139.00

5,945.72
1,606.95
2,571.12
411.38
10,535.17
42,674.00

UNIDAD: M2
ITEM: 200325
VALOR TOTAL

3.20
17,388.00
521.42
825.50
6,130.56
24,868.68

1,497.45
10,632.80
12,130.25

55.00
55.00

37,054.00

6,854.99
1,852.70
2,964.32
474.29
12,146.30
49,200.00

UNIDAD: UND
ITEM: 250402
VALOR TOTAL

6.00
410.00
52,000.00
52,416.00

18,688.75
18,688.75

11.00
11.00

71,116.00

13,156.46
3,555.80
5,689.28
910.28
23,311.82
94,428.00

UNIDAD: UND
ITEM: 250421
VALOR TOTAL

12.00
820.00
120,000.00
120,832.00

18,688.75
18,688.75

220.00
220.00

139,741.00

25,852.09
6,987.05
11,179.28
1,788.68
45,807.10
185,548.00

UNIDAD: UND
ITEM: 250423
VALOR TOTAL

12.00
820.00
2,475.00
205,000.00
208,307.00

19,436.30
19,436.30

11.00
11.00

227,754.00

42,134.49
11,387.70
18,220.32
2,915.25
74,657.76
302,412.00

UNIDAD: UND
ITEM: 250442
VALOR TOTAL

12.00
820.00
274,900.00
2,475.00
278,207.00

19,436.30
19,436.30

11.00
11.00
297,654.00

55,065.99
14,882.70
23,812.32
3,809.97
97,570.98
395,225.00

UNIDAD: UND
ITEM: 250449
VALOR TOTAL

6.00
410.00
83,900.00
84,316.00

18,688.75
18,688.75

110.00
110.00

103,115.00

19,076.28
5,155.75
8,249.20
1,319.87
33,801.10
136,916.00

UNIDAD: UND
ITEM: 250520
VALOR TOTAL

23,900.00
27.00
23,927.00

8,472.60
8,472.60

66.00
66.00
32,466.00

6,006.21
1,623.30
2,597.28
415.56
10,642.35
43,108.00

UNIDAD: UND
ITEM: 250611
VALOR TOTAL

1.20
3,400.00
35.96
3,437.16

3,322.75
3,322.75

22.00
22.00

6,782.00

1,254.67
339.10
542.56
86.81
2,223.14
9,005.00

UNIDAD: M2
ITEM: 220104
VALOR TOTAL

32,307.45
2,550.00
3,099.52
2,271.74
1,125.00
41,353.71

39,872.50
39,872.50

13,970.00
13,970.00

95,196.00

17,611.26
4,759.80
7,615.68
1,218.51
31,205.25
126,401.00

UNIDAD: UND
ITEM: 220118
VALOR TOTAL

850.00
497.85
61,623.88
1,514.49
750.00
65,236.22

15,949.00
15,949.00

9,900.00
9,900.00

91,085.00

16,850.73
4,554.25
7,286.80
1,165.89
29,857.67
120,943.00

UNIDAD: M2
ITEM: 220153
VALOR TOTAL

43,076.60
1,700.00
3,099.52
5,679.36
2,250.00
132.00
55,937.48

39,872.50
39,872.50

13,750.00
13,750.00

109,560.00

20,268.60
5,478.00
8,764.80
1,402.37
35,913.77
145,474.00

UNIDAD: UND
ITEM: 220170
VALOR TOTAL

3,300.00
1,275.00
619.90
41,500.00
562.50
2,724.00
49,981.40

22,328.60
22,328.60

11,000.00
11,000.00

83,310.00

15,412.35
4,165.50
6,664.80
1,066.37
27,309.02
110,619.00
UNIDAD: M2
ITEM: 220171
VALOR TOTAL

2,550.00
3,719.42
41,500.00
3,750.00
9,080.00
60,599.42

39,872.50
39,872.50

16,060.00
16,060.00

116,532.00

21,558.42
5,826.60
9,322.56
1,491.61
38,199.19
154,731.00

Unidad: M2
ITEM: 220156
VALOR TOTAL

51,691.92
1,275.00
24,000.00
929.85
4,475.00
7,572.48
750.00
3,080.00
3,600.00
6,364.00
103,738.25

47,847.00
20,731.00
68,578.00
1,980.00
1,980.00

174,296.00

32,244.76
8,714.80
13,943.68
2,230.99
57,134.23
231,430.00

Unidad: M2
ITEM: 221001
VALOR TOTAL

240.00
156.00
306.00
82,500.00
23,100.00
106,302.00

12,759.20
12,000.00
24,759.20

1,716.00
1,716.00

132,777.00

24,563.75
6,638.85
10,622.16
1,699.55
43,524.31
176,301.00

UNIDAD: UND
ITEM: 240313
VALOR TOTAL

343,070.00
343,070.00

3,987.25
3,987.25

2,750.00
2,750.00

349,807.00

64,714.30
17,490.35
27,984.56
4,477.53
114,666.74
464,474.00

UNIDAD: UND
ITEM: 240316
VALOR TOTAL

375,603.36
375,603.36

13,556.65
13,556.65

3,300.00
3,300.00

392,460.00

72,605.10
19,623.00
31,396.80
5,023.49
128,648.39
521,108.00

UNIDAD: UND
ITEM: 240318
VALOR TOTAL

200,013.00
200,013.00
15,949.00
15,949.00

2,750.00
2,750.00

218,712.00

40,461.72
10,935.60
17,496.96
2,799.51
71,693.79
290,406.00

Unidad: M2
ITEM: 221403
VALOR TOTAL

1,664.00
75,037.20
52,800.00
18,700.00
10,546.80
3,080.00
1,760.00
163,588.00

51,036.80
51,036.80

18,700.00
18,700.00

233,325.00

43,165.13
11,666.25
18,666.00
2,986.56
76,483.94
309,809.00

UNIDAD: UND
ITEM: 210148
VALOR TOTAL
95,700.00
63,384.00
5,191.05
9,112.50
2,280.00
45,200.00
220,867.55

44,853.00
84,726.00
129,579.00

6,600.00
6,600.00

357,047.00

66,053.70
17,852.35
28,563.76
4,570.20
117,040.01
474,087.00

UNIDAD: ML
ITEM: 182118
VALOR TOTAL

20,419.25
276.72
371.94
1,893.12
22,961.03

249.57
5,648.40
706.05
6,604.02

1,040.00
1,620.00
220.00
67.20
2,947.20

32,512.00
6,014.72
1,625.60
2,600.96
416.15
10,657.43
43,169.00

UNIDAD: ML
ITEM: 180159
VALOR TOTAL

600.00
2,150.00
2,750.00

1,329.10
127.59
1,456.69

110.00
134.40
244.40

4,451.00

823.44
222.55
356.08
56.97
1,459.04
5,910.00

Unidad: ML
ITEM: 182113
VALOR TOTAL

276.72
371.94
1,893.12
14,043.59
16,585.37

249.57
5,648.40
706.05
6,604.02

520.00
1,620.00
220.00
67.20
2,427.20

25,617.00

4,739.15
1,280.85
2,049.36
327.90
8,397.26
34,014.00

UNIDAD: M2
ITEM: 182118
VALOR TOTAL

20,419.25
276.72
371.94
1,893.12
22,961.03

249.57
5,648.40
706.05
6,604.02

1,040.00
1,620.00
220.00
67.20
2,947.20

32,512.00

6,014.72
1,625.60
2,600.96
416.15
10,657.43
43,169.00
Unidad: M2
ITEM: 180404
VALOR TOTAL

336.40
0.24
1,864.46
1,666.50
162.00
15.60
244.58
3,850.00
180.00
8,653.68
64.53
1,666.17
300.00
19,004.16

8,472.60
1,694.52
10,167.12

1,650.00
537.60
80.00
2,267.60

31,439.00

5,816.22
1,571.95
2,515.12
402.42
10,305.71
41,745.00

UNIDAD: M2
ITEM: 290304
VALOR TOTAL

0.42
2,165.94
2,166.36
2,541.78
2,541.78

22.00
67.20
89.20

4,797.00

887.45
239.85
383.76
61.40
1,572.46
6,369.00

UNIDAD: ML
ITEM: 290401
VALOR TOTAL

351.00
2,766.48
442.76
235.94
3,796.18

49.92
2,541.78
2,591.70

110.00
110.00

6,498.00

1,202.13
324.90
519.84
83.17
2,130.04
8,628.00

UNIDAD: M2
ITEM: 290409
VALOR TOTAL
819.00
66.41
686.40
2,069.55
3,641.36

3,953.88
3,953.88

33.00
33.00

7,628.00

1,411.18
381.40
610.24
97.64
2,500.46
10,128.00

UNIDAD: UND
ITEM: 290417
VALOR TOTAL

7.80
4,610.80
166.03
4,784.63

3,953.88
3,953.88

165.00
165.00

8,904.00

1,647.24
445.20
712.32
113.97
2,918.73
11,823.00

UNIDAD: UND
ITEM: 270404
VALOR TOTAL

23,500.00
23,500.00

15,949.00
15,949.00

3,850.00
3,850.00

43,299.00

8,010.32
2,164.95
3,463.92
554.23
14,193.42
57,492.00

Unidad: UND
ITEM: 060802
VALOR TOTAL

25.72
688.00
16,056.80
385.00
7,100.00
934.13
1,345.20
18,457.10
44,991.95

4,992.00
26,582.00
7,974.50
39,548.50

1,100.00
1,100.00

85,640.00

15,843.40
4,282.00
6,851.20
1,096.19
28,072.79
113,713.00

Unidad: UND
ITEM: 061338
VALOR TOTAL

34,800.00
34,800.00

18,607.00
18,607.00

2,200.00
2,200.00

55,607.00

10,287.30
2,780.35
4,448.56
711.77
18,227.98
73,835.00

Unidad: UND
ITEM: 061303
VALOR TOTAL

237,747.80
237,747.80

63,355.00
63,355.00

110.00
110.00

301,213.00

55,724.41
15,060.65
24,097.04
3,855.53
98,737.63
399,951.00

UNIDAD: Ml
ITEM: 170104
VALOR TOTAL

1,543.20
1,543.20

372.14
372.14

110.00
110.00

2,025.00

-
-
-
-
-
2,030.00

UNIDAD: Und
ITEM: 170233
VALOR TOTAL

6,954.20
6,954.20

744.28
744.28

110.00
110.00

7,808.00

-
-
-
-
-
7,810.00

UNIDAD: Und
ITEM: 170256
VALOR TOTAL

32,358.20
2,593.76
525.48
35,477.44

1,860.70
1,860.70

110.00
110.00

37,448.00

-
-
-
-
-
37,450.00

UNIDAD: Und
ITEM: 170224
VALOR TOTAL

2,273.60
2,273.60

744.28
744.28

110.00
110.00

3,128.00

-
-
-
-
-
3,130.00

UNIDAD: Ml
ITEM: 170262
VALOR TOTAL

70.97
147.19
1,168.92
1,387.08

1,860.70
1,860.70

110.00
110.00

3,358.00

621.23
167.90
268.64
42.98
1,100.75
4,459.00

UNIDAD: Ml
ITEM: 170266
VALOR TOTAL

141.95
294.39
4,904.44
5,340.78

3,721.40
3,721.40

110.00
110.00

9,172.00

1,696.82
458.60
733.76
117.40
3,006.58
12,179.00

UNIDAD: Ml
ITEM: 170261
VALOR TOTAL

70.97
147.19
892.71
1,110.87

1,860.70
1,860.70

110.00
110.00

3,082.00

570.17
154.10
246.56
39.45
1,010.28
4,092.00

UNIDAD: Ml
ITEM: 170312
VALOR TOTAL

4,686.86
33,393.90
141.95
294.39
4,904.44
43,421.54

7,070.66
7,070.66

110.00
110.00
50,602.00

9,361.37
2,530.10
4,048.16
647.71
16,587.34
67,189.00

UNIDAD: Und
ITEM: 170403
VALOR TOTAL

380.48
73.06
151.52
2,680.81
1,173.92
313.66
4,773.45

11,164.20
11,164.20

110.00
110.00

16,048.00

2,968.88
802.40
1,283.84
205.41
5,260.53
21,309.00

UNIDAD: Und
ITEM: 170406
VALOR TOTAL

9,700.15
380.48
73.06
151.52
2,680.81
1,173.92
313.66
120.17
788.80
1,392.00
16,774.57

16,932.37
16,932.37

116.60
116.60

33,824.00

6,257.44
1,691.20
2,705.92
432.95
11,087.51
44,912.00

UNIDAD: Und
ITEM: 170520
VALOR TOTAL

15,432.06
6,148.00
21,580.06

7,442.80
7,442.80

110.00
110.00

29,133.00

5,389.61
1,456.65
2,330.64
372.90
9,549.80
38,683.00

UNIDAD: Und
ITEM: 170521
VALOR TOTAL

23,148.09
10,208.00
33,356.09

9,303.50
9,303.50

110.00
110.00

42,770.00

7,912.45
2,138.50
3,421.60
547.46
14,020.01
56,790.00

UNIDAD: Und
ITEM: 170522
VALOR TOTAL

23,148.09
7,540.00
30,688.09

9,303.50
9,303.50

110.00
110.00

40,102.00

7,418.87
2,005.10
3,208.16
513.31
13,145.44
53,247.00

UNIDAD: Und
ITEM: 170616
VALOR TOTAL

627.32
183,744.00
184,371.32

13,024.90
13,024.90

110.00
110.00

197,506.00

36,538.61
9,875.30
15,800.48
2,528.08
64,742.47
262,248.00

UNIDAD: Und
ITEM: 170703
VALOR TOTAL

14,550.22
8,468.00
23,018.22

9,303.50
9,303.50

110.00
110.00

32,432.00

5,999.92
1,621.60
2,594.56
415.13
10,631.21
43,063.00

UNIDAD: Und
ITEM: 170813
VALOR TOTAL

16,371.08
16,371.08

9,303.50
9,303.50

110.00
110.00

25,785.00

4,770.23
1,289.25
2,062.80
330.05
8,452.33
34,237.00

UNIDAD: Und
ITEM: 170802
VALOR TOTAL

37,381.00
37,381.00

11,164.20
11,164.20

110.00
110.00

48,655.00

9,001.18
2,432.75
3,892.40
622.78
15,949.11
64,604.00

UNIDAD: Und
ITEM: 170912
VALOR TOTAL
218,776.00
218,776.00

37,214.00
37,214.00

110.00
110.00

256,100.00

47,378.50
12,805.00
20,488.00
3,278.08
83,949.58
340,050.00

UNIDAD: Und
ITEM: 171212
VALOR TOTAL

99,113.88
99,113.88

5,582.10
5,582.10

110.00
110.00

104,806.00

19,389.11
5,240.30
8,384.48
1,341.52
34,355.41
139,161.00

Unidad: M3K
ITEM: 010201
VALOR TOTAL
1,055.60
1,055.60

1,056.00

195.36
52.80
84.48
13.52
346.16
1,402.00

Unidad: M2
ITEM: 010215
VALOR TOTAL

4.20
4.20

99.84
99.84

359.60
359.60

464.00

85.84
23.20
37.12
5.94
152.10
616.00

Unidad: M2
ITEM: 080514
VALOR TOTAL

2,365.00
1,495.00
3,860.00

1,594.92
1,594.92
275.00
275.00

5,730.00

1,060.05
286.50
458.40
73.34
1,878.29
7,608.00

UNIDAD: M3
ITEM: 100607
VALOR TOTAL

2,246.40
2,246.40

11,368.00
443.30
11,811.30

14,058.00

2,600.73
702.90
1,124.64
179.94
4,608.21
18,666.00

UNIDAD: M2
ITEM: 310105
VALOR TOTAL

99.84
99.84

1,100.00
1,100.00

1,200.00
222.00
60.00
96.00
15.36
393.36
1,593.00

UNIDAD: M3
ITEM: 100101
VALOR TOTAL

7,488.00
7,488.00

184.80
184.80

7,673.00

1,419.51
383.65
613.84
98.21
2,515.21
10,188.00

UNIDAD: M3
ITEM: 100605
VALOR TOTAL

4,492.80
4,492.80

5,040.00
135.30
5,175.30

9,668.00

1,788.58
483.40
773.44
123.75
3,169.17
12,837.00

UNIDAD: M2
ITEM: 120210
VALOR TOTAL

11,074.26
11,074.26

5,316.40
5,316.40

540.00
33.00
573.00

16,964.00

3,138.34
848.20
1,357.12
217.14
5,560.80
22,525.00

UNIDAD: M3
ITEM: 120213
VALOR TOTAL

609.60
162.40
816.50
193,799.55
195,388.05

39,208.45
39,208.45

9,000.00
33.00
9,033.00

243,630.00
45,071.55
12,181.50
19,490.40
3,118.46
79,861.91
323,492.00

UNIDAD: M3
ITEM: 120301
VALOR TOTAL

2,378.00
48,488.00
4,806.00
193,799.55
249,471.55

107,863.80
107,863.80

1,682.00
9,000.00
10,682.00

368,017.00

68,083.15
18,400.85
29,441.36
4,710.62
120,635.98
488,653.00

UNIDAD: M3
ITEM: 130204
VALOR TOTAL

11,484.00
24,592.00
1,345.60
34,564.32
19,024.00
35,500.00
7,794.00
193,799.55
328,103.47

176,874.80
176,874.80

3,364.00
9,000.00
363.00
4,080.00
2,688.00
19,495.00

524,473.00

97,027.51
26,223.65
41,957.84
6,713.25
171,922.25
696,395.00

Unidad: M3
ITEM: 130411
VALOR TOTAL

9,144.00
8,000.00
9,036.40
24,850.00
2,706.75
190,108.13
243,845.28

201,102.00
201,102.00

10,092.00
9,000.00
363.00
2,688.00
22,143.00

467,090.00

86,411.65
23,354.50
37,367.20
5,978.75
153,112.10
620,202.00

UNIDAD: KG
ITEM: 120101
VALOR TOTAL

73.52
76.58
2,309.26
2,459.36

199.68
199.68

2,659.00

491.92
132.95
212.72
34.04
871.63
3,531.00

UNIDAD: M3
ITEM: 100607
VALOR TOTAL

2,246.40
2,246.40

11,368.00
443.30
11,811.30

14,058.00

2,600.73
702.90
1,124.64
179.94
4,608.21
18,666.00
Unidad: UND
ITEM: 270202
VALOR TOTAL

20,340.00
20,340.00

15,949.00
15,949.00

2,860.00
2,860.00

39,149.00

7,242.57
1,957.45
3,131.92
501.11
12,833.05
51,982.00

Unidad: UND
ITEM: 270113
VALOR TOTAL

29,354.00
29,354.00

7,974.50
7,974.50

3,300.00
3,300.00

40,629.00

7,516.37
2,031.45
3,250.32
520.05
13,318.19
53,947.00
Unidad: UND
ITEM: 060714
VALOR TOTAL

14,697.20
620,000.00
61,851.20
696,548.40

21,428.44
21,428.44

2,565.20
2,565.20

720,542.00

133,300.27
36,027.10
57,643.36
9,222.94
236,193.67
956,736.00

Unidad: UND
ITEM: 060720
VALOR TOTAL

10,035.50
16,771.28
4,064.64
30,871.42

20,737.20
20,737.20

968.00
968.00

52,577.00

9,726.75
2,628.85
4,206.16
672.99
17,234.75
69,812.00
RESUMEN DE INSUMOS
FECHA: 24-Nov-08
-

RESUMEN DE INSUMOS A UTILIZAR


DESCRIPCION UND VR. UNIT. CANT. VR.TOTAL

MATERIALES 187,446,186.87
DESCRIPCION UND VR. UNIT. CANT. VR.TOTAL
ACEITE MOTOR 4 TIEMPOS GLN 45,000.00 0.58 25,878.30
ADAP.M PRS PVC .1/2 UND 236.00 106.40 25,110.40
AGUA LTS 12.00 29,273.42 351,281.03
ALAMBRE COBRE THW #12 CEAT ML 1,469.72 1,805.50 2,653,579.46
ALAMBRE GALVANIZADO # 10 KLS 3,364.00 34.85 117,235.40
ALAMBRE GALVANIZADO # 18 U KG 3,136.64 19.70 61,791.81
ALAMBRE NEGRO # 18 KLS 2,450.00 613.55 1,503,204.29
ESCUDO ANCLAJE ALUM. 1/2" CONTRA PARED UND 9,350.00 12.48 116,688.00
ANGULO 11/2 x 3/16 TIRA DE 6 METROS UND 40,142.00 5.80 232,823.60
ANTICORROSIVO PHCL GLN 37,862.40 63.21 2,393,441.33
ANTICORROSIVO ROJO BASE PINTURA GLN 19,662.00 0.27 5,296.94
ANTICORROSIVO WASH-PRIMER GLN 90,800.00 0.55 49,576.80
ANTISOL BLANCO KLS 5,742.00 29.20 167,666.40
ARENA FINA M3 22,388.00 21.55 482,517.59
ARENA GRUESA M3 22,388.00 65.18 1,459,328.43
ARENA MEDIANA M3 22,388.00 44.64 999,317.32
BAJANTE PVC CUADRADO ML 16,227.00 74.56 1,209,843.82
BAJANTE PVC SOPORTE UND 1,456.00 106.50 155,064.00
BANDA COPA DOBLE 6" CONJ PRIM Y SECUND UND 16,771.28 4.00 67,085.12
BISAGRA 3x2" COBRIZ UND 1,475.00 3.00 4,425.00
BISAGRA 3x3" COBRIZ PAR 1,100.00 15.00 16,500.00
BISAGRA VAIVEN # 30 PIVOTE PUERTA UND 31,900.00 9.00 287,100.00
BLOQUE CONCRETO M 14X19X19 UND 881.00 194.74 171,564.53
BLOQUE CONCRETO N 14X19X39 UND 1,587.00 973.69 1,545,249.20
BLOQUE CONCRETO T 14X19X39 UND 1,587.00 146.05 231,787.38
BLOQUE PIEDRA M 14X19X19 UND 1,341.00 878.85 1,178,541.07
BLOQUE PIEDRA N 14X19X39 UND 2,157.00 4,394.26 9,478,423.13
BLOQUE PIEDRA T 14X19X39 UND 2,157.00 659.14 1,421,763.47
BOMBILLO 100W INCANDESCEN UND 788.80 7.00 5,521.60
BOMBILLO MET.HALIDE 250 W UND 61,851.20 4.00 247,404.80
BREAKER 1x 15 AMP UND 16,371.08 9.00 147,339.72
BREAKER 2x 15 AMP UND 37,381.00 1.00 37,381.00
CABLE COBRE THW # 4 ML 10,601.24 78.75 834,847.65
CABLE COBRE THW # 8 ML 4,463.68 26.25 117,171.60
CAJA OCTOGONAL PVC UND 1,173.92 37.00 43,435.04
CANAL PVC AMAZONAS AGUAS LLUVIAS ML 17,800.00 57.70 1,027,012.01
CANAL PVC SOPORTE UND 1,915.00 153.44 293,837.60
CANDADO YALE 110-30 UND 17,400.00 1.00 17,400.00
CAPACETE GALV. 1" UND 2,273.60 1.00 2,273.60
CE.SCHLAGE BAムO BELL WOOD MAD-PLATIN UND 23,500.00 3.00 70,500.00
CE.SCHLAGE ENTRADA-APTO BELL WOOD MAD-PL UND 29,354.00 2.00 58,708.00
CE.SCHLAGE PASO MODELO GEORGIA REF:A UND 20,340.00 10.00 203,400.00
CEDRO CAQUETA PG2 4,520.00 30.00 135,600.00
CEMENTO BLANCO SACO DE 40 KILOS BTO 32,200.00 1.02 32,750.62
CEMENTO BLANCO NARE SACO DE 25 KILOS KLS 820.00 19.45 15,945.20
CEMENTO GRIS CONQUISTADOR KLS 359.60 62,381.32 22,432,323.17
CERAMICA CORONA 20 x25 PRIMERA CALIDAD M2 16,400.00 3.51 57,642.72
CERAMICA TRAF.3 20 x20CM BLANCO O COLOR M2 15,500.00 37.45 580,481.20
CHAZO EXPANDIBLE 3/8" LARGO 7CMS UND 600.00 174.25 104,550.00
CHAZO PLASTICO 1/4 UND 40.00 108.00 4,320.00
CIERRE 1/2 LUNA VENTANERIA UND 3,080.00 130.95 403,326.00
CINTA AISLANTE # 33 ROLLO x 20 MTS UND 12,017.60 0.07 841.23
CINTA BANDIT CONJ PRIM O SECUNDAR UND 2,593.76 1.00 2,593.76
CINTA SELLO 2"(PANEL-YESO) CINTA DE 150 PIES ROL 12,900.00 1.74 22,489.49
CINTA TEFLON 10 MTS CARRETE DE 10 METROS UND 450.00 1.98 891.00
CODO CANAL PVC BAJANTE UND 3,150.00 16.00 50,400.00
CODO GALV .1/2x90 UND 790.00 52.00 41,080.00
CODO PRS PVC .1/2x90ø UND 297.00 117.00 34,749.00
CODO PRS PVC .3/4x90ø UND 493.00 2.00 986.00
CODO PRS PVC 1 x90ø UND 966.00 1.00 966.00
CODO SAN PVC 2 x45ø CxC UND 1,902.00 4.00 7,608.00
CODO SAN PVC 4 x22.5 CxC UND 6,921.00 9.00 62,289.00
CONTADOR 2F 120/240V ISKRA UND 237,747.80 1.00 237,747.80
CUARTON 2"x4"x3M OTOBO UND 6,096.00 160.27 976,985.80
CURVA GALV. 1" UND 6,954.20 1.00 6,954.20
EMBOQUILLADOR KLS 3,250.00 16.20 52,664.63
ENCHAPE CERAMICA EGEO 20.5 CERAMICA 20.5X2 M2 15,900.00 95.92 1,525,121.50
ESMALTE SEMIBRILLANTE A GLN 45,990.00 0.42 19,122.64
ESMALTE SINTETICO MATE ALGRECO GLS 46,108.00 2.85 131,269.48
ESTERILLA GUADUA 4 MTS. ML 1,800.00 566.54 1,019,779.20
GANCHO P/TEJA ASB. MADERA UND 261.00 8.00 2,088.00
GASOLINA CORRIENTE GLN 7,400.00 9.58 70,925.71
GRAVA TRITURADA DE 3/4 M3 32,000.00 80.51 2,576,328.49
GUADUA ML 1,100.00 3.83 4,210.80
GUADUA [TACO] 2.50-3M UND 2,000.00 97.81 195,613.60
HEBILLA - CINTA-BANDIT CONJ PRIM O SECUNDAR UND 525.48 1.00 525.48
HIERR.DE 37000 PSI 259 MPA U KLS 2,242.00 7.20 16,142.40
HIERR.DE 60000 PSI 420 MPA KLS 2,242.00 19,349.20 43,380,903.93
HIERRO .1/2" 60.000 [12M] KLS 2,150.00 57.84 124,356.00
HIERRO .3/8" 37.000 [CH] KLS 2,150.00 27.84 59,856.00
LAM.COLD ROLLED C. 20 DE 100x200CM UND 43,076.60 209.51 9,024,763.08
LAM.COLL-ROLLED C.20 DE 122X244 UND 64,641.00 9.53 616,238.81
LAM.TRIPLEX 4 MM. DE 122x244CM PIZANO UND 31,692.00 6.00 190,152.00
LAM.PERF. ASTM A-36 KLS 1,050.00 292.98 307,627.51
LAMP MFL 2x32 ELECTRON ILUMINACIONES TECNI UND 183,744.00 30.00 5,512,320.00
LAVAM.ACUACER [COLGA] UND 52,000.00 3.00 156,000.00
LIJA 320 AGUA PLI 850.00 369.27 313,875.25
LIJA 400 AGUA PLI 780.00 26.92 21,001.11
LIMPIADOR PVC 112 GRMS UND 4,046.00 0.55 2,209.12
LIMPIADOR PVC 760-G 1/4 GL UND 23,195.00 4.25 98,571.10
LISTON 1 x2x3M. OTOBO UND 2,900.00 1.10 3,189.42
MALLA ELEC.M-0.84 / DO84 ESPAC 15X15 1.34K/M2 KLS 2,800.00 349.65 979,020.00
MARMOLINA BLANCA BTO 3,206.00 0.53 1,701.91
MASILLA PLASTICA INTERIORES CUム 37,500.00 6.04 226,672.50
MECANISMO CELOSIA UND/PAR UND 7,500.00 198.00 1,485,000.00
MINERAL ROJO KLS 7,000.00 4.38 30,690.10
NIPLE GALV .1/2x 5 CM UND 991.00 26.00 25,766.00
ORINAL MEDIANO 6101 UND 120,000.00 3.00 360,000.00
PASTA MASTIQUE(PANEL-YESO) PANELEC USO IN GLN 9,900.00 58.65 580,660.25
PEGACOR BLANCO CORONA R:30100 KLS 972.00 298.44 290,080.13
PEGANTE A X W MADERA GLN 34,607.00 0.45 15,573.15
PEGANTE CERAMICA PEGACOR-ALFALISTO KLS 900.00 144.04 129,636.00
PERF.OVALO 3"*1"*6M ALUM. UND 52,734.00 1.25 65,812.03
PINTURA ANTICORROSIVA GLN 31,000.00 1.17 36,322.08
PIOLA GRUESA 50 METROS ROL 2,500.00 52.61 131,529.00
PIRAGUA ALUM. NATURAL TIRA DE 6M UND 6,800.00 1.56 10,606.94
PLACA YESO 12.7MM-GYPLAC 244X122M HUMEDAD UND 25,500.00 118.27 3,015,807.48
PLAFON-BLANCO 200W LUMINEX UND 1,392.00 7.00 9,744.00
PLATINA ALUM 1.1/2x8x 1/ 8 UND 880.00 12.48 10,982.40
PORTACANDADO UND 2,750.00 1.00 2,750.00
PRADO M2 2,150.00 142.45 306,267.50
PUNTILLA 1 SC LBS 2,850.00 2.40 6,840.00
PUNTILLA 2 CC LBS 2,378.00 263.13 625,728.13
PUNTILLA 2.1/2 CC 104 UND/LB LBS 2,450.00 0.28 694.84
PUNTILLAS LBS 812.00 1.56 1,266.72
REFLECTOR MET-HALIDE 250 W ILUMINACION UND 620,000.00 4.00 2,480,000.00
REGILLA SOSCO 3 X2" UND 3,400.00 8.00 27,200.00
ROCA MUERTA (SIN TRANSPORTE) M3 5,500.00 0.84 4,620.00
RODACHINES UND 1,800.00 261.90 471,420.00
SANITARIO ACUACER CORONA GRIFERIA-MUEBLE JGO 205,000.00 8.00 1,640,000.00
SEGUETA SIN MARCO UND 2,552.00 566.60 1,445,959.30
SIFON SANI PVC 2" TAP UND 6,200.00 8.00 49,600.00
SIKA 1 UNX20 KG. IMPERMEAB R:110002 KLS 4,814.00 57.55 277,026.44
SILICONA TRANSPARENT.11 OZ UND 8,950.00 65.48 586,001.25
BALASTRO DE RIO CANTO RODADO-ARENA M3 19,000.00 1.17 22,230.00
SOLDADURA 6011 1/8" VARILLA KLS 6,199.04 106.91 662,744.95
SOLDADURA CPVC 1/ 4 GLN UND 51,533.00 0.20 10,100.47
SOLDADURA PVC 1/ 2 GLN UND 48,108.00 2.37 113,804.28
SOLDADURA PVC 1/ 4 GLN UND 48,104.00 2.78 133,732.49
SOPORT.CANAL AMAZONAS PVC UND 1,884.00 18.00 33,912.00
SWITCHE CONMUTABLE AMBIA LUMINEX UND 7,540.00 2.00 15,080.00
SWITCHE DOBLE AMBIA LUMINEX UND 10,208.00 8.00 81,664.00
SWITCHE SENCILLO AMBIA LUMINEX UND 6,148.00 5.00 30,740.00
TABLA 1x05x3M OTOBO [1C] UND 4,106.00 1.11 4,560.94
TABLA 1x10x3M OTOBO UND 7,100.00 503.05 3,571,628.02
TABLA 1X10x3M OTOBO [2C] UND 8,816.00 83.95 740,140.23
TABLERO 2F-12 CTOS TBC SQUAR-D UND 218,776.00 1.00 218,776.00
TAPA CANAL PVC EXTERNA [P] UND 4,800.00 4.00 19,200.00
TAPA OVALO 3"*1" ALUMINIO UND 1,540.00 12.48 19,219.20
TAPAPOROS INCOLORO PREPARADOR SUPERFICI GLN 31,200.00 0.20 6,342.34
TAPON PRS PVC .1/2 R UND 173.00 26.00 4,498.00
TEE PRS PVC .1/2 UND 408.00 22.00 8,976.00
TEE PRS PVC .3/4 UND 688.00 3.00 2,064.00
TEE PRS PVC 1 UND 1,344.00 4.00 5,376.00
TEJA ONDULIT #6 UND 22,667.00 8.00 181,336.00
TERMINAL PVC 1/2" UND 190.24 74.00 14,077.76
THINER DISOLVENTE GLN 11,069.00 16.24 179,770.96
TIERRA NEGRA M3 23,000.00 8.42 193,602.50
TOMA DOBLE P-T AMBIA LUMINEX UND 8,468.00 57.00 482,676.00
TORN 1 x 6 UND 20.00 224.00 4,480.00
TORN P/MAD 1 x 6 UND 29.00 249.00 7,221.00
TORN.AVELLANADO 2" x 8 UND 51.00 108.00 5,508.00
TORN.CARRUA 5/8 X 1 1/2 CONJ PRIM O SECUNDA UND 1,354.88 12.00 16,258.56
TORN.PAMPHILLIPS 1/2" #8 UND 26.00 507.36 13,191.36
TORN.PERNOS 3/8" #10 UND 33.00 132.00 4,356.00
TUBO GALV. 1" X 3 MTS COLMENA UND 32,358.20 1.00 32,358.20
TUBO PRS .1/2 RDE- 9 ML 1,919.00 37.90 72,730.10
TUBO PRS .1/2 RDE-13.5 ML 1,369.00 40.95 56,060.55
TUBO PRS .3/4 RDE-11 ML 2,677.00 9.90 26,507.60
TUBO PRS 1 RDE-13.5 ML 3,612.00 39.11 141,257.45
TUBO PVC 1/2" X 3 MTS UND 2,553.16 80.81 206,315.75
TUBO PVC 3/4" X 3 MTS UND 3,343.12 25.17 84,162.38
TUBO PVC 2" X 3 MTS UND 14,026.72 17.48 245,222.13
TUBO SANIT PVC 2" ML 6,610.00 39.01 257,841.56
TUBO SANIT PVC 3 ML 9,873.00 8.00 78,999.80
TUBO SANIT PVC 4" ML 13,759.00 130.03 1,789,027.73
TUBUL.ALUM.1.1/2"X1.1/2"X6 UND 53,598.00 8.74 468,232.13
UNION 8CMX1/8" UND 3,300.00 99.84 329,472.00
UNION BAJ.CANAL AMAZ.PVC UND 12,950.00 14.00 181,300.00
UNION SAN PVC 4 UND 3,695.00 8.00 29,560.00
VALVULA C.METALICO .1/2" UND 11,889.00 7.00 83,223.00
VAR.REDONDA 1/2" 12MMX6M VAR 6,364.00 130.95 833,365.80
VARETA 1"x1"x3M OTOBO UND 1,400.00 0.95 1,323.50
VARETA 2"x2"x3M OTOBO UND 1,800.00 119.86 215,743.41
VARILLA CU-CU 9/16 X 2.40 CODECO UND 99,113.88 1.00 99,113.88
VIDRIO 4MM .10M*1M TIRA UND 2,100.00 198.00 415,800.00
VIDRIO TRANSP. 4 MM M2 24,000.00 130.95 3,142,800.00
VIDRIO TRANSP. 6 MM. M2 33,750.00 0.81 27,337.50
VINILO ACRILTEX TIPO 2 PINTUCO LTS 12,229.00 6.97 85,236.13
VINILO TIPO 1 BASE DE AGUA GLN 42,890.00 28.69 1,230,624.97
WAIPE KLS 4,000.00 24.73 98,912.00
YEE SAN PVC 2x3x2 D-R UND 13,345.00 14.00 186,830.00
YEE SAN PVC 4 DOB UND 25,243.00 6.00 151,458.00
CERAMICA 30.6x30.6 TRAF.4 MANCESA M2 17,950.00 0.98 17,641.26
MANGUERA FLEXIBLE GRIFLEX GRIVAL REF.38014 UND 2,475.00 11.00 27,225.00
SEPAROL DESFORMALETEANTE TARRO 15 KLS KLS 12,296.00 29.20 359,043.20
SIKAMENT NS SUPERPLASTIFIC TARRO DE 25 KLS KLS 6,728.00 2.92 19,645.76
TUERCA GALV. 1/2" ARANDELA + TUERCA UND 300.00 108.00 32,400.00
CAJA HERMETICA INTERPERIE UND 34,800.00 1.00 34,800.00
PERFIL HR C220mmx 80mm-1.9 CAL.14 L= 6MTS. A UND 123,007.56 94.70 11,649,184.95
SANITARIO INFANTIL CORONA UND 274,900.00 3.00 824,700.00
GRIF.DUCHA SENCILLA PISCIS GRIVAL UND 23,900.00 3.00 71,700.00
CODO SAN PVC 2 x90ø CXC UND 1,589.00 32.00 50,848.00
GRAVA TRITURADA 3/8" M3 34,000.00 5.76 195,670.00
PUNTILLA 1.1/2 AC LISA LBS 3,600.00 17.43 62,730.00
TABLON RUSTICO 33x33 M2 18,900.00 488.38 9,230,419.80
CANAL 40 GUIA L.GALV 3.05M PERFILERIA ROLADA UND 5,200.00 124.95 649,764.31
TORN PANEL YESO 6 X 1" BOLSA DE 100 UNIDADE UND 13.50 4,182.00 56,457.00
LAM.GALVANIZADA C.20 DE 100X200CM UND 41,500.00 8.96 371,840.00
CAL HIDRATADA NARE SACO 10 KILOS KLS 550.00 587.95 323,374.73
PERFIL HR C160X 60MM-2.0MM CAL.14 ACESCO UND 84,599.96 5.31 449,394.99
MALLA FIBRA TEJIDA H=2.10M VERDE 65GR/M2 M2 3,150.00 50.00 157,500.00
BUJE PRS PVC 1 x.1/2 S UND 1,344.44 3.00 4,033.32
MALLA GALLINERO 1" ROLLO DE 1.80 X 36MTS L ROL 65,600.00 4.06 266,069.66
DIV.ORINAL ACERO INOX C.20 .95-1.00X45-50CM UND 200,013.00 2.00 400,026.00
LAVAMANOS SOBREPONER L.ECO LINEA ECONOM UND 83,900.00 6.00 503,400.00
PARAL LATERAL A.INOX C.20 DE 25-30CMX1.80MT UND 343,070.00 8.00 2,744,560.00
PTA.DIV.ACERO INOX C.20 DE 55-60CMX1.50-1.60 UND 375,603.36 8.00 3,004,826.88
ANGULO 29X29X2440MM C.26 PERFILERIA ROLAD UND 3,000.00 193.59 580,775.25
HIERRO ESCALERILLA 1/4" GRAFILADO L=6MTS UND 3,500.00 228.84 800,940.00
LISTON 2 x2x3M. OTOBO UND 3,500.00 98.54 344,899.10
PERFIL OMEGA 60 2.44M C26 L=2.44M A=60MM LA UND 5,500.00 243.95 1,341,725.00
REDUCCION PVC 3/4" X 1/2" UND 820.00 4.00 3,280.00
REDUCCION PVC 1" X 3/4" UND 1,560.00 1.00 1,560.00

MANO DE OBRA 79,561,732.62


DESCRIPCION UND VR. UNIT. CANT. VR.TOTAL
M.O. ALB. ACABADOS 1 AYUDANTE-1 OFI HC 14,951.00 60.12 898,898.97
M.O. ALBANILERIA 1 AYUDANTE HC 4,992.00 2,017.89 10,073,305.24
M.O. ALBANILERIA 1 AYUDANTE-1 OFI HC 13,291.00 1,204.41 16,007,768.39
M.O. ALBANILERIA 2 AYUDANTE HC 9,983.00 289.20 2,887,085.04
M.O. ALBANILERIA 2 AYUDANTE-1 OFI HC 18,282.00 557.21 10,186,916.15
M.O. ALBANILERIA 3 AYUDANTE-1 OFI HC 23,273.00 513.66 11,954,409.18
M.O. CARP.MADERA 1 AYUDANTE-1 OFI HC 14,951.00 15.74 235,286.28
M.O. CARP.TALLER 1 AYUDANTE-1 OFI HC 14,121.00 477.83 6,747,376.71
M.O. ELECTRICAS 1 AYUDANTE-1 OFI HC 18,607.00 144.30 2,684,990.10
M.O. ELECTRICAS 2 AYUDANTE-1 OFI HC 25,342.00 2.50 63,355.00
M.O. HIDROSANIT. 2 AYUDANTE - 1 OFIC. HC 19,527.00 35.40 691,255.80
M.O. HIDROSANIT. 1 AYUDANTE-1 OFI HC 14,121.00 40.33 569,453.33
M.O. ELECTRICAS 3 AYUD-1 OFI-1 PROF HC 69,124.00 2.54 175,574.96
M.O. METALISTERIA 1 AYUDANTE-1 OFI HC 15,949.00 652.32 10,403,899.53
M.O. PINTURA 1 AYUDANTE-1 OFI HC 14,121.00 185.04 2,613,003.50
M.O. TOPOGRAFIA 1 CADENERO-1 TOP HC 12,500.00 35.07 438,430.00
SUBCONTRATO CARPINTERIA ALUMINIO GLB 10,000.00 293.07 2,930,724.45
EQUIPO 19,190,359.44
DESCRIPCION UND VR. UNIT. CANT. VR.TOTAL
ANDAMIO METALICO TUBULAR U/D 672.00 850.82 571,748.35
COMPRESOR DE DOS MARTILLOS HRS 87,000.00 37.75 3,283,954.20
CRUCETA ANDAMIO DIA 100.00 285.90 28,590.00
HERRAMIENTA MENOR GLB 1,100.00 4,483.22 4,931,537.14
MOTONIVELADORA HRS 89,900.00 1.44 129,815.60
OXICORTE (OXIGENO-ACETILENO) DIA 27,000.00 0.29 7,908.84
PLUMA GRUA 500 KILOS DIA 37,000.00 5.86 216,760.80
PULIDORA CON PIEDRA O DISCO DIA 26,000.00 27.45 713,700.00
SOLDADOR ELECTRICO DIA 27,000.00 41.65 1,124,463.06
TABLONES 3 MTS DIA 520.00 140.23 72,920.64
TACO METALICO EXTENSION DE 2.OM A 3.30MT DIA 170.00 434.40 73,848.00
VIBRADOR ELECTRICO DIA 33,640.00 13.43 451,750.21
VIBROCOMPACTADOR CA-15 HRS 72,000.00 2.86 205,581.60
VOLQUETA 5 M3 VJE 40,600.00 137.51 5,583,071.07
FORMALETA PARA ENTREPISO M2 3,765.00 63.48 238,993.16
VOLQUETA(ACARREO) M3K 812.00 338.00 274,456.00
VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS M3 6,000.00 175.52 1,053,094.32
MEZCLADORA DE 9 PIES CUBICOS DIA 34,200.00 6.67 228,166.44

VALOR TOTAL INSUMOS 286,198,278.93

También podría gustarte