Documentos de Académico
Documentos de Profesional
Documentos de Cultura
DOCUMENTOS ADMINISTRATIVOS
EQUIPO: AMORTIGUADOR DE PULSOS,
BLACOH
TAGS: DAMP-ACSA-21811
DAMP-ACSA-21812
DAMP-ACSA-21911
DAMP-ACSA-21912
PC 4500398464
PEDIDO DE COMPRA
Número Rev. Pág Fecha
4500398464 0 1/8 05.07.2019
184207-LAMAR USA L.L.C.
Moneda: USD Condición de Entrega: Ver detalles en las notas del presente
Valor total: Condición de Pago: Ver detalles en las notas del presente
BLACOH, Pulsation Dampener, 10 cubic inch, SS wetted, SS nonwetted, Viton bladder, 1/2" FNPT inlet, 300 psi maximum, Chargeable
air control.
P/N: CTS1020V-5-G22
INCLUDES:
- 0-300 psi Pressure Gauge
- SS Tag Plate.
- Certificate of Conformity
Nota
BLACOH, Pulsation Dampener, 10 cubic inch, SS wetted, SS nonwetted, Viton bladder, 1/2" FNPT inlet, 300 psi maximum, Chargeable
air control.
P/N: CTS1020V-5-G22
INCLUDES:
- 0-300 psi Pressure Gauge
- SS Tag Plate.
Nota
BLACOH, Pulsation Dampener, 10 cubic inch, SS wetted, SS nonwetted, Viton bladder, 1/2" FNPT inlet, 300 psi maximum, Chargeable
air control.
P/N: CTS1020V-5-G22
INCLUDES:
- 0-300 psi Pressure Gauge
- SS Tag Plate.
- Certificate of Conformity
Nota
BLACOH, Pulsation Dampener, 10 cubic inch, SS wetted, SS nonwetted, Viton bladder, 1/2" FNPT inlet, 300 psi maximum, Chargeable
air control.
P/N: CTS1020V-5-G22
INCLUDES:
- 0-300 psi Pressure Gauge
CONSTRUCCIONES Y PRESTACIONES PETROLERAS PEDIDO DE COMPRA
AV. Coruña N28-14 y Manuel Itu Número Rev. Pág Fecha
EC170107 Quito - Ecuador
4500398464 0 3/8 05.07.2019
Nota
Total:
Valor:
NOTAS
1. Partes Intervinientes
1.1. CONSTRUCCIONES Y PRESTACIONES PETROLERAS S.A. CPP, con domicilio en: Coruña N28 - 14 y Manuel Iturrey Edificio
SANTA FE Piso 4, en adelante CPP;
1.2. LAMAR USA L.L.C. con domicilio ubicado en: MIAMI, FLORIDA # USA en adelante el PROVEEDOR,
2. Alcance
CPP se complace en adjudicar al Proveedor este Pedido de Compra Spot para el material de:
- AMORTIGUADOR DE PULSOS
Considerando los términos y condiciones que se establecen a continuación
3. Documentos de Aplicación
Los únicos documentos de aplicación que las partes declaran conocer y aceptar en todos sus términos y condiciones, que se adjuntan al
presente, son los indicados a continuación siguiendo el siguiente orden de prelación:
4. Precio
Los precios indicados en este Pedido de Compra serán expresados en DÓLARES AMERICANOS y no incluyen el impuesto al valor
agregado (IVA).
Los precios unitarios, tarifas diarias, precios opcionales y descuentos indicados en este Pedido de Compra serán considerados precios
fijos y firmes, no están sujetos a reajustes de ningún tipo y válidos para toda modificación de este Pedido de Compra.
5. Entregas
El Proveedor deberá entregar los bienes de CPP de acuerdo con los siguientes términos de entrega:
Documentación de Ingeniería, entregada según lo especificado en la Requisición de Material (MR) o en su defecto en la Sede central de
CPP en Ecuador.
6.1. 100% pagadero a los treinta (30) días de presentada la siguiente documentación a conformidad de CPP:
6.1.1. Guía de Remisión Original (o impresión del RIDE en caso de Guía de Remisión Electrónica) sellada por Almacén CPP, esta debe
tener el nombre y firma de la persona que recibió los Material
6.1.2. Entrega por parte del PROVEEDOR de los certificados correspondientes (Origen / Calidad / Garantía)
6.1.3. Factura Comercial (o impresión del RIDE en caso de Factura Electrónica)
6.1.4. El Presente Pedido de Compra de Material firmado por parte del PROVEEDOR o el Formato Impreso del Pedido de Entrega de
Material (PEM # el cual aplica únicamente para Pedidos de Compra Abierto)
6.1.5. Brochure con catálogo y ficha técnicos de cada uno de los ítems del presente pedido de compra para trámites de aduana en
destino.
6.1.6. CERTIFICADO DE CONFORMIDAD, emitido por un organismo de certificación acreditado por el gobierno del país de origen.
- Certificado de validez de facturas o comprobantes de venta, emitido por el portal web del Material de Rentas Internas (SRI):
https://declaraciones.sri.gob.ec/facturacion-internet/consultas/publico/consulta-validez-documento.jsp
Lo antedicho será aplicable únicamente cuando la factura presentada por el PROVEEDOR no se encuentre objetada por CPP.
En caso de que CPP realizara al PROVEEDOR pagos en exceso de lo establecido en el Pedido de Compra, dichos pagos deberán ser
reembolsados a CPP en la misma moneda en que fuera realizado dicho pago, mediante transferencia bancaria, dentro de los SIETE (7)
días CORRIDOS contados desde que CPP comunicara al PROVEEDOR de esta situación. Este reembolso será considerado deuda
exigible y sujeta a la adición de gastos financieros por mora.
7. Mora
La Mora en el Cumplimiento de las Obligaciones Pactadas por parte del Proveedor se producirá de pleno derecho por el sólo vencimiento
de los plazos fijados o por la omisión o realización de cualquier acto o hecho que se traduzca directa o indirectamente en hacer o no
hacer algo contrario a lo estipulado y sin necesidad de interpelación judicial o extrajudicial de clase alguna.
8. Penalidades
CONSTRUCCIONES Y PRESTACIONES PETROLERAS PEDIDO DE COMPRA
AV. Coruña N28-14 y Manuel Itu Número Rev. Pág Fecha
EC170107 Quito - Ecuador
4500398464 0 5/8 05.07.2019
De acuerdo a lo indicado en la Cláusula "13. Plazo y Penalidades" de las Condiciones Generales de Contratación (Anexo II).
De acuerdo a la indicado en el "Anexo IV: Condiciones de Inspección" y las Condiciones Generales de Contratación.
El Proveedor Garantizará la calidad del material entregado, contra defectos, fallas, vicos ocultos, no imputables al mal uso de los mismos.
En este sentido se compromete a su costo a reparar, reponer y/o cambiar, al solo juicio de CPP y sin cargo, cualquier material que
presente fallas por causas imputables a los mismos.
El plazo de garantía de los equipos y/o materiales será de veinticuatro (24) meses desde la puesta en marcha o treinta (30) meses desde
la entrega de la provisión en campo; lo que ocurra primero.
12. Seguros
De acuerdo a lo indicado en el "Anexo VIII: Documentos Administrativos" las Condiciones Generales de Contratación.
En el supuesto de verificarse, por intermedio de nuestra auditoria, anormalidades en vuestra facturación y/o prestación de vuestros
material s, se incluirá en la nota de débito un plus equivalente al costo administrativo que erogue la labor de control, sin perjuicio de
retener y compensar de tales facturaciones el valor económico asignado a las anomalías contratadas.
14.2. En caso que el pago se realice vía trasferencia bancaria (solamente para el primer pago), el proveedor deberá entregar un
certificado bancario actualizado, en el cual consten sus datos como: Nombre Banco; Nro. Cuenta; Tipo de Cuenta; Sucursal (aplica para
la primera facturación).
14.3. Las facturas deberán ser presentadas en nuestras oficinas ubicadas en:
QUITO
Av. La Coruña N2814 y Manuel Iturrey, Ed. Santa Fe, Piso 4. Pichincha-Ecuador, Departamento de Cuentas a Pagar-Administración.
SHUSHUFINDI
Av. De la Policía S/N y Perimetral, Sucumbíos#Ecuador, Departamento de Administración
AUCA
Km 40 Dayuma, Orellana#Ecuador, Departamento de Administración
14.4. Las facturas se recibirán los días MARTES Y JUEVES de 09:00h. a 12:00h. y de 15:00h. a 17:00h.
Los contribuyentes especiales deberán enviar los comprobantes electrónicos a la casilla: facturacion@cpp.com.ec
14.5. Fecha límite de recepción de facturas, con fecha del mes en que se presentan, será hasta el 20 de cada mes o el inmediato día
hábil anterior (martes o jueves).
14.6. Se brindará atención telefónica a PROVEEDORES por parte de Cuentas por Pagar los días MARTES y JUEVES de 09:00 a
CONSTRUCCIONES Y PRESTACIONES PETROLERAS PEDIDO DE COMPRA
AV. Coruña N28-14 y Manuel Itu Número Rev. Pág Fecha
EC170107 Quito - Ecuador
4500398464 0 6/8 05.07.2019
NOTA:
Se debe tener presente al momento de la entrega de fracturas lo siguiente:
CONSTRUCCIONES Y PRESTACIONES PETROLERAS S.A. CPP, según Resolución N° NAC PCTRSGE13-00162 del 02/04/2013 fue
designada como Contribuyente Especial a partir del 01/05/2013.
De ser usted ARTESANO agradecemos nos remitan reimpresión del REGISTRO UNICO DE CONTRIBUYENTES y la CALIFICACION
ARTESANAL avalada por la Junta General del Artesano.
De ser usted prestador de MATERIAL S DE TRANSPORTE agradecemos que nos remitan reimpresión del REGISTRO UNICO DE
CONTRIBUYENTES y la inscripción en la AGENCIA NACIONAL DE REGULACION Y CONTROL DE TRANSPORTE TERRESTRE
TRANSITO Y SEGURIDAD VIA (ANRCTTTSV) o por el Gobierno Autónomo Descentralizado Regional, Metropolitano o Municipal, que
tenga competencia para regular el tránsito y transporte dentro de la jurisdicción.
La documentación deberá estar dirigida en Atención al Departamento Contable, pudiendo la misma ser entregarla en nuestras oficinas
con el área de Cuentas a Pagar.
El valor de cualquier suministro ó servicio que efectúe CPP, a pesar de que tal suministro ó servicio constituyan una obligación del
PROVEEDOR, será facturado y cobrado por CPP a el PROVEEDOR.
BLACOH, Pulsation Dampener, 10 cubic inch, SS wetted, SS nonwetted, Viton bladder, 1/2" FNPT inlet, 300 psi maximum, Chargeable
air control.
P/N: CTS1020V-5-G22
INCLUDES:
- 0-300 psi Pressure Gauge
- SS Tag Plate.
- Certificate of Conformity
17. Acompañamiento
En cualquier momento CPP tendrá la potestad de condicionar los pagos que le correspondan al Proveedor en virtud de este Pedido de
Compras, al previo pago del Cliente Final a CPP de los alcances convenidos con el Proveedor en el Presente Pedido de Compra o de
otros conceptos a su vez reconocidos contractualmente por el Cliente a favor de CPP; y/o a la entrega de los instrumentos de garantía
que deba emitir el Proveedor conforme al presente Pedido de Compra, cuando resulte aplicable. Este condicionamiento de pagos no
situará a CPP en una situación de incumplimiento contractual frente al Proveedor, ni facultará al Proveedor a suspender la ejecución del
Alcance o resolver del presente Pedido de Compra por falta de pago. En estos casos, CPP deberá avisar por escrito al Proveedor el
motivo que sustenta la demora de pago, quedando CPP obligado a efectuar dichos pagos dentro de los tres días hábiles siguientes de
superada dicha situación.
19.1. El Proveedor no podrá por ningún motivo, ceder, total o parcialmente, su posición contractual en el presente Pedido de Compras y/o
en los créditos derivados del mismo a favor del Proveedor.
19.2. Con la celebración de este Pedido de Compras, el Proveedor da su conformidad expresa e irrevocable a CPP para que CPP ceda
en cualquier momento a favor del Cliente Final este Pedido de Compra, o cualesquiera derechos y/u obligaciones emanados del mismo.
Dicha cesión operará de manera automática desde el momento en que CPP la comunique al Proveedor, acreditándole que la cesión
cuenta con la conformidad del Cliente Final; y quedando CPP desde ese momento liberado de las obligaciones y derechos de este
Pedido de Compras, las cuales pasarán a ser de titularidad exclusiva del Cliente Final, sin ninguna limitación ni responsabilidad para
CPP. El Proveedor renuncia de manera expresa e irrevocable a interponer cualquier recurso posterior contra con motivo de esta cesión.
19.3. Todas las garantías otorgadas por el Proveedor a favor de CPP en virtud de este Pedido de Compra, incluyendo garantías de fiel
cumplimiento, anticipos, fondo de garantía, garantía general por correcta ejecución de trabajos o material s, garantía de buen
funcionamiento, garantía por vicios ocultos, responsabilidad civil, entre otras; y, cualquier garantía que corresponda al Proveedor obtener
de terceros fabricantes, proveedores o subcontratistas en beneficio de CPP, se entenderán otorgadas u obtenidas también a favor del
Cliente Final o en beneficio de éste, en sus mismos términos y condiciones. El Proveedor da su conformidad y aceptación anticipada para
que estas garantías puedan ser extendidas (endosadas) a favor del Cliente Final, sin ninguna restricción.
CPP podrá rescindir el Presente Pedido de Compra en cualquier momento y sin expresar causa alguna con la sola condición de dar aviso
al proveedor mediante comunicación fehaciente con 72 Hs. de anticipación, no pudiendo el Proveedor por tal motivo reclamar suma de
dinero alguna por lucro cesante, perjuicio o indemnizaciones que hubieran correspondido hasta la finalización del presente Pedido de
Compra.
CPP podrá, a su discreción notificar al Proveedor la suspensión de la totalidad de los trabajos o una parte de los mismos. En la medida
en que sea compensado por el Cliente de CPP, CPP compensará al Proveedor por los costos de espera o "Stand By", (al 80% de las
tarifas contempladas en el Pedido de Compra, en caso que el Proveedor realmente incurriera en estos costos. El Proveedor estará
obligado a minimizar sus costos durante la suspensión de los trabajos, lo cual podrá ser revisado por CPP. Cualquier suspensión de los
trabajos de acuerdo con la presente cláusula dará lugar a una prórroga equivalente a la que otorgará el Cliente de CPP a favor de CPP
respecto de los trabajos.
El Proveedor cumplirá con las instrucciones de CPP y, durante la suspensión, protegerá y brindara seguridad adecuada a los trabajos
que encuentren afectados contra todo deterioro, pérdida o daño.
El Proveedor no tendrá derecho a recibir ninguna compensación ni tampoco tendrá derecho a recibir prorroga de tiempo alguna en caso
de que: dicha suspensión esté dispuesta de alguna otra forma en el Pedido de Compra, en cuyo caso regirá la cláusula especifica; dicha
suspensión sea necesaria para la adecuada seguridad de los trabajos, de las personas en el Sitio o el medio ambiente debido a un acto,
omisión o incumplimiento por parte del Proveedor.
Si la ejecución de los Trabajos se hubiera visto interrumpida por un período continuo de doce (12) meses como una suspensión,
cualquiera de las Pares tendrá derecho a dar por concluido el Pedido de Compras.
Las partes convienen irrevocablemente que en caso de surgir divergencias entre ellas, por razón o con ocasión del presente contrato,
realizarán los mejores esfuerzos para buscar y encontrar una solución mutuamente aceptable. Sin embargo, para el caso en el cual la
divergencia no pueda ser resuelta por mutuo acuerdo entre ellas, las partes renuncian fuero y domicilio y determinan que toda
controversia o diferencia relativa a este contrato y a su ejecución y liquidación e interpretación, será resuelta en primera instancia con la
asistencia de un mediador del Centro de Arbitraje y Mediación de la Cámara de Comercio de Quito. En el evento que el conflicto no fuere
resuelto mediante este procedimiento las partes renuncian fuero y domicilio y se someten a la resolución de un Tribunal de Arbitraje de la
Cámara de Comercio de Quito, que se sujetará a lo dispuesto en la Ley de Arbitraje y Mediación; el reglamento para el Funcionamiento
del Centro de Arbitraje y Mediación de la Cámara de Comercio de Quito y a las siguientes normas: a.- Los árbitros serán seleccionados
conforme lo establecido en la Ley de Arbitraje y Mediación. b.- Las partes renuncian a la jurisdicción ordinaria, se obligan a acatar el
laudo que expida el Tribunal Arbitral y se compromete a no interponer ningún tipo de recurso en contra del laudo arbitral. c.- Para la
ejecución de las medidas cautelares el Tribunal Arbitral está facultado para solicitar de los funcionarios públicos, judiciales, policiales y
administrativos su cumplimiento, sin que sea necesario recurrir a juez ordinario alguno. d.- El Tribunal Arbitral está integrado por tres
CONSTRUCCIONES Y PRESTACIONES PETROLERAS PEDIDO DE COMPRA
AV. Coruña N28-14 y Manuel Itu Número Rev. Pág Fecha
EC170107 Quito - Ecuador
4500398464 0 8/8 05.07.2019
árbitros. e.- El procedimiento arbitral será confidencial. f.- El lugar de arbitraje será las instalaciones del Centro de Arbitraje y Mediación
de la Cámara de Comercio de Quito. Las partes se someten a los jueces de lo civil y mercantil de la ciudad de Quito para el caso de que
el laudo arbitral que se dicte deba ser ejecutado judicialmente.
24. Aceptación
El presente Pedido de Compra deberá ser aceptado o rechazado por el Proveedor dentro del término de 48 Hs. de su recepción.
En el supuesto caso de no existir conformidad con las condiciones contenidas en el presente, su rechazo parcial o total deberá ser
comunicado por escrito dentro del plazo arriba indicado.
En caso contrario el presente Pedido de Compra se considerará tácitamente aceptado en todos sus términos y el cumplimiento de las
obligaciones de la misma será plenamente exigible.
Para constancia y fe de lo acordado, las partes suscriben este documento en Quito, hoy Para constancia y fe de lo acordado, las partes
suscriben este documento en Quito, hoy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . de . . . . . . . . . . . . . . . . . . . . . . . . . . . . . de 201 . . . .
Por CPP
.............................
Por el PROVEEDOR
.............................
*** SI UD. DETECTASE ALGUNA POSIBLE IRREGULARIDAD DURANTE EL PROCESO DE COMPRA Y/O INVITACION A
COTIZAR, O ALGUNA POSIBLE VIOLACION AL CODIGO DE CONDUCTA, PODRA UTILIZAR LOS MECANISMOS
CONFIDENCIALES ESTABLECIDOS EN DICHO CODIGO PARA REALIZAR SU DENUNCIA A LA DIRECCION CORPORATIVA DE
AUDITORIA INGRESANDO A WWW.CPP.COMPLIANCE-LINE.COM O LLAMANDO AL NUMERO GRATUITO
CORRESPONDIENTE A SU PAIS INCLUIDO EN ESA PAGINA WEB ***
PROYECTO: CAMPO AUCA
CODIGO CPP: 3808-E527-I-MR-100-185
CATÁLOGO Y DIBUJO
EQUIPO: AMORTIGUADOR DE PULSOS, BLACOH
TAGS: DAMP-ACSA-21811
DAMP-ACSA-21812
DAMP-ACSA-21911
DAMP-ACSA-21912
PC 4500398464
Version 2.4
ADDITIONAL RESOURCES
AODDampener 15
SENTINEL Gauge Guards/Diaphragm Seals 16
SPILLSTOP Leak Containment 17
Supporting Products– Pressure Relief Valves, Back Pressure Valves, Check & Poppet Valves, Calibration Columns, Charging Kits 18
Air Control Types 19
Bladders & Bellows 20
Bladder Temperature Limits 21
Testing & Certifications 22-23
Performance Charts 24-25
Website Resources 26
Blacoh University 27
Conversions & Sizing 28
POSITIVE
DISPLACEMENT
PUMP
TANK QUICK
CLOSE
DISCHARGE VALVE
SENTRY III
Series Bladder Air Control Est. Shipping Certifications
Body Material Inlet Size Inlet Type Max Pressure
Material Material Type Weight & Testing
Plastic ATEX
CPVC ISO 9001:2008
Polypropylene (PP) NAFTA
0.375" to 0.5" 150 psi 2 to 4 lbs
PTFE Aflas CRN
(10 to 15 mm) (10.3 bar) (0.91 to 1.81 kg)
PVC Buna-N PED
PVDF FNPT
Buna-N (Food Grade) ARRA
BSP
EPDM 3.1 Cert.
ANSI Flange
Hypalon Adjustable Material Cert.
DN Flange
Neoprene Chargeable Cert. of Origin
Metal Socket Weld
PTFE Hydrostatic Testing
Tri-Clamp
Alloy 20 (A20) Santoprene Dye Penetrant Test
Union Fitting
Hastelloy C (HAST) Silicone (Food Grade) X-Ray/Radiography
Viton 0.375" to 0.75" 1000 psi 4 to 6 lbs PMI Testing
Stainless Steel (SS)
(10 to 20 mm) (68.9 bar) (1.81 to 2.72 kg) Bolt Tensile Testing
Stainless Steel - 30 RA Polished
(SSP) Customer Specified
Testing
Plastic Series Wetted / Non- Wetted Metal Series Wetted / Non- Wetted Accessories
Charging Kits
04PP PP / PP 1120 SS / SS Bladder Replacement Kits
04PVC PVC / PVC 1170 A20 / A20 Hardware Replacement Kits
04X CPVC / CPVC 1175 A20 / SS Pressure Relief Valves
04K PVDF / PVDF 1185 HAST / SS Back Pressure Valves
T1010 PTFE / PTFE 7325 SS / SS Gauge Guards
T1050 PTFE / PTFE 8325 SSP/ SSP Gauge Upgrades
Spill Containment for AODD
SENTRY III
Series Bladder Air Control Est. Shipping Certifications
Body Material Inlet Size Inlet Type Max Pressure
Material Material Type Weight & Testing
Plastic Series Wetted / Non- Wetted Metal Series Wetted / Non- Wetted Accessories
Charging Kits
10PP PP / PP 1020 SS / SS
Bladder Replacement Kits
10PVC PVC / PVC 1070 A20 / A20
Hardware Replacement Kits
10X CPVC / CPVC 1075 A20 / SS
Pressure Relief Valves
DC1005 Acetal-Cond / Acetal-Cond 1080 HAST / HAST
Back Pressure Valves
10K PVDF / PVDF 1085 HAST / SS
Gauge Guards
T1000 PTFE / PTFE 7320 SS / SS
Gauge Upgrades
T1012 PTFE / PTFE 8320 SSP / SSP
Spill Containment for AODD
XPA/XPX ATEX
Autoclave
XPA: 7500 psi XPA: 10-13 lbs ISO 9001:2008
FNPT
(517.1 bar) (4.54 to 6.90 kg) NAFTA
BSP
CRN
ANSI Flange
PED
DN Flange XPX: 15000 psi XPX: 44 lbs ARRA
RTJ Flange (1034.2 bar) (20.0 kg)
Buna-N 3.1 Cert.
Socket Weld
Stainless Steel (SS) EPDM 0.5" Material Cert.
Chargeable
Duplex Stainless Steel (DSS) PTFE (15 mm) Cert. of Origin
XPH Gauge Adaptor
Viton Hydrostatic Testing
Dye Penetrant Test
X-Ray/Radiography
HP Flow- XPH: 7500 psi XPH: 10-13 lbs
PMI Testing
Through (517.1 bar) (4.54 to 6.90 kg)
Bolt Tensile Testing
Customer Specified
Testing
XPA_-08 / XPH_-08 8 in3 / 0.13 L SS / SS Charging Kits The XPH model’s unique design allows it to
Bladder Replacement Kits effectively remove both hydraulic pulses and
Hardware Replacement Kits acoustic pulses. The flow-through inlet is spe-
XPX10-12 12 in3 / 0.20 L SS / SS
Pressure Relief Valves cifically designed to remove high frequency
Back Pressure Valves pulses greater than 15 Hz. Residual pulsations
XPA_-12 / XPH_-12 12 in3 / 0.20 L SS / SS Gauge Guards of less than 1% can be achieved with the flow-
Gauge Upgrades through design versus a single inlet/outlet
XPA_-24 / XPH_-24 24 in3 / 0.39 L SS / SS Spill Containment for AODD dampener. (See performance chart on p. 24)
SENTRY Tef-Guard
Series Bladder Air Control Est. Shipping Certifications
Body Material Inlet Size Inlet Type Max Pressure
Material Material Type Weight & Testing
ATEX
ISO 9001:2008
Metal NAFTA
PED
ARRA
FNPT 3.1 Cert.
BSP Material Cert.
0.5” 2,000 psi 12 lbs
Stainless Steel (SS) PTFE ANSI Flange Chargeable Cert. of Origin
(15 mm) (137.8 bar) (5.44 kg)
DN Flange Hydrostatic Testing
Socket Weld Dye Penetrant Test
X-Ray/Radiography
PMI Testing
Bolt Tensile Testing
Customer Specified
Testing
Charging Kits
Bladder Replacement Kits
Hardware Replacement Kits
Pressure Relief Valves
TG12SS SS / SS
Back Pressure Valves
Gauge Guards
Gauge Upgrades
Spill Containment for AODD
SENTRY II
Series Bladder Air Control Est. Shipping Certifications
Body Material Inlet Size Inlet Type Max Pressure
Material Material Type Weight & Testing
ATEX
Plastic Acetal ISO 9001:2008
CPVC NAFTA
Polypropylene (PP) Aflas 0.5" to 1" 150 psi 6 to 10 lbs CRN
PTFE Buna-N (15 to 25 mm) (10.3 bar) (2.72 to 4.54 kg) PED
PVC FNPT
Buna-N (Food Grade) ARRA
PVDF BSP
EPDM 3.1 Cert.
ANSI Flange Adjustable
Hypalon Material Cert.
DN Flange Automatic
Neoprene Cert. of Origin
Socket Weld Chargeable
Metal PTFE Hydrostatic Testing
Alloy 20 (A20) Tri-Clamp
Santoprene Dye Penetrant Test
Carbon Steel (CS) Union FItting
Silicone (Food Grade) X-Ray/Radiography
Hastelloy C (HAST) 0.75" to 1.5" 1000 psi 14 to 18 lbs
Viton PMI Testing
Stainless Steel (SS) (20 to 40 mm) (68.9 bar) (6.35 to 8.16 kg)
Bolt Tensile Testing
Stainless Steel - 30 RA Polished
Customer Specified
(SSP)
Testing
Plastic Series Wetted / Non- Wetted Metal Series Wetted / Non- Wetted Accessories
SENTRY II
Series Bladder Air Control Est. Shipping Certifications
Body Material Inlet Size Inlet Type Max Pressure
Material Material Type Weight & Testing
Plastic
Acetal ATEX
CPVC ISO 9001:2008
Polypropylene (PP) NAFTA
Polypropylene - Conductive Aflas 0.5" to 1" 250 psi 7 to 9 lbs CRN
PTFE Buna-N (15 to 25 mm) (17.2 bar) (3.18 to 4.08 kg) PED
PVC FNPT
Buna-N (Food Grade) ARRA
PVDF (to 250 psi) BSP
EPDM Adjustable 3.1 Cert.
ANSI Flange
Hypalon Automatic Material Cert.
DN Flange
Neoprene Chargeable Cert. of Origin
Metal Socket Weld
PTFE Inlet Stabilizer Hydrostatic Testing
Alloy 20 (A20) Tri-Clamp
Santoprene Dye Penetrant Test
Carbon Steel (CS) Union Fitting
Silicone (Food Grade) X-Ray/Radiography
Hastelloy C (HAST) Viton PMI Testing
Stainless Steel (SS) 0.75" to 1.5" 1000 psi 15 to 19 lbs
(20 to 40 mm) (68.9 bar) (6.80 to 8.62 kg) Bolt Tensile Testing
Stainless Steel - 30 RA Polished Customer Specified
(SSP) Testing
Plastic Series Wetted / Non- Wetted Metal Series Wetted / Non- Wetted Accessories
301 PP / PP
305 PP / PP Charging Kits
3020 SS / SS
311 PVC / PVC Bladder Replacement Kits
3024 SS / CS
321 PP- Cond / PP- Cond Hardware Replacement Kits
3040 CS / CS
331 CPVC / CPVC Pressure Relief Valves
3075 A20 / SS
401 PVDF / PP Back Pressure Valves
3085 HAST / SS
421 PVDF / PVDF Gauge Guards
7220 SS / SS
651 PTFE / PTFE Gauge Upgrades
8220 SSP / SSP
661 PTFE / PTFE Spill Containment for AODD
801 Acetal / PP
SENTRY I
Series Bladder Air Control Est. Shipping Certifications
Body Material Inlet Size Inlet Type Max Pressure
Material Material Type Weight & Testing
Plastic ATEX
Noryl (non-wetted only) ISO 9001:2008
Polypropylene (PP) NAFTA
1.5" to 2" 150 psi 18 to 22 lbs
PTFE CRN
Aflas (40 to 50 mm) (10.3 bar) (8.16 to 9.98 kg)
PVC PED
Buna-N FNPT
PVDF ARRA
EPDM BSP
3.1 Cert.
Hypalon ANSI Flange Adjustable
Material Cert.
Neoprene DN Flange Automatic
Cert. of Origin
PTFE Socket Weld Chargeable
Metal Santoprene Tri-Clamp
Hydrostatic Testing
Alloy 20 (A20) Dye Penetrant Test
Carbon Steel (CS) Silicone (Food Grade) Union Fitting
X-Ray/Radiography
Hastelloy C (HAST) Viton 1.5" to 2.5" 1000 psi 34 to 37 lbs PMI Testing
Stainless Steel (SS) (40 to 70 mm) (68.9 bar) (15.42 to 16.78 kg) Bolt Tensile Testing
Stainless Steel - 30 RA Polished Customer Specified
(SSP) Testing
Plastic Series Wetted / Non- Wetted Metal Series Wetted / Non- Wetted Accessories
SENTRY I
Series Bladder Air Control Est. Shipping Certifications
Body Material Inlet Size Inlet Type Max Pressure
Material Material Type Weight & Testing
Plastic
ATEX
ISO 9001:2008
Polypropylene (PP) NAFTA
PTFE 1.5" to 2" 200 psi 24 to 27 lbs CRN
PVC Aflas (40 to 50 mm) (13.7 bar) (10.80 to 12.25 kg) PED
PVDF Buna-N FNPT
ARRA
EPDM BSP
Adjustable 3.1 Cert.
Hypalon ANSI Flange
Automatic Material Cert.
Neoprene DN Flange
Metal Chargeable Cert. of Origin
PTFE Socket Weld
Inlet Stabilizer Hydrostatic Testing
Alloy 20 (A20) Santoprene Tri-Clamp
Dye Penetrant Test
Carbon Steel (CS) Silicone (Food Grade) Union Fitting
X-Ray/Radiography
Hastelloy C (HAST) Viton 2" to 2.5" 1000 psi 42 to 50 lbs
PMI Testing
Stainless Steel (SS) (50 to 70 mm) (68.9 bar) (19.05 to 22.68 kg)
Bolt Tensile Testing
Stainless Steel - 30 RA Polished
Customer Specified
(SSP)
Testing
Plastic Series Wetted / Non- Wetted Metal Series Wetted / Non- Wetted Accessories
2075 A20 / SS
Charging Kits
101 PP / PP 2085 HAST / SS
Bladder Replacement Kits
105 PP / PP 2400 SS / PP
Hardware Replacement Kits
111 PVC / PVC 2420 SS / SS
Pressure Relief Valves
115 PVC / PVC 2425 SS / CS
Back Pressure Valves
201 PVDF / PP 2600 CS / PP
Gauge Guards
221 PVDF / PVDF 2620 CS / CS
Gauge Upgrades
551 PTFE / PTFE 7120 SS / SS
Spill Containment for AODD
8121 SSP / SSP
CIP
Series Bladder Air Control Est. Shipping Certifications
Body Material Inlet Size Inlet Type Max Pressure
Material Material Type Weight & Testing
ATEX
ISO 9001:2008
Metal NAFTA
PED
ARRA
3.1 Cert.
Material Cert.
Stainless Steel – 30 RA EPDM (Food Grade) 2.5" 150 psi Adjustable 8 to 10 lbs
Tri-Clamp Cert. of Origin
Polished (SSP) Silicone (Pharma Grade) (70 mm) (10.3 bar) Chargeable (3.63 to 4.54 kg)
Hydrostatic Testing
Dye Penetrant Test
X-Ray/Radiography
PMI Testing
Bolt Tensile Testing
Customer Specified
Testing
Charging Kits
Bladder Replacement Kits
Hardware Replacement Kits
275 SSP Pressure Relief Valves
Back Pressure Valves
Gauge Guards
Gauge Upgrades
Spill Containment for AODD
SENTRY IV
Series Bladder Max Air Control Est. Shipping Certifications
Body Material Inlet Size Inlet Type
Material Material Pressure Type Weight & Testing
Plastic ATEX
ISO 9001:2008
33 to 36 lbs NAFTA
Polypropylene (PP) 3" 90 psi
(14.97 to 16.33 PED
(80 mm) (6.2 bar)
Buna-N kg) ARRA
EPDM ANSI Flange 3.1 Cert.
Adjustable
Hypalon DN Flange Material Cert.
Aluminum (AL) Automatic
Metal Alloy 20 (A20) Neoprene Hammer Union Cert. of Origin
Chargeable
Epoxy Coated Aluminum (ECAL) PTFE Tri-Clamp Hydrostatic Testing
Inlet Stabilizer
Carbon Steel (CS) Silicone (Food Grade) NPTF Dye Penetrant Test
3" to 6" 72 to 82 lbs
Epoxy Coated Carbon Steel (ECCS) Viton 275 psi X-Ray/Radiography
(80 to 150 (32.66 to 37.19
Hastelloy C (HAST) (18.9 bar) PMI Testing
Stainless Steel (SS) mm) kg)
Bolt Tensile Testing
Stainless Steel - 30 RA Polished (SSP) Customer Specified
Duplex Stainless Steel (DSS) Testing
Plastic Series Wetted / Non- Wetted Metal Series Wetted / Non- Wetted Accessories
4000 AL / AL
4015 ECAL/ ECAL
4020 SS / SS
4030 CS / AL Charging Kits
4040 CS / CS
4045 ECCS/ ECCS Bladder Replacement Kits
4046 ECCS/ AL Hardware Replacement Kits
4050 SS / AL Pressure Relief Valves
P4000 PP / PP
4060 SS / CS Back Pressure Valves
4065 SS / ECCS Gauge Guards
4070 A20 / A20 Gauge Upgrades
4075 A20 / SS
4080 HAST / HAST Spill Containment for AODD
4085 HAST / SS
7420 SS / SS
8420 SSP / SSP
SENTRY V
Series Bladder Air Control Est. Shipping Certifications
Body Material Inlet Size Inlet Type Max Pressure
Material Material Type Weight & Testing
ATEX
ISO 9001:2008
Metal NAFTA
PED
ARRA
Carbon Steel (CS) Buna-N
3.1 Cert.
Epoxy Coated Carbon Steel EPDM Adjustable
Material Cert.
(ECCS) Hypalon 3" to 6" ANSI Flange 275 psi Automatic 145 to 155 lbs
Cert. of Origin
316 Stainless Steel (SS) Neoprene (80 to 150 mm) DN Flange (18.9 bar) Chargeable (65.77 to 70.31 kg)
Hydrostatic Testing
Duplex Stainless Steel Silicone (Food Grade) Inlet Stabilizer
Dye Penetrant Test
(DSS) Viton
X-Ray/Radiography
PMI Testing
Bolt Tensile Testing
Customer Specified
Testing
Charging Kits
5040 CS / CS Bladder Replacement Kits
5045 ECCS / ECCS Hardware Replacement Kits
5420 SS / SS Pressure Relief Valves
5440 CS / CS Back Pressure Valves
5445 ECCS / ECCS Gauge Guards
5620 SS / SS Gauge Upgrades
Spill Containment for AODD
AODDampener
Bladder Air Control Est. Shipping Certifications
Series Body Material Inlet Size Inlet Type Max Pressure
Material Type Weight & Testing
Metal
ATEX
ISO 9001:2008
1.0” (25 mm) Material Cert.
FNPT 150psi Fully 18 lbs
316 Stainless Steel (SS) PTFE back Buna 1.5” (40 mm) Cert. of Origin
BSP (10.3 bar) Automatic (8.16 kg)
2.0” (50 mm) Hydrostatic Testing
Plastic
CPVC
Polypropylene (PP) 1/2" 200 psi 1-2 lbs ATEX
PVC (12.7 mm) (13.7 bar) (0.5 to 0.9 kg) ISO 9001:2008
PVDF NAFTA
FNPT PED
EPDM
BSP ARRA
PTFE
Metal Socket Weld 3.1 Cert.
Viton
Union Fitting Material Cert.
Cert. of Origin
Customer Specified
Alloy 20 (A20) 1/2" 1000 psi 2-3 lbs
Testing
Stainless Steel (SS) (12.7 mm) (68.9 bar) (0.9 to 1.4 kg)
Plastic Series Wetted / Non- Wetted Metal Series Wetted / Non- Wetted About
ATEX
Hastelloy C (HAST) ISO 9001:2008
Polypropylene (PP) Noryl Whistle NAFTA
3/4-1” FNPT 1/4” 25-55 lbs
PVC PVDF Electronic ARRA
(19-25 mm) BSP (6.4 mm) (11.3 to 25.0 kg)
PVDF Stainless Steel Switch 3.1 Cert.
Stainless Steel (SS) Material Cert.
Cert. of Origin
SPS-10 PP / NORYL
SPS-11 PVC / NORYL The SPILLSTOP Leak Containment System attaches
SPS-20 SS / NORYL directly to the exhaust of an air operated diaphragm
SPS-21 SS / SS pump. When pump diaphragms fail, SPILLSTOP
SPS-30 PVDF / NORYL captures dangerous and/or expensive process fluid
in an internal receptacle while raising a float switch
SPS-31 PVDF / PVDF
to automatically shut down the pump. SPILLSTOP can
SPS-33 PVDF / PVDF also be configured to sound a warning alarm and/or
SPS-39 PVDF / NORYL initiate a backup pump switchover.
SPS-80 HAST / NORYL
SENTINEL Pressure Relief Valves protect SENTINEL Back Pressure Valves enhance
pumping systems from over-pressure system performance by applying a
damage caused by defective equipment
or a blockage in the system line. They continuous back pressure to the pump.
consist of a spring and diaphragm that is The diaphragm is held against the valve
pushed down on a seat to a preset seat by an internal ring. When the
adjustable pressure setting. Once the valve’s present pressure is exceeded,
pressure is exceeded, the seat is lifted off the diaphragm is forced up and system
the relief port and the excess fluid fluid flows through the valves to the
pressure flows back to a holding tank or injection point.
the suction side of the pump. When the
pressure is reduced, the spring pushes
the seat back over the discharge port.
SENTINELTM Check Valve & Poppet Valve SENTINELTM Calibration Column Charging Kit
275 in³
(4.50 L)
8 in³
(0.13 L)
577 in³
(9.46 L)
12 in³
(0.20 L)
1155 in³
(5 gal)
(18.93 L)
AODDampener
36 to 85 in³ 1.0, 1.5, 2.0” Inlet
(0.59 to 1.40 L) (25, 40, 50 mm)
Aflas 0°F to +400°F (-18°C to +204°C) High temperature, petroleum based chemicals, strong acids and bases.
Buna +10°F to +180°F (-12°C to +82°C) Good flex life; use with petroleum, solvents and oil-based fluids.
FDA Buna +10°F to +180°F (-12°C to +82°C) FDA-approved food grade; similar characteristics of regular Buna.
EPDM -60°F to +280°F (-51°C to +138°C) Use in extreme cold; good chemical resistance with ketones, caustics.
Hypalon -20°F to +275°F (-29°C to +135°C) Excellent abrasion resistance; good in aggressive acid applications.
Neoprene 0°F to +200°F (-18°C to +93°C) Good abrasion resistance and flex; use with moderate chemicals.
PTFE -20°F to +220°F (-29°C to +104°C) Bellows design; excellent flex life; use with highly aggressive fluids.
Santoprene -20°F to +225°F (-29°C to +107°C) Excellent choice as a low cost alternative for PTFE in many applications.
FDA Silicone -20°F to +300°F (-29°C to +149°C) FDA-approved food grade material; for use in food and pharmaceutical processing.
USP Class VI Silicone -20°F to +300°F (-29°C to +149°C) Pharmaceutical grade material; for use in food and pharmaceutical processing.
Viton® -10°F to +350°F (-23°C to +177°C) Use in hot and aggressive fluids; good with aromatics, solvents, acids and oils.
Triplex Pump
With SENTRY XPH Dampener
Without Dampener
(1715 rpm, 757 pulses/s)
With XPH Flow-Thru
Dampener (± 4 PSI)
Pressure (PSI)
Time (Seconds)
Triplex Pump
With SENTRY XP Dampeners
Without Dampener
With XPA Dampener
With XPH Flow-Thru
Dampener
Pressure (PSI)
Time (Seconds)
1” Metering Pump
With SENTRY II Dampener
Without Dampener
With Dampener
Pressure (PSI)
Time (Seconds)
Time (Seconds)
1” AODD Pump
With 1” AODDampener
Without Dampener
With Dampener
Pressure (PSI)
Time (Seconds)
B L A C O H F LU I D C O N T R O L
proudly introduces
new series of learning videos new lecture videos from industry experts assembly videos for each model
take exams and earn certificates for each series earn free Professional Development Hours quick links to installation & operation manuals
documents and articles to read and download resources and articles to read and download product brochures by model
1.25" 175 in³ (2.87 L) 2" - 2.5" 0.400 - 0.890 1.514 - 3.369 370 in³ (6.06 L)
Premature Pump
Blacoh Dampener / Suppressor
(Component) Failure 1.50" 1.5” AODDampener 2" 0.400 - 0.890 1.514 - 3.369 577 in³ (9.46 L)
2" 2.0” AODDampener
Valves Leaking Blacoh Dampener / Suppressor 3" - 4" 0.900- 3.100 3.407 - 11.74 5 Gal (18.93 L)
3" 5 Gal (18.93 L)
Fittings Breaking Blacoh Pulsation Dampener 4" 5 or 10 Gal (37.85 L) 5" - 6" 3.110 - 6.000 11.77 - 22.71 10 Gal (37.85 L)
MODEL #: CTS1020V-5
AIR CONTROL: CHARGE
BLADDER: VITON
CAPACITY: 10 CUBIC INCHES/0.16 LITERS
INLET: 0.5" FNPT
MAXIMUM PRESSURE: 300 PSI/20.6 BAR
NONWETTED HOUSING: STAINLESS STEEL
WETTED HOUSING: STAINLESS STEEL
EST SHIP WEIGHT EACH: 4 LB
DISCLAIMER
ALTHOUGH THE INFORMATION ON THIS SHEET IS BELIEVED TO HAVE BEEN ACCURATE WHEN THE SHEET WAS FIRST PREPARED, SOME
INFORMATION ON THIS SHEET MAY NOT BE ENTIRELY ACCURATE NOW. PLEASE VERIFY MATERIAL COMPONENTS, DIMENSIONS, AND
PRESSURE RATING ON THE CURRENT BROCHURE FOR THIS PRODUCT BY BLACOH FLUID CONTROL, INC. (“BLACOH”) OR, IF NECESSARY,
CONTACT BLACOH DIRECTLY. PRESSURE TOLERANCES, INCLUDING BUT NOT LIMITED TO, ON MODELS MADE OF PLASTIC, MAY BE
REDUCED BY TEMPERATURE VARIATION AND BY THE COMPOSITION OF THE SUBSTANCE BEING PUMPED.
USE OF AN INCOMPATIBLE OR UNSUITABLE DAMPENER ON A PUMP MAY BE DANGEROUS TO PERSONS AND PROPERTY. BY WAY OF
EXAMPLE BUT NOT LIMITATION, USE OF AN INCOMPATIBLE OR UNSUITABLE DAMPENER MAY RESULT IN EXPLOSIONS, LEAKAGE OF
LIQUIDS OR GASES (WHICH MAY BE HAZARDOUS), OR MALFUNCTIONING EQUIPMENT.
THE USER IS SOLELY RESPONSIBLE FOR (AND BLACOH IS NOT RESPONSIBLE FOR) VERIFYING THE COMPATIBILITY AND SUITABILITY OF A
PARTICULAR DAMPENER FOR A PARTICULAR PUMP AND APPLICATION. AS WELL AS DETERMINING WHETHER TESTING OF A DAMPENER IS
ADVISABLE PRIOR TO USE IN A PARTICULAR APPLICATION.
DIMENSIONAL DRAWING
(TOLERANCE ± .25")
IOM’S
EQUIPO: AMORTIGUADOR DE PULSOS, BLACOH
TAGS: DAMP-ACSA-21811
DAMP-ACSA-21812
DAMP-ACSA-21911
DAMP-ACSA-21912
PC 4500398464
Installation and Operation Manual
Chargeable Dampener Models
SENTRY™ dampeners are pressure vessels containing a flexible bladder or bellows inside that separates an
inert pressurized gas (air or Nitrogen) from a system fluid in the lower chamber. Depending on how dampeners are
configured, they are used as Pulsation Dampeners, Inlet Stabilizers or Surge Suppressors to control pressure
fluctuations and spikes in liquid piping systems.
Dampeners work on the principle that volume is inversely proportional to pressure (P1V1=P2V2). Compressed air
or Nitrogen (never Oxygen) is introduced into the non-wetted side of the dampener. The gas charge is contained
by the bladder or bellows preventing contact between the system fluid and the gas.
When the dampener is sized correctly, properly installed and charged according to the instructions provided it
will greatly reduce the damaging effects of pressure variations in piping systems and significantly improve the
efficiency of transferring liquids.
All dampeners manufactured by BLACOH use pressure bodies made in the USA to ensure quality. Prior
to shipment, each and every dampener is factory pressure tested to assure proper function and leak-free
operation.
GENERAL Information��������������������������������������������������������������������������������������������������������������������������������������������������3
Must Read Before Installation������������������������������������������������������������������������������������������������������������������3
Installation Notes�������������������������������������������������������������������������������������������������������������������������������������4
ATEX Standard����������������������������������������������������������������������������������������������������������������������������������������4
Maintenance��������������������������������������������������������������������������������������������������������������������������������������������4
Temperature Limits����������������������������������������������������������������������������������������������������������������������������������5
SUPPORTING Products������������������������������������������������������������������������������������������������������������������������������������������������9
Body Material: Wetted / Non-wetted Bladder / Bellows Material Pump Area and Number
The word “dampener”, as used in this Manual, has the same meaning as Pulsation Dampener, Inlet Stabilizer
or Surge Suppressor. Depending on the specific model, the word “bladder” is used to reference the dampener’s
elastomeric diaphragm.
Safety Symbols
The following symbols indicate cautions, warnings and notes that must be observed for safe and satisfactory installation,
operation and maintenance of dampener.
WARNINGS Danger of serious injury or death could occur if these warnings are ignored.
CAUTIONS Equipment damage, injury or death could occur if these cautions are not observed.
NOTES Special instructions for safe and satisfactory installation, operation and maintenance.
General Safety
CAUTION!
▪▪ Observe all safety symbols in installation and operation ▪▪ DO NOT operate a dampener that is leaking, damaged,
instructions. corroded or otherwise unable to contain internal fluid, air
or gas pressure.
▪▪ The internal dampener pressure will equal the maximum
fluid pressure of the system in which it is installed. ▪▪ DO NOT pump incompatible fluids through dampener.
Consult distributor or factory if you are not sure of the
▪▪ DO NOT exceed maximum allowable working pressure
compatibility of system fluids with dampener materials.
(MAWP) specified on dampener serial tag or marked on
dampener. If missing, DO NOT use dampener without ▪▪ Dampeners are designed to operate with compressed
consulting distributor or factory for maximum pressure air or clean dry Nitrogen only. Other compressed gases
rating. have not been tested and may be unsafe to use. DO
NOT USE OXYGEN.
▪▪ Always make sure safety shutoff valves, regulators,
pressure relief valves, gauges, etc. are working properly ▪▪ Always shut off air supply, remove internal dampener
before starting system or assembly. pressure and shut dampener isolation valve before
performing dampener maintenance or repair.
▪▪ Verify dampener model received against purchase order
and shipper. ▪▪ Remove all pressure from dampener AND pumping
system before disassembly, removal or maintenance.
▪▪ Before starting a system or assembly make certain the
discharge point of the piping system is clear and safe, ▪▪ Static spark can cause an explosion resulting in
and all persons have been warned to stand clear. severe injury or death. Ground dampeners and
pumping system when pumping flammable fluids or
▪▪ DO NOT put your face or body near dampener when
operating in flammable environments.
the system or assembly is operating or dampener is
pressurized. ▪▪ NOTE: EC standard EN-13463-1 and EN-13463-5
(ATEX) require grounding (earthing) on dampeners
when the potential for static sparking is present.
A grounding point is located and marked on ATEX
specific dampener models.
GENERAL Information
For safe and satisfactory operation of dampener read all safety warnings, caution statements and this complete
Manual before installation, startup, operation or maintenance.
Turn pump off and remove all pressure from system DO NOT operate a dampener that is leaking,
prior to dampener installation. damaged, corroded or otherwise unable to contain
internal fluid, air or gas pressure.
Always wear safety glasses and other appropriate
safety equipment when installing, charging or Temperature, pressure and chemicals affect the
repairing dampener. strength of plastic, elastomer and metal components.
It is recommended that a BLACOH pressure relief valve be installed in all pump systems to ensure compliance with
pressure limits on system equipment.
Install dampener inline as close to the pump discharge/inlet or quick closing valve as possible. Dampener installation
should be no more than ten pipe diameters from pump discharge/inlet or quick closing valve.
It is recommended that an isolation valve be installed between the dampener and system piping.
ATEX Standard
Certain models made for the European market comply with the ATEX standard for use in potentially explosive
atmospheres. These models have the AT designation at the end of the part number and comply with EC standard
EN-13463-5 with protection degree of II 2 GD IIB T4. AT models have a grounding lug and must be grounded
(earthed) before operation.
Maintenance
Remove all pressure from dampener AND pumping system before disassembly, removal or maintenance.
Dampeners require very little maintenance. There is no need for lubrication with elastomeric bladder or PTFE bellows.
Elastomeric bladder replacement should be part of a preventive maintenance program. Dampeners used in conjunction
with diaphragm pumps should have the bladders replaced at least every second time the diaphragms in the pump are
replaced. As with any pumping system, wear is dependent on many factors including material, temperature, chemicals,
fluid abrasiveness and system design. This suggested maintenance program may need to be adjusted according to specific
applications.
Periodic inspection of the dampener and fasteners should be conducted to visually check for signs of over-pressurization,
fatigue, stress or corrosion. Body housings and fasteners must be replaced at first indication of deterioration.
CAUTION! Replace nut and bolt fasteners at each reassembly with fasteners of equal grade/strength value.
DO NOT reuse old nuts and bolts.
After the initial torque of fasteners, bolts may lose strength when re-torqued. Failure to replace both nuts and bolts upon
each vessel reassembly will void the product warranty given by the manufacturer and the manufacturer will have no liability
whatsoever for any vessel failure or malfunction.
Where dampeners are used in corrosive environments, nut and bolt fasteners should be regularly inspected and replaced
with nut and bolt fasteners of equal grade/strength value if corrosion is observed. Failure to conduct such regular inspections
and replacement will void the product warranty given by the manufacturer and the manufacturer will have no liability
whatsoever for any vessel failure or malfunction.
IMPORTANT! After maintenance or reassembly, use new fasteners and torque fasteners according to specification
on dampener tag. If missing, consult distributor or factory for specifications.
DO NOT use dampener if the fasteners (nuts and bolts) are corroded. Check for fastener corrosion frequently,
especially in atmospheres containing salt or corrosive chemicals, or if dampener leakage has occurred.
Elastomer
Temperature Limits Applications
Materials
High temperature, petroleum based chemicals, strong acids and
Aflas 0°F to +400°F (-18°C to +204°C)
bases.
Buna-N +10°F to +180°F (-12°C to +82°C) Good flex life; use with petroleum, solvents and oil-based fluids.
FDA-approved food grade; similar characteristics of regular
FDA Buna-N +10°F to +180°F (-12°C to +82°C)
Buna-N.
Use in extreme cold; good chemical resistance with ketones,
EPDM -60°F to +280°F (-51°C to +138°C)
caustics.
FDA EPDM -50°F to +225°F (-45°C to +107°C) FDA-approved food grade; similar characteristics of regular EPDM.
Hypalon -20°F to +275°F (-29°C to +135°C) Excellent abrasion resistance; good in aggressive acid applications.
Neoprene 0°F to +200°F (-18°C to +93°C) Good abrasion resistance and flex; use with moderate chemicals.
PTFE Diaphragm +40°F to +220°F (+4°C to +104°C) Use with highly aggressive fluids.
Exclusive bellows design with excellent flex life; use with highly
PTFE Bellows -20°F to +220°F (-29°C to +104°C)
aggressive fluids.
Excellent choice as a low cost alternative for PTFE in many
Santoprene -20°F to +225°F (-29°C to +107°C)
applications.
FDA-approved food grade material; for use in food and
FDA Silicone -20°F to +300°F (-29°C to +149°C)
pharmaceutical processing.
Use with hot and aggressive fluids; good with aromatics, solvents,
Viton® -10°F to +350°F (-23°C to +177°C)
acids and oils.
Non-Metallic
Temperature Limits Applications
Body Materials
Good flex life; low moisture sensitivity; high resistance to solvents
Acetal* +32°F to +175°F (0°C to +79°C)
and chemicals.
Chlorinated PVC (CPVC): Good general chemical resistance; loses
CPVC +32°F to +180°F (0°C to +82°C)
strength as temperature rises.
Noryl +32°F to +220°F (0°C to +104°C) Good resistance to acids and bases; good temperature stability.
Good general purpose plastic; broad chemical compatibility at
Polypropylene* +32°F to +175°F (0°C to +79°C)
medium temperatures.
PTFE +40°F to +220°F (+4°C to +104°C) Use with highly aggressive fluids, high temperatures.
Good general chemical resistance; loses strength as temperature
PVC +32°F to +140°F (0°C to +60°C)
rises.
PVDF +10°F to +200°F (-12°C to +93°C) Excellent resistance to most acids and bases; high temperatures.
[T22E11_020]
Turn pump off and remove all pressure from system prior to dampener installation.
Remove all pressure from dampener AND pumping system before disassembly, removal or maintenance.
Use compressed air or clean dry Nitrogen to charge dampener. DO NOT USE OXYGEN.
DO NOT exceed maximum allowable working pressure (MAWP) specified on dampener serial tag. If missing,
consult distributor or factory for specifications.
Always wear safety glasses and other appropriate safety equipment when installing, charging or repairing dampener.
Read and observe all safety warnings and instructions in this Manual before installation, operation or repair.
IMPORTANT! After maintenance or reassembly, use new fasteners and torque fasteners according to
specification on dampener tag. If missing, consult distributor or factory for specifications.
Before performing a system pressure test, dampener must be charged with 80% of system test pressure to avoid
possible damage to bladder/bellows.
The following pre-charge notes are for all plastic dampener models; and, metal dampener models with a
maximum pressure rating up to 300 psi (20.6 bar). NOTE: Dampener can be pre-charged with compressed
air up to a maximum pressure of 150 psi (10.3 bar). If maximum pressure will exceed 150 psi (10.3 bar),
dampener must be pre-charged with Nitrogen only. DO NOT USE OXYGEN.
Pre-charge pressure should be checked at least monthly as gas molecules will diffuse through bladders/bellows, the speed
of which depends on the material, temperature and pressure. Checks must occur when no system pressure is present or
inaccurate readings will be recorded. If temperature is above 72°F (22°C) and/or pressure is over 300 psi (20.6 bar), checks
should be performed more frequently. To prevent pre-charge loss through the fill valve, always replace the fill valve
cap after charging. A proper gas charge is the key to dampener effectiveness and bladder/bellows life.
FIGURE 1
CAUTION! DO NOT use plastic models as Surge Suppressors at quick closing valves. Use metal Surge
Suppressors for water hammer or quick closing valve applications. Consult factory for options.
Step 1 — Installation Position
Install the dampener inline as close as possible to and before the device causing the water hammer pressure spike (see
FIGURE 2). For example, if a quick closing valve is causing water hammer, install the dampener on a tee or elbow as
close as possible upstream of the valve. Dampener installation should be no more than ten pipe diameters from the valve.
It is advisable to install an isolation valve between the dampener inlet and the mounting tee so maintenance and
pressure checks can be done while the system is operating.
FIGURE 2
M13E11_086
PROYECTO: CAMPO AUCA
CODIGO CPP: 3808-E527-I-MR-100-185
CERTIFICADOS
EQUIPO: AMORTIGUADOR DE PULSOS, BLACOH
TAGS: DAMP-ACSA-21811
DAMP-ACSA-21812
DAMP-ACSA-21911
DAMP-ACSA-21912
PC 4500398464