Presupuesto final de Estructuras S/. 2,003,130.74 S/. 192,335.17 S/. 2,195,465.91 S/. 395,183.86 S/. 2,590,649.77 S/. 845.77 $258.64
(todo el casco)
RESUMEN DE AREA
TECHADA
Descripcion Area
2do Sotano 290.33
1er Sotano 386.2
Semisotano 377.81
1° Piso 266.24
2° Piso 265.51
3° Piso 265.51
4° Piso 265.51
5° Piso 265.51
6° Piso 265.51
7° Piso 265.51
Azotea 149.44
Azotea 92.98
05.05.05 ACERO FY= 4200 kg/cm2 GRADO 60 EN PLACAS kg 45,090.02 2.50 112,725.05
(SUBCONTRATO)
05.06 COLUMNAS 38,182.86
05.06.01 CONCRETO PREMEZCLADO COLUMNAS f'c=245 kg/cm2 m3 50.00 290.00 14,500.00
05.06.05 ACERO FY= 4200 kg/cm2 GRADO 60 EN COLUMNAS kg 9,473.14 2.50 23,682.86
(SUBCONTRATO)
05.07 LOSAS ALIGERADAS e = 0.20 m. 145,497.97
05.07.01 CONCRETO PREMEZCLADO LOSAS ALIGERADAS f'c=210 kg/cm2 m3 150.00 274.00 41,098.90
05.07.03 ACERO FY= 4200 kg/cm2 GRADO 60 EN LOSA ALIGERADA kg 4,078.28 2.50 10,195.71
(SUBCONTRATO)
05.07.04 COLOCACION DE VIGUETAS PREFABRICADAS m2 2,186.20 3.19 6,973.98
05.07.05 COLOCACION DE BOVEDILLA DE ARCILLA 15x25x39 CM und 19,675.80 0.15 2,951.37
05.07.06 SISTEMA DE VIGUETAS PREFABRICADAS Y BOBEDILLAS m2 2,186.20 38.55 84,278.01
15x25x39 CM
05.08 LOSAS MACIZAS 29,385.89
05.08.01 CONCRETO PREMEZCLADO LOSAS MACIZAS f'c=210 kg/cm2 m3 70.00 274.00 19,180.00
05.08.03 ACERO FY= 4200 kg/cm2 GRADO 60 EN LOSA MACIZA kg 4,082.36 2.50 10,205.89
(SUBCONTRATO)
05.09 VIGAS 137,398.85
05.09.01 CONCRETO PREMEZCLADO VIGAS f'c=210 kg/cm2 m3 250.00 274.00 68,499.45
05.09.03 ACERO FY= 4200 kg/cm2 GRADO 60 EN VIGAS (SUBCONTRATO) kg 27,559.76 2.50 68,899.39
05.10 ESCALERAS 8,886.79
SUBTOTAL 1,193,037.32
IMPUESTO(IGV 18%) 214,746.72
===============
TOTAL PRESUPUESTO
S/. 1,407,784.04
SON: UN MILLON TRESCIENTOS SESENTA MIL, TREINTA Y SEIS MIL Y 79/100 NUEVOS SOLES
Presupuestos por Recursos - Estructuras Casco
Obra 0103019 EDIFICIO RESIDENCIAL TRIANA (Nivel +1.50) - OPTIMIZADO 23/08/17
Subpresupuesto 001 ESTRUCTURAS
Fecha
Lugar
Código Recurso Unidad Cantidad Precio S/. Parcial S/.
MANO DE OBRA
Subpresupues 001
to
Cliente TALE CONSTRUCTORA SAC
Lugar LIMA - LIMA - PUEBLO LIBRE
03.06 RELLENO CON MATERIAL GRANULAR PARA ENCOFRADO MUROS hm 306.00 186.44 57,050.64
ANCLADOS
03.11 PICADO PARA ANCLADO DE VIGUETAS, VIGAS DE LA LOSA DE L ml 264.00 13.65 3,603.60
03.12 ELIMINACION MATERIAL EXCEDENTE CARGIO m3 229.07 29.66 6,794.22
MANUAL(SUBCONTRATO)
04 CONCRETO SIMPLE 19,870.62
05
CONCRETO ARMADO 534,313.24
05.01.03 ACERO FY= 4200 kg/cm2 GRADO 60 EN ZAPATAS kg 3,225.40 1.98 6,386.29
(SUBCONTRATO)
05.02 VIGA DE CIMENTACION 945.24
05.02.01 CONCRETO PREMEZCLADO VIGA DE CIMENTACION f'c=210 m3 1.87 269.00 503.03
kg/cm2
05.02.03 ACERO FY= 4200 kg/cm2 GRADO 60 EN VIGA DE CIMENTACION kg 216.77 2.04 442.21
(SUBCONTRATO)
05.03.03 ACERO FY= 4200 kg/cm2 GRADO 60 EN CIMINETOS kg 1,287.20 2.01 2,587.27
(SUBCONTRATO)
05.04 MUROS DE CONTENCION 101,493.56
05.04.01 CONCRETO PREMEZCLADO MURO DE CONTENCION f'c=245 m3 143.88 285.00 41,005.80
kg/cm2
05.04.02 CONCRETO PREMEZCLADO MURO DE CONTENCION f'c=280 m3 80.75 298.00 24,063.50
kg/cm2
05.04.03 ACERO FY= 4200 kg/cm2 GRADO 60 EN MUROS DE CONTENCION kg 18,121.52 2.01 36,424.26
(SUBCONTRATO)
05.05 PLACAS 16,782.61
05.05.01 CONCRETO PREMEZCLADO PLACAS f'c=245 kg/cm2 m3 15.37 285.00 4,380.45
05.05.03 CONCRETO PREMEZCLADO PLACAS f'c=280 kg/cm2 (Aditivo m3 0.00 440.66 0.00
Impermeable)
05.05.05 ACERO FY= 4200 kg/cm2 GRADO 60 EN PLACAS kg 6,170.23 2.01 12,402.16
(SUBCONTRATO)
05.06.05 ACERO FY= 4200 kg/cm2 GRADO 60 EN COLUMNAS kg 4,233.17 2.01 8,508.67
(SUBCONTRATO)
05.07 LOSAS ALIGERADAS e = 0.20 m. 52,655.85
05.07.01 CONCRETO PREMEZCLADO LOSAS ALIGERADAS f'c=210 kg/cm2 m3 76.13 269.00 20,478.97
05.07.03 ACERO FY= 4200 kg/cm2 GRADO 60 EN LOSA ALIGERADA kg 1,806.37 2.01 3,630.80
(SUBCONTRATO)
05.08.03 ACERO FY= 4200 kg/cm2 GRADO 60 EN LOSA MACIZA kg 1,672.27 2.01 3,361.26
(SUBCONTRATO)
05.09 VIGAS 29,643.37
05.09.01 CONCRETO PREMEZCLADO VIGAS f'c=210 kg/cm2 m3 60.52 269.00 16,279.88
05.09.03 ACERO FY= 4200 kg/cm2 GRADO 60 EN VIGAS (SUBCONTRATO) kg 6,648.50 2.01 13,363.49
05.10.03 ACERO FY= 4200 kg/cm2 GRADO 60 EN ESCALERA kg 412.94 2.01 830.01
(SUBCONTRATO)
05.11 CISTERNA 29,192.59
05.11.01 CONCRETO PREMEZCLADO CISTERNA f'c=245 kg/cm2 m3 72.00 285.00 20,520.00
05.11.03 ACERO FY= 4200 kg/cm2 GRADO 60 EN CISTERNA kg 4,314.72 2.01 8,672.59
(SUBCONTRATO)
UTILIDAD 0 %
----------------------------------
SUBTOTAL 1,002,428.59
=======================
TOTAL PRESUPUESTO
S/. 1,182,865.73
SON: UN MILLON CIENTO OCHENTA Y DOS MIL, OCHOCIENTOS SESENTA Y CINCO Y 73/100 NUEVOS SOLES
Presupuestos por Recursos - Estrcturas Cota + 1.50m
MANO DE OBRA
145,185.12
MATERIALES
403,649.92
EQUIPOS
03010600020008 REGLA DE MADERA PINO 2" X 4" X 10' und 16.5120 19.78 326.61
0301100003 COMPACTADORA DE PLANCHA día 2.1350 155.60 332.21
0301140009 MARTILLO ELECTRICO día 135.0000 58.50 7,897.50
03012900010002 VIBRADOR DE CONCRETO 4 HP 1.25" hm 86.6720 7.40 641.37
03012900030001 MEZCLADORA DE CONCRETO 11 P3 (23 HP) hm 115.7419 27.14 3,141.24
0301340001 ANDAMIO METALICO día 60.0000 8.65 519.00
03013800010006 PUNTAS PARA MARTILLO HILTI und 16.0000 80.00 1,280.00
WINCHE DE 5.5 HP CIMAX und 1.0000 2,669.49 2,669.49
LAPTOP LEVONO CORE I5 8 GB 1 TB 15'6 " und 2.0000 3,203.40 6,406.80
LAPTOP HP CORE I3 4 GB 1 TB 15'6 " und 2.0000 1,118.64 2,237.28
IMPRESORA MULTIFUNCIONAL HP CON und 1.0000 576.27 576.27
WIFI
TALADRO PERCU GSB 16 und 1.0000 228.73 0.00
AMOLADORA 4" und 1.0000 203.39 203.39
AMOLADORA 4" und 1.0000 457.63 457.63
33,964.02
SUBCONTRATOS
331,811.14
137323.613
47436.11
89887.503
RESUMEN
SS PISO 1 PISO 2 PISO 3 PISO 4 PISO 5 PISO 6 PISO 7
49,860.64