DATOS
DATOS ESTRUCTURALES
TIPO DE EDIFICIO C 1
UBICACIÓN Cajam CONCRETO
USO HOTEL LOSA 210 Kg/cm^2
NUMERO DE PISOS 6 COLUMNAS 210 Kg/cm^2
ALTURA DEL 1 PISO 3 m VIGA 210 Kg/cm^2
ALTURA DEL 1 AL 2 PISO 2.5 m ZAPATA 175 Kg/cm^2
ÁREA A CONSTRUIR 194.25 m^2 ACERO
SISTEMA ESTRUCTURAL DUAL 7 f¨y 4200 Kg/cm^2
RECUBRIMIENTO
COLUMNAS 4 cm
VIGA 4 cm
LOSA 2 cm
ZAPATA 10 cm
PARÁMETROS SISMICOS
factor de zono (Z) 0.35
Factor de uso (U) 1
Factor de suelo (S) 1.1
F. amplificación sis. (C.) 2.5
Factor de reducción (R.) 7
L max. = 5.5 m
ⅇ = 𝐿/25
e = 0.22 m
ASUMIMOS: e = 25 cm
del 1 al 6 piso
L max. = 6m
h= L a h= L
10 12 VIGAS DE AMARRE
h = 0.60 cm
b= 2 h ó b= h b = 0.30 cm
3 2
b= 2 h ó b= h
3 2
VIGAS DE AMARRE
h = 0.39286 cm
b = 0.2619 cm
VIGAS H B
PRINCIPALES 0.60 0.35
AMARRE 0.40 0.30
MURO PORTANTE
T = 0.15 ELEGIMOS T = 25 cm
MURO NO PORTANTE = 15 cm
PREDIMENCIONAMIENTO DE COLUMNAS
Columna Centradas:
AC= 2170.102
AC= 46.58 cm
AC(asum)= 50*50 cm
columnas esquinadas
AC= 563.61
AC= 23.74 cm
AC(asum)= 25x25 cm
columnas excentrica
AC= 1091.67
AC= 33.04 cm
AC(asum)= 35x35 cm
METRADO DE CARGAS PARA UNA LOSA
CARGA MUERTA
CARGA VIVA
CM D*0.4 = 180
CV D*0.4 = 140
W= 490 Kg/m
CARGA MUERTA
Pesos A. Trb. A.V.P Kg/m T/m
P.P.LOSA 350 2.4 0.35 294 0.2940
P.P.Viga 2400 0.21 504 0.504
P.P.P.Terminado 100 2.4 240 0.240
P.P.Muro 1800 2.4 4320 4.320
P.P.Cielo raso 50 5.25 262.5 0.263
TOTAL 5358 5.358
CARGA VIVA
S/C = 250 2.4 600 0.6
P.P.T.Movil 100 2.4 240 0.24
TOTAL 0.84
W = 8.929 T/m
VIGA PRINCIPAL EJE 2 TRAMO A - D
CARGA MUERTA
Pesos A. Trb. A.V.P Kg/m T/m
P.P.LOSA 350 4.736 0.35 580.16 0.5802
P.P.Viga 2400 0.21 504 0.504
P.P.P.Terminado 100 4.736 473.6 0.474
P.P.Muro 1800 4.736 8524.8 8.525
P.P.Cielo raso 50 4.736 236.8 0.237
TOTAL 10082.56 10.319
CARGA VIVA
S/C = 250 4.736 1184 1.184
P.P.T.Movil 100 4.736 473.6 0.4736
TOTAL 1.6576
W = 17.265 T/m
CARGA MUERTA
Pesos A. Trb. A.V.P Kg/m T/m
P.P.LOSA 350 2.15 0.35 263.375 0.2634
P.P.Viga 2400 0.21 504 0.504
P.P.P.Terminado 100 2.15 215 0.215
P.P.Muro 1800 2.15 3870 3.870
P.P.Cielo raso 50 2.15 107.5 0.108
TOTAL 4852.375 4.852
CARGA VIVA
S/C = 250 2.15 537.5 0.5375
P.P.T.Movil 100 2.15 215 0.215
TOTAL 0.7525
W = 8.073 T/m
CARGA MUERTA
Pesos A. Trb. A.V.P Kg/m T/m
P.P.LOSA 350 1 0.3 105 0.1050
P.P.Viga 2400 0.12 288 0.288
P.P.P.Terminado 100 1.3 130 0.130
P.P.Cielo raso 50 1.3 65 0.065
TOTAL 523 0.588
CARGA VIVA
S/C = 250 1.3 325 0.325
P.P.T.Movil 150 1.3 195 0.195
TOTAL 0.52
W = 1.707 T/m
CARGA MUERTA
Pesos A. Trb. A.V.P Kg/m T/m
P.P.LOSA 350 2 0.3 210 0.2100
P.P.Viga 2400 0.12 288 0.288
P.P.P.Terminado 100 2.3 230 0.230
P.P.Cielo raso 50 2.3 115 0.115
TOTAL 728 0.843
CARGA VIVA
S/C = 250 2.3 575 0.575
P.P.T.Movil 150 2.3 345 0.345
TOTAL 0.92
W = 2.744 T/m
5)PESO TOTAL DE LA ESTRUCTURA
PESO DE LA LOSA
PESO DE VIGAS
PESO DE COLUMNAS
COLUMNAS 1º PISO
DESCRIPCIÓN PESO LARGO ANCHO ALTURA #VECES SUBTOTAL
C1 2400 0.35 0.35 3.6 10 10584
C2 2400 0.5 0.5 3.6 2 4320
TOTAL 14904
b) Calculo del Ag
Ag = 1225
Ag 730.55
1225
d) Combinación de acero
b) Calculo del Ag
Ag = 2500
Ag 1956.08
2500
d) Combinación de acero
1. DATOS
COLUMNA
b= 0.35
t= 0.35
CM= 49.41Tn
CV= 10.99Tn
ZAPATA
LONGITUD DE VOLADO
2. DIMENCIONAMIENTO DE LA ZAPATA
2.1.
Pu= 87.87Tn
2.2.
PT 63.43Tn
Az= =
σt 20.00Tn
2.3.
𝐴=√𝐴𝑧+1/2(𝑡−𝑏)
AxB= 3.17m2
B=√𝐴𝑧−1/2(𝑡−𝑏)
A= 1.780810583695
A=B= 1.78m
Replanteamos
Az= 3.17m2
σt >= σcs
σcs = σn
Pu 87.87Tn
wn = Az
=
3.17m2
wn = 27.73tn/m2
σt >= wn
20.00tn/m2 >= 27.73tn/m2 NO CUMPLE
Pu 87.87Tn
wn = Az
=
4.41m2
wn = 19.92tn/m2
σt >= wn
20.00tn/m2 >= 19.92tn/m2 CUMPLE
3. DETERMINACION DE hz
d= 15cm 0.15m
d= 35cm 0.35m
por lo tanto
hz= 45cm
Perimetro
b0=(b+d+t+d)*2
b0= 2.80m
A0=bo*d
Pu= AxBxWn
V0=AxBxWn-(b+d)(d+t)*Wn
V0= 78.10Tn
Esfuerzo Actuante
V0 78.10Tn
vo= =
bo*d 0.98m2
vo= 79.70tn/m2
𝑉𝑐°="1.06∗φ "∗√(𝑓´𝑐)
φ= 0.85
Vc°= 11.92kg/cm2
α= 20
bo
"Vc°= "0.27(2+(𝛼∗𝑑)/"bo
" )∗√(𝑓´𝑐)
𝑚= (𝐴−𝑏)/2 A= 2.10m
b= 0.35m
B= 2.10m
m= 0.875 d= 0.35m
𝑊_𝑛= 19.92tn/m2
𝑉_𝑢=B(m-d)*𝑊_𝑛
𝑉_𝑢= 21.97tn
𝑣_𝑢=𝑉_𝑢/(𝐵∗𝑑)
𝑣_𝑢= 29.89tn/m2
𝑉_𝑢𝑐=0.53∗∅∗√(𝑓´𝑐)
𝑉_𝑢𝑐= 5.96kg/cm2
𝑉_𝑢𝑐= 59.60tn/m2
𝑉_𝑢𝑐≥ 𝑉_𝑢
59.60tn ≥ 21.97tn/m2 OK!
OTRO MÉTODO
𝑉_𝑢𝑐≥ 𝑉_𝑢
59.60tn/m2 ≥𝑉_𝑢/(𝐵∗𝑑)
(𝐵(𝑚−𝑑)∗𝑤_𝑛)/(𝐵∗𝑑)
≥
59.60tn/m2≥ ((𝑚−𝑑)∗𝑤_𝑛)/𝑑
reemplazando
d= 0.22m d= 0.35m
(𝑚∗𝐵)∗𝑊_𝑛
𝑀_11=(𝑚∗𝐵)∗𝑊_𝑛∗𝑚/2
Por lo tanto:
𝑀_11=1/2∗𝑚^2∗𝐵∗𝑊_𝑛
𝑀_11= 16.02Tn.m
𝑀_22=(𝐴∗𝑛)∗𝑊_𝑛∗𝑛/2
𝑀_22=1/2∗𝑛^2∗𝐴∗𝑊_𝑛
𝑀_22= 16.02Tn.m
ACERO
MÉTODO ACI
𝐴_𝑆=𝑀_𝑈/(∅∗𝑓_𝑦∗(𝑑−𝑎/2))
despejamos "a"
a= 5%*d 5%* 45
a= 2.25cm
𝑀_𝑈= 16.02Tn.m
φ= 0.9
fy= 4200.00kg/cm2
d= 35.00m
𝐴_𝑆= 12.51cm2
a= 1.68m
ii). a= 1.68m
𝐴_𝑆= 12.40cm2
ok!
a= 1.67m
MÉTODO TABLAS
𝐾_𝑢=𝑀_𝑢/
i). (𝑏∗𝑑^2 )
𝐾_𝑢= 6.23
𝜌 𝐾_𝑢
0.0020 7.34
x 6.23
0.0022 3.05
𝜌= x= 0.0021
iii). 𝐴_𝑆=𝜌∗𝑏∗𝑑
𝐴_𝑆= 15.44cm2
DISTRIBUCIÓN DE ACERO ( n ; s )
n= Numero de varillas
s= Espaciamiento
Numero de varillas
𝑛=𝐴_𝑆/𝐴_(𝑆1 5/8)
n= 7.80
Le dejamos en:
n= 13.00
Espaciamiento
Lpata = 30cm
Lpata= dobles del acero de la columna
10 ≤𝑠 ≤𝐿𝑝𝑎𝑡𝑎
se recomienda que el S= 15cm
s= de eje a eje
𝑆=(𝐵−2 𝑟𝑒−∅)/(𝑛−1)
25.00cm
s= 16.09cm
16.00cm
Por lo tanto obtenemos tanto en el eje longitudinal como el eje tranasversal que:
𝑓_𝑎𝑢=𝑃_𝑇/𝐴_𝑔
𝑓_𝑎𝑢= 517.76Tn/m2
SE COGE EL MENOR VALOR DE LOS DOS
Columna con estribo
φ= 0.70
Columna con sunchos
φ= 0.65
1249.50Tn/m2
𝑓_𝑎𝑛=0.85∅𝑓´𝑐c 𝑓_𝑎𝑛=
17403.75Tn/m2
𝑓_𝑎𝑛=0.85∅𝑓´𝑐z∗√(𝐴𝑧/𝐴𝑔)
𝑓_𝑎𝑛=
POR LO TANTO:
𝑓_𝑎𝑛 ≥ 𝑓_𝑎𝑢
= 3.17m2
119.19tn/m2 ≥ 79.70tn/m2
𝑀𝐸𝑁𝑆𝐼𝑂𝑁 𝑀𝐸𝑁𝑂𝑅)
2.25cm2
𝜌
𝜌 y 𝐾_𝑢
obles del acero de la columna
anasversal que:
con estribo
con sunchos
CUMPLE
As PEDESTAL
NO CUMPLE
As DOWELY
DISEZO DE ZAPATA AISLADA
1. DATOS
COLUMNA
b= 0.35
t= 0.35
CM= 66.44Tn
CV= 10.99Tn
ZAPATA
LONGITUD DE VOLADO
2. DIMENCIONAMIENTO DE LA ZAPATA
2.1.
Pu= 111.70Tn
2.2.
PT 81.30Tn
Az= =
σt 20.00Tn
2.3.
𝐴=√𝐴𝑧+1/2(𝑡−𝑏)
AxB= 4.07m2
B=√𝐴𝑧−1/2(𝑡−𝑏)
A= 2.016201213917
A=B= 2.00m
Replanteamos
Az= 4.00m2
σt >= σcs
σcs = σn
Pu 111.70Tn
wn = Az
=
4.00m2
wn = 27.92tn/m2
σt >= wn
20.00tn/m2 >= 27.92tn/m2 NO CUMPLE
Pu 111.70Tn
wn = Az
=
6.25m2
wn = 17.87tn/m2
σt >= wn
20.00tn/m2 >= 17.87tn/m2 CUMPLE
3. DETERMINACION DE hz
d= 15cm 0.15m
d= 35cm 0.35m
por lo tanto
hz= 45cm
Perimetro
b0=(b+d+t+d)*2
b0= 2.80m
A0=bo*d
Pu= AxBxWn
V0=AxBxWn-(b+d)(d+t)*Wn
V0= 102.94Tn
Esfuerzo Actuante
V0 102.94Tn
vo= =
bo*d 0.98m2
vo= 105.04tn/m2
𝑉𝑐°="1.06∗φ "∗√(𝑓´𝑐)
φ= 0.85
Vc°= 11.92kg/cm2
α= 30
bo
"Vc°= "0.27(2+(𝛼∗𝑑)/"bo
" )∗√(𝑓´𝑐)
𝑚= (𝐴−𝑏)/2 A= 2.50m
b= 0.35m
B= 2.50m
m= 1.075 d= 0.35m
𝑊_𝑛= 17.87tn/m2
𝑉_𝑢=B(m-d)*𝑊_𝑛
𝑉_𝑢= 32.39tn
𝑣_𝑢=𝑉_𝑢/(𝐵∗𝑑)
𝑣_𝑢= 37.02tn/m2
𝑉_𝑢𝑐=0.53∗∅∗√(𝑓´𝑐)
𝑉_𝑢𝑐= 5.96kg/cm2
𝑉_𝑢𝑐= 59.60tn/m2
𝑉_𝑢𝑐≥ 𝑉_𝑢
59.60tn ≥ 32.39tn/m2 OK!
OTRO MÉTODO
𝑉_𝑢𝑐≥ 𝑉_𝑢
59.60tn/m2 ≥𝑉_𝑢/(𝐵∗𝑑)
(𝐵(𝑚−𝑑)∗𝑤_𝑛)/(𝐵∗𝑑)
≥
59.60tn/m2≥ ((𝑚−𝑑)∗𝑤_𝑛)/𝑑
reemplazando
d= 0.25m d= 0.35m
(𝑚∗𝐵)∗𝑊_𝑛
𝑀_11=(𝑚∗𝐵)∗𝑊_𝑛∗𝑚/2
Por lo tanto:
𝑀_11=1/2∗𝑚^2∗𝐵∗𝑊_𝑛
𝑀_11= 25.82Tn.m
𝑀_22=(𝐴∗𝑛)∗𝑊_𝑛∗𝑛/2
𝑀_22=1/2∗𝑛^2∗𝐴∗𝑊_𝑛
𝑀_22= 25.82Tn.m
ACERO
MÉTODO ACI
𝐴_𝑆=𝑀_𝑈/(∅∗𝑓_𝑦∗(𝑑−𝑎/2))
despejamos "a"
a= 5%*d 5%* 45
a= 2.25cm
𝑀_𝑈= 25.82Tn.m
φ= 0.9
fy= 4200.00kg/cm2
d= 35.00m
𝐴_𝑆= 20.16cm2
a= 2.28m
ii). a= 2.28m
𝐴_𝑆= 20.17cm2
ok!
a= 2.28m
MÉTODO TABLAS
𝐾_𝑢=𝑀_𝑢/
i). (𝑏∗𝑑^2 )
𝐾_𝑢= 8.43
𝜌 𝐾_𝑢
0.0020 7.34
x 8.43
0.0022 3.05
𝜌= x= 0.0021
iii). 𝐴_𝑆=𝜌∗𝑏∗𝑑
𝐴_𝑆= 18.38cm2
DISTRIBUCIÓN DE ACERO ( n ; s )
n= Numero de varillas
s= Espaciamiento
Numero de varillas
𝑛=𝐴_𝑆/𝐴_(𝑆1 5/8)
n= 9.28
Le dejamos en:
n= 13.00
Espaciamiento
Lpata = 30cm
Lpata= dobles del acero de la columna
10 ≤𝑠 ≤𝐿𝑝𝑎𝑡𝑎
se recomienda que el S= 15cm
s= de eje a eje
𝑆=(𝐵−2 𝑟𝑒−∅)/(𝑛−1)
25.00cm
s= 19.42cm
16.00cm
Por lo tanto obtenemos tanto en el eje longitudinal como el eje tranasversal que:
𝑓_𝑎𝑢=𝑃_𝑇/𝐴_𝑔
𝑓_𝑎𝑢= 663.68Tn/m2
SE COGE EL MENOR VALOR DE LOS DOS
Columna con estribo
φ= 0.70
Columna con sunchos
φ= 0.65
1249.50Tn/m2
𝑓_𝑎𝑛=0.85∅𝑓´𝑐c 𝑓_𝑎𝑛=
24665.18Tn/m2
𝑓_𝑎𝑛=0.85∅𝑓´𝑐z∗√(𝐴𝑧/𝐴𝑔)
𝑓_𝑎𝑛=
POR LO TANTO:
𝑓_𝑎𝑛 ≥ 𝑓_𝑎𝑢
= 4.07m2
119.19tn/m2 ≥ 105.04tn/m2
𝑀𝐸𝑁𝑆𝐼𝑂𝑁 𝑀𝐸𝑁𝑂𝑅)
2.25cm2
𝜌
𝜌 y 𝐾_𝑢
obles del acero de la columna
anasversal que:
con estribo
con sunchos
CUMPLE
As PEDESTAL
NO CUMPLE
As DOWELY
DISEZO DE ZAPATA AISLADA
1. DATOS
COLUMNA
b= 0.35
t= 0.35
CM= 135.64Tn
CV= 46.46Tn
ZAPATA
LONGITUD DE VOLADO
2. DIMENCIONAMIENTO DE LA ZAPATA
2.1.
Pu= 268.87Tn
2.2.
PT 191.20Tn
Az= =
σt 20.00Tn
2.3.
𝐴=√𝐴𝑧+1/2(𝑡−𝑏)
AxB= 9.56m2
B=√𝐴𝑧−1/2(𝑡−𝑏)
A= 3.091933370886
A=B= 3.10m
Replanteamos
Az= 9.61m2
σt >= σcs
σcs = σn
Pu 268.87Tn
wn = Az
=
9.61m2
wn = 27.98tn/m2
σt >= wn
20.00tn/m2 >= 27.98tn/m2 NO CUMPLE
Pu 268.87Tn
wn = Az
=
14.44m2
wn = 18.62tn/m2
σt >= wn
20.00tn/m2 >= 18.62tn/m2 CUMPLE
3. DETERMINACION DE hz
d= 15cm 0.15m
d= 60cm 0.60m
por lo tanto
hz= 70cm
Perimetro
b0=(b+d+t+d)*2
b0= 3.80m
A0=bo*d
Pu= AxBxWn
V0=AxBxWn-(b+d)(d+t)*Wn
V0= 252.07Tn
Esfuerzo Actuante
V0 252.07Tn
vo= =
bo*d 2.28m2
vo= 110.56tn/m2
𝑉𝑐°="1.06∗φ "∗√(𝑓´𝑐)
φ= 0.85
Vc°= 11.92kg/cm2
α= 40
bo
"Vc°= "0.27(2+(𝛼∗𝑑)/"bo
" )∗√(𝑓´𝑐)
𝑚= (𝐴−𝑏)/2 A= 3.80m
b= 0.35m
B= 3.80m
m= 1.725 d= 0.60m
𝑊_𝑛= 18.62tn/m2
𝑉_𝑢=B(m-d)*𝑊_𝑛
𝑉_𝑢= 79.60tn
𝑣_𝑢=𝑉_𝑢/(𝐵∗𝑑)
𝑣_𝑢= 34.91tn/m2
𝑉_𝑢𝑐=0.53∗∅∗√(𝑓´𝑐)
𝑉_𝑢𝑐= 5.96kg/cm2
𝑉_𝑢𝑐= 59.60tn/m2
𝑉_𝑢𝑐≥ 𝑉_𝑢
59.60tn ≥ 79.60tn/m2 OK!
OTRO MÉTODO
𝑉_𝑢𝑐≥ 𝑉_𝑢
59.60tn/m2 ≥𝑉_𝑢/(𝐵∗𝑑)
(𝐵(𝑚−𝑑)∗𝑤_𝑛)/(𝐵∗𝑑)
≥
59.60tn/m2≥ ((𝑚−𝑑)∗𝑤_𝑛)/𝑑
reemplazando
d= 0.41m d= 0.35m
(𝑚∗𝐵)∗𝑊_𝑛
𝑀_11=(𝑚∗𝐵)∗𝑊_𝑛∗𝑚/2
Por lo tanto:
𝑀_11=1/2∗𝑚^2∗𝐵∗𝑊_𝑛
𝑀_11= 105.27Tn.m
𝑀_22=(𝐴∗𝑛)∗𝑊_𝑛∗𝑛/2
𝑀_22=1/2∗𝑛^2∗𝐴∗𝑊_𝑛
𝑀_22= 105.27Tn.m
ACERO
MÉTODO ACI
𝐴_𝑆=𝑀_𝑈/(∅∗𝑓_𝑦∗(𝑑−𝑎/2))
despejamos "a"
a= 5%*d 5%* 45
a= 2.25cm
𝑀_𝑈= 105.27Tn.m
φ= 0.9
fy= 4200.00kg/cm2
d= 60.00m
𝐴_𝑆= 47.30cm2
a= 3.51m
ii). a= 3.51m
𝐴_𝑆= 47.82cm2
ok!
a= 3.55m
MÉTODO TABLAS
𝐾_𝑢=𝑀_𝑢/
i). (𝑏∗𝑑^2 )
𝐾_𝑢= 7.70
𝜌 𝐾_𝑢
0.0020 7.34
x 7.70
0.0022 3.05
𝜌= x= 0.0021
iii). 𝐴_𝑆=𝜌∗𝑏∗𝑑
𝐴_𝑆= 47.88cm2
DISTRIBUCIÓN DE ACERO ( n ; s )
n= Numero de varillas
s= Espaciamiento
Numero de varillas
𝑛=𝐴_𝑆/𝐴_(𝑆1 5/8)
n= 24.19
Le dejamos en:
n= 13.00
Espaciamiento
Lpata = 30cm
Lpata= dobles del acero de la columna
10 ≤𝑠 ≤𝐿𝑝𝑎𝑡𝑎
se recomienda que el S= 15cm
s= de eje a eje
𝑆=(𝐵−2 𝑟𝑒−∅)/(𝑛−1)
25.00cm
s= 30.25cm
16.00cm
Por lo tanto obtenemos tanto en el eje longitudinal como el eje tranasversal que:
𝑓_𝑎𝑢=𝑃_𝑇/𝐴_𝑔
𝑓_𝑎𝑢= 1560.82Tn/m2
SE COGE EL MENOR VALOR DE LOS DOS
Columna con estribo
φ= 0.70
Columna con sunchos
φ= 0.65
1249.50Tn/m2
𝑓_𝑎𝑛=0.85∅𝑓´𝑐c 𝑓_𝑎𝑛=
56986.43Tn/m2
𝑓_𝑎𝑛=0.85∅𝑓´𝑐z∗√(𝐴𝑧/𝐴𝑔)
𝑓_𝑎𝑛=
POR LO TANTO:
𝑓_𝑎𝑛 ≥ 𝑓_𝑎𝑢
= 9.56m2
119.19tn/m2 ≥ 110.56tn/m2
𝑀𝐸𝑁𝑆𝐼𝑂𝑁 𝑀𝐸𝑁𝑂𝑅)
2.25cm2
𝜌
𝜌 y 𝐾_𝑢
obles del acero de la columna
anasversal que:
con estribo
con sunchos
CUMPLE
As PEDESTAL
NO CUMPLE
As DOWELY
CARGA DE SERVICIO CV+CM
PESO ZAPATA 4% *CARGA DE SERVICIO
PESO TOTAL CARGA DE SERVICIO + PESO DE ZAPATA
C.T
Az = l 1.714392875 1.70 m
E.T
PT
Wn 20.1693279412 tn/m^2
Az
CALCULO DE "n"
Es 2000000
n 10.08
Ec 198431.348
Es ELASTICIDAD DEL ACERO
Ec ELASTICIDAD DEL CONCRETO
CALCULO DE "K"
n 10.0790526136
k 0.22
n+(fs/fc) 46.8247718938
CALCULO DE "j"
j 1-(k/3) 0.93
CALCULO DE "m"
m l-n 1.55
0.78
2 2
CALCULO DE "M"
M 1*Wn*m^2 6.06
3.03
2 2
b 1 m
CALCULO DE "d"
d(m) ((M/(1/2*fc*k*j*b)))^0.5 3.03
0.20 0.20
78.673686056
aproximamos multiplos de 5 y en metros
a) cortante utima Vu
Vu Wn*(m-d) 11.59736357
c) b 1 m
d) peralte efectivo Vu
0.275321397 0.3
d Vc°*b
elegimos el mayor aproximamos multiplos de 5 y en metros
4 DISEÑO DE ACERO
M 302855.06
AS
fs*j*d 58479.74082 5.18
a ESPACIAMIENTO
AS VARILLA *b 254
S 49.046081417
AS TOTAL 5.18
1Ø 3/4" @50
4.2 ACERO TRANVERSAL
AS 0.0020*100*d 6
b ESPACIAMIENTO
AS VARILLA *b 254
S 42.333333333
AS TOTAL 6.00
1Ø 3/4" @45
1C + 1D
CM 90.5456175 70.702695
CV 24.48635 12.0799
50
OK SECCIÓN
DIÁMETRO
TRANSV. (cm) 1
6mm 0.60 0.28
8mm 0.80 0.50
P 3/8" 0.95 0.71
12mm 1.20 1.13
1/2" 1.27 1.29
5/8" 1.59 1.99
45
3/4" 1.91 2.84
1" 2.54 5.10
OK 1 3/8" 3.49 10.06
CORTES DE VARILLAS
ÁREA (cm2)
2 3 4 5 6 7
0.56 0.84 1.12 1.40 1.68 1.96
1.00 1.50 2.00 2.50 3.00 3.50
1.42 2.13 2.84 3.55 4.26 4.97
2.26 3.39 4.52 5.65 6.78 7.91
2.58 3.87 5.16 6.45 7.74 9.03
3.98 5.97 7.96 9.95 11.94 13.93
5.68 8.52 11.36 14.20 17.04 19.88
10.20 15.30 20.40 25.50 30.60 35.70
20.12 30.18 40.24 50.30 60.36 70.42
PESO POR
rb w max 0.75rb 0.5rb UND.
ALIGERADOS
METRADOD ECARGAS:
PREDIMENCIONAMIENTO.
h = 25 cm
SENTIDO DE TECHADO DE LA LOSA
CARGA MUERTA
CARGA VIVA
CM D*0.4 = 180
CV D*0.4 = 140
W= 490 Kg/m
ASIGNACION DE COEFICIENTES
CÁCULO DE MOMENTOS:
𝑀_3^−=1/24⋅𝑊⋅𝐿^
2 𝑀_3^−= 510.4167 kg.m
𝑀_(1−2)^+=1/11⋅
𝑊⋅𝐿^2 𝑀_(1−2)^ 1347.5000 kg.m
+=
𝑀_(2−3)^+=1/11⋅ 𝑀_(2−3)^
𝑊⋅𝐿^2 += 1113.63636 kg.m
CÁLCULO DEL d
V1= 1347.5 Kg
V2= 1408.75 Kg
CALCULO DE ACERO.
APOYO EN A
𝑀_𝐴^−= ⋅ 617.6042
APOYO EN B
𝑀_𝐵^−= ⋅ 1500.625
𝐴_𝑆^ = ⋅
0.62622 cm^2
TRTRAMO : A- B
𝑀_𝐴𝐵^+
= 1347.5000
𝐾_𝑈^ = ⋅ 6.7348973 POR TABLA LA CUANTIA ES : P = 0.0019
𝐴_𝑆^ = ⋅
1.69974 cm^2
TRTRAMO : B- C
𝑀_𝐵𝐶^+ 1113.63636
= POR TABLA LA CUANTIA ES : P = 0.0015
𝐾_𝑈^ = ⋅
5.56603083
VERIFICAMOS EL ACERO
𝐴_𝑆𝑚𝑖𝑛^ 0.738045 cm^2
14/(𝑓𝑦^ )⋅𝑏𝑑 −= ⋅
𝐴_𝑆𝑚𝑖𝑛^
−= ⋅
POR LO TANTO :
𝜙 REALES
𝐴_𝑆1^ = ⋅ 0.782775 cm^2 CUMPLE CON ACERO MINIMO 1𝜙
3⁄8^¨ 1 𝜙 1⁄2^¨
𝐴_𝑆2^ = ⋅ 2𝜙
2.0129 cm^2 NO CUMPLE CON ACERO MINIMO 1 𝜙 1⁄2 + 1 𝜙 3⁄8
3⁄8^¨
𝐴_𝑆3^ = ⋅
0.62622 cm^2 CUMPLE CON ACERO MINIMO 1𝜙
3⁄8^¨ 1 𝜙 1⁄2^¨
1 𝜙 1⁄2 + 1 𝜙 1⁄4
𝐴_(1−2)^ 1.69974 cm^2 CUMPLE CON ACERO MINIMO 2𝜙
=⋅ 3⁄8^¨
𝐴_(2−3)^ 1 𝜙 1⁄2 + 1 𝜙 1⁄4
1.3419 cm^2 CUMPLE CON ACERO MINIMO 2𝜙
=⋅ 3⁄8^¨
DISEÑO DE LA VIGA POR CORTE: POR COEFICIENTE ACI.
1) EJE A - D
CARGA MUERTA
Pesos A. Trb. A.V.P Kg/m T/m
P.P.LOSA 350 4.736 0.35 580.16 0.58016
P.P.Viga 2400 0.21 504 0.504
P.P.P.Terminado 100 4.736 473.6 0.4736
P.P. Cielo raso 50 4.736 236.8 0.2368
P.P.Muro 1800 4.736 8524.8 8.5248
TOTAL 10319.36 10.31936
CARGA VIVA
S/C = 250 4.736 1184 1.184
P.P.T.Movil 100 4.736 473.6 0.4736
TOTAL 1.6576
W = 17.2650 T/m
(𝑤_𝑢 𝐿)/2=
VA + = 43.5942 Tn
(𝑤_𝑢 𝐿)/2=
VC -= 49.2053 Tn
(𝑤_𝑢 𝐿)/2=
VD - = 47.9104 Tn
2) Calculamos los cortantes de diseño.
𝑉𝐴/𝑋_1 =(𝑉𝐵−)/(𝐿⋅𝑋_1 )
X1 =
X1 = 2.3488 m
X2 = 𝐿−𝑋_1 X2 = 2.7012 m
(𝑉𝐵+)/𝑋_3 =(𝑉C−)/(𝐿⋅𝑋_3 )
X3 =
X3 = 2.8500 m
X4 = 𝐿−𝑋_3 X4 = 2.8500 m
X4 = 2.9686 m
X5 = 𝐿−𝑋_4 X4 = 2.5814 m
𝑉𝐴/𝑋_1 =𝑉𝑑𝐴/(𝑋1−𝑑)
Cálculo de VdA:
VdA = 33.2006412
(𝑉𝐵−)/𝑋_2 =(𝑉𝑑𝐵−)/(𝑋2−𝑑)
Cálculo de -VdB :
-VdB = 39.739769
: 〖𝑋 3 〗 _ =(𝑉𝑑𝐵+)/(𝑋3−𝑑)
(𝑉𝐵+)/
Cálculo de +VdB
+VdB = 39.536905
VdC : 〖𝑋 4 〗 _ =(𝑉𝑑𝐶−)/(𝑋4−𝑑)
Cálculo de -(𝑉𝐶−)/
-VdC = 39.536905
+VdC = 44.2709291
-VdD = 37.5168972
𝑉_𝑐=0.53√(𝑓^′ 𝐶 ) 𝑏𝜔 𝑑
Vc = 15053.6422
Sabemos que:
𝑉𝑠=𝑉_𝑢/𝜙−𝑉_𝑐
Comparamos: Vud = 33.20064 > 𝜙Vc 12.7956 Por lo tanto la viga necesita estribos
para absorver el esfuerzo
𝑉_𝐴/𝑥_1 =(𝑉_𝑢∕𝜙−𝑉_𝐶)/𝑥𝑐
S ≤ 𝑑/2 S = 28 cm
S max = d/4
𝑠=(𝐴_𝑢 𝑓𝑦 𝑑)/𝑣𝑠
Av = 1.325 cm^2
Xm = 2.00413
Analisis de punto B -
𝑉_𝑐=0.53√(𝑓^′ 𝐶 ) 𝑏𝜔 𝑑
Vc = 15053.6422
Sabemos que:
𝑉𝑠=𝑉_𝑢/𝜙−𝑉_𝑐
Comparamos: Vud = 39.739769 > 𝜙Vc 12.7955958 Por lo tanto la viga necesita estribos
para absorver el esfuerzo
b) Cálculamos ¨Xc¨
𝑉_𝐴/𝑥_1 =(𝑉_𝑢∕𝜙−𝑉_𝐶)/𝑥𝑐
Xc m = 1.82959348
S max = d/4
Av = 1.325 cm^2
Xm = 2.00412643
𝑉_𝑐=0.53√(𝑓^′ 𝐶 ) 𝑏𝜔 𝑑
Vc = 15053.6422
Sabemos que:
𝑉𝑠=𝑉_𝑢/𝜙−𝑉_𝑐
Comparamos: Vud = 39.5369 > 𝜙Vc 12.7956 Por lo tanto la viga necesita estribos
para absorver el esfuerzo
b) Cálculamos ¨Xc¨
𝑉_𝐵/𝑥_3 =(𝑉_𝑢∕𝜙−𝑉_𝐶)/𝑥𝑐
Xc m = 1.9530
S ≤ 𝑑/2 S = 28 cm
S max = d/4
Av = 1.325 cm^2
Xm = 2.35645201
𝑉_𝑐=0.53√(𝑓^′ 𝐶 ) 𝑏𝜔 𝑑
Vc = 15053.6422
Sabemos que:
𝑉𝑠=𝑉_𝑢/𝜙−𝑉_𝑐
Comparamos: Vud = 44.2709 > 𝜙Vc 12.7956 Por lo tanto la viga necesita estribos
para absorver el esfuerzo
b) Cálculamos ¨Xc¨
𝑉_𝐵/𝑥_3 =(𝑉_𝑢∕𝜙−𝑉_𝐶)/𝑥𝑐
Xc m = 2.32639909
S ≤ 𝑑/2 S = 28 cm
S max = d/4
Av = 1.325 cm^2
Xm = 2.5826
Análisis del punto D -
𝑉_𝑐=0.53√(𝑓^′ 𝐶 ) 𝑏𝜔 𝑑
Vc = 15053.6422
Sabemos que:
𝑉𝑠=𝑉_𝑢/𝜙−𝑉_𝑐
Comparamos: Vud = 37.5168972 > 𝜙Vc 12.7955958 Por lo tanto la viga necesita estribos
para absorver el esfuerzo
b) Cálculamos ¨Xc¨
𝑉_𝐵/𝑥_3 =(𝑉_𝑢∕𝜙−𝑉_𝐶)/𝑥𝑐
Xc m = 1.84071
S ≤ 𝑑/2 S = 28 cm
S max = d/4
Av = 1.325 cm^2
1) EJE A - D
CARGA MUERTA
Pesos A. Trb. A.V.P Kg/m T/m
P.P.LOSA 350 2 0.3 210 0.21
P.P.Viga 2400 0.12 288 0.288
P.P.P.Terminado 100 2.3 230 0.23
P.P. Cielo raso 50 2.3 115 0.115
TOTAL 843 0.843
CARGA VIVA
S/C = 250 2.3 575 0.575
P.P.T.Movil 150 2.3 345 0.345
TOTAL 0.92
W = 2.744 T/m
Tn
(𝑤_𝑢 𝐿)/2=
V1 + = 6.8262 Tn
V 2 - 3C + = 1.0000 Tn
X1 = 2.3140 m
X2 = 𝐿−𝑋_1 X2 = 2.6610 m
(𝑉2+)/𝑋_3 =(𝑉3−)/(𝐿⋅𝑋_3 )
X3 =
X3 = 2.2375 m
X4 = 𝐿−𝑋_3 X4 = 2.2375 m
𝑉1/𝑋_1 =𝑉𝑑1/(𝑋1−𝑑)
Cálculo de VdA:
Vd 1 = 5.764192
(𝑉2−)/𝑋_2 =(𝑉𝑑2−)/(𝑋2−𝑑)
Cálculo de -VdB :
-Vd 2 = 6.788122
+VdB〖
(𝑉2+)/
Cálculo de : 𝑋 3 〗 _ =(𝑉𝑑2+)/(𝑋3−𝑑)
+Vd 2 = 5.152236
Cálculo de - VdC〖
(𝑉3−)/ : 𝑋 4 〗 _ =(𝑉𝑑3−)/(𝑋4−𝑑)
-Vd 3 = 5.152236
ANALIZAMOS EL PUNTO ¨1¨
𝑉_𝑐=0.53√(𝑓^′ 𝐶 ) 𝑏𝜔 𝑑
Vc = 8294.864
Sabemos que:
𝑉𝑠=𝑉_𝑢/𝜙−𝑉_𝑐
Comparamos: Vud = 5.764 > 𝜙Vc 7.051 Por lo tanto la viga necesita estribos
para absorver el esfuerzo
𝑉_𝐴/𝑥_1 =(𝑉_𝑢∕𝜙−𝑉_𝐶)/𝑥𝑐
Xc = 0.091265
S ≤ 𝑑/2 S = 18 cm
S max = d/4
Av = 0.6332 cm^2
S = 355.6035 cm NO CUMPLE
𝑠_1=𝐴𝑣𝑓𝑦/(0.2√𝑓𝑐 𝑏) S 2 =(𝐴_𝑢
𝑓𝑦 )/(3.5 𝑏)
S1 = 30.58647 S2 = 25.328
Tomaremo S 2 = 25.328 cm
Xm = 1.118937
Analisis de punto 2 -
𝑉_𝑐=0.53√(𝑓^′ 𝐶 ) 𝑏𝜔 𝑑
Vc = 8294.864
Sabemos que:
𝑉𝑠=𝑉_𝑢/𝜙−𝑉_𝑐
Comparamos: Vud = 6.78812 > 𝜙Vc 7.05063 Por lo tanto la viga necesita estribos
para absorver el esfuerzo
b) Cálculamos ¨Xc¨
𝑉_𝐴/𝑥_1 =(𝑉_𝑢∕𝜙−𝑉_𝐶)/𝑥𝑐
Xc m = 0.275722
S ≤ 𝑑/2 S = 18 cm
S max = d/4
Av = 0.6332 cm^2
S = 102.3527 cm NO CUMPlE
𝑠_1=𝐴𝑣𝑓𝑦/(0.2√𝑓𝑐 𝑏) S 2 =(𝐴_𝑢
𝑓𝑦 )/(3.5 𝑏)
S1 = 30.58647 S2 = 25.328
Tomaremo S 2 = 25.328 cm
Xm = 1.118937
Análisis del punto 2 +
𝑉_𝑐=0.53√(𝑓^′ 𝐶 ) 𝑏𝜔 𝑑
Vc = 8294.864
Sabemos que:
𝑉𝑠=𝑉_𝑢/𝜙−𝑉_𝑐
Comparamos: Vud = 5.15224 > 𝜙Vc 7.05063 Por lo tanto la viga necesita estribos
para absorver el esfuerzo
b) Cálculamos ¨Xc¨
𝑉_𝐵/𝑥_3 =(𝑉_𝑢∕𝜙−𝑉_𝐶)/𝑥𝑐
Xc m = 0.405384
S ≤ 𝑑/2 S = 18 cm
S max = d/4
Av = 0.6332 cm^2
S = 102.3527 cm
𝐴𝑣=(3.5 𝑏𝑤 𝑆)/𝑓𝑥
𝐴𝑣=(3.5 𝑏𝑤 𝑆)/𝑓𝑥 Av = 2.55882 cm
Cálculo del S max:
𝑠_1=𝐴𝑣𝑓𝑦/(0.2√𝑓𝑐 𝑏) S 2 =(𝐴_𝑢
𝑓𝑦 )/(3.5 𝑏)
S1 = 30.58647 S2 = 25.328
Tomaremo S 2 = 25.328 cm
Xm = 1.46603
𝑉_𝑐=0.53√(𝑓^′ 𝐶 ) 𝑏𝜔 𝑑
Vc = 8294.864
Sabemos que:
𝑉𝑠=𝑉_𝑢/𝜙−𝑉_𝑐
Comparamos: Vud = 5.15224 > 𝜙Vc 7.05063 Por lo tanto la viga necesita estribos
para absorver el esfuerzo
b) Cálculamos ¨Xc¨
𝑉_𝐵/𝑥_3 =(𝑉_𝑢∕𝜙−𝑉_𝐶)/𝑥𝑐
Xc m = 0.281943
S ≤ 𝑑/2 S = 18 cm
S max = d/4
Av = 0.6332 cm^2
S = 96.78699 cm
𝑠_1=𝐴𝑣𝑓𝑦/(0.2√𝑓𝑐 𝑏) S 2 =(𝐴_𝑢
𝑓𝑦 )/(3.5 𝑏)
S1 = 30.58647 S2 = 25.328
Tomaremo S 2 = 25.328 cm
Xm = 0.952857
DISEÑO DE LA VIGA POR FLEXIÓN: POR COEFICIENTE ACI.
CARGA MUERTA
Pesos A. Trb. A.V.P Kg/m T/m
P.P.LOSA 350 2.4 0.35 294 0.2940
P.P.Viga 2400 0.21 504 0.504
P.P.P.Terminado 100 2.4 240 0.240
P.P.Muro 1800 2.4 4320 4.320
P.P.Cielo raso 50 5.25 262.5 0.263
TOTAL 5358 5.358
CARGA VIVA
S/C = 250 2.4 600 0.6
P.P.T.Movil 100 2.4 240 0.24
TOTAL 0.84
W = 8.929 T/m
DONDE:
M = Momento
(𝑤_𝑢 𝐿^2)/n =
M = Wu = Carga ultima
L = Longitud de luz
n = Coeficiente
(𝑤_𝑢
MA = 𝐿^2)/16 16.882 Tn-m
=
(𝑤_𝑢
MB= 29.522 Tn-m
𝐿^2)/10
=
(𝑤_𝑢
𝐿^2)/10
=
(𝑤_𝑢
MC-= 𝐿^2)/10 32.145 Tn-m
=
(𝑤_𝑢
MD-= 𝐿^2)/10 20.091 Tn-m
=
(𝑤_𝑢
M A-B = 𝐿^2)/14 19.293 Tn-m
=
(𝑤_𝑢
M B-C = 𝐿^2)/16 20.091 Tn-m
=
(𝑤_𝑢
M C-D = 𝐿^2)/14 22.961 Tn-m
=
𝐴_S= 𝑀𝑢/(𝜙.𝑓𝑦.(𝑑−𝑎/2)𝑎=(𝐴𝑠.𝑓𝑦)/(0.85.(𝑓𝑐.
) 𝑏) )
1). Asumimos el valor inicial ¨ a¨ = d/5. 1). Primera verificación de valor de ¨a¨
a = 11.2
a = 5.95715
As = 8.86126 cm^2
1). Asumimos el valor inicial ¨ a¨ = d/5. 1). Primera verificación de valor de ¨a¨
a = 11.2
a = 10.4176
As = 15.4962 cm^2
1). Asumimos el valor inicial ¨ a¨ = d/5. 1). Primera verificación de valor de ¨a¨
a = 11.2
a = 11.3432
As = 16.873 cm^2
1). Asumimos el valor inicial ¨ a¨ = d/5. 1). Primera verificación de valor de ¨a¨
a = 11.2
a = 7.0895
As = 10.5456 cm^2
1). Asumimos el valor inicial ¨ a¨ = d/5. 1). Primera verificación de valor de ¨a¨
a = 11.2
a = 6.80817
As = 10.1272 cm^2
a = 11.2
a = 7.0895
As = 10.5456 cm^2
a = 11.2
a = 8.10229
As = 12.0522 cm^2
4 𝜙 3/4+2 𝜙 5/8
B 15.36
4 𝜙 3/4+2 𝜙 3/4
C 16.90
4 𝜙 3/4
D 10.10
4 𝜙 3/4
A-B 9.68
4 𝜙 3/4
B-C 10.10
CARGA MUERTA
Pesos A. Trb. A.V.P Kg/m T/m
P.P.LOSA 350 4.736 0.35 580.16 0.5802
P.P.Viga 2400 0.21 504 0.504
P.P.P.Terminado 100 4.736 473.6 0.474
P.P.Muro 1800 4.736 8524.8 8.525
P.P.Cielo raso 50 4.736 236.8 0.237
TOTAL 10082.56 10.319
CARGA VIVA
S/C = 250 4.736 1184 1.184
P.P.T.Movil 100 4.736 473.6 0.4736
TOTAL 1.6576
W = 17.265 T/m
DONDE:
M = Momento
(𝑤_𝑢 𝐿^2)/n =
M = Wu = Carga ultima
L = Longitud de luz
n = Coeficiente
(𝑤_𝑢
MA = 𝐿^2)/16 32.642 Tn-m
=
(𝑤_𝑢
MB= 44.611 Tn-m
𝐿^2)/10
=
(𝑤_𝑢
MC-= 𝐿^2)/10 45.562 Tn-m
=
(𝑤_𝑢
MD-= 𝐿^2)/16 38.846 Tn-m
=
(𝑤_𝑢
𝐿^2)/16
=
(𝑤_𝑢
M A-B = 𝐿^2)/14 37.305 Tn-m
=
(𝑤_𝑢
M B-C = 𝐿^2)/16 38.846 Tn-m
=
(𝑤_𝑢
M C-D = 𝐿^2)/14 44.396 Tn-m
=
1). Asumimos el valor inicial ¨ a¨ = d/5. 1). Primera verificación de valor de ¨a¨
a = 11.2
a = 11.5184
As = 17.133664 cm^2
1). Asumimos el valor inicial ¨ a¨ = d/5. 1). Primera verificación de valor de ¨a¨
a = 11.2
a = 15.7421
As = 23.416373 cm^2
1). Asumimos el valor inicial ¨ a¨ = d/5. 1). Primera verificación de valor de ¨a¨
a = 11.2
a = 16.0777
As = 23.915554 cm^2
1). Asumimos el valor inicial ¨ a¨ = d/5. 1). Primera verificación de valor de ¨a¨
a = 11.2
a = 13.7079
As = 20.390476 cm^2
1). Asumimos el valor inicial ¨ a¨ = d/5. 1). Primera verificación de valor de ¨a¨
a = 11.2
a = 13.1639
As = 19.58133 cm^2
a = 11.2
a = 13.7079
As = 20.390476 cm^2
a = 11.2
a = 15.6662
As = 23.303401 cm^2
4 𝜙 1+2 𝜙 5/8
B 24.75
4 𝜙 1+2 𝜙 5/8
C 25.39
D 21.00 4𝜙1
CARGA MUERTA
Pesos A. Trb. A.V.P Kg/m T/m
P.P.LOSA 350 2.15 0.35 263.375 0.2634
P.P.Viga 2400 0.21 504 0.504
P.P.P.Terminado 100 2.15 215 0.215
P.P.Muro 1800 2.15 3870 3.870
P.P.Cielo raso 50 2.15 107.5 0.108
TOTAL 4852.38 4.852
CARGA VIVA
S/C = 250 2.15 537.5 0.5375
P.P.T.Movil 100 2.15 215 0.215
TOTAL 0.7525
W = 8.073 T/m
DONDE:
M = Momento
(𝑤_𝑢 𝐿^2)/n =
M = Wu = Carga ultima
L = Longitud de luz
n = Coeficiente
(𝑤_𝑢
MA = 𝐿^2)/16 15.262 Tn-m
=
(𝑤_𝑢
MB= 𝐿^2)/10 26.690 Tn-m
=
(𝑤_𝑢
M C - = 𝐿^2)/10 29.061 Tn-m
=
(𝑤_𝑢
M D - = 𝐿^2)/10 18.163 Tn-m
=
(𝑤_𝑢
M A-B = 𝐿^2)/14 17.443 Tn-m
=
(𝑤_𝑢
M B-C = 𝐿^2)/16 18.163 Tn-m
=
(𝑤_𝑢
M C-D = 𝐿^2)/14 20.758 Tn-m
=
𝐴_S= 𝑀𝑢/(𝜙.𝑓𝑦.(𝑑−𝑎/2)𝑎=(𝐴𝑠.𝑓𝑦)/(0.85.(𝑓𝑐.
) 𝑏) )
1). Asumimos el valor inicial ¨ a¨ = d/5. 1). Primera verificación de valor de ¨a¨
a = 11.2
a = 5.385651
As = 8.01116 cm^2
1). Asumimos el valor inicial ¨ a¨ = d/5. 1). Primera verificación de valor de ¨a¨
a = 11.2
a = 9.418212
As = 14.0096 cm^2
1). Asumimos el valor inicial ¨ a¨ = d/5. 1). Primera verificación de valor de ¨a¨
a = 11.2
a = 10.25499
As = 15.2543 cm^2
1). Asumimos el valor inicial ¨ a¨ = d/5. 1). Primera verificación de valor de ¨a¨
a = 11.2
a = 6.409369
As = 9.53394 cm^2
1). Asumimos el valor inicial ¨ a¨ = d/5. 1). Primera verificación de valor de ¨a¨
a = 11.2
a = 6.155029
As = 9.15561 cm^2
a = 11.2
a = 6.409369
As = 9.53394 cm^2
a = 11.2
a = 7.324993
As = 10.8959 cm^2
2). Remplazando el valor de ¨a¨ 2). Sefunda verificación de valor de ¨a¨
4 𝜙 3/4+1 𝜙
B 13.74 5/8
2 𝜙 1+2 𝜙 5/8
C 15.10
4 𝜙 3/4
D 9.07
4 𝜙 3/4
A-B 8.69
4 𝜙 3/4
B-C 9.07
4 𝜙 3/4
C-D 10.46
DISEÑO DE LA VIGA SECUNDARIAS POR FLEXIÓN: POR COEFICIENTE ACI.
CARGA VIVA
S/C = 250 1.3 325 0.325
P.P.T.Movil 150 1.3 195 0.195
TOTAL 0.52
W = 1.707 T/m
DONDE:
M = Momento
(𝑤_𝑢 𝐿^2)/n =
M = Wu = Carga ultima
L = Longitud de luz
n = Coeficiente
(𝑤_𝑢
M 1 = 𝐿^2)/16 3.228 Tn
=
(𝑤_𝑢
M 2 = 𝐿^2)/9= 5.228 Tn
(𝑤_𝑢
M 3 - = 𝐿^2)/16 2.668 Tn
=
(𝑤_𝑢
M 1-2 = 𝐿^2)/14 3.689 Tn
=
1). Asumimos el valor inicial ¨ a¨ = d/5. 1). Primera verificación de valor de ¨a¨
a = 7.2
a = 2.536786
As = 3.234403 cm^2
1). Asumimos el valor inicial ¨ a¨ = d/5. 1). Primera verificación de valor de ¨a¨
a = 7.2
a = 4.109175
As = 5.239198 cm^2
1). Asumimos el valor inicial ¨ a¨ = d/5. 1). Primera verificación de valor de ¨a¨
a = 7.2
a = 2.096518
As = 2.67306 cm^2
1). Asumimos el valor inicial ¨ a¨ = d/5. 1). Primera verificación de valor de ¨a¨
a = 7.2
a = 2.899184
As = 3.69646 cm^2
1). Asumimos el valor inicial ¨ a¨ = d/5. 1). Primera verificación de valor de ¨a¨
a = 7.2
a = 2.899184
As = 3.69646 cm^2
2 4.93 2 𝜙 5/8 + 1 𝜙
1/2
2 𝜙 5/8
3 2.43
2 𝜙 5/8
1. - 2 3.40
2 𝜙 5/8
2. - 3 3.40
DISEÑO DE LA VIGA SECUNDARIAS POR FLEXIÓNE: POR COEFICIENTE ACI.
CARGA VIVA
S/C = 250 2.3 575 0.575
P.P.T.Movil 150 2.3 345 0.345
TOTAL 0.92
W = 2.744 T/m
DONDE:
M = Momento
(𝑤_𝑢 𝐿^2)/n =
M = Wu = Carga ultima
L = Longitud de luz
n = Coeficiente
(𝑤_𝑢
M 1 = 𝐿^2)/16 5.188 Tn
=
(𝑤_𝑢
M 2 = 𝐿^2)/9= 8.404 Tn
(𝑤_𝑢
M 3 - = 𝐿^2)/16 4.288 Tn
=
(𝑤_𝑢
M 1-2 = 𝐿^2)/14 5.929 Tn
=
1). Asumimos el valor inicial ¨ a¨ = d/5. 1). Primera verificación de valor de ¨a¨
a = 7.2
a = 4.0777
As = 5.19907 cm^2
1). Asumimos el valor inicial ¨ a¨ = d/5. 1). Primera verificación de valor de ¨a¨
a = 7.2
a = 6.6052
As = 8.42163 cm^2
1). Asumimos el valor inicial ¨ a¨ = d/5. 1). Primera verificación de valor de ¨a¨
a = 7.2
a = 3.37
As = 4.29675 cm^2
1). Asumimos el valor inicial ¨ a¨ = d/5. 1). Primera verificación de valor de ¨a¨
a = 7.2
a = 4.66023
As = 5.94179 cm^2
1). Asumimos el valor inicial ¨ a¨ = d/5. 1). Primera verificación de valor de ¨a¨
a = 7.2
a = 4.66023
As = 5.94179 cm^2
3 𝜙 3/4
2 8.31
3 𝜙 5/8
3 3.99
3 𝜙 5/8
1. - 2 5.65
3 𝜙 5/8
2. - 3 5.65