MODULO 01 OBRAS PRELIMINARES

1 INSTALACION DE FAENAS glb 1.00


1.0 1.00

2 LETRERO DE OBRA MURO LADRILLO (SEGÚN DISEÑO) pza 1.00

Letrero de obras 1.0 1.00

3 LETRERO DE OBRA DE MADERA (SEGÚN DISEÑO) pza 1.00

1.0 1.00

4 PLACA ENTREGA DE OBRA 50X70CM (SEGÚN DISEÑO) pza 1.00


1.0 1.00

5 MOVILIZACION Y DESMOVILIZACION glb 1.00


1.0 1.00
PLANILLA DE COMPUTOS METRICOS
PROYECTO : E. D. T. P. "CONST. SISTEMA DE RIEGO COMUNIDAD INCA CORRAL"
POSITIVO
No ITEM UNID. PZA PARC. TOTAL
L A AREA H VOL.

MODULO 02 OBRA DE TOMA

6 REPLANTEO Y TRAZADO m² 25.27


Area obra de toma AUTOCAD 1 25.27 25.27

7 EXCAVACION EN ROCA m³ 8.01


Zanja tuberia
1.0 10.00 0.30 3.00 0.30 0.90 0.90
Azud
Cuerpo 1.0 4.00 3.00 12.00 0.20 2.40 2.40
Anclaje 1.0 4.00 0.30 1.20 0.50 0.60 0.60
Dentellon 1.0 4.00 0.30 1.20 0.50 0.60 0.60
Muros
Muros deflector 1 1.0 6.10 1.00 6.10 0.30 1.83 1.83
Muros deflector 2 1.0 5.60 1.00 5.60 0.30 1.68 1.68

8 HºCº FUNDACIONES TIPO "B" 50% P.D. m³ 8.01


Zanja tuberia
1.0 10.00 0.30 3.00 0.30 0.90 0.90
Azud
Cuerpo 1.0 4.00 3.00 12.00 0.20 2.40 2.40
Anclaje 1.0 4.00 0.30 1.20 0.50 0.60 0.60
Dentellon 1.0 4.00 0.30 1.20 0.50 0.60 0.60
Muros
Muros deflector 1 1.0 6.10 1.00 6.10 0.30 1.83 1.83
Muros deflector 2 1.0 5.60 1.00 5.60 0.30 1.68 1.68

9 HºCº ELEVACIONES TIPO "B" 50% P.D. m³ 18.07


Azud
Cuerpo 1.0 1.08 4.00 4.32 4.32
Muros
Muros deflector 1 1.0 6.10 0.50 3.05 2.35 7.17 7.17
Muros deflector 2 1.0 5.60 0.50 2.80 2.35 6.58 6.58

10 REVOQUE DE CEMENTO S/MURO DE Hº m² 41.34


Muros
Muro deflector 1 1.0 6.10 2.35 14.34 14.34
Muro deflector 1 1.0 5.60 2.35 13.16 13.16
Area Azud -2.0 1.08 -2.16
Azud
Cuerpo 1.0 4.00 2.00 8.00 8.00
Colchon 1.0 4.00 2.00 8.00 8.00

11 REJA METALICA FG D=1" C/2.54 CM m² 0.06


1.0 0.30 0.20 0.06 0.06

12 ACCESORIOS TOMA ZUD D=4" FG/HDPE Pza 1.00


1.0 1.00
PLANILLA DE COMPUTOS METRICOS
PROYECTO : E. D. T. P. "CONST. SISTEMA DE RIEGO COMUNIDAD INCA CORRAL"
POSITIVO
No ITEM UNID. PZA PARC. TOTAL
L A AREA H VOL.

MODULO 03 CAMARA DE CAPTACION Y LLAVES

13 REPLANTEO Y TRAZADO m² 3.38


Area Camara de Captacion y Llaves AUTOCAD 1.0 3.38 3.38

14 EXCAVACION EN ROCA m³ 4.06


Camara de Captacion 1.0 1.30 1.30 1.69 1.20 2.03 2.03
Camara de Llaves 1.0 1.30 1.30 1.69 1.20 2.03 2.03

15 ZAMPEADO DE PIEDRA m² 3.38


Camara de Captacion 1.0 1.30 1.30 1.69 1.69
Camara de Llaves 1.0 1.30 1.30 1.69 1.69

16 HºCº FUNDACIONES TIPO "B" 50% P.D. m³ 0.51


Camara de Captacion 1.0 1.30 1.30 1.69 0.15 0.25 0.25
Camara de Llaves 1.0 1.30 1.30 1.69 0.15 0.25 0.25

17 HºCº ELEVACIONES TIPO "B" 50% P.D. m³ 1.38


Camara de captacion
Muro mayor 2.0 1.30 0.15 0.20 1.00 0.20 0.39
Muro menor 2.0 1.00 0.15 0.15 1.00 0.15 0.30
Camara de llaves
Muro mayor 2.0 1.30 0.15 0.20 1.00 0.20 0.39
Muro menor 2.0 1.00 0.15 0.15 1.00 0.15 0.30

18 REVOQUE Y ENLUCIDO C/SIKA (E=2.5CM. ) m² 5.00


Camara de captacion
Base 1.0 1.00 1.00 1.00 1.00
Muros 4.0 1.00 1.00 1.00 4.00

19 REVOQUE DE CEMENTO S/MURO DE Hº m² 14.83


Camara de captacion
Muro exterior 3.0 1.30 1.15 1.50 4.49
1.0 1.30 0.20 0.26 0.26
Camara de llaves 0.00
Base 1.0 1.00 1.00 1.00 1.00
Muros interiores 4.0 1.00 1.15 1.15 4.60
Muros exteriores 3.0 1.30 1.15 1.50 4.49

20 ACC. CAMARAS TOMA D=4" FG/HDPE + TAP/MET glb 1.00


Camara de Captacion y Llaves Inca Corral 1.0 1.00

MODULO 04 LINEA DE ADUCCIÓN


PLANILLA DE COMPUTOS METRICOS
PROYECTO : E. D. T. P. "CONST. SISTEMA DE RIEGO COMUNIDAD INCA CORRAL"
POSITIVO
No ITEM UNID. PZA PARC. TOTAL
L A AREA H VOL.
21 REPLANTEO Y CONTROL LINEAS DE TUBERÍA m 6933.13
Aduccion O.T. -Tanque 1 (0+000-0+041) S. Rocoso THDPE D=110mm PN-8 1.0 41.09 41.09
Aduccion O.T. -Tanque 1 (0+041-0+920) S. Duro THDPE D=110mm PN-8 1.0 885.17 885.17
Aduccion O.T. -Tanque 1 (0+920-1+020) S. Rocoso THDPE D=110mm PN-8 1.0 103.61 103.61
Aduccion O.T. -Tanque 1 (1+020-1+296) S. Duro THDPE D=110mm PN-8 1.0 279.18 279.18
Aduccion O.T. -Tanque 1 (1+296-2+080) S. Rocoso THDPE D=110mm PN-8 1.0 797.78 797.78
Aduccion O.T. -Tanque 1 (2+080-3+580) S. Duro THDPE D=110mm PN-8 1.0 1507.35 1507.35
Aduccion O.T. -Tanque 1 (3+580-3+920) S. Rocoso THDPE D=110mm PN-8 1.0 343.69 343.69
Aduccion O.T. -Tanque 1 (3+920-4+034) S. Rocoso THDPE D=110mm PN-10 1.0 116.18 116.18
Aduccion Tanque 1 - Tanque 2 (0+000-0+360) S. Duro THDPE D=110mm PN-8 1.0 365.39 365.39
Aduccion Tanque 1 - Tanque 2 (0+360-0+460) S. Duro THDPE D=110mm PN-10 1.0 101.46 101.46
Aduccion Tanque 1 - Tanque 2 (0+460-0+580) S. Duro THDPE D=110mm PN-12.5 1.0 121.75 121.75
Aduccion Tanque 1 - Tanque 2 (0+580-0+780) S. Duro THDPE D=110mm PN-16 1.0 201.99 201.99
Aduccion Tanque 1 - Tanque 2 (0+780-1+380) S. Duro THDPE D=110mm PN-8 1.0 602.24 602.24
Aduccion Tanque 1 - Tanque 2 (1+380-1+480) S. Semiduro THDPE D=110mm PN-8 1.0 100.11 100.11
Aduccion Tanque 1 - Tanque 2 (1+480-1+860) S. Semiduro THDPE D=110mm PN-10 1.0 380.14 380.14
Aduccion Tanque 1 - Tanque 2 (1+860-2+845) S. Semiduro THDPE D=110mm PN-8 1.0 985.99 985.99

22 EXCAVACION DE ZANJA (0-1.5 M) SUELO ROCOSO m³ 325.53


Aduccion O.T. -Tanque 1 (0+000-0+041) S. Rocoso THDPE D=110mm PN-8 1.0 41.09 0.40 16.44 0.60 9.86 9.86
Aduccion O.T. -Tanque 1 (0+920-1+020) S. Rocoso THDPE D=110mm PN-8 1.0 103.61 0.40 41.44 0.60 24.87 24.87
Aduccion O.T. -Tanque 1 (1+296-2+080) S. Rocoso THDPE D=110mm PN-8 1.0 797.78 0.40 319.11 0.60 191.47 191.47
Aduccion O.T. -Tanque 1 (3+580-3+920) S. Rocoso THDPE D=110mm PN-8 1.0 343.69 0.40 137.48 0.60 82.49 82.49
Aduccion O.T. -Tanque 1 (3+920-4+034) S. Rocoso THDPE D=110mm PN-10 1.0 116.18 0.40 46.47 0.60 27.88 27.88
PASARELAS -1.0 34.00 0.40 13.60 0.60 8.16 -8.16
PASOS DE QUEBRADA -2.0 6.00 0.40 2.40 0.60 1.44 -2.88

23 EXCAVACION DE ZANJA (0-1.5 M) SUELO DURO m³ 940.56


Aduccion O.T. -Tanque 1 (0+041-0+920) S. Duro THDPE D=110mm PN-8 1.0 885.17 0.40 354.07 0.60 212.44 212.44
Aduccion O.T. -Tanque 1 (1+020-1+296) S. Duro THDPE D=110mm PN-8 1.0 279.18 0.40 111.67 0.60 67.00 67.00
Aduccion O.T. -Tanque 1 (2+080-3+580) S. Duro THDPE D=110mm PN-8 1.0 1507.35 0.40 602.94 0.60 361.76 361.76
Aduccion Tanque 1 - Tanque 2 (0+000-0+360) S. Duro THDPE D=110mm PN-8 1.0 365.39 0.40 146.16 0.60 87.69 87.69
Aduccion Tanque 1 - Tanque 2 (0+360-0+460) S. Duro THDPE D=110mm PN-10 1.0 101.46 0.40 40.58 0.60 24.35 24.35
Aduccion Tanque 1 - Tanque 2 (0+460-0+580) S. Duro THDPE D=110mm PN-12.5 1.0 121.75 0.40 48.70 0.60 29.22 29.22
Aduccion Tanque 1 - Tanque 2 (0+580-0+780) S. Duro THDPE D=110mm PN-16 1.0 201.99 0.40 80.80 0.60 48.48 48.48
Aduccion Tanque 1 - Tanque 2 (0+780-1+380) S. Duro THDPE D=110mm PN-8 1.0 602.24 0.40 240.90 0.60 144.54 144.54
PASARELAS -1.0 139.54 0.40 55.82 0.60 33.49 -33.49
PASO DE QUEBRADA -1.0 6.00 0.40 2.40 0.60 1.44 -1.44

24 EXCAVACION DE ZANJA (0-1.5 M) SUELO SEMI DURO m³ 351.90


Aduccion Tanque 1 - Tanque 2 (1+380-1+480) S. Semiduro THDPE D=110mm PN-8 1.0 100.11 0.40 40.04 0.60 24.03 24.03
Aduccion Tanque 1 - Tanque 2 (1+480-1+860) S. Semiduro THDPE D=110mm PN-10 1.0 380.14 0.40 152.06 0.60 91.23 91.23
Aduccion Tanque 1 - Tanque 2 (1+860-2+845) S. Semiduro THDPE D=110mm PN-8 1.0 985.99 0.40 394.40 0.60 236.64 236.64

25 RELLENO Y COMP. C/MAQUINARIA C/TIERRA CERNIDA m³ 538.81


Aduccion O.T. -Tanque 1 (0+000-0+041) S. Rocoso THDPE D=110mm PN-8 1.0 41.09 0.40 16.44 0.20 3.29 3.29
Aduccion O.T. -Tanque 1 (0+041-0+920) S. Duro THDPE D=110mm PN-8 1.0 885.17 0.40 354.07 0.20 70.81 70.81
Aduccion O.T. -Tanque 1 (0+920-1+020) S. Rocoso THDPE D=110mm PN-8 1.0 103.61 0.40 41.44 0.20 8.29 8.29
Aduccion O.T. -Tanque 1 (1+020-1+296) S. Duro THDPE D=110mm PN-8 1.0 279.18 0.40 111.67 0.20 22.33 22.33
Aduccion O.T. -Tanque 1 (1+296-2+080) S. Rocoso THDPE D=110mm PN-8 1.0 797.78 0.40 319.11 0.20 63.82 63.82
Aduccion O.T. -Tanque 1 (2+080-3+580) S. Duro THDPE D=110mm PN-8 1.0 1507.35 0.40 602.94 0.20 120.59 120.59
Aduccion O.T. -Tanque 1 (3+580-3+920) S. Rocoso THDPE D=110mm PN-8 1.0 343.69 0.40 137.48 0.20 27.50 27.50
Aduccion O.T. -Tanque 1 (3+920-4+034) S. Rocoso THDPE D=110mm PN-10 1.0 116.18 0.40 46.47 0.20 9.29 9.29
Aduccion Tanque 1 - Tanque 2 (0+000-0+360) S. Duro THDPE D=110mm PN-8 1.0 365.39 0.40 146.16 0.20 29.23 29.23
Aduccion Tanque 1 - Tanque 2 (0+360-0+460) S. Duro THDPE D=110mm PN-10 1.0 101.46 0.40 40.58 0.20 8.12 8.12
Aduccion Tanque 1 - Tanque 2 (0+460-0+580) S. Duro THDPE D=110mm PN-12.5 1.0 121.75 0.40 48.70 0.20 9.74 9.74
Aduccion Tanque 1 - Tanque 2 (0+580-0+780) S. Duro THDPE D=110mm PN-16 1.0 201.99 0.40 80.80 0.20 16.16 16.16
Aduccion Tanque 1 - Tanque 2 (0+780-1+380) S. Duro THDPE D=110mm PN-8 1.0 602.24 0.40 240.90 0.20 48.18 48.18
Aduccion Tanque 1 - Tanque 2 (1+380-1+480) S. Semiduro THDPE D=110mm PN-8 1.0 100.11 0.40 40.04 0.20 8.01 8.01
Aduccion Tanque 1 - Tanque 2 (1+480-1+860) S. Semiduro THDPE D=110mm PN-10 1.0 380.14 0.40 152.06 0.20 30.41 30.41
Aduccion Tanque 1 - Tanque 2 (1+860-2+845) S. Semiduro THDPE D=110mm PN-8 1.0 985.99 0.40 394.40 0.20 78.88 78.88
PASARELAS -1.0 180.01 0.40 72.00 0.20 14.40 -14.40
PASOS DE QUEBRADA -3.0 6.00 0.40 2.40 0.20 0.48 -1.44

26 PROV. Y TEND. TUB. SUPERTUBO HDPE D=110mm PN-8 m 6011.61


Aduccion O.T. -Tanque 1 (0+000-0+041) S. Rocoso THDPE D=110mm PN-8 1.0 41.09 41.09
Aduccion O.T. -Tanque 1 (0+041-0+920) S. Duro THDPE D=110mm PN-8 1.0 885.17 885.17
Aduccion O.T. -Tanque 1 (0+920-1+020) S. Rocoso THDPE D=110mm PN-8 1.0 103.61 103.61
Aduccion O.T. -Tanque 1 (1+020-1+296) S. Duro THDPE D=110mm PN-8 1.0 279.18 279.18
Aduccion O.T. -Tanque 1 (1+296-2+080) S. Rocoso THDPE D=110mm PN-8 1.0 797.78 797.78
Aduccion O.T. -Tanque 1 (2+080-3+580) S. Duro THDPE D=110mm PN-8 1.0 1507.35 1507.35
Aduccion O.T. -Tanque 1 (3+580-3+920) S. Rocoso THDPE D=110mm PN-8 1.0 343.69 343.69
Aduccion Tanque 1 - Tanque 2 (0+000-0+360) S. Duro THDPE D=110mm PN-8 1.0 365.39 365.39
Aduccion Tanque 1 - Tanque 2 (0+780-1+380) S. Duro THDPE D=110mm PN-8 1.0 602.24 602.24
Aduccion Tanque 1 - Tanque 2 (1+380-1+480) S. Semiduro THDPE D=110mm PN-8 1.0 100.11 100.11
Aduccion Tanque 1 - Tanque 2 (1+860-2+845) S. Semiduro THDPE D=110mm PN-8 1.0 985.99 985.99

27 PROV. Y TEND. TUB. SUPERTUBO HDPE D=110mm PN-10 m 597.78


Aduccion O.T. -Tanque 1 (3+920-4+034) S. Rocoso THDPE D=110mm PN-10 1.0 116.18 116.18
Aduccion Tanque 1 - Tanque 2 (0+360-0+460) S. Duro THDPE D=110mm PN-10 1.0 101.46 101.46
Aduccion Tanque 1 - Tanque 2 (1+480-1+860) S. Semiduro THDPE D=110mm PN-10 1.0 380.14 380.14
PLANILLA DE COMPUTOS METRICOS
PROYECTO : E. D. T. P. "CONST. SISTEMA DE RIEGO COMUNIDAD INCA CORRAL"
POSITIVO
No ITEM UNID. PZA PARC. TOTAL
L A AREA H VOL.
28 PROV. Y TEND. TUB. SUPERTUBO HDPE D=110mm PN-12.5 m 121.75
Aduccion Tanque 1 - Tanque 2 (0+460-0+580) S. Duro THDPE D=110mm PN-12.5 1.0 121.75 121.75

29 PROV. Y TEND. TUB. SUPERTUBO HDPE D=110mm PN-16 m 201.99


Aduccion Tanque 1 - Tanque 2 (0+580-0+780) S. Duro THDPE D=110mm PN-16 1.0 201.99 201.99

30 RELLENO Y COMP. C/MAQUINARIA C/TIERRA COMUN m³ 1079.17


Aduccion O.T. -Tanque 1 (0+000-0+041) S. Rocoso THDPE D=110mm PN-8 1.0 41.09 0.40 16.44 0.40 6.57 6.57
Aduccion O.T. -Tanque 1 (0+041-0+920) S. Duro THDPE D=110mm PN-8 1.0 885.17 0.40 354.07 0.40 141.63 141.63
Aduccion O.T. -Tanque 1 (0+920-1+020) S. Rocoso THDPE D=110mm PN-8 1.0 103.61 0.40 41.44 0.40 16.58 16.58
Aduccion O.T. -Tanque 1 (1+020-1+296) S. Duro THDPE D=110mm PN-8 1.0 279.18 0.40 111.67 0.40 44.67 44.67
Aduccion O.T. -Tanque 1 (1+296-2+080) S. Rocoso THDPE D=110mm PN-8 1.0 797.78 0.40 319.11 0.40 127.65 127.65
Aduccion O.T. -Tanque 1 (2+080-3+580) S. Duro THDPE D=110mm PN-8 1.0 1507.35 0.40 602.94 0.40 241.18 241.18
Aduccion O.T. -Tanque 1 (3+580-3+920) S. Rocoso THDPE D=110mm PN-8 1.0 343.69 0.40 137.48 0.40 54.99 54.99
Aduccion O.T. -Tanque 1 (3+920-4+034) S. Rocoso THDPE D=110mm PN-10 1.0 116.18 0.40 46.47 0.40 18.59 18.59
Aduccion Tanque 1 - Tanque 2 (0+000-0+360) S. Duro THDPE D=110mm PN-8 1.0 365.39 0.40 146.16 0.40 58.46 58.46
Aduccion Tanque 1 - Tanque 2 (0+360-0+460) S. Duro THDPE D=110mm PN-10 1.0 101.46 0.40 40.58 0.40 16.23 16.23
Aduccion Tanque 1 - Tanque 2 (0+460-0+580) S. Duro THDPE D=110mm PN-12.5 1.0 121.75 0.40 48.70 0.40 19.48 19.48
Aduccion Tanque 1 - Tanque 2 (0+580-0+780) S. Duro THDPE D=110mm PN-16 1.0 201.99 0.40 80.80 0.40 32.32 32.32
Aduccion Tanque 1 - Tanque 2 (0+780-1+380) S. Duro THDPE D=110mm PN-8 1.0 602.24 0.40 240.90 0.40 96.36 96.36
Aduccion Tanque 1 - Tanque 2 (1+380-1+480) S. Semiduro THDPE D=110mm PN-8 1.0 100.11 0.40 40.04 0.40 16.02 16.02
Aduccion Tanque 1 - Tanque 2 (1+480-1+860) S. Semiduro THDPE D=110mm PN-10 1.0 380.14 0.40 152.06 0.40 60.82 60.82
Aduccion Tanque 1 - Tanque 2 (1+860-2+845) S. Semiduro THDPE D=110mm PN-8 1.0 985.99 0.40 394.40 0.40 157.76 157.76
PASARELAS -1.0 170.31 0.40 68.12 0.40 27.25 -27.25
PASOS DE QUEBRADA -3.0 6.00 0.40 2.40 0.40 0.96 -2.88

31 PRUEBA HIDRAULICA (HASTA D=4") m 6933.13


Aduccion O.T. -Tanque 1 (0+000-0+041) S. Rocoso THDPE D=110mm PN-8 1.0 41.09 41.09
Aduccion O.T. -Tanque 1 (0+041-0+920) S. Duro THDPE D=110mm PN-8 1.0 885.17 885.17
Aduccion O.T. -Tanque 1 (0+920-1+020) S. Rocoso THDPE D=110mm PN-8 1.0 103.61 103.61
Aduccion O.T. -Tanque 1 (1+020-1+296) S. Duro THDPE D=110mm PN-8 1.0 279.18 279.18
Aduccion O.T. -Tanque 1 (1+296-2+080) S. Rocoso THDPE D=110mm PN-8 1.0 797.78 797.78
Aduccion O.T. -Tanque 1 (2+080-3+580) S. Duro THDPE D=110mm PN-8 1.0 1507.35 1507.35
Aduccion O.T. -Tanque 1 (3+580-3+920) S. Rocoso THDPE D=110mm PN-8 1.0 343.69 343.69
Aduccion O.T. -Tanque 1 (3+920-4+034) S. Rocoso THDPE D=110mm PN-10 1.0 116.18 116.18
Aduccion Tanque 1 - Tanque 2 (0+000-0+360) S. Duro THDPE D=110mm PN-8 1.0 365.39 365.39
Aduccion Tanque 1 - Tanque 2 (0+360-0+460) S. Duro THDPE D=110mm PN-10 1.0 101.46 101.46
Aduccion Tanque 1 - Tanque 2 (0+460-0+580) S. Duro THDPE D=110mm PN-12.5 1.0 121.75 121.75
Aduccion Tanque 1 - Tanque 2 (0+580-0+780) S. Duro THDPE D=110mm PN-16 1.0 201.99 201.99
Aduccion Tanque 1 - Tanque 2 (0+780-1+380) S. Duro THDPE D=110mm PN-8 1.0 602.24 602.24
Aduccion Tanque 1 - Tanque 2 (1+380-1+480) S. Semiduro THDPE D=110mm PN-8 1.0 100.11 100.11
Aduccion Tanque 1 - Tanque 2 (1+480-1+860) S. Semiduro THDPE D=110mm PN-10 1.0 380.14 380.14
Aduccion Tanque 1 - Tanque 2 (1+860-2+845) S. Semiduro THDPE D=110mm PN-8 1.0 985.99 985.99
PLANILLA DE COMPUTOS METRICOS
PROYECTO : E. D. T. P. "CONST. SISTEMA DE RIEGO COMUNIDAD INCA CORRAL"
POSITIVO
No ITEM UNID. PZA PARC. TOTAL
L A AREA H VOL.

MODULO 05 TANQUE DE ALMACENAMIENTO DE HºA°

32 REPLANTEO Y TRAZADO m² 225.48


CHULLPA WAYCO
Tanque 2 10.60 10.40 110.24 220.48
Camara de Entrada 2 0.90 0.90 0.81 1.62
Camara de Salida 2 1.30 1.30 1.69 3.38

33 EXCAVACION (0-2 M) SUELO SEMIDURO m³ 224.48


Tanque 2 10.60 10.40 110.24 1.00 110.24 220.48
Camara de Entrada 2 0.90 0.90 0.81 0.80 0.65 1.30
Camara de Salida 2 1.30 1.30 1.69 0.80 1.35 2.70

34 ZAMPEADO DE PIEDRA m2 220.48


Tanque 2 10.60 10.40 110.24 220.48

35 LOSA BASE DE HºAº m³ 44.10


2 10.60 10.40 110.24 0.20 22.05 44.10

36 MURO DE HºAº m² 43.01


Tanque 6 10.00 0.20 2.00 2.10 4.20 25.20
4 10.60 0.20 2.12 2.10 4.45 17.81

37 HºCº CAMARAS DE ENTRADA Y SALIDA m³ 2.57


Camara de Entrada 2 0.90 0.90 0.81 0.15 0.12 0.24
4 0.90 0.80 0.72 0.15 0.11 0.43
4 0.60 0.80 0.48 0.15 0.07 0.29
Camara de Salida 2 1.30 1.30 1.69 0.15 0.25 0.51
4 1.30 0.80 1.04 0.15 0.16 0.62
4 1.00 0.80 0.80 0.15 0.12 0.48

38 REVOQUE Y ENLUCIDO C/SIKA (E=2.5CM. ) m² 352.00


Base Tanque 2 10.00 5.00 50.00 100.00
Muro Longitudinal 8 10.00 2.10 21.00 168.00
Muro Transversal 8 5.00 2.10 10.50 84.00
PLANILLA DE COMPUTOS METRICOS
PROYECTO : E. D. T. P. "CONST. SISTEMA DE RIEGO COMUNIDAD INCA CORRAL"
POSITIVO
No ITEM UNID. PZA PARC. TOTAL
L A AREA H VOL.
39 REVOQUE DE CEMENTO S/MURO DE Hº m² 203.44
Tanque 4 10.60 2.10 22.26 89.04
4 10.40 2.10 21.84 87.36
Camara de Entrada 2 0.60 0.60 0.36 0.72
4 0.60 0.80 0.48 1.92
4 0.60 0.80 0.48 1.92
4 0.90 0.80 0.72 2.88
4 0.90 0.80 0.72 2.88
Camara de Salida 2 1.00 1.00 1.00 2.00
4 1.00 0.80 0.80 3.20
4 1.00 0.80 0.80 3.20
4 1.30 0.80 1.04 4.16
4 1.30 0.80 1.04 4.16

40 PINTURA LATEX EXTERIOR m² 190.48


Tanque 4 10.60 2.10 22.26 89.04
4 10.40 2.10 21.84 87.36
Camara de Entrada 4 0.90 0.80 0.72 2.88
4 0.90 0.80 0.72 2.88
Camara de Salida 4 1.30 0.80 1.04 4.16
4 1.30 0.80 1.04 4.16

41 ACCESORIOS TANQUE I=4" ; S=4" FG/HDPE + TAP/MET glb 2.00


2.0 2.00

MODULO 06 RED DE DISTRIBUCION

42 REPLANTEO Y CONTROL LINEAS DE TUBERÍA m 13517.23


D. Principal T1 (0+000 - 0+360) S. Rocoso THDPE D=110mm PN-8 1.0 365.43 365.43
D. Principal T1 (0+360 - 0+460) S. Duro THDPE D=110mm PN-10 1.0 101.48 101.48
D. Principal T1 (0+460 - 0+560) S. Duro THDPE D=110mm PN-12.5 1.0 101.47 101.47
D. Principal T1 (0+560 - 0+780) S. Duro THDPE D=110mm PN-16 1.0 222.16 222.16
D. Principal T1 (0+780 - 1+080) S. Duro THDPE D=110mm PN-8 1.0 301.56 301.56
D. Principal T1 (1+080 - 1+480) S. Duro THDPE D=90mm PN-8 1.0 400.78 400.78
D. Principal T1 (1+480 - 1+680) S. Duro THDPE D=90mm PN-10 1.0 200.11 200.11
D. Principal T1 (1+680 - 1+900) S. Semiduro THDPE D=90mm PN-10 1.0 220.04 220.04
D. Principal T1 (1+900 - 2+080) S. Semiduro THDPE D=90mm PN-8 1.0 180.07 180.07
D. Principal T1 (2+080 - 2+200) S. Duro THDPE D=90mm PN-10 1.0 120.58 120.58
D. Principal T1 (2+200 - 2+248) S. Duro THDPE D=75mm PN-10 1.0 48.62 48.62
D. Principal T1 (2+248 - 2+420) S. Duro THDPE D=75mm PN-8 1.0 173.08 173.08
D. Principal T1 (2+420 - 2+580) S. Semiduro THDPE D=75mm PN-8 1.0 160.17 160.17
D. Principal T1 (2+580 - 3+158) S. Semiduro THDPE D=63mm PN-8 1.0 578.03 578.03
Ramal 1 (0+000 - 0+240) S. Duro THDPE D=90mm PN-12.5 1.0 240.41 240.41
Ramal 1 (0+240 - 0+300) S. Semiduro THDPE D=75mm PN-12.5 1.0 60.31 60.31
Ramal 1 (0+300 - 0+380) S. Semiduro THDPE D=75mm PN-16 1.0 80.80 80.80
Ramal 1 (0+380 - 0+500) S. Duro THDPE D=75mm PN-16 1.0 121.08 121.08
Ramal 1 (0+500 - 0+640) S. Semiduro THDPE D=75mm PN-8 1.0 141.17 141.17
Ramal 1 (0+640 - 0+840) S. Semiduro THDPE D=63mm PN-8 1.0 202.99 202.99
Ramal 1 (0+840 - 0+940) S. Semiduro THDPE D=63mm PN-10 1.0 101.12 101.12
Ramal 1 (0+840 - 1+240) S. Rocoso THDPE D=63mm PN-12.5 1.0 304.16 304.16
Ramal 1 (1+240 - 1+347) S. Semiduro THDPE D=63mm PN-16 1.0 107.95 107.95
Ramal 2 (0+000 - 0+300) S. Semiduro THDPE D=90mm PN-8 1.0 301.44 301.44
Ramal 2 (0+300 - 0+400) S. Semiduro THDPE D=75mm PN-8 1.0 100.45 100.45
Ramal 2 (0+400 - 0+560) S. Duro THDPE D=75mm PN-8 1.0 160.50 160.50
Ramal 2 (0+560 - 0+620) S. Duro THDPE D=75mm PN-10 1.0 61.21 61.21
Ramal 2 (0+620 - 0+660) S. Rocoso THDPE D=75mm PN-12.5 1.0 41.94 41.94
Ramal 2 (0+660 - 0+760) S. Rocoso THDPE D=75mm PN-10 1.0 104.00 104.00
Ramal 2 (0+760 - 0+840) S. Rocoso THDPE D=75mm PN-12.5 1.0 83.68 83.68
Ramal 2 (0+840 - 1+060) S. Semiduro THDPE D=75mm PN-8 1.0 220.88 220.88
Ramal 2 (1+060 - 1+140) S. Rocoso THDPE D=75mm PN-8 1.0 80.05 80.05
Ramal 2 (1+140 - 1+280) S. Rocoso THDPE D=63mm PN-10 1.0 146.37 146.37
Ramal 2 (1+280 - 1+720) S. Semiduro THDPE D=63mm PN-8 1.0 441.79 441.79
Ramal 2 (1+720 - 1+802) S. Semiduro THDPE D=63mm PN-10 1.0 82.12 82.12
Sub Ramal 1 (0+000 - 0+080) S. Semiduro THDPE D=63mm PN-8 1.0 80.71 80.71
Sub Ramal 1 (0+080 - 0+220) S. Semiduro THDPE D=63mm PN-10 1.0 140.94 140.94
Sub Ramal 1 (0+220 - 0+309) S. Semiduro THDPE D=63mm PN-12.5 1.0 89.30 89.30
Sub Ramal 2 (0+000 - 0+120) S. Semiduro THDPE D=63mm PN-8 1.0 120.68 120.68
Sub Ramal 2 (0+120 - 0+213) S. Semiduro THDPE D=63mm PN-10 1.0 93.91 93.91
Ramal 3 (0+000 - 0+220) S. Duro THDPE D=63mm PN-8 1.0 220.45 220.45
PLANILLA DE COMPUTOS METRICOS
PROYECTO : E. D. T. P. "CONST. SISTEMA DE RIEGO COMUNIDAD INCA CORRAL"
POSITIVO
No ITEM UNID. PZA PARC. TOTAL
L A AREA H VOL.
Ramal 3 (0+220 - 0+380) S. Semiduro THDPE D=63mm PN-8 1.0 160.46 160.46
Ramal 3 (0+380 - 0+540) S. Semiduro THDPE D=63mm PN-10 1.0 160.74 160.74
Ramal 3 (0+540 - 0+698) S. Semiduro THDPE D=63mm PN-12.5 1.0 159.51 159.51
Sub Ramal 3 (0+000 - 0+110) S. Duro THDPE D=63mm PN-8 1.0 111.05 111.05
Sub Ramal 3 (0+110 - 0+204) S. Semiduro THDPE D=63mm PN-8 1.0 94.34 94.34
D. Principal T2 (0+000 - 0+120) S. Semiduro THDPE D=110mm PN-8 1.0 120.15 120.15
D. Principal T2 (0+120 - 0+300) S. Semiduro THDPE D=90mm PN-8 1.0 180.58 180.58
D. Principal T2 (0+300 - 0+640) S. Semiduro THDPE D=63mm PN-8 1.0 340.69 340.69
D. Principal T2 (0+640 - 0+860) S. Duro THDPE D=63mm PN-8 1.0 221.54 221.54
D. Principal T2 (0+860 - 1+000) S. Duro THDPE D=63mm PN-10 1.0 141.00 141.00
D. Principal T2 (1+000 - 1+056) S. Duro THDPE D=63mm PN-12.5 1.0 56.98 56.98
Ramal 4 (0+000 - 0+600) S. Semiduro THDPE D=90mm PN-8 1.0 600.69 600.69
Ramal 4 (0+600 - 0+889) S. Duro THDPE D=75mm PN-8 1.0 289.47 289.47
Ramal 4 (0+889 - 1+000) S. Semiduro THDPE D=75mm PN-8 1.0 111.17 111.17
Ramal 4 (1+000 - 1+240) S. Duro THDPE D=63mm PN-8 1.0 240.81 240.81
Ramal 4 (1+240 - 1+781) S. Semiduro THDPE D=63mm PN-8 1.0 541.72 541.72
Ramal 5 (0+000 - 0+420) S. Semiduro THDPE D=63mm PN-8 1.0 420.45 420.45
Ramal 5 (0+420 - 0+761) S. Duro THDPE D=63mm PN-8 1.0 344.57 344.57
Ramal 5 (0+761 - 0+928) S. Duro THDPE D=63mm PN-10 1.0 166.97 166.97
Sub Ramal 4 (0+000 - 0+040) S. Duro THDPE D=63mm PN-10 1.0 40.39 40.39
Sub Ramal 4 (0+040 - 0+120) S. Rocoso THDPE D=63mm PN-10 1.0 81.48 81.48
Sub Ramal 4 (0+120 - 0+180) S. Duro THDPE D=63mm PN-10 1.0 60.19 60.19
Sub Ramal 4 (0+180 - 0+209) S. Semiduro THDPE D=63mm PN-10 1.0 29.49 29.49
Sub Ramal 5 (0+000 - 0+107) S. Duro THDPE D=63mm PN-10 1.0 106.76 106.76
Sub Ramal 5 (0+107 - 0+220) S. Semiduro THDPE D=63mm PN-8 1.0 113.69 113.69
Sub Ramal 5 (0+220 - 0+360) S. Semiduro THDPE D=63mm PN-10 1.0 140.99 140.99
Sub Ramal 5 (0+360 - 0+460) S. Duro THDPE D=63mm PN-12.5 1.0 101.56 101.56
Sub Ramal 5 (0+460 - 0+840) S. Duro THDPE D=63mm PN-16 1.0 385.55 385.55
Sub Ramal 5 (0+840 - 1+180) S. Rocoso THDPE D=63mm PN-16 1.0 353.91 353.91
Sub Ramal 5 (1+180 - 1+360) S. Semiduro THDPE D=63mm PN-16 1.0 180.18 180.18
Sub Ramal 6 (0+000 - 0+120) S. Duro THDPE D=63mm PN-8 1.0 120.04 120.04
Sub Ramal 6 (0+120 - 0+204) S. Semiduro THDPE D=63mm PN-8 1.0 83.90 83.90
Ramal 6 (0+000 - 0+100) S. Duro THDPE D=63mm PN-12.5 1.0 102.40 102.40
Ramal 6 (0+100 - 0+149) S. Semiduro THDPE D=63mm PN-16 1.0 49.81 49.81

43 EXCAVACION DE ZANJA (0-1.5 M) SUELO ROCOSO m³ 469.13


D. Principal T1 (0+000 - 0+360) S. Rocoso THDPE D=110mm PN-8 1.0 365.43 0.40 146.17 0.80 116.94 116.94
Ramal 1 (0+840 - 1+240) S. Rocoso THDPE D=63mm PN-12.5 1.0 304.16 0.40 121.67 0.80 97.33 97.33
Ramal 2 (0+620 - 0+660) S. Rocoso THDPE D=75mm PN-12.5 1.0 41.94 0.40 16.78 0.80 13.42 13.42
Ramal 2 (0+660 - 0+760) S. Rocoso THDPE D=75mm PN-10 1.0 104.00 0.40 41.60 0.80 33.28 33.28
Ramal 2 (0+760 - 0+840) S. Rocoso THDPE D=75mm PN-12.5 1.0 83.68 0.40 33.47 0.80 26.78 26.78
Ramal 2 (1+060 - 1+140) S. Rocoso THDPE D=75mm PN-8 1.0 80.05 0.40 32.02 0.80 25.62 25.62
Ramal 2 (1+140 - 1+280) S. Rocoso THDPE D=63mm PN-10 1.0 146.37 0.40 58.55 0.80 46.84 46.84
Sub Ramal 4 (0+040 - 0+120) S. Rocoso THDPE D=63mm PN-10 1.0 81.48 0.40 32.59 0.80 26.07 26.07
Sub Ramal 5 (0+840 - 1+180) S. Rocoso THDPE D=63mm PN-16 1.0 353.91 0.40 141.56 0.80 113.25 113.25
PASARELAS -1.0 94.99 0.40 38.00 0.80 30.40 -30.40

44 EXCAVACION DE ZANJA (0-1.5 M) SUELO DURO m³ 1499.62


D. Principal T1 (0+360 - 0+460) S. Duro THDPE D=110mm PN-10 1.0 101.48 0.40 40.59 0.80 32.47 32.47
D. Principal T1 (0+460 - 0+560) S. Duro THDPE D=110mm PN-12.5 1.0 101.47 0.40 40.59 0.80 32.47 32.47
D. Principal T1 (0+560 - 0+780) S. Duro THDPE D=110mm PN-16 1.0 222.16 0.40 88.86 0.80 71.09 71.09
D. Principal T1 (0+780 - 1+080) S. Duro THDPE D=110mm PN-8 1.0 301.56 0.40 120.63 0.80 96.50 96.50
D. Principal T1 (1+080 - 1+480) S. Duro THDPE D=90mm PN-8 1.0 400.78 0.40 160.31 0.80 128.25 128.25
D. Principal T1 (1+480 - 1+680) S. Duro THDPE D=90mm PN-10 1.0 200.11 0.40 80.04 0.80 64.03 64.03
D. Principal T1 (2+080 - 2+200) S. Duro THDPE D=90mm PN-10 1.0 120.58 0.40 48.23 0.80 38.59 38.59
D. Principal T1 (2+200 - 2+248) S. Duro THDPE D=75mm PN-10 1.0 48.62 0.40 19.45 0.80 15.56 15.56
D. Principal T1 (2+248 - 2+420) S. Duro THDPE D=75mm PN-8 1.0 173.08 0.40 69.23 0.80 55.39 55.39
Ramal 1 (0+000 - 0+240) S. Duro THDPE D=90mm PN-12.5 1.0 240.41 0.40 96.16 0.80 76.93 76.93
Ramal 1 (0+380 - 0+500) S. Duro THDPE D=75mm PN-16 1.0 121.08 0.40 48.43 0.80 38.75 38.75
Ramal 2 (0+400 - 0+560) S. Duro THDPE D=75mm PN-8 1.0 160.50 0.40 64.20 0.80 51.36 51.36
Ramal 2 (0+560 - 0+620) S. Duro THDPE D=75mm PN-10 1.0 61.21 0.40 24.48 0.80 19.59 19.59
Ramal 3 (0+000 - 0+220) S. Duro THDPE D=63mm PN-8 1.0 220.45 0.40 88.18 0.80 70.54 70.54
Sub Ramal 3 (0+000 - 0+110) S. Duro THDPE D=63mm PN-8 1.0 111.05 0.40 44.42 0.80 35.54 35.54
D. Principal T2 (0+640 - 0+860) S. Duro THDPE D=63mm PN-8 1.0 221.54 0.40 88.62 0.80 70.89 70.89
D. Principal T2 (0+860 - 1+000) S. Duro THDPE D=63mm PN-10 1.0 141.00 0.40 56.40 0.80 45.12 45.12
D. Principal T2 (1+000 - 1+056) S. Duro THDPE D=63mm PN-12.5 1.0 56.98 0.40 22.79 0.80 18.23 18.23
Ramal 4 (0+600 - 0+889) S. Duro THDPE D=75mm PN-8 1.0 289.47 0.40 115.79 0.80 92.63 92.63
Ramal 4 (1+000 - 1+240) S. Duro THDPE D=63mm PN-8 1.0 240.81 0.40 96.32 0.80 77.06 77.06
Ramal 5 (0+420 - 0+761) S. Duro THDPE D=63mm PN-8 1.0 344.57 0.40 137.83 0.80 110.26 110.26
Ramal 5 (0+761 - 0+928) S. Duro THDPE D=63mm PN-10 1.0 166.97 0.40 66.79 0.80 53.43 53.43
Sub Ramal 4 (0+000 - 0+040) S. Duro THDPE D=63mm PN-10 1.0 40.39 0.40 16.15 0.80 12.92 12.92
Sub Ramal 4 (0+120 - 0+180) S. Duro THDPE D=63mm PN-10 1.0 60.19 0.40 24.08 0.80 19.26 19.26
Sub Ramal 5 (0+000 - 0+107) S. Duro THDPE D=63mm PN-10 1.0 106.76 0.40 42.70 0.80 34.16 34.16
Sub Ramal 5 (0+360 - 0+460) S. Duro THDPE D=63mm PN-12.5 1.0 101.56 0.40 40.62 0.80 32.50 32.50
Sub Ramal 5 (0+460 - 0+840) S. Duro THDPE D=63mm PN-16 1.0 385.55 0.40 154.22 0.80 123.38 123.38
Sub Ramal 6 (0+000 - 0+120) S. Duro THDPE D=63mm PN-8 1.0 120.04 0.40 48.02 0.80 38.41 38.41
Ramal 6 (0+000 - 0+100) S. Duro THDPE D=63mm PN-12.5 1.0 102.40 0.40 40.96 0.80 32.77 32.77
PASARELAS -1.0 276.47 0.40 110.59 0.80 88.47 -88.47
PLANILLA DE COMPUTOS METRICOS
PROYECTO : E. D. T. P. "CONST. SISTEMA DE RIEGO COMUNIDAD INCA CORRAL"
POSITIVO
No ITEM UNID. PZA PARC. TOTAL
L A AREA H VOL.
45 EXCAVACION DE ZANJA (0-1.5 M) SUELO SEMIDURO m³ 2171.16
D. Principal T1 (1+680 - 1+900) S. Semiduro THDPE D=90mm PN-10 1.0 220.04 0.40 88.02 0.80 70.41 70.41
D. Principal T1 (1+900 - 2+080) S. Semiduro THDPE D=90mm PN-8 1.0 180.07 0.40 72.03 0.80 57.62 57.62
D. Principal T1 (2+420 - 2+580) S. Semiduro THDPE D=75mm PN-8 1.0 160.17 0.40 64.07 0.80 51.25 51.25
D. Principal T1 (2+580 - 3+158) S. Semiduro THDPE D=63mm PN-8 1.0 578.03 0.40 231.21 0.80 184.97 184.97
Ramal 1 (0+240 - 0+300) S. Semiduro THDPE D=75mm PN-12.5 1.0 60.31 0.40 24.12 0.80 19.30 19.30
Ramal 1 (0+300 - 0+380) S. Semiduro THDPE D=75mm PN-16 1.0 80.80 0.40 32.32 0.80 25.85 25.85
Ramal 1 (0+500 - 0+640) S. Semiduro THDPE D=75mm PN-8 1.0 141.17 0.40 56.47 0.80 45.17 45.17
Ramal 1 (0+640 - 0+840) S. Semiduro THDPE D=63mm PN-8 1.0 202.99 0.40 81.20 0.80 64.96 64.96
Ramal 1 (0+840 - 0+940) S. Semiduro THDPE D=63mm PN-10 1.0 101.12 0.40 40.45 0.80 32.36 32.36
Ramal 1 (1+240 - 1+347) S. Semiduro THDPE D=63mm PN-16 1.0 107.95 0.40 43.18 0.80 34.54 34.54
Ramal 2 (0+000 - 0+300) S. Semiduro THDPE D=90mm PN-8 1.0 301.44 0.40 120.58 0.80 96.46 96.46
Ramal 2 (0+300 - 0+400) S. Semiduro THDPE D=75mm PN-8 1.0 100.45 0.40 40.18 0.80 32.14 32.14
Ramal 2 (0+840 - 1+060) S. Semiduro THDPE D=75mm PN-8 1.0 220.88 0.40 88.35 0.80 70.68 70.68
Ramal 2 (1+280 - 1+720) S. Semiduro THDPE D=63mm PN-8 1.0 441.79 0.40 176.72 0.80 141.37 141.37
Ramal 2 (1+720 - 1+802) S. Semiduro THDPE D=63mm PN-10 1.0 82.12 0.40 32.85 0.80 26.28 26.28
Sub Ramal 1 (0+000 - 0+080) S. Semiduro THDPE D=63mm PN-8 1.0 80.71 0.40 32.28 0.80 25.83 25.83
Sub Ramal 1 (0+080 - 0+220) S. Semiduro THDPE D=63mm PN-10 1.0 140.94 0.40 56.38 0.80 45.10 45.10
Sub Ramal 1 (0+220 - 0+309) S. Semiduro THDPE D=63mm PN-12.5 1.0 89.30 0.40 35.72 0.80 28.58 28.58
Sub Ramal 2 (0+000 - 0+120) S. Semiduro THDPE D=63mm PN-8 1.0 120.68 0.40 48.27 0.80 38.62 38.62
Sub Ramal 2 (0+120 - 0+213) S. Semiduro THDPE D=63mm PN-10 1.0 93.91 0.40 37.57 0.80 30.05 30.05
Ramal 3 (0+220 - 0+380) S. Semiduro THDPE D=63mm PN-8 1.0 160.46 0.40 64.18 0.80 51.35 51.35
Ramal 3 (0+380 - 0+540) S. Semiduro THDPE D=63mm PN-10 1.0 160.74 0.40 64.29 0.80 51.44 51.44
Ramal 3 (0+540 - 0+698) S. Semiduro THDPE D=63mm PN-12.5 1.0 159.51 0.40 63.80 0.80 51.04 51.04
Sub Ramal 3 (0+110 - 0+204) S. Semiduro THDPE D=63mm PN-8 1.0 94.34 0.40 37.74 0.80 30.19 30.19
D. Principal T2 (0+000 - 0+120) S. Semiduro THDPE D=110mm PN-8 1.0 120.15 0.40 48.06 0.80 38.45 38.45
D. Principal T2 (0+120 - 0+300) S. Semiduro THDPE D=90mm PN-8 1.0 180.58 0.40 72.23 0.80 57.79 57.79
D. Principal T2 (0+300 - 0+640) S. Semiduro THDPE D=63mm PN-8 1.0 340.69 0.40 136.28 0.80 109.02 109.02
Ramal 4 (0+000 - 0+600) S. Semiduro THDPE D=90mm PN-8 1.0 600.69 0.40 240.28 0.80 192.22 192.22
Ramal 4 (0+889 - 1+000) S. Semiduro THDPE D=75mm PN-8 1.0 111.17 0.40 44.47 0.80 35.57 35.57
Ramal 4 (1+240 - 1+781) S. Semiduro THDPE D=63mm PN-8 1.0 541.72 0.40 216.69 0.80 173.35 173.35
Ramal 5 (0+000 - 0+420) S. Semiduro THDPE D=63mm PN-8 1.0 420.45 0.40 168.18 0.80 134.54 134.54
Sub Ramal 4 (0+180 - 0+209) S. Semiduro THDPE D=63mm PN-10 1.0 29.49 0.40 11.80 0.80 9.44 9.44
Sub Ramal 5 (0+107 - 0+220) S. Semiduro THDPE D=63mm PN-8 1.0 113.69 0.40 45.48 0.80 36.38 36.38
Sub Ramal 5 (0+220 - 0+360) S. Semiduro THDPE D=63mm PN-10 1.0 140.99 0.40 56.40 0.80 45.12 45.12
Sub Ramal 5 (1+180 - 1+360) S. Semiduro THDPE D=63mm PN-16 1.0 180.18 0.40 72.07 0.80 57.66 57.66
Sub Ramal 6 (0+120 - 0+204) S. Semiduro THDPE D=63mm PN-8 1.0 83.90 0.40 33.56 0.80 26.85 26.85
Ramal 6 (0+100 - 0+149) S. Semiduro THDPE D=63mm PN-16 1.0 49.81 0.40 19.92 0.80 15.94 15.94
PASARELAS -1.0 208.55 0.40 83.42 0.80 66.74 -66.74

46 RELLENO Y COMP. C/MAQUINARIA C/TIERRA CERNIDA m³ 1034.98


D. Principal T1 (0+000 - 0+360) S. Rocoso THDPE D=110mm PN-8 1.0 365.43 0.40 146.17 0.20 29.23 29.23
D. Principal T1 (0+360 - 0+460) S. Duro THDPE D=110mm PN-10 1.0 101.48 0.40 40.59 0.20 8.12 8.12
D. Principal T1 (0+460 - 0+560) S. Duro THDPE D=110mm PN-12.5 1.0 101.47 0.40 40.59 0.20 8.12 8.12
D. Principal T1 (0+560 - 0+780) S. Duro THDPE D=110mm PN-16 1.0 222.16 0.40 88.86 0.20 17.77 17.77
D. Principal T1 (0+780 - 1+080) S. Duro THDPE D=110mm PN-8 1.0 301.56 0.40 120.63 0.20 24.13 24.13
D. Principal T1 (1+080 - 1+480) S. Duro THDPE D=90mm PN-8 1.0 400.78 0.40 160.31 0.20 32.06 32.06
D. Principal T1 (1+480 - 1+680) S. Duro THDPE D=90mm PN-10 1.0 200.11 0.40 80.04 0.20 16.01 16.01
D. Principal T1 (1+680 - 1+900) S. Semiduro THDPE D=90mm PN-10 1.0 220.04 0.40 88.02 0.20 17.60 17.60
D. Principal T1 (1+900 - 2+080) S. Semiduro THDPE D=90mm PN-8 1.0 180.07 0.40 72.03 0.20 14.41 14.41
D. Principal T1 (2+080 - 2+200) S. Duro THDPE D=90mm PN-10 1.0 120.58 0.40 48.23 0.20 9.65 9.65
D. Principal T1 (2+200 - 2+248) S. Duro THDPE D=75mm PN-10 1.0 48.62 0.40 19.45 0.20 3.89 3.89
D. Principal T1 (2+248 - 2+420) S. Duro THDPE D=75mm PN-8 1.0 173.08 0.40 69.23 0.20 13.85 13.85
D. Principal T1 (2+420 - 2+580) S. Semiduro THDPE D=75mm PN-8 1.0 160.17 0.40 64.07 0.20 12.81 12.81
D. Principal T1 (2+580 - 3+158) S. Semiduro THDPE D=63mm PN-8 1.0 578.03 0.40 231.21 0.20 46.24 46.24
Ramal 1 (0+000 - 0+240) S. Duro THDPE D=90mm PN-12.5 1.0 240.41 0.40 96.16 0.20 19.23 19.23
Ramal 1 (0+240 - 0+300) S. Semiduro THDPE D=75mm PN-12.5 1.0 60.31 0.40 24.12 0.20 4.82 4.82
Ramal 1 (0+300 - 0+380) S. Semiduro THDPE D=75mm PN-16 1.0 80.80 0.40 32.32 0.20 6.46 6.46
Ramal 1 (0+380 - 0+500) S. Duro THDPE D=75mm PN-16 1.0 121.08 0.40 48.43 0.20 9.69 9.69
Ramal 1 (0+500 - 0+640) S. Semiduro THDPE D=75mm PN-8 1.0 141.17 0.40 56.47 0.20 11.29 11.29
Ramal 1 (0+640 - 0+840) S. Semiduro THDPE D=63mm PN-8 1.0 202.99 0.40 81.20 0.20 16.24 16.24
Ramal 1 (0+840 - 0+940) S. Semiduro THDPE D=63mm PN-10 1.0 101.12 0.40 40.45 0.20 8.09 8.09
Ramal 1 (0+840 - 1+240) S. Rocoso THDPE D=63mm PN-12.5 1.0 304.16 0.40 121.67 0.20 24.33 24.33
Ramal 1 (1+240 - 1+347) S. Semiduro THDPE D=63mm PN-16 1.0 107.95 0.40 43.18 0.20 8.64 8.64
Ramal 2 (0+000 - 0+300) S. Semiduro THDPE D=90mm PN-8 1.0 301.44 0.40 120.58 0.20 24.12 24.12
Ramal 2 (0+300 - 0+400) S. Semiduro THDPE D=75mm PN-8 1.0 100.45 0.40 40.18 0.20 8.04 8.04
Ramal 2 (0+400 - 0+560) S. Duro THDPE D=75mm PN-8 1.0 160.50 0.40 64.20 0.20 12.84 12.84
Ramal 2 (0+560 - 0+620) S. Duro THDPE D=75mm PN-10 1.0 61.21 0.40 24.48 0.20 4.90 4.90
Ramal 2 (0+620 - 0+660) S. Rocoso THDPE D=75mm PN-12.5 1.0 41.94 0.40 16.78 0.20 3.36 3.36
Ramal 2 (0+660 - 0+760) S. Rocoso THDPE D=75mm PN-10 1.0 104.00 0.40 41.60 0.20 8.32 8.32
Ramal 2 (0+760 - 0+840) S. Rocoso THDPE D=75mm PN-12.5 1.0 83.68 0.40 33.47 0.20 6.69 6.69
Ramal 2 (0+840 - 1+060) S. Semiduro THDPE D=75mm PN-8 1.0 220.88 0.40 88.35 0.20 17.67 17.67
Ramal 2 (1+060 - 1+140) S. Rocoso THDPE D=75mm PN-8 1.0 80.05 0.40 32.02 0.20 6.40 6.40
Ramal 2 (1+140 - 1+280) S. Rocoso THDPE D=63mm PN-10 1.0 146.37 0.40 58.55 0.20 11.71 11.71
Ramal 2 (1+280 - 1+720) S. Semiduro THDPE D=63mm PN-8 1.0 441.79 0.40 176.72 0.20 35.34 35.34
Ramal 2 (1+720 - 1+802) S. Semiduro THDPE D=63mm PN-10 1.0 82.12 0.40 32.85 0.20 6.57 6.57
Sub Ramal 1 (0+000 - 0+080) S. Semiduro THDPE D=63mm PN-8 1.0 80.71 0.40 32.28 0.20 6.46 6.46
Sub Ramal 1 (0+080 - 0+220) S. Semiduro THDPE D=63mm PN-10 1.0 140.94 0.40 56.38 0.20 11.28 11.28
Sub Ramal 1 (0+220 - 0+309) S. Semiduro THDPE D=63mm PN-12.5 1.0 89.30 0.40 35.72 0.20 7.14 7.14
Sub Ramal 2 (0+000 - 0+120) S. Semiduro THDPE D=63mm PN-8 1.0 120.68 0.40 48.27 0.20 9.65 9.65
Sub Ramal 2 (0+120 - 0+213) S. Semiduro THDPE D=63mm PN-10 1.0 93.91 0.40 37.57 0.20 7.51 7.51
Ramal 3 (0+000 - 0+220) S. Duro THDPE D=63mm PN-8 1.0 220.45 0.40 88.18 0.20 17.64 17.64
Ramal 3 (0+220 - 0+380) S. Semiduro THDPE D=63mm PN-8 1.0 160.46 0.40 64.18 0.20 12.84 12.84
PLANILLA DE COMPUTOS METRICOS
PROYECTO : E. D. T. P. "CONST. SISTEMA DE RIEGO COMUNIDAD INCA CORRAL"
POSITIVO
No ITEM UNID. PZA PARC. TOTAL
L A AREA H VOL.
Ramal 3 (0+380 - 0+540) S. Semiduro THDPE D=63mm PN-10 1.0 160.74 0.40 64.29 0.20 12.86 12.86
Ramal 3 (0+540 - 0+698) S. Semiduro THDPE D=63mm PN-12.5 1.0 159.51 0.40 63.80 0.20 12.76 12.76
Sub Ramal 3 (0+000 - 0+110) S. Duro THDPE D=63mm PN-8 1.0 111.05 0.40 44.42 0.20 8.88 8.88
Sub Ramal 3 (0+110 - 0+204) S. Semiduro THDPE D=63mm PN-8 1.0 94.34 0.40 37.74 0.20 7.55 7.55
D. Principal T2 (0+000 - 0+120) S. Semiduro THDPE D=110mm PN-8 1.0 120.15 0.40 48.06 0.20 9.61 9.61
D. Principal T2 (0+120 - 0+300) S. Semiduro THDPE D=90mm PN-8 1.0 180.58 0.40 72.23 0.20 14.45 14.45
D. Principal T2 (0+300 - 0+640) S. Semiduro THDPE D=63mm PN-8 1.0 340.69 0.40 136.28 0.20 27.26 27.26
D. Principal T2 (0+640 - 0+860) S. Duro THDPE D=63mm PN-8 1.0 221.54 0.40 88.62 0.20 17.72 17.72
D. Principal T2 (0+860 - 1+000) S. Duro THDPE D=63mm PN-10 1.0 141.00 0.40 56.40 0.20 11.28 11.28
D. Principal T2 (1+000 - 1+056) S. Duro THDPE D=63mm PN-12.5 1.0 56.98 0.40 22.79 0.20 4.56 4.56
Ramal 4 (0+000 - 0+600) S. Semiduro THDPE D=90mm PN-8 1.0 600.69 0.40 240.28 0.20 48.06 48.06
Ramal 4 (0+600 - 0+889) S. Duro THDPE D=75mm PN-8 1.0 289.47 0.40 115.79 0.20 23.16 23.16
Ramal 4 (0+889 - 1+000) S. Semiduro THDPE D=75mm PN-8 1.0 111.17 0.40 44.47 0.20 8.89 8.89
Ramal 4 (1+000 - 1+240) S. Duro THDPE D=63mm PN-8 1.0 240.81 0.40 96.32 0.20 19.26 19.26
Ramal 4 (1+240 - 1+781) S. Semiduro THDPE D=63mm PN-8 1.0 541.72 0.40 216.69 0.20 43.34 43.34
Ramal 5 (0+000 - 0+420) S. Semiduro THDPE D=63mm PN-8 1.0 420.45 0.40 168.18 0.20 33.64 33.64
Ramal 5 (0+420 - 0+761) S. Duro THDPE D=63mm PN-8 1.0 344.57 0.40 137.83 0.20 27.57 27.57
Ramal 5 (0+761 - 0+928) S. Duro THDPE D=63mm PN-10 1.0 166.97 0.40 66.79 0.20 13.36 13.36
Sub Ramal 4 (0+000 - 0+040) S. Duro THDPE D=63mm PN-10 1.0 40.39 0.40 16.15 0.20 3.23 3.23
Sub Ramal 4 (0+040 - 0+120) S. Rocoso THDPE D=63mm PN-10 1.0 81.48 0.40 32.59 0.20 6.52 6.52
Sub Ramal 4 (0+120 - 0+180) S. Duro THDPE D=63mm PN-10 1.0 60.19 0.40 24.08 0.20 4.82 4.82
Sub Ramal 4 (0+180 - 0+209) S. Semiduro THDPE D=63mm PN-10 1.0 29.49 0.40 11.80 0.20 2.36 2.36
Sub Ramal 5 (0+000 - 0+107) S. Duro THDPE D=63mm PN-10 1.0 106.76 0.40 42.70 0.20 8.54 8.54
Sub Ramal 5 (0+107 - 0+220) S. Semiduro THDPE D=63mm PN-8 1.0 113.69 0.40 45.48 0.20 9.10 9.10
Sub Ramal 5 (0+220 - 0+360) S. Semiduro THDPE D=63mm PN-10 1.0 140.99 0.40 56.40 0.20 11.28 11.28
Sub Ramal 5 (0+360 - 0+460) S. Duro THDPE D=63mm PN-12.5 1.0 101.56 0.40 40.62 0.20 8.12 8.12
Sub Ramal 5 (0+460 - 0+840) S. Duro THDPE D=63mm PN-16 1.0 385.55 0.40 154.22 0.20 30.84 30.84
Sub Ramal 5 (0+840 - 1+180) S. Rocoso THDPE D=63mm PN-16 1.0 353.91 0.40 141.56 0.20 28.31 28.31
Sub Ramal 5 (1+180 - 1+360) S. Semiduro THDPE D=63mm PN-16 1.0 180.18 0.40 72.07 0.20 14.41 14.41
Sub Ramal 6 (0+000 - 0+120) S. Duro THDPE D=63mm PN-8 1.0 120.04 0.40 48.02 0.20 9.60 9.60
Sub Ramal 6 (0+120 - 0+204) S. Semiduro THDPE D=63mm PN-8 1.0 83.90 0.40 33.56 0.20 6.71 6.71
Ramal 6 (0+000 - 0+100) S. Duro THDPE D=63mm PN-12.5 1.0 102.40 0.40 40.96 0.20 8.19 8.19
Ramal 6 (0+100 - 0+149) S. Semiduro THDPE D=63mm PN-16 1.0 49.81 0.40 19.92 0.20 3.98 3.98
PASARELAS -1.0 580.01 0.40 232.00 0.20 46.40 -46.40

47 PROV. Y TEND. TUB. SUPERTUBO HDPE D=63mm PN-8 m 4437.91


D. Principal T1 (2+580 - 3+158) S. Semiduro THDPE D=63mm PN-8 1.0 578.03 578.03
Ramal 1 (0+640 - 0+840) S. Semiduro THDPE D=63mm PN-8 1.0 202.99 202.99
Ramal 2 (1+280 - 1+720) S. Semiduro THDPE D=63mm PN-8 1.0 441.79 441.79
Sub Ramal 1 (0+000 - 0+080) S. Semiduro THDPE D=63mm PN-8 1.0 80.71 80.71
Sub Ramal 2 (0+000 - 0+120) S. Semiduro THDPE D=63mm PN-8 1.0 120.68 120.68
Ramal 3 (0+000 - 0+220) S. Duro THDPE D=63mm PN-8 1.0 220.45 220.45
Ramal 3 (0+220 - 0+380) S. Semiduro THDPE D=63mm PN-8 1.0 160.46 160.46
Sub Ramal 3 (0+000 - 0+110) S. Duro THDPE D=63mm PN-8 1.0 111.05 111.05
Sub Ramal 3 (0+110 - 0+204) S. Semiduro THDPE D=63mm PN-8 1.0 94.34 94.34
D. Principal T2 (0+300 - 0+640) S. Semiduro THDPE D=63mm PN-8 1.0 340.69 340.69
D. Principal T2 (0+640 - 0+860) S. Duro THDPE D=63mm PN-8 1.0 221.54 221.54
Ramal 4 (1+000 - 1+240) S. Duro THDPE D=63mm PN-8 1.0 240.81 240.81
Ramal 4 (1+240 - 1+781) S. Semiduro THDPE D=63mm PN-8 1.0 541.72 541.72
Ramal 5 (0+000 - 0+420) S. Semiduro THDPE D=63mm PN-8 1.0 420.45 420.45
Ramal 5 (0+420 - 0+761) S. Duro THDPE D=63mm PN-8 1.0 344.57 344.57
Sub Ramal 5 (0+107 - 0+220) S. Semiduro THDPE D=63mm PN-8 1.0 113.69 113.69
Sub Ramal 6 (0+000 - 0+120) S. Duro THDPE D=63mm PN-8 1.0 120.04 120.04
Sub Ramal 6 (0+120 - 0+204) S. Semiduro THDPE D=63mm PN-8 1.0 83.90 83.90

48 PROV. Y TEND. TUB. SUPERTUBO HDPE D=63mm PN-10 m 1492.46


Ramal 1 (0+840 - 0+940) S. Semiduro THDPE D=63mm PN-10 1.0 101.12 101.12
Ramal 2 (1+140 - 1+280) S. Rocoso THDPE D=63mm PN-10 1.0 146.37 146.37
Ramal 2 (1+720 - 1+802) S. Semiduro THDPE D=63mm PN-10 1.0 82.12 82.12
Sub Ramal 1 (0+080 - 0+220) S. Semiduro THDPE D=63mm PN-10 1.0 140.94 140.94
Sub Ramal 2 (0+120 - 0+213) S. Semiduro THDPE D=63mm PN-10 1.0 93.91 93.91
Ramal 3 (0+380 - 0+540) S. Semiduro THDPE D=63mm PN-10 1.0 160.74 160.74
D. Principal T2 (0+860 - 1+000) S. Duro THDPE D=63mm PN-10 1.0 141.00 141.00
Ramal 5 (0+761 - 0+928) S. Duro THDPE D=63mm PN-10 1.0 166.97 166.97
Sub Ramal 4 (0+000 - 0+040) S. Duro THDPE D=63mm PN-10 1.0 40.39 40.39
Sub Ramal 4 (0+040 - 0+120) S. Rocoso THDPE D=63mm PN-10 1.0 81.48 81.48
Sub Ramal 4 (0+120 - 0+180) S. Duro THDPE D=63mm PN-10 1.0 60.19 60.19
Sub Ramal 4 (0+180 - 0+209) S. Semiduro THDPE D=63mm PN-10 1.0 29.49 29.49
Sub Ramal 5 (0+000 - 0+107) S. Duro THDPE D=63mm PN-10 1.0 106.76 106.76
Sub Ramal 5 (0+220 - 0+360) S. Semiduro THDPE D=63mm PN-10 1.0 140.99 140.99

49 PROV. Y TEND. TUB. SUPERTUBO HDPE D=63mm PN-12.5 m 813.91


Ramal 1 (0+840 - 1+240) S. Rocoso THDPE D=63mm PN-12.5 1.0 304.16 304.16
Sub Ramal 1 (0+220 - 0+309) S. Semiduro THDPE D=63mm PN-12.5 1.0 89.30 89.30
Ramal 3 (0+540 - 0+698) S. Semiduro THDPE D=63mm PN-12.5 1.0 159.51 159.51
D. Principal T2 (1+000 - 1+056) S. Duro THDPE D=63mm PN-12.5 1.0 56.98 56.98
Sub Ramal 5 (0+360 - 0+460) S. Duro THDPE D=63mm PN-12.5 1.0 101.56 101.56
Ramal 6 (0+000 - 0+100) S. Duro THDPE D=63mm PN-12.5 1.0 102.40 102.40
PLANILLA DE COMPUTOS METRICOS
PROYECTO : E. D. T. P. "CONST. SISTEMA DE RIEGO COMUNIDAD INCA CORRAL"
POSITIVO
No ITEM UNID. PZA PARC. TOTAL
L A AREA H VOL.
50 PROV. Y TEND. TUB. SUPERTUBO HDPE D=63mm PN-16 m 1077.39
Ramal 1 (1+240 - 1+347) S. Semiduro THDPE D=63mm PN-16 1.0 107.95 107.95
Sub Ramal 5 (0+460 - 0+840) S. Duro THDPE D=63mm PN-16 1.0 385.55 385.55
Sub Ramal 5 (0+840 - 1+180) S. Rocoso THDPE D=63mm PN-16 1.0 353.91 353.91
Sub Ramal 5 (1+180 - 1+360) S. Semiduro THDPE D=63mm PN-16 1.0 180.18 180.18
Ramal 6 (0+100 - 0+149) S. Semiduro THDPE D=63mm PN-16 1.0 49.81 49.81

51 PROV. Y TEND. TUB. SUPERTUBO HDPE D=75mm PN-8 m 1436.94


D. Principal T1 (2+248 - 2+420) S. Duro THDPE D=75mm PN-8 1.0 173.08 173.08
D. Principal T1 (2+420 - 2+580) S. Semiduro THDPE D=75mm PN-8 1.0 160.17 160.17
Ramal 1 (0+500 - 0+640) S. Semiduro THDPE D=75mm PN-8 1.0 141.17 141.17
Ramal 2 (0+300 - 0+400) S. Semiduro THDPE D=75mm PN-8 1.0 100.45 100.45
Ramal 2 (0+400 - 0+560) S. Duro THDPE D=75mm PN-8 1.0 160.50172 160.50
Ramal 2 (0+840 - 1+060) S. Semiduro THDPE D=75mm PN-8 1.0 220.88 220.88
Ramal 2 (1+060 - 1+140) S. Rocoso THDPE D=75mm PN-8 1.0 80.05 80.05
Ramal 4 (0+600 - 0+889) S. Duro THDPE D=75mm PN-8 1.0 289.47 289.47
Ramal 4 (0+889 - 1+000) S. Semiduro THDPE D=75mm PN-8 1.0 111.17136 111.17

52 PROV. Y TEND. TUB. SUPERTUBO HDPE D=75mm PN-10 m 213.83


D. Principal T1 (2+200 - 2+248) S. Duro THDPE D=75mm PN-10 1.0 48.62 48.62
Ramal 2 (0+560 - 0+620) S. Duro THDPE D=75mm PN-10 1.0 61.21 61.21
Ramal 2 (0+660 - 0+760) S. Rocoso THDPE D=75mm PN-10 1.0 104.00 104.00

53 PROV. Y TEND. TUB. SUPERTUBO HDPE D=75mm PN-12.5 m 185.93


Ramal 1 (0+240 - 0+300) S. Semiduro THDPE D=75mm PN-12.5 1.0 60.31 60.31
Ramal 2 (0+620 - 0+660) S. Rocoso THDPE D=75mm PN-12.5 1.0 41.94 41.94
Ramal 2 (0+760 - 0+840) S. Rocoso THDPE D=75mm PN-12.5 1.0 83.68 83.68

54 PROV. Y TEND. TUB. SUPERTUBO HDPE D=75mm PN-16 m 201.88


Ramal 1 (0+300 - 0+380) S. Semiduro THDPE D=75mm PN-16 1.0 80.80 80.80
Ramal 1 (0+380 - 0+500) S. Duro THDPE D=75mm PN-16 1.0 121.08 121.08

55 PROV. Y TEND. TUB. SUPERTUBO HDPE D=90mm PN-8 m 1663.57


D. Principal T1 (1+080 - 1+480) S. Duro THDPE D=90mm PN-8 1.0 400.78 400.78
D. Principal T1 (1+900 - 2+080) S. Semiduro THDPE D=90mm PN-8 1.0 180.07 180.07
Ramal 2 (0+000 - 0+300) S. Semiduro THDPE D=90mm PN-8 1.0 301.44 301.44
D. Principal T2 (0+120 - 0+300) S. Semiduro THDPE D=90mm PN-8 1.0 180.58 180.58
Ramal 4 (0+000 - 0+600) S. Semiduro THDPE D=90mm PN-8 1.0 600.69 600.69

56 PROV. Y TEND. TUB. SUPERTUBO HDPE D=90mm PN-10 m 540.73


D. Principal T1 (1+480 - 1+680) S. Duro THDPE D=90mm PN-10 1.0 200.11 200.11
D. Principal T1 (1+680 - 1+900) S. Semiduro THDPE D=90mm PN-10 1.0 220.04 220.04
D. Principal T1 (2+080 - 2+200) S. Duro THDPE D=90mm PN-10 1.0 120.58 120.58

57 PROV. Y TEND. TUB. SUPERTUBO HDPE D=90mm PN-12.5 m 240.41


Ramal 1 (0+000 - 0+240) S. Duro THDPE D=90mm PN-12.5 1.0 240.41 240.41

58 PROV. Y TEND. TUB. SUPERTUBO HDPE D=110mm PN-8 m 787.15


D. Principal T1 (0+000 - 0+360) S. Rocoso THDPE D=110mm PN-8 1.0 365.43 365.43
D. Principal T1 (0+780 - 1+080) S. Duro THDPE D=110mm PN-8 1.0 301.56 301.56
D. Principal T2 (0+000 - 0+120) S. Semiduro THDPE D=110mm PN-8 1.0 120.15 120.15

59 PROV. Y TEND. TUB. SUPERTUBO HDPE D=110mm PN-10 m 101.48


D. Principal T1 (0+360 - 0+460) S. Duro THDPE D=110mm PN-10 1.0 101.48 101.48

60 PROV. Y TEND. TUB. SUPERTUBO HDPE D=110mm PN-12.5 m 101.47


D. Principal T1 (0+460 - 0+560) S. Duro THDPE D=110mm PN-12.5 1.0 101.47 101.47

61 PROV. Y TEND. TUB. SUPERTUBO HDPE D=110mm PN-16 m 222.16


D. Principal T1 (0+560 - 0+780) S. Duro THDPE D=110mm PN-16 1.0 222.16 222.16

62 RELLENO Y COMP. C/MAQUINARIA C/TIERRA COMUN m³ 3104.93


D. Principal T1 (0+000 - 0+360) S. Rocoso THDPE D=110mm PN-8 1.0 365.43 0.40 146.17 0.60 87.70 87.70
D. Principal T1 (0+360 - 0+460) S. Duro THDPE D=110mm PN-10 1.0 101.48 0.40 40.59 0.60 24.36 24.36
D. Principal T1 (0+460 - 0+560) S. Duro THDPE D=110mm PN-12.5 1.0 101.47 0.40 40.59 0.60 24.35 24.35
D. Principal T1 (0+560 - 0+780) S. Duro THDPE D=110mm PN-16 1.0 222.16 0.40 88.86 0.60 53.32 53.32
D. Principal T1 (0+780 - 1+080) S. Duro THDPE D=110mm PN-8 1.0 301.56 0.40 120.63 0.60 72.38 72.38
D. Principal T1 (1+080 - 1+480) S. Duro THDPE D=90mm PN-8 1.0 400.78 0.40 160.31 0.60 96.19 96.19
D. Principal T1 (1+480 - 1+680) S. Duro THDPE D=90mm PN-10 1.0 200.11 0.40 80.04 0.60 48.03 48.03
D. Principal T1 (1+680 - 1+900) S. Semiduro THDPE D=90mm PN-10 1.0 220.04 0.40 88.02 0.60 52.81 52.81
D. Principal T1 (1+900 - 2+080) S. Semiduro THDPE D=90mm PN-8 1.0 180.07 0.40 72.03 0.60 43.22 43.22
D. Principal T1 (2+080 - 2+200) S. Duro THDPE D=90mm PN-10 1.0 120.58 0.40 48.23 0.60 28.94 28.94
D. Principal T1 (2+200 - 2+248) S. Duro THDPE D=75mm PN-10 1.0 48.62 0.40 19.45 0.60 11.67 11.67
D. Principal T1 (2+248 - 2+420) S. Duro THDPE D=75mm PN-8 1.0 173.08 0.40 69.23 0.60 41.54 41.54
D. Principal T1 (2+420 - 2+580) S. Semiduro THDPE D=75mm PN-8 1.0 160.17 0.40 64.07 0.60 38.44 38.44
D. Principal T1 (2+580 - 3+158) S. Semiduro THDPE D=63mm PN-8 1.0 578.03 0.40 231.21 0.60 138.73 138.73
Ramal 1 (0+000 - 0+240) S. Duro THDPE D=90mm PN-12.5 1.0 240.41 0.40 96.16 0.60 57.70 57.70
Ramal 1 (0+240 - 0+300) S. Semiduro THDPE D=75mm PN-12.5 1.0 60.31 0.40 24.12 0.60 14.47 14.47
Ramal 1 (0+300 - 0+380) S. Semiduro THDPE D=75mm PN-16 1.0 80.80 0.40 32.32 0.60 19.39 19.39
Ramal 1 (0+380 - 0+500) S. Duro THDPE D=75mm PN-16 1.0 121.08 0.40 48.43 0.60 29.06 29.06
Ramal 1 (0+500 - 0+640) S. Semiduro THDPE D=75mm PN-8 1.0 141.17 0.40 56.47 0.60 33.88 33.88
Ramal 1 (0+640 - 0+840) S. Semiduro THDPE D=63mm PN-8 1.0 202.99 0.40 81.20 0.60 48.72 48.72
Ramal 1 (0+840 - 0+940) S. Semiduro THDPE D=63mm PN-10 1.0 101.12 0.40 40.45 0.60 24.27 24.27
PLANILLA DE COMPUTOS METRICOS
PROYECTO : E. D. T. P. "CONST. SISTEMA DE RIEGO COMUNIDAD INCA CORRAL"
POSITIVO
No ITEM UNID. PZA PARC. TOTAL
L A AREA H VOL.
Ramal 1 (0+840 - 1+240) S. Rocoso THDPE D=63mm PN-12.5 1.0 304.16 0.40 121.67 0.60 73.00 73.00
Ramal 1 (1+240 - 1+347) S. Semiduro THDPE D=63mm PN-16 1.0 107.95 0.40 43.18 0.60 25.91 25.91
Ramal 2 (0+000 - 0+300) S. Semiduro THDPE D=90mm PN-8 1.0 301.44 0.40 120.58 0.60 72.35 72.35
Ramal 2 (0+300 - 0+400) S. Semiduro THDPE D=75mm PN-8 1.0 100.45 0.40 40.18 0.60 24.11 24.11
Ramal 2 (0+400 - 0+560) S. Duro THDPE D=75mm PN-8 1.0 160.50 0.40 64.20 0.60 38.52 38.52
Ramal 2 (0+560 - 0+620) S. Duro THDPE D=75mm PN-10 1.0 61.21 0.40 24.48 0.60 14.69 14.69
Ramal 2 (0+620 - 0+660) S. Rocoso THDPE D=75mm PN-12.5 1.0 41.94 0.40 16.78 0.60 10.07 10.07
Ramal 2 (0+660 - 0+760) S. Rocoso THDPE D=75mm PN-10 1.0 104.00 0.40 41.60 0.60 24.96 24.96
Ramal 2 (0+760 - 0+840) S. Rocoso THDPE D=75mm PN-12.5 1.0 83.68 0.40 33.47 0.60 20.08 20.08
Ramal 2 (0+840 - 1+060) S. Semiduro THDPE D=75mm PN-8 1.0 220.88 0.40 88.35 0.60 53.01 53.01
Ramal 2 (1+060 - 1+140) S. Rocoso THDPE D=75mm PN-8 1.0 80.05 0.40 32.02 0.60 19.21 19.21
Ramal 2 (1+140 - 1+280) S. Rocoso THDPE D=63mm PN-10 1.0 146.37 0.40 58.55 0.60 35.13 35.13
Ramal 2 (1+280 - 1+720) S. Semiduro THDPE D=63mm PN-8 1.0 441.79 0.40 176.72 0.60 106.03 106.03
Ramal 2 (1+720 - 1+802) S. Semiduro THDPE D=63mm PN-10 1.0 82.12 0.40 32.85 0.60 19.71 19.71
Sub Ramal 1 (0+000 - 0+080) S. Semiduro THDPE D=63mm PN-8 1.0 80.71 0.40 32.28 0.60 19.37 19.37
Sub Ramal 1 (0+080 - 0+220) S. Semiduro THDPE D=63mm PN-10 1.0 140.94 0.40 56.38 0.60 33.83 33.83
Sub Ramal 1 (0+220 - 0+309) S. Semiduro THDPE D=63mm PN-12.5 1.0 89.30 0.40 35.72 0.60 21.43 21.43
Sub Ramal 2 (0+000 - 0+120) S. Semiduro THDPE D=63mm PN-8 1.0 120.68 0.40 48.27 0.60 28.96 28.96
Sub Ramal 2 (0+120 - 0+213) S. Semiduro THDPE D=63mm PN-10 1.0 93.91 0.40 37.57 0.60 22.54 22.54
Ramal 3 (0+000 - 0+220) S. Duro THDPE D=63mm PN-8 1.0 220.45 0.40 88.18 0.60 52.91 52.91
Ramal 3 (0+220 - 0+380) S. Semiduro THDPE D=63mm PN-8 1.0 160.46 0.40 64.18 0.60 38.51 38.51
Ramal 3 (0+380 - 0+540) S. Semiduro THDPE D=63mm PN-10 1.0 160.74 0.40 64.29 0.60 38.58 38.58
Ramal 3 (0+540 - 0+698) S. Semiduro THDPE D=63mm PN-12.5 1.0 159.51 0.40 63.80 0.60 38.28 38.28
Sub Ramal 3 (0+000 - 0+110) S. Duro THDPE D=63mm PN-8 1.0 111.05 0.40 44.42 0.60 26.65 26.65
Sub Ramal 3 (0+110 - 0+204) S. Semiduro THDPE D=63mm PN-8 1.0 94.34 0.40 37.74 0.60 22.64 22.64
D. Principal T2 (0+000 - 0+120) S. Semiduro THDPE D=110mm PN-8 1.0 120.15 0.40 48.06 0.60 28.84 28.84
D. Principal T2 (0+120 - 0+300) S. Semiduro THDPE D=90mm PN-8 1.0 180.58 0.40 72.23 0.60 43.34 43.34
D. Principal T2 (0+300 - 0+640) S. Semiduro THDPE D=63mm PN-8 1.0 340.69 0.40 136.28 0.60 81.77 81.77
D. Principal T2 (0+640 - 0+860) S. Duro THDPE D=63mm PN-8 1.0 221.54 0.40 88.62 0.60 53.17 53.17
D. Principal T2 (0+860 - 1+000) S. Duro THDPE D=63mm PN-10 1.0 141.00 0.40 56.40 0.60 33.84 33.84
D. Principal T2 (1+000 - 1+056) S. Duro THDPE D=63mm PN-12.5 1.0 56.98 0.40 22.79 0.60 13.67 13.67
Ramal 4 (0+000 - 0+600) S. Semiduro THDPE D=90mm PN-8 1.0 600.69 0.40 240.28 0.60 144.17 144.17
Ramal 4 (0+600 - 0+889) S. Duro THDPE D=75mm PN-8 1.0 289.47 0.40 115.79 0.60 69.47 69.47
Ramal 4 (0+889 - 1+000) S. Semiduro THDPE D=75mm PN-8 1.0 111.17 0.40 44.47 0.60 26.68 26.68
Ramal 4 (1+000 - 1+240) S. Duro THDPE D=63mm PN-8 1.0 240.81 0.40 96.32 0.60 57.79 57.79
Ramal 4 (1+240 - 1+781) S. Semiduro THDPE D=63mm PN-8 1.0 541.72 0.40 216.69 0.60 130.01 130.01
Ramal 5 (0+000 - 0+420) S. Semiduro THDPE D=63mm PN-8 1.0 420.45 0.40 168.18 0.60 100.91 100.91
Ramal 5 (0+420 - 0+761) S. Duro THDPE D=63mm PN-8 1.0 344.57 0.40 137.83 0.60 82.70 82.70
Ramal 5 (0+761 - 0+928) S. Duro THDPE D=63mm PN-10 1.0 166.97 0.40 66.79 0.60 40.07 40.07
Sub Ramal 4 (0+000 - 0+040) S. Duro THDPE D=63mm PN-10 1.0 40.39 0.40 16.15 0.60 9.69 9.69
Sub Ramal 4 (0+040 - 0+120) S. Rocoso THDPE D=63mm PN-10 1.0 81.48 0.40 32.59 0.60 19.55 19.55
Sub Ramal 4 (0+120 - 0+180) S. Duro THDPE D=63mm PN-10 1.0 60.19 0.40 24.08 0.60 14.45 14.45
Sub Ramal 4 (0+180 - 0+209) S. Semiduro THDPE D=63mm PN-10 1.0 29.49 0.40 11.80 0.60 7.08 7.08
Sub Ramal 5 (0+000 - 0+107) S. Duro THDPE D=63mm PN-10 1.0 106.76 0.40 42.70 0.60 25.62 25.62
Sub Ramal 5 (0+107 - 0+220) S. Semiduro THDPE D=63mm PN-8 1.0 113.69 0.40 45.48 0.60 27.29 27.29
Sub Ramal 5 (0+220 - 0+360) S. Semiduro THDPE D=63mm PN-10 1.0 140.99 0.40 56.40 0.60 33.84 33.84
Sub Ramal 5 (0+360 - 0+460) S. Duro THDPE D=63mm PN-12.5 1.0 101.56 0.40 40.62 0.60 24.37 24.37
Sub Ramal 5 (0+460 - 0+840) S. Duro THDPE D=63mm PN-16 1.0 385.55 0.40 154.22 0.60 92.53 92.53
Sub Ramal 5 (0+840 - 1+180) S. Rocoso THDPE D=63mm PN-16 1.0 353.91 0.40 141.56 0.60 84.94 84.94
Sub Ramal 5 (1+180 - 1+360) S. Semiduro THDPE D=63mm PN-16 1.0 180.18 0.40 72.07 0.60 43.24 43.24
Sub Ramal 6 (0+000 - 0+120) S. Duro THDPE D=63mm PN-8 1.0 120.04 0.40 48.02 0.60 28.81 28.81
Sub Ramal 6 (0+120 - 0+204) S. Semiduro THDPE D=63mm PN-8 1.0 83.90 0.40 33.56 0.60 20.14 20.14
Ramal 6 (0+000 - 0+100) S. Duro THDPE D=63mm PN-12.5 1.0 102.40 0.40 40.96 0.60 24.58 24.58
Ramal 6 (0+100 - 0+149) S. Semiduro THDPE D=63mm PN-16 1.0 49.81 0.40 19.92 0.60 11.95 11.95
PASARELAS -1.0 580.01 0.40 232.00 0.60 139.20 -139.20

63 PRUEBA HIDRAULICA (HASTA D=4") m 13517.23


D. Principal T1 (0+000 - 0+360) S. Rocoso THDPE D=110mm PN-8 1.0 365.43 365.43
D. Principal T1 (0+360 - 0+460) S. Duro THDPE D=110mm PN-10 1.0 101.48 101.48
D. Principal T1 (0+460 - 0+560) S. Duro THDPE D=110mm PN-12.5 1.0 101.47 101.47
D. Principal T1 (0+560 - 0+780) S. Duro THDPE D=110mm PN-16 1.0 222.16 222.16
D. Principal T1 (0+780 - 1+080) S. Duro THDPE D=110mm PN-8 1.0 301.56 301.56
D. Principal T1 (1+080 - 1+480) S. Duro THDPE D=90mm PN-8 1.0 400.78 400.78
D. Principal T1 (1+480 - 1+680) S. Duro THDPE D=90mm PN-10 1.0 200.11 200.11
D. Principal T1 (1+680 - 1+900) S. Semiduro THDPE D=90mm PN-10 1.0 220.04 220.04
D. Principal T1 (1+900 - 2+080) S. Semiduro THDPE D=90mm PN-8 1.0 180.07 180.07
D. Principal T1 (2+080 - 2+200) S. Duro THDPE D=90mm PN-10 1.0 120.58 120.58
D. Principal T1 (2+200 - 2+248) S. Duro THDPE D=75mm PN-10 1.0 48.62 48.62
D. Principal T1 (2+248 - 2+420) S. Duro THDPE D=75mm PN-8 1.0 173.08 173.08
D. Principal T1 (2+420 - 2+580) S. Semiduro THDPE D=75mm PN-8 1.0 160.17 160.17
D. Principal T1 (2+580 - 3+158) S. Semiduro THDPE D=63mm PN-8 1.0 578.03 578.03
Ramal 1 (0+000 - 0+240) S. Duro THDPE D=90mm PN-12.5 1.0 240.41 240.41
Ramal 1 (0+240 - 0+300) S. Semiduro THDPE D=75mm PN-12.5 1.0 60.31 60.31
Ramal 1 (0+300 - 0+380) S. Semiduro THDPE D=75mm PN-16 1.0 80.80 80.80
Ramal 1 (0+380 - 0+500) S. Duro THDPE D=75mm PN-16 1.0 121.08 121.08
Ramal 1 (0+500 - 0+640) S. Semiduro THDPE D=75mm PN-8 1.0 141.17 141.17
Ramal 1 (0+640 - 0+840) S. Semiduro THDPE D=63mm PN-8 1.0 202.99 202.99
Ramal 1 (0+840 - 0+940) S. Semiduro THDPE D=63mm PN-10 1.0 101.12 101.12
Ramal 1 (0+840 - 1+240) S. Rocoso THDPE D=63mm PN-12.5 1.0 304.16 304.16
Ramal 1 (1+240 - 1+347) S. Semiduro THDPE D=63mm PN-16 1.0 107.95 107.95
Ramal 2 (0+000 - 0+300) S. Semiduro THDPE D=90mm PN-8 1.0 301.44 301.44
Ramal 2 (0+300 - 0+400) S. Semiduro THDPE D=75mm PN-8 1.0 100.45 100.45
Ramal 2 (0+400 - 0+560) S. Duro THDPE D=75mm PN-8 1.0 160.50 160.50
PLANILLA DE COMPUTOS METRICOS
PROYECTO : E. D. T. P. "CONST. SISTEMA DE RIEGO COMUNIDAD INCA CORRAL"
POSITIVO
No ITEM UNID. PZA PARC. TOTAL
L A AREA H VOL.
Ramal 2 (0+560 - 0+620) S. Duro THDPE D=75mm PN-10 1.0 61.21 61.21
Ramal 2 (0+620 - 0+660) S. Rocoso THDPE D=75mm PN-12.5 1.0 41.94 41.94
Ramal 2 (0+660 - 0+760) S. Rocoso THDPE D=75mm PN-10 1.0 104.00 104.00
Ramal 2 (0+760 - 0+840) S. Rocoso THDPE D=75mm PN-12.5 1.0 83.68 83.68
Ramal 2 (0+840 - 1+060) S. Semiduro THDPE D=75mm PN-8 1.0 220.88 220.88
Ramal 2 (1+060 - 1+140) S. Rocoso THDPE D=75mm PN-8 1.0 80.05 80.05
Ramal 2 (1+140 - 1+280) S. Rocoso THDPE D=63mm PN-10 1.0 146.37 146.37
Ramal 2 (1+280 - 1+720) S. Semiduro THDPE D=63mm PN-8 1.0 441.79 441.79
Ramal 2 (1+720 - 1+802) S. Semiduro THDPE D=63mm PN-10 1.0 82.12 82.12
Sub Ramal 1 (0+000 - 0+080) S. Semiduro THDPE D=63mm PN-8 1.0 80.71 80.71
Sub Ramal 1 (0+080 - 0+220) S. Semiduro THDPE D=63mm PN-10 1.0 140.94 140.94
Sub Ramal 1 (0+220 - 0+309) S. Semiduro THDPE D=63mm PN-12.5 1.0 89.30 89.30
Sub Ramal 2 (0+000 - 0+120) S. Semiduro THDPE D=63mm PN-8 1.0 120.68 120.68
Sub Ramal 2 (0+120 - 0+213) S. Semiduro THDPE D=63mm PN-10 1.0 93.91 93.91
Ramal 3 (0+000 - 0+220) S. Duro THDPE D=63mm PN-8 1.0 220.45 220.45
Ramal 3 (0+220 - 0+380) S. Semiduro THDPE D=63mm PN-8 1.0 160.46 160.46
Ramal 3 (0+380 - 0+540) S. Semiduro THDPE D=63mm PN-10 1.0 160.74 160.74
Ramal 3 (0+540 - 0+698) S. Semiduro THDPE D=63mm PN-12.5 1.0 159.51 159.51
Sub Ramal 3 (0+000 - 0+110) S. Duro THDPE D=63mm PN-8 1.0 111.05 111.05
Sub Ramal 3 (0+110 - 0+204) S. Semiduro THDPE D=63mm PN-8 1.0 94.34 94.34
D. Principal T2 (0+000 - 0+120) S. Semiduro THDPE D=110mm PN-8 1.0 120.15 120.15
D. Principal T2 (0+120 - 0+300) S. Semiduro THDPE D=90mm PN-8 1.0 180.58 180.58
D. Principal T2 (0+300 - 0+640) S. Semiduro THDPE D=63mm PN-8 1.0 340.69 340.69
D. Principal T2 (0+640 - 0+860) S. Duro THDPE D=63mm PN-8 1.0 221.54 221.54
D. Principal T2 (0+860 - 1+000) S. Duro THDPE D=63mm PN-10 1.0 141.00 141.00
D. Principal T2 (1+000 - 1+056) S. Duro THDPE D=63mm PN-12.5 1.0 56.98 56.98
Ramal 4 (0+000 - 0+600) S. Semiduro THDPE D=90mm PN-8 1.0 600.69 600.69
Ramal 4 (0+600 - 0+889) S. Duro THDPE D=75mm PN-8 1.0 289.47 289.47
Ramal 4 (0+889 - 1+000) S. Semiduro THDPE D=75mm PN-8 1.0 111.17 111.17
Ramal 4 (1+000 - 1+240) S. Duro THDPE D=63mm PN-8 1.0 240.81 240.81
Ramal 4 (1+240 - 1+781) S. Semiduro THDPE D=63mm PN-8 1.0 541.72 541.72
Ramal 5 (0+000 - 0+420) S. Semiduro THDPE D=63mm PN-8 1.0 420.45 420.45
Ramal 5 (0+420 - 0+761) S. Duro THDPE D=63mm PN-8 1.0 344.57 344.57
Ramal 5 (0+761 - 0+928) S. Duro THDPE D=63mm PN-10 1.0 166.97 166.97
Sub Ramal 4 (0+000 - 0+040) S. Duro THDPE D=63mm PN-10 1.0 40.39 40.39
Sub Ramal 4 (0+040 - 0+120) S. Rocoso THDPE D=63mm PN-10 1.0 81.48 81.48
Sub Ramal 4 (0+120 - 0+180) S. Duro THDPE D=63mm PN-10 1.0 60.19 60.19
Sub Ramal 4 (0+180 - 0+209) S. Semiduro THDPE D=63mm PN-10 1.0 29.49 29.49
Sub Ramal 5 (0+000 - 0+107) S. Duro THDPE D=63mm PN-10 1.0 106.76 106.76
Sub Ramal 5 (0+107 - 0+220) S. Semiduro THDPE D=63mm PN-8 1.0 113.69 113.69
Sub Ramal 5 (0+220 - 0+360) S. Semiduro THDPE D=63mm PN-10 1.0 140.99 140.99
Sub Ramal 5 (0+360 - 0+460) S. Duro THDPE D=63mm PN-12.5 1.0 101.56 101.56
Sub Ramal 5 (0+460 - 0+840) S. Duro THDPE D=63mm PN-16 1.0 385.55 385.55
Sub Ramal 5 (0+840 - 1+180) S. Rocoso THDPE D=63mm PN-16 1.0 353.91 353.91
Sub Ramal 5 (1+180 - 1+360) S. Semiduro THDPE D=63mm PN-16 1.0 180.18 180.18
Sub Ramal 6 (0+000 - 0+120) S. Duro THDPE D=63mm PN-8 1.0 120.04 120.04
Sub Ramal 6 (0+120 - 0+204) S. Semiduro THDPE D=63mm PN-8 1.0 83.90 83.90
Ramal 6 (0+000 - 0+100) S. Duro THDPE D=63mm PN-12.5 1.0 102.40 102.40
Ramal 6 (0+100 - 0+149) S. Semiduro THDPE D=63mm PN-16 1.0 49.81 49.81

MODULO 07 CERCO PERIMETRAL CON MALLA OLIMPICA

64 REPLANTEO DE MURO DE CERCO PERIMETRAL m 102.40

4.0 13.20 52.80


4.0 12.40 49.60
PLANILLA DE COMPUTOS METRICOS
PROYECTO : E. D. T. P. "CONST. SISTEMA DE RIEGO COMUNIDAD INCA CORRAL"
POSITIVO
No ITEM UNID. PZA PARC. TOTAL
L A AREA H VOL.
65 EXCAVACION (0-2 M) SUELO SEMIDURO m³ 18.43
4.0 13.20 0.30 3.96 0.60 2.38 9.50
4.0 12.40 0.30 3.72 0.60 2.23 8.93

66 CIMIENTOS DE HºCº TIPO "B" 50% PD m³ 18.43


4.0 13.20 0.30 3.96 0.60 2.38 9.50
4.0 12.40 0.30 3.72 0.60 2.23 8.93

67 SOBRE CIMIENTOS DE HºCº TIPO "B" 50% PD m³ 4.51


4.0 13.20 0.15 1.98 0.30 0.59 2.38
4.0 12.40 0.15 1.86 0.30 0.56 2.23
Puerta -2.0 1.05 0.15 0.16 0.30 0.05 -0.09

68 ACERA DE CEMENTO + EMPEDRADO E=5CM TIPO "B" m² 91.72


Area Total 2.0 13.00 12.20 158.60 317.20
Area Tanque -2.0 10.60 10.40 110.24 -220.48
Area Camara Ingreso -2.0 0.90 0.90 0.81 -1.62
Area Camara Salida -2.0 1.30 1.30 1.69 -3.38

69 CERCO DE MALLA OLIMPICA FG D=2" + ALAMBRE DE PUAS 3 HILERAS m² 200.00


4.0 13.20 2.00 26.40 105.60
4.0 12.40 2.00 24.80 99.20
Puerta -2.0 1.20 2.00 2.40 -4.80

70 PUERTA METALICA C/MALLA OLIMPICA F.G. Ø 2" m² 4.50


2.0 1.00 2.25 2.25 4.50

MODULO 08 ESTRUCTURAS ESPECIALES

71 EXCAVACION (0-2 M) SUELO SEMIDURO m³ 196.01


Aduccion
Aduccion Pte. Pasarela L=10m +/- 2m HDPE D=4" (0+069 - 0+0479) 2.0 1.10 1.10 1.21 0.90 1.09 2.18
2.0 1.00 1.00 1.00 1.00 1.00 2.00
Aduccion Pte. Pasarela L=15m +/- 2m HDPE D=4" (0+688 - 0+703) 2.0 1.50 0.90 1.35 0.90 1.22 2.43
2.0 1.05 1.05 1.10 1.05 1.16 2.32
Aduccion Pte. Pasarela L=20m +/- 2m HDPE D=4" (1+086 - 1+106) 2.0 1.60 1.00 1.60 0.95 1.52 3.04
2.0 1.15 1.15 1.32 1.15 1.52 3.04
Aduccion Pte. Pasarela L=20m +/- 2m HDPE D=4" (1+183 - 1+203) 2.0 1.60 1.00 1.60 0.95 1.52 3.04
2.0 1.15 1.15 1.32 1.15 1.52 3.04
Aduccion Pte. Pasarela L=20m +/- 2m HDPE D=4" (1+276 - 1+296) 2.0 1.60 1.00 1.60 0.95 1.52 3.04
2.0 1.15 1.15 1.32 1.15 1.52 3.04
Aduccion Pte. Pasarela L=20m +/- 2m HDPE D=4" (1+395 - 1+415) 2.0 1.60 1.00 1.60 0.95 1.52 3.04
2.0 1.15 1.15 1.32 1.15 1.52 3.04
Aduccion Pte. Pasarela L=10m +/- 2m HDPE D=4" (1+600 - 1+610) 2.0 1.10 1.10 1.21 0.90 1.09 2.18
2.0 1.00 1.00 1.00 1.00 1.00 2.00
Aduccion Pte. Pasarela L=10m +/- 2m HDPE D=4" (1+943 - 1+953) 2.0 1.10 1.10 1.21 0.90 1.09 2.18
2.0 1.00 1.00 1.00 1.00 1.00 2.00
Aduccion Pte. Pasarela L=40m +/- 2m HDPE D=4" (2+254 - 2+294) 4.0 2.00 1.00 2.00 0.90 1.80 7.20
2.0 1.35 1.35 1.82 1.30 2.37 4.74
Aduccion T1-T2 Pte. Pasarela L=15m +/- 2m HDPE D=4" (0+825 - 0+840) 2.0 1.50 0.90 1.35 0.90 1.22 2.43
2.0 1.05 1.05 1.10 1.05 1.16 2.32

Distribucion
Dist. Principal 1 Pte. Pasarela L=20m +/- 2m HDPE D=4" (0+813 - 0+833) 2.0 1.60 1.00 1.60 0.95 1.52 3.04
2.0 1.15 1.15 1.32 1.15 1.52 3.04
Dist. Principal 1 Pte. Pasarela L=15m +/- 2m HDPE D=3" (2+123 - 2+138) 2.0 1.50 0.90 1.35 0.85 1.15 2.30
2.0 1.00 1.00 1.00 1.00 1.00 2.00
Dist. Principal 1 Pte. Pasarela L=10m +/- 2m HDPE D=2.5" (2+238 - 2+248) 2.0 0.95 0.95 0.90 0.95 0.86 1.71
2.0 0.95 0.95 0.90 0.95 0.86 1.71
Ramal 1 Pte. Pasarela L=10m +/- 2m HDPE D=2" (1+051 - 1+061) 2.0 0.95 0.95 0.90 0.90 0.81 1.62
2.0 0.90 0.90 0.81 0.90 0.73 1.46
Ramal 2 Pte. Pasarela L=15m +/- 2m HDPE D=2.5" (0+423 - 0+438) 2.0 1.45 0.85 1.23 0.85 1.05 2.10
2.0 1.00 1.00 1.00 1.00 1.00 2.00
Ramal 2 Pte. Pasarela L=20m +/- 2m HDPE D=2.5" (0+639 - 0+659) 2.0 1.50 0.90 1.35 0.90 1.22 2.43
2.0 1.05 1.05 1.10 1.05 1.16 2.32
Ramal 2 Pte. Pasarela L=25m +/- 2m HDPE D=2.5" (0+767 - 0+792) 2.0 1.95 0.95 1.85 0.95 1.76 3.52
2.0 1.10 1.10 1.21 1.10 1.33 2.66
Ramal 2 Pte. Pasarela L=10m +/- 2m HDPE D=2.5" (0+981 - 0+991) 2.0 0.95 0.95 0.90 0.95 0.86 1.71
2.0 0.95 0.95 0.90 0.95 0.86 1.71
Ramal 2 Pte. Pasarela L=15m +/- 2m HDPE D=2" (1+222 - 1+237) 2.0 1.45 0.85 1.23 0.80 0.99 1.97
2.0 0.95 0.95 0.90 0.95 0.86 1.71
Ramal 2 Pte. Pasarela L=10m +/- 2m HDPE D=2" (1+506 - 1+516) 2.0 0.95 0.95 0.90 0.90 0.81 1.62
2.0 0.90 0.90 0.81 0.90 0.73 1.46
Ramal 3 Pte. Pasarela L=30m +/- 2m HDPE D=2" (0+620 - 0+650) 2.0 2.00 1.00 2.00 0.95 1.90 3.80
2.0 1.15 1.15 1.32 1.15 1.52 3.04
Sub Ramal 3 Pte. Pasarela L=20m +/- 2m HDPE D=2" (0+110 - 0+130) 2.0 1.50 0.90 1.35 0.85 1.15 2.30
2.0 1.05 1.05 1.10 1.05 1.16 2.32
Dist. Principal 2 Pte. Pasarela L=10m +/- 2m HDPE D=3" (0+239 - 0+249) 2.0 1.00 1.00 1.00 0.95 0.95 1.90
2.0 0.95 0.95 0.90 0.95 0.86 1.71
Ramal 4 Pte. Pasarela L=15m +/- 2m HDPE D=2.5" (0+782 - 0+797) 2.0 1.45 0.85 1.23 0.85 1.05 2.10
2.0 1.00 1.00 1.00 1.00 1.00 2.00
Ramal 4 Pte. Pasarela L=15m +/- 2m HDPE D=2" (1+142 - 1+157) 2.0 1.45 0.85 1.23 0.80 0.99 1.97
2.0 0.95 0.95 0.90 0.95 0.86 1.71
PLANILLA DE COMPUTOS METRICOS
PROYECTO : E. D. T. P. "CONST. SISTEMA DE RIEGO COMUNIDAD INCA CORRAL"
POSITIVO
No ITEM UNID. PZA PARC. TOTAL
L A AREA H VOL.
Ramal 4 Pte. Pasarela L=10m +/- 2m HDPE D=2" (1+167 - 1+177) 2.0 0.95 0.95 0.90 0.90 0.81 1.62
2.0 0.90 0.90 0.81 0.90 0.73 1.46
Ramal 4 Pte. Pasarela L=10m +/- 2m HDPE D=2" (1+228 - 1+238) 2.0 0.95 0.95 0.90 0.90 0.81 1.62
2.0 0.90 0.90 0.81 0.90 0.73 1.46
Ramal 4 Pte. Pasarela L=10m +/- 2m HDPE D=2" (1+374 - 1+384) 2.0 0.95 0.95 0.90 0.90 0.81 1.62
2.0 0.90 0.90 0.81 0.90 0.73 1.46
Ramal 5 Pte. Pasarela L=15m +/- 2m HDPE D=2" (0+128 - 0+143) 2.0 1.45 0.85 1.23 0.80 0.99 1.97
2.0 0.95 0.95 0.90 0.95 0.86 1.71
Ramal 5 Pte. Pasarela L=10m +/- 2m HDPE D=2" (0+162 - 0+172) 2.0 0.95 0.95 0.90 0.90 0.81 1.62
2.0 0.90 0.90 0.81 0.90 0.73 1.46
Ramal 5 Pte. Pasarela L=10m +/- 2m HDPE D=2" (0+320 - 0+330) 2.0 0.95 0.95 0.90 0.90 0.81 1.62
2.0 0.90 0.90 0.81 0.90 0.73 1.46
Ramal 5 Pte. Pasarela L=10m +/- 2m HDPE D=2" (0+387 - 0+397) 2.0 0.95 0.95 0.90 0.90 0.81 1.62
2.0 0.90 0.90 0.81 0.90 0.73 1.46
Ramal 5 Pte. Pasarela L=10m +/- 2m HDPE D=2" (0+402 - 0+412) 2.0 0.95 0.95 0.90 0.90 0.81 1.62
2.0 0.90 0.90 0.81 0.90 0.73 1.46
Ramal 5 Pte. Pasarela L=10m +/- 2m HDPE D=2" (0+453 - 0+463) 2.0 0.95 0.95 0.90 0.90 0.81 1.62
2.0 0.90 0.90 0.81 0.90 0.73 1.46
Ramal 5 Pte. Pasarela L=10m +/- 2m HDPE D=2" (0+583 - 0+593) 2.0 0.95 0.95 0.90 0.90 0.81 1.62
2.0 0.90 0.90 0.81 0.90 0.73 1.46
Ramal 5 Pte. Pasarela L=15m +/- 2m HDPE D=2" (0+667 - 0+682) 2.0 1.45 0.85 1.23 0.80 0.99 1.97
2.0 0.95 0.95 0.90 0.95 0.86 1.71
Ramal 5 Pte. Pasarela L=10m +/- 2m HDPE D=2" (0+694 - 0+704) 2.0 0.90 0.90 0.81 0.90 0.73 1.46
2.0 0.95 0.95 0.90 0.90 0.81 1.62
Ramal 5 Pte. Pasarela L=10m +/- 2m HDPE D=2" (0+761 - 0+771) 2.0 0.90 0.90 0.81 0.90 0.73 1.46
2.0 0.95 0.95 0.90 0.90 0.81 1.62
Ramal 5 Pte. Pasarela L=10m +/- 2m HDPE D=2" (0+854 - 0+864) 2.0 0.95 0.95 0.90 0.90 0.81 1.62
2.0 0.90 0.90 0.81 0.90 0.73 1.46
Sub Ramal 4 Pte. Pasarela L=15m +/- 2m HDPE D=2" (0+074 - 0+089) 2.0 1.45 0.85 1.23 0.80 0.99 1.97
2.0 0.95 0.95 0.90 0.95 0.86 1.71
Sub Ramal 5 Pte. Pasarela L=15m +/- 2m HDPE D=2" (0+022 - 0+037) 2.0 1.45 0.85 1.23 0.80 0.99 1.97
2.0 0.95 0.95 0.90 0.95 0.86 1.71
Sub Ramal 5 Pte. Pasarela L=15m +/- 2m HDPE D=2" (0+048 - 0+063) 2.0 1.45 0.85 1.23 0.80 0.99 1.97
2.0 0.95 0.95 0.90 0.95 0.86 1.71
Sub Ramal 5 Pte. Pasarela L=15m +/- 2m HDPE D=2" (0+064 - 0+079) 2.0 1.45 0.85 1.23 0.80 0.99 1.97
2.0 0.95 0.95 0.90 0.95 0.86 1.71
Sub Ramal 5 Pte. Pasarela L=20m +/- 2m HDPE D=2" (0+087 - 0+107) 2.0 1.50 0.90 1.35 0.85 1.15 2.30
2.0 1.05 1.05 1.10 1.05 1.16 2.32
Sub Ramal 5 Pte. Pasarela L=10m +/- 2m HDPE D=2" (0+272 - 0+282) 2.0 0.90 0.90 0.81 0.90 0.73 1.46
2.0 0.95 0.95 0.90 0.90 0.81 1.62
Sub Ramal 5 Pte. Pasarela L=10m +/- 2m HDPE D=2" (1+059 - 1+067) 2.0 0.90 0.90 0.81 0.90 0.73 1.46
2.0 0.95 0.95 0.90 0.90 0.81 1.62
Pasos de Quebrada
Aduccion 1 Paso de Quebrada L=6m +/- 1m HDPE D=4" (0+041 - 0+047) 2.0 0.40 0.40 0.16 0.50 0.08 0.16

Aduccion 1 Paso de Quebrada L=6m +/- 1m HDPE D=4" (0+784 - 0+790) 2.0 0.40 0.40 0.16 0.50 0.08 0.16

Aduccion 1 Paso de Quebrada L=6m +/- 1m HDPE D=4" (0+992 - 0+997) 2.0 0.40 0.40 0.16 0.50 0.08 0.16

Ramal 4 Paso de Quebrada L=6m +/- 1m HDPE D=2.5" (0+859 - 0+865) 2.0 0.40 0.40 0.16 0.50 0.08 0.16

Ramal 4 Paso de Quebrada L=6m +/- 1m HDPE D=2.5" (0+889 - 0+895) 2.0 0.40 0.40 0.16 0.50 0.08 0.16

Ramal 4 Paso de Quebrada L=6m +/- 1m HDPE D=2" (1+087 - 1+093) 2.0 0.40 0.40 0.16 0.50 0.08 0.16

Ramal 5 Paso de Quebrada L=6m +/- 1m HDPE D=2" (0+085 - 0+091) 2.0 0.40 0.40 0.16 0.50 0.08 0.16

Ramal 5 Paso de Quebrada L=6m +/- 1m HDPE D=2" (0+134 - 0+200) 2.0 0.40 0.40 0.16 0.50 0.08 0.16

Ramal 5 Paso de Quebrada L=6m +/- 1m HDPE D=2" (0+213 - 0+219) 2.0 0.40 0.40 0.16 0.50 0.08 0.16

Ramal 5 Paso de Quebrada L=6m +/- 1m HDPE D=2" (0+310 - 0+316) 2.0 0.40 0.40 0.16 0.50 0.08 0.16

Ramal 5 Paso de Quebrada L=6m +/- 1m HDPE D=2" (0+595 - 0+601) 2.0 0.40 0.40 0.16 0.50 0.08 0.16

Ramal 5 Paso de Quebrada L=6m +/- 1m HDPE D=2" (0+755 - 0+761) 2.0 0.40 0.40 0.16 0.50 0.08 0.16

Ramal 5 Paso de Quebrada L=6m +/- 1m HDPE D=2" (0+900 - 0+906) 2.0 0.40 0.40 0.16 0.50 0.08 0.16

Sub Ramal 4 Paso de Quebrada L=6m +/- 1m HDPE D=2" (0+032 - 0+038) 2.0 0.40 0.40 0.16 0.50 0.08 0.16

Sub Ramal 4 Paso de Quebrada L=6m +/- 1m HDPE D=2" (0+180 - 0+186) 2.0 0.40 0.40 0.16 0.50 0.08 0.16

Sub Ramal 5 Paso de Quebrada L=6m +/- 1m HDPE D=2" (0+115 - 0+121) 2.0 0.40 0.40 0.16 0.50 0.08 0.16

Sub Ramal 6 Paso de Quebrada L=6m +/- 1m HDPE D=2" (0+131 - 0+137) 2.0 0.40 0.40 0.16 0.50 0.08 0.16

Ramal 6 Paso de Quebrada L=6m +/- 1m HDPE D=2" (0+137 - 0+143) 2.0 0.40 0.40 0.16 0.50 0.08 0.16
PLANILLA DE COMPUTOS METRICOS
PROYECTO : E. D. T. P. "CONST. SISTEMA DE RIEGO COMUNIDAD INCA CORRAL"
POSITIVO
No ITEM UNID. PZA PARC. TOTAL
L A AREA H VOL.
72 HºCº FUNDACIONES TIPO "B" 50% P.D. m³ 196.01
Aduccion
Aduccion Pte. Pasarela L=10m +/- 2m HDPE D=4" (0+069 - 0+0479) 2.0 1.10 1.10 1.21 0.90 1.09 2.18
2.0 1.00 1.00 1.00 1.00 1.00 2.00
Aduccion Pte. Pasarela L=15m +/- 2m HDPE D=4" (0+688 - 0+703) 2.0 1.50 0.90 1.35 0.90 1.22 2.43
2.0 1.05 1.05 1.10 1.05 1.16 2.32
Aduccion Pte. Pasarela L=20m +/- 2m HDPE D=4" (1+086 - 1+106) 2.0 1.60 1.00 1.60 0.95 1.52 3.04
2.0 1.15 1.15 1.32 1.15 1.52 3.04
Aduccion Pte. Pasarela L=20m +/- 2m HDPE D=4" (1+183 - 1+203) 2.0 1.60 1.00 1.60 0.95 1.52 3.04
2.0 1.15 1.15 1.32 1.15 1.52 3.04
Aduccion Pte. Pasarela L=20m +/- 2m HDPE D=4" (1+276 - 1+296) 2.0 1.60 1.00 1.60 0.95 1.52 3.04
2.0 1.15 1.15 1.32 1.15 1.52 3.04
Aduccion Pte. Pasarela L=20m +/- 2m HDPE D=4" (1+395 - 1+415) 2.0 1.60 1.00 1.60 0.95 1.52 3.04
2.0 1.15 1.15 1.32 1.15 1.52 3.04
Aduccion Pte. Pasarela L=10m +/- 2m HDPE D=4" (1+600 - 1+610) 2.0 1.10 1.10 1.21 0.90 1.09 2.18
2.0 1.00 1.00 1.00 1.00 1.00 2.00
Aduccion Pte. Pasarela L=10m +/- 2m HDPE D=4" (1+943 - 1+953) 2.0 1.10 1.10 1.21 0.90 1.09 2.18
2.0 1.00 1.00 1.00 1.00 1.00 2.00
Aduccion Pte. Pasarela L=40m +/- 2m HDPE D=4" (2+254 - 2+294) 4.0 2.00 1.00 2.00 0.90 1.80 7.20
2.0 1.35 1.35 1.82 1.30 2.37 4.74
Aduccion T1-T2 Pte. Pasarela L=15m +/- 2m HDPE D=4" (0+825 - 0+840) 2.0 1.50 0.90 1.35 0.90 1.22 2.43
2.0 1.05 1.05 1.10 1.05 1.16 2.32
Distribucion
Dist. Principal 1 Pte. Pasarela L=20m +/- 2m HDPE D=4" (0+813 - 0+833) 2.0 1.60 1.00 1.60 0.95 1.52 3.04
2.0 1.15 1.15 1.32 1.15 1.52 3.04
Dist. Principal 1 Pte. Pasarela L=15m +/- 2m HDPE D=3" (2+123 - 2+138) 2.0 1.50 0.90 1.35 0.85 1.15 2.30
2.0 1.00 1.00 1.00 1.00 1.00 2.00
Dist. Principal 1 Pte. Pasarela L=10m +/- 2m HDPE D=2.5" (2+238 - 2+248) 2.0 0.95 0.95 0.90 0.95 0.86 1.71
2.0 0.95 0.95 0.90 0.95 0.86 1.71
Ramal 1 Pte. Pasarela L=10m +/- 2m HDPE D=2" (1+051 - 1+061) 2.0 0.95 0.95 0.90 0.90 0.81 1.62
2.0 0.90 0.90 0.81 0.90 0.73 1.46
Ramal 2 Pte. Pasarela L=15m +/- 2m HDPE D=2.5" (0+423 - 0+438) 2.0 1.45 0.85 1.23 0.85 1.05 2.10
2.0 1.00 1.00 1.00 1.00 1.00 2.00
Ramal 2 Pte. Pasarela L=20m +/- 2m HDPE D=2.5" (0+639 - 0+659) 2.0 1.50 0.90 1.35 0.90 1.22 2.43
2.0 1.05 1.05 1.10 1.05 1.16 2.32
Ramal 2 Pte. Pasarela L=25m +/- 2m HDPE D=2.5" (0+767 - 0+792) 2.0 1.95 0.95 1.85 0.95 1.76 3.52
2.0 1.10 1.10 1.21 1.10 1.33 2.66
Ramal 2 Pte. Pasarela L=10m +/- 2m HDPE D=2.5" (0+981 - 0+991) 2.0 0.95 0.95 0.90 0.95 0.86 1.71
2.0 0.95 0.95 0.90 0.95 0.86 1.71
Ramal 2 Pte. Pasarela L=15m +/- 2m HDPE D=2" (1+222 - 1+237) 2.0 1.45 0.85 1.23 0.80 0.99 1.97
2.0 0.95 0.95 0.90 0.95 0.86 1.71
Ramal 2 Pte. Pasarela L=10m +/- 2m HDPE D=2" (1+506 - 1+516) 2.0 0.95 0.95 0.90 0.90 0.81 1.62
2.0 0.90 0.90 0.81 0.90 0.73 1.46
Ramal 3 Pte. Pasarela L=30m +/- 2m HDPE D=2" (0+620 - 0+650) 2.0 2.00 1.00 2.00 0.95 1.90 3.80
2.0 1.15 1.15 1.32 1.15 1.52 3.04
Sub Ramal 3 Pte. Pasarela L=20m +/- 2m HDPE D=2" (0+110 - 0+130) 2.0 1.50 0.90 1.35 0.85 1.15 2.30
2.0 1.05 1.05 1.10 1.05 1.16 2.32
Dist. Principal 2 Pte. Pasarela L=10m +/- 2m HDPE D=3" (0+239 - 0+249) 2.0 1.00 1.00 1.00 0.95 0.95 1.90
2.0 0.95 0.95 0.90 0.95 0.86 1.71
Ramal 4 Pte. Pasarela L=15m +/- 2m HDPE D=2.5" (0+782 - 0+797) 2.0 1.45 0.85 1.23 0.85 1.05 2.10
2.0 1.00 1.00 1.00 1.00 1.00 2.00
Ramal 4 Pte. Pasarela L=15m +/- 2m HDPE D=2" (1+142 - 1+157) 2.0 1.45 0.85 1.23 0.80 0.99 1.97
2.0 0.95 0.95 0.90 0.95 0.86 1.71
Ramal 4 Pte. Pasarela L=10m +/- 2m HDPE D=2" (1+167 - 1+177) 2.0 0.95 0.95 0.90 0.90 0.81 1.62
2.0 0.90 0.90 0.81 0.90 0.73 1.46
Ramal 4 Pte. Pasarela L=10m +/- 2m HDPE D=2" (1+228 - 1+238) 2.0 0.95 0.95 0.90 0.90 0.81 1.62
2.0 0.90 0.90 0.81 0.90 0.73 1.46
Ramal 4 Pte. Pasarela L=10m +/- 2m HDPE D=2" (1+374 - 1+384) 2.0 0.95 0.95 0.90 0.90 0.81 1.62
2.0 0.90 0.90 0.81 0.90 0.73 1.46
Ramal 5 Pte. Pasarela L=15m +/- 2m HDPE D=2" (0+128 - 0+143) 2.0 1.45 0.85 1.23 0.80 0.99 1.97
2.0 0.95 0.95 0.90 0.95 0.86 1.71
Ramal 5 Pte. Pasarela L=10m +/- 2m HDPE D=2" (0+162 - 0+172) 2.0 0.95 0.95 0.90 0.90 0.81 1.62
2.0 0.90 0.90 0.81 0.90 0.73 1.46
Ramal 5 Pte. Pasarela L=10m +/- 2m HDPE D=2" (0+320 - 0+330) 2.0 0.95 0.95 0.90 0.90 0.81 1.62
2.0 0.90 0.90 0.81 0.90 0.73 1.46
Ramal 5 Pte. Pasarela L=10m +/- 2m HDPE D=2" (0+387 - 0+397) 2.0 0.95 0.95 0.90 0.90 0.81 1.62
2.0 0.90 0.90 0.81 0.90 0.73 1.46
Ramal 5 Pte. Pasarela L=10m +/- 2m HDPE D=2" (0+402 - 0+412) 2.0 0.95 0.95 0.90 0.90 0.81 1.62
2.0 0.90 0.90 0.81 0.90 0.73 1.46
Ramal 5 Pte. Pasarela L=10m +/- 2m HDPE D=2" (0+453 - 0+463) 2.0 0.95 0.95 0.90 0.90 0.81 1.62
2.0 0.90 0.90 0.81 0.90 0.73 1.46
Ramal 5 Pte. Pasarela L=10m +/- 2m HDPE D=2" (0+583 - 0+593) 2.0 0.95 0.95 0.90 0.90 0.81 1.62
2.0 0.90 0.90 0.81 0.90 0.73 1.46
Ramal 5 Pte. Pasarela L=15m +/- 2m HDPE D=2" (0+667 - 0+682) 2.0 1.45 0.85 1.23 0.80 0.99 1.97
2.0 0.95 0.95 0.90 0.95 0.86 1.71
Ramal 5 Pte. Pasarela L=10m +/- 2m HDPE D=2" (0+694 - 0+704) 2.0 0.90 0.90 0.81 0.90 0.73 1.46
2.0 0.95 0.95 0.90 0.90 0.81 1.62
Ramal 5 Pte. Pasarela L=10m +/- 2m HDPE D=2" (0+761 - 0+771) 2.0 0.90 0.90 0.81 0.90 0.73 1.46
2.0 0.95 0.95 0.90 0.90 0.81 1.62
Ramal 5 Pte. Pasarela L=10m +/- 2m HDPE D=2" (0+854 - 0+864) 2.0 0.95 0.95 0.90 0.90 0.81 1.62
2.0 0.90 0.90 0.81 0.90 0.73 1.46
Sub Ramal 4 Pte. Pasarela L=15m +/- 2m HDPE D=2" (0+074 - 0+089) 2.0 1.45 0.85 1.23 0.80 0.99 1.97
2.0 0.95 0.95 0.90 0.95 0.86 1.71
PLANILLA DE COMPUTOS METRICOS
PROYECTO : E. D. T. P. "CONST. SISTEMA DE RIEGO COMUNIDAD INCA CORRAL"
POSITIVO
No ITEM UNID. PZA PARC. TOTAL
L A AREA H VOL.
Sub Ramal 5 Pte. Pasarela L=15m +/- 2m HDPE D=2" (0+022 - 0+037) 2.0 1.45 0.85 1.23 0.80 0.99 1.97
2.0 0.95 0.95 0.90 0.95 0.86 1.71
Sub Ramal 5 Pte. Pasarela L=15m +/- 2m HDPE D=2" (0+048 - 0+063) 2.0 1.45 0.85 1.23 0.80 0.99 1.97
2.0 0.95 0.95 0.90 0.95 0.86 1.71
Sub Ramal 5 Pte. Pasarela L=15m +/- 2m HDPE D=2" (0+064 - 0+079) 2.0 1.45 0.85 1.23 0.80 0.99 1.97
2.0 0.95 0.95 0.90 0.95 0.86 1.71
Sub Ramal 5 Pte. Pasarela L=20m +/- 2m HDPE D=2" (0+087 - 0+107) 2.0 1.50 0.90 1.35 0.85 1.15 2.30
2.0 1.05 1.05 1.10 1.05 1.16 2.32
Sub Ramal 5 Pte. Pasarela L=10m +/- 2m HDPE D=2" (0+272 - 0+282) 2.0 0.90 0.90 0.81 0.90 0.73 1.46
2.0 0.95 0.95 0.90 0.90 0.81 1.62
Sub Ramal 5 Pte. Pasarela L=10m +/- 2m HDPE D=2" (1+059 - 1+067) 2.0 0.90 0.90 0.81 0.90 0.73 1.46
2.0 0.95 0.95 0.90 0.90 0.81 1.62
Pasos de Quebrada
Aduccion 1 Paso de Quebrada L=6m +/- 1m HDPE D=4" (0+041 - 0+047) 2.0 0.40 0.40 0.16 0.50 0.08 0.16

Aduccion 1 Paso de Quebrada L=6m +/- 1m HDPE D=4" (0+784 - 0+790) 2.0 0.40 0.40 0.16 0.50 0.08 0.16

Aduccion 1 Paso de Quebrada L=6m +/- 1m HDPE D=4" (0+992 - 0+997) 2.0 0.40 0.40 0.16 0.50 0.08 0.16

Ramal 4 Paso de Quebrada L=6m +/- 1m HDPE D=2.5" (0+859 - 0+865) 2.0 0.40 0.40 0.16 0.50 0.08 0.16

Ramal 4 Paso de Quebrada L=6m +/- 1m HDPE D=2.5" (0+889 - 0+895) 2.0 0.40 0.40 0.16 0.50 0.08 0.16

Ramal 4 Paso de Quebrada L=6m +/- 1m HDPE D=2" (1+087 - 1+093) 2.0 0.40 0.40 0.16 0.50 0.08 0.16

Ramal 5 Paso de Quebrada L=6m +/- 1m HDPE D=2" (0+085 - 0+091) 2.0 0.40 0.40 0.16 0.50 0.08 0.16

Ramal 5 Paso de Quebrada L=6m +/- 1m HDPE D=2" (0+134 - 0+200) 2.0 0.40 0.40 0.16 0.50 0.08 0.16

Ramal 5 Paso de Quebrada L=6m +/- 1m HDPE D=2" (0+213 - 0+219) 2.0 0.40 0.40 0.16 0.50 0.08 0.16

Ramal 5 Paso de Quebrada L=6m +/- 1m HDPE D=2" (0+310 - 0+316) 2.0 0.40 0.40 0.16 0.50 0.08 0.16

Ramal 5 Paso de Quebrada L=6m +/- 1m HDPE D=2" (0+595 - 0+601) 2.0 0.40 0.40 0.16 0.50 0.08 0.16

Ramal 5 Paso de Quebrada L=6m +/- 1m HDPE D=2" (0+755 - 0+761) 2.0 0.40 0.40 0.16 0.50 0.08 0.16

Ramal 5 Paso de Quebrada L=6m +/- 1m HDPE D=2" (0+900 - 0+906) 2.0 0.40 0.40 0.16 0.50 0.08 0.16

Sub Ramal 4 Paso de Quebrada L=6m +/- 1m HDPE D=2" (0+032 - 0+038) 2.0 0.40 0.40 0.16 0.50 0.08 0.16

Sub Ramal 4 Paso de Quebrada L=6m +/- 1m HDPE D=2" (0+180 - 0+186) 2.0 0.40 0.40 0.16 0.50 0.08 0.16

Sub Ramal 5 Paso de Quebrada L=6m +/- 1m HDPE D=2" (0+115 - 0+121) 2.0 0.40 0.40 0.16 0.50 0.08 0.16

Sub Ramal 6 Paso de Quebrada L=6m +/- 1m HDPE D=2" (0+131 - 0+137) 2.0 0.40 0.40 0.16 0.50 0.08 0.16

Ramal 6 Paso de Quebrada L=6m +/- 1m HDPE D=2" (0+137 - 0+143) 2.0 0.40 0.40 0.16 0.50 0.08 0.16

73 PTE PASARELA L=10m +/- 2m CELOSIA METALICA HDPE D=2" pza 16.00
Ramal 1 Pte. Pasarela L=10m +/- 2m HDPE D=2" (1+051 - 1+061) 1.0 1.00
Ramal 2 Pte. Pasarela L=10m +/- 2m HDPE D=2" (1+506 - 1+516) 1.0 1.00
Ramal 4 Pte. Pasarela L=10m +/- 2m HDPE D=2" (1+167 - 1+177) 1.0 1.00
Ramal 4 Pte. Pasarela L=10m +/- 2m HDPE D=2" (1+228 - 1+238) 1.0 1.00
Ramal 4 Pte. Pasarela L=10m +/- 2m HDPE D=2" (1+374 - 1+384) 1.0 1.00
Ramal 5 Pte. Pasarela L=10m +/- 2m HDPE D=2" (0+162 - 0+172) 1.0 1.00
Ramal 5 Pte. Pasarela L=10m +/- 2m HDPE D=2" (0+320 - 0+330) 1.0 1.00
Ramal 5 Pte. Pasarela L=10m +/- 2m HDPE D=2" (0+387 - 0+397) 1.0 1.00
Ramal 5 Pte. Pasarela L=10m +/- 2m HDPE D=2" (0+402 - 0+412) 1.0 1.00
Ramal 5 Pte. Pasarela L=10m +/- 2m HDPE D=2" (0+453 - 0+463) 1.0 1.00
Ramal 5 Pte. Pasarela L=10m +/- 2m HDPE D=2" (0+583 - 0+593) 1.0 1.00
Ramal 5 Pte. Pasarela L=10m +/- 2m HDPE D=2" (0+694 - 0+704) 1.0 1.00
Ramal 5 Pte. Pasarela L=10m +/- 2m HDPE D=2" (0+761 - 0+771) 1.0 1.00
Ramal 5 Pte. Pasarela L=10m +/- 2m HDPE D=2" (0+854 - 0+864) 1.0 1.00
Sub Ramal 5 Pte. Pasarela L=10m +/- 2m HDPE D=2" (0+272 - 0+282) 1.0 1.00
Sub Ramal 5 Pte. Pasarela L=10m +/- 2m HDPE D=2" (1+059 - 1+067) 1.0 1.00

74 PTE PASARELA L=10m +/- 2m CELOSIA METALICA HDPE D=2.5" pza 2.00
Dist. Principal 1 Pte. Pasarela L=10m +/- 2m HDPE D=2.5" (2+238 - 2+248) 1.0 1.00
Ramal 2 Pte. Pasarela L=10m +/- 2m HDPE D=2.5" (0+981 - 0+991) 1.0 1.00

75 PTE PASARELA L=10m +/- 2m CELOSIA METALICA HDPE D=3" pza 1.00
Dist. Principal 2 Pte. Pasarela L=10m +/- 2m HDPE D=3" (0+239 - 0+249) 1.0 1.00

76 PTE PASARELA L=10m +/- 2m CELOSIA METALICA HDPE D=4" pza 3.00
Aduccion Pte. Pasarela L=10m +/- 2m HDPE D=4" (0+069 - 0+0479) 1.0 1.00
Aduccion Pte. Pasarela L=10m +/- 2m HDPE D=4" (1+600 - 1+610) 1.0 1.00
Aduccion Pte. Pasarela L=10m +/- 2m HDPE D=4" (1+943 - 1+953) 1.0 1.00
PLANILLA DE COMPUTOS METRICOS
PROYECTO : E. D. T. P. "CONST. SISTEMA DE RIEGO COMUNIDAD INCA CORRAL"
POSITIVO
No ITEM UNID. PZA PARC. TOTAL
L A AREA H VOL.
77 PTE PASARELA L=15m +/- 2m CELOSIA METALICA HDPE D=2" pza 8.00
Ramal 2 Pte. Pasarela L=15m +/- 2m HDPE D=2" (1+222 - 1+237) 1.0 1.00
Ramal 4 Pte. Pasarela L=15m +/- 2m HDPE D=2" (1+142 - 1+157) 1.0 1.00
Ramal 5 Pte. Pasarela L=15m +/- 2m HDPE D=2" (0+128 - 0+143) 1.0 1.00
Ramal 5 Pte. Pasarela L=15m +/- 2m HDPE D=2" (0+667 - 0+682) 1.0 1.00
Sub Ramal 4 Pte. Pasarela L=15m +/- 2m HDPE D=2" (0+074 - 0+089) 1.0 1.00
Sub Ramal 5 Pte. Pasarela L=15m +/- 2m HDPE D=2" (0+022 - 0+037) 1.0 1.00
Sub Ramal 5 Pte. Pasarela L=15m +/- 2m HDPE D=2" (0+048 - 0+063) 1.0 1.00
Sub Ramal 5 Pte. Pasarela L=15m +/- 2m HDPE D=2" (0+064 - 0+079) 1.0 1.00

78 PTE PASARELA L=15m +/- 2m CELOSIA METALICA HDPE D=2.5" pza 2.00
Ramal 2 Pte. Pasarela L=15m +/- 2m HDPE D=2.5" (0+423 - 0+438) 1.0 1.00
Ramal 4 Pte. Pasarela L=15m +/- 2m HDPE D=2.5" (0+782 - 0+797) 1.0 1.00

79 PTE PASARELA L=15m +/- 2m CELOSIA METALICA HDPE D=3" pza 1.00
Dist. Principal 1 Pte. Pasarela L=15m +/- 2m HDPE D=3" (2+123 - 2+138) 1.0 1.00

80 PTE PASARELA L=15m +/- 2m CELOSIA METALICA HDPE D=4" pza 2.00
Aduccion Pte. Pasarela L=15m +/- 2m HDPE D=4" (0+688 - 0+703) 1.0 1.00
Aduccion T1-T2 Pte. Pasarela L=15m +/- 2m HDPE D=4" (0+825 - 0+840) 1.0 1.00

81 PTE PASARELA L=20m +/- 2m CELOSIA METALICA HDPE D=2" pza 2.00
Sub Ramal 3 Pte. Pasarela L=20m +/- 2m HDPE D=2" (0+110 - 0+130) 1.0 1.00
Sub Ramal 5 Pte. Pasarela L=20m +/- 2m HDPE D=2" (0+087 - 0+107) 1.0 1.00

82 PTE PASARELA L=20m +/- 2m CELOSIA METALICA HDPE D=2.5" pza 1.00
Ramal 2 Pte. Pasarela L=20m +/- 2m HDPE D=2.5" (0+639 - 0+659) 1.0 1.00

83 PTE PASARELA L=20m +/- 2m CELOSIA METALICA HDPE D=4" pza 5.00
Aduccion Pte. Pasarela L=20m +/- 2m HDPE D=4" (1+086 - 1+106) 1.0 1.00
Aduccion Pte. Pasarela L=20m +/- 2m HDPE D=4" (1+183 - 1+203) 1.0 1.00
Aduccion Pte. Pasarela L=20m +/- 2m HDPE D=4" (1+276 - 1+296) 1.0 1.00
Aduccion Pte. Pasarela L=20m +/- 2m HDPE D=4" (1+395 - 1+415) 1.0 1.00
Dist. Principal 1 Pte. Pasarela L=20m +/- 2m HDPE D=4" (0+813 - 0+833) 1.0 1.00

84 PTE PASARELA L=25m +/- 2m CELOSIA METALICA HDPE D=2.5" pza 1.00
Ramal 2 Pte. Pasarela L=25m +/- 2m HDPE D=2.5" (0+767 - 0+792) 1.0 1.00

85 PTE PASARELA L=30m +/- 2m CELOSIA METALICA HDPE D=2" pza 1.00
Ramal 3 Pte. Pasarela L=30m +/- 2m HDPE D=2" (0+620 - 0+650) 1.0 1.00

86 PTE PASARELA L=40m +/- 2m CELOSIA METALICA HDPE D=4" pza 1.00
Aduccion Pte. Pasarela L=40m +/- 2m HDPE D=4" (2+254 - 2+294) 1.0 1.00

87 PASO DE QUEBRADA L=6m +/- 1m CELOSIA METALICA HDPE D=2" pza 13.00
Ramal 4 Paso de Quebrada L=6m +/- 1m HDPE D=2" (1+087 - 1+093) 1.0 1.00
Ramal 5 Paso de Quebrada L=6m +/- 1m HDPE D=2" (0+085 - 0+091) 1.0 1.00
Ramal 5 Paso de Quebrada L=6m +/- 1m HDPE D=2" (0+134 - 0+200) 1.0 1.00
Ramal 5 Paso de Quebrada L=6m +/- 1m HDPE D=2" (0+213 - 0+219) 1.0 1.00
Ramal 5 Paso de Quebrada L=6m +/- 1m HDPE D=2" (0+310 - 0+316) 1.0 1.00
Ramal 5 Paso de Quebrada L=6m +/- 1m HDPE D=2" (0+595 - 0+601) 1.0 1.00
Ramal 5 Paso de Quebrada L=6m +/- 1m HDPE D=2" (0+755 - 0+761) 1.0 1.00
Ramal 5 Paso de Quebrada L=6m +/- 1m HDPE D=2" (0+900 - 0+906) 1.0 1.00
Sub Ramal 4 Paso de Quebrada L=6m +/- 1m HDPE D=2" (0+032 - 0+038) 1.0 1.00
Sub Ramal 4 Paso de Quebrada L=6m +/- 1m HDPE D=2" (0+180 - 0+186) 1.0 1.00
Sub Ramal 5 Paso de Quebrada L=6m +/- 1m HDPE D=2" (0+115 - 0+121) 1.0 1.00
Sub Ramal 6 Paso de Quebrada L=6m +/- 1m HDPE D=2" (0+131 - 0+137) 1.0 1.00
Ramal 6 Paso de Quebrada L=6m +/- 1m HDPE D=2" (0+137 - 0+143) 1.0 1.00

88 PASO DE QUEBRADA L=6m +/- 1m CELOSIA METALICA HDPE D=2.5" pza 2.00
Ramal 4 Paso de Quebrada L=6m +/- 1m HDPE D=2.5" (0+859 - 0+865) 1.0 1.00
Ramal 4 Paso de Quebrada L=6m +/- 1m HDPE D=2.5" (0+889 - 0+895) 1.0 1.00

89 PASO DE QUEBRADA L=6m +/- 1m CELOSIA METALICA HDPE D=4" pza 3.00
Aduccion 1 Paso de Quebrada L=6m +/- 1m HDPE D=4" (0+041 - 0+047) 1.0 1.00
Aduccion 1 Paso de Quebrada L=6m +/- 1m HDPE D=4" (0+784 - 0+790) 1.0 1.00
Aduccion 1 Paso de Quebrada L=6m +/- 1m HDPE D=4" (0+992 - 0+997) 1.0 1.00

90 C. DE PURGA HºCº D=2" + ACC. FG/HDPE + TAP MET pza 1.00


Ramal 4 (1+142) 1.0 1.00

91 C. DE PURGA HºCº D=2.5" + ACC. FG/HDPE + TAP MET pza 1.00


Ramal 2 (1+055) 1.0 1.00

92 C. DE PURGA HºCº D=3" + ACC. FG/HDPE + TAP MET pza 1.00


Dist. Principal (2+198) 1.0 1.00

93 C. DE PURGA HºCº D=4" + ACC. FG/HDPE + TAP MET pza 3.00


Aduccion (0+980) 1.0 1.00
Aduccion (3+375) 1.0 1.00
Aduccion T1-T2 (1+640) 1.0 1.00
PLANILLA DE COMPUTOS METRICOS
PROYECTO : E. D. T. P. "CONST. SISTEMA DE RIEGO COMUNIDAD INCA CORRAL"
POSITIVO
No ITEM UNID. PZA PARC. TOTAL
L A AREA H VOL.
94 C. VENTOSA AUTOMATICA HºCº D=2" + ACC. FG/HDPE + TAP MET pza 2.00
Dist. Principal (2+600) 1.0 1.00
Ramal 4 (1+420) 1.0 1.00

95 C. VENTOSA AUTOMATICA HºCº D=2.5" + ACC. FG/HDPE + TAP MET pza 1.00
Ramal 2 (1+055) 1.0 1.00

96 C. VENTOSA AUTOMATICA HºCº D=4" + ACC. FG/HDPE + TAP MET pza 2.00
Aduccion (1+820) 1.0 1.00
Aduccion (3+660) 1.0 1.00

97 C. DE DISTRIB. SIMPLE HºCº D=4"- 3" + ACC. HDPE/FG + TAP MET pza 3.00
Dist. Principal T1 (0+460) 1.0 1.00
Dist. Principal T1 (0+840) 1.0 1.00
Dist. Principal T2 (0+060) 1.0 1.00

98 C. DE DISTRIB. SIMPLE HºCº D=4"- 2" + ACC. HDPE/FG + TAP MET pza 1.00
Dist. Principal T1 (1+080) 1.0 1.00

99 C. DE DISTRIB. SIMPLE HºCº D=3"- 2" + ACC. HDPE/FG + TAP MET pza 1.00
Dist. Principal T1 (0+300) 1.0 1.00

100 C. DE DISTRIB. SIMPLE HºCº D=2.5"- 2" + ACC. HDPE/FG + TAP MET pza 1.00
Ramal 2 (1+060) 1.0 1.00

101 C. DE DISTRIB. SIMPLE HºCº D=2"- 2" + ACC. HDPE/FG + TAP MET pza 4.00
Dist. Principal T2 (0+940) 1.0 1.00
Ramal 2 (1+480) 1.0 1.00
Ramal 3 (0+080) 1.0 1.00
Sub Ramal 5 (0+200) 1.0 1.00

102 C. DE DISTRIB. DOBLE HºCº D=2"- 2" + ACC. HDPE/FG + TAP MET pza 1.00
Ramal 5 (0+800) 1.0 1.00

103 C. DE VALVULA ROMPEPRESION HºCº D=2.5" + ACC. FG/HDPE + TAP/MET pza 1.00
Ramal 1 (0+500) 1.0 1.00

104 C. HIDRANTE DE HºCº D=1.5" + ACC. FG/HDPE + TAP/MET pza 72.00


Hidrantes 72.0 72.00

MODULO 09 CAMARA ROMPE PRESION DE HºAº D=4"

105 REPLANTEO Y TRAZADO m² 20.05


Camara Rompepresion 3.0 2.75 1.65 4.54 13.61
Camara de llaves 3.0 1.30 1.65 2.15 6.44

106 EXCAVACION (0-2M) SUELO SEMIDURO m³ 17.04


Camara Rompepresion 3.0 2.75 1.65 4.54 0.85 3.86 11.57
Camara de llaves 3.0 1.30 1.65 2.15 0.85 1.82 5.47

107 ZAMPEADO DE PIEDRA m³ 20.05


Camara Rompepresion 3.0 2.75 1.65 4.54 13.61
Camara de llaves 3.0 1.30 1.65 2.15 6.44

108 HºCº FUNDACIONES TIPO "B" 50% P.D. m³ 1.29


Camara de llaves 3.0 1.30 1.65 2.15 0.20 0.43 1.29

109 LOSA BASE DE HºAº m² 2.72


3.0 2.75 1.65 4.54 0.20 0.91 2.72

110 HºCº ELEVACIONES TIPO "B" 50% P.D. m³ 2.14


Muro Longitudinal 6.0 0.90 0.20 0.18 0.70 0.13 0.76
Muro Transversal 6.0 1.65 0.20 0.33 0.70 0.23 1.39
PLANILLA DE COMPUTOS METRICOS
PROYECTO : E. D. T. P. "CONST. SISTEMA DE RIEGO COMUNIDAD INCA CORRAL"
POSITIVO
No ITEM UNID. PZA PARC. TOTAL
L A AREA H VOL.
111 MURO DE HºAº m² 7.31
Muro Longitudinal 6.0 2.75 0.20 0.55 1.40 0.77 4.62
Muro Transversal 6.0 1.25 0.20 0.25 1.40 0.35 2.10
Muro Pantalla 3.0 1.25 0.15 0.19 1.05 0.20 0.59

112 LOSA TAPA DE HºAº m³ 1.25


Tapa camara rompepresion 3.0 2.75 1.65 4.54 0.10 0.45 1.36
3.0 0.40 0.90 0.36 -0.10 -0.04 -0.11

113 REVOQUE Y ENLUCIDO C/SIKA (E=2.5CM) m² 48.42


Interior
Base camara rompepresion 3.0 1.60 1.25 2.00 6.00
Muros camara rompepresion 12.0 1.60 1.40 2.24 26.88
Muros camara rompepresion 6.0 1.25 1.40 1.75 10.50
Muros camara rompepresion 6.0 0.60 1.40 0.84 5.04

114 REVOQUE DE CEMENTO S/MURO DE Hº m² 51.95


Exterior
Camara rompepresion 6.0 2.75 1.40 3.85 23.10
3.0 1.65 1.40 2.31 6.93
3.0 1.65 0.80 1.32 3.96
Camara de Llaves 6.0 1.30 0.70 0.91 5.46
3.0 1.65 0.70 1.16 3.47
Interior
Camara de Llaves 6.0 0.90 0.70 0.63 3.78
6.0 1.25 0.70 0.88 5.25

115 PINTURA LATEX EXTERIOR m² 56.53


Camara rompepresion 6.0 2.75 1.40 3.85 23.10
3.0 1.65 1.40 2.31 6.93
3.0 1.65 0.80 1.32 3.96
Camara de Llaves 6.0 1.30 0.70 0.91 5.46
3.0 1.65 0.70 1.16 3.47
Tapa 3.0 2.75 1.65 4.54 13.61

116 ACCESORIOS CAMARA ROMPEPRESION D=3" FG/HDPE + TAP/MET pza 3.00


3.0 3.00

MODULO 10 COMPONENTE AMBIENTAL

117 ANÁLISIS FISICO-QUIMICO DE AGUA PARA RIEGO Mtra 1.00


INCA CORRAL 1.0 1.00

118 LETREROS DE SEÑALIZACION AMBIENTAL pza 10.00

10.0 10.00

119 LETRINA ECOLOGICA CON ARRASTRE DE AGUA + POZO DE ABSORCION pza 2.00

2.0 2.00
PLANILLA DE COMPUTOS METRICOS
PROYECTO : E. D. T. P. "CONST. SISTEMA DE RIEGO COMUNIDAD INCA CORRAL"
POSITIVO
No ITEM UNID. PZA PARC. TOTAL
L A AREA H VOL.
120 BASUREROS PLASTICOS TIPO ARTURITO V=120 LT pza 4.00

4.0 4.00

121 CINTA PLASTICA DE SEGURIDAD m 2000.00

2000 2000.00

122 PASOS PEATONALES P/ZANJAS CON PASA MANOS FG pza 2.00

2.0 2.00

MODULO 11 MEDIDAS DE ADAPTACION AL CAMBIO CLIMATICO

123 EXCAVACION (0-2 M) SUELO SEMIDURO m³ 64.00


1.0 80.00 1.00 80.00 0.80 64.00 64.00

124 MURO DE CONTENCION CON GAVIONES m³ 80.00


1.0 80.00 1.00 80.00 1.00 80.00 80.00

125 BOMBAS ANTIGRANIZO ARTESANAL pza 50.00


50.0 50.00

126 LANZADORES DE BOMBAS ANTIGRANIZO ARTESANAL pza 5.00


5.0 5.00
LISTA DE ÍTEMS

PROYECTO: E. D. T. P. "CONST. SISTEMA DE RIEGO COMUNIDAD INCA CORRAL"


UBICACIÓN: INCA CORRAL - HUAYRA KASA
CLIENTE: G.A.M. DE TOROTORO
ÍTEM DESCRIPCIÓN UNIDAD CANTIDAD
MODULO 01 OBRAS PRELIMINARES
1 INSTALACION DE FAENAS glb 1.00
2 LETRERO DE OBRA MURO LADRILLO (SEGÚN DISEÑO) pza 1.00
3 LETRERO DE OBRA DE MADERA (SEGÚN DISEÑO) pza 1.00
4 PLACA ENTREGA DE OBRA 50X70CM (SEGÚN DISEÑO) pza 1.00
5 MOVILIZACION Y DESMOVILIZACION glb 1.00
MODULO 02 OBRA DE TOMA
6 REPLANTEO Y TRAZADO m² 25.27
7 EXCAVACION EN ROCA m³ 8.01
8 HºCº FUNDACIONES TIPO "B" 50% P.D. m³ 8.01
9 HºCº ELEVACIONES TIPO "B" 50% P.D. m³ 18.07
10 REVOQUE DE CEMENTO S/MURO DE Hº m² 41.34
11 REJA METALICA FG D=1" C/2.54 CM m² 0.06
12 ACCESORIOS TOMA ZUD D=4" FG/HDPE Pza 1.00
MODULO 03 CAMARA DE CAPTACION Y LLAVES
13 REPLANTEO Y TRAZADO m² 3.38
14 EXCAVACION EN ROCA m³ 4.06
15 ZAMPEADO DE PIEDRA m² 3.38
16 HºCº FUNDACIONES TIPO "B" 50% P.D. m³ 0.51
17 HºCº ELEVACIONES TIPO "B" 50% P.D. m³ 1.38
18 REVOQUE Y ENLUCIDO C/SIKA (E=2.5CM. ) m² 5.00
19 REVOQUE DE CEMENTO S/MURO DE Hº m² 14.83
20 ACC. CAMARAS TOMA D=4" FG/HDPE + TAP/MET glb 1.00
MODULO 04 LINEA DE ADUCCIÓN
21 REPLANTEO Y CONTROL LINEAS DE TUBERÍA m 6933.13
22 EXCAVACION DE ZANJA (0-1.5 M) SUELO ROCOSO m³ 325.53
23 EXCAVACION DE ZANJA (0-1.5 M) SUELO DURO m³ 940.56
24 EXCAVACION DE ZANJA (0-1.5 M) SUELO SEMI DURO m³ 351.90
25 RELLENO Y COMP. C/MAQUINARIA C/TIERRA CERNIDA m³ 538.81
26 PROV. Y TEND. TUB. SUPERTUBO HDPE D=110mm PN-8 m 6011.61
27 PROV. Y TEND. TUB. SUPERTUBO HDPE D=110mm PN-10 m 597.78
28 PROV. Y TEND. TUB. SUPERTUBO HDPE D=110mm PN-12.5 m 121.75
29 PROV. Y TEND. TUB. SUPERTUBO HDPE D=110mm PN-16 m 201.99
30 RELLENO Y COMP. C/MAQUINARIA C/TIERRA COMUN m³ 1079.17
31 PRUEBA HIDRAULICA (HASTA D=4") m 6933.13
MODULO 05 TANQUE DE ALMACENAMIENTO DE HºA°
32 REPLANTEO Y TRAZADO m² 225.48
33 EXCAVACION (0-2 M) SUELO SEMIDURO m³ 224.48
34 ZAMPEADO DE PIEDRA m2 220.48
35 LOSA BASE DE HºAº m³ 44.10
36 MURO DE HºAº m² 43.01
37 HºCº CAMARAS DE ENTRADA Y SALIDA m³ 2.57
38 REVOQUE Y ENLUCIDO C/SIKA (E=2.5CM. ) m² 352.00
39 REVOQUE DE CEMENTO S/MURO DE Hº m² 203.44
40 PINTURA LATEX EXTERIOR m² 190.48
41 ACCESORIOS TANQUE I=4" ; S=4" FG/HDPE + TAP/MET glb 2.00
MODULO 06 RED DE DISTRIBUCION
42 REPLANTEO Y CONTROL LINEAS DE TUBERÍA m 13517.23
43 EXCAVACION DE ZANJA (0-1.5 M) SUELO ROCOSO m³ 469.13
44 EXCAVACION DE ZANJA (0-1.5 M) SUELO DURO m³ 1499.62
45 EXCAVACION DE ZANJA (0-1.5 M) SUELO SEMIDURO m³ 2171.16
46 RELLENO Y COMP. C/MAQUINARIA C/TIERRA CERNIDA m³ 1034.98
47 PROV. Y TEND. TUB. SUPERTUBO HDPE D=63mm PN-8 m 4437.91
48 PROV. Y TEND. TUB. SUPERTUBO HDPE D=63mm PN-10 m 1492.46
49 PROV. Y TEND. TUB. SUPERTUBO HDPE D=63mm PN-12.5 m 813.91
50 PROV. Y TEND. TUB. SUPERTUBO HDPE D=63mm PN-16 m 1077.39
51 PROV. Y TEND. TUB. SUPERTUBO HDPE D=75mm PN-8 m 1436.94
52 PROV. Y TEND. TUB. SUPERTUBO HDPE D=75mm PN-10 m 213.83
53 PROV. Y TEND. TUB. SUPERTUBO HDPE D=75mm PN-12.5 m 185.93
54 PROV. Y TEND. TUB. SUPERTUBO HDPE D=75mm PN-16 m 201.88
55 PROV. Y TEND. TUB. SUPERTUBO HDPE D=90mm PN-8 m 1663.57
56 PROV. Y TEND. TUB. SUPERTUBO HDPE D=90mm PN-10 m 540.73
57 PROV. Y TEND. TUB. SUPERTUBO HDPE D=90mm PN-12.5 m 240.41
58 PROV. Y TEND. TUB. SUPERTUBO HDPE D=110mm PN-8 m 787.15
59 PROV. Y TEND. TUB. SUPERTUBO HDPE D=110mm PN-10 m 101.48
60 PROV. Y TEND. TUB. SUPERTUBO HDPE D=110mm PN-12.5 m 101.47
61 PROV. Y TEND. TUB. SUPERTUBO HDPE D=110mm PN-16 m 222.16
ÍTEM DESCRIPCIÓN UNIDAD CANTIDAD
62 RELLENO Y COMP. C/MAQUINARIA C/TIERRA COMUN m³ 3104.93
63 PRUEBA HIDRAULICA (HASTA D=4") m 13517.23
ÍTEM DESCRIPCIÓN UNIDAD CANTIDAD
MODULO 07 CERCO PERIMETRAL CON MALLA OLIMPICA
64 REPLANTEO DE MURO DE CERCO PERIMETRAL m 102.40
65 EXCAVACION (0-2 M) SUELO SEMIDURO m³ 18.43
66 CIMIENTOS DE HºCº TIPO "B" 50% PD m³ 18.43
67 SOBRE CIMIENTOS DE HºCº TIPO "B" 50% PD m³ 4.51
68 ACERA DE CEMENTO + EMPEDRADO E=5CM TIPO "B" m² 91.72
69 CERCO DE MALLA OLIMPICA FG D=2" + ALAMBRE DE PUAS 3 HILERAS m² 200.00
70 PUERTA METALICA C/MALLA OLIMPICA F.G. Ø 2" m² 4.50
MODULO 08 ESTRUCTURAS ESPECIALES
71 EXCAVACION (0-2 M) SUELO SEMIDURO m³ 196.01
72 HºCº FUNDACIONES TIPO "B" 50% P.D. m³ 196.01
73 PTE PASARELA L=10m +/- 2m CELOSIA METALICA HDPE D=2" pza 16.00
74 PTE PASARELA L=10m +/- 2m CELOSIA METALICA HDPE D=2.5" pza 2.00
75 PTE PASARELA L=10m +/- 2m CELOSIA METALICA HDPE D=3" pza 1.00
76 PTE PASARELA L=10m +/- 2m CELOSIA METALICA HDPE D=4" pza 3.00
77 PTE PASARELA L=15m +/- 2m CELOSIA METALICA HDPE D=2" pza 8.00
78 PTE PASARELA L=15m +/- 2m CELOSIA METALICA HDPE D=2.5" pza 2.00
79 PTE PASARELA L=15m +/- 2m CELOSIA METALICA HDPE D=3" pza 1.00
80 PTE PASARELA L=15m +/- 2m CELOSIA METALICA HDPE D=4" pza 2.00
81 PTE PASARELA L=20m +/- 2m CELOSIA METALICA HDPE D=2" pza 2.00
82 PTE PASARELA L=20m +/- 2m CELOSIA METALICA HDPE D=2.5" pza 1.00
83 PTE PASARELA L=20m +/- 2m CELOSIA METALICA HDPE D=4" pza 5.00
84 PTE PASARELA L=25m +/- 2m CELOSIA METALICA HDPE D=2.5" pza 1.00
85 PTE PASARELA L=30m +/- 2m CELOSIA METALICA HDPE D=2" pza 1.00
86 PTE PASARELA L=40m +/- 2m CELOSIA METALICA HDPE D=4" pza 1.00
87 PASO DE QUEBRADA L=6m +/- 1m CELOSIA METALICA HDPE D=2" pza 13.00
88 PASO DE QUEBRADA L=6m +/- 1m CELOSIA METALICA HDPE D=2.5" pza 2.00
89 PASO DE QUEBRADA L=6m +/- 1m CELOSIA METALICA HDPE D=4" pza 3.00
90 C. DE PURGA HºCº D=2" + ACC. FG/HDPE + TAP MET pza 1.00
91 C. DE PURGA HºCº D=2.5" + ACC. FG/HDPE + TAP MET pza 1.00
92 C. DE PURGA HºCº D=3" + ACC. FG/HDPE + TAP MET pza 1.00
93 C. DE PURGA HºCº D=4" + ACC. FG/HDPE + TAP MET pza 3.00
94 C. VENTOSA AUTOMATICA HºCº D=2" + ACC. FG/HDPE + TAP MET pza 2.00
95 C. VENTOSA AUTOMATICA HºCº D=2.5" + ACC. FG/HDPE + TAP MET pza 1.00
96 C. VENTOSA AUTOMATICA HºCº D=4" + ACC. FG/HDPE + TAP MET pza 2.00
97 C. DE DISTRIB. SIMPLE HºCº D=4"- 3" + ACC. HDPE/FG + TAP MET pza 3.00
98 C. DE DISTRIB. SIMPLE HºCº D=4"- 2" + ACC. HDPE/FG + TAP MET pza 1.00
99 C. DE DISTRIB. SIMPLE HºCº D=3"- 2" + ACC. HDPE/FG + TAP MET pza 1.00
100 C. DE DISTRIB. SIMPLE HºCº D=2.5"- 2" + ACC. HDPE/FG + TAP MET pza 1.00
101 C. DE DISTRIB. SIMPLE HºCº D=2"- 2" + ACC. HDPE/FG + TAP MET pza 4.00
102 C. DE DISTRIB. DOBLE HºCº D=2"- 2" + ACC. HDPE/FG + TAP MET pza 1.00
103 C. DE VALVULA ROMPEPRESION HºCº D=2.5" + ACC. FG/HDPE + TAP/MET pza 1.00
104 C. HIDRANTE DE HºCº D=1.5" + ACC. FG/HDPE + TAP/MET pza 72.00
MODULO 09 CAMARA ROMPE PRESION DE HºAº D=4"
105 REPLANTEO Y TRAZADO m² 20.05
106 EXCAVACION (0-2M) SUELO SEMIDURO m³ 17.04
107 ZAMPEADO DE PIEDRA m³ 20.05
108 HºCº FUNDACIONES TIPO "B" 50% P.D. m³ 1.29
109 LOSA BASE DE HºAº m² 2.72
110 HºCº ELEVACIONES TIPO "B" 50% P.D. m³ 2.14
111 MURO DE HºAº m² 7.31
112 LOSA TAPA DE HºAº m³ 1.25
113 REVOQUE Y ENLUCIDO C/SIKA (E=2.5CM) m² 48.42
114 REVOQUE DE CEMENTO S/MURO DE Hº m² 51.95
115 PINTURA LATEX EXTERIOR m² 56.53
116 ACCESORIOS CAMARA ROMPEPRESION D=3" FG/HDPE + TAP/MET pza 3.00
MODULO 10 COMPONENTE AMBIENTAL
117 ANÁLISIS FISICO-QUIMICO DE AGUA PARA RIEGO Mtra 1.00
118 LETREROS DE SEÑALIZACION AMBIENTAL pza 10.00
119 LETRINA ECOLOGICA CON ARRASTRE DE AGUA + POZO DE ABSORCION pza 2.00
120 BASUREROS PLASTICOS TIPO ARTURITO V=120 LT pza 4.00
121 CINTA PLASTICA DE SEGURIDAD m 2000.00
122 PASOS PEATONALES P/ZANJAS CON PASA MANOS FG pza 2.00
MODULO 11 MEDIDAS DE ADAPTACION AL CAMBIO CLIMATICO
123 EXCAVACION (0-2 M) SUELO SEMIDURO m³ 64.00
124 MURO DE CONTENCION CON GAVIONES m³ 80.00
125 BOMBAS ANTIGRANIZO ARTESANAL pza 50.00
126 LANZADORES DE BOMBAS ANTIGRANIZO ARTESANAL pza 5.00