Está en la página 1de 3

RESUMEN DE METRADOS

PROYECTO: "MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VIAL INTERURBANA


EN LA RED VIAL DEPARTAMENTAL AYACUCHO 106 TRAYECTORIA: EMP PE-28 A
(OCAYHUACANCHA – CASACANCHA – ROSASPATA - CHICCHIPATA – JARHUAJARA (DV
EMP AYAC 107 CATALINAYOCC) – QUIMSACRUZ – CHUSCHI, DISTRITOS CHUSCHI Y
VINCHOS, PROVINCIA DE HUAMANGA Y CANGALLO DEPARTAMENTO DE AYACUCHO”

4 OBRAS DE ARTE Y DRENAJE


4.06 CUNETAS Long Unidad
04.06.01 CUNETAS TRIANGULRES SIN REVESTIR 57288.00 m
SUSTENTO DE METRADOS - CUNETAS TRIANGULARES
: ESTUDIO DEFINITIVO PARA EL MEJORAMIENTO DE LA CARRETERA ACOS
VINCHOS – URPAY - HUAYCHAO - HUAMANCCOCHA - LUCASPATA
PROYECTO
(Km 0+000.0 a Km 25+310.0)
ACTIVIDAD : Cunetas

01.05 TRAZO Y NIVELACIÓN DE OBRAS DE ARTE #REF!


DESCRIPCIÓN Largo m Ancho m Total
#REF! #REF! 1.50 #REF!
CUNETAS TRIANGULRES SIN REVESTIR 57,288.00 1.50 85932
TRANSICION DE CUNETAS #REF! 1.50 #REF!
#REF! #REF!

#REF!
METRADO DE CUNETAS TRIANGULARES

SUSTENTO DE METRADOS
CUNETAS TRIANGULARES SIN REVESTIR
PROGRESIVA LADO DE CAMINO LONGITUD DE LONGITUD DE
DE A CUNETA TRAMO
(km) IZQUIERDA DERECHA (m) (m)
0+000.0 0+100.0 100.0 100.0 100.00
0+100.0 0+300.0 200.0 200.0 200.00
0+300.0 0+400.0 100.0 100.0 100.00
0+400.0 0+460.0 60.0 60.0 60.00
0+460.0 0+700.0 240.0 240.0 240.00
0+700.0 0+760.0 60.0 60.0 60.00
0+760.0 0+950.0 190.0 190.0 190.00
0+950.0 1+420.0 470.0 470.0 470.00
1+420.0 5+700.0 4280.0 4280.0 4,280.00
6+200.0 7+800.0 1600.0 1600.0 1,600.00
7+800.0 10+920.0 3120.0 3120.0 3,120.00
10+920.0 12+050.0 1130.0 1130.0 1,130.00
12+050.0 12+500.0 450.0 450.0 450.00
12+500.0 12+650.0 150.0 150.0 150.00
12+650.0 12+900.0 250.0 250.0 250.00
12+900.0 25+920.0 13020.0 13020.0 13,020.00
25+920.0 26+020.0 100.0 100.0 100.00
26+020.0 33+560.0 7540.0 7540.0 7,540.00
33+560.0 41+500.0 7940.0 7940.0 7,940.00
41+500.0 42+850.0 1350.0 1350.0 1,350.00
42+850.0 44+150.0 1300.0 1300.0 1,300.00
44+150.0 46+780.0 2630.0 2630.0 2,630.00
46+780.0 46+940.0 160.0 160.0 160.00
46+940.0 47+450.0 510.0 510.0 510.00
47+450.0 47+630.0 180.0 180.0 180.00
47+630.0 48+520.0 890.0 890.0 890.00
48+520.0 48+980.0 460.0 460.0 460.00
48+980.0 50+280.0 1300.0 1300.0 1,300.00
50+280.0 50+600.0 320.0 320.0 320.00
50+600.0 50+720.0 120.0 120.0 120.00
50+720.0 51+260.0 540.0 540.0 540.00
51+260.0 51+850.0 590.0 590.0 590.00
51+850.0 55+840.0 3990.0 3990.0 3,990.00
55+840.0 56+150.0 310.0 310.0 310.00
56+150.0 56+440.0 290.0 290.0 290.00
56+440.0 56+750.0 310.0 310.0 310.00
56+750.0 57+788.0 1038.0 1038.0 1,038.00
TOTAL 57,288.00 57,288.00