VALORIZ. 01 (Del 29/08 al 30 de Setiembre del 2 1 1,909,257.11 14,055.83 190,925.71 944,056.69 1,691.72 0.00 786,638.83 141,594.99 928,233.82 13.39% 13.39%
VALORIZ. 02 (Del 01 al 31 de Octubre del 2017) 2 1,648,264.99 15,872.41 164,826.50 170,888.35 2,332.30 0.00 1,326,090.25 238,696.24 1,564,786.49 24.96% 24.96%
VALORIZ. 03 (Del 01 al 31 de Noviembre del 2017 3 3,470,538.22 49,709.36 347,053.82 957,748.18 6,816.71 21,419.97 2,187,208.89 393,697.60 2,580,906.49 49.31% 49.31%
VALORIZ. 04 (Del 01 al 31 de Diciembre del 2017 4 4,318,163.50 68,549.82 431,816.35 778,082.23 8,847.78 41,678.50 3,126,288.46 562,731.92 3,689,020.38 79.59% 79.60%
VALORIZ. 05 (Del 01 al 30 de Enero del 2018) 5 361,966.89 14,704.22 36,196.69 0.00 1,575.25 0.00 338,899.16 61,001.85 399,901.01 96.09% 82.14%
VALORIZ. 06 (Del 01 al 28 de Febrero del 2018) 6 662,240.25 7,297.55 66,224.03 0.00 2,270.97 0.00 601,042.80 108,187.70 709,230.50 86.78% 86.79%
VALORIZ. 07 (Del 01 al 31 de Marzo del 2018) 7 700,895.15 7,836.63 70,089.52 0.00 3,057.26 0.00 635,585.00 114,405.30 749,990.30 91.70% 91.70%
VALORIZ. 08 (Del 01 al 30 de Abril del 2018) 8 352,366.18 19,260.47 35,236.62 0.00 2,042.29 0.00 334,347.74 60,182.59 394,530.33 94.18% 94.18%
VALORIZ. 09 (Del 01 al 31 de Mayo del 2018) 9 181,762.16 5,827.78 18,176.22 0.00 584.90 0.00 168,828.83 30,389.19 199,218.02 95.45% 95.85%
VALORIZ. 10 (Del 01 al 30 de Junio del 2018) 10 91,248.63 4,699.41 64,842.28 0.00 602.61 0.00 30,503.14 5,490.57 35,993.71 96.09% 96.09%
VALORIZ. 11 (Del 01 al 31 de Julio del 2018) 11 61,190.75 3,855.02 0.00 0.00 0.00 0.00 65,045.77 11,708.24 76,754.01 96.52% 100.00%
13,757,893.83 211,668.50 1,425,387.73 2,850,775.45 29,821.80 63,098.47
VR=VB+R-D
VN=VR-A
VB=VN+A+D-R
Monto final
Montos pagados
Concepto recalculado
(S/)
(S/)
Valorización mensual/bruta (A) 12,238,617.70 13,757,893.83
- Contrato principal 12,238,617.70 13,757,893.83
- Adicional de obra - -
- Mayores metrados - -
-1,519,276.13
-1,519,276.13
-
-
380,979.08
380,979.08
-
-
-0.01
-0.00
-0.01
-
-52,665.66
-16,210.84
-36,454.81
#REF!
#REF!
-
-
-
-
-
-
#REF!
#REF!
#REF!
#REF!
#REF!
OFERT
Part. Nº ESPECIFICACIONES
Unid
01 OBRAS PROVISIONALES
01.01 Cartel de identificación de la obra de 3.60 m x 2.40 m und
01.02 caseta de guardiania oficina y almacen und
02 OBRAS PRELIMINARES
02.01 Movilización y desmovilización de equipos y maquinaria glb
02.02 Mantenimiento de tránsito temporal y seguridad vial en obras mes
02.03 Trazo, niveles y replanteo en obra m2
02.04 Limpieza y acondicionamiento del terreno m2
03 MOVIMIENTOS DE TIERRAS
03.01 Demolición de pavimento de concreto m2
03.02 Excavación a nivel de sub rasante en terreno compacto C/Equipo m3
03.03 Excavación de zanjas para sardineles sumergidos (0.15 x 0.30 m) m
03.04 Eliminación de desmonte en terreno normal R=20 km con maquinaria m3
04 PAVIMENTACION
04.01 PAVIMENTO FLEXIBLE
04.01.01 Conformación y compactación a nivel de sub rasante C/Equipo m2
04.01.02 Sub - Base granular e=0.15m C/Equipo m2
04.01.03 Base granular e=0.20m C/Equipo m2
04.01.04 Imprimación asfáltica (Dosf. 0.40 gl/m2 - tanque 1800 gl) m2
04.01.05 Carpeta asfáltica en caliente de 3" m2
04.02 SARDINELES
04.02.01 Encofrado y desencofrado de sardineles sumergidos H=0.15m m
04.02.02 Concreto premezclado f´c=175 kg/cm2 en sardinel sumergido (0.15x0.30) m
04.02.03 Juntas asfálticas m
05 RAMPAS PEATONALES
05.01 Demolición de veredas e=0.10m m2
05.02 Excavación manual a nivel de sub rasante en veredas m3
05.03 Eliminación de desmonte en terreno normal R=20 km con maquinaria m3
05.04 Conformación y compactación de sub rasante en veredas m2
05.05 Trazo, niveles y replanteo en veredas m2
05.06 Base granular e=0.10m C/Equipo liviano m2
05.07 Encofrado y desencofrado normal en veredas m
05.08 Sardinel en veredas de concreto premezclado f'c=175 kg/cm2 m
05.09 Concreto premezclado en veredas f'c=175 kg/cm2, e=0.10m acabado C/Bruña @ 1.00m m2
05.10 Juntas asfálticas m
05.11 curado de concreto en veredas m2
06 SEÑALIZACIÓN
06.01 Pintura tráfico línea continua e=0.10m m
06.02 Pintura tráfico línea discontinua e=0.10m m
06.03 Pintado de pavimento (Símbolos y letras) m2
07 TRABAJOS COMPLEMENTARIOS
07.01 reductores de velocidad m
07.02 nivelacion de buzones und
08 IMPACTO AMBIENTAL, SEGURIDAD Y SALUD
08.01 Elaboración, implementación y administración del plan de seguridad y salud glb
08.02 Equipos de protección individual und
08.03 Equipos de protección colectiva glb
08.04 Mitigacion de impacto ambiental m2
COSTO DIRECTO
GASTOS GENERALES (10.00% CD )
UTILIDAD ( 10.00% CD )
SUBTOTAL
IMPUESTO ( IGV 18% )
PRESUPUESTO TOTAL
OFERTA VALORIZACIÓN N° 1 - SET.2017 VALORIZACIÓN N° 2 - OCT.2017
Metr. P.Unit Parcial Metr. Parcial % Metr. Parcial
3,779,772.45 795,597.07
377,977.25 79,559.71
377,977.25 79,559.71
4,535,726.95 954,716.49
816,430.85 171,848.97
5,352,157.80 1,126,565.46 21.05%
9100000
14,452,157.80
VALORIZACIÓN N° 2 - OCT.2017 VALORIZACIÓN N° 3 - NOV.2017 VALORIZACIÓN N° 4 - DIC.2017
Parcial % Metr. Parcial % Metr. Parcial %
33,798.33
CONTRATO DE OBRA
INTERESES
S/.
2303.49538258602
2,303.50
INTERESES
S/.
PISTA
Valorización Avance programado Avance real Coef. Reajuste programado
N° Mes Mensual Acumulado Mensual Acumulado Estado de la K-1 Mensual
(1) (2) obra (3) (4)=(1)x(3)
K
1 Set.2017 632,517.96 632,517.96 632,517.95 632,517.95 ATRASADO 1.018 0.018 11,385.32
2 Oct.2017 744,142.43 1,376,660.39 744,142.42 1,376,660.37 ATRASADO 1.021 0.021 15,626.99
3 Nov.2017 2,227,572.86 3,604,233.25 2,227,572.86 3,604,233.24 ATRASADO 1.055 0.055 122,516.51
4 Dic.2017 2,466,946.11 6,071,179.36 2,466,946.11 6,071,179.34 ATRASADO 1.054 0.054 132,029.11
5 Ene.2018 231,883.23 6,303,062.59 231,883.25 6,303,062.60 ADELANTADO 1.058 0.058 13,483.78
6 Feb.2018 282,749.85 6,585,812.44 282,749.85 6,585,812.45 ADELANTADO 1.060 0.060 17,024.55
7 Mar.2018 285,445.78 6,871,258.22 285,445.78 6,871,258.23 ADELANTADO 1.059 0.059 16,820.84
8 Abr.2018 269,061.09 7,140,319.31 269,060.53 7,140,318.76 ATRASADO 1.063 0.063 17,074.11
9 May.2018 - 7,140,319.31 439.26 7,140,758.02 ADELANTADO 1.070 0.070 -
10 Jun.2018 292,933.17 7,433,252.48 309,674.01 7,450,432.03 ADELANTADO 1.071 0.071 20,850.06
11 Jul.2018 298,280.92 7,731,533.40 281,101.37 7,731,533.40 ATRASADO 1.100 0.100 29,794.47
ALCANTARILLA
Valorización Avance programado Avance real Coef. Reajuste programado
Estado de la K-1
N° Mes Mensual Acumulado Mensual Acumulado Mensual
obra (3)
(1) (2) K (4)=(1)x(3)
ALCANTARILLA
ALCANTARILLADO
Monto del contrato original (C) 4,535,726.95 Sin IGV 4535726.9542
Adelanto directo (A) 1,425,387.73 Sin IGV 527,026.36
CON IGV 621,891.10
Valorización Valorizacion Amortización
Saldo por
N° Mes V (A/C)*V amortizar
1 Set.17 954,716.49 110,932.77 416,093.59
2 Oct.17 546,720.56 63,525.90 352,567.69
3 Nov.17 928,753.84 107,916.05 244,651.63
4 Dic.17 1,221,223.10 141,899.36 102,752.27
5 Ene.18 65,349.62 7,593.26 95,159.01
6 Feb.18 196,586.31 22,842.24 72,316.77
7 Mar.18 363,208.52 42,202.82 30,113.95
8 Abr.18 67,920.99 7,892.04 22,221.90
9 May.18 162,604.89 18,893.79 3,328.12
10 Jun.18 - 3,328.12 -
11 Jul.18 - - -
TOTAL AMORTIZADO
AMORTIZACION AMORTIZACION
Valorización PISTA ALCANTARILLADO TOTAL AMORTIZADO
N° Mes
1 Set.17 73,495.08 110,932.77 184,427.85
2 Oct.17 86,465.23 63,525.90 149,991.13
3 Nov.17 258,831.63 107,916.05 366,747.69
4 Dic.17 286,645.48 141,899.36 428,544.84
5 Ene.18 26,943.55 7,593.26 34,536.81
6 Feb.18 32,853.97 22,842.24 55,696.21
7 Mar.18 33,167.22 42,202.82 75,370.04
8 Abr.18 31,263.34 7,892.04 39,155.39
9 May.18 51.04 18,893.79 18,944.83
10 Jun.18 35,982.41 3,328.12 39,310.53
11 Jul.18 32,662.42 - 32,662.42
TOTAL 1,425,387.73
PISTA
Saldo del contrato por valorizar a la fecha del adelanto (C) 7,731,533.40 Sin IGV
Adelanto directo (A) 1,425,387.73 Sin IGV
Fecha pago del adelanto 8/25/2017
Valorización Valorizacion Amortización Deducción
K Ka
N° Mes V A*V/C [(A/C)xV]*(K/Ka-1)
1 Set.17 632,517.95 73,495.08 1.018 0.999 1,397.80
2 Oct.17 744,142.42 86,465.23 1.021 0.999 1,904.14
3 Nov.17 2,227,572.86 258,831.63 1.055 0.999 14,509.08
4 Dic.17 2,466,946.11 286,645.48 1.054 0.999 15,643.34
5 Ene.18 231,883.25 26,943.55 1.058 0.999 1,595.28
6 Feb.18 282,749.85 32,853.97 1.060 0.999 2,013.03
7 Mar.18 285,445.78 33,167.22 1.059 0.999 1,989.65
8 Abr.18 269,060.53 31,263.34 1.063 0.999 2,017.19
9 May.18 439.26 51.04 1.070 0.999 3.61
10 Jun.18 309,674.01 35,982.41 1.071 0.999 2,599.70
11 Jul.18 281,101.37 32,662.42 1.100 0.999 3,298.52
46,971.34
ALCANTARILLA
Saldo del contrato por valorizar a la fecha del adelanto (C) 4,535,726.95 Sin IGV
Adelanto directo (A) 1,425,387.73 Sin IGV
Fecha pago del adelanto 8/25/2017
Valorización Valorizacion Amortización Deducción
K Ka
N° Mes V A*V/C [(A/C)xV]*(K/Ka-1)
1 Set.17 546,720.56 110,932.77 1.013 0.999 1,554.61
2 Oct.17 928,753.84 63,525.90 1.015 0.999 1,017.43
3 Nov.17 1,221,223.10 107,916.05 1.014 0.999 1,620.36
4 Dic.17 65,349.62 141,899.36 1.015 0.999 2,272.66
5 Ene.18 196,586.31 7,593.26 1.014 0.999 110.25
6 Feb.18 363,208.52 22,842.24 1.029 0.999 684.44
7 Mar.18 67,920.99 42,202.82 1.033 0.999 1,455.84
8 Abr.18 162,604.89 7,892.04 1.031 0.999 254.55
9 May.18 - 18,893.79 1.037 0.999 715.61
10 Jun.18 - 3,328.12 1.038 0.999 129.69
11 Jul.18 - - 1.040 0.999 -
9,815.44
TOTAL 56,786.78
7,731,533.40
898,361.37 63.02575455 %
12,267,260.35 100
7731533.4 X
63.02575455
4,535,726.95 36.9742454 %
527,026.36
Orden de servicio Comprobante de pago
N° SIAF Concepto
N° Fecha N° Fecha Importe (S/)
7582 25.Ago.17 67278.3
7576 25.Ago.17 300000
7577 25.Ago.17 300000
1 1 15.Ago.17 1001 7578 25.Ago.17 300000 Adelanto directo
7579 25.Ago.17 300000
7580 25.Ago.17 300000
7581 25.Ago.17 114679.22
8128 11.Set.17 300000
8129 11.Set.17 300000
8130 11.Set.17 300000
8131 11.Set.17 300000
8132 11.Set.17 300000
8133 11.Set.17 300000
2 2 11.Set.17 1001 Adelanto de mater
8134 11.Set.17 300000
8135 11.Set.17 300000
8136 11.Set.17 300000
8137 11.Set.17 300000
8138 11.Set.17 229358.44
8139 11.Set.17 134556.6
9566 25.Oct.17 300000
9567 25.Oct.17 300000
3 3 24.Oct.17 1001 Val. 1 - Set.17
9568 25.Oct.17 291104.47
9569 25.Oct.17 37129.35
10362 22.Nov.17 300000
10363 22.Nov.17 300000
10364 22.Nov.17 300000
4 4 21.Nov.17 1001 10365 22.Nov.17 300000 Val. 2 - Oct.17
10366 22.Nov.17 250000
10367 22.Nov.17 52195.03
10368 22.Nov.17 62591.46
11337 15.Dic.17 300000
11338 15.Dic.17 300000
11339 15.Dic.17 300000
11340 15.Dic.17 300000
11341 15.Dic.17 300000
5 5 14.Dic.17 1001 Val. 3 - Nov.17
11342 15.Dic.17 300000
11343 15.Dic.17 300000
11344 15.Dic.17 300000
11345 15.Dic.17 77670.23
11346 15.Dic.17 103236.26
82 8.Ene.18 300000
83 8.Ene.18 300000
84 8.Ene.18 300000
85 8.Ene.18 300000
1341699.58
-33,798.32
Avance Acum.
Avance (%) TOTAL
(%)
- - 1,681,957.52
- - 3,363,915.04
601042.797
4.65 86.78 709,230.50 601,042.80
0
0
0
635585
4.92 91.7 749,990.30 635,585.00
0
0
0
2.47 94.17 394,530.33 334,347.74 334347.737
0
0
168828.831
1.28 95.45 199,218.02 168,828.83
0
0
- - 407,881.25
16,782,318.87
oviembre de 2018. con un saldo a favor del consorcio El Rápido de S/
s metrados y S/ 1 251 894.18 por menores metrados.
14475367.21 16,253,198.47
16,661,079.72
121,239.15
CALENDARIO VALORIZADO DE AVANCE DE OBRA CON AMPLIACION N° 02
Obra :
COSTO PARCIAL Del 29/08/17 al Del 01/09/17 al Del 01/10/17 al Del 01/11/2017 al Del 01/12/17 al Del 01/01/18 al Del 01/02/18 al Del 01/03/18 al Del 01/04/18 al Del 01/05/18 al Del 01/06/18 al Del 01/06/18 al
DESCRIPCION DE PARTIDAS
S/. 31/08/17 30/09/17 31/10/17 30/11/17 31/12/17 31/01/18 28/02/18 31/03/18 25/04/18 25/05/18 24/06/18 24/07/18
REDES Y CONEXIÓN DEL ALCANTARILLADO
OBRAS PRELIMINARES Y PROVISIONALES ALC.
Señales-iluminación nocturna con lámpara intermitente cada 10m (línea hasta 12") S/.41,324.92 S/. 13,795.97 S/. 9,386.30 S/. 0.00 S/. 14,488.92 S/. 1,070.92 S/. 2,330.83 S/. 0.00 S/. 0.00 S/. 251.98
Cerco de malla HDP de 1 m altura para límite de seguridad de obra S/.15,721.37 S/. 2,633.65 S/. 1,782.72 S/. 3,468.41 S/. 5,550.46 S/. 415.39 S/. 829.03 S/. 941.76 S/. 0.00 S/. 99.95
Desvío de aguas servidas incl. bombeo y alquiler de tubo p/mantenim. servicio S/.158,589.30 S/. 26,567.09 S/. 17,983.19 S/. 34,987.57 S/. 55,990.22 S/. 4,189.78 S/. 8,998.13 S/. 9,113.13 S/. 0.00 S/. 760.19
Riego de zona de trabajo para mitigar la contaminación -polvo (con autorización de uso de grifo) S/.9,825.86 S/. 1,646.04 S/. 1,114.20 S/. 2,167.76 S/. 3,469.04 S/. 259.59 S/. 557.51 S/. 564.63 S/. 0.00 S/. 47.09
Proteccion de redes existentes de DN 100 a 150 S/.1,743.66 S/. 193.74 S/. 161.45 S/. 678.09 S/. 387.48 S/. 64.58 S/. 96.87 S/. 129.16 S/. 0.00 S/. 32.29
Trazo y replanteo inicial del proyecto, para líneas-redes con estación total S/.5,464.15 S/. 5,464.15 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
P
Replanteo final de la obra, para líneas redes con estación total S/.2,593.56 L S/. 0.00 S/. 0.00 S/. 1,300.73 S/. 909.33 S/. 67.21 S/. 146.28 S/. 90.93 S/. 0.00 S/. 79.08
MOVIMIENTO DE TIERRAS A
N
Provisión de material de préstamo seleccionado para reemplazo de material de relleno S/.405,660.37 E S/. 63,129.61 S/. 44,314.44 S/. 93,713.60 S/. 116,789.17 S/. 7,234.42 S/. 23,439.66 S/. 46,577.00 S/. 0.00 S/. 10,462.47
Eliminación de desmonte en terreno normal R=20 km con maquinaria S/.440,950.37 S S/. 68,622.01 S/. 48,169.53 S/. 101,866.12 S/. 126,949.12 S/. 7,863.77 S/. 25,478.77 S/. 50,628.92 S/. 0.00 S/. 11,372.13
Excavac. zanja (máq.) p/tub. terr-normal DN 200 - 250 de 1,26 m a 1,50 m prof. S/.20,920.63 D S/. 3,732.76 S/. 1,339.11 S/. 2,961.02 S/. 10,129.73 S/. 1,811.94 S/. 713.01 S/. 0.00 S/. 0.00 S/. 233.06
Excavac. zanja (máq.) p/tub. terr-normal DN 200 - 250 de 1,51 m a 1,75 m prof. S/.12,152.03 E S/. 2,163.84 S/. 2,053.37 S/. 5,103.90 S/. 2,156.10 S/. 0.00 S/. 551.76 S/. 0.00 S/. 0.00 S/. 123.06
Excavac. zanja (máq.) p/tub. terr-normal DN 200 - 250 de 1,76 m a 2,00 m prof. S/.10,972.42 S/. 1,971.13 S/. 2,105.80 S/. 4,845.46 S/. 1,230.98 S/. 0.00 S/. 763.28 S/. 0.00 S/. 0.00 S/. 55.77
C
Excavac. zanja (máq.) p/tub. terr-normal DN 200 - 250 de 2,01 m a 2,50 m prof. S/.24,457.33 O S/. 4,361.28 S/. 3,032.01 S/. 6,044.02 S/. 8,603.26 S/. 0.00 S/. 1,883.28 S/. 0.00 S/. 0.00 S/. 533.48
Excavac. zanja (máq.) p/tub. terr-normal DN 200 - 250 de 2.51 m a 3,00 m prof. S/.21,551.54 N S/. 3,836.41 S/. 2,755.98 S/. 4,865.68 S/. 7,609.14 S/. 0.00 S/. 2,146.59 S/. 0.00 S/. 0.00 S/. 337.74
T
Excavac. zanja (máq.) p/tub. terr-normal DN 200 - 250 de 3,01 m a 3,50 m prof. S/.7,642.86 I S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 6,767.32 S/. 0.00 S/. 875.54
Excavac. zanja (máq.) p/tub. terr-normal DN 200 - 250 de 3,51 m a 4.00 m prof. S/.3,319.80 N S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 3,319.80 S/. 0.00 S/. 0.00
Refine y nivel de zanja terr-normal para tub. DN 200 - 250 para toda profund. S/.11,070.46 G S/. 1,854.54 S/. 1,255.33 S/. 2,442.32 S/. 3,908.43 S/. 292.47 S/. 628.12 S/. 636.15 S/. 0.00 S/. 53.10
E
Relleno comp.zanja(pulso) p/tub t-normal DN 200 - 250 de 1,26 m a 1,50 m prof. S/.49,833.82 N S/. 8,888.04 S/. 3,167.86 S/. 7,050.45 S/. 24,119.03 S/. 4,314.39 S/. 1,697.48 S/. 0.00 S/. 0.00 S/. 596.57
Relleno comp.zanja(pulso) p/tub t-normal DN 200 - 250 de 1,51 m a 1,75 m prof. S/.28,753.11 C S/. 5,119.90 S/. 4,858.51 S/. 12,076.71 S/. 5,101.58 S/. 0.00 S/. 1,305.53 S/. 0.00 S/. 0.00 S/. 290.88
I
Relleno comp.zanja(pulso) p/tub t-normal DN 200 - 250 de 1,76 m a 2,00 m prof. S/.25,787.89 A S/. 4,632.65 S/. 4,949.14 S/. 11,387.69 S/. 2,893.45 S/. 0.00 S/. 1,794.23 S/. 0.00 S/. 0.00 S/. 130.73
Relleno comp.zanja(pulso) p/tub t-normal DN 200 - 250 de 2.01 m a 2,50 m prof. S/.56,915.11 S/. 10,149.22 S/. 7,056.67 S/. 14,055.26 S/. 20,020.40 S/. 0.00 S/. 4,382.62 S/. 0.00 S/. 0.00 S/. 1,250.94
Relleno comp.zanja(pulso) p/tub t-normal DN 200 - 250 de 2.51 m a 3,00 m prof. S/.49,599.96 - S/. 8,829.34 S/. 6,342.77 S/. 11,200.17 S/. 17,514.13 S/. 0.00 S/. 4,942.81 S/. 0.00 S/. 0.00 S/. 770.74
Relleno comp.zanja(pulso) p/tub t-normal DN 200 - 250 de 3,01 m a 3,50 m prof. S/.17,509.37 D S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 15,503.56 S/. 0.00 S/. 2,005.81
Relleno comp.zanja(pulso) p/tub t-normal DN 200 - 250 de 3,51 m a 4,00 m prof. S/.7,697.80 E S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 7,697.80 S/. 0.00 S/. 0.00
S
Elimin. desmonte(carg+v) t-normal D=20km p/tub. DN 200 - 250 para toda prof. S/.78,213.81 V S/. 13,102.48 S/. 8,869.03 S/. 17,255.33 S/. 27,613.52 S/. 2,066.34 S/. 4,437.74 S/. 4,494.57 S/. 0.00 S/. 374.80
Proteccion de cable eléctrico de baja tensión S/.1,181.70 I S/. 157.56 S/. 105.04 S/. 393.90 S/. 157.56 S/. 105.04 S/. 183.82 S/. 52.52 S/. 0.00 S/. 26.26
Entibado metálico ambas caras, tipo cajón (Box), de zanjas de 1.76 a 2.00 m de prof. (Incl. O
S/.31,131.05 S/. 5,592.52 S/. 5,975.39 S/. 13,747.58 S/. 3,492.96 S/. 0.00 S/. 1,082.99 S/. 0.00 S/. 1,239.61 S/. 0.00
Instalación, mantenimiento
Entibado metálico tipoy cajón
retiro)(Box), de zanjas de 2.01 a 2.50 m de prof. (Incl. Instalación,
S/.83,320.73 D S/. 9,905.28 S/. 10,329.39 S/. 20,576.17 S/. 29,309.42 S/. 0.00 S/. 2,138.64 S/. 0.00 S/. 11,061.83 S/. 0.00
mantenimiento
Entibado ymetálico
retiro) tipo cajón (Box), de zanjas de 2.51 a 2.75 m de prof. (Incl. Instalación,
S/.79,022.33 E S/. 7,033.42 S/. 10,105.26 S/. 17,844.04 S/. 27,904.21 S/. 0.00 S/. 1,968.71 S/. 0.00 S/. 14,166.69 S/. 0.00
mantenimiento
Entibado ymetálico
retiro) tipo cajón (Box), de zanjas de 3.01 a 3.50 m de prof. (Incl. Instalación,
S/.31,248.47 T S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 31,248.47 S/. 0.00 S/. 0.00
mantenimiento
Entibado ymetálico
retiro) tipo cajón (Box), de zanjas de 3.51 a 4.00 m de prof. (Incl. Instalación,
S/.13,767.60 R S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 13,767.60 S/. 0.00 S/. 0.00
mantenimiento y retiro)
A
Desmontaje y retiro de tuberia CSN DN 200 - 250 mm S/.19,029.41 S/. 0.00 S/. 5,895.16 S/. 5,997.46 S/. 7,136.79 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
N
Eliminación de desmonte proveniente de desmontaje de tub AC (incl disp. final - material peligroso) S/.8,108.43 S S/. 0.00 S/. 2,513.35 S/. 2,555.35 S/. 3,039.73 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
SUMINISTRO E INSTALACION DE TUBERIAS I
T
Tubería PVC-U UF NTP ISO 4435 SN 2 DN 200 incl. anillo + 2% desperdicios S/.214,072.63 O S/. 214,072.63 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
Instalación de tubería de PVC p/desagüe DN 200 incluye prueba hidráulica S/.33,604.42 S/. 5,629.46 S/. 3,810.56 S/. 7,413.72 S/. 11,864.10 S/. 887.80 S/. 1,906.67 S/. 1,931.09 S/. 0.00 S/. 161.02
-
BUZONES
Demolición de buzón de mal estado, de 1,01 a 1,25 m de profundidad (incl. acomodo del desmonte
S/.5,081.23 P S/. 923.86 S/. 923.86 S/. 923.86 S/. 923.86 S/. 0.00 S/. 0.00 S/. 923.86 S/. 0.00 S/. 461.93
para suDemolición
eliminación)
de buzón de mal estado, de 1,26 a 1,50 m de profundidad (incl. acomodo del desmonte
S/.14,735.77 E S/. 0.00 S/. 1,524.39 S/. 2,032.52 S/. 4,573.17 S/. 0.00 S/. 1,016.26 S/. 4,065.04 S/. 0.00 S/. 1,524.39
para suDemolición
eliminación)
de buzón de mal estado, de 1,51 a 1,75 m de profundidad (incl. acomodo del desmonte R
S/.12,985.57 M S/. 1,693.77 S/. 0.00 S/. 4,516.72 S/. 3,952.13 S/. 0.00 S/. 564.59 S/. 1,129.18 S/. 0.00 S/. 1,129.18
para suDemolición
eliminación)
de buzón de mal estado, de 1,76 a 2,00 m de profundidad (incl. acomodo del desmonte
S/.10,797.89 I S/. 1,270.34 S/. 1,270.34 S/. 4,446.19 S/. 2,540.68 S/. 0.00 S/. 635.17 S/. 0.00 S/. 0.00 S/. 635.17
para suDemolición
eliminación)
de buzón de mal estado, de 2,01 a 2,50 m de profundidad (incl. acomodo del desmonte S
S/.15,243.90 S/. 4,355.40 S/. 1,451.80 S/. 4,355.40 S/. 2,177.70 S/. 0.00 S/. 2,903.60 S/. 0.00 S/. 0.00 S/. 0.00
para suDemolición
eliminación)
de buzón de mal estado, de 2,51 a 3.00 m de profundidad (incl. acomodo del desmonte O
S/.13,550.08 S S/. 3,387.52 S/. 3,387.52 S/. 846.88 S/. 0.00 S/. 0.00 S/. 846.88 S/. 3,387.52 S/. 0.00 S/. 1,693.76
para suDemolición
eliminación)
de buzón de mal estado, de 3.01 a 3.50 m de profundidad (incl. acomodo del desmonte
S/.2,771.64 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 1,847.76 S/. 0.00 S/. 923.88
para suDemolición
eliminación)
de buzón de mal estado, de 3.51 a 4.00 m de profundidad (incl. acomodo del desmonte A
S/.2,032.54 S/. 0.00 S/. 0.00 S/. 0.00 S/. 2,032.54 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
para su eliminación)
Eliminación desmonte por demoliciones S/.20,507.67 L S/. 3,164.68 S/. 2,294.82 S/. 4,455.65 S/. 4,241.37 S/. 0.00 S/. 1,613.18 S/. 1,547.78 S/. 0.00 S/. 3,190.19
A
Buzón I t. normal a máq. 1,01 a 1,25 m profundidad (encof. exterior e interior) S/.20,403.90 S/. 1,854.90 S/. 3,709.80 S/. 7,419.60 S/. 3,709.80 S/. 1,854.90 S/. 0.00 S/. 0.00 S/. 0.00 S/. 1,854.90
Buzón I t. normal a máq. 1,26 a 1,50 m profundidad (encof. exterior e interior) S/.57,020.96 E S/. 1,966.24 S/. 11,797.44 S/. 9,831.20 S/. 11,797.44 S/. 0.00 S/. 11,797.44 S/. 0.00 S/. 0.00 S/. 9,831.20
Buzón I t. normal a máq. 1,51 a 1,75 m profundidad (encof. exterior e interior) S/.49,520.15 N S/. 4,306.10 S/. 4,306.10 S/. 17,224.40 S/. 10,765.25 S/. 0.00 S/. 8,612.20 S/. 0.00 S/. 0.00 S/. 4,306.10
T
Buzón I t. normal a máq. 1,76 a 2,00 m profundidad (encof. exterior e interior) S/.39,773.54 I S/. 14,037.72 S/. 2,339.62 S/. 14,037.72 S/. 4,679.24 S/. 0.00 S/. 2,339.62 S/. 0.00 S/. 0.00 S/. 2,339.62
Buzón I t. normal a máq. 2,01 a 2,50 m profundidad (encof. exterior e interior) S/.54,653.34 D S/. 20,820.32 S/. 10,410.16 S/. 18,217.78 S/. 2,602.54 S/. 0.00 S/. 2,602.54 S/. 0.00 S/. 0.00 S/. 0.00
A
Buzón I t. normal a máq. 2,51 a 2,75 m profundidad (encof. exterior e interior) S/.47,619.20 S/. 17,857.20 S/. 11,904.80 S/. 5,952.40 S/. 5,952.40 S/. 0.00 S/. 2,976.20 S/. 2,976.20 S/. 0.00 S/. 0.00
D
Buzón I t. normal a máq. 3.01 a 3.50 m profundidad (encof. exterior e interior) S/.12,712.20 , S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 12,712.20 S/. 0.00 S/. 0.00
Buzón I t. normal a máq. 3.51 a 4.00 m profundidad (encof. exterior e interior) S/.9,409.66 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 9,409.66 S/. 0.00
S
O
L
I
C
I
T
I
D
A
D
,
S
VARIOS - PRUEBAS - CORTES DE PAVIMENTOS O
Prueba hidráulica de tubería p/desague DN 200 S/.23,058.01 L S/. 3,862.71 S/. 2,614.69 S/. 4,577.69 S/. 8,140.67 S/. 609.17 S/. 1,308.28 S/. 1,325.03 S/. 0.00 S/. 619.77
I
Prueba de compactación de suelos (procto modif densidad campo) S/.22,472.00 S/. 3,792.15 S/. 1,685.40 S/. 4,494.40 S/. 7,865.20 S/. 561.80 S/. 1,264.05 S/. 2,247.20 S/. 0.00 S/. 561.80
C
Prueba de calidad del concreto (prueba a la compresión) S/.1,827.00 I S/. 182.70 S/. 182.70 S/. 578.55 S/. 213.15 S/. 243.60 S/. 304.50 S/. 60.90 S/. 0.00 S/. 60.90
CONEXIONES DOMICILIARIAS DE ALCANTARILLADO T
A
OBRAS PRELIMINARES Y PROVISIONALES ALC.
Cerco de malla HDP de 1 m altura para límite de seguridad de obra-SEDAPAL S/.16,514.40 I S/. 2,570.40 S/. 2,318.40 S/. 3,057.60 S/. 5,476.80 S/. 268.80 S/. 1,276.80 S/. 1,092.00 S/. 0.00 S/. 453.60
N
Riego de zona de trabajo para mitigar la contaminación -polvo (con autorización de uso de grifo) S/.10,321.50 S/. 1,606.50 S/. 1,449.00 S/. 1,911.00 S/. 3,423.00 S/. 168.00 S/. 798.00 S/. 682.50 S/. 0.00 S/. 283.50
F
Proteccion de cable eléctrico de baja tensión S/.1,575.60 O S/. 52.52 S/. 52.52 S/. 682.76 S/. 210.08 S/. 52.52 S/. 210.08 S/. 262.60 S/. 0.00 S/. 52.52
Proteccion de cable eléctrico de media tensión S/.4,444.50 R S/. 118.52 S/. 177.78 S/. 1,896.32 S/. 474.08 S/. 118.52 S/. 829.64 S/. 651.86 S/. 0.00 S/. 177.78
M
Proteccion de cables telefónicos S/.3,151.20 A S/. 52.52 S/. 52.52 S/. 945.36 S/. 288.86 S/. 52.52 S/. 735.28 S/. 840.32 S/. 0.00 S/. 183.82
Proteccion de redes existentes de DN 50 a 80 S/.4,102.50 C S/. 273.50 S/. 109.40 S/. 1,723.05 S/. 437.60 S/. 54.70 S/. 382.90 S/. 929.90 S/. 0.00 S/. 191.45
I
Proteccion de redes existentes S/.5,166.40 S/. 322.90 S/. 129.16 S/. 1,872.82 S/. 548.93 S/. 64.58 S/. 710.38 S/. 1,227.02 S/. 0.00 S/. 290.61
O
Trazo y replanteo inicial para conexión domiciliaria S/.2,477.16 N S/. 385.56 S/. 347.76 S/. 458.64 S/. 821.52 S/. 40.32 S/. 191.52 S/. 163.80 S/. 68.04 S/. 0.00
Replanteo final de la obra para conexión domiciliaria S/.3,627.27 S/. 0.00 S/. 0.00 S/. 1,833.93 S/. 1,202.94 S/. 59.04 S/. 280.44 S/. 239.85 S/. 0.00 S/. 11.07
S
MOVIMIENTOS DE TIERRAS E
Provisión de material de préstamo seleccionado para reemplazo de material de relleno S/.201,367.56 D S/. 31,341.89 S/. 28,269.89 S/. 37,282.96 S/. 66,781.65 S/. 3,278.20 S/. 0.00 S/. 13,314.81 S/. 0.00 S/. 21,098.16
A
Eliminación de desmonte en terreno normal R=20 km con maquinaria S/.218,885.32 P S/. 34,068.45 S/. 30,729.20 S/. 40,526.35 S/. 72,591.25 S/. 3,563.38 S/. 0.00 S/. 14,473.12 S/. 0.00 S/. 22,933.57
Excav. zanja (pulso) p/tub. terr-normal DN 100 - 150 de 1,01 m a 1,25 m prof. S/.78,104.18 A S/. 12,209.19 S/. 14,200.76 S/. 13,075.09 S/. 21,993.86 S/. 2,770.88 S/. 0.00 S/. 3,290.42 S/. 0.00 S/. 10,563.98
Excav. zanja (pulso) p/tub. terr-normal DN 50 - 80 de 1,25 m a 1,50 m prof. S/.61,250.49 L S/. 14,101.97 S/. 13,294.69 S/. 16,713.45 S/. 11,632.99 S/. 0.00 S/. 0.00 S/. 2,607.41 S/. 0.00 S/. 2,899.98
,
Excav. zanja (pulso) p/tub. terr-normal DN 100 - 150 de 1,51 m a 2,00 m prof. S/.40,131.84 S/. 7,242.54 S/. 0.00 S/. 11,318.43 S/. 14,108.85 S/. 0.00 S/. 0.00 S/. 3,135.30 S/. 0.00 S/. 4,326.72
Excav. zanja (pulso) p/tub. terr-normal DN 100 - 150 de 2,01 m a 2,50 m prof. S/.3,778.25 E S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 3,778.25 S/. 0.00 S/. 0.00
N
Refine y nivel de zanja terr-normal para tub. DN 100 - 150 para toda profund. S/.9,633.40 E S/. 1,499.40 S/. 1,352.40 S/. 1,783.60 S/. 3,194.80 S/. 156.80 S/. 0.00 S/. 637.00 S/. 0.00 S/. 1,009.40
Relleno comp.zanja(pulso) p/tub t-normal DN 100 - 150 de 1,01 m a 1,25 m prof. S/.57,173.27 L S/. 8,937.29 S/. 10,395.32 S/. 9,571.14 S/. 16,099.79 S/. 2,028.32 S/. 0.00 S/. 2,408.63 S/. 0.00 S/. 7,732.78
Relleno comp.zanja(pulso) p/tub t-normal DN 100 - 150 de 1,26 m a 1,50 m prof. S/.42,212.87 , S/. 9,718.86 S/. 9,162.49 S/. 11,518.64 S/. 8,017.27 S/. 0.00 S/. 0.00 S/. 1,796.99 S/. 0.00 S/. 1,998.62
Relleno comp.zanja(pulso) p/tub t-normal DN 100 - 150 de 1,51 m a 2,00 m prof. S/.25,885.44 C S/. 4,671.51 S/. 0.00 S/. 7,300.50 S/. 9,100.35 S/. 0.00 S/. 0.00 S/. 2,022.30 S/. 0.00 S/. 2,790.78
Relleno comp.zanja(pulso) p/tub t-normal DN 100 - 150 de 2,01 m a 2,50 m prof. S/.2,378.81 A S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 2,378.81 S/. 0.00 S/. 0.00
L
Elimin. desmonte(carg+v) t-normal D=20km p/tub. DN 100 - 150 para toda prof. S/.55,667.29 I S/. 0.00 S/. 7,814.94 S/. 10,306.66 S/. 18,461.38 S/. 906.08 S/. 0.00 S/. 3,680.95 S/. 0.00 S/. 14,497.28
TUBERIAS D
Tubería PVC-U UF NTP ISO 4435 SN 2 DN 150 incl. anillo + 2% desperdicios S/.116,770.57 D S/. 35,043.05 S/. 16,393.02 S/. 21,619.78 S/. 38,725.54 S/. 1,900.64 S/. 3,088.54 S/. 0.00 S/. 0.00 S/. 0.00
A
Instalación de tubería de PVC p/desagüe DN 150 incluye prueba hidráulica S/.29,381.87 , S/. 4,573.17 S/. 4,124.82 S/. 5,439.98 S/. 9,744.14 S/. 478.24 S/. 1,587.16 S/. 1,942.85 S/. 0.00 S/. 1,491.51
Suministro de elemento de empotramiento de tubería de PVC-U DN 150 S/.34,208.40 S/. 10,266.00 S/. 4,802.40 S/. 6,333.60 S/. 11,344.80 S/. 556.80 S/. 904.80 S/. 0.00 S/. 0.00 S/. 0.00
E
Instalación de elemento de empotramiento de tubería PVC-U DN 150 a 200 S/.32,743.73 T S/. 5,096.43 S/. 5,396.22 S/. 6,062.42 S/. 10,859.06 S/. 532.96 S/. 2,531.56 S/. 2,165.15 S/. 0.00 S/. 99.93
CAJAS DOMICILIARIAS C
Demolición de caja y tapa en mal estado, de conex. dom. desague (incl. acomodo del desmonte .
S/.15,826.30 S/. 2,463.30 S/. 2,221.80 S/. 2,930.20 S/. 5,248.60 S/. 257.60 S/. 1,223.60 S/. 1,046.50 S/. 0.00 S/. 434.70
para su eliminación)
Eliminación desmonte por demoliciones S/.5,024.57 S/. 0.00 S/. 733.75 S/. 967.69 S/. 1,732.28 S/. 84.54 S/. 0.00 S/. 556.69 S/. 0.00 S/. 949.62
Suministro de caja de concreto simple y tapa concreto armado de 0,30 m x 0,60 m S/.53,544.01 S/. 24,783.85 S/. 7,516.86 S/. 9,913.54 S/. 11,329.76 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
Instalación de caja de concreto y colocado de tapa S/.43,655.03 S/. 6,794.73 S/. 6,128.58 S/. 8,082.62 S/. 14,477.66 S/. 710.56 S/. 3,375.16 S/. 2,886.65 S/. 0.00 S/. 1,199.07
Prueba de compactación de suelos (procto modif densidad campo) S/.9,129.25 S/. 842.70 S/. 561.80 S/. 4,353.95 S/. 842.70 S/. 280.90 S/. 2,247.20 S/. 0.00 S/. 0.00 S/. 0.00
P
PAVIMENTOS L
Corte+rotura, ED y reposición de vereda rígida f'c 175 kg/cm2 de 10 cm espesor S/.132,705.00 A S/. 0.00 S/. 18,630.00 S/. 24,570.00 S/. 44,010.00 S/. 2,160.00 S/. 10,260.00 S/. 8,775.00 S/. 20,655.00 S/. 3,645.00
N
COSTO DIRECTO S/.3,779,772.50 E S/. 0.00 S/. 795,597.08 S/. 455,600.48 S/. 773,961.55 S/. 1,017,685.94 S/. 54,458.01 S/. 163,821.93 S/. 302,673.76 S/. 56,600.83 S/. 159,372.92 S/. 0.00 S/. 0.00
GASTOS GENERALES (10.00%) S/.377,977.25 S S/. 0.00 S/. 79,559.71 S/. 45,560.05 S/. 77,396.16 S/. 101,768.59 S/. 5,445.80 S/. 16,382.19 S/. 30,267.38 S/. 5,660.08 S/. 15,937.29 S/. 0.00 S/. 0.00
UTILIDAD (10%) S/.377,977.25 S/. 0.00 S/. 79,559.71 S/. 45,560.05 S/. 77,396.16 S/. 101,768.59 S/. 5,445.80 S/. 16,382.19 S/. 30,267.38 S/. 5,660.08 S/. 15,937.29 S/. 0.00 S/. 0.00
D
SUB-TOTAL: S/.4,535,727.00 E S/. 0.00 S/. 954,716.50 S/. 546,720.58 S/. 928,753.87 S/. 1,221,223.12 S/. 65,349.61 S/. 196,586.31 S/. 363,208.52 S/. 67,920.99 S/. 191,247.50 S/. 0.00 S/. 0.00
IGV:(18%) 816430.86 S/. 0.00 S/. 171,848.97 S/. 98,409.70 S/. 167,175.70 S/. 219,820.16 S/. 11,762.93 S/. 35,385.54 S/. 65,377.53 S/. 12,225.78 S/. 34,424.55 S/. 0.00 S/. 0.00
C
TOTAL DEL PRESUPUESTO S/.5,352,157.86 O S/. 0.00 S/. 1,126,565.47 S/. 645,130.28 S/. 1,095,929.57 S/. 1,441,043.28 S/. 77,112.54 S/. 231,971.85 S/. 428,586.05 S/. 80,146.77 S/. 225,672.05 S/. 0.00 S/. 0.00
PORCENTAJE MENSUAL N 0.00% 21.05% 12.05% 20.48% 26.92% 1.44% 4.33% 8.01% 1.50% 4.22% 0.00% 0.00%
PORCENTAJE ACUMULADO T 0.00% 21.05% 33.10% 53.58% 80.50% 81.94% 86.28% 94.29% 95.78% 100.00% 100.00% 100.00%
I
N
G
E
COSTO PARCIAL N Del 29/08/17 al Del 01/09/17 al Del 01/10/17 al Del 01/11/2017 al Del 01/12/17 al Del 01/01/18 al Del 01/02/18 al Del 01/03/18 al Del 01/04/18 al Del 01/05/18 al Del 01/06/18 al Del 01/06/18 al
DESCRIPCION DE PARTIDAS
S/. C 31/08/17 30/09/17 31/10/17 30/11/17 31/12/17 31/01/18 28/02/18 31/03/18 25/04/18 25/05/18 24/06/18 24/07/18
MEJORAMIENTO VIAL Y PEATONAL I
A
CALZADA VEHICULAR Y BERMA LATERAL
OBRAS PROVISIONALES -
Cartel de identificación de la obra de 3.60 m x 2.40 m S/.1,754.68 D S/. 1,754.68 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
Caseta de guardiania oficina y almacen S/.20,000.00 E S/. 2,500.00 S/. 2,500.00 S/. 2,500.00 S/. 2,500.00 S/. 2,500.00 S/. 2,500.00 S/. 2,500.00 S/. 1,250.00 S/. 625.00 S/. 625.00
S
OBRAS PRELIMINARES
V
Movilización y desmovilización de equipos y maquinaria S/.7,360.00 I S/. 1,840.00 S/. 1,840.00 S/. 1,840.00 S/. 1,104.00 S/. 736.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
Mantenimiento de tránsito temporal y seguridad vial en obras S/.19,572.80 O S/. 2,446.60 S/. 2,446.60 S/. 2,446.60 S/. 2,446.60 S/. 2,446.60 S/. 2,446.60 S/. 2,446.60 S/. 1,223.30 S/. 611.00 S/. 612.30
Trazo, niveles y replanteo en obra S/.50,662.34 D S/. 8,612.96 S/. 7,242.77 S/. 9,947.81 S/. 17,237.25 S/. 1,522.74 S/. 5,607.60 S/. 0.00 S/. 0.00 S/. 245.00 S/. 246.21
E
T
R
A
N
S
I
E
S
V
I
O
D
Limpieza y acondicionamiento del terreno S/.57,997.73 E S/. 9,832.50 S/. 8,268.29 S/. 11,443.42 S/. 19,677.92 S/. 1,738.35 S/. 6,401.60 S/. 0.00 S/. 0.00 S/. 0.17 S/. 635.48
MOVIMIENTOS DE TIERRAS
T
Demolición de pavimento de concreto S/.467,169.55 R S/. 79,422.18 S/. 66,787.30 S/. 91,731.12 S/. 158,948.76 S/. 14,041.58 S/. 51,709.04 S/. 0.00 S/. 0.00 S/. 2,264.80 S/. 2,264.77
Excavación a nivel de sub rasante en terreno compacto C/Equipo S/.111,974.17 A S/. 19,206.15 S/. 15,962.93 S/. 21,986.72 S/. 38,097.85 S/. 3,365.57 S/. 12,393.96 S/. 0.00 S/. 0.00 S/. 480.50 S/. 480.49
N
Excavación de zanjas para sardineles sumergidos (0.15 x 0.30 m) S/.69,767.61 S S/. 0.00 S/. 10,797.15 S/. 15,478.10 S/. 14,553.33 S/. 2,057.81 S/. 3,600.09 S/. 7,920.29 S/. 0.00 S/. 7,680.40 S/. 7,680.44
Eliminación de desmonte en terreno normal R=20 km con maquinaria S/.1,338,958.27 I S/. 157,202.80 S/. 193,965.87 S/. 263,638.87 S/. 451,804.58 S/. 40,228.52 S/. 146,516.18 S/. 3,241.83 S/. 0.00 S/. 41,179.80 S/. 41,179.82
T
PAVIMENTACION
O
PAVIMENTO FLEXIBLE ,
Conformación y compactación a nivel de sub rasante C/Equipo S/.135,846.81 S/. 21,100.22 S/. 21,415.59 S/. 26,674.21 S/. 46,220.23 S/. 4,083.11 S/. 0.00 S/. 15,036.31 S/. 0.00 S/. 658.60 S/. 658.54
P
Sub - Base granular e=0.15m C/Equipo S/.611,983.14 E S/. 95,055.46 S/. 96,476.15 S/. 120,166.00 S/. 208,219.83 S/. 18,394.19 S/. 0.00 S/. 67,737.85 S/. 0.00 S/. 2,966.80 S/. 2,966.86
Base granular e=0.20m C/Equipo S/.764,866.85 R S/. 118,801.92 S/. 120,577.52 S/. 150,185.49 S/. 260,236.65 S/. 22,989.37 S/. 0.00 S/. 84,659.91 S/. 0.00 S/. 1,854.00 S/. 5,561.99
M
Imprimación asfáltica (Dosf. 0.40 gl/m2 - tanque 1800 gl) S/.173,943.21 S/. 0.00 S/. 0.00 S/. 88,782.31 S/. 59,204.43 S/. 5,228.89 S/. 0.00 S/. 0.00 S/. 19,234.59 S/. 745.00 S/. 747.99
I
Carpeta asfáltica en caliente de 3" S/.1,803,808.15 S S/. 0.00 S/. 0.00 S/. 920,681.25 S/. 613,955.76 S/. 54,224.07 S/. 0.00 S/. 0.00 S/. 199,464.57 S/. 7,741.00 S/. 7,741.50
SARDINELES O
S
Encofrado y desencofrado de sardineles sumergidos H=0.15m S/.94,425.60 S/. 0.00 S/. 14,367.05 S/. 20,948.53 S/. 32,035.06 S/. 2,785.11 S/. 0.00 S/. 10,719.56 S/. 0.00 S/. 6,785.00 S/. 6,785.29
Concreto premezclado f´c=175 kg/cm2 en sardinel sumergido (0.15x0.30) S/.320,989.01 E S/. 0.00 S/. 48,839.14 S/. 71,212.13 S/. 108,899.52 S/. 9,467.66 S/. 0.00 S/. 36,439.92 S/. 0.00 S/. 23,065.00 S/. 23,065.64
N
Juntas asfálticas S/.2,758.49 S/. 0.00 S/. 420.46 S/. 612.41 S/. 936.33 S/. 82.08 S/. 0.00 S/. 313.83 S/. 0.00 S/. 196.60 S/. 196.78
T
RAMPAS PEATONALES I
Demolición de veredas e=0.10m S/.1,308.23 D S/. 0.00 S/. 0.00 S/. 703.45 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 302.00 S/. 302.78
A
Excavación manual a nivel de sub rasante en veredas S/.950.66 D S/. 0.00 S/. 0.00 S/. 511.11 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 219.00 S/. 220.55
Eliminación de desmonte en terreno normal R=20 km con maquinaria S/.2,535.11 , S/. 0.00 S/. 0.00 S/. 1,362.96 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 586.00 S/. 586.15
Conformación y compactación de sub rasante en veredas S/.867.55 S/. 0.00 S/. 0.00 S/. 466.49 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 200.50 S/. 200.56
S
Trazo, niveles y replanteo en veredas S/.141.87 O S/. 0.00 S/. 0.00 S/. 76.29 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 32.80 S/. 32.78
Base granular e=0.10m C/Equipo liviano S/.2,508.49 L S/. 0.00 S/. 0.00 S/. 1,348.85 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 580.00 S/. 579.64
I
Encofrado y desencofrado normal en veredas S/.2,351.97 C S/. 0.00 S/. 0.00 S/. 1,264.50 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 543.00 S/. 544.47
Sardinel en veredas de concreto premezclado f'c=175 kg/cm2 S/.3,191.76 I S/. 0.00 S/. 0.00 S/. 1,716.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 740.00 S/. 735.76
T
Concreto premezclado en veredas f'c=175 kg/cm2, e=0.10m acabado C/Bruña @ 1.00m S/.4,895.19 S/. 0.00 S/. 0.00 S/. 2,632.21 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 1,130.00 S/. 1,132.98
A
Juntas asfálticas S/.36.15 S/. 0.00 S/. 0.00 S/. 19.77 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 16.38
curado de concreto en veredas S/.172.00 I S/. 0.00 S/. 0.00 S/. 92.49 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 79.51
N
SEÑALIZACIÓN F
Pintura tráfico línea continua e=0.10m S/.150,703.83 O S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 75,350.00 S/. 75,353.83
R
Pintura tráfico línea discontinua e=0.10m S/.65,978.22 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 32,989.00 S/. 32,989.22
M
Pintado de pavimento (Símbolos y letras) S/.34,772.72 A S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 17,385.00 S/. 17,387.72
TRABAJOS COMPLEMENTARIOS C
I
reductores de velocidad S/.32,399.00 O S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 16,199.00 S/. 16,200.00
nivelacion de buzones S/.30,051.00 N S/. 0.00 S/. 0.00 S/. 15,309.00 S/. 7,938.00 S/. 756.00 S/. 1,512.00 S/. 3,024.00 S/. 0.00 S/. 756.00 S/. 756.00
IMPACTO AMBIENTAL, SEGURIDAD Y SALUD
S
Elaboración, implementación y administración del plan de seguridad y salud S/.5,522.00 E S/. 1,380.50 S/. 1,380.50 S/. 1,380.50 S/. 552.20 S/. 276.10 S/. 552.20 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
Equipos de protección individual S/.20,912.40 D S/. 3,485.40 S/. 3,485.40 S/. 3,485.40 S/. 2,323.60 S/. 4,647.20 S/. 1,742.70 S/. 929.44 S/. 813.26 S/. 0.00 S/. 0.00
A
Equipos de protección colectiva S/.6,429.00 P S/. 835.77 S/. 835.77 S/. 1,542.96 S/. 964.35 S/. 964.35 S/. 642.90 S/. 321.45 S/. 321.45 S/. 0.00 S/. 0.00
Mitigacion de impacto ambiental S/.23,378.93 A S/. 3,621.16 S/. 2,510.20 S/. 4,123.77 S/. 7,932.18 S/. 700.73 S/. 0.00 S/. 2,580.49 S/. 1,910.40 S/. 0.00 S/. 0.00
L
COSTO DIRECTO S/.6,442,944.50 , S/.0.00 S/.527,098.30 S/.620,118.69 S/.1,856,310.72 S/.2,055,788.43 S/.193,236.03 S/.235,624.87 S/.237,871.48 S/.224,217.57 S/.0.00 S/.244,110.97 S/.248,567.44
GASTOS GENERALES (10.00%) S/.644,294.45 S/.0.00 S/.52,709.83 S/.62,011.87 S/.185,631.07 S/.205,578.84 S/.19,323.60 S/.23,562.49 S/.23,787.15 S/.22,421.76 S/.0.00 S/.24,411.10 S/.24,856.74
UTILIDAD (10%) S/.644,294.45 E S/.0.00 S/.52,709.83 S/.62,011.87 S/.185,631.07 S/.205,578.84 S/.19,323.60 S/.23,562.49 S/.23,787.15 S/.22,421.76 S/.0.00 S/.24,411.10 S/.24,856.74
N
SUB-TOTAL: S/.7,731,533.40 E S/.0.00 S/.632,517.96 S/.744,142.43 S/.2,227,572.86 S/.2,466,946.11 S/.231,883.23 S/.282,749.85 S/.285,445.78 S/.269,061.09 S/.0.00 S/.292,933.17 S/.298,280.92
IGV:(18%) S/. 1,391,676.01 L S/. 0.00 S/. 113,853.23 S/. 133,945.64 S/. 400,963.11 S/. 444,050.30 S/. 41,738.98 S/. 50,894.97 S/. 51,380.24 S/. 48,431.00 S/. 0.00 S/. 52,727.97 S/. 53,690.57
,
TOTAL DEL PRESUPUESTO S/.9,123,209.41 S/.0.00 S/.746,371.19 S/.878,088.07 S/.2,628,535.97 S/.2,910,996.41 S/.273,622.21 S/.333,644.82 S/.336,826.02 S/.317,492.09 S/.0.00 S/.345,661.14 S/.351,971.49
PORCENTAJE MENSUAL C 0.00% 8.18% 9.62% 28.81% 31.91% 3.00% 3.66% 3.69% 3.48% 0.00% 3.79% 3.86%
PORCENTAJE ACUMULADO A 0.00% 8.18% 17.81% 46.62% 78.52% 81.52% 85.18% 88.87% 92.35% 92.35% 96.14% 100.00%
L
I
D
D
A
,
PRESUPUESTO RESUMEN
E
COSTO PARCIAL T Del 29/08/17 al Del 01/09/17 al Del 01/10/17 al Del 01/11/2017 al Del 01/12/17 al Del 01/01/18 al Del 01/02/18 al Del 01/03/18 al Del 01/04/18 al Del 01/05/18 al Del 01/06/18 al Del 01/06/18 al
DESCRIPCION DE PARTIDAS
S/. C 31/08/17 30/09/17 31/10/17 30/11/17 31/12/17 31/01/18 28/02/18 31/03/18 25/04/18 25/05/18 24/06/18 24/07/18
.
SUBPRESUPUESTO N° 01 - ALCANTARILLADO S/.3,779,772.50 S/.0.00 S/.795,597.08 S/.455,600.48 S/.773,961.55 S/.1,017,685.94 S/.54,458.01 S/.163,821.93 S/.302,673.76 S/.56,600.83 S/.159,372.92 S/.0.00 S/.0.00
SUBPRESUPUESTO N° 02 - PISTA S/.6,442,944.50 S/.0.00 S/.527,098.30 S/.620,118.69 S/.1,856,310.72 S/.2,055,788.43 S/.193,236.03 S/.235,624.87 S/.237,871.48 S/.224,217.57 S/.0.00 S/.244,110.97 S/.248,567.44
COSTO DIRECTO S/.10,222,717.00 S/.0.00 S/.1,322,695.38 S/.1,075,719.17 S/.2,630,272.27 S/.3,073,474.37 S/.247,694.04 S/.399,446.80 S/.540,545.24 S/.280,818.40 S/.159,372.92 S/.244,110.97 S/.248,567.44
GASTOS GENERALES (10.00%) S/.1,022,271.70 S/.0.00 S/.132,269.54 S/.107,571.92 S/.263,027.23 S/.307,347.44 S/.24,769.40 S/.39,944.68 S/.54,054.52 S/.28,081.84 S/.15,937.29 S/.24,411.10 S/.24,856.74
UTILIDAD (10%) S/.1,022,271.70 S/.0.00 S/.132,269.54 S/.107,571.92 S/.263,027.23 S/.307,347.44 S/.24,769.40 S/.39,944.68 S/.54,054.52 S/.28,081.84 S/.15,937.29 S/.24,411.10 S/.24,856.74
SUB-TOTAL: S/.12,267,260.40 S/.0.00 S/.1,587,234.46 S/.1,290,863.01 S/.3,156,326.73 S/.3,688,169.25 S/.297,232.84 S/.479,336.16 S/.648,654.28 S/.336,982.08 S/.191,247.50 S/.292,933.17 S/.298,280.92
IGV:(18%) S/. 2,208,106.87 S/. 0.00 S/. 285,702.20 S/. 232,355.34 S/. 568,138.81 S/. 663,870.47 S/. 53,501.91 S/. 86,280.51 S/. 116,757.77 S/. 60,656.77 S/. 34,424.55 S/. 52,727.97 S/. 53,690.57
TOTAL DEL PRESUPUESTO S/.14,475,367.27 S/.0.00 S/.1,872,936.66 S/.1,523,218.35 S/.3,724,465.54 S/.4,352,039.72 S/.350,734.75 S/.565,616.67 S/.765,412.05 S/.397,638.85 S/.225,672.05 S/.345,661.14 S/.351,971.49
PORCENTAJE MENSUAL 0.00% 12.94% 10.52% 25.73% 30.07% 2.42% 3.91% 5.29% 2.75% 1.56% 2.39% 2.43%
PORCENTAJE ACUMULADO 0.00% 12.94% 23.46% 49.19% 79.26% 81.68% 85.59% 90.87% 93.62% 95.18% 97.57% 100.00%
Calculo de coeficiente de reajuste
Monto del contrato original S/. 9,123,209.41 Con IGV
Monto del contrato original S/. 7,731,533.40 Sin IGV
Formula polinómica
K=
0.231 *(AFr/AFo)+ 0.234 *(MQr/MQo)+ 0.162 *(ACr/ACo)+ 0.055 *(Dr/Do)+ 0.151
Formula polinómica
K=
0.083 *(TTTFr/TTTFo)+ 0.167 *(MQr/MQo)+ 0.183 *(CMr/CMo)+ 0.132 *(Dr/Do)+ 0.268
K=0
Porcentaje Descripcion
Nº Monomio Factor (%) IU Material
7.229 65 TUBERIA DE ACERO NEGRO Y/O GALVANIZADO
1.00 TTT 0.083 84.337 66 TUBERIA PVC PARA RED DE AGUA POT. Y ALCANTARILLADO
8.434 72 TUBERIA DE PVC
2.00 MQ 0.167 100.000 49 MAQUINARIA Y EQUIPO IMPORTADO
98.361 21 CEMENTO PORTLAND TIPO I
3.00 CM 0.183
1.639 43 MADERA NACIONAL PARA ENCOFRADO Y CARPINTERIA
4.00 D 0.132 100.000 30 DÓLAR
MANO DE
OBRA INC.
5.00 MO 0.268 100.000 47 LEYES
SOCIALES
INDICE
GENERAL DE
6.00 I 0.167 100.000 39 PRECIOS AL
CONSUMIDO
R ( INEI )
1.000
e coeficiente de reajuste
ALCANTARILLADO
CANTARILLADO
K I (Nov.17) K I (Dic.17) K I (Ene.18)
233.92 16.91 244.12 17.65 245.62 17.76
- 705.83 595.28 - 706.68 595.99 - 702.21 592.22
- 425.95 35.92 - 426.06 35.93 - 424.54 35.81
0.086 648.11 0.086 649.57 0.086 645.78
0.161 292.27 292.27 0.161 293.24 293.24 0.161 290.65 290.65
401.92 395.33 401.92 395.33 401.92 395.33
- 658.32 10.79 - 662.00 10.85 - 740.32 12.13
0.191 406.12 0.191 406.18 0.191 407.47
0.130 465.87 465.87 0.129 466.75 466.75 0.129 462.02 462.02
0.277 580.90 580.90 0.277 580.90 580.90 0.277 582.52 582.52
0.170 441.61 441.61 0.170 442.30 442.30 0.170 442.87 442.87
ALCANTARILLADO
Formula polinómica
K=
0.083 *(TTTFr/TTTFo)+ 0.167 *(MQr/MQo)+ 0.183 *(CMr/CMo)+ 0.132 *(Dr/Do)+ 0.268
Monto
Ima (Set.17) Monto max
Solicitable
1,229.09 1,868,995.61 1,868,995.61
293.03 1,747,112.01
107.68 256,781.39 256,781.39
216.23 998,157.20 998,157.20
464.58 414,570.68
580.90 1,206,208.04
444.57 1,323,740.75
Subtotal 7,815,565.68 3,123,934.19
IGV 1,406,801.82 562,308.15
Total 9,222,367.50 3,686,242.34
40.41%
Monto
Ima (Set.17) Monto max
Solicitable
228.52 47,730.68 47,730.68
686.33 546,162.76 546,162.76
416.95 54,252.55 54,252.55
-
293.03 1,246,870.54
401.92 1,452,427.57 1,452,427.57
655.57 23,719.79 23,719.79
-
464.58 994,969.64
580.90 2,140,819.57
444.57 1,323,740.75
Subtotal 7,830,693.86 2,124,293.35
IGV 1,409,524.89 382,372.80
Total 9,240,218.76 2,506,666.16
46.83%
PISTA
Solicitud y pago en setiembre
Monto
Marerial solicitado IUPC Und Cantidad Precio Imo (Oct.2016)
solicitado (S/)
ALCANTARILLA
Solicitud y pago en setiembre
Monto
Marerial solicitado IUPC Und Cantidad Precio Imo (Oct.2016)
solicitado (S/)
TUBERIA DE ACERO NEGRO Y/O GALVANIZADO 65 UND 18,205.54 222.10
TUBERIA PVC PARA RED DE AGUA POT. Y ALCANTA 66 UND 4,914.78 680.10
TUBERIA DE PVC 72 UND - 415.95
CEMENTO PORTLAND TIPO I 21 BLS 13,831.47 385.11
MADERA NACIONAL PARA ENCOFRADO Y CARPINTE 43 PIE3 1,867.29 640.92
Monto solicitado
Ima (Set.2017) 8128
actualizado (S/)
11.Set.17 300000
11.Set.17 300000
11.Set.17 300000
11.Set.17 300000
11.Set.17 300000 Adelanto de materi - - 3,363,915.04
11.Set.17 300000
11.Set.17 300000
11.Set.17 300000
11.Set.17 300000
11.Set.17 229358.44
11.Set.17 134556.6
Valorización Adelanto Valorización bruta Coef. Incidencia % Part. A. Utilizado
Imr (6) Ima (7)
N° Mes otorgado (1) (2) (3) (4) (5)=(2)x(3)x(4)
Adelanto N° 1: Asfalto IUPC 13 -11/09/2017
1 Set.17 781,454.06 632,517.95 0.231 100.00 146,111.65 1270.34 1,229.09
2 Oct.17 744,142.42 0.231 100.00 171,896.90 1290.00 1,229.09
3 Nov.17 2,227,572.86 0.231 100.00 514,569.33 1461.65 1,229.09
4 Dic.17 2,466,946.11 0.231 100.00 569,864.55 1461.65 1,229.09
5 Ene.18 231,883.25 0.231 100.00 53,565.03 1461.65 1,229.09
6 Feb.18 282,749.85 0.231 100.00 65,315.22 1461.65 1,229.09
7 Mar.18 285,445.78 0.231 100.00 65,937.98 1461.65 1,229.09
8 Abr.18 269,060.53 0.231 100.00 62,152.98 1461.65 1,229.09
9 May.18 439.26 0.231 100.00 101.47 1461.65 1,229.09
10 Jun.18 309,674.01 0.231 100.00 71,534.70 1461.65 1,229.09
11 Jul.18 281,101.37 0.231 100.00 64,934.42 1596.69 1,229.09
ALCANTARILLA
ALCANTARILLADO
ADELANTO DE MATERIALES
FECHA MONTO OTORG. DESCRIPCION
ALCANTARILLADO
30/11/17 4,959.80 Tubería de PVC para Red de Agua Potable y Alcantarillado ( I.U. 66 )
PISTA
Sub-Total 1,053,451.41
I.G.V. 189,621.25
Total 1,243,072.67
MONTO DEL CONTRATO CON IGV 14,475,367.21
S/ 1,447,536.72
RESOLUCIÓN JEFATURAL N° 389-2016-INEI
Cod. 1 2 3 4 5 6 Cod. 1
01 822.67 822.67 822.67 822.67 822.67 822.67 02 482.15
03 464.71 464.71 464.71 464.71 464.71 464.71 04 530.96
05 436.38 216.06 412.73 604.91 (*) 659.87 06 779.10
07 574.46 574.46 574.46 574.46 574.46 574.46 08 716.89
09 210.81 210.81 210.81 210.81 210.81 210.81 10 406.38
11 246.36 246.36 246.36 246.36 246.36 246.36 12 325.50
13 1174.50 1174.50 1174.50 1174.50 1174.50 1174.50 14 287.28
17 590.52 660.51 717.73 852.08 673.53 882.18 16 362.41
19 656.03 656.03 656.03 656.03 656.03 656.03 18 288.37
21 462.57 385.11 408.40 431.73 408.40 410.96 20 1396.46
23 414.16 414.16 414.16 414.16 414.16 414.16 22 367.30
27 731.24 731.24 731.24 731.24 731.24 731.24 24 246.28
31 399.20 399.20 399.20 399.20 399.20 399.20 26 365.21
33 864.90 864.90 864.90 864.90 864.90 864.90 28 624.08
37 295.36 295.36 295.36 295.36 295.36 295.36 30 476.53
39 433.63 433.63 433.63 433.63 433.63 433.63 32 462.71
41 401.34 401.34 401.34 401.34 401.34 401.34 34 413.86
43 702.16 640.92 862.21 641.80 1079.25 889.05 38 422.28
45 315.01 315.01 315.01 315.01 315.01 315.01 40 378.13
47 562.24 562.24 562.24 562.24 562.24 562.24 42 286.61
49 303.44 303.44 303.44 303.44 303.44 303.44 44 369.26
51 264.41 264.41 264.41 264.41 264.41 264.41 46 488.86
53 625.21 625.21 625.21 625.21 625.21 625.21 48 368.83
55 520.63 520.63 520.63 520.63 520.63 520.63 50 722.12
57 323.85 323.85 323.85 323.85 323.85 323.85 52 302.38
59 237.70 237.70 237.70 237.70 237.70 237.70 54 375.63
61 213.29 213.29 213.29 213.29 213.29 213.29 56 414.71
65 222.10 222.10 222.10 222.10 222.10 222.10 60 295.99
69 389.45 327.82 428.87 488.52 269.39 451.51 62 469.96
71 672.40 672.40 672.40 672.40 672.40 672.40 64 319.97
73 541.86 541.86 541.86 541.86 541.86 541.86 66 680.10
77 315.06 315.06 315.06 315.06 315.06 315.06 68 216.81
70 218.25
72 415.95
78 490.27
80 106.99
(*) Sin Producción.
Nota: El cuadro incluye los índices unificados de código: 30, 34, 39, 47, 49 y 53 que fueron aprobados mediante
Resolución Jefatural N° 373-2016-INEI.
MES DE OCTUBRE DEL 2016
FICAS
00,0)
2 3 4 5 6
482.15 482.15 482.15 482.15 482.15
924.49 1055.22 587.87 399.27 777.40
779.10 779.10 779.10 779.10 779.10
716.89 716.89 716.89 716.89 716.89
406.38 406.38 406.38 406.38 406.38
325.50 325.50 325.50 325.50 325.50
287.28 287.28 287.28 287.28 287.28
362.41 362.41 362.41 362.41 362.41
288.37 288.37 288.37 288.37 288.37
1396.46 1396.46 1396.46 1396.46 1396.46
367.30 367.30 367.30 367.30 367.30
246.28 246.28 246.28 246.28 246.28
365.21 365.21 365.21 365.21 365.21
624.08 624.08 589.53 624.08 624.08
476.53 476.53 476.53 476.53 476.53
462.71 462.71 462.71 462.71 462.71
413.86 413.86 413.86 413.86 413.86
947.22 872.49 573.15 (*) 688.89
404.26 448.33 335.39 272.89 331.41
286.61 286.61 286.61 286.61 286.61
369.26 369.26 369.26 369.26 369.26
488.86 488.86 488.86 488.86 488.86
368.83 368.83 368.83 368.83 368.83
722.12 722.12 722.12 722.12 722.12
302.38 302.38 302.38 302.38 302.38
375.63 375.63 375.63 375.63 375.63
414.71 414.71 414.71 414.71 414.71
295.99 295.99 295.99 295.99 295.99
469.96 469.96 469.96 469.96 469.96
319.97 319.97 319.97 319.97 319.97
680.10 680.10 680.10 680.10 680.10
216.81 216.81 216.81 216.81 216.81
218.25 218.25 218.25 218.25 218.25
415.95 415.95 415.95 415.95 415.95
490.27 490.27 490.27 490.27 490.27
106.99 106.99 106.99 106.99 106.99
Cod. 1 2 3 4 5 6 Cod. 1
01 810.48 810.48 810.48 810.48 810.48 810.48 02 474.70
03 460.39 460.39 460.39 460.39 460.39 460.39 04 554.25
05 448.18 216.43 416.99 610.21 (*) 648.02 06 847.68
07 620.15 620.15 620.15 620.15 620.15 620.15 08 803.42
09 235.37 235.37 235.37 235.37 235.37 235.37 10 410.19
11 233.56 233.56 233.56 233.56 233.56 233.56 12 317.99
13 1174.50 1174.50 1174.50 1174.50 1174.50 1174.50 14 285.57
17 628.23 671.71 698.93 858.54 715.25 858.12 16 368.08
19 705.86 705.86 705.86 705.86 705.86 705.86 18 315.92
21 465.71 401.92 426.29 431.73 426.29 410.96 20 1396.46
23 418.10 418.10 418.10 418.10 418.10 418.10 22 367.30
27 699.94 699.94 699.94 699.94 699.94 699.94 24 243.74
31 373.25 373.25 373.25 373.25 373.25 373.25 26 368.55
33 828.08 828.08 828.08 828.08 828.08 828.08 28 597.37
37 297.47 297.47 297.47 297.47 297.47 297.47 30 462.48
39 444.64 444.64 444.64 444.64 444.64 444.64 32 467.18
41 411.80 411.80 411.80 411.80 411.80 411.80 34 437.57
43 715.43 655.25 890.51 645.62 1076.82 884.27 38 426.67
45 322.01 322.01 322.01 322.01 322.01 322.01 40 378.13
47 580.90 580.90 580.90 580.90 580.90 580.90 42 283.79
49 292.36 292.36 292.36 292.36 292.36 292.36 44 376.43
51 276.10 276.10 276.10 276.10 276.10 276.10 46 469.43
53 670.24 670.24 670.24 670.24 670.24 670.24 48 366.02
55 500.65 500.65 500.65 500.65 500.65 500.65 50 691.32
57 377.39 377.39 377.39 377.39 377.39 377.39 52 295.14
59 238.53 238.53 238.53 238.53 238.53 238.53 54 405.60
61 224.84 224.84 224.84 224.84 224.84 224.84 56 468.11
65 216.20 216.20 216.20 216.20 216.20 216.20 60 295.99
69 389.45 327.82 428.87 488.52 269.39 451.51 62 461.75
71 643.63 643.63 643.63 643.63 643.63 643.63 64 319.97
73 534.64 534.64 534.64 534.64 534.64 534.64 66 685.58
77 317.65 317.65 317.65 317.65 317.65 317.65 68 255.47
70 218.25
72 416.90
78 479.67
80 107.53
(*) Sin Producción.
Nota: El cuadro incluye los índices unificados de código: 30, 34, 39, 47, 49 y 53 que fueron aprobados mediante
Resolución Jefatural N° 282-2017-INEI.
MES DE AGOSTO DEL 2017
FICAS
00,0)
2 3 4 5 6
474.70 474.70 474.70 474.70 474.70
936.12 1041.51 593.35 391.80 773.84
847.68 847.68 847.68 847.68 847.68
803.42 803.42 803.42 803.42 803.42
410.19 410.19 410.19 410.19 410.19
317.99 317.99 317.99 317.99 317.99
285.57 285.57 285.57 285.57 285.57
368.08 368.08 368.08 368.08 368.08
315.92 315.92 315.92 315.92 315.92
1396.46 1396.46 1396.46 1396.46 1396.46
367.30 367.30 367.30 367.30 367.30
243.74 243.74 243.74 243.74 243.74
368.55 368.55 368.55 368.55 368.55
597.37 597.37 564.47 597.37 597.37
462.48 462.48 462.48 462.48 462.48
467.18 467.18 467.18 467.18 467.18
437.57 437.57 437.57 437.57 437.57
948.41 875.70 573.10 (*) 668.79
405.80 447.87 332.33 272.89 331.41
283.79 283.79 283.79 283.79 283.79
376.43 376.43 376.43 376.43 376.43
469.43 469.43 469.43 469.43 469.43
366.02 366.02 366.02 366.02 366.02
691.32 691.32 691.32 691.32 691.32
295.14 295.14 295.14 295.14 295.14
405.60 405.60 405.60 405.60 405.60
468.11 468.11 468.11 468.11 468.11
295.99 295.99 295.99 295.99 295.99
461.75 461.75 461.75 461.75 461.75
319.97 319.97 319.97 319.97 319.97
685.58 685.58 685.58 685.58 685.58
255.47 255.47 255.47 255.47 255.47
218.25 218.25 218.25 218.25 218.25
416.90 416.90 416.90 416.90 416.90
479.67 479.67 479.67 479.67 479.67
107.53 107.53 107.53 107.53 107.53
Cod. 1 2 3 4 5 6 Cod. 1
01 811.16 811.16 811.16 811.16 811.16 811.16 02 485.11
03 467.17 467.17 467.17 467.17 467.17 467.17 04 545.60
05 450.52 216.23 420.47 605.20 (*) 631.53 06 892.79
07 648.23 648.23 648.23 648.23 648.23 648.23 08 848.55
09 235.74 235.74 235.74 235.74 235.74 235.74 10 412.88
11 233.88 233.88 233.88 233.88 233.88 233.88 12 318.23
13 1229.09 1229.09 1229.09 1229.09 1229.09 1229.09 14 285.57
17 625.05 670.94 700.96 859.71 708.49 848.63 16 368.08
19 742.62 742.62 742.62 742.62 742.62 742.62 18 332.33
21 465.71 401.92 426.29 431.73 426.29 410.96 20 1474.06
23 418.10 418.10 418.10 418.10 418.10 418.10 22 367.30
27 701.02 701.02 701.02 701.02 701.02 701.02 24 245.01
31 373.34 373.34 373.34 373.34 373.34 373.34 26 370.65
33 829.55 829.55 829.55 829.55 829.55 829.55 28 598.29
37 297.54 297.54 297.54 297.54 297.54 297.54 30 464.58
39 444.57 444.57 444.57 444.57 444.57 444.57 32 468.00
41 410.40 410.40 410.40 410.40 410.40 410.40 34 467.31
43 716.76 655.57 889.00 642.33 1076.82 883.78 38 426.68
45 322.01 322.01 322.01 322.01 322.01 322.01 40 378.13
47 580.90 580.90 580.90 580.90 580.90 580.90 42 284.08
49 293.03 293.03 293.03 293.03 293.03 293.03 44 379.04
51 291.12 291.12 291.12 291.12 291.12 291.12 46 474.26
53 682.16 682.16 682.16 682.16 682.16 682.16 48 366.18
55 500.65 500.65 500.65 500.65 500.65 500.65 50 692.38
57 385.09 385.09 385.09 385.09 385.09 385.09 52 300.17
59 238.53 238.53 238.53 238.53 238.53 238.53 54 405.60
61 236.34 236.34 236.34 236.34 236.34 236.34 56 480.06
65 228.52 228.52 228.52 228.52 228.52 228.52 60 295.99
69 389.45 327.82 428.87 488.52 269.39 451.51 62 461.86
71 644.62 644.62 644.62 644.62 644.62 644.62 64 319.97
73 535.26 535.26 535.26 535.26 535.26 535.26 66 686.33
77 318.40 318.40 318.40 318.40 318.40 318.40 68 258.34
70 218.25
72 416.95
78 479.99
80 107.68
(*) Sin Producción.
Nota: El cuadro incluye los índices unificados de código: 30, 34, 39, 47, 49 y 53 que fueron aprobados mediante
Resolución Jefatural N° 339-2017-INEI.
ES DE SETIEMBRE DEL 2017
FICAS
00,0)
2 3 4 5 6
485.11 485.11 485.11 485.11 485.11
933.62 1035.99 593.55 391.80 762.99
892.79 892.79 892.79 892.79 892.79
848.55 848.55 848.55 848.55 848.55
412.88 412.88 412.88 412.88 412.88
318.23 318.23 318.23 318.23 318.23
285.57 285.57 285.57 285.57 285.57
368.08 368.08 368.08 368.08 368.08
332.33 332.33 332.33 332.33 332.33
1474.06 1474.06 1474.06 1474.06 1474.06
367.30 367.30 367.30 367.30 367.30
245.01 245.01 245.01 245.01 245.01
370.65 370.65 370.65 370.65 370.65
598.29 598.29 565.13 598.29 598.29
464.58 464.58 464.58 464.58 464.58
468.00 468.00 468.00 468.00 468.00
467.31 467.31 467.31 467.31 467.31
954.75 869.70 571.75 (*) 659.85
406.83 445.68 332.33 272.89 331.41
284.08 284.08 284.08 284.08 284.08
379.04 379.04 379.04 379.04 379.04
474.26 474.26 474.26 474.26 474.26
366.18 366.18 366.18 366.18 366.18
692.38 692.38 692.38 692.38 692.38
300.17 300.17 300.17 300.17 300.17
405.60 405.60 405.60 405.60 405.60
480.06 480.06 480.06 480.06 480.06
295.99 295.99 295.99 295.99 295.99
461.86 461.86 461.86 461.86 461.86
319.97 319.97 319.97 319.97 319.97
686.33 686.33 686.33 686.33 686.33
258.34 258.34 258.34 258.34 258.34
218.25 218.25 218.25 218.25 218.25
416.95 416.95 416.95 416.95 416.95
479.99 479.99 479.99 479.99 479.99
107.68 107.68 107.68 107.68 107.68
Cod. 1 2 3 4 5 6 Cod. 1
01 811.68 811.68 811.68 811.68 811.68 811.68 02 488.45
03 469.92 469.92 469.92 469.92 469.92 469.92 04 545.90
05 449.54 216.12 418.45 603.46 (*) 632.37 06 899.02
07 653.31 653.31 653.31 653.31 653.31 653.31 08 857.27
09 236.02 236.02 236.02 236.02 236.02 236.02 10 412.23
11 234.14 234.14 234.14 234.14 234.14 234.14 12 318.43
13 1270.34 1270.34 1270.34 1270.34 1270.34 1270.34 14 285.57
17 624.31 666.77 703.47 860.67 697.48 859.67 16 368.08
19 751.34 751.34 751.34 751.34 751.34 751.34 18 335.86
21 465.71 401.92 426.29 431.73 426.29 410.96 20 1533.84
23 418.10 418.10 418.10 418.10 418.10 418.10 22 367.30
27 701.88 701.88 701.88 701.88 701.88 701.88 24 240.78
31 373.41 373.41 373.41 373.41 373.41 373.41 26 370.67
33 830.19 830.19 830.19 830.19 830.19 830.19 28 599.03
37 298.08 298.08 298.08 298.08 298.08 298.08 30 467.61
39 442.48 442.48 442.48 442.48 442.48 442.48 32 468.00
41 410.71 410.71 410.71 410.71 410.71 410.71 34 464.73
43 719.16 655.68 887.32 642.01 1088.94 884.54 38 428.42
45 322.70 322.70 322.70 322.70 322.70 322.70 40 378.13
47 580.90 580.90 580.90 580.90 580.90 580.90 42 284.22
49 293.18 293.18 293.18 293.18 293.18 293.18 44 376.71
51 305.83 305.83 305.83 305.83 305.83 305.83 46 474.55
53 680.84 680.84 680.84 680.84 680.84 680.84 48 363.30
55 500.65 500.65 500.65 500.65 500.65 500.65 50 693.13
57 385.56 385.56 385.56 385.56 385.56 385.56 52 300.40
59 238.53 238.53 238.53 238.53 238.53 238.53 54 405.60
61 236.63 236.63 236.63 236.63 236.63 236.63 56 488.10
65 235.92 235.92 235.92 235.92 235.92 235.92 60 295.99
69 389.45 327.82 428.87 488.52 269.39 451.51 62 462.33
71 645.41 645.41 645.41 645.41 645.41 645.41 64 319.97
73 544.62 544.62 544.62 544.62 544.62 544.62 66 707.19
77 321.23 321.23 321.23 321.23 321.23 321.23 68 259.97
70 218.25
72 426.35
78 480.28
80 107.23
(*) Sin Producción.
Nota: El cuadro incluye los índices unificados de código: 30, 34, 39, 47, 49 y 53 que fueron aprobados mediante
Resolución Jefatural N° 372-2017-INEI.
MES DE OCTUBRE DEL 2017
FICAS
00,0)
2 3 4 5 6
488.45 488.45 488.45 488.45 488.45
935.73 1036.19 591.86 391.80 760.70
899.02 899.02 899.02 899.02 899.02
857.27 857.27 857.27 857.27 857.27
412.23 412.23 412.23 412.23 412.23
318.43 318.43 318.43 318.43 318.43
285.57 285.57 285.57 285.57 285.57
368.08 368.08 368.08 368.08 368.08
335.86 335.86 335.86 335.86 335.86
1533.84 1533.84 1533.84 1533.84 1533.84
367.30 367.30 367.30 367.30 367.30
240.78 240.78 240.78 240.78 240.78
370.67 370.67 370.67 370.67 370.67
599.03 599.03 565.65 599.03 599.03
467.61 467.61 467.61 467.61 467.61
468.00 468.00 468.00 468.00 468.00
464.73 464.73 464.73 464.73 464.73
960.95 864.26 568.39 (*) 656.62
412.96 443.25 340.12 272.89 331.41
284.22 284.22 284.22 284.22 284.22
376.71 376.71 376.71 376.71 376.71
474.55 474.55 474.55 474.55 474.55
363.30 363.30 363.30 363.30 363.30
693.13 693.13 693.13 693.13 693.13
300.40 300.40 300.40 300.40 300.40
405.60 405.60 405.60 405.60 405.60
488.10 488.10 488.10 488.10 488.10
295.99 295.99 295.99 295.99 295.99
462.33 462.33 462.33 462.33 462.33
319.97 319.97 319.97 319.97 319.97
707.19 707.19 707.19 707.19 707.19
259.97 259.97 259.97 259.97 259.97
218.25 218.25 218.25 218.25 218.25
426.35 426.35 426.35 426.35 426.35
480.28 480.28 480.28 480.28 480.28
107.23 107.23 107.23 107.23 107.23
Cod. 1 2 3 4 5 6 Cod. 1
01 806.19 806.19 806.19 806.19 806.19 806.19 02 482.69
03 464.75 464.75 464.75 464.75 464.75 464.75 04 549.83
05 449.82 216.23 420.51 605.77 (*) 633.17 06 907.22
07 657.97 657.97 657.97 657.97 657.97 657.97 08 862.99
09 236.54 236.54 236.54 236.54 236.54 236.54 10 414.97
11 233.49 233.49 233.49 233.49 233.49 233.49 12 317.93
13 1290.00 1290.00 1290.00 1290.00 1290.00 1290.00 14 285.57
17 625.15 667.89 706.38 860.76 704.48 856.42 16 368.08
19 759.15 759.15 759.15 759.15 759.15 759.15 18 341.52
21 465.71 401.92 426.29 431.73 426.29 410.96 20 1556.73
23 418.10 418.10 418.10 418.10 418.10 418.10 22 367.30
27 699.72 699.72 699.72 699.72 699.72 699.72 24 243.60
31 373.23 373.23 373.23 373.23 373.23 373.23 26 370.68
33 827.46 827.46 827.46 827.46 827.46 827.46 28 597.18
37 301.15 301.15 301.15 301.15 301.15 301.15 30 465.87
39 441.61 441.61 441.61 441.61 441.61 441.61 32 468.00
41 410.71 410.71 410.71 410.71 410.71 410.71 34 463.00
43 722.52 658.32 890.87 643.05 1093.34 877.03 38 429.95
45 321.10 321.10 321.10 321.10 321.10 321.10 40 378.13
47 580.90 580.90 580.90 580.90 580.90 580.90 42 283.79
49 292.27 292.27 292.27 292.27 292.27 292.27 44 376.91
51 311.33 311.33 311.33 311.33 311.33 311.33 46 473.94
53 712.63 712.63 712.63 712.63 712.63 712.63 48 363.07
55 500.65 500.65 500.65 500.65 500.65 500.65 50 691.10
57 384.38 384.38 384.38 384.38 384.38 384.38 52 303.79
59 238.53 238.53 238.53 238.53 238.53 238.53 54 405.60
61 235.90 235.90 235.90 235.90 235.90 235.90 56 493.55
65 233.92 233.92 233.92 233.92 233.92 233.92 60 295.99
69 389.45 327.82 428.87 488.52 269.39 451.51 62 461.57
71 643.43 643.43 643.43 643.43 643.43 643.43 64 333.84
73 543.42 543.42 543.42 543.42 543.42 543.42 66 705.83
77 320.57 320.57 320.57 320.57 320.57 320.57 68 264.43
70 218.25
72 425.95
78 479.55
80 107.22
(*) Sin Producción.
Nota: El cuadro incluye los índices unificados de código: 30, 34, 39, 47, 49 y 53 que fueron aprobados mediante
Resolución Jefatural N° 397-2017-INEI.
ES DE NOVIEMBRE DEL 2017
FICAS
00,0)
2 3 4 5 6
482.69 482.69 482.69 482.69 482.69
937.25 1038.03 592.26 377.01 760.96
907.22 907.22 907.22 907.22 907.22
862.99 862.99 862.99 862.99 862.99
414.97 414.97 414.97 414.97 414.97
317.93 317.93 317.93 317.93 317.93
285.57 285.57 285.57 285.57 285.57
368.08 368.08 368.08 368.08 368.08
341.52 341.52 341.52 341.52 341.52
1556.73 1556.73 1556.73 1556.73 1556.73
367.30 367.30 367.30 367.30 367.30
243.60 243.60 243.60 243.60 243.60
370.68 370.68 370.68 370.68 370.68
597.18 597.18 564.34 597.18 597.18
465.87 465.87 465.87 465.87 465.87
468.00 468.00 468.00 468.00 468.00
463.00 463.00 463.00 463.00 463.00
956.73 866.04 565.60 (*) 658.60
421.99 447.10 340.37 272.89 331.41
283.79 283.79 283.79 283.79 283.79
376.91 376.91 376.91 376.91 376.91
473.94 473.94 473.94 473.94 473.94
363.07 363.07 363.07 363.07 363.07
691.10 691.10 691.10 691.10 691.10
303.79 303.79 303.79 303.79 303.79
405.60 405.60 405.60 405.60 405.60
493.55 493.55 493.55 493.55 493.55
295.99 295.99 295.99 295.99 295.99
461.57 461.57 461.57 461.57 461.57
333.84 333.84 333.84 333.84 333.84
705.83 705.83 705.83 705.83 705.83
264.43 264.43 264.43 264.43 264.43
218.25 218.25 218.25 218.25 218.25
425.95 425.95 425.95 425.95 425.95
479.55 479.55 479.55 479.55 479.55
107.22 107.22 107.22 107.22 107.22
Cod. 1 2 3 4 5 6 Cod. 1
01 806.25 806.25 806.25 806.25 806.25 806.25 02 491.28
03 472.49 472.49 472.49 472.49 472.49 472.49 04 549.00
05 450.15 215.47 421.04 606.60 (*) 629.22 06 915.64
07 665.07 665.07 665.07 665.07 665.07 665.07 08 874.25
09 236.97 236.97 236.97 236.97 236.97 236.97 10 411.62
11 233.88 233.88 233.88 233.88 233.88 233.88 12 318.27
13 1461.65 1461.65 1461.65 1461.65 1461.65 1461.65 14 285.57
17 624.52 665.87 702.39 864.50 707.56 861.38 16 368.08
19 767.79 767.79 767.79 767.79 767.79 767.79 18 347.94
21 465.71 401.92 426.29 431.73 426.29 410.96 20 1778.04
23 418.10 418.10 418.10 418.10 418.10 418.10 22 367.30
27 701.02 701.02 701.02 701.02 701.02 701.02 24 243.08
31 373.34 373.34 373.34 373.34 373.34 373.34 26 370.68
33 835.28 835.28 835.28 835.28 835.28 835.28 28 598.29
37 301.24 301.24 301.24 301.24 301.24 301.24 30 466.75
39 442.30 442.30 442.30 442.30 442.30 442.30 32 468.42
41 411.93 411.93 411.93 411.93 411.93 411.93 34 462.14
43 724.34 662.00 885.84 642.83 1101.89 881.06 38 428.85
45 324.93 324.93 324.93 324.93 324.93 324.93 40 378.13
47 580.90 580.90 580.90 580.90 580.90 580.90 42 284.08
49 293.24 293.24 293.24 293.24 293.24 293.24 44 379.73
51 321.12 321.12 321.12 321.12 321.12 321.12 46 479.10
53 713.95 713.95 713.95 713.95 713.95 713.95 48 363.24
55 500.65 500.65 500.65 500.65 500.65 500.65 50 692.38
57 396.16 396.16 396.16 396.16 396.16 396.16 52 304.07
59 238.53 238.53 238.53 238.53 238.53 238.53 54 405.60
61 239.94 239.94 239.94 239.94 239.94 239.94 56 510.72
65 244.12 244.12 244.12 244.12 244.12 244.12 60 295.99
69 389.45 327.82 428.87 488.52 269.39 451.51 62 466.21
71 644.62 644.62 644.62 644.62 644.62 644.62 64 344.11
73 544.18 544.18 544.18 544.18 544.18 544.18 66 706.68
77 322.64 322.64 322.64 322.64 322.64 322.64 68 269.25
70 218.25
72 426.06
78 483.99
80 107.05
(*) Sin Producción.
Nota: El cuadro incluye los índices unificados de código: 30, 34, 39, 47, 49 y 53 que fueron aprobados mediante
Resolución Jefatural N° 002-2018-INEI.
ES DE DICIEMBRE DEL 2017
FICAS
00,0)
2 3 4 5 6
491.28 491.28 491.28 491.28 491.28
935.56 1035.47 594.40 360.39 760.99
915.64 915.64 915.64 915.64 915.64
874.25 874.25 874.25 874.25 874.25
411.62 411.62 411.62 411.62 411.62
318.27 318.27 318.27 318.27 318.27
285.57 285.57 285.57 285.57 285.57
368.08 368.08 368.08 368.08 368.08
347.94 347.94 347.94 347.94 347.94
1778.04 1778.04 1778.04 1778.04 1778.04
367.30 367.30 367.30 367.30 367.30
243.08 243.08 243.08 243.08 243.08
370.68 370.68 370.68 370.68 370.68
598.29 598.29 565.13 598.29 598.29
466.75 466.75 466.75 466.75 466.75
468.42 468.42 468.42 468.42 468.42
462.14 462.14 462.14 462.14 462.14
944.82 864.31 571.24 (*) 655.10
432.63 448.79 340.37 272.89 331.41
284.08 284.08 284.08 284.08 284.08
379.73 379.73 379.73 379.73 379.73
479.10 479.10 479.10 479.10 479.10
363.24 363.24 363.24 363.24 363.24
692.38 692.38 692.38 692.38 692.38
304.07 304.07 304.07 304.07 304.07
405.60 405.60 405.60 405.60 405.60
510.72 510.72 510.72 510.72 510.72
295.99 295.99 295.99 295.99 295.99
466.21 466.21 466.21 466.21 466.21
344.11 344.11 344.11 344.11 344.11
706.68 706.68 706.68 706.68 706.68
269.25 269.25 269.25 269.25 269.25
218.25 218.25 218.25 218.25 218.25
426.06 426.06 426.06 426.06 426.06
483.99 483.99 483.99 483.99 483.99
107.05 107.05 107.05 107.05 107.05
Cod. 1 2 3 4 5 6 Cod. 1
01 888.11 888.11 888.11 888.11 888.11 888.11 02 497.78
03 475.87 475.87 475.87 475.87 475.87 475.87 04 545.09
05 450.09 217.61 423.40 606.47 (*) 629.95 06 925.49
07 667.91 667.91 667.91 667.91 667.91 667.91 08 887.34
09 234.71 234.71 234.71 234.71 234.71 234.71 10 412.82
11 231.87 231.87 231.87 231.87 231.87 231.87 12 316.53
13 1461.65 1461.65 1461.65 1461.65 1461.65 1461.65 14 285.57
17 627.06 925.82 702.13 867.79 726.99 878.12 16 355.71
19 771.98 771.98 771.98 771.98 771.98 771.98 18 338.93
21 475.73 401.92 426.29 431.73 426.29 410.96 20 1778.04
23 418.10 418.10 418.10 418.10 418.10 418.10 22 367.30
27 694.34 694.34 694.34 694.34 694.34 694.34 24 244.83
31 376.35 376.35 376.35 376.35 376.35 376.35 26 370.51
33 826.20 826.20 826.20 826.20 826.20 826.20 28 592.58
37 304.98 304.98 304.98 304.98 304.98 304.98 30 462.02
39 442.87 442.87 442.87 442.87 442.87 442.87 32 468.42
41 415.67 415.67 415.67 415.67 415.67 415.67 34 466.45
43 722.03 740.32 886.99 642.98 1096.77 900.56 38 425.85
45 322.55 322.55 322.55 322.55 322.55 322.55 40 383.17
47 582.52 582.52 582.52 582.52 582.52 582.52 42 282.65
49 290.65 290.65 290.65 290.65 290.65 290.65 44 380.43
51 322.67 322.67 322.67 322.67 322.67 322.67 46 486.42
53 747.07 747.07 747.07 747.07 747.07 747.07 48 363.04
55 500.65 500.65 500.65 500.65 500.65 500.65 50 685.68
57 397.60 397.60 397.60 397.60 397.60 397.60 52 302.47
59 238.53 238.53 238.53 238.53 238.53 238.53 54 406.60
61 244.35 244.35 244.35 244.35 244.35 244.35 56 513.52
65 245.62 245.62 245.62 245.62 245.62 245.62 60 295.99
69 389.45 327.82 428.87 488.52 269.39 451.51 62 462.81
71 638.47 638.47 638.47 638.47 638.47 638.47 64 348.21
73 539.85 539.85 539.85 539.85 539.85 539.85 66 702.21
77 321.18 321.18 321.18 321.18 321.18 321.18 68 269.61
70 218.25
72 424.54
78 482.27
80 107.78
(*) Sin Producción.
Nota: El cuadro incluye los índices unificados de código: 30, 34, 39, 47, 49 y 53 que fueron aprobados mediante
Resolución Jefatural N° 032-2018-INEI.
MES DE ENERO DEL 2018
FICAS
00,0)
2 3 4 5 6
497.78 497.78 497.78 497.78 497.78
995.58 1038.06 591.03 360.57 767.26
925.49 925.49 925.49 925.49 925.49
887.34 887.34 887.34 887.34 887.34
412.82 412.82 412.82 412.82 412.82
316.53 316.53 316.53 316.53 316.53
285.57 285.57 285.57 285.57 285.57
355.71 355.71 355.71 355.71 355.71
338.93 338.93 338.93 338.93 338.93
1778.04 1778.04 1778.04 1778.04 1778.04
367.30 367.30 367.30 367.30 367.30
244.83 244.83 244.83 244.83 244.83
370.51 370.51 370.51 370.51 370.51
592.58 592.58 561.08 592.58 592.58
462.02 462.02 462.02 462.02 462.02
468.42 468.42 468.42 468.42 468.42
466.45 466.45 466.45 466.45 466.45
967.00 875.76 572.93 (*) 663.54
453.09 448.83 339.71 272.89 331.41
282.65 282.65 282.65 282.65 282.65
380.43 380.43 380.43 380.43 380.43
486.42 486.42 486.42 486.42 486.42
363.04 363.04 363.04 363.04 363.04
685.68 685.68 685.68 685.68 685.68
302.47 302.47 302.47 302.47 302.47
406.60 406.60 406.60 406.60 406.60
513.52 513.52 513.52 513.52 513.52
295.99 295.99 295.99 295.99 295.99
462.81 462.81 462.81 462.81 462.81
348.21 348.21 348.21 348.21 348.21
702.21 702.21 702.21 702.21 702.21
269.61 269.61 269.61 269.61 269.61
218.25 218.25 218.25 218.25 218.25
424.54 424.54 424.54 424.54 424.54
482.27 482.27 482.27 482.27 482.27
107.78 107.78 107.78 107.78 107.78
Cod. 1 2 3 4 5 6 Cod. 1
01 893.04 893.04 893.04 893.04 893.04 893.04 02 528.59
03 502.32 502.32 502.32 502.32 502.32 502.32 04 545.16
05 450.89 218.43 426.06 610.00 (*) 632.74 06 944.54
07 674.81 674.81 674.81 674.81 674.81 674.81 08 907.49
09 237.12 237.12 237.12 237.12 237.12 237.12 10 414.90
11 234.01 234.01 234.01 234.01 234.01 234.01 12 318.38
13 1461.65 1461.65 1461.65 1461.65 1461.65 1461.65 14 283.57
17 628.25 942.73 704.84 862.66 744.29 873.71 16 354.83
19 784.46 784.46 784.46 784.46 784.46 784.46 18 350.94
21 476.04 423.68 449.56 431.73 449.56 410.96 20 1778.04
23 439.25 439.25 439.25 439.25 439.25 439.25 22 367.30
27 461.15 461.15 461.15 461.15 461.15 461.15 24 243.92
31 377.31 377.31 377.31 377.31 377.31 377.31 26 370.36
33 850.57 850.57 850.57 850.57 850.57 850.57 28 572.47
37 303.68 303.68 303.68 303.68 303.68 303.68 30 469.31
39 443.97 443.97 443.97 443.97 443.97 443.97 32 468.42
41 414.15 414.15 414.15 414.15 414.15 414.15 34 475.93
43 727.14 742.33 889.28 648.60 1096.45 907.26 38 426.92
45 320.77 320.77 320.77 320.77 320.77 320.77 40 383.17
47 582.52 582.52 582.52 582.52 582.52 582.52 42 284.08
49 294.48 294.48 294.48 294.48 294.48 294.48 44 379.38
51 332.79 332.79 332.79 332.79 332.79 332.79 46 485.91
53 749.06 749.06 749.06 749.06 749.06 749.06 48 362.79
55 501.45 501.45 501.45 501.45 501.45 501.45 50 641.45
57 401.68 401.68 401.68 401.68 401.68 401.68 52 305.19
59 238.53 238.53 238.53 238.53 238.53 238.53 54 406.60
61 251.89 251.89 251.89 251.89 251.89 251.89 56 518.79
65 246.90 246.90 246.90 246.90 246.90 246.90 60 295.99
69 389.45 327.82 428.87 488.52 269.39 451.51 62 465.05
71 645.02 645.02 645.02 645.02 645.02 645.02 64 348.21
73 546.30 546.30 546.30 546.30 546.30 546.30 66 709.29
77 323.20 323.20 323.20 323.20 323.20 323.20 68 272.89
70 218.25
72 424.19
78 486.96
80 106.99
(*) Sin Producción.
Nota: El cuadro incluye los índices unificados de código: 30, 34, 39, 47, 49 y 53 que fueron aprobados mediante
Resolución Jefatural N° 061-2018-INEI.
MES DE FEBRERO DEL 2018
FICAS
00,0)
2 3 4 5 6
528.59 528.59 528.59 528.59 528.59
1009.88 1041.37 587.60 365.28 770.17
944.54 944.54 944.54 944.54 944.54
907.49 907.49 907.49 907.49 907.49
414.90 414.90 414.90 414.90 414.90
318.38 318.38 318.38 318.38 318.38
283.57 283.57 283.57 283.57 283.57
354.83 354.83 354.83 354.83 354.83
350.94 350.94 350.94 350.94 350.94
1778.04 1778.04 1778.04 1778.04 1778.04
367.30 367.30 367.30 367.30 367.30
243.92 243.92 243.92 243.92 243.92
370.36 370.36 370.36 370.36 370.36
572.47 572.47 565.39 572.47 572.47
469.31 469.31 469.31 469.31 469.31
468.42 468.42 468.42 468.42 468.42
475.93 475.93 475.93 475.93 475.93
979.68 869.84 569.50 (*) 665.42
453.09 446.89 339.12 272.89 331.41
284.08 284.08 284.08 284.08 284.08
379.38 379.38 379.38 379.38 379.38
485.91 485.91 485.91 485.91 485.91
362.79 362.79 362.79 362.79 362.79
641.45 641.45 641.45 641.45 641.45
305.19 305.19 305.19 305.19 305.19
406.60 406.60 406.60 406.60 406.60
518.79 518.79 518.79 518.79 518.79
295.99 295.99 295.99 295.99 295.99
465.05 465.05 465.05 465.05 465.05
348.21 348.21 348.21 348.21 348.21
709.29 709.29 709.29 709.29 709.29
272.89 272.89 272.89 272.89 272.89
218.25 218.25 218.25 218.25 218.25
424.19 424.19 424.19 424.19 424.19
486.96 486.96 486.96 486.96 486.96
106.99 106.99 106.99 106.99 106.99
Cod. 1 2 3 4 5 6 Cod. 1
01 905.29 905.29 905.29 905.29 905.29 905.29 02 529.67
03 506.47 506.47 506.47 506.47 506.47 506.47 04 548.18
05 449.53 219.17 422.53 607.83 (*) 634.49 06 943.48
07 675.04 675.04 675.04 675.04 675.04 675.04 08 905.86
09 240.29 240.29 240.29 240.29 240.29 240.29 10 416.69
11 234.20 234.20 234.20 234.20 234.20 234.20 12 318.55
13 1461.65 1461.65 1461.65 1461.65 1461.65 1461.65 14 283.57
17 626.79 945.38 703.89 863.40 747.80 866.46 16 354.83
19 783.82 783.82 783.82 783.82 783.82 783.82 18 348.82
21 476.04 423.68 449.56 431.73 449.56 410.96 20 1778.04
23 439.25 439.25 439.25 439.25 439.25 439.25 22 367.30
27 461.56 461.56 461.56 461.56 461.56 461.56 24 243.60
31 377.40 377.40 377.40 377.40 377.40 377.40 26 369.89
33 851.92 851.92 851.92 851.92 851.92 851.92 28 573.00
37 304.11 304.11 304.11 304.11 304.11 304.11 30 471.87
39 446.14 446.14 446.14 446.14 446.14 446.14 32 468.41
41 414.55 414.55 414.55 414.55 414.55 414.55 34 470.76
43 726.59 744.00 894.42 647.62 1090.59 906.22 38 427.34
45 322.55 322.55 322.55 322.55 322.55 322.55 40 383.17
47 582.52 582.52 582.52 582.52 582.52 582.52 42 284.22
49 295.18 295.18 295.18 295.18 295.18 295.18 44 380.79
51 337.08 337.08 337.08 337.08 337.08 337.08 46 487.81
53 747.73 747.73 747.73 747.73 747.73 747.73 48 365.55
55 500.55 500.55 500.55 500.55 500.55 500.55 50 641.89
57 399.44 399.44 399.44 399.44 399.44 399.44 52 305.35
59 238.53 238.53 238.53 238.53 238.53 238.53 54 406.60
61 251.17 251.17 251.17 251.17 251.17 251.17 56 519.26
65 243.56 243.56 243.56 243.56 243.56 243.56 60 295.99
69 389.45 327.82 428.87 488.52 269.39 451.51 62 464.29
71 645.61 645.61 645.61 645.61 645.61 645.61 64 348.21
73 548.33 548.33 548.33 548.33 548.33 548.33 66 732.29
77 324.60 324.60 324.60 324.60 324.60 324.60 68 274.56
70 218.25
72 427.74
78 487.23
80 106.47
(*) Sin Producción.
Nota: El cuadro incluye los índices unificados de código: 30, 34, 39, 47, 49 y 53 que fueron aprobados mediante
Resolución Jefatural N° 103-2018-INEI.
MES DE MARZO DEL 2018
FICAS
00,0)
2 3 4 5 6
529.67 529.67 529.67 529.67 529.67
1004.35 1036.83 587.58 365.28 770.05
943.48 943.48 943.48 943.48 943.48
905.86 905.86 905.86 905.86 905.86
416.69 416.69 416.69 416.69 416.69
318.55 318.55 318.55 318.55 318.55
283.57 283.57 283.57 283.57 283.57
354.83 354.83 354.83 354.83 354.83
348.82 348.82 348.82 348.82 348.82
1778.04 1778.04 1778.04 1778.04 1778.04
367.30 367.30 367.30 367.30 367.30
243.60 243.60 243.60 243.60 243.60
369.89 369.89 369.89 369.89 369.89
573.00 573.00 565.77 573.00 573.00
471.87 471.87 471.87 471.87 471.87
468.41 468.41 468.41 468.41 468.41
470.76 470.76 470.76 470.76 470.76
993.18 866.09 568.58 (*) 665.48
453.09 446.07 340.62 272.89 331.41
284.22 284.22 284.22 284.22 284.22
380.79 380.79 380.79 380.79 380.79
487.81 487.81 487.81 487.81 487.81
365.55 365.55 365.55 365.55 365.55
641.89 641.89 641.89 641.89 641.89
305.35 305.35 305.35 305.35 305.35
406.60 406.60 406.60 406.60 406.60
519.26 519.26 519.26 519.26 519.26
295.99 295.99 295.99 295.99 295.99
464.29 464.29 464.29 464.29 464.29
348.21 348.21 348.21 348.21 348.21
732.29 732.29 732.29 732.29 732.29
274.56 274.56 274.56 274.56 274.56
218.25 218.25 218.25 218.25 218.25
427.74 427.74 427.74 427.74 427.74
487.23 487.23 487.23 487.23 487.23
106.47 106.47 106.47 106.47 106.47
Cod. 1 2 3 4 5 6 Cod. 1
01 902.13 902.13 902.13 902.13 902.13 902.13 02 526.55
03 501.98 501.98 501.98 501.98 501.98 501.98 04 547.13
05 450.08 216.64 420.58 607.14 (*) 628.08 06 932.93
07 671.19 671.19 671.19 671.19 671.19 671.19 08 892.57
09 238.74 238.74 238.74 238.74 238.74 238.74 10 418.64
11 235.08 235.08 235.08 235.08 235.08 235.08 12 317.37
13 1461.65 1461.65 1461.65 1461.65 1461.65 1461.65 14 283.57
17 627.28 672.21 702.73 861.15 764.74 868.72 16 354.83
19 774.80 774.80 774.80 774.80 774.80 774.80 18 340.50
21 476.04 423.68 449.56 431.73 449.56 410.96 20 1778.04
23 439.25 439.25 439.25 439.25 439.25 439.25 22 367.30
27 458.59 458.59 458.59 458.59 458.59 458.59 24 243.19
31 376.78 376.78 376.78 376.78 376.78 376.78 26 370.53
33 841.52 841.52 841.52 841.52 841.52 841.52 28 569.30
37 304.20 304.20 304.20 304.20 304.20 304.20 30 469.88
39 445.52 445.52 445.52 445.52 445.52 445.52 32 468.41
41 419.01 419.01 419.01 419.01 419.01 419.01 34 471.19
43 721.99 670.45 898.75 649.51 1103.19 904.30 38 425.65
45 322.55 322.55 322.55 322.55 322.55 322.55 40 383.17
47 582.52 582.52 582.52 582.52 582.52 582.52 42 283.36
49 294.12 294.12 294.12 294.12 294.12 294.12 44 381.73
51 340.88 340.88 340.88 340.88 340.88 340.88 46 486.77
53 745.75 745.75 745.75 745.75 745.75 745.75 48 365.01
55 500.55 500.55 500.55 500.55 500.55 500.55 50 637.87
57 381.93 381.93 381.93 381.93 381.93 381.93 52 304.25
59 244.25 244.25 244.25 244.25 244.25 244.25 54 406.26
61 243.10 243.10 243.10 243.10 243.10 243.10 56 523.71
65 247.66 247.66 247.66 247.66 247.66 247.66 60 295.99
69 389.45 327.82 428.87 488.52 269.39 451.51 62 463.83
71 641.45 641.45 641.45 641.45 641.45 641.45 64 348.21
73 545.39 545.39 545.39 545.39 545.39 545.39 66 729.10
77 325.14 325.14 325.14 325.14 325.14 325.14 68 276.08
70 218.25
72 429.31
78 485.34
80 106.96
(*) Sin Producción.
Nota: El cuadro incluye los índices unificados de código: 30, 34, 39, 47, 49 y 53 que fueron aprobados mediante
Resolución Jefatural N° 138-2018-INEI.
MES DE ABRIL DEL 2018
FICAS
00,0)
2 3 4 5 6
526.55 526.55 526.55 526.55 526.55
937.59 1039.22 587.84 365.28 763.89
932.93 932.93 932.93 932.93 932.93
892.57 892.57 892.57 892.57 892.57
418.64 418.64 418.64 418.64 418.64
317.37 317.37 317.37 317.37 317.37
283.57 283.57 283.57 283.57 283.57
354.83 354.83 354.83 354.83 354.83
340.50 340.50 340.50 340.50 340.50
1778.04 1778.04 1778.04 1778.04 1778.04
367.30 367.30 367.30 367.30 367.30
243.19 243.19 243.19 243.19 243.19
370.53 370.53 370.53 370.53 370.53
569.30 569.30 563.03 569.30 569.30
469.88 469.88 469.88 469.88 469.88
468.41 468.41 468.41 468.41 468.41
471.19 471.19 471.19 471.19 471.19
958.44 867.04 568.58 (*) 659.07
437.47 450.27 343.15 272.89 331.41
283.36 283.36 283.36 283.36 283.36
381.73 381.73 381.73 381.73 381.73
486.77 486.77 486.77 486.77 486.77
365.01 365.01 365.01 365.01 365.01
637.87 637.87 637.87 637.87 637.87
304.25 304.25 304.25 304.25 304.25
406.26 406.26 406.26 406.26 406.26
523.71 523.71 523.71 523.71 523.71
295.99 295.99 295.99 295.99 295.99
463.83 463.83 463.83 463.83 463.83
348.21 348.21 348.21 348.21 348.21
729.10 729.10 729.10 729.10 729.10
276.08 276.08 276.08 276.08 276.08
218.25 218.25 218.25 218.25 218.25
429.31 429.31 429.31 429.31 429.31
485.34 485.34 485.34 485.34 485.34
106.96 106.96 106.96 106.96 106.96
Cod. 1 2 3 4 5 6 Cod. 1
01 908.57 908.57 908.57 908.57 908.57 908.57 02 534.75
03 513.58 513.58 513.58 513.58 513.58 513.58 04 545.10
05 450.97 216.68 422.12 608.03 (*) 617.54 06 945.80
07 679.18 679.18 679.18 679.18 679.18 679.18 08 905.34
09 249.31 249.31 249.31 249.31 249.31 249.31 10 416.29
11 237.63 237.63 237.63 237.63 237.63 237.63 12 319.78
13 1461.65 1461.65 1461.65 1461.65 1461.65 1461.65 14 283.57
17 624.36 668.02 700.78 859.84 784.13 865.43 16 354.83
19 782.52 782.52 782.52 782.52 782.52 782.52 18 350.69
21 476.04 423.68 449.56 431.73 449.56 410.96 20 1778.04
23 439.25 439.25 439.25 439.25 439.25 439.25 22 367.30
27 464.69 464.69 464.69 464.69 464.69 464.69 24 242.45
31 378.03 378.03 378.03 378.03 378.03 378.03 26 371.13
33 857.98 857.98 857.98 857.98 857.98 857.98 28 576.87
37 304.54 304.54 304.54 304.54 304.54 304.54 30 478.04
39 445.61 445.61 445.61 445.61 445.61 445.61 32 468.41
41 419.01 419.01 419.01 419.01 419.01 419.01 34 494.47
43 718.60 674.85 900.76 646.54 1103.67 899.03 38 422.07
45 323.64 323.64 323.64 323.64 323.64 323.64 40 383.17
47 582.52 582.52 582.52 582.52 582.52 582.52 42 285.22
49 298.68 298.68 298.68 298.68 298.68 298.68 44 382.02
51 347.86 347.86 347.86 347.86 347.86 347.86 46 489.60
53 779.52 779.52 779.52 779.52 779.52 779.52 48 368.95
55 500.55 500.55 500.55 500.55 500.55 500.55 50 646.23
57 389.94 389.94 389.94 389.94 389.94 389.94 52 309.75
59 244.25 244.25 244.25 244.25 244.25 244.25 54 406.26
61 253.46 253.46 253.46 253.46 253.46 253.46 56 539.72
65 250.41 250.41 250.41 250.41 250.41 250.41 60 295.99
69 389.45 327.82 428.87 488.52 269.39 451.51 62 467.17
71 649.98 649.98 649.98 649.98 649.98 649.98 64 348.21
73 551.43 551.43 551.43 551.43 551.43 551.43 66 735.57
77 331.39 331.39 331.39 331.39 331.39 331.39 68 278.22
70 218.25
72 431.66
78 489.20
80 107.02
(*) Sin Producción.
Nota: El cuadro incluye los índices unificados de código: 30, 34, 39, 47, 49 y 53 que fueron aprobados mediante
Resolución Jefatural N° 168-2018-INEI.
MES DE MAYO DEL 2018
FICAS
00,0)
2 3 4 5 6
534.75 534.75 534.75 534.75 534.75
935.32 1036.79 589.61 365.28 746.69
945.80 945.80 945.80 945.80 945.80
905.34 905.34 905.34 905.34 905.34
416.29 416.29 416.29 416.29 416.29
319.78 319.78 319.78 319.78 319.78
283.57 283.57 283.57 283.57 283.57
354.83 354.83 354.83 354.83 354.83
350.69 350.69 350.69 350.69 350.69
1778.04 1778.04 1778.04 1778.04 1778.04
367.30 367.30 367.30 367.30 367.30
242.45 242.45 242.45 242.45 242.45
371.13 371.13 371.13 371.13 371.13
576.87 576.87 568.64 576.87 576.87
478.04 478.04 478.04 478.04 478.04
468.41 468.41 468.41 468.41 468.41
494.47 494.47 494.47 494.47 494.47
954.76 865.26 567.84 (*) 653.87
436.92 450.27 347.98 272.89 331.41
285.22 285.22 285.22 285.22 285.22
382.02 382.02 382.02 382.02 382.02
489.60 489.60 489.60 489.60 489.60
368.95 368.95 368.95 368.95 368.95
646.23 646.23 646.23 646.23 646.23
309.75 309.75 309.75 309.75 309.75
406.26 406.26 406.26 406.26 406.26
539.72 539.72 539.72 539.72 539.72
295.99 295.99 295.99 295.99 295.99
467.17 467.17 467.17 467.17 467.17
348.21 348.21 348.21 348.21 348.21
735.57 735.57 735.57 735.57 735.57
278.22 278.22 278.22 278.22 278.22
218.25 218.25 218.25 218.25 218.25
431.66 431.66 431.66 431.66 431.66
489.20 489.20 489.20 489.20 489.20
107.02 107.02 107.02 107.02 107.02
Cod. 1 2 3 4 5 6 Cod. 1
01 908.11 908.11 908.11 908.11 908.11 908.11 02 532.76
03 508.81 508.81 508.81 508.81 508.81 508.81 04 546.69
05 453.10 216.69 423.80 609.06 (*) 618.89 06 939.31
07 683.55 683.55 683.55 683.55 683.55 683.55 08 904.81
09 250.85 250.85 250.85 250.85 250.85 250.85 10 414.54
11 238.13 238.13 238.13 238.13 238.13 238.13 12 319.59
13 1461.65 1461.65 1461.65 1461.65 1461.65 1461.65 14 283.57
17 622.17 668.52 700.21 859.00 787.91 864.03 16 354.83
19 782.96 782.96 782.96 782.96 782.96 782.96 18 350.51
21 476.04 423.68 449.56 431.73 449.56 410.96 20 1778.04
23 439.25 439.25 439.25 439.25 439.25 439.25 22 367.30
27 464.25 464.25 464.25 464.25 464.25 464.25 24 244.80
31 377.94 377.94 377.94 377.94 377.94 377.94 26 371.51
33 857.70 857.70 857.70 857.70 857.70 857.70 28 576.34
37 303.74 303.74 303.74 303.74 303.74 303.74 30 479.58
39 447.10 447.10 447.10 447.10 447.10 447.10 32 470.47
41 419.01 419.01 419.01 419.01 419.01 419.01 34 507.40
43 720.10 678.76 903.70 652.81 1103.67 896.42 38 423.83
45 323.64 323.64 323.64 323.64 323.64 323.64 40 383.17
47 582.52 582.52 582.52 582.52 582.52 582.52 42 285.07
49 298.83 298.83 298.83 298.83 298.83 298.83 44 382.87
51 349.06 349.06 349.06 349.06 349.06 349.06 46 483.55
53 790.12 790.12 790.12 790.12 790.12 790.12 48 368.82
55 500.55 500.55 500.55 500.55 500.55 500.55 50 645.61
57 389.58 389.58 389.58 389.58 389.58 389.58 52 309.58
59 243.79 243.79 243.79 243.79 243.79 243.79 54 406.60
61 260.82 260.82 260.82 260.82 260.82 260.82 56 539.22
65 250.53 250.53 250.53 250.53 250.53 250.53 60 295.99
69 389.45 327.82 428.87 488.52 269.39 451.51 62 469.04
71 649.38 649.38 649.38 649.38 649.38 649.38 64 348.21
73 550.99 550.99 550.99 550.99 550.99 550.99 66 735.11
77 331.78 331.78 331.78 331.78 331.78 331.78 68 288.14
70 218.25
72 434.23
78 488.93
80 107.59
(*) Sin Producción.
Nota: El cuadro incluye los índices unificados de código: 30, 34, 39, 47, 49 y 53 que fueron aprobados mediante
Resolución Jefatural N° 198-2018-INEI.
MES DE JUNIO DEL 2018
FICAS
00,0)
2 3 4 5 6
532.76 532.76 532.76 532.76 532.76
938.46 1036.79 588.70 365.28 744.62
939.31 939.31 939.31 939.31 939.31
904.81 904.81 904.81 904.81 904.81
414.54 414.54 414.54 414.54 414.54
319.59 319.59 319.59 319.59 319.59
283.57 283.57 283.57 283.57 283.57
354.83 354.83 354.83 354.83 354.83
350.51 350.51 350.51 350.51 350.51
1778.04 1778.04 1778.04 1778.04 1778.04
367.30 367.30 367.30 367.30 367.30
244.80 244.80 244.80 244.80 244.80
371.51 371.51 371.51 371.51 371.51
576.34 576.34 568.25 576.34 576.34
479.58 479.58 479.58 479.58 479.58
470.47 470.47 470.47 470.47 470.47
507.40 507.40 507.40 507.40 507.40
951.31 862.48 569.30 (*) 651.43
439.33 448.01 348.83 272.89 331.41
285.07 285.07 285.07 285.07 285.07
382.87 382.87 382.87 382.87 382.87
483.55 483.55 483.55 483.55 483.55
368.82 368.82 368.82 368.82 368.82
645.61 645.61 645.61 645.61 645.61
309.58 309.58 309.58 309.58 309.58
406.60 406.60 406.60 406.60 406.60
539.22 539.22 539.22 539.22 539.22
295.99 295.99 295.99 295.99 295.99
469.04 469.04 469.04 469.04 469.04
348.21 348.21 348.21 348.21 348.21
735.11 735.11 735.11 735.11 735.11
288.14 288.14 288.14 288.14 288.14
218.25 218.25 218.25 218.25 218.25
434.23 434.23 434.23 434.23 434.23
488.93 488.93 488.93 488.93 488.93
107.59 107.59 107.59 107.59 107.59
Cod. 1 2 3 4 5 6 Cod. 1
01 957.83 957.83 957.83 957.83 957.83 957.83 02 532.40
03 512.37 512.37 512.37 512.37 512.37 512.37 04 547.19
05 453.63 216.64 425.85 605.75 (*) 619.23 06 944.94
07 685.35 685.35 685.35 685.35 685.35 685.35 08 904.70
09 251.38 251.38 251.38 251.38 251.38 251.38 10 414.88
11 236.99 236.99 236.99 236.99 236.99 236.99 12 319.93
13 1461.65 1461.65 1461.65 1461.65 1461.65 1461.65 14 283.57
17 622.77 671.19 697.96 858.99 795.04 865.97 16 354.83
19 783.88 783.88 783.88 783.88 783.88 783.88 18 350.24
21 476.04 423.68 449.56 438.28 449.56 410.96 20 1778.04
23 439.25 439.25 439.25 439.25 439.25 439.25 22 367.30
27 465.25 465.25 465.25 465.25 465.25 465.25 24 243.50
31 378.15 378.15 378.15 378.15 378.15 378.15 26 377.26
33 859.31 859.31 859.31 859.31 859.31 859.31 28 577.58
37 305.61 305.61 305.61 305.61 305.61 305.61 30 481.37
39 448.81 448.81 448.81 448.81 448.81 448.81 32 470.47
41 419.01 419.01 419.01 419.01 419.01 419.01 34 503.52
43 725.34 678.97 914.43 650.56 1119.03 894.58 38 425.64
45 323.28 323.28 323.28 323.28 323.28 323.28 40 383.17
47 582.52 582.52 582.52 582.52 582.52 582.52 42 285.36
49 299.69 299.69 299.69 299.69 299.69 299.69 44 383.09
51 348.95 348.95 348.95 348.95 348.95 348.95 46 483.51
53 805.35 805.35 805.35 805.35 805.35 805.35 48 369.08
55 500.55 500.55 500.55 500.55 500.55 500.55 50 647.15
57 390.41 390.41 390.41 390.41 390.41 390.41 52 309.94
59 243.79 243.79 243.79 243.79 243.79 243.79 54 406.60
61 266.57 266.57 266.57 266.57 266.57 266.57 56 540.38
65 254.51 254.51 254.51 254.51 254.51 254.51 60 295.99
69 389.45 327.82 428.87 488.52 269.39 451.51 62 468.68
71 650.77 650.77 650.77 650.77 650.77 650.77 64 348.21
73 551.96 551.96 551.96 551.96 551.96 551.96 66 736.16
77 331.03 331.03 331.03 331.03 331.03 331.03 68 288.64
70 218.25
72 434.41
78 489.56
80 107.54
(*) Sin Producción.
Nota: El cuadro incluye los índices unificados de código: 30, 34, 39, 47, 49 y 53 que fueron aprobados mediante
Resolución Jefatural N° 226-2018-INEI.
MES DE JULIO DEL 2018
FICAS
00,0)
2 3 4 5 6
532.40 532.40 532.40 532.40 532.40
936.14 1036.46 589.75 365.28 751.32
944.94 944.94 944.94 944.94 944.94
904.70 904.70 904.70 904.70 904.70
414.88 414.88 414.88 414.88 414.88
319.93 319.93 319.93 319.93 319.93
283.57 283.57 283.57 283.57 283.57
354.83 354.83 354.83 354.83 354.83
350.24 350.24 350.24 350.24 350.24
1778.04 1778.04 1778.04 1778.04 1778.04
367.30 367.30 367.30 367.30 367.30
243.50 243.50 243.50 243.50 243.50
377.26 377.26 377.26 377.26 377.26
577.58 577.58 569.16 577.58 577.58
481.37 481.37 481.37 481.37 481.37
470.47 470.47 470.47 470.47 470.47
503.52 503.52 503.52 503.52 503.52
955.92 865.32 570.93 (*) 649.00
442.60 446.07 350.36 272.89 331.41
285.36 285.36 285.36 285.36 285.36
383.09 383.09 383.09 383.09 383.09
483.51 483.51 483.51 483.51 483.51
369.08 369.08 369.08 369.08 369.08
647.15 647.15 647.15 647.15 647.15
309.94 309.94 309.94 309.94 309.94
406.60 406.60 406.60 406.60 406.60
540.38 540.38 540.38 540.38 540.38
295.99 295.99 295.99 295.99 295.99
468.68 468.68 468.68 468.68 468.68
348.21 348.21 348.21 348.21 348.21
736.16 736.16 736.16 736.16 736.16
288.64 288.64 288.64 288.64 288.64
218.25 218.25 218.25 218.25 218.25
434.41 434.41 434.41 434.41 434.41
489.56 489.56 489.56 489.56 489.56
107.54 107.54 107.54 107.54 107.54
Cod. 1 2 3 4 5 6 Cod. 1 2 3 4 5 6
01 959.66 959.66 959.66 959.66 959.66 959.66 02 546.81 546.81 546.81 546.81 546.81 546.81
03 525.48 525.48 525.48 525.48 525.48 525.48 04 548.83 940.00 1036.18 590.75 365.28 756.52
05 453.45 216.30 425.00 604.07 (*) 623.21 06 928.00 928.00 928.00 928.00 928.00 928.00
07 672.83 672.83 672.83 672.83 672.83 672.83 08 885.16 885.16 885.16 885.16 885.16 885.16
09 252.23 252.23 252.23 252.23 252.23 252.23 10 414.57 414.57 414.57 414.57 414.57 414.57
11 239.37 239.37 239.37 239.37 239.37 239.37 12 320.72 320.72 320.72 320.72 320.72 320.72
13 1596.69 1596.69 1596.69 1596.69 1596.69 1596.69 14 284.81 284.81 284.81 284.81 284.81 284.81
17 621.60 671.52 704.00 855.53 791.87 871.64 16 354.83 354.83 354.83 354.83 354.83 354.83
19 772.71 772.71 772.71 772.71 772.71 772.71 18 330.04 330.04 330.04 330.04 330.04 330.04
21 476.04 423.68 449.56 438.28 449.56 414.76 20 1944.65 1944.65 1944.65 1944.65 1944.65 1944.65
23 439.25 439.25 439.25 439.25 439.25 439.25 22 367.30 367.30 367.30 367.30 367.30 367.30
27 466.82 466.82 466.82 466.82 466.82 466.82 24 243.29 243.29 243.29 243.29 243.29 243.29
31 378.47 378.47 378.47 378.47 378.47 378.47 26 381.16 381.16 381.16 381.16 381.16 381.16
33 857.24 857.24 857.24 857.24 857.24 857.24 28 579.52 579.52 579.52 570.60 579.52 579.52
37 305.79 305.79 305.79 305.79 305.79 305.79 30 483.02 483.02 483.02 483.02 483.02 483.02
39 449.40 449.40 449.40 449.40 449.40 449.40 32 470.47 470.47 470.47 470.47 470.47 470.47
41 419.01 419.01 419.01 419.01 419.01 419.01 34 507.40 507.40 507.40 507.40 507.40 507.40
43 732.59 677.88 919.11 649.73 1123.51 896.96 38 427.32 955.92 867.52 573.30 (*) 648.49
45 328.06 328.06 328.06 328.06 328.06 328.06 40 383.17 443.38 445.69 352.36 272.89 331.41
47 602.11 602.11 602.11 602.11 602.11 602.11 42 285.93 285.93 285.93 285.93 285.93 285.93
49 302.20 302.20 302.20 302.20 302.20 302.20 44 385.69 385.69 385.69 385.69 385.69 385.69
51 350.57 350.57 350.57 350.57 350.57 350.57 46 484.15 484.15 484.15 484.15 484.15 484.15
53 806.68 806.68 806.68 806.68 806.68 806.68 48 369.15 369.15 369.15 369.15 369.15 369.15
55 498.78 498.78 498.78 498.78 498.78 498.78 50 649.27 649.27 649.27 649.27 649.27 649.27
57 391.72 391.72 391.72 391.72 391.72 391.72 52 310.53 310.53 310.53 310.53 310.53 310.53
59 243.79 243.79 243.79 243.79 243.79 243.79 54 408.28 408.28 408.28 408.28 408.28 408.28
61 267.64 267.64 267.64 267.64 267.64 267.64 56 542.19 542.19 542.19 542.19 542.19 542.19
65 253.41 253.41 253.41 253.41 253.41 253.41 60 295.99 295.99 295.99 295.99 295.99 295.99
69 389.45 327.82 428.87 488.52 269.39 451.51 62 472.19 472.19 472.19 472.19 472.19 472.19
71 652.95 652.95 652.95 652.95 652.95 652.95 64 348.21 348.21 348.21 348.21 348.21 348.21
73 553.51 553.51 553.51 553.51 553.51 553.51 66 737.81 737.81 737.81 737.81 737.81 737.81
77 333.21 333.21 333.21 333.21 333.21 333.21 68 289.65 289.65 289.65 289.65 289.65 289.65
70 218.25 218.25 218.25 218.25 218.25 218.25
72 435.02 435.02 435.02 435.02 435.02 435.02
78 490.54 490.54 490.54 490.54 490.54 490.54
80 107.68 107.68 107.68 107.68 107.68 107.68
(*) Sin Producción.
Nota: El cuadro incluye los índices unificados de código: 30, 34, 39, 47, 49 y 53 que fueron aprobados mediante
Resolución Jefatural N° 260-2018-INEI.