Fecha ´agosto-2018
Plazo 150 Días calendarios
COSTO DIRECTO S/, 2,498,838.84
COEF. COSTO DURACION COSTO TOTALES % INCIDENCIA
ITEM DESCRIPCION DE UNITARIO PARCIAL S/. SOBRE EL CD
PARTICIP.
Personal Administrativo
1 Almacenero 1.00 1,200.00 5.00 6,000.00
1 Administrador 1.00 2,500.00 5.00 12,500.00
1 Secretaria 1.00 1,150.00 5.00 5,750.00
01 OBRAS PROVISIONALES
01.01 CARTEL DE IDENTIIFICACION DE LA OBRA DE 4.80X3.60
und 1.00 1,281.34 1,281.34 100% 1,281.34 0% 0.00 0% 0.00 0% 0.00 0% 0.00
CON BANNER
01.02 INSTALACIONES PROVISIONALES GLB 1.00 3,800.00 3,800.00 100% 3,800.00 0% 0.00 0% 0.00 0% 0.00 0% 0.00
02 TRABAJOS PRELIMINARES
02.01 MOVILIZACION Y DESMOVILIZACIÓN DE EQUIPO GLB 1.00 7,867.20 7,867.20 50% 3,933.60 0% 0.00 0% 0.00 0% 0.00 50% 3,933.60
02.02 TRAZO Y REPLANTEO C/EQUIPO m2 15,258.94 2.31 35,248.15 20% 7,049.63 20% 7,049.63 20% 7,049.63 20% 7,049.63 20% 7,049.63
02.03 MANTENIMIENTO DE TRANSITO GLB 1.00 5,515.69 5,515.69 20% 1,103.14 20% 1,103.14 20% 1,103.14 20% 1,103.14 20% 1,103.14
02.04 BAÑO QUIMICO PARA PERSONAL DE OBRA mes 5.00 300.00 1,500.00 20% 300.00 20% 300.00 20% 300.00 20% 300.00 20% 300.00
03 SEGURIDAD EN OBRA
03.01 EQUIPOS DE PROTECCIÓN INDIVIDUAL GLB 1.00 5,070.00 5,070.00 20% 1,014.00 20% 1,014.00 20% 1,014.00 20% 1,014.00 20% 1,014.00
03.02 EQUIPOS DE PROTECCIÓN COLECTIVO GLB 1.00 1,760.00 1,760.00 20% 352.00 20% 352.00 20% 352.00 20% 352.00 20% 352.00
4 DEMOLICIONES
03.01 DEMOLICION DE VEREDAS DE CONCRETO C/EQUIPO E = m2 462.25 14.37 6,642.53 100% 6,642.53 0% 0.00 0% 0.00 0% 0.00 0% 0.00
04 MOVIMIENTO DE TIERRAS
04.01 EXCAVACION A NIVEL DE SUB RASANTE C/EQUIPO m3 6,328.80 9.44 59,743.87 60% 35,846.32 20% 11,948.77 20% 11,948.77 0% 0.00 0% 0.00
04.02 CORTE EN TERRENO ROCOSO C/EQUIPO m3 947.40 88.92 84,242.81 60% 50,545.69 20% 16,848.56 20% 16,848.56 0% 0.00 0% 0.00
04.03 RELLENO Y COMPACTADO C/MATERIAL DE PRESTAMO C m3 3,775.30 60.50 228,405.65 30% 68,521.70 70% 159,883.96 0% 0.00 0% 0.00 0% 0.00
04.04 ELIMINACIÓN DE MATERIAL EXCEDENTE D>=10 km. VOL m3 9,743.55 29.81 290,455.23 20% 58,091.05 40% 116,182.09 40% 116,182.09 0% 0.00 0% 0.00
06 PAVIMENTOS
06.01 ESCARIFICADO, CONFORMACION Y COMPACTACION
m2 11,000.68 5.47 60,173.72 0% 0.00 50% 30,086.86 25% 15,043.43 25% 15,043.43 0% 0.00
SUBRASANTE (E=0.20m.) C/EQUIPO
06.02 SUB BASE GRANULAR E=0.15M INC. COMPACTACION m2 11,000.68 11.77 129,478.00 0% 0.00 50% 64,739.00 25% 32,369.50 25% 32,369.50 0% 0.00
06.03 BASE GRANULAR E=0.20m. INC. COMPACTACION C/EQUI m2 11,000.68 17.50 192,511.90 0% 0.00 50% 96,255.95 25% 48,127.98 25% 48,127.98 0% 0.00
06.04 IMPRIMACION ASFALTICA. m2 11,000.68 3.68 40,482.50 0% 0.00 50% 20,241.25 25% 10,120.63 25% 10,120.63 0% 0.00
06.05 CARPETA ASFALTICA EN CALIENTE E=2" C/EQUIPO m2 11,000.68 27.00 297,018.36 0% 0.00 50% 148,509.18 25% 74,254.59 25% 74,254.59 0% 0.00
07 SARDINELES SUMERGIDOS
07.01 EXCAVACION MANUAL PARA SARDINEL SUMERGIDO m 4,836.74 6.77 32,744.73 0% 0.00 ### 32,744.73 0% 0.00 0% 0.00 0% 0.00
07.02 CONCRETO PREMEZCLADO EN SARDINELES SUMERGIDOS mF 4,836.74 23.52 113,760.12 0% 0.00 ### 113,760.12 0% 0.00 0% 0.00 0% 0.00
07.03 JUNTA DE DILATACION PARA SARDINEL SUMERGIDO m 896.29 7.74 6,937.28 0% 0.00 ### 6,937.28 0% 0.00 0% 0.00 0% 0.00
08 SEÑALIZACION
08.01 PINTURA DE PAVIMENTOS (LINEAL CONTINUA) m 4,836.74 15.76 76,227.02 0% 0.00 0% 0.00 0% 0.00 50% 38,113.51 50% 38,113.51
08.02 PINTURA DE PAVIMENTOS (LINEAL DISCONTINUA) m 523.88 12.64 6,621.84 0% 0.00 0% 0.00 0% 0.00 50% 3,310.92 50% 3,310.92
08.03 PINTURA DE SIMBOLOS m2 79.90 20.42 1,631.56 0% 0.00 0% 0.00 0% 0.00 50% 815.78 50% 815.78
09 VEREDAS
09.01 EXCAVACION MANUAL A NIVEL DE SUBRASANTE PARA V m3 1,064.57 36.02 38,345.81 0% 0.00 0% 0.00 ### 38,345.81 0% 0.00 0% 0.00
09.02 CONFORMACIÓN DE SUB RASANTE PARA VEREDAS m2 4,258.26 13.43 57,188.43 0% 0.00 0% 0.00 0% 0.00 0% 0.00 100% 57,188.43
09.03 BASE GRANULAR E=0.15m. INC. COMPACTACIÓN CON P m2 4,258.26 24.83 105,732.60 0% 0.00 0% 0.00 0% 0.00 0% 0.00 100% 105,732.60
09.04 VEREDA DE CONCRETO PREMEZCLADO F'C=175 KG/CM2 m2 4,258.26 37.02 157,640.79 0% 0.00 0% 0.00 ### 157,640.79 0% 0.00 0% 0.00
09.05 EXCAVACION MANUAL PARA SARDINEL DE VEREDAS m 3,444.48 3.38 11,642.34 30% 3,492.70 30% 3,492.70 20% 2,328.47 10% 1,164.23 10% 1,164.23
09.06 SARDINEL DE VEREDA CONCRETO PREMEZCLADO F'C=17m 3,444.48 25.53 87,937.57 0% 0.00 20% 17,587.51 20% 17,587.51 30% 26,381.27 30% 26,381.27
09.07 JUNTAS DE DILATACION PARA VEREDAS m 826.68 5.24 4,331.80 0% 0.00 20% 866.36 20% 866.36 30% 1,299.54 30% 1,299.54
10 BOULEVARD
10.01 VEREDAS ADOQUINADAS
OBRA
CONSTRUCCION DE PISTAS Y VEREDAS EN LA CALLE SANTA ROSA Y LAS FLORES DE LA ASOCIACION DE VIVIENDA SANTA ROSA DE VALLE GRANDE
,CALLE SANTA DEL PROGRAMA MUNICIPAL URBANO AMBIENTAL LAS LONGUERAS, ZONA 03, SUB ZONA 03,DISTRITO DE ATE -LIMA-LIMA
CONSTRUCCION DE PISTAS Y VEREDAS EN LA CALLE SANTA ROSA Y LAS FLORES DE LA ASOCIACION DE VIVIENDA SANTA
Proyecto : ROSA DE VALLE GRANDE ,CALLE SANTA DEL PROGRAMA MUNICIPAL URBANO AMBIENTAL LAS LONGUERAS, ZONA 03, SUB
ZONA 03,DISTRITO DE ATE -LIMA-LIMA
Fecha : ´AGOSTO-2018
DESCRIPCION
COSTO DIRECTO
GASTOS GENERALES (8.00 %)
UTILIDAD (7.00 %)
SUBTOTAL
I.G.V. (18.00 %)
TOTAL
DESCRIPCION
COSTO DIRECTO
GASTOS GENERALES (8.00 %)
UTILIDAD (7.00 %)
SUBTOTAL
I.G.V. (18.00 %)
TOTAL
#REF!
#REF! #REF! #REF!
TOTAL
#REF!
#REF!
#REF!
#REF!
#REF! 0.18
#REF!
#REF!
31,000.00
#REF!
TOTAL
2,498,838.84
199,907.11
174,918.72
2,873,664.67
517,259.64 ok
3,390,924.31 3,377,790.72
118,682.35
3,509,606.66 4,350,000.00 840,393.34
3634200.11 118222.68
CRONOGRAMA DE EJECUCION DE OBRA
Obra
CONSTRUCCION DE PISTAS Y VEREDAS EN LA CALLE SANTA ROSA Y LAS FLORES DE LA ASOCIACION DE VIVIENDA SANTA ROSA DE VALLE GRANDE
,CALLE SANTA DEL PROGRAMA MUNICIPAL URBANO AMBIENTAL LAS LONGUERAS, ZONA 03, SUB ZONA 03,DISTRITO DE ATE -LIMA-LIMA
Ubicación ATE
Propietario MUNCIPALIDAD DE ATE
Fecha ´FEBRERO 2018
TIEMPO DE EJECUCION
ITEM DESCRIPCION TOTAL (S/.)
1º MES 2º MES 3º MES 4º MES 5º MES
01 OBRAS PROVISIONALES 5,081.34
02 TRABAJOS PRELIMINARES 50,131.04
03 SEGURIDAD EN OBRA 6,830.00
04 DEMOLICIONES 6,642.53
05 MOVIMIENTO DE TIERRAS 662,847.56
06 PAVIMENTOS 719,664.48
10 BOULEVARD 119,011.13
11 AREAS VERDES 33,161.63
12 VARIOS 194,727.24
CANTIDAD DESCRIPCIÓN