ANALISIS DE SENSIBILIDAD

Costos por departamentos


Detalle Total Costo Total Costo Total Costo Total Costo
unitario unitario unitario Unitario
MP $273,390, $136,695. $7,120,22 $4,038.70 $11,726,0 $7,760.47 $292,236, $148,494.
528.00 26 7.00 72.00 827.00 43
MO $4,440,41 $2,351.16 $4,527,53 $2,753.04 $4,442,20 $3,043.09 $13,410,1 $8,147.28
5.00 2.00 5.00 52.00
CIF $15,828,5 $8,381.07 $28,195,7 $17,144.8 $21,852,4 $14,969.7 $65,876,7 $40,495.7
71.00 91.00 8 13.00 6 75.00 2
TOTAL $293,659, $147,427. $39,843,5 $23,936.6 $38,020,6 $25,773.3 $371,523, $197,137.
514.00 49 50.00 2 90.00 2 754.00 43
COSTOS $0.00 $0.00 $259,914, $147,427. $258,931, $171,364. $0.00 $0.00
TRANSFER 661.75 49 166.30 11
IDOS
COSTOS $293,659, $147,427. $299,758, $171,364. $296,951, $197,137. $371,523, $197,137.
TOTALES 514.00 49 211.75 11 856.30 43 754.00 43

Unidades
DEPARTAMENTO A DEPARTAMENTO B DEPARTAMENTO C
UNIDADES $1,763.00 $1,511.00 $1,402.00
TRANSFERIDAS
UNIDADES EN $237.00 $252.00 $109.00
EXISTENCIA
TOTAL UNIDADES EN $2,000.00 $1,763.00 $1,511.00
PRODUCCIÓN

Porcentaje de producción equivalente


MP MO CIF
100 53 53

Producción equivalente
DEPARTAMENTO A DEPARTAMENTO B DEPARTAMENTO C
MP $237.00 $252.00 $109.00
MO $125.61 $133.56 $57.77
CIF $125.61 $133.56 $57.77

Unidades Transferidas
DEPARTAMENTO A DEPARTAMENTO B DEPARTAMENTO C
MP TRANSFERIDO $2,000.00 $1,763.00 $1,511.00
MO TRANSFERIDO $1,888.61 $1,644.56 $1,459.77
CIF TRANSFERIDO $1,888.61 $1,644.56 $1,459.77

Costos en existencias
Detalle Costo Total Costo Total Costo Total Total
unitario unitario unitario
MP $136,695. $32,396,7 $4,038.70 $1,017,75 $7,760.47 $845,891. $34,260,4 $0.00
Detalle Costo Total Costo Total Costo Total Total
unitario unitario unitario
26 77.57 2.24 36 21.17
MO $2,351.16 $295,328. $2,753.04 $367,695. $3,043.09 $175,799. $838,823. $0.00
59 42 05 06
CIF $8,381.07 $1,052,74 $17,144.8 $2,289,87 $14,969.7 $864,803. $4,207,42 $0.00
6.10 8 0.75 6 29 0.14
DTO $0.00 $0.00 $147,427. $37,151,7 $171,364. $18,678,6 $55,830,4 $0.00
ANTERIOR 49 27.03 11 87.71 14.74
TOTAL $0.00 $33,744,8 $0.00 $40,827,0 $0.00 $20,565,1 $95,137,0 $0.00
COSTOS 52.25 45.45 81.41 79.11
ASIGNADO
S
COMPROBA $0.00
CIÓN

Justificación
Es importante porque se debe tener presente que cuando se tiene una producción terminada y
en proceso si se deben cargar los gastos y todos los costos que implique dicha producción pero
de forma proporcional en el caso de los productos que aún están sin terminar. Estro permite un
mayor detalle del costo real de la producción y con ello evita subestimar costos que podrían
estar afectando la utilidad final del negocio.