Está en la página 1de 34

Item Partida Unidad Cantidad

3.0 Trazado y niveles M² 99.75


Item Partida Eje Tramo Largo (m) Ancho (m)
4.1 Excavaciones 1 E-A 18.61 1.4
2 D-A 14.55 1.4
3 E-A 18.61 1.4
5 E-B 10.88 1.4
7 E-B 10.88 1.4
A 1-3 11 1.4
B 1-7 29.7 1.4
C 1-3 11 1.4
D 1-3 11 1.4
E 3-7 18.7 1.4
Alto (m) Total
0.65 16.9351
0.65 13.2405
0.65 16.9351
0.65 9.9008
0.65 9.9008
0.65 10.01
0.65 27.027
0.65 10.01
0.65 10.01
0.65 17.017
Total M³ 140.9863
Item Partida Eje Tramo Largo (m) Ancho (m)
5.1.1 Emplantillado 1 E-A 18.61 0.6
2 D-A 14.55 0.6
3 E-A 18.61 0.6
5 E-B 10.88 0.6
7 E-B 10.88 0.6
A 1-3 11 0.6
B 1-7 29.7 0.6
C 1-3 11 0.6
D 1-3 11 0.6
E 3-7 18.7 0.6
Alto (m) Total
0.05 0.5583
0.05 0.4365
0.05 0.5583
0.05 0.3264
0.05 0.3264
0.05 0.33
0.05 0.891
0.05 0.33
0.05 0.33
0.05 0.561
Total M³ 4.6479
Item Partida Eje Tramo Largo (m) Ancho (m)
5.1.2 Cimientos Hormigon H-20 1 E-A 18.61 0.6
2 D-A 14.55 0.6
3 E-A 18.61 0.6
5 E-B 10.88 0.6
7 E-B 10.88 0.6
A 1-3 11 0.6
B 1-7 29.7 0.6
C 1-3 11 0.6
D 1-3 11 0.6
E 3-7 18.7 0.6
Alto (m) Total
0.6 6.6996
0.6 5.238
0.6 6.6996
0.6 3.9168
0.6 3.9168
0.6 3.96
0.6 10.692
0.6 3.96
0.6 3.96
0.6 6.732
Total M³ 55.7748
Item Partida Eje Tramo Largo (m) Ancho (m)
5.1.3 Sobrecimientos Hormigon H-25 1 E-A 18.61 0.2
2 D-A 14.55 0.2
3 E-A 18.61 0.2
5 E-B 10.88 0.2
7 E-B 10.88 0.2
A 1-3 11 0.2
B 1-7 29.7 0.2
C 1-3 11 0.2
D 1-3 11 0.2
E 3-7 18.7 0.2
Alto (m) Total
0.3 1.1166
0.3 0.873
0.3 1.1166
0.3 0.6528
0.3 0.6528
0.3 0.66
0.3 1.782
0.3 0.66
0.3 0.66
0.3 1.122
Total M³ 9.2958
Item Partida Eje Tramo Largo (m)
5.2.1 Moldaje Cimientos 1 E-A 18.61
2 D-A 14.55
3 E-A 18.61
5 E-B 10.88
7 E-B 10.88
A 1-3 11
B 1-7 29.7
C 1-3 11
D 1-3 11
E 3-7 18.7
Alto (m) N° Caras Total
0.6 2 22.332
0.6 2 17.46
0.6 2 22.332
0.6 2 13.056
0.6 2 13.056
0.6 2 13.2
0.6 2 35.64
0.6 2 13.2
0.6 2 13.2
0.6 2 22.44
Total M² 185.916
Item Partida Eje Tramo Largo (m) Alto (m)
5.2.2 Moldaje Sobrecimientos 1 E-A 18.61 0.3
2 D-A 14.55 0.3
3 E-A 18.61 0.3
5 E-B 10.88 0.3
7 E-B 10.88 0.3
A 1-3 11 0.3
B 1-7 29.7 0.3
C 1-3 11 0.3
D 1-3 11 0.3
E 3-7 18.7 0.3
N° Caras Total
2 11.166
2 8.73
2 11.166
2 6.528
2 6.528
2 6.6
2 17.82
2 6.6
2 6.6
2 11.22
Total M² 92.958
Item Partida Eje Tramo Largo (m)
6.2.2 Cama de arena e=5 cm 3-7 F-B 9.3
1-3 A-E 5.4
Ancho (m) Espesor (m) Total
7.02 0.05 3.2643
7.32 0.05 1.9764
Total M³ 5.2407
Item Partida Eje Tramo Largo (m) Ancho (m)
6.2.3 Poliestireno e=0,2 mm 3-7 F-B 9.3 7.02
1-3 A-E 5.4 7.32
Total M²
Total
65.286
39.528
104.814
Item Partida Eje Tramo Largo (m)
6.3 Radier de Hormigon e= 10 cm 3-7 F-B 9.3
1-3 A-E 5.4
Ancho (m) Espesor (m) Total
7.02 0.1 6.5286
7.32 0.1 3.9528
Total M³ 10.4814
Item Partida Eje Tramo Largo (m)
7.1 Tabiqueria ext. Pino impregnado 2" x 4" 1 F-A
3 F-E 2.04
3 A-B 2.33
7 F-B 7.02
F 3-7
E 1-3
B 3-7
A 1-3
Alto (m) Total

4.79

3.07

Total M²
Item Partida Ancho Alto Total
8.1 Cerchas y costaneras
Item Partida Area Largo (m) Ancho (m)
11.1.1 Techumbre lana mineral 120 mm A1 9.3 7.03
A2 5.4 7.32
Total M²
Total
65.379
39.528
104.907
Item Partida Area Largo (m) Ancho (m)
11.2 Tabiques poliestireno exp. 20 mm A1 9.3 7.03
A2 5.4 7.32
Total M²
Total
65.379
39.528
104.907
Item Partida Area Largo (m) Ancho (m)
11.1.1 Aislacion Hidrica A1 9.3 7.03
A2 5.4 7.32
Total M²
Total
65.379
39.528
104.907
Item Partida Area Largo (m) Ancho (m)
14.1 Ceramica 33x33 Baños y Cocina A1 2.75 6.94
Total M²
Total
19.085
19.085
Item Partida Area Largo (m) Ancho (m) Total
14.2 Ceramica 45x45 cm A1 9.2 6.88 63.296
A2 2.45 6.94 17.003
Total M² 80.299
Item Partidas Ventanas Alto Ancho Cantidad Total
18.1 Vidrios V1 1.36 1.36 2 3.6992
V2 0.72 0.55 3 1.188
V3 1.36 0.57 6 4.6512
Total M² 9.5384
Item Partida Eje Tramo Cantidad Largo (m)
9.1 Canal Zinc 0,35 mm A 1-3 1 6.5
3 A-B 1 2.325
B 3-7 1 9.3
7 B-F 1 9.3
F 1-7 1 15.65
- - 1 2.03
E - 1 7.88
- - 1 5.545
Total ML
Total
6.5
2.325
9.3
9.3
15.65
2.03
7.88
5.545
58.53

También podría gustarte