Está en la página 1de 6

Pozo: SAL-15 Liner Hanger @ 4113.

7 m Date: 03 Jul 2010


Casing: 7in ( 29.0 #) MD: 4450 m BHST 217°F
Trabajo: Cementacion remedial con retenedor de cemento TVD: 4433 m BHCT 185°F
Cement Volume
OD ID Capacidad Tope Fondo Longitud Volumen
Previous Casing 9 5/8'' 8.535 0.23 bbl/m 4114 m to 4114 m = 0m = 0.0 bbls
Bit Size / Open Hole 8 1/2'' 0.230 bbl/m 4250 m to 4392 m = 142 m = 32.7 bbls
Caliper Measurement 8.750 '' 0.244 bbl/m
2.0 bbls
Excess: On Open Hole 6.0% On Annulus 6.0%
34.6 bbls
Casing-Displace 7 '' 0.156 bbl/m 4250 m to 4392 m = 142 m = 22.2 bbls
Shoe-Track 7 '' 6.004 0.115 bbl/m 4392 m to 4392 m = 0m = 0.0 bbls

Volumen Anular Casing Anterior 0.08 b/m Cemento sobre colgador de liner 0m 0.0 bbls
OH/Liner 0.09 b/m Exceso de cemento 355% 44.3 bbls
Displacement Recalculate Before the Job
Drillpipe 5 7/8 '' 5.045 '' 0.081 bbl/m 3077 m 249.6 bbls
Drillpipe 4 '' 3.340 '' 0.036 bbl/m 1315 m 46.8 bbls
Riser 7 '' 6.184 '' 0.122 bbl/m 0m 0.0 bbls Cement Volume: 57.0 bbls
HP Line FMC 1502 1.875 '' 0.011 bbl/m 60 m 0.7 bbls
Mud Compressibility 1.0% check with mud engineer 0.5 bbls
Total Maximum Displacement: 297 bbls
Pump Schedule
Volumen Fluido / Accion Presion Densidad Bombea Caudal Tiempo
600 bbls Circular el pozo con 8 bbl/min 10.50 PPG Taladro 8 bpm 75.0 min
Reunion de seguridad (Seguir circulando) 0.0 min
Preparar MUDPUSH II y Agua de Mezcla para Lechada SLB 60.0 min
2 bbls Prueba de linea con 2 bbls de agua @ 5000 psi 5000 psi 8.30 PPG SLB 1 bpm 10.0 min
Pre-mezclar 57 barriles de cemento 16.00 PPG SLB 30.0 min
25 bbls MUDPUSH II 12.50 PPG SLB 6 bpm 4.2 min
10 bbls CW8 Lavador 12.50 PPG SLB 6 bpm 1.7 min
57 bbls Lechada 16.00 PPG SLB 6 bpm 9.5 min
10 bbls Desplazamiento: MUDPUSH II 12.50 PPG SLB 6 bpm 1.7 min
226 bbls Desplazamiento: Lodo (dejar 4 bbls de lavador in DP) 10.50 PPG SLB 6 bpm 37.7 min
Enchufar Stinger y comenzar proceso de inyeccion 10.50 PPG SLB
ver reporte 46 bbls Desplazamiento: Inyeccion de cemento, Pmax = 4000 psi 10.50 PPG SLB 2 bpm 23.0 min
Desenchufar del retenedor de cemento(dejar cemento contaminado arriba)r Taladro 5.0 min
Levantar DP 3 tiros Taladro 20.0 min
600 bbls Circular por directa para limpiar DP Taladro 8.5 bpm 70.6 min
Wait on Cement 36 Hours Tiempo de bombeo 168 min

Lavador CW8 S.G 8.28 PPG


Component 1 m3 spacer
Agua 0.89 bbl * 10 bbls = 8.9
D206 Antiespumante 0.10 g/bbl * 10 bbls = 1.00 gal
D122A Lavador Quimico 0.50 g/bbl * 10 bbls = 5.00 gal
F108 Surfactante 1.00 g/bbl * 10 bbls = 10.00 gal
U066 Solvente 2.00 g/bbl * 10 bbls = 20.00 gal
YIELD 1 BBL

MUDPUSH II S.G 12.50 PPG carga muerta 1 bbls


Component 1 m3 spacer
Agua 0.75 bbl * 36 bbls = 27.0
D206 Antiespumante 0.20 g/bbl * 36 bbls = 7.20 gal
D020 Bentonita 5.00 lb/bbl * 36 bbls = 180.00 lb
D182 MUDPUSH II 4.00 lb/bbl * 36 bbls = 144.00 lb
D031 Barita 225.84 lb/bbl * 36 bbls = 8130.24 lb
F108 Surfactante 1.00 g/bbl * 36 bbls = 36.00 gal
U066 Solvente 2.00 g/bbl * 36 bbls = 72.00 gal
YIELD 1 BBL
Lechada S.G 16.00 PPG carga muerta 0 bbls
por saco de cemento Componente 1 bbl de cemento
3.440 gal Agua fresca 2.6 gal * 57 bbls = 19.6
gal/sk 0.05 gal D047 Antiespumante 0.037 gal * 57 bbls = 11.94 gal
%BWOC 0.35 % D153 Antisedimentante 0.287 lb * 57 bbls = 91.95 lb
%BWOC 0.25 % D065 Dispersante 0.205 lb * 57 bbls = 65.68 lb
gal/sk 2.25 gal D600 GASBLOK 1.679 gal * 57 bbls = 537.37 gal
gal/sk 0.070 gal D197 Retardador 0.052 gal * 57 bbls = 16.72 gal
110.0 lb D907 Cemento G 82.090 * 57 bbls = 239 sks
1.34 YIELD 1.00

Material Requirements Fluid Storage Requirements


Quimicos Requerido En pozo Mix Fluid Lead Mix Fluid Tail
D047 Antiespumante 11.94 gal Spacer
D122A Lavador Quimico 5.00 gal Equipment Notes
F108 Surfactante 46.00 gal
U066 Solvente 92.0 gal
D206 Antiespumante 8.20 gal
D020 Bentonita 180.00 lb
D182 MUDPUSH II 144.00 lb
D031 Barita 8130 lb
D153 Antisedimentante 91.95 lb
D065 Dispersante 65.7 lb
D600 GASBLOK 537.37 gal
D197 Retardador 16.72 gal
D907 Cemento G 238.83 sks
PlugAdvisor Summary Report

Company: PETROBRAS
Well Name: SAL-15
Field Name: SAN ALBERTO

State: GRAN CHACO

Date: 03/Jul/10
Well Location: TARIJA
API/UWI Number:
Proposal Number: 3
Contact: PASCUAL SANDAGORDA

Objective:

Disclaimer Notice
This information is presented in good faith, but no warranty is given by and Schlumberger assumes no liability for advice or recommendations made concerning
the use of any product or service. The results given are estimates based on calculations produced by a computer model including various assumptions on the
well, reservoir and treatment. The results depend on input data provided by the Customer and estimates as to unknown data and can be no more accurate than
the model, the assumptions and such input data. The information presented is Schlumberger's best estimate of the results that may be achieved and should be
used for comparison purposes rather than absolute values. The quality of input data, and hence results, may be improved through the use of certain tests and
procedures which Schlumberger can assist in selecting. Freedom from infringement of patents of Schlumberger or others is not to be inferred nor are any such
rights granted unless expressly agreed to in writing.
WELL DATA

Well Data
Job Type: Lost Circulation Plug
Rig Type: Land
Total Depth (Measured): 4450 mt
True Vertical Depth (TVD): 4439.2 mt
TOC in pipe before POOH: 2929.8 mt
TOC in annulus before POOH: 3107.1 mt

Open Hole
Bottom Depth
Depth Mean Calliper Mean Excess Mean Equiv.
Diameter Diameter
4450 mt 8.5 in 0% 8.915 in

Drill Pipe
Bottom Measured OD ID Weight
Depth
3114 mt 5.875 in 5.045 in 36.76 kg/m
4392 mt 4 in 3.34 in 20.83 kg/m

Casing
Bottom Measured OD ID Weight
Depth
129.3 mt 10.75 in 9.56 in 97.77 kg/m
4101.5 mt 9.625 in 8.535 in 79.62 kg/m
4113.8 mt 9.75 in 8.56 in 88.1 kg/m
4138.2 mt 7 in 6.184 in 43.16 kg/m
4162.2 mt 8.2 in 6.184 in 43.16 kg/m
4395 mt 7 in 6.184 in 43.16 kg/m
FLUIDS
FLUIDS DATA
Fluids Data
Name Type Density, Model Consistency, Power Ty, Gel
lbm/gal lbf.s^n/100ft Index lbf/100ft2 Strength,
2 lbf/100ft2
Mud MUD 10.5 Herschel-B. 0.03838 0.99 15.42 22.41
Wellclean II SPACER 12.5 Herschel-B. 1.62021 0.5 8.89 16.01
Tail Slurry SLURRY 16 Herschel-B. 0.7293 0.73 12.61 37.36
CW8 WASH 8.3 Herschel-B. 0.43492 0.43 1.88 4.27

PLACEMENT VOLUMES

Placement Summary
Volume Optimization Underdisplacement Sensitivity Mode
Plug Length 377.6 mt
Plug top MD after POOH 4014.4 mt
Plug Volume 57 bbl
Original Fluid Mud
Underdisplacement Volume 46 bbl
Drill Pipe Volume 298.04 bbl

Fluid Sequence
Name Balanced Volume, Annular Top MD, Density, Length, mt
bbl Length, mt mt lbm/gal
Mud 557.3 4048.2 0 10.5 4048.2
Wellclean II 25 250.4 4048.2 12.5 250.4
CW8 10 93.4 4298.6 8.3 93.4
Tail Slurry 57 0 3107.1 16 1189.8
Wellclean II 10 0 2806.5 12.5 123.3
Mud 227.7 0 0 10.5 2806.5

Conectar stinger
PLACEMENT

Pumping Schedule
Fluid Name Flow Rate, Volume,
Volum e, bbl Time, min Backpressure, Cumulative
bbl/min psi Time, min
Wellclean II 6 25 4.17 100 4.17
CW8 6 10 1.67 100 5.83
Tail Slurry 6 57 1.53 100 7.36
Wellclean II 6 10 1.67 0 17
Mud 6 227.66 37.94 0 54.94

Well Security
FLUID MIXING BEFORE POOH

Fluid Mixing at the end of placement

-33 barriles de cemento


sin contaminar
-Dejar cemento
contaminado fuera del
Retenedor de cemento (8
bbls)

Slurry Contamination Risk


Pipe High: 425 mt Medium: 588 mt Low: 840 mt
Annulus High: 373 mt Medium: 11 mt Low: 0 mt