ESTRUCTURA DE COSTOS PARA COTIZACION DE FLETES UNITARIOS

REFERENCIA DE LA RUTA
RUTA Chincha - Impala https://www.google.com/maps/dir/Mah

PARAMETROS BASICOS

ITEM PARAMETROS BASICOS UNIDAD DE MEDIDA VALOR


PARAMETROS OPERATIVOS
1 PRODUCTO Cu
2 CARGA POR UNIDAD TON POR VIAJE 37.00
3 ROUND TRIP DIAS POR VIAJE 2.00
4 DIAS PRODUCTIVOS MES DIAS POR MES 28.00
5 VIAJES AL MES VIAJES POR MES 14.00
6 KILOMETRAJE KM POR VIAJE 1,040.00
PARAMETROS DE RENDIMIENTO
7 RENDIMIENTO COMBUSTIBLE KM POR GALON 9.0
8 GALONAJE GALONES POR VIAJE 115.56
PARAMETROS DE ACTUALIDAD
9 TIPO DE CAMBIO SOLES POR DÓLAR 4.12

CALCULO DE COSTOS

1. COMBUSTIBLE
ITEM CONCEPTO UNIDAD DE MEDIDA VALOR
1.1 PRECIO DEL COMBUSTIBLE SIN IGV SOLES POR GALON 13.56
1.2 GALONAJE GALONES POR VIAJE 115.56
1.3 COSTO COMBUSTIBLE SOLES POR VIAJE 1,566.85

2. LLANTAS
ITEM CONCEPTO UNIDAD DE MEDIDA TIPO DE LLANTA
DELANTERA
2.1 CANTIDAD DE LLANTAS LLANTAS 2

2.2 COSTO LLANTA NUEVA DOLARES POR LLANTA 520.00

2.3 COSTO REENCAUCHE DOLARES POR LLANTA 210.00

2.4 RENDIMIENTO LLANTA NUEVA KM POR LLANTA 90,000.00


2.5 RENDIMIENTO REENCAUCHADA KM POR LLANTA
NRO. REEN. POR
2.6 REENCAUCHES PERMITIDOS
LLANTA

2.7 COSTO KILOMETRICO SOLES POR KM 0.0476

2.8 KILOMETRAJE KM POR VIAJE


2.9 COSTO LLANTAS SOLES POR VIAJE

3. MANTENIMIENTO
ITEM CONCEPTO UNIDAD DE MEDIDA TIPO DE UNIDAD
TRACTO
3.1 COSTO KILOMETRICO SOLES POR KM 0.1500

3.2 KILOMETRAJE KM POR VIAJE


3.3 COSTO MANTENIMIENTO SOLES POR VIAJE

4. PERSONAL
ITEM CONCEPTO UNIDAD DE MEDIDA CARGO
CONDUCTOR
REMUNERACION SOLES POR MES 3,000.00
4.1 SUELDO BASICO SOLES POR MES 3,000.00
4.2 BONO VARIABLE SOLES POR MES
4.3 BONO EXTRA (SIN BENEFICIOS) SOLES POR MES 0.00
4.4 FACTOR BENEFICIOS SOCIALES FACTOR 1.48

FACTOR FACTOR 1.44


4.5 FACTOR PERSONAL POR UNIDAD FACTOR 1/1
4.6 FACTOR DE REGIMEN FACTOR 4/3
4.7 FACTOR TURNOS DIA FACTOR 1/1
4.8 FACTOR VACACIONES FACTOR 13/12

4.9 COSTO MENSUAL SOLES POR MES 6,413.33

4.10 COSTO PERSONAL SOLES POR VIAJE

5. POSESION DE EQUIPOS
ITEM CONCEPTO UNIDAD DE MEDIDA TIPO DE UNIDAD
TRACTO
5.1 CANTIDAD DE EQUIPOS EQUIPOS 1
5.2 VALOR DEL EQUIPO DOLARES POR EQUIPO 100,000.00
5.3 NRO. CUOTAS / TIEMPO DEPR. MESES 60.00
5.4 TASA DE RECATE % 35%

5.5 VALOR DE RESCATE DOLARES POR EQUIPO 35,000.00


5.6 VALOR DE LA CUOTA SOLES POR MES 4,660.22

5.7 COSTO POSESION DE EQUIPOS SOLES POR VIAJE

6. ALQUILER DE EQUIPOS
ITEM CONCEPTO UNIDAD DE MEDIDA TIPO DE UNIDAD
TRACTO
6.1 CANTIDAD DE EQUIPOS EQUIPOS 0
6.2 COSTO DE ALQUILER POR EQUIPO DLOARES POR DIA
6.3 COSTO MENSUAL SOLES POR MES 0.00

6.4 COSTO ALQUILER DE EQUIPOS SOLES POR VIAJE

7. SEGURO DE EQUIPOS
ITEM CONCEPTO UNIDAD DE MEDIDA TIPO DE UNIDAD
TRACTO
7.1 CANTIDAD DE EQUIPOS EQUIPOS 1
7.2 POLIZA DE RC SOLES POR MES
7.3 POLIZA VEHICULAR SOLES POR MES 353.29
7.4 SOAT SOLES POR MES 25.00
7.5 OTROS SEGUROS SOLES POR MES 103.00
7.6 COSTO MENSUAL SOLES POR MES 481.29

7.7 COSTO SEGURO DE EQUIPOS SOLES POR VIAJE

8. GASTOS DE RUTA
ITEM CONCEPTO UNIDAD DE MEDIDA TIPO DE GASTO
POR DIA
8.1 ALIMENTACION SOLES POR DIA 35.00
8.2 HOSPEDAJE SOLES POR NOCHE 50.00
8.3 COCHERA Y/O GUARDANIA SOLES POR NOCHE 10.00
8.4 LAVADO SOLES POR VIAJE
8.5 PEAJES SOLES POR VIAJE
8.6 OTROS GASTOS SOLES POR VIAJE

8.7 COSTOS PARCIALES SOLES POR VIAJE 190.00


8.8 COSTO GASTOS DE RUTA SOLES POR VIAJE

GASTOS OPERATIVOS DIRECTOS


COSTO UNITARIO
ITEM CONCEPTO CANTIDAD
MENSUAL
GASTOS ASOCIADOS PERSONAL
1 UNIFORMES 60.00 1.44
2 EPPS 80.00 1.44
3 COMUNICACIÓN 45.00 1.44
4 EXAM. MEDICOS 33.33 1.44
5 CAPACITACIONES 70.83 1.44
6 OTROS 25.00 1.44
GASTOS ASOCIADOS EQUIPOS
7 GPS (SERVICIO + EQUIPO) 60.00 1.00
8 IMPL. UNIDAD TRANSPORTE 0.00 1.00
9 CAMARAS/PULSERAS 0.00 1.00
9 OTROS 0.00 1.00

10 GASTOS OPERATIVOS DIRECTOS


11 GASTOS OPERATIVOS DIRECTOS POR VIAJE

RESUMEN DE COSTOS

ITEM CONCEPTO UNIDAD DE MEDIDA VALOR


1 COSTO COMBUSTIBLE SOLES POR VIAJE 1,566.85
2 COSTO LLANTAS SOLES POR VIAJE 250.94
3 COSTO MANTENIMIENTO SOLES POR VIAJE 228.80
4 COSTO PERSONAL SOLES POR VIAJE 251.95
5 COSTO POSESION EQUIPOS SOLES POR VIAJE 441.06
6 COSTO ALQUILER DE EQUIPOS SOLES POR VIAJE 0.00
7 COSTO SEGURO DE EQUIPOS SOLES POR VIAJE 51.10
8 COSTO GASTOS DE RUTA SOLES POR VIAJE 410.00
9 OTROS SOLES POR VIAJE 25.00
TOTAL COSTO DE VENTAS SOLES POR VIAJE 3,225.71
GASTOS OP. DIRECTOS 36.70
GASTOS OP. INDIRECTOS 8.00% 200.00
GASTOS ADM. 5.00% 125.00
TOTAL GAO SOLES POR VIAJE 361.70
SUB-TOTAL COSTOS SOLES POR VIAJE 3,587.41
UTILIDAD SOLES POR VIAJE 1 -1,087.41
TARIFA SIN IGV SOLES POR VIAJE 2,500.00
SOLES POR TON 67.57
$ POR TON 16.40

155400 TON

3
FLETES UNITARIOS
ENCIA DE LA RUTA
Ruta

TRAMO Mahr Túnel/Callao Callao/Mahr Túnel

DIAS

BAJAMOS DE CERRO SUBIDA A CERRO


KM 520.00 520.00

KM 8.50 9.50
GALONES 61.18 54.74

14

TRAMO Mahr Túnel/Callao Callao/Mahr Túnel


SOLES 14.00 14.00
GALONES 61.18 54.74
SOLES 856.47 766.32

TIPO DE LLANTA
TRACCION REMOLQUE
4 6

640.00 640.00

210.00 210.00

70,000.00 95,000.00
52,500.00 71,250.00
3.00 3.00

0.0920 0.1017
0.2413
1,040.00
250.94

TIPO DE UNIDAD
REMOLQUE
0.0700 5000 KM
0.2200 800 S/.
1,040.00 0.16 S/. X KM
228.80

CARGO
AUXILIAR
0.00
0.00
0.00
0.00
1.48

0.00
0/1
0/1
0/1
0/1

0.00
6,413.33
458.10 251.952380952381

TIPO DE UNIDAD
REMOLQUE CAMIONETA
1 0
32,500.00 0.00
60.00 60.00
35% 20%

11,375.00 0.00
1,514.57 0.00
6,174.79
441.06

TIPO DE UNIDAD
REMOLQUE CAMIONETA
0 0

0.00 0.00
0.00
0.00

TIPO DE UNIDAD
REMOLQUE CAMIONETA
1 0
85.83
114.82 0.00
0.00
33.48 0.00
234.13 0.00
715.42
51.10

TIPO DE GASTO VALOR


POR VIAJE
PERSONAS x VJE 1/1
PERSONAS x VJE 1/1

25.00
185.00 EJES 6.00 33
10.00 31.2
31.2
220.00 38.3
410.00 38.3
172

COSTO MENSUAL

86.67 0.00069
115.56 0.00092
65.00 0.00052
48.15 0.00038
102.31 0.00081
36.11 0.00029

60.00 0.00048
0.00 0.00000
0.00
0.00 0.00000

513.80
36.70 0.00408

% CF CV TOTAL
62.7% 0.17409 1,566.85
10.0% 0.02788 250.94
9.2% 0.02542 228.80
10.1% 0.02799 251.95
17.6% 0.04901 441.06
0.0% 0.00000 0.00
2.0% 0.00568 51.10
16.4% 0.04556 190.00 220.00
1.0% 0.00278 25.00
129.0% 0.35841
1.5% 0.00408 36.70
8.0% 0.02222 200.00
5.0% 0.01389 125.00
14.5% 0.04019
143.5% 0.39860 1,320.81 2,266.60 3,587.41
-43.5% -0.12082 -400.36 -687.05 -1,087.41
100.0% 0.27778 920.45 1,579.55 2,500.00

2 STAND BY 460.22
3108 TON/CAMION
50 CAMIONES
3
10,500,005.04 SOLES
PEAJES A NIVEL NACIONAL

Costo Pesados Por Costo Total


Nº Concesionario Unidades de Peaje Sentidos
Ligeros Eje Ligero

1 Sin Concesión Cancas 7.50 6.50 1.00 7.50


2 Sin Concesión Desvio Talara 7.50 6.50 1.00 7.50
3 Sin Concesión Tambogrande 7.50 6.50 1.00 7.50
4 Sin Concesión Cuculi 7.50 6.50 1.00 7.50
5 Sin Concesión Tunan 7.50 6.50 1.00 7.50
6 Sin Concesión Catac 7.50 6.50 1.00 7.50
7 Sin Concesión Challhuapuquio 7.50 6.50 1.00 7.50
8 Sin Concesión Chacapampa 7.50 6.50 1.00 7.50
9 Sin Concesión Lunahuana 7.50 6.50 1.00 7.50
10 Sin Concesión Ambo 7.50 6.50 1.00 7.50
11 Sin Concesión Pacra 7.50 6.50 1.00 7.50
12 Sin Concesión Rumichaca 7.50 6.50 1.00 7.50
13 Sin Concesión Socos 7.50 6.50 1.00 7.50
14 Sin Concesión Nazca 7.50 6.50 1.00 7.50
15 Sin Concesión Yauca 7.50 6.50 1.00 7.50
16 Sin Concesión Atico 7.50 6.50 1.00 7.50
17 Sin Concesión Saylla (Cusipata) 7.50 6.50 1.00 7.50
18 Sin Concesión Aguas Calientes 7.50 6.50 1.00 7.50
19 Sin Concesión Ayaviri 7.50 6.50 1.00 7.50
20 Sin Concesión Ilave 7.50 6.50 1.00 7.50
21 Sin Concesión Sicuyani 7.50 6.50 1.00 7.50
22 Sin Concesión Punta Perdida 7.50 6.50 1.00 7.50
23 Sin Concesión Pozo Redondo 7.50 6.50 1.00 7.50
24 Linea Amarilla Ramiro Priale 5.70 5.70 2.00 11.40
25 Linea Amarilla Monterrico 5.30 5.30 2.00 10.60
26 Linea Amarilla Santa Anita 5.30 5.30 2.00 10.60
27 Linea Amarilla Separadora Industrial 5.30 5.30 2.00 10.60
28 Linea Amarilla El Pino 5.30 5.30 2.00 10.60
29 Rutas de Lima Chillon 5.00 4.50 1.00 5.00
30 Rutas de Lima Pucusana 5.00 4.50 1.00 5.00
31 Rutas de Lima Villa 5.00 4.50 1.00 5.00
32 Rutas de Lima Punta Negra 5.00 4.50 1.00 5.00
33 Autopista del Norte Fortaleza 7.90 7.90 2.00 15.80
34 Autopista del Norte Huarmey 7.70 7.70 2.00 15.40
35 Autopista del Norte Vesique 8.00 8.00 2.00 16.00
36 Autopista del Norte Virú 8.00 8.00 2.00 16.00
37 Norvial El Paraiso 7.50 7.50 2.00 15.00
38 Norvial Serpentin de Pasamayo 7.50 7.50 2.00 15.00
39 Norvial Variente de Pasamayo 7.50 7.50 2.00 15.00
40 Covi Peru Chilca 14.00 14.00 1.00 14.00
41 Covi Peru Jahuay - Chincha 14.00 14.00 1.00 14.00
42 Covi Peru Ica 14.00 14.00 1.00 14.00
43 IIRSA Norte Paita 6.60 6.60 2.00 13.20
44 IIRSA Norte Chulucanas 6.60 6.60 2.00 13.20
45 IIRSA Norte Desvio Olmos 6.60 6.60 2.00 13.20
46 IIRSA Norte Pomahuaca 6.60 6.60 2.00 13.20
47 IIRSA Norte Utcubamba 6.60 6.60 1.00 6.60
48 IIRSA Norte Pedro Ruiz  6.60 6.60 1.00 6.60
49 IIRSA Norte Aguas Claras 6.60 6.60 2.00 13.20
50 IIRSA Norte Moyobamba 6.60 6.60 2.00 13.20
51 IIRSA Norte Pongo 6.60 6.60 2.00 13.20
52 IIRSA Norte Mocce 7.50 6.50 1.00 7.50
53 IIRSA Sur Covisur Matarani 5.00 4.00 2.00 10.00
54 IIRSA Sur Covisur Uchumayo 5.00 4.00 2.00 10.00
55 IIRSA Sur Covisur Patahuasi 3.90 3.85 2.00 7.80
56 IIRSA Sur Covisur Santa Lucia 3.90 3.85 2.00 7.80
57 IIRSA Sur Covisur Caracoto 3.90 3.85 2.00 7.80
58 IIRSA Sur Covisur Pampa Cuellar 3.90 3.85 2.00 7.80
59 IIRSA Sur Covisur Ilo 3.90 3.85 2.00 7.80
60 IIRSA Sur Survial Marcona 3.90 3.85 2.00 7.80
61 IIRSA Sur Survial Pampa Galera 3.90 3.85 2.00 7.80
62 IIRSA Sur Survial Pampamarca 3.90 3.85 2.00 7.80
63 IIRSA Sur Survial Pichirhua 3.90 3.85 2.00 7.80
64 IIRSA Sur Survial Ccasacancha 3.90 3.85 2.00 7.80
65 Autopista del Sol Chicama 7.60 7.65 2.00 15.20
66 Autopista del Sol Pacanguilla 12.40 12.40 1.00 12.40
67 Autopista del Sol Morrope 12.30 12.30 1.00 12.30
68 Autopista del Sol Cruce Bayobar 11.70 11.70 1.00 11.70
69 Autopista del Sol Piura Sullana 7.70 7.70 2.00 15.40
70 Canchaque Loma Baja Larga 2.40 2.40 2.00 4.80
71 Deviandes Corcona 6.23 6.23 2.00 12.46
72 Deviandes Quiulla 6.00 6.00 2.00 12.00
73 Deviandes Casaracra 6.00 6.00 2.00 12.00
74 Intersur Macusani 6.10 6.10 2.00 12.20
75 Intersur San Gaban 6.10 6.10 2.00 12.20
76 Intersur San Anton 6.10 6.10 2.00 12.20
77 IIRSA Sur Interoceanica Union Progreso 6.40 6.40 2.00 12.80
78 IIRSA Sur Interoceanica Planchon 6.40 6.40 2.00 12.80
79 IIRSA Sur Interoceanica San Lorenzo 6.40 6.40 2.00 12.80
80 Covinca Camana 8.85 7.65 1.00 8.85
81 Covinca El Fiscal 8.85 7.65 1.00 8.85
82 Covinca Montalvo 8.85 7.65 1.00 8.85
83 Covinca Tomasiri  8.85 7.65 1.00 8.85
84 Covial Sierra Ciudad De DIOS 8.85 7.65 1.00 8.85
85 Covial Sierra Menocucho 8.85 7.65 1.00 8.85
-PUCALLPA
Costo Total CALLAO
por Eje 23.86
Pesado

6.50
6.50
6.50
6.50
6.50
6.50
6.50
6.50
6.50
6.50
6.50
6.50
6.50
6.50
6.50
6.50
6.50
6.50
6.50
6.50
6.50
6.50
6.50
11.40 1.00
10.60
10.60
10.60
10.60
4.50
4.50
4.50
4.50
15.80
15.40
16.00
16.00
15.00
15.00
15.00
14.00
14.00
14.00
13.20
13.20
13.20
13.20
6.60
6.60
13.20
13.20
13.20
6.50
8.00
8.00
7.70
7.70
7.70
7.70
7.70
7.70
7.70
7.70
7.70
7.70
15.30
12.40
12.30
11.70
15.40
4.80
12.46 1.00
12.00
12.00
12.20
12.20
12.20
12.80
12.80
12.80
7.65
7.65
7.65
7.65
7.65
7.65

También podría gustarte