Está en la página 1de 26

DISEÑO DE LOSA ALIGERADA e = 0.

25 m

1.00.00 DATOS
h PP kg/m² L máx
f 'c = 210 kg/cm² 0.17 280 ln ≤ 4
f 'y = 4200 kg/cm² 0.20 300 4 ≤ ln ≤ 5.5
γC= 2400 kg/m³ 0.25 350 5 ≤ ln ≤ 6.5
0.30 420 6 ≤ ln ≤ 7.5
2.00.00 CARGAS

2.01.00 CARGA MUERTA


Peso propio = 300 kg/m² (e = 0.20 m) W= CM+ CV= 900
Tabiqueria = 210 kg/m² Wu= 1.4CM + 1.7CV
Porcelanato = 40 kg/m²
Terminado = 100 kg/m² CM= 260 kg/m
650 CV= 100 kg/m
2.02.00 CARGA VIVA
Aulas = 250 kg/m² (en techos inclinado)

3.00.00 CARGA POR VIGUETA


b

b'

b= 0.40 m
b' = 0.10 m
e= 0.05 m
h= 0.20 m

Area = 0.04 m²
Volumen = 0.04 m³

Area de una vigueta = 0.40 m²

3.01.00 CARGA MUERTA


Peso propio = 300 kg/m² (e = 0.20 m)
Tabiqueria = 210 kg/m²
Porcelanato = 40 kg/m²
Terminado = 100 kg/m²
650
3.02.00 CARGA VIVA
Aulas = 250 kg/m² (en techos inclinado)
Techo = 100 kg /ml

4.00.00 CALCULO DE MOMENTOS (SAP 2000 V14)

5.00.00 DISEÑO EN CONCRETO ARMADO DE LAS VIGUETAS

5.01.00 DISEÑO POR FLEXION

5.01.01 ACERO MINIMO

As min = 0.7 ( f 'c )^ 0.5 b d / f y

As min = 0.5314 cm²

5.01.02 ACERO MAXIMO

As max = 0.85 Β1 f 'C / f 'y (6000 / (6000 + f 'y))

As max = 3.5063 cm²

5.01.03 ACERO COLOCADO

Mu = Ø b d² f 'C ω ( 1 - 0.59 ω)

Mu = 0.80 Tn - m dato obtenido del SAP2000

Mu = As fy (d - a/2)
a = As fy / ( 0.85 f 'C b)

d 22 cm
a 4.4 cm

a As ( cm²) a As ( cm²) a As ( cm²) a As ( cm²)


4.4 1.0689 2.515 0.9620 2.264 1.0142 2.386 1.0172 cm²

Vamos a asumir Ø 5/8 " → 1.979 cm²


Aseguramos Asmin y Asb
1Ø1/2"+1Ø3/8" 1.98 cm²

5.02.00 DISEÑO POR CORTANTE


VC = 1.1 ( 0.53 ( f ' C )^ 0.5 . b . d )

VC = 1858.66 kg
VC = 1.86 Tn

Ya que ningun cortante supera el Vc calculado, entonces no amerita mayores cálculos.

Vn = 1.24 Tn Ok
z= 0.4 v= 0.3111
u= 1
C= 2.5
S= 1.4
r= 4.5
Esf. Terreno= 0.80 kg/cm2 8.00 tn/m2 #PISO

CIMIENTO CORRIDO
ml Altura P.e Ancho Espesor
PESO LOSA ALIGERADA E=0.20 1.00 210.00 1.50
PESO DE VIGA SOLERA 1.00 2400.00 0.30 0.25
PESO DE MURO 1.00 2.40 1800.00 0.13
PESO DE SOBRECIMIENTO 1.00 2000.00 0.50 0.13

SOBRECARGA 200.00 2.00 2.50

PESO PARCIAL (P.P)


P.P CIMIENTO 10%(P.P)

TOTAL (kg)

ANCHO DE CIMIENTO= 90.197 cm


3.00

PESO
945.00
540.00
1684.80
390.00

3000.00

6559.80
655.98

7215.78 104.4125
DESCRIPCION ØAs VIGUETAS LONGITUD #VECES ALTURA

1/2" 10 1.5 1.00


EJE B-D/1-5 10 2.65 1.00
10 2.35 1.00
10 2.35 1.00
10 1.5 1.00
10 4.25 1.00
10 4.65 1.00

1/2" 8 1.5 1.00


EJE A-B/1-5 8 2.65 1.00
8 2.35 1.00
8 2.35 1.00
8 1.5 1.00
8 4.25 1.00
8 4.65 1.00

1/2" 6 1.5 2.00


EJE 5-7/A-B 6 3.85 1.00

EJES CORTOS
EJE 1/A-D 1/2" 5.00 9.00 6.00
EJE 2/A-D 1/2" 5.00 9.00 6.00
EJE 3/A-D 1/2" 5.00 9.00 6.00
EJE 4/A-D 1/2" 5.00 9.00 6.00
EJE 5/A-D 1/2" 5.00 9.00 6.00
EJE 6/B-D 1/2" 5.00 5.65 6.00
EJE 7/A-B 1/2"

VOLADO
EJE 1/C-D 1/2" 1.00 2.00 1.00
EJE 2/C-D 1/2" 1.00 2.00 1.00
EJE 3/C-D 1/2" 1.00 2.00 1.00
EJE 4/C-D 1/2" 1.00 2.00 1.00
EJE 5/C-D 1/2" 1.00 2.00 1.00
EJE 6/C-D 1/2" 1.00 1.00
EJE A,B,C/1-5 1/2" 1.00 6.95 2.00
VIGA 1/2" 1.00 9.00 2.00
1/2" 1.00 2.70 2.00

EJE A,B,C/1-5 1/2" 1.00 5.00 2.00


VIGA 1/2" 1.00 5.50 2.00
1/2" 1.00 8.65 2.00

EJE D/1-5 1/2" 3.00 6.95 2.00


VIGA 1/2" 3.00 9.00 2.00
1/2" 3.00 2.70 2.00

EJE D/1-5 1/2" 3.00 5.00 3.00


VIGA 1/2" 3.00 5.50 3.00
1/2" 3.00 8.65 3.00

EJE 1/A-D 1/2" 5.00 9.00 3.00


VIGA 1/2" 5.00 2.00 1.00

1/2" 5.00 9.00 3.00

EJE 5/B-D 1/2" 1.00 5.35 3.00


VIGA 1/2" 1.00 2.00 1.00

1/2" 1.00 9.00 3.00

ACERO LOSA ALIGERADA

EJE A-B/1-5 3/8" 8 2.65 1.00


8 1.85 1.00
8 8.65 1.00
8 4.75 1.00
8 1.85 1.00

EJE B-D/1-5 3/8" 10 2.65 1.00


10 1.85 1.00
10 8.65 1.00
10 4.75 1.00
10 1.85 1.00

EJE 5-7/A-B 3/8" 6 2.4 1.00

ESTRIBOS 3/8" 1.00 1.10 8.00


VOLADO

VARILLAS TEMPERATURA
1/4" 5.00 8.70 63.00

ESTRIBOS
1/4" 1.00 1.10 77.00
1/4" 4.00 1.10 23.00

EJE A 1/4" 1.00 1.10 127


EJE B 1/4" 1.00 1.10 127

EJE C 1/4" 1.00 1.10 105


EJE D 1/4" 1.00 1.10 105

METRADO DE CONCRETO
VIGAS

EJE 1-5/A-D 0.25 0.30 8.80 5.00


0.25 0.30 5.15 1.00
0.25 0.30 17.90 4.00
BOLS/M3
9.00

COLUMNA
0.25 3.00 2.70
BOLS/M3
9.00
LOSA ALIGERADA 12.41
12.92
12.75
BOL/M3 11.40
9.50 11.40

12.54
13.06
12.95
11.42
11.56

3.65
3.80
3.75
3.35 VOL M3/M2
110.63 0.10 11.063

UND/M2

TARRAJEO EN CIELO RASO:


BOLS/M2
0.18

LADRILLO DE TECHO 110.63 8.33

LADRILLO DE PARED 1.00 12.49 2.70

UND/M2
45.00

TARRAJEO DE PARED 1.00 12.50 2.00 2.70


1:05
BOL/M2
0.25

ASENTADO DE PARED 1.00 12.49 2.70


1:05
BOL/M2
0.15
FALSO PISO DE AULAS Y SS.HH 1.00 1.00 1.00

BOL/M2
0.50

CONTRAPISO DE AULAS Y SS.HH 1.00 1.00 1.00


1:05
BOL/M2
0.25

PIEDRA CHANCADA 0.53 M3 11.06


ARENA GRUESA 0.52 M3 11.06

AGUA 0.19 M3 11.06

CIMIENTO 7.3 0.60 0.80 3.50


10.4 0.60 0.80 4.99
8.50
BOL/M3
2.66

SOBRECIMINETO 0.15 7.3 0.40


0.15 10.4 0.40
BOL/M3
3.65

SODIMAC FLETE

Ø1/4" 371.9 6.80


Ø3/8" 29.48 14.03
Ø1/2" 218.43 25.24

CEMENTO AZUL 100.0 22.70


CEMENTO ROJO 50.0 21.30

FERRETERIA FLETE
Ø1/4" 371.9 6.80
Ø3/8" 29.5 16.10
Ø1/2" 218.4 25.50

CEMENTO AZUL 100.0 23.00


CEMENTO ROJO 50.0 22.50
PARCIAL TOTAL SALDO
(ML) (ML)

15.00
26.50
23.50
23.50
15.00
42.50
46.50

12.00
21.20
18.80
18.80
12.00
34.00
37.20

270.00
270.00
270.00
270.00
270.00
169.50

2.00
2.00
2.00
2.00
2.00
0.00
13.90
18.00
5.40
0.00
10.00
11.00
17.30

41.70
54.00
16.20
0.00
45.00
49.50
77.85

2235.85 248.43 30 218.43

21.2
14.8
69.2
38.00
14.8

26.5
18.5
86.5
47.5
18.5

8.80

364.3 40.48 11 29.48

2740.50

84.70
101.20

139.70
139.70

115.50
115.50

3436.80 381.87 10 371.87

3.30
0.39
5.37

9.06 81.51 BOLsas

2.025 18.23 BOLsas


M3 105.10 BOLsas

110.63 19.91 BOLsas

921.55 unidades -1000.00 -78.45

33.72 1,517.54 unidades 1517.54

67.50 16.88 BOLsas


m2

33.72 5.06 BOLsas


m2
20.00 10.00 BOLsas
m2

20.00 5.00 BOLsas


m2

5.86 M3 TOTAL DE CEMENTO:


5.75 M3
VIGAS TECHO :
2.06 M3 COLUMNAS
LOSA ALIGERADA :
FALSO PISO AULAS:
CONTRAPISO AULAS:
ASENTADO LADRILLO:
22.60 BOLsas TARRAJEO PARED:
TARRAJEO CIELO RASO:
CIMIENTO:
SOBRECIMIENTO:

0.44
0.62
1.06 3.88 BOLsas
II EE
II.SS
OBRAS
ACERO

2528.69
413.57
5513.12

2270.00
1065.00

8455.38 3335.00
2528.69
474.59
5569.91

2300.00
1125.00

8573.19 3425.00 90.00

117.81
OTAL DE CEMENTO:

IGAS TECHO : 81.51


18.23
OSA ALIGERADA : 105.10
ALSO PISO AULAS: 10.00
ONTRAPISO AULAS: 5.00
SENTADO LADRILLO: 16.88
ARRAJEO PARED: 5.06
ARRAJEO CIELO RASO: 19.91
22.60
OBRECIMIENTO: 3.88

288.15 21.50 6195.27

MANO OBRA MATERIAL TOTAL


400 200 600
400 300 700
7000 6195.27 13195.27
8455.38 8455.38

22,950.66
GASTOS Cantidad Precio Total

Adelanto a Maquen 30.01.15 1000.00


Planos de obra 30.01.15 12.00
Planos de obra final 02.02.15 26.00

Cemento MS (azul) 03.02.15 15.00 23.00 345.00


Acero Ø 1/4" 03.02.15 10.00 6.80 68.00
Transporte local 03.02.15 10.00

Clavos 2" 5.00 5.00 25.00


Clavos 2-1/2" 2.00 5.00 10.00

Ladriillo techo H=15cm 03.02.15 1000 1.700 1700

3196.00