NOMBRE DE CONTRATA FECHA 6/15/2021

MAESTRO SANTAMARIA QUINCENA PRIMERA MES JUNIO


VALORIZACIÓN ACUMULADA
DESCRIPCION Und Metrado Precio TOTAL
OBRA COLEGIO CESAR ACUÑA
ACERO KG 545.91 S/0.85 S/464.02
ENCOFRADO Y DESENCOFRADO M2 58.87 S/26.00 S/1,530.49
CONCRETO MIXER M3 9.12 S/20.00 S/182.40
CONCRETO TROMPO M3 19.85 S/90.00 S/1,786.32
LADRILLO TECHO UND - S/0.50 S/0.00
LADRILLO MURO SOGA MILLAR - S/380.00 S/0.00
LADRILLO MURO CABEZA MILLAR - S/330.00 S/0.00
TARRAJEO MUROS M2 64.69 S/15.00 S/970.28
TARRAJEO DERRAMES (VIGAS Y COLUMNAS) ML 83.00 S/10.00 S/830.00
FROTACHADO M2 - S/5.00 S/0.00
FROTACHADO DE PISOS Y CONTRAPISOS M2 - S/10.00 S/0.00
OPERARIO MES - S/300.00 S/0.00
REINTEGRO OPERARIO MES - S/300.00 S/0.00
TRABAJADOR ACCIDENTADO MES - S/500.00 S/0.00
GASTOS MEDICOS DE TRABAJADOR ACCIDENTADO MES - S/300.00 S/0.00
REINTEGRO OPERARIO Y AYUDANTE DIA - S/190.00 S/0.00
COLUMNETAS ML - S/33.00 S/0.00
ALQUILER DE MAQUINARIA MES - S/500.00 S/0.00
REINTEGRO CORRECCION DE COLUMNETAS M02 ML - S/362.56 S/0.00
REINTEGRO CORRECCION DERRAMES POR TARRAJEO M02 ML - S/46.60 S/0.00
ENCHAPADO PORCELANATO M2 S/15.00 S/0.00
ENCHAPADO PORCELANATO OVALINES UND 4.00 S/30.00 S/120.00
CONTRAZOCALO ML - S/6.00 S/0.00
PULIDO DE PISO Y VEREDA M2 61.89 S/15.00 S/928.39
CREACION DE LOSA DEPORTIVA Y INICIAL M2 194.55 S/14.00 S/2,723.73
LOSA DEPORTIVA Y PATIO PRINCIPAL (RECONOCIMIENTO) M2 920.54 S/6.00 S/5,523.22
CREACION DE PATIO PRINCIPAL M2 - S/14.00 S/0.00
IMPERMEABILIZACION DE CISTERNA M2 - S/22.00 S/0.00
CAJAS DE CONCRETO EN CALLE UND - S/50.00 S/0.00
GARGOLAS UND 3.00 S/100.00 S/300.00
TOTAL VALORIZADO S/15,358.85

DESCUENTOS
DESCRIPCION UM CANT. PRECIO SUB TOTAL

PORCENTAJE DE DESCUENTO ACUMULADO 100%


PARCIAL DESCUENTO S/ -

PAGOS VALORIZADOS
N° DE VALORIZACION - VOUCHER FECHA ESTADO TOTAL SUB TOTAL
--------------

PARCIAL VALORIZADO S/ -

RETENCIONES PREVISIBLES
DESCRIPCION UM CANT. PRECIO SUB TOTAL
ABSOLVER OBSERVACIONES GARGOLAS (ROMPE GOTAS) 6/15/2021 0.00 S/ -
S/ -
PARCIAL DESCUENTO S/ -

MONTO A DEPOSITAR EN CUENTA


MONTO A
NUMERO DE CUENTA NOMBRE DEL TITULAR DEPOSITAR
MAESTRO SANTAMARIA S/ 15,358.85
MEDIDAS

ÍTEM DESCRIPCIÓN UNID VECES CANT. LARGO ANCHO ALTO SUB TOTAL TOTAL

AREA LONGITUD KG
- VEREDAS A=0 a 120 = ML ; A=120 > = M2 ML & M2 61.89
vereda en LOSA DEPORTIVA LATERAL 1.00 1.00 8.00 1.20 9.60
RAMPA - CONEXCION DE ENTRADA A PATIO PRINCIPAL 1.00 1.00 1.20 4.10 4.92
RAMPA - CONEXCION DE PATIO PRINCIPAL A PABELLON N°03 1.00 1.00 3.15 4.10 12.92
GRADERIAS - TRAMO 1 Y 2 1.00 2.00 8.00 0.75 12.00
GRADERIAS - TRAMO 3 1.00 1.00 8.00 0.50 4.00
vereda de losa deportiva a pabellon n°4 1.00 1.00 5.35 3.45 18.46

- CONCRETO A TROMPO - VEREDAS M3 4.99


LOSA DEPORTIVA LATERAL 1.00 1.00 8.00 1.20 0.10 0.96
RAMPA - CONEXCION DE ENTRADA A PATIO PRINCIPAL 1.00 1.00 1.20 4.10 0.10 0.49
RAMPA - CONEXCION DE PATIO PRINCIPAL A PABELLON N°03 1.00 1.00 3.15 4.10 0.10 1.29
vereda de losa deportiva a pabellon n°4 1.00 1.00 5.35 3.45 0.10 2.25

- LOSA DEPORTIVA
CONCRETO F'C=210KG/CM2 (ACABADO SEMI FROTACHADO) M2 194.55
PAÑOS DE LOSA 1.00 12.00 4.00 3.17 152.02

LOSAS EN PATIO INICIAL 1.00 1.00 AREA CAD = 39.09 39.09


RESANE DE PATIO INICIAL 1.00 1.00 AREA CAD = 3.45 3.45

(losa y patio principal) RECONOCIMIENTO m3 920.54


losa deportiva 1.00 1.00 32.00 19.00 608.00
patio principal 1.00 1.00 18.00 15.00 270.00

LOSAS EN PATIO INICIAL 1.00 1.00 AREA CAD = 39.09 39.09


RESANE DE PATIO INICIAL 1.00 1.00 AREA CAD = 3.45 3.45
- GRADERIAS
CONCRETO EN GRADERIAS M3 12.72
TRAMO N°01
SOBRECIMIENTO 1.00 1.00 8.00 1.05 0.20 1.68
CIMIENTO 1.00 1.00 8.00 0.70 0.50 2.80

TRAMO N°02
BASE 1.00 1.00 8.00 0.20 0.95 1.52

TRAMO N°03
SOBRECIMIENTO 1.00 1.00 8.00 0.25 0.20 0.40

TRAMO N°04
BASE 1.00 1.00 8.00 0.20 0.95 1.52
CIMIENTO 1.00 1.00 8.00 0.50 0.50 2.00

TRAMO N°04
AREA CAD 1.00 1.00 8.00 AREA CAD= 0.35 2.80

ENCOFRADO EN GRADERIAS M2 41.54


TRAMO N°01
MURO INTERIOR 1.00 1.00 8.00 1.05 8.40
MURO EXTERIOR 1.00 1.00 8.00 1.05 8.40

TRAMO N°02
MURO INTERIOR 0.00 0.00 0.00 0.00 0.00
MURO EXTERIOR 1.00 1.00 8.00 0.20 1.60

TRAMO N°03
MURO INTERIOR 1.00 1.00 8.00 0.25 2.00
MURO EXTERIOR 1.00 1.00 8.00 0.25 2.00

TRAMO N°04
MURO INTERIOR 1.00 1.00 8.00 0.25 2.00
MURO EXTERIOR 1.00 1.00 8.00 0.45 3.60

TRAMO N°05
POSTERIOR 1.00 1.00 8.00 0.70 5.60
PRINCIPAL 1.00 1.00 8.00 0.45 3.60
PRINCIPAL 1.00 1.00 8.00 0.25 2.00

LATERAL DE GRADERIA 1.00 1.00 AREA CAD= 2.34 2.34

ACERO EN GRADERIAS KG 294.62


- CIMENTACION PARA MALLA METALICA EN LOSA DEPORTIVA
CONCRETO EN CIMENTACION M3
SOBRECIMIENTO 1.00 1.00 19.00 0.45 0.25 2.14
CIMIENTO 1.00 1.00 19.00 0.80 0.60 9.12
ENCOFRADO EN SOBRECIMIENTO M2 17.33
POSTERIOR 1.00 1.00 19.00 0.45 8.55
FRONTAL 1.00 1.00 19.00 0.45 8.55
LATERAL 1.00 2.00 0.25 0.45 0.23
ACERO EN CIMENTACION KG 181.22
- TARRAJEO M2 64.69
TARRAJEO EN GRADERIAS
POSTERIOR 1.00 4.00 8.00 1.80 57.60
DESCUENTO EN TRAMO VEREDA 1.00 4.00 11.10 0.20 -8.88
CARA DE GRADERIA 1.00 1.00 AREA CAD = 2.00 2.00

TARRAJEO EN SOBRECIMIENTO DE MALLA METALICA


POSTERIOR 1.00 1.00 19.00 0.45 8.55
SUPERIOR 1.00 1.00 19.00 0.29 5.42

DERRAME ML 83.00
GRADERIAS SUPERIOR 1.00 4.00 8.00 32.00
GRADERIA FRONTAL 1.00 4.00 8.00 32.00
SOBRECIMIENTO DE MALLA METALICA FRONTAL 1.00 1.00 19.00 19.00

- ENCHAPADO DE PORCELANATO M2 4.00


AULA N°01 - MESAS PARA OVALINES 1.00 2.00 2.00

AULA N°02 - MESAS PARA OVALINES 1.00 2.00 2.00

- GARGOLAS UND 3.00


GARGOLAS EN PABELLON N°01 1.00 3.00 3.00
- CERCO PERIMETRICO GENERAL M2 -
SOBRECIMIENTO - CONCRETO M3 0.00
SOBRECIMIENTO - ENCOFRADO M2 0.00

COLUMNAS - CONCRETO M3 0.00


COLUMNAS - ENCOFRADO M2 0.00

VIGAS - CONCRETO M3 0.00


VIGAS - ENCOFRADO M2 0.00

ACERO GENERAL UTILIZADO KG 70.08 70.08

LOSA DEPORTIVA Y PATIO PRINCIPAL (RECONOCIMIENTO) M2 920.54


ENCHAPADO DE PORCELANATO OVALINES UND 4.00
TARRAJEO EN MUROS M2 64.69
DERRAME ML 83.00
VEREDAS, PISOS Y RAMPAS ML & M2 61.89
CONCRETO CON TROMPO M3 19.85
CONCRETO CON MIXER M3 9.12
ENCOFRADO M2 58.87
ACERO KG 545.91
LOSA DEPORTIVA M2 194.55
GARGOLAS UND 3.00
LONGITUD PARCIAL POR DIAMETRO
Peso
ITEM DISEÑO DEL ACERO Diametro Acero Longitud Cant. Nº de Veces kg/m 1/4 '' 3/8 '' 1/2 '' 5/8 '' 3/4 '' 1 ''
(Kg.)
Nº 2 Nº 3 Nº 4 Nº 5 Nº 6 Nº 8
CERCO PERIMETRICO INTERNO
01.04.02 SOBRECIMIENTOS REFORZADOS
01.04.02.03 SOBRECIMIENTOS REF., ACERO F'y=4200 KG/CM2

TRAMO N°01
Varilla Vertical 3/8 3.10 40 01 0.56 69.44 124.00
Varilla horizontal 3/8 8.07 13 01 0.56 58.75 104.91

TRAMO N°02
Varilla Vertical 3/8 1.20 40 01 0.56 26.88 48.00
Varilla horizontal 3/8 8.07 6 01 0.56 27.12 48.42

TRAMO N°03
Varilla Vertical 3/8 1.45 40 01 0.56 32.48 58.00
Varilla horizontal 3/8 8.07 6 01 0.56 27.12 48.42

TRAMO N°04
Varilla Vertical 3/8 1.35 40 01 0.56 30.24 54.00
Varilla horizontal 3/8 8.07 5 01 0.56 22.60 40.35

Diámetro del Fierro de Construcción 1/4 '' 3/8 '' 1/2 '' 5/8 '' 3/4 '' 1 ''
Peso en Kg. por Metro Lineal de Fo. Co. 0.25 0.56 0.99 1.55 2.24 3.98
Area transversal 0.317 0.713 1.267 1.98 2.85 5.07
Longitud en m por Diámetro de Fo. Co. 0.00 526.10 0.00 0.00 0.00 0.00
TOTAL KILOS POR DIAMETRO DE Fo. Co. 0.00 294.62 0.00 0.00 0.00 0.00
TOTAL KG. NETO : 294.62
LONGITUD PARCIAL POR DIAMETRO
Peso
ITEM DISEÑO DEL ACERO Diametro Acero Longitud Cant. Nº de Veces kg/m 1/4 '' 3/8 '' 1/2 '' 5/8 '' 3/4 '' 1 ''
(Kg.)
Nº 2 Nº 3 Nº 4 Nº 5 Nº 6 Nº 8
CIMENTACION PARA ESTRUCTURA METALICA
01.04.02 CIMENTACION
01.04.02.03 ACERO F'y=4200 KG/CM2

TRAMO N°01
Varilla Vertical 3/8 1.80 96 01 0.56 96.77 172.80
Varilla horizontal 3/8 18.85 8 01 0.56 84.45 150.80

1.50

0.30

Diámetro del Fierro de Construcción 1/4 '' 3/8 '' 1/2 '' 5/8 '' 3/4 '' 1 ''
Peso en Kg. por Metro Lineal de Fo. Co. 0.25 0.56 0.99 1.55 2.24 3.98
Area transversal 0.317 0.713 1.267 1.98 2.85 5.07
Longitud en m por Diámetro de Fo. Co. 0.00 323.60 0.00 0.00 0.00 0.00
TOTAL KILOS POR DIAMETRO DE Fo. Co. 0.00 181.22 0.00 0.00 0.00 0.00
TOTAL KG. NETO : 181.22
LONGITUD PARCIAL POR DIAMETRO
Peso
ITEM DISEÑO DEL ACERO Diametro Acero Longitud Cant. Nº de Veces kg/m 1/4 '' 3/8 '' 1/2 '' 5/8 '' 3/4 '' 1 ''
(Kg.)
Nº 2 Nº 3 Nº 4 Nº 5 Nº 6 Nº 8
COLUMNAS Y VIGAS
01.04.02 COLUMNAS
01.04.02.03 ACERO F'y=4200 KG/CM2

TRAMO N°01
Varilla Vertical 3/8 3.35 6 02 0.56 22.51 40.20
Varilla Vertical 3/8 3.35 4 01 0.56 7.50 13.40
ESTRIVOS 3/8 0.74 21 03 0.56 26.11 46.62

3.2

VIGA DE AMARRE 3/8 7.70 2 01 0.56 8.62 15.40


ESTRIVOS 3/8 0.28 34 01 0.56 5.33 9.52

0.15

Diámetro del Fierro de Construcción 1/4 '' 3/8 '' 1/2 '' 5/8 '' 3/4 '' 1 ''
Peso en Kg. por Metro Lineal de Fo. Co. 0.25 0.56 0.99 1.55 2.24 3.98
Area transversal 0.317 0.713 1.267 1.98 2.85 5.07
Longitud en m por Diámetro de Fo. Co. 0.00 125.14 0.00 0.00 0.00 0.00
TOTAL KILOS POR DIAMETRO DE Fo. Co. 0.00 70.08 0.00 0.00 0.00 0.00
TOTAL KG. NETO : 70.08