c1 = Columna central
3.25 3.25 3.5 3.5
c2 = columna extrema del portico principal exterior
VS c3 = columna extrema del portico secundario interior
c4 = columna en esquina
c4 c3 3.5
7.0 m AREA TRIBUTARIA
VP
c1 3.5
VP
VS
6.5 m 7.0 m
x
1.1 LOSAS
Losa Aligerada "e"
LL 4
e= 20 = 20
= 0.20
0.18
e= 0.20 m
L 4
h= 25 = 25
= 0.16
L 5
h=
10 = 10
= 0.50
h 0.5
b=
2 = 2
= 0.25
L 4
a= + a' = + 2 = 4.00 m
2 2
1.4 COLUMNAS
Area Area
Tipo de Dimensiónes
tributaria Nº de total k Area de
columnas probables Dimensión
(m2) piso (m2) columna real
Antepenultimo piso X (3)
C1 45.23 3 135.675 0.0011 0.1492425 0.38631917 0.40X0.40
C2 21.78 3 65.325 0.0022 0.143715 0.37909761 0.35X0.35
C3 23.63 3 70.875 0.0025 0.1771875 0.42094 0.40X0.40
C4 11.38 3 34.125 0.0040 0.1365 0.36945906 0.35X0.35
Segundo piso x (6)
C1 45.23 7 316.575 0.0012 0.37989 0.61635217 0.55x0.55
C2 21.78 7 152.425 0.0014 0.213395 0.46194697 0.45x0.45
C3 23.63 7 165.375 0.0014 0.231525 0.48117 0.45x0.45
C4 11.38 7 79.625 0.0021 0.1672125 0.40891625 0.40X0.40
Primer piso al primer piso se suma 7 cm a los resultados del segundo piso
1.5 PLACAS
Página 1
Usamos : P1 = 0.25 x 7.0 m2
Página 2
2.- METRADO DE CARGAS
h8= 1.40
8 2.80
h7= 2.80
2.1.- CARGA MUERTA
h sismico W Cº Aº Total para
7 2.80 NIVEL Nº b (m) t (m) (m) (Ton/m3) piso (Ton)
h6= 2.90 2.1.1.- COLUMNAS VECES
VIII 52 0.45 0.45 1.40 2.40 35.3808
0.45
6 3.00 VII 52 0.45 0.45 2.80 2.40 70.7616
h5= 3.10 VI 52 0.45 0.45 2.90 2.40 73.2888
V 52 0.45 0.45 3.10 2.40 78.3432
5 3.20 IV 52 0.45 0.45 3.20 2.40 80.8704
0.45
h4= 3.20 III 52 0.45 0.45 3.30 2.40 83.3976
II 52 0.45 0.45 3.50 2.40 88.4520
4 3.20 I 52 0.45 0.45 3.80 2.40 96.0336
h3= 3.30 TOTAL 606.5280
2.1.5.- LOSAS
NIVEL L y (m) L x(m) W Cº Aº Parcial
Total por piso
(Ton/m2) (Ton)
Ly1= ( 42.6 - ( 6 x 0.25 ) ) - 7.00 m = 34.1 m Nº VECES
Ly2= ( 7.00 - ( 2 x 0.25 ) ) = 6.50 m 1 34.10 33.25 0.35 396.8
VIII 472.938
1 6.50 33.45 0.35 76.1
Lx1= ( 35.7 - ( 7 x 0.35 ) ) = 33.25 m 1 34.10 33.25 0.35 396.8
VII 472.938
Lx2= ( 35.7 - ( 5 x 0.35 ) ) - 0.50 m = 33.45 m 1 6.50 33.45 0.35 76.1
1 34.10 33.25 0.35 396.8
VI 472.938
1 6.50 33.45 0.35 76.1
0.40
1 34.10 33.25 0.35 396.8
V 472.938
0.05 1 6.50 33.45 0.35 76.1
1 34.10 33.25 0.35 396.8
IV 472.938
0.25 1 6.50 33.45 0.35 76.1
0.20
1 34.10 33.25 0.35 396.8
III 472.938
1 6.50 33.45 0.35 76.1
1 34.10 33.25 0.35 396.8
0.30 0.10 0.30 0.10 II 472.938
1 6.50 33.45 0.35 76.1
1 34.10 33.25 0.35 396.8
I 472.938
Página 3
I 472.938
1 6.50 33.45 0.35 76.1
TOTAL= 3783.500
2.1.6.- ACABADOS
NIVEL L y (m) L x(m) W Cº Aº Parcial
Total por piso
(Ton/m2) (Ton)
Ly1= ( 42.6 - ( 6 x 0.25 ) ) - 7.00 m = 34.1 m Nº VECES
Ly2= ( 7.00 - ( 2 x 0.25 ) ) = 6.50 m 1 34.10 33.25 0.10 113.4
VIII 135.125
1 6.50 33.45 0.10 21.7
Lx1= ( 35.7 - ( 7 x 0.35 ) ) = 33.25 m 1 34.10 33.25 0.10 113.4
VII 135.125
Lx2= ( 35.7 - ( 5 x 0.35 ) ) - 0.50 m = 33.45 m 1 6.50 33.45 0.10 21.7
1 34.10 33.25 0.10 113.4
VI 135.125
1 6.50 33.45 0.10 21.7
1 34.10 33.25 0.10 113.4
V 135.125
1 6.50 33.45 0.10 21.7
1 34.10 33.25 0.10 113.4
IV 135.125
1 6.50 33.45 0.10 21.7
1 34.10 33.25 0.10 113.4
III 135.125
1 6.50 33.45 0.10 21.7
1 34.10 33.25 0.10 113.4
II 135.125
1 6.50 33.45 0.10 21.7
1 34.10 33.25 0.10 113.4
I 135.125
1 6.50 33.45 0.10 21.7
TOTAL= 1081.000
VIGAS
NIVEL COLUMNA ( PLACA LOSAS (Ton) Acabado S/C Total (Ton)
Ton) (Ton) Principales Secundarias (Ton) (Ton)
VIII 35.3808 11.760 176.282 96.033 472.94 135.125 66.85 994.371
VII 70.7616 23.520 176.282 96.033 472.94 135.125 66.85 1041.512
VI 73.2888 24.360 176.282 96.033 472.94 135.125 66.85 1044.879
V 78.3432 26.040 176.282 96.033 472.94 135.125 66.85 1051.613
IV 80.8704 26.880 176.282 96.033 472.94 135.125 66.85 1054.980
III 83.3976 27.720 176.282 96.033 472.94 135.125 66.85 1058.348
II 88.4520 29.400 176.282 96.033 472.94 135.125 66.85 1065.082
I 96.0336 31.920 176.282 96.033 472.94 135.125 66.85 1075.184
TOTAL 7391.60
Página 4
3.- CALCULO DE LA FUERZA BASAL SISMICA
Vxx = Z.U.C.S P
R
T= Periodo fundamental T = hn
CT
Ct = Coeficiente de periodo fundamental = 60 DUAL ( POR REGLAMENTO placa + portico)
Entonces Tenemos
T = 0.43333
C = 3.75493 £ 2.5 Como no cumple utilizaremos = 2.5
Verificando=
C ≥ 0.125 = 0.35714 OK! Si cumple
R
* hallamos la fuerza cortante de la base
V=ZUCS P
= 1267.13 Ton En la direccion X - X
R 17.1429 % si cumple ya que es = 12% @ 18 %
* EN LA DIRECCION X - X
Σ Pi * hi
Pi
NIVEL (Ton)
hi (Ton) Pi * hi V Fi Vi
VIII 994.4 26.00 25853.6 1267.13 254.648 254.648
VII 1041.5 23.20 24163.1 1267.13 238.00 492.644
VI 1044.9 20.40 21315.5 1267.13 209.949 702.59
V 1051.6 17.40 18298.1 1267.13 180.228 882.821
IV 1055.0 14.20 14980.7 1267.13 147.55 1030.37
III 1058.3 11.00 11641.8 1267.13 114.67 1145.04 b
II 1065.1 7.60 8094.6 1267.13 79.7286 1224.77
I 1075.2 4.00 4300.7 1267.13 42.3604 1267.13
∑ Pi * hi = 128648.20
254.65 254.648
238.00 492.644
209.95 702.5926
180.23 882.821
147.55 1030.37
114.67 1145
79.729 1224.77
42.36 1267.13
5
3.1.- FUERZA BAZAL EN LA DIRECCION Y - Y
Vyy = Z.U.C.S P
R
T= Periodo fundamental T = hn
CT
Ct = Coeficiente de periodo fundamental = 35 PORTICO ( POR REGLAMENTO portico )
Entonces Tenemos
T = 0.74286
C = 1.91424 £ 2.5 Como si cumple utilizaremos = 1.91
Verificando =
C ≥ 0.125 = 0.23875 OK! Si cumple
R
* hallamos la fuerza cortante de la base
V=ZUCS P
= 847.077 Ton En la direccion Y - Y
R 11.46 % si cumple ya que es = 12% @ 18 %
* EN LA DIRECCION Y - Y
Pero como T = 0.74 > 0.7 Calcularemos FA Fa = 0.070 ( 0.743 x 847.07696 ) ≤ 0 ( 847.08 )
hi
NIVEL Pi (Ton)
(Ton) Pi * hi V Fi Vi
Fa + F8 (8vo Nivel)
VIII 994.371 26.00 25853.64 847.077 170.232 170.232 = 44.048 + 170.23
VII 1041.51 23.20 24163.07 847.077 159.100 329.332 = 214.28
VI 1044.88 20.40 21315.53 847.077 140.351 469.683
V 1051.61 17.40 18298.07 847.077 120.483 590.166
IV 1054.98 14.20 14980.72 847.077 98.6397 688.805
III 1058.35 11.00 11641.82 847.077 76.6549 765.46
II 1065.08 7.60 8094.62 847.077 53.2986 818.759
I 1075.18 4.00 4300.73 847.077 28.3179 847.077
∑ Pi * hi = 128648.198
170.232 170.232
159.100 329.332
140.351 469.6831
120.483 590.166
98.640 688.805
76.655 765.46
53.299 818.759
28.318 847.077
6
7
8
NIVEL
X
IX
VIII
VII
VI
V
IV
III
II
I
9
4.- RIGIDEZ DE PLACA
- Analizaremos la placa como viga en voladizo
DPLACA
PLACA
= V = V
δTOTAL
TOTAL
δSN
SN + δBN
BN +
δRN
RN
δ SN
SN
= 33.12 x Vnn x Koo Donde : - hn
- Awn
=
=
altura de nivel
exl = 0.25 x 7.00 = 1.750 = 1750.00
Awn x hm - Ko = 100 si trabajamos en centimetros
254.65 254.65
2.80
238.00 492.64
2.80
209.95 702.59
3.00
180.23 882.82
3.20
147.55 1030.37
7.00
Vn
Mn Mi
254.648
356.5065
2.80
492.644 713.013
1046.2075
2.80
702.593 1379.402
2433.2909
3.00
882.821 3487.18
4899.693
3.20
1030.37 6312.21
7960.8061
3.20
1145.04 9609.41
11670.481
3.40
1224.77 13731.6
15936.143
3.60
1267.13 18140.73
20674.991
4.00
23209.3
In 1 3
Kwn
wn = x Kwn = In =
1 25 700
h00 K00 12
In = 714583333.33
Nivel K E Ko θ hn δRN
VIII 12 2100 1 0.0085714 280.00 0.771
VII 12 2100 1 0.0085714 280.00 0.771
Vi 12 2100 1 0.0085714 300.00 0.720
V 12 2100 1 0.0085714 320.00 0.675
IV 12 2100 1 0.0085714 320.00 0.675
III 12 2100 1 0.0085714 340.00 0.635
II 12 2100 1 0.0085714 360.00 0.600
I 12 2100 1 0.0085714 400.00 0.540
DPLACA
PLACA
= V = V
δTOTAL
TOTAL
δSN
SN + δBN
BN +
δRN
RN
Nivel δ SN δ BN δ RN δ TOTAL Vn D
VIII 1.721 0.140 0.771 2.632 254.648 96.734
VII 3.330 0.140 0.771 4.241 492.644 116.160
VI 4.432 0.131 0.720 5.283 702.593 132.991
V 5.221 0.121 0.675 6.017 882.821 146.709
IV 6.094 0.116 0.675 6.885 1030.375 149.662
III 6.374 0.100 0.635 7.109 1145.042 161.061
II 6.439 0.081 0.600 7.119 1224.770 172.034
I 5.995 0.054 0.540 6.590 1267.131 192.294
5.- CENTRO DE RIGIDECES
5.1 .- CENTRO DE RIGIDEZ EN EL 1ER PISO
h losa W losa
DESCRIPCIÓN (m) l x (m) l y (m) (ton/m2) Peso X CG Y CG P*XCG P*YCG
LOSA EJE 1-2 / A-B 0.25 5.25 5.30 0.35 9.7388 3.25 3.4 31.65 33.11
LOSA EJE 1-2 / B-C 0.25 5.25 6.00 0.35 11.025 3.25 10.00 35.83 110.25
LOSA EJE 1-2 / C-D 0.25 5.25 5.00 0.35 9.1875 3.25 16.70 29.86 153.43
LOSA EJE 1-2 / D-E 0.25 5.25 6.60 0.35 12.128 3.25 22.95 39.41 278.33
LOSA EJE 1-2 / E-F 0.25 5.25 6.20 0.35 11.393 3.25 25.70 37.03 292.79
LOSA EJE 1-2 / F-G 0.25 5.25 6.80 0.35 12.495 3.25 25.70 40.61 321.12
LOSA EJE 1-2 / G-H 0.25 5.25 5.30 0.35 9.7388 3.25 25.70 31.65 250.29
LOSA EJE 2-3 / A-B 0.25 6.45 5.30 0.35 11.965 10.00 3.40 119.65 40.68
LOSA EJE 2-3 / B-C 0.25 6.45 6.00 0.35 13.545 10.00 10.00 135.45 135.45
LOSA EJE 2-3 / C-D 0.25 6.45 5.00 0.35 11.288 10.00 16.70 112.88 188.50
LOSA EJE 2-3 / D-E 0.25 6.45 6.60 0.35 14.9 10.00 22.95 149.00 341.94
LOSA EJE 2-3 / E-F 0.25 6.45 6.20 0.35 13.997 10.00 25.70 139.97 359.71
LOSA EJE 2-3 / F-G 0.25 6.45 6.80 0.35 15.351 10.00 25.70 153.51 394.52
LOSA EJE 2-3 / G-H 0.25 6.45 5.30 0.35 11.965 10.00 25.70 119.65 307.49
LOSA EJE 3-4 / A-B 0.25 6.95 5.30 0.35 12.892 16.00 3.4 206.28 43.83
LOSA EJE 3-4 / B-C 0.25 6.95 6.00 0.35 14.595 16.00 10.00 233.52 145.95
LOSA EJE 3-4 / C-D 0.25 6.95 5.00 0.35 12.163 16.00 16.70 194.60 203.11
LOSA EJE 3-4 / D-E 0.25 6.95 6.60 0.35 16.055 16.00 22.95 256.87 368.45
LOSA EJE 3-4 / E-F 0.25 6.95 6.20 0.35 15.082 16.00 25.70 241.30 387.59
LOSA EJE 3-4 / F-G 0.25 6.95 6.80 0.35 16.541 16.00 25.70 264.66 425.10
LOSA EJE 3-4 / G-H 0.25 6.95 5.30 0.35 12.892 16.00 25.70 206.28 331.33
LOSA EJE 4-5 / A-B 0.25 4.95 5.30 0.35 9.1823 21.40 3.40 196.50 31.22
LOSA EJE 4-5 / B-C 0.25 4.95 6.00 0.35 10.395 21.40 10.00 222.45 103.95
LOSA EJE 4-5 / C-D 0.25 4.95 5.00 0.35 8.6625 21.40 16.70 185.38 144.66
LOSA EJE 4-5 / D-E 0.25 4.95 6.60 0.35 11.435 21.40 22.95 244.70 262.42
LOSA EJE 4-5 / E-F 0.25 4.95 6.20 0.35 10.742 21.40 25.70 229.87 276.06
LOSA EJE 4-5 / F-G 0.25 4.95 6.80 0.35 11.781 21.40 25.70 252.11 302.77
LOSA EJE 4-5 / G-H 0.25 4.95 5.30 0.35 9.1823 21.40 25.70 196.50 235.98
LOSA EJE 5-6 / A-B 0.25 4.95 5.30 0.35 9.1823 27.40 3.4 251.59 31.22
LOSA EJE 5-6 / B-C 0.25 4.95 6.00 0.35 10.395 27.40 10.00 284.82 103.95
LOSA EJE 5-6 / C-D 0.25 4.95 5.00 0.35 8.6625 27.40 16.70 237.35 144.66
LOSA EJE 5-6 / D-E 0.25 4.95 6.60 0.35 11.435 27.40 22.95 313.31 262.42
LOSA EJE 5-6 / E-F 0.25 4.95 6.20 0.35 10.742 27.40 25.70 294.32 276.06
LOSA EJE 5-6 / F-G 0.25 4.95 6.80 0.35 11.781 27.40 25.70 322.80 302.77
LOSA EJE 5-6 / G-H 0.25 4.95 5.30 0.35 9.1823 27.40 25.70 251.59 235.98
LOSA EJE 6-7 / A-B 0.25 6.15 5.30 0.35 11.408 30.50 3.40 347.95 38.79
LOSA EJE 6-7 / B-C 0.25 6.15 6.00 0.35 12.915 30.50 10.00 393.91 129.15
LOSA EJE 6-7 / C-D 0.25 6.15 5.00 0.35 10.763 30.50 16.70 328.26 179.73
LOSA EJE 6-7 / D-E 0.25 6.15 6.60 0.35 14.207 30.50 22.95 433.30 326.04
LOSA EJE 6-7 / E-F 0.25 6.15 6.20 0.35 13.346 30.50 25.70 407.04 342.98
LOSA EJE 6-7 / F-G 0.25 6.15 6.80 0.35 14.637 30.50 25.70 446.43 376.17
LOSA EJE 6-7 / G-H 0.25 6.15 5.30 0.35 11.408 30.50 25.70 347.95 293.19
500.37 8967.76 9513.18
6.12 CENTRO DE MASAS EN ACABADOS Y SOBRECARGAS 1ER, 2DO, 3ER, 4TO, 5TO, 6TO, 7MO Y 8VO NIVEL
PESO = 100 + 25% 200 = 150 Kg/m = 0.15 ton/m
h losa Acabados
DESCRIPCIÓN (m) l x (m) l y (m) +25%S/C Peso X CG Y CG P*XCG P*YCG
LOSA EJE 1-2 / A-B 0.25 5.25 5.30 0.15 4.17 3.25 3.4 13.56 14.19
LOSA EJE 1-2 / B-C 0.25 5.25 6.00 0.15 4.73 3.25 10.00 15.36 47.25
LOSA EJE 1-2 / C-D 0.25 5.25 5.00 0.15 3.94 3.25 16.70 12.80 65.76
LOSA EJE 1-2 / D-E 0.25 5.25 6.60 0.15 5.20 3.25 22.95 16.89 119.28
LOSA EJE 1-2 / E-F 0.25 5.25 6.20 0.15 4.88 3.25 25.70 15.87 125.48
LOSA EJE 1-2 / F-G 0.25 5.25 6.80 0.15 5.36 3.25 25.70 17.40 137.62
LOSA EJE 1-2 / G-H 0.25 5.25 5.30 0.15 4.17 3.25 25.70 13.56 107.27
LOSA EJE 2-3 / A-B 0.25 6.45 5.30 0.15 5.13 10.00 3.40 51.28 17.43
LOSA EJE 2-3 / B-C 0.25 6.45 6.00 0.15 5.81 10.00 10.00 58.05 58.05
LOSA EJE 2-3 / C-D 0.25 6.45 5.00 0.15 4.84 10.00 16.70 48.38 80.79
LOSA EJE 2-3 / D-E 0.25 6.45 6.60 0.15 6.39 10.00 22.95 63.86 146.55
LOSA EJE 2-3 / E-F 0.25 6.45 6.20 0.15 6.00 10.00 25.70 59.99 154.16
LOSA EJE 2-3 / F-G 0.25 6.45 6.80 0.15 6.58 10.00 25.70 65.79 169.08
LOSA EJE 2-3 / G-H 0.25 6.45 5.30 0.15 5.13 10.00 25.70 51.28 131.78
LOSA EJE 3-4 / A-B 0.25 6.95 5.30 0.15 5.53 16.00 3.4 88.40 18.79
LOSA EJE 3-4 / B-C 0.25 6.95 6.00 0.15 6.26 16.00 10.00 100.08 62.55
LOSA EJE 3-4 / C-D 0.25 6.95 5.00 0.15 5.21 16.00 16.70 83.40 87.05
LOSA EJE 3-4 / D-E 0.25 6.95 6.60 0.15 6.88 16.00 22.95 110.09 157.91
LOSA EJE 3-4 / E-F 0.25 6.95 6.20 0.15 6.46 16.00 25.70 103.42 166.11
LOSA EJE 3-4 / F-G 0.25 6.95 6.80 0.15 7.09 16.00 25.70 113.42 182.19
LOSA EJE 3-4 / G-H 0.25 6.95 5.30 0.15 5.53 16.00 25.70 88.40 142.00
LOSA EJE 4-5 / A-B 0.25 4.95 5.30 0.15 3.94 21.40 3.40 84.21 13.38
LOSA EJE 4-5 / B-C 0.25 4.95 6.00 0.15 4.46 21.40 10.00 95.34 44.55
LOSA EJE 4-5 / C-D 0.25 4.95 5.00 0.15 3.71 21.40 16.70 79.45 62.00
LOSA EJE 4-5 / D-E 0.25 4.95 6.60 0.15 4.90 21.40 22.95 104.87 112.47
LOSA EJE 4-5 / E-F 0.25 4.95 6.20 0.15 4.60 21.40 25.70 98.51 118.31
LOSA EJE 4-5 / F-G 0.25 4.95 6.80 0.15 5.05 21.40 25.70 108.05 129.76
LOSA EJE 4-5 / G-H 0.25 4.95 5.30 0.15 3.94 21.40 25.70 84.21 101.14
LOSA EJE 5-6 / A-B 0.25 4.95 5.30 0.15 3.94 27.40 3.4 107.83 13.38
LOSA EJE 5-6 / B-C 0.25 4.95 6.00 0.15 4.46 27.40 10.00 122.07 44.55
LOSA EJE 5-6 / C-D 0.25 4.95 5.00 0.15 3.71 27.40 16.70 101.72 62.00
LOSA EJE 5-6 / D-E 0.25 4.95 6.60 0.15 4.90 27.40 22.95 134.27 112.47
LOSA EJE 5-6 / E-F 0.25 4.95 6.20 0.15 4.60 27.40 25.70 126.14 118.31
LOSA EJE 5-6 / F-G 0.25 4.95 6.80 0.15 5.05 27.40 25.70 138.34 129.76
LOSA EJE 5-6 / G-H 0.25 4.95 5.30 0.15 3.94 27.40 25.70 107.83 101.14
LOSA EJE 6-7 / A-B 0.25 6.15 5.30 0.15 4.89 30.50 3.40 149.12 16.62
LOSA EJE 6-7 / B-C 0.25 6.15 6.00 0.15 5.54 30.50 10.00 168.82 55.35
LOSA EJE 6-7 / C-D 0.25 6.15 5.00 0.15 4.61 30.50 16.70 140.68 77.03
LOSA EJE 6-7 / D-E 0.25 6.15 6.60 0.15 6.09 30.50 22.95 185.70 139.73
LOSA EJE 6-7 / E-F 0.25 6.15 6.20 0.15 5.72 30.50 25.70 174.44 146.99
LOSA EJE 6-7 / F-G 0.25 6.15 6.80 0.15 6.27 30.50 25.70 191.33 161.22
LOSA EJE 6-7 / G-H 0.25 6.15 5.30 0.15 4.89 30.50 25.70 149.12 125.65
214.45 3843.33 4077.08
NIVEL
VIII 33.71 749.48 1000.32
VII 1089.65 17253.41 20806.75
VI 1093.21 17314.59 20881.66
V 1100.34 17436.93 21031.48
IV 1103.90 17498.11 21106.39
III 1107.46 17559.28 21181.30
II 1114.58 17681.63 21331.12
I 1125.27 17865.15 21555.84
TOTAL 7734.42 122609.10 147894.53
122609.102
= = 15.852
7734.420
147894.525
= = 19.122
7734.420
7.- METODO DE MUTO
7.1 PORTICO PRINCIPAL A-A, B-B, C-C, D-D, E-E, F-F, G-G, H-H
1 b . t22 1 b . t22
Kviga = 12 . K' Kcolumna
columna
= 12 . K'
viga
h h
K' = 1000
kv= 1.81894 kv= 1.613575 kv= 1.92388 kv= 1.4712 kv= 1.56315 kv= 1.429167 kv= 1.818939
###
###
###
###
###
###
###
###
2.80
kc=
kc=
kc=
kc=
kc=
kc=
kc=
kc=
kv= 1.81894 kv= 1.613575 kv= 1.924 kv= 1.4712 kv= 1.56315 kv= 1.429167 kv= 1.818939
###
###
###
###
###
###
###
###
2.80
kc=
kc=
kc=
kc=
kc=
kc=
kc=
kc=
kv= 1.81894 kv= 1.613575 kv= 1.924 kv= 1.4712 kv= 1.56315 kv= 1.429167 kv= 1.818939
1
1
3.00
kc=
kc=
kc=
kc=
kc=
kc=
kc=
kc=
kv= 1.81894 kv= 1.613575 kv= 1.924 kv= 1.4712 kv= 1.56315 kv= 1.429167 kv= 1.818939
###
###
###
###
###
###
###
###
3.20
kc=
kc=
kc=
kc=
kc=
kc=
kc=
kc=
kv= 1.81894 kv= 1.613575 kv= 1.924 kv= 1.4712 kv= 1.56315 kv= 1.429167 kv= 1.818939
###
###
###
###
###
###
###
###
3.20
kc=
kc=
kc=
kc=
kc=
kc=
kc=
kc=
kv= 1.81894 kv= 1.613575 kv= 1.924 kv= 1.4712 kv= 1.56315 kv= 1.429167 kv= 1.818939
###
###
###
###
###
###
###
###
3.40
kc=
kc=
kc=
kc=
kc=
kc=
kc=
kc=
kv= 1.81894 kv= 1.613575 kv= 1.924 kv= 1.4712 kv= 1.56315 kv= 1.429167 kv= 1.818939
###
###
###
###
###
###
###
###
3.60
kc=
kc=
kc=
kc=
kc=
kc=
kc=
kc=
kv= 1.81894 kv= 1.613575 kv= 1.924 kv= 1.4712 kv= 1.56315 kv= 1.429167 kv= 1.818939
###
###
###
###
###
###
###
###
4.00
kc=
kc=
kc=
kc=
kc=
kc=
kc=
kc=
A B C D E F G H
1
7.1.2.- CALCULO DE LA RIGIDEZ
D = a . Kc
K = Kv1 + Kv2 + Kv3 + Kv4
CASO GENERAL Kv1 Kv2
2Kc
K = Kv
CASO EMPOTRADO Kv1 Kv2 Kv1
K = Kv1 + Kv2 Kc
2Kc Kc
a= K a = 0.5 + K
2+K CASO LATERAL 2+K
A B C D E F G H
NIVEL Σ Dn NIVEL Σ Dn
IV 4.702 VIII 5.475
III 4.545 VII 5.054
II 4.397 VI 4.872
I 4.248 V 4.702
7.1.3 .- CALCULO DE LA CORTANTE EN CADA COLUMNA
NIVEL Σ Dn
VIII 5.475
VII 5.054 Vn = Vt Dn
VI 4.872
V 4.702
IV 4.702
ΣDn
III 4.545
II 4.397
I 4.248
Kv1
v1
+ Kv2
v2 Como Kviga superior y Kviga inferior son iguales entonces la divsion es igual a 1
α11 == α1 No se considera para el primer piso
Kv3
v3
+ Kv4
v4
Y2 = Término de correción debido al piso superior (TABLA 03)
K inf - Yo inf 2.00 - 0.60 2.00 - 3.00 0.60 - 0.55 -1.00 0.05
= = Yo = 0.597
K - Yo = 2.07 - Yo 2.07 - 3.00 Yo - 0.55 -0.93 Yo - 0.55
K sup - Yo sup 3.00 - 0.55
Para Interpolación
Nivel EJE h colum K inf Y0 inf K sup Y0 sup K α1 α2 α3 Y0 Y1 Y2 Y3 Y
VIII A 2.80 2.0 0.45 3.0 0.45 2.220 1.00 Ξ 1.00 0.450 0 Ξ 0 0.45
VII A 2.80 1.0 0.45 2.0 0.45 1.490 1.00 1.00 1.07 0.450 0 0 0 0.45
VI A 3.00 1.0 0.45 2.0 0.50 1.597 1.00 0.93 1.07 0.480 0 0 0 0.48
V A 3.20 1.0 0.45 2.0 0.50 1.703 1.00 0.94 1.00 0.485 0 0 0 0.49
IV A 3.20 1.0 0.50 2.0 0.50 1.703 1.00 1.00 1.06 0.500 0 0 0 0.50
III A 3.40 1.0 0.50 2.0 0.50 1.810 1.00 0.94 1.06 0.500 0 0 0 0.50
II A 3.60 1.0 0.50 2.0 0.50 1.916 1.00 0.94 1.11 0.500 0 0 0 0.50
I A 4.00 2.0 0.60 3.0 0.55 2.129 Ξ 0.90 Ξ 0.594 Ξ 0 Ξ 0.59
VIII B 2.80 2.0 0.45 3.0 0.45 2.813 1.00 Ξ 1.00 0.450 0 Ξ 0 0.45
VII B 2.80 2.0 0.45 3.0 0.50 2.609 1.00 1.00 1.07 0.480 0 0 0 0.48
VI B 3.00 2.0 0.50 3.0 0.50 2.795 1.00 0.93 1.07 0.500 0 0 0 0.50
V B 3.20 2.0 0.50 3.0 0.50 2.981 1.00 0.94 1.00 0.500 0 0 0 0.50
IV B 3.20 2.0 0.50 3.0 0.50 2.981 1.00 1.00 1.06 0.500 0 0 0 0.50
III B 3.40 3.0 0.50 4.0 0.50 3.168 1.00 0.94 1.06 0.500 0 0 0 0.50
II B 3.60 3.0 0.50 4.0 0.50 3.354 1.00 0.94 1.11 0.500 0 0 0 0.50
I B 4.00 2.0 0.60 3.0 0.55 2.009 Ξ 0.90 Ξ 0.599 Ξ 0 Ξ 0.60
VIII C 2.80 2.0 0.45 3.0 0.45 2.899 1.00 Ξ 1.00 0.450 0 Ξ 0 0.45
VII C 2.80 2.0 0.45 3.0 0.50 2.721 1.00 1.00 1.07 0.486 0 0 0 0.49
VI C 3.00 2.0 0.50 3.0 0.50 2.915 1.00 0.93 1.07 0.500 0 0 0 0.50
V C 3.20 3.0 0.50 4.0 0.50 3.110 1.00 0.94 1.00 0.500 0 0 0 0.50
IV C 3.20 3.0 0.50 4.0 0.50 3.110 1.00 1.00 1.06 0.500 0 0 0 0.50
III C 3.40 3.0 0.50 4.0 0.50 3.304 1.00 0.94 1.06 0.500 0 0 0 0.50
II C 3.60 3.0 0.50 4.0 0.50 3.499 1.00 0.94 1.11 0.500 0 0 0 0.50
I C 4.00 2.0 0.60 3.0 0.55 2.070 Ξ 0.90 Ξ 0.597 Ξ 0 Ξ 0.60
K inf - Yo inf 2.00 - 0.60 2.00 - 3.00 0.60 - 0.55 -1.00 0.05
= = Yo = 0.59
K - Yo = 2.129 - Yo 2.13 - 3.00 Yo - 0.55 -0.87 Yo - 0.55
K sup - Yo sup 3.00 - 0.55
Para Interpolación
Nivel EJE h colum K inf Y0 inf K sup Y0 sup K α1 α2 α3 Y0 Y1 Y2 Y3 Y
VIII D 2.80 2.0 0.45 3.0 0.45 2.782 1.00 Ξ 1.00 0.450 0 Ξ 0 0.45
VII D 2.80 2.0 0.45 3.0 0.50 2.551 1.00 1.00 1.07 0.478 0 0 0 0.48
VI D 3.00 2.0 0.50 3.0 0.50 2.733 1.00 0.93 1.07 0.500 0 0 0 0.50
V D 3.20 2.0 0.50 3.0 0.50 2.915 1.00 0.94 1.00 0.500 0 0 0 0.50
IV D 3.20 2.0 0.50 3.0 0.50 2.915 1.00 1.00 1.06 0.500 0 0 0 0.50
III D 3.40 3.0 0.50 4.0 0.50 3.097 1.00 0.94 1.06 0.500 0 0 0 0.50
II D 3.60 3.0 0.50 4.0 0.50 3.279 1.00 0.94 1.11 0.500 0 0 0 0.50
I D 4.00 1.0 0.65 2.0 0.6 1.987 Ξ 0.90 Ξ 0.601 Ξ 0 Ξ 0.60
VIII E 2.80 2.0 0.45 3.0 0.45 2.486 1.00 Ξ 1.00 0.450 0 Ξ 0 0.45
VII E 2.80 2.0 0.45 3.0 0.50 2.185 1.00 1.00 1.07 0.459 0 0 0 0.46
VI E 3.00 2.0 0.50 3.0 0.50 2.341 1.00 0.93 1.07 0.500 0 0 0 0.50
V E 3.20 2.0 0.50 3.0 0.50 2.498 1.00 0.94 1.00 0.500 0 0 0 0.50
IV E 3.20 2.0 0.50 3.0 0.50 2.498 1.00 1.00 1.06 0.500 0 0 0 0.50
III E 3.40 2.0 0.50 3.0 0.50 2.654 1.00 0.94 1.06 0.500 0 0 0 0.50
II E 3.60 2.0 0.50 3.0 0.50 2.810 1.00 0.94 1.11 0.500 0 0 0 0.50
I E 4.00 1.0 0.65 2.0 0.6 1.776 Ξ 0.90 Ξ 0.611 Ξ 0 Ξ 0.61
VIII F 2.80 2.0 0.45 3.0 0.45 2.452 1.00 Ξ 1.00 0.450 0 Ξ 0 0.45
VII F 2.80 2.0 0.45 3.0 0.50 2.141 1.00 1.00 1.07 0.457 0 0 0 0.46
VI F 3.00 2.0 0.50 3.0 0.50 2.294 1.00 0.93 1.07 0.500 0 0 0 0.50
V F 3.20 2.0 0.50 3.0 0.50 2.447 1.00 0.94 1.00 0.500 0 0 0 0.50
IV F 3.20 2.0 0.50 3.0 0.50 2.447 1.00 1.00 1.06 0.500 0 0 0 0.50
III F 3.40 2.0 0.50 3.0 0.50 2.600 1.00 0.94 1.06 0.500 0 0 0 0.50
II F 3.60 2.0 0.50 3.0 0.50 2.753 1.00 0.94 1.11 0.500 0 0 0 0.50
I F 4.00 1.0 0.65 2.0 0.6 1.751 Ξ 0.90 Ξ 0.612 Ξ 0 Ξ 0.61
VIII G 2.80 2.0 0.45 3.0 0.45 2.661 1.00 Ξ 1.00 0.450 0 Ξ 0 0.45
VII G 2.80 2.0 0.45 3.0 0.50 2.396 1.00 1.00 1.07 0.470 0 0 0 0.47
VI G 3.00 2.0 0.50 3.0 0.50 2.567 1.00 0.93 1.07 0.500 0 0 0 0.50
V G 3.20 2.0 0.50 3.0 0.50 2.738 1.00 0.94 1.00 0.500 0 0 0 0.50
IV G 3.20 2.0 0.50 3.0 0.50 2.738 1.00 1.00 1.06 0.500 0 0 0 0.50
III G 3.40 2.0 0.50 3.0 0.50 2.909 1.00 0.94 1.06 0.500 0 0 0 0.50
II G 3.60 3.0 0.50 4.0 0.50 3.080 1.00 0.94 1.11 0.500 0 0 0 0.50
I G 4.00 1.0 0.65 2.0 0.6 1.901 Ξ 0.90 Ξ 0.605 Ξ 0 Ξ 0.61
VIII H 2.80 2.0 0.45 3.0 0.45 2.220 1.00 Ξ 1.00 0.450 0 Ξ 0 0.45
VII H 2.80 1.0 0.45 2.0 0.45 1.490 1.00 1.00 1.07 0.450 0 0 0 0.45
VI H 3.00 1.0 0.45 2.0 0.50 1.597 1.00 0.93 1.07 0.479 0 0 0 0.48
V H 3.20 1.0 0.45 2.0 0.50 1.703 1.00 0.94 1.00 0.485 0 0 0 0.49
IV H 3.20 1.0 0.50 2.0 0.50 1.703 1.00 1.00 1.06 0.500 0 0 0 0.50
III H 3.40 1.0 0.50 2.0 0.50 1.810 1.00 0.94 1.06 0.500 0 0 0 0.50
II H 3.60 1.0 0.50 2.0 0.50 1.916 1.00 0.94 1.11 0.500 0 0 0 0.50
I H 4.00 2.0 0.60 3.0 0.55 2.129 Ξ 0.90 Ξ 0.594 Ξ 0 Ξ 0.59
7.1.4 .- MOMENTOS EN LAS COLUMNAS
DIAGRAMA DE MOMENTOS EN COLUMNAS DEL PORTICO PRINCIPAL A-A, B-B, C-C, D-D, E-E, F-F, G-G, H-H
A B C D E F G H
45.99
78.23
113.99
151.96
172.20
204.50
232.87
263.48