Documentos de Académico
Documentos de Profesional
Documentos de Cultura
• ESQUEMA
E
ESCUELA PROFESIONAL DE INGENIERIA CIVIL
• COLUMNA
XX YY C. AXIAL MTO
MURO CASO
(m) (m) (ton) (ton*m)
P-1 DEAD 1.88 7.13 216.38 0.39
P-1 LIVE 1.88 7.13 45.61 -0.06
P-1 XX 1.88 7.13 5.30 29.86
P-1 YY 1.88 7.13 120.24 3.08
P-2 DEAD 1.20 2.00 59.61 -0.43
P-2 LIVE 1.20 2.00 11.06 -0.17
P-2 XX 1.20 2.00 27.87 0.19
P-2 YY 1.20 2.00 28.95 0.79
P-3 DEAD 1.20 0.15 47.74 0.29
P-3 LIVE 1.20 0.15 6.66 0.13
P-3 XX 1.20 0.15 12.77 2.78
P-3 YY 1.20 0.15 87.21 3.42
P-4 DEAD 0.18 1.08 24.15 -1.07
P-4 LIVE 0.18 1.08 3.98 -0.39
P-4 XX 0.18 1.08 8.87 0.01
P-4 YY 0.18 1.08 23.25 6.07
P-5 DEAD 3.58 1.08 28.55 -0.52
P-5 LIVE 3.58 1.08 4.79 -0.17
P-5 XX 3.58 1.08 30.61 0.13
P-5 YY 3.58 1.08 28.96 3.30
P-6 DEAD 0.18 4.00 59.73 1.51
P-6 LIVE 0.18 4.00 12.42 0.50
P-6 XX 0.18 4.00 52.82 0.08
P-6 YY 0.18 4.00 29.35 4.56
P-7 DEAD 3.58 4.00 64.27 1.46
P-7 LIVE 3.58 4.00 12.34 0.42
P-7 XX 3.58 4.00 62.71 0.09
P-7 YY 3.58 4.00 12.08 4.65
• CONSIDERACIONES DE DISEÑO
✓ Capacidad portante del suelo : 2.35 kg/cm2
✓ Resistencia a la compresión del Concreto : 210 kg/cm2
✓ Resistencia de fluencia del Acero : 4200 kg/cm2
✓ Altura de la zapata : 0.80 m
✓ Peralte de la zapata : 0.70 m
E
ESCUELA PROFESIONAL DE INGENIERIA CIVIL
2. PREDIMENSIONAMIENTO
XX YY C. AXIAL MTO P x XX P x YY
MURO CASO
(m) (m) (ton) (ton*m) (ton*m) (ton*m)
P-1 DEAD 1.88 7.13 216.38 0.39 406.79 1542.79
P-1 LIVE 1.88 7.13 45.61 -0.06 85.75 325.20
P-1 XX 1.88 7.13 5.30 29.86 9.96 37.79
P-1 YY 1.88 7.13 120.24 3.08 226.05 857.31
P-2 DEAD 1.20 2.00 59.61 -0.43 71.53 119.22
P-2 LIVE 1.20 2.00 11.06 -0.17 13.27 22.12
P-2 XX 1.20 2.00 27.87 0.19 33.44 55.74
P-2 YY 1.20 2.00 28.95 0.79 34.74 57.90
P-3 DEAD 1.20 0.15 47.74 0.29 57.29 7.16
P-3 LIVE 1.20 0.15 6.66 0.13 7.99 1.00
P-3 XX 1.20 0.15 12.77 2.78 15.32 1.92
P-3 YY 1.20 0.15 87.21 3.42 104.65 13.08
P-4 DEAD 0.18 1.08 24.15 -1.07 4.35 26.08
P-4 LIVE 0.18 1.08 3.98 -0.39 0.72 4.30
P-4 XX 0.18 1.08 8.87 0.01 1.60 9.58
P-4 YY 0.18 1.08 23.35 6.07 4.20 25.22
P-5 DEAD 3.58 1.08 28.55 -0.52 102.21 30.83
P-5 LIVE 3.58 1.08 4.79 -0.17 17.15 5.17
P-5 XX 3.58 1.08 30.61 0.13 109.58 33.06
P-5 YY 3.58 1.08 28.96 3.30 103.68 31.28
P-6 DEAD 0.18 4.00 59.73 1.51 10.75 238.92
P-6 LIVE 0.18 4.00 12.42 0.50 2.24 49.68
P-6 XX 0.18 4.00 52.82 0.08 9.51 211.28
P-6 YY 0.18 4.00 29.35 4.56 5.28 117.40
P-7 DEAD 3.58 4.00 64.27 1.46 230.09 257.08
P-7 LIVE 3.58 4.00 12.34 0.42 44.18 49.36
P-7 XX 3.58 4.00 62.71 0.09 224.50 250.84
P-7 YY 3.58 4.00 12.08 4.65 43.25 48.32
Σ= 1128.38 Σ= 1980.07 4429.63
∑ 𝑃 ∗ 𝑋𝐼 1,980.07 𝑡𝑜𝑛 ∗ 𝑚
𝑋̅ = = = 1.75 𝑚
∑ 𝑃𝐼 1,128.38 𝑡𝑜𝑛
3.1. CASOS:
𝑡𝑜𝑛
𝑃𝑍𝐴𝑃 = 4.50 𝑚 ∗ 7.90 𝑚 ∗ 0.80 𝑚 ∗ 2.4 = 68.26 𝑡𝑜𝑛
𝑚3
𝑃𝑆𝐼𝑆𝑀𝑂 𝑋−𝑋 (+) = 𝑃𝐶𝑀 + 𝑃𝐶𝑉 + 𝑃𝑍𝐴𝑃 + 𝑃𝑋𝑋 = 500.43 + 96.86 + 68.26 + 200.95 = 866.50 𝑡𝑜𝑛
𝑀𝑋𝑋 33.14
𝑀𝑆𝐼𝑆𝑀𝑂 𝑋−𝑋 (+) = 𝑀𝐶𝑀 + 𝑀𝐶𝑉 + = 1.63 + 0.26 + = 28.402 𝑡𝑜𝑛 ∗ 𝑚
1.25 1.25
𝑃𝑆𝐼𝑆𝑀𝑂 𝑋−𝑋 (+) 𝑀𝑆𝐼𝑆𝑀𝑂 𝑋−𝑋 (+) ∗ 𝑋̅ 866.50 𝑡𝑜𝑛 28.402 𝑡𝑜𝑛 ∗ 𝑚 ∗ 1.75 𝑚 𝑡𝑜𝑛
𝑇1 = + = + = 25.20 2
𝐴𝑍𝐴𝑃 𝑙𝑜𝑛𝑔 𝑧𝑎𝑝𝑌𝑌 ∗ (𝑙𝑜𝑛𝑔 𝑧𝑎𝑝𝑋𝑋 )3 35.55 𝑚2 7.90 𝑚 ∗ (4.50 𝑚)3 𝑚
12 12
𝑃𝑆𝐼𝑆𝑀𝑂 𝑋−𝑋 (+) 𝑀𝑆𝐼𝑆𝑀𝑂 𝑋−𝑋 (+) ∗ 𝑋̅ 866.50 𝑡𝑜𝑛 28.402 𝑡𝑜𝑛 ∗ 𝑚 ∗ 1.75 𝑚 𝑡𝑜𝑛
𝑇2 = − = − 3 = 23.55
𝐴𝑍𝐴𝑃 𝑙𝑜𝑛𝑔 𝑧𝑎𝑝𝑌𝑌 ∗ (𝑙𝑜𝑛𝑔 𝑧𝑎𝑝𝑋𝑋 )3 35.55 𝑚2 7.90 𝑚 ∗ (4.50 𝑚) 𝑚2
12 12
E
ESCUELA PROFESIONAL DE INGENIERIA CIVIL
𝑃𝑆𝐼𝑆𝑀𝑂 𝑋−𝑋 (−) = 𝑃𝐶𝑀 + 𝑃𝐶𝑉 + 𝑃𝑍𝐴𝑃 − 𝑃𝑋𝑋 = 500.43 + 96.86 + 68.26 − 200.95 = 464.600 𝑡𝑜𝑛
𝑀𝑋𝑋 33.14
𝑀𝑆𝐼𝑆𝑀𝑂 𝑋−𝑋 (+) = 𝑀𝐶𝑀 + 𝑀𝐶𝑉 − = 1.63 + 0.26 − = −24.622 𝑡𝑜𝑛 ∗ 𝑚
1.25 1.25
𝑃𝑆𝐼𝑆𝑀𝑂 𝑋−𝑋 (−) 𝑀𝑆𝐼𝑆𝑀𝑂 𝑋−𝑋 (−) ∗ 𝑋̅ 464.600 𝑡𝑜𝑛 −24.622 𝑡𝑜𝑛 ∗ 𝑚 ∗ 1.75 𝑚 𝑡𝑜𝑛
𝑇1 = + 3 = 2
+ 3 = 12.35 2
𝐴𝑍𝐴𝑃 𝑙𝑜𝑛𝑔 𝑧𝑎𝑝𝑌𝑌 ∗ (𝑙𝑜𝑛𝑔 𝑧𝑎𝑝𝑋𝑋 ) 35.55 𝑚 7.90 𝑚 ∗ (4.50 𝑚) 𝑚
12 12
𝑃𝑆𝐼𝑆𝑀𝑂 𝑋−𝑋 (+) 𝑀𝑆𝐼𝑆𝑀𝑂 𝑋−𝑋 (−) ∗ 𝑋̅ 464.600 𝑡𝑜𝑛 −24.622 𝑡𝑜𝑛 ∗ 𝑚 ∗ 1.75 𝑚 𝑡𝑜𝑛
𝑇2 = − 3 = 2
− 3 = 13.79 2
𝐴𝑍𝐴𝑃 𝑙𝑜𝑛𝑔 𝑧𝑎𝑝𝑌𝑌 ∗ (𝑙𝑜𝑛𝑔 𝑧𝑎𝑝𝑋𝑋 ) 35.55 𝑚 7.90 𝑚 ∗ (4.50 𝑚) 𝑚
12 12
𝑃𝑆𝐼𝑆𝑀𝑂 𝑌−𝑌 (+) = 𝑃𝐶𝑀 + 𝑃𝐶𝑉 + 𝑃𝑍𝐴𝑃 + 𝑃𝑌𝑌 = 500.43 + 96.86 + 68.26 + 330.14 = 995.69 𝑡𝑜𝑛
𝑀𝑌𝑌 25.87
𝑀𝑆𝐼𝑆𝑀𝑂 𝑌−𝑌 (+) = 𝑀𝐶𝑀 + 𝑀𝐶𝑉 + = 1.63 + 0.26 + = 22.59 𝑡𝑜𝑛 ∗ 𝑚
1.25 1.25
𝑃𝑆𝐼𝑆𝑀𝑂 𝑌−𝑌 (+) 𝑀𝑆𝐼𝑆𝑀𝑂 𝑌−𝑌 (+) ∗ 𝑌̅ 995.69 𝑡𝑜𝑛 22.59 𝑡𝑜𝑛 ∗ 𝑚 ∗ 3.93 𝑚 𝑡𝑜𝑛
𝑇1 = + 3 = 2
+ 3 = 28.49 2
𝐴𝑍𝐴𝑃 𝑙𝑜𝑛𝑔 𝑧𝑎𝑝𝑋𝑋 ∗ (𝑙𝑜𝑛𝑔 𝑧𝑎𝑝𝑌𝑌 ) 35.55 𝑚 4.50 𝑚 ∗ (7.90 𝑚) 𝑚
12 12
𝑃𝑆𝐼𝑆𝑀𝑂 𝑌−𝑌 (+) 𝑀𝑆𝐼𝑆𝑀𝑂 𝑌−𝑌 (+) ∗ 𝑌̅ 995.69 𝑡𝑜𝑛 22.59 𝑡𝑜𝑛 ∗ 𝑚 ∗ 3.93 𝑚 𝑡𝑜𝑛
𝑇2 = − 3 = 2
− 3 = 27.53 2
𝐴𝑍𝐴𝑃 𝑙𝑜𝑛𝑔 𝑧𝑎𝑝𝑋𝑋 ∗ (𝑙𝑜𝑛𝑔 𝑧𝑎𝑝𝑌𝑌 ) 35.55 𝑚 4.50 𝑚 ∗ (7.90 𝑚) 𝑚
12 12
𝑃𝑆𝐼𝑆𝑀𝑂 𝑌−𝑌 (−) = 𝑃𝐶𝑀 + 𝑃𝐶𝑉 + 𝑃𝑍𝐴𝑃 − 𝑃𝑌𝑌 = 500.43 + 96.86 + 68.26 − 330.14 = 335.41 𝑡𝑜𝑛
𝑀𝑌𝑌 25.87
𝑀𝑆𝐼𝑆𝑀𝑂 𝑌−𝑌 (−) = 𝑀𝐶𝑀 + 𝑀𝐶𝑉 − = 1.63 + 0.26 − = −18.81 𝑡𝑜𝑛 ∗ 𝑚
1.25 1.25
𝑃𝑆𝐼𝑆𝑀𝑂 𝑌−𝑌 (−) 𝑀𝑆𝐼𝑆𝑀𝑂 𝑌−𝑌 (−) ∗ 𝑌̅ 335.41 𝑡𝑜𝑛 −18.81 𝑡𝑜𝑛 ∗ 𝑚 ∗ 3.93 𝑚 𝑡𝑜𝑛
𝑇1 = + 3 = 2
+ 3 = 9.04 2
𝐴𝑍𝐴𝑃 𝑙𝑜𝑛𝑔 𝑧𝑎𝑝𝑋𝑋 ∗ (𝑙𝑜𝑛𝑔 𝑧𝑎𝑝𝑌𝑌 ) 35.55 𝑚 4.50 𝑚 ∗ (7.90 𝑚) 𝑚
12 12
𝑃𝑆𝐼𝑆𝑀𝑂 𝑌−𝑌 (−) 𝑀𝑆𝐼𝑆𝑀𝑂 𝑌−𝑌 (−) ∗ 𝑌̅ 335.41 𝑡𝑜𝑛 −18.81 𝑡𝑜𝑛 ∗ 𝑚 ∗ 3.93 𝑚 𝑡𝑜𝑛
𝑇2 = − 3 = 2
− 3 = 9.83 2
𝐴𝑍𝐴𝑃 𝑙𝑜𝑛𝑔 𝑧𝑎𝑝𝑋𝑋 ∗ (𝑙𝑜𝑛𝑔 𝑧𝑎𝑝𝑌𝑌 ) 35.55 𝑚 4.50 𝑚 ∗ (7.90 𝑚) 𝑚
12 12
E
ESCUELA PROFESIONAL DE INGENIERIA CIVIL
3.2. COMPARANDO
𝑡𝑜𝑛 𝑡𝑜𝑛
𝑇1 = 28.49 𝑇2 = 27.53
𝑚2 𝑚2
𝑡𝑜𝑛 𝑡𝑜𝑛
𝑇1 = 9.04 𝑇2 = 9.83
𝑚2 𝑚2
o Mínimo T debe de ser mayor o igual que cero, 9.04 ton/m2 ≥ 0 ton/m2, si se cumple, y se cumple
que el T máximo debe satisfacer:
4.1. DIAGRAMA
E
ESCUELA PROFESIONAL DE INGENIERIA CIVIL
o Hallando el Pu max
𝑃𝑚𝑎𝑥 = 447.73 𝑡𝑜𝑛
o Perímetro de Punzonamiento
𝑏𝑂 = 𝑢𝑠𝑎𝑛𝑑𝑜 𝑝𝑒𝑟í𝑚𝑒𝑡𝑟𝑜 𝑑𝑒 𝐴𝑐𝑎𝑑 = 10.66 𝑚
o Área de Punzonamiento
𝐴𝑂 = 𝑢𝑠𝑎𝑛𝑑𝑜 á𝑟𝑒𝑎 𝑑𝑒 𝐴𝑐𝑎𝑑 = 4.16 𝑚2
𝑃1 = 1.4 ∗ (59.61 + 47.74 + 24.15 + 59.73) + 1.7 ∗ (11.06 + 6.66 + 3.98 + 12.42)
𝑃1 = 325.73 𝑡𝑜𝑛
E
ESCUELA PROFESIONAL DE INGENIERIA CIVIL
𝑃2 = 384.02 𝑡𝑜𝑛
𝑃3 = 179.36 𝑡𝑜𝑛
𝑃4 = 450.55 𝑡𝑜𝑛
𝑃5 = 112.83 𝑡𝑜𝑛
o Hallando el Pu max
𝑃𝑚𝑎𝑥 = 450.55 𝑡𝑜𝑛
o Perímetro de Punzonamiento
𝑏𝑂 = 𝑢𝑠𝑎𝑛𝑑𝑜 𝑝𝑒𝑟í𝑚𝑒𝑡𝑟𝑜 𝑑𝑒 𝐴𝑐𝑎𝑑 = 22.10 𝑚
o Área de Punzonamiento
𝐴𝑂 = 𝑢𝑠𝑎𝑛𝑑𝑜 á𝑟𝑒𝑎 𝑑𝑒 𝐴𝑐𝑎𝑑 = 9.58 𝑚2
𝑃1 = 159.07 𝑡𝑜𝑛
𝑃2 = 230.76 𝑡𝑜𝑛
𝑃3 = 44.12 𝑡𝑜𝑛
𝑃4 = 174.20 𝑡𝑜𝑛
𝑃5 = 92.12 𝑡𝑜𝑛
o Hallando el Pu max
𝑃𝑚𝑎𝑥 = 230.76 𝑡𝑜𝑛
E
ESCUELA PROFESIONAL DE INGENIERIA CIVIL
o Perímetro de Punzonamiento
𝑏𝑂 = 𝑢𝑠𝑎𝑛𝑑𝑜 𝑝𝑒𝑟í𝑚𝑒𝑡𝑟𝑜 𝑑𝑒 𝐴𝑐𝑎𝑑 = 13.76 𝑚
o Área de Punzonamiento
𝐴𝑂 = 𝑢𝑠𝑎𝑛𝑑𝑜 á𝑟𝑒𝑎 𝑑𝑒 𝐴𝑐𝑎𝑑 = 5.78 𝑚2
𝑘𝑔 𝑘𝑔 𝑘𝑔 𝑡𝑜𝑛
𝐸𝑠𝑓 𝑝𝑢𝑛𝑧𝑍𝐴𝑃 = 1.10 ∗ √𝑓 ′ 𝑐 ( 2
) = 1.10 ∗ √210 2 = 15.94 2 ≈ 159.41 2
𝑐𝑚 𝑐𝑚 𝑐𝑚 𝑚
4.6. COMPARANDO
𝑡𝑜𝑛
𝑉𝑉 = 75.69
𝑚2
𝑡𝑜𝑛
𝑉𝑉 = 30.39
𝑚2
𝑡𝑜𝑛
𝑉𝑉 = 28.66
𝑚2
𝑡𝑜𝑛
𝑀𝐴𝑋𝑣𝑉 = 75.69
𝑚2
𝑡𝑜𝑛 𝑡𝑜𝑛
75.69 ≤ 159.41 "𝐶𝑢𝑚𝑝𝑙𝑒 𝑝𝑜𝑟 𝑃𝑢𝑛𝑧𝑜𝑛𝑎𝑚𝑖𝑒𝑛𝑡𝑜"
𝑚2 𝑚2
E
ESCUELA PROFESIONAL DE INGENIERIA CIVIL
o Hallando el Pu max xx
✓ Máxima Combinación
𝑃𝑚𝑎𝑥 = 380.47 𝑡𝑜𝑛
o Cálculo de Cortante en XX
𝑃𝑢𝑚𝑎𝑥
𝑉𝑋𝑋 = ∗ [𝑙𝑜𝑛𝑔 𝑧𝑎𝑝𝑋𝑋 − (𝑚𝑒𝑛𝑜𝑟 𝑙𝑜𝑛𝑔 𝑐𝑜𝑙𝑋𝑋 + 𝑑𝑧𝑎𝑝)] ∗ 𝑙𝑜𝑛𝑔 𝑧𝑎𝑝𝑌𝑌
𝐴𝑍𝐴𝑃
380.47 𝑡𝑜𝑛
𝑉𝑋𝑋 = ∗ [4.50 𝑚 − (0.35 𝑚 + 0.70 𝑚)] ∗ 7.90 𝑚 = 291.69 𝑡𝑜𝑛
35.55 𝑚2
E
ESCUELA PROFESIONAL DE INGENIERIA CIVIL
291.69 𝑡𝑜𝑛
𝑉𝑢𝑋𝑋 = = 343.16 𝑡𝑜𝑛
0.85
o Comparando
𝑉𝑢𝑋𝑋 ≤ 𝑉𝑐𝑋𝑋
o Modificando la distancia en XX
𝑡𝑜𝑛
𝑃𝑍𝐴𝑃 = 4.50 𝑚 ∗ 7.90 𝑚 ∗ 1.10 𝑚 ∗ 2.4 = 93.85 𝑡𝑜𝑛
𝑚3
𝑃𝑆𝐼𝑆𝑀𝑂 𝑌−𝑌 (+) = 𝑃𝐶𝑀 + 𝑃𝐶𝑉 + 𝑃𝑍𝐴𝑃 + 𝑃𝑌𝑌 = 500.43 + 96.86 + 93.85 + 330.14 = 1,021.28 𝑡𝑜𝑛
𝑃𝑆𝐼𝑆𝑀𝑂 𝑌−𝑌 (+) 𝑀𝑆𝐼𝑆𝑀𝑂 𝑌−𝑌 (+) ∗ 𝑌̅ 1,021.28 𝑡𝑜𝑛 22.59 𝑡𝑜𝑛 ∗ 𝑚 ∗ 3.93 𝑚 𝑡𝑜𝑛
𝑇1 = + 3 = 2
+ 3 = 29.21 2
𝐴𝑍𝐴𝑃 𝑙𝑜𝑛𝑔 𝑧𝑎𝑝𝑋𝑋 ∗ (𝑙𝑜𝑛𝑔 𝑧𝑎𝑝𝑌𝑌 ) 35.55 𝑚 4.50 𝑚 ∗ (7.90 𝑚) 𝑚
12 12
𝑡𝑜𝑛 𝑡𝑜𝑛 𝑡𝑜𝑛
1.3 ∗ 23.50 2
= 30.55 2 ≥ 29.21 2
𝑚 𝑚 𝑚
5.3. CORTANTE EN YY
o Hallando el Pu max
✓ Máxima Combinación
𝑃𝑚𝑎𝑥 = 447.73 𝑡𝑜𝑛
o Cálculo de Cortante en YY
𝑃𝑢𝑚𝑎𝑥
𝑉𝑌𝑌 = ∗ [𝑙𝑜𝑛𝑔 𝑧𝑎𝑝𝑌𝑌 − (𝑙𝑜𝑛𝑔 𝑐𝑜𝑙𝑌𝑌 + 𝑑𝑧𝑎𝑝𝑌𝑌 )] ∗ 𝑙𝑜𝑛𝑔 𝑧𝑎𝑝𝑋𝑋
𝐴𝑍𝐴𝑃
447.73 𝑡𝑜𝑛
𝑉𝑌𝑌 = ∗ [7.90 𝑚 − (0.35 𝑚 + 1.00 𝑚)] ∗ 4.50 𝑚 = 371.22 𝑡𝑜𝑛
35.55 𝑚2
371.22 𝑡𝑜𝑛
𝑉𝑢𝑌𝑌 = = 436.73 𝑡𝑜𝑛
0.85
o Comparando
𝑉𝑢𝑌𝑌 ≤ 𝑉𝑐𝑌𝑌
✓ Hallando el Pu max xx
✓ Máxima Combinación
𝑃𝑚𝑎𝑥 = 380.47 𝑡𝑜𝑛
𝑑𝑍𝐴𝑃 100 𝑐𝑚
𝑎= = = 20 𝑐𝑚
5 5
E
ESCUELA PROFESIONAL DE INGENIERIA CIVIL
𝑘𝑔
𝐴𝑠 ∗ 𝑓′𝑦 53.50 𝑐𝑚2 ∗ 4,200 2
𝑎= = 𝑐𝑚 = 2.80 𝑐𝑚
0.85 ∗ 𝑓 ′ 𝑐 ∗ 𝑙𝑜𝑛𝑔 𝑧𝑎𝑝𝑋𝑋 0.85 ∗ 210 𝑘𝑔 ∗ 450𝑐𝑚
𝑐𝑚2
𝑘𝑔
𝐴𝑠 ∗ 𝑓′𝑦 48.86 𝑐𝑚2 ∗ 4,200 2
𝑎= = 𝑐𝑚 = 2.55 𝑐𝑚
0.85 ∗ 𝑓 ′ 𝑐 ∗ 𝑙𝑜𝑛𝑔 𝑧𝑎𝑝𝑋𝑋 𝑘𝑔
0.85 ∗ 210 2 ∗ 450𝑐𝑚
𝑐𝑚
➢ ACERO MÍNIMO
48.78 𝑐𝑚2 ≥ 54.00 𝑐𝑚2 "No, cumple, se emplea el As min" → 𝐴𝑠 𝑧𝑎𝑝𝑋𝑋 = 54.00 𝑐𝑚2
Usando As Ø:
▪ Hallando el Pu max
▪ Máxima Combinación
𝑃𝑚𝑎𝑥 = 447.73 𝑡𝑜𝑛
𝑘𝑔
𝐴𝑠 ∗ 𝑓′𝑦 118.70 𝑐𝑚2 ∗ 4,200 2
𝑎= = 𝑐𝑚 = 3.54 𝑐𝑚
0.85 ∗ 𝑓 ′ 𝑐 ∗ 𝑙𝑜𝑛𝑔 𝑧𝑎𝑝𝑋𝑋 0.85 ∗ 210 𝑘𝑔 ∗ 790𝑐𝑚
𝑐𝑚2
𝑘𝑔
𝐴𝑠 ∗ 𝑓′𝑦 6.24 𝑐𝑚2 ∗ 4,200 2
𝑎= = 𝑐𝑚 = 3.24 𝑐𝑚
0.85 ∗ 𝑓 ′ 𝑐 ∗ 𝑙𝑜𝑛𝑔 𝑧𝑎𝑝𝑋𝑋 𝑘𝑔
0.85 ∗ 210 2 ∗ 790 𝑐𝑚
𝑐𝑚
➢ ACERO MÍNIMO
𝐴𝑠𝑚𝑖𝑛 = 𝜌𝑚𝑖𝑛 ∗ 𝑙𝑜𝑛𝑔 𝑧𝑎𝑝𝑋𝑋 ∗ 𝑑𝑍𝐴𝑃
Usando As Ø:
- 5/8”, su separación será:
∅𝐴𝑠𝑈𝑆𝐴𝑅 ∗ 𝑙𝑜𝑛𝑔 𝑧𝑎𝑝𝑌𝑌
𝑆𝐴𝑠 =
𝐴𝑠𝑁𝐸𝐶𝐸𝑆𝐴𝑅𝐼𝑂
7. DISEÑO FINAL