Cubierta 0.2
Placa entrepiso 0.751
Cimentación 0.1
Combo 1.2
CV t/m2 N° Área Af m2 CARGA TOTAL Af ton
C1 6.55 9.36126
0.18 C2 15.43 22.052556
C3 15.99 22.852908
1.6 C4 4.6148 6.59547216
B5 10.5 15.0066
B6 22.64 32.357088
B7 19.7787 28.26771804
B8 18.3 26.15436
A9 5.6 8.00352
A10 13.94 19.923048
A11 13.6 19.43712
A12 10.51 15.020892
qa del suelo ton/m2 Área de la zapata m2 Lado de la zapata m
4.7 1.99175744680851 1.41129637100381
4.7 4.69203319148936 2.16611015220588
4.7 4.86232085106383 2.20506708538852
4.7 1.40329194893617 1.18460624214807
4.7 3.19289361702128 1.78686698358363
4.7 6.88448680851064 2.62383056017545
4.7 6.01440809361702 2.45242901907823
4.7 5.56475744680851 2.35897381223457
4.7 1.70287659574468 1.30494313889329
4.7 4.23894638297872 2.05887017147238
4.7 4.13555744680851 2.03360700402229
4.7 3.19593446808511 1.78771767012722
1. CONCRETO
Lado final m
1.5 F'c Mpa
2.2 COLUMNAS 24.5
2.3 VIGAS 21
1.2 ZAPATAS 21
1.8
2.7 2. MAMPOSTERIA
2.5
2.4 Mpa
1.4 MAMPOSTERÍA,F'cu 15
2.1 MORTERO RELLENO, F'cr 18-22,5
2.1 MORTERO DE PEGA, F'cp 12.5
1.8
3. ACEROS
Fy Mpa
Diámetro 1/4" 240
Diámetro 3/8" A 1" 420
MALLA ELECT. 500
ONCRETO GANCHOS SEGÚN NSR-10
MPOSTERIA
kg/cm2 P.S.I
150 2150
180-225 2600-3250
125 1800
ACEROS
Kg/cm2
2400
4200
5000