PLANILLA DE AVANCE DE OBRA Nº 4

PROYECTO: PAVIMENTADO AV. BAUTISTA SAAVEDRA SECTOR "F" Y "G"


LOCALIZACION L/DISTRITAL D-7
DISTRITO: Nº 7
SUPERVISOR: ING. ARMANDO QUISPE CALLE

MONTO DE ADJUDICACION ACTUALIZADO A CONTRATO MODIFICATORIO Nº 1 AVANCE DE OBRA DESEMBOLSO (Bs.) % DE

No. Precio Precio Total Precio Precio Total


Descripción Unidad Cantidad Cantidad ANTERIOR ACTUAL TOTAL ANTERIOR ACTUAL TOTAL AVANCE
ITEM Unitario Bs. Unitario Bs.

1 INSTALACION DE FAENAS Y COLOCADO DE LETRERO GLB 1.00 16,878.37 16,878.37 1.00 16,878.37 16,878.37 1.00 - 1.00 16,878.37 - 16,878.37 100.00
2 REPLANTEO Y TRAZADO DE VIAS ML 853.69 9.87 8,425.92 853.69 9.87 8,425.92 853.69 - 853.69 8,425.92 - 8,425.92 100.00
3 EXCAVACION COMUN C/EQUIPO CAT D7-G* M3 3,077.10 19.30 59,388.03 4,032.33 19.30 77,823.97 3,913.20 - 3,913.20 75,524.76 - 75,524.76 97.05
4 RETIRO DE MATERIAL EXCEDENTE CON CARGUIO M3 3,870.15 13.99 54,143.40 5,660.75 13.99 79,193.89 5,659.89 - 5,659.89 79,181.86 - 79,181.86 99.98
5 RELLENO Y COMPACTADO CON MATERIAL COMUN M3 12.83 28.07 360.14 - 28.07 - - - - - - - -
6 REPLANTEO Y TRAZADO DE TUBERIAS (ALCANTARILLADO) ML 1,154.40 2.69 3,105.34 1,171.96 2.69 3,152.57 1,071.96 - 1,071.96 2,883.57 - 2,883.57 91.47
7 EXCAVACION DE ZANJAS CAMARAS Y SUMIDEROS CON RETROEXCAVADORA M3 1,200.56 17.77 21,333.95 2,356.29 17.77 41,871.27 2,173.49 - 2,173.49 38,622.92 - 38,622.92 92.24
8 CAMARA DE INSPECCION (HO SO) 0-2 M PZA 17.00 2,549.80 43,346.60 17.00 2,549.80 43,346.60 - - - - - - -
9 SUMIDERO TIPO R3 DE Hº Cº SIN PROVISIÓN DE TUBERIA PZA 34.00 2,517.91 85,608.94 34.00 2,517.91 85,608.94 - 34.00 34.00 - 85,608.94 85,608.94 100.00
10 TAPAS DE HORMIGON ARMADO D=70 CM, E=10 CM DOSIF 1:2:3 PZA 2.00 283.46 566.92 16.00 283.46 4,535.36 - - - - - - -
11 ELEVACIóN Y/O REDUCCION DE TAPAS DE CAMARA PZA 2.00 188.54 377.08 16.00 188.54 3,016.64 - - - - - -
12 PROVISIóN Y COLOCADO DE TUBOS DE PVC D=200MM ML 354.40 120.23 42,609.51 266.92 120.23 32,091.79 266.92 - 266.92 32,091.79 - 32,091.79 100.00
13 PROVISIóN Y COLOCADO DE TUBOS DE PVC D=400 MM ML 300.00 165.21 49,563.00 - 165.21 - - - - - - - -
14 PROVISIóN Y COLOCADO DE TUBOS DE PVC D=450 MM ML 300.00 210.98 63,294.00 - 210.98 - - - - - - - -
15 PROVISIóN Y COLOCADO DE TUBOS DE PVC D=500 MM ML 350.00 260.92 91,322.00 - 260.92 - - - - - - - -
16 MATERIAL DE APOYO PARA TUBERIAS M3 179.75 140.52 25,258.47 653.69 140.52 91,856.52 565.45 - 565.45 79,457.03 - 79,457.03 86.50
17 RELLENO Y COMPACTADO DE TIERRA CERNIDA M3 310.51 29.56 9,178.68 72.07 29.56 2,130.39 72.07 - 72.07 2,130.39 - 2,130.39 100.00
18 RELLENO Y COMPACTADO DE ZANJAS CON TIERRA COMUN M3 1,010.10 25.02 25,272.70 352.17 25.02 8,811.29 352.05 - 352.05 8,808.29 - 8,808.29 99.97
19 CUNETAS DE HORMIGON SIMPLE E= 5 CM, ANCHO = 30 CM ML 1,707.38 53.23 90,883.84 - 53.23 - - - - - - - -
20 PERFILADO Y COMPACTADO DE LA SUB RASANTE M2 9,282.95 3.94 36,574.82 8,879.96 3.94 34,987.04 8,500.00 - 8,500.00 33,490.00 - 33,490.00 95.72
21 CONFORMACION DE CAPA SUB BASE ET=0.15 M M3 1,392.44 138.00 192,156.72 1,332.00 138.00 183,816.00 1,275.00 53.94 1,328.94 175,950.00 7,443.72 183,393.72 99.77
22 LOSA DE HORMIGON E=0.20 M M2 8,770.74 231.81 2,033,145.24 8,907.30 231.81 2,064,801.21 5,978.32 2,767.44 8,745.76 1,385,834.36 641,520.27 2,027,354.63 98.19
23 CORDON DE ACERA DE 20*40 CM 1:2:4 ML 331.78 117.70 39,050.51 153.76 117.70 18,097.55 - - - - - - -
24 COLOCACION Y PROVISION DE DADOS DE Hº M3 3.00 1,175.46 3,526.38 3.00 1,175.46 3,526.38 - - - - - - -
25 DEMOLICION DE CORDON DE ACERA ML 10.00 5.18 51.80 10.00 5.18 51.80 - - - - - - -
26 SEÑALIZACION HORIZONTAL (DIVISOR DE CARRIL) ML 1,138.25 7.38 8,400.29 1,138.25 7.38 8,400.29 - - - - - - -
27 SEÑALIZACION VERTICAL (INFORMATIVA) PZA 10.00 1,545.60 15,456.00 10.00 1,545.60 15,456.00 - - - - - - -
28 SEÑALIZACION VERTICAL (PREVENTIVA) PZA 15.00 677.20 10,158.00 15.00 677.20 10,158.00 - - - - - - -
29 SEÑALIZACION VERTICAL (RESTRICTIVA) PZA 15.00 677.20 10,158.00 15.00 677.20 10,158.00 - - - - - - -
30 SEÑALIZACION HORIZONTAL (PASOS DE CEBRA) M2 120.00 23.39 2,806.80 134.00 23.39 3,134.26 - - - - - - -
31 SEÑALIZACION HORIZONTAL (OJOS DE GATO) PZA 426.00 79.23 33,751.98 426.00 79.23 33,751.98 - - - - - - -
32 ROMPE MUELLES A= 2 M ; H= 10 CM ML 20.00 162.96 3,259.20 40.00 162.96 6,518.40 - - - - - - -
33 PAPELERO METALICO PZA 25.00 1,187.44 29,686.00 24.00 1,187.44 28,498.56 - - - - - - -
34 ARBORIZACION PZA 150.00 30.75 4,612.50 150.00 30.75 4,612.50 - - - - - - -
35 PROTECTORES DE MADERA - ARBOL PZA 150.00 195.28 29,292.00 150.00 195.28 29,292.00 - - - - - - -
36 LIMPIEZA Y RETIRO DE ESCOMBROS GLB 1.00 5,952.45 5,952.45 1.00 5,952.45 5,952.45 - - - - - - -
ITEMS NUEVOS -
37 PROVISIÓN Y COLOCADO DE TUBOS DE H°S° D=400 MM ML - - - 300.53 165.21 49,650.56 298.24 - 298.24 49,272.23 - 49,272.23 99.24
38 PROVISIÓN Y COLOCADO DE TUBOS DE H°S° D=450 MM ML - - - 306.60 210.98 64,686.47 296.95 - 296.95 62,650.51 - 62,650.51 96.85
39 PROVISIÓN Y COLOCADO DE TUBOS DE H°S° D=500 MM ML - - - 350.91 260.93 91,562.95 194.00 - 194.00 50,620.42 - 50,620.42 55.28
40 MEJORAMIENTO DE SUB-RASANTE E = 0,20 M (70% SUELO + 30% MAT. YACIMIENTO) M3 - - - 1,775.98 69.72 123,821.33 1,700.00 - 1,700.00 118,524.00 - 118,524.00 95.72
41 RELLENO ZANJA C/MAT. SELECCIONADO (70% SUELO + 30% MAT. YACIMIENTO) M3 - - - 748.77 56.84 42,560.09 693.44 - 693.44 39,415.13 - 39,415.13 92.61

CORRECCION POR REDONDEO ARITMETICO

GRAN TOTAL 3,148,955.58 3,332,237.34 2,259,761.55 734,572.93 2,994,334.48

IMPORTE CERTIFICADO Bs: 734,572.93


DEDUCCION POR ANTICIPO (20%) Bs: 146,914.59
LIQUIDO PAGABLE Bs: 587,658.34 SON: QUINIENTOS OCHENTA Y SIETE MIL SEIS CIENTOS CINCUENTA Y NUEVE 08/100 BOLIVIANOS

SUPERVISOR CONTRATISTA FISCAL DE OBRA DIRECTOR DE OBRAS


GOBIERNO MUNICIPAL DE EL ALTO

LICITACION N° LP/CPN-O/006/09

OBRA:
PAVIMENTADO AV. BAUTISTA SAAVEDRA
SECTOR "F" Y "G"

CONTRATO MODIFICATORIO Nº 2

SUPERVISOR:
ING. ARMANDO QUISPE CALLE
ZONA:
DISTRITAL
DISTRITO:
Nº 7
CONTRATISTA:
SOCIEDAD CONSTRUCTORA "CONSTEC" SRL.

EL ALTO, MAYO DE 2010


OBRA:
0 PAVIMENTADO AV. BAUTISTA SAAVEDRA
SECTOR "F" Y "G"

COMPUTOS MÉTRICOS
EL ALTO, MAYO DE 2010
OBRA:
0 PAVIMENTADO AV. BAUTISTA SAAVEDRA
SECTOR "F" Y "G"

PRECIOS UNITARIOS

EL ALTO, MAYO DE 2010


OBRA:
### PAVIMENTADO AV. BAUTISTA SAAVEDRA
SECTOR "F" Y "G"

DOCUMENTOS LEGALES
EL ALTO, MAYO DE 2010

OBRA:
0 PAVIMENTADO AV. BAUTISTA SAAVEDRA
SECTOR "F" Y "G"

ESPECIFICACIONES TECNICAS
EL ALTO, MAYO DE 2010

OBRA:
0 PAVIMENTADO AV. BAUTISTA SAAVEDRA
SECTOR "F" Y "G"

PRECIOS UNITARIOS
EL ALTO, MAYO DE 2010
CONSTEC
SOCIEDAD CONSTRUCTORA

ITEM 8. CAMARA DE INSPECCION (HO SO) 0-2 M

PROGRESIVA No

0+860.53 1

TOTAL 1 PZA
CONSTEC
SOCIEDAD CONSTRUCTORA

ITEM 42. CAMARA DE INSPECCION PREFABRICADA

PROGRESIVA No

0+044.00 1

0+099.75 2

0+142.82 3

0+195.17 4

0+245.58 5

0+301.37 6

0+344.52 7

0+395.47 8

0+452.31 9

0+493.24 10

0+547.95 11

0+601.56 12

0+651.13 13

0+702.95 14

0+749.28 15

0+801.06 16

0+849.03 17

TOTAL 17 PZAS
CONSTEC
SOCIEDAD CONSTRUCTORA

ITEM 9. SUMIDERO TIPO R3 DE Hº Cº SIN PROVISIÓN DE TUBERIA

PROGRESIVA No

0+044.00 2

0+099.75 2

0+142.82 2

0+195.17 2

0+245.58 2

0+301.37 2

0+344.52 2

0+395.47 2

0+452.31 2

0+493.24 2

0+547.95 2

0+601.56 2

0+651.13 2

0+702.95 2

0+749.28 2

0+801.06 2

0+849.03 2

TOTAL 34 PZAS
CONSTEC
SOCIEDAD CONSTRUCTORA

ITEM 10. TAPAS DE HORMIGON ARMADO D=70 CM, E=10 CM DOSIF 1:2:3

PROGRESIVA No

0+065.00 1

0+150.00 1

0+190.00 1

0+200.00 1

0+250.00 1

0+295.00 1

0+350.00 1

0+400.00 1

0+475.00 1

0+550.00 1

0+600.00 1

0+650.00 1

0+700.00 1

0+750.00 1

0+802.00 1

0+852.00 1

TOTAL 17 PZAS
CONSTEC
SOCIEDAD CONSTRUCTORA

ITEM 11. ELEVACIóN Y/O REDUCCION DE TAPAS DE CAMARA

PROGRESIVA No

0+065.00 1

0+150.00 1

0+190.00 1

0+200.00 1

0+250.00 1

0+295.00 1

0+350.00 1

0+400.00 1

0+475.00 1

0+550.00 1

0+600.00 1

0+650.00 1

0+700.00 1

0+750.00 1

0+802.00 1

0+852.00 1

TOTAL 16 PZAS
CONSTEC
SOCIEDAD CONSTRUCTORA

ITEM 20 PERFILADO Y COMPACTADO DE LA SUB RASANTE

ANCHO LARGO AREA


DESCRIPCION TOTAL ACUMULADO
m m m2
AREA DE BOCACALLES
AREA 1 21.58 21.58

AREA 2 15.36 36.94

AREA 3 24.35 61.29

AREA 4 36.37 97.66

AREA 5 19.83 117.49

AREA 6 36.89 154.38

AREA 7 19.57 173.95

AREA 8 19.38 193.33

AREA 9 33.90 227.23

AREA 10 19.39 246.62

AREA 11 16.02 262.64

AREA 12 13.66 276.30

AREA 13 16.09 292.39

AREA 14 17.02 309.41

AREA 15 17.63 327.04

AREA 16 6.13 333.17

AREA 17 1.16 334.33

AREA 18 5.43 339.76

AREA DE PERFILADO Y COMPACTADO DE LA SUBRASANTE M² 339.76


CONSTEC
SOCIEDAD CONSTRUCTORA

ITEM 21 CONFORMACION DE CAPA SUB BASE ET=0.15 M

ANCHO LARGO PROF AREA VOLUMEN VOLUMEN


DESCRIPCION
M M M M² M³ M³
AREA DE BOCACALLES
AREA 1 0.15 21.58 3.24 3.24
AREA 2 0.15 15.36 2.30 5.54
AREA 3 0.15 21.34 3.20 8.74
AREA 4 0.15 36.37 5.46 14.20
AREA 5 0.15 19.83 2.97 17.17
AREA 6 0.15 36.84 5.53 22.70
AREA 7 0.15 19.57 2.94 25.64
AREA 8 0.15 19.39 2.91 28.55
AREA 9 0.15 33.90 5.09 33.64
AREA 10 0.15 42.32 6.35 39.99
AREA 11 0.15 16.02 2.40 42.39
AREA 12 0.15 13.66 2.05 44.44
AREA 13 0.15 16.09 2.41 46.85
AREA 14 0.15 17.01 2.55 49.40
AREA 15 0.15 17.63 2.64 52.04
AREA 16 0.15 6.13 0.92 52.96
AREA 17 0.15 5.43 0.81 53.77
AREA 18 0.15 1.16 0.17 53.94

VOLUMEN TOTAL DE SUBBASE M³ 53.94


CONSTEC
SOCIEDAD CONSTRUCTORA

ITEM 22. LOSA DE HORMIGON E=0.20 M

LONGITUD AREA ACUMUL


PROGRESIVA ANCHO M ESPESOR M AREA M2
M M2
0+610 0.00 10.00 0.20 0.00 0.00
0+620 10.00 9.98 0.20 99.90 99.90
0+630 10.00 10.00 0.20 99.90 199.80
0+640 10.00 10.01 0.20 100.05 299.85
0+650 10.00 10.01 0.20 100.10 399.95
0+660 10.00 9.98 0.20 99.95 499.90
0+670 10.00 9.98 0.20 99.80 599.70
0+680 10.00 9.98 0.20 99.80 699.50
0+690 10.00 9.98 0.20 99.80 799.30
0+700 10.00 10.01 0.20 99.95 899.25
0+710 10.00 9.99 0.20 100.00 999.25
0+720 10.00 9.99 0.20 99.90 1,099.15
0+730 10.00 9.99 0.20 99.90 1,199.05
0+740 10.00 9.98 0.20 99.85 1,298.90
0+750 10.00 9.96 0.20 99.70 1,398.60
0+760 10.00 9.99 0.20 99.75 1,498.35
0+770 10.00 9.99 0.20 99.90 1,598.25
0+780 10.00 9.97 0.20 99.80 1,698.05
0+790 10.00 9.95 0.20 99.60 1,797.65
0+800 10.00 10.00 0.20 99.75 1,897.40
0+810 10.00 9.96 0.20 99.80 1,997.20
0+820 10.00 9.96 0.20 99.60 2,096.80
0+830 10.00 9.96 0.20 99.60 2,196.40
0+840 10.00 9.98 0.20 99.70 2,296.10
0+850 10.00 9.99 0.20 99.85 2,395.95

AREA TRANSVERSAL A1 M² 2,395.95

INCREMENTO POR BOCACALLES


LONGITUD AREA ACUMUL
DESCRIPCION ANCHO M ESPESOR M AREA M2
M M2
AREA 1 21.58 21.58
AREA 2 15.36 36.94
AREA 3 21.34 58.28
AREA 4 36.37 94.65
AREA 5 19.83 114.48
AREA 6 36.84 151.37
AREA 7 19.57 170.94
AREA 8 19.39 190.33
AREA 9 33.90 224.23
AREA 10 42.32 255.55
AREA 11 16.02 282.57
AREA 12 13.66 296.23
AREA 13 16.09 312.32
AREA 14 17.01 329.33
AREA 15 17.63 346.96
AREA 16-A 6.13 353.09
AREA 17-A 5.43 358.52
AREA 18-A 1.16 359.68

AREA POR BOCACALLES A2 M² 359.68


CONSTEC
SOCIEDAD CONSTRUCTORA

ITEM 22. LOSA DE HORMIGON E=0.20 M

INCREMENTO POR DENTELLONES


LONGITUD AREA ACUMUL
PROGRESIVA ANCHO M ESPESOR M AREA M2
M M2
DENTELLON 1 10.36 0.20 0.20 4.14 4.14
DENTELLON 2 6.18 0.20 0.20 1.24 5.38
DENTELLON 3 5.10 0.20 0.20 1.02 6.40
DENTELLON 4 7.05 0.20 0.20 1.41 7.81
DENTELLON 5 10.88 0.20 0.20 2.18 9.99
DENTELLON 6 5.39 0.20 0.20 1.08 11.07
DENTELLON 7 11.86 0.20 0.20 2.37 13.44
DENTELLON 8 5.46 0.20 0.20 1.09 14.53
DENTELLON 9 5.45 0.20 0.20 1.09 15.62
DENTELLON 10 14.61 0.20 0.20 2.92 18.54
DENTELLON 11 14.20 0.20 0.20 2.84 21.38
DENTELLON 12 5.18 0.20 0.20 1.04 22.42
DENTELLON 13 5.02 0.20 0.20 1.00 23.42
DENTELLON 14 5.23 0.20 0.20 1.05 24.47
DENTELLON 15 5.33 0.20 0.20 1.07 25.54
DENTELLON 16 5.37 0.20 0.20 1.07 26.61
DENTELLON 17 - 1 9.27 0.20 0.20 1.85 28.46
DENTELLON 17 - 2 6.17 0.20 0.20 1.25 29.69

AREA BOCACALLES A3 M² 29.69

AREA TOTAL DE LOSA DE HORMIGON A1 + A2 + A3 M² (+) 2,785.32

AREA POR CAMARA DE D = 1 M M² (-) 0.79

DESCUENTO POR 32 CAMARAS (D=1 M) M² (-) 9.47

DESCUENTO POR 34 SUMIDEROS 0.70 x 1.20 m M² (-) 8.40

AREA TOTAL DE LOSA DE HORMIGON A CERTIFICAR M² 2,767.44


c
L
c
H L
Ls

CONSTEC
SOCIEDAD CONSTRUCTORA

ITEM 23. CORDON DE ACERA DE 20*401 CM 1:2:4

DESCRIPCION LONGITUD M LADO


0+000 4.60 izq
0+000 5.50 der
0+005 1.20 der
0+035 3.30 izq
0+115 1.45 der
0+140 7.00 izq
0+148 6.30 izq
0+150 3.00 der
0+155 2.00 izq
0+205 3.00 der
0+214 2.07 izq
0+318 3.00 der
0+325 3.20 izq
0+343 1.80 izq
0+350 2.05 der
0+390 3.10 der
0+446 2.35 der
0+489 3.10 der
0+487 1.30 izq
0+500 3.05 izq
0+513 1.60 izq
0+545 5.25 der
0+540 8.85 der
0+656 4.05 der
0+697 2.05 izq
0+744 2.10 izq
0+753 2.90 der
0+761 2.20 izq
0+767 2.16 izq

TOTAL 93.53 ML
c
L
c
H L
Ls

CONSTEC
SOCIEDAD CONSTRUCTORA

ITEM 24. COLOCACION Y PROVISION DE DADOS DE Hº

PROG VOL M³
0+000.00 1.00
0+540.00 1.00
0+840.00 1.00

TOTAL 0.00 M3
c
L
c
H L
Ls

CONSTEC
SOCIEDAD CONSTRUCTORA

ITEM 25. DEMOLICION DE CORDON DE ACERA

DESCRIPCION LONGITUD M LADO

0+005 1.20 der


0+035 3.30 izq
0+150 3.00 der
0+155 2.00 izq
0+214 2.07 izq
0+318 3.00 der
0+325 3.20 izq
0+390 3.10 der
0+446 2.35 der
0+489 3.10 der
0+487 1.30 izq
0+500 3.05 izq
0+697 2.05 izq
0+744 2.10 izq
0+753 2.90 der
0+761 2.20 izq
0+767 2.16 izq

TOTAL 42.08 ML
c
L
c
H L
Ls

CONSTEC
SOCIEDAD CONSTRUCTORA

ITEM 26. SEÑALIZACION HORIZONTAL (DIVISOR DE CARRIL)

DE A LONG M
EJE SEGMENTADO
0+000.00 0+851.09 425.55
LADO IZQUIERDO CONTINUA
0+000.00 0+140.00 179.83
0+150.00 0+190.00 102.31
0+200.00 0+350.00 149.12
0+350.00 0+545.00 189.09
0+560.00 0+698.00 143.60
0+705.00 0+750.00 47.94
0+755.00 0+851.09 97.86
LADO DERECHO CONTINUA
0+000.00 0+140.00 175.80
0+150.00 0+190.00 102.12
0+200.00 0+240.00 44.03
0+250.00 0+350.00 97.12
0+350.00 0+390.00 47.25
0+400.00 0+545.00 146.25
0+560.00 0+600.00 46.19
0+610.00 0+650.00 46.42
0+655.00 0+800.00 148.29
0+810.00 0+851.09 45.85

TOTAL 1,809.07 ML
c
L
c
H L
Ls

CONSTEC
SOCIEDAD CONSTRUCTORA

ITEM 27. SEÑALIZACION VERTICAL (INFORMATIVA)

ITEM 28. SEÑALIZACION VERTICAL (PREVENTIVA)

ITEM 29. SEÑALIZACION VERTICAL (RESTRICTIVA)

SEÑALIZACION VERTICAL DE A CANTIDAD


SEÑALIZACION INFORMATIVA 0+000.00 0+851.09 4.00 PZA
SEÑALIZACION PREVENTIVA 0+000.00 0+851.09 12.00 PZA
SEÑALIZACION RESTRICTIVA 0+000.00 0+851.09 7.00 PZA
c
L
c
H L
Ls

CONSTEC
SOCIEDAD CONSTRUCTORA

ITEM 30. SEÑALIZACION HORIZONTAL (PASOS DE CEBRA)

PROG AREA M2
0+000.00 16.75
0+135.00 16.75
0+150.00 16.75
0+340.00 16.75
0+360.00 16.75
0+540.00 16.75
0+560.00 16.75
0+840.00 16.75
FLECHA DE
6.60
DIRECCION

TOTAL 140.60 M2
c
L
c
H L
Ls

CONSTEC
SOCIEDAD CONSTRUCTORA

ITEM 31. SEÑALIZACION HORIZONTAL (OJOS DE GATO)

DESCRIPCION CANTIDAD
Divisor de carril 86 x 2 = 172 172.00
Rompe muelles 42 x 4 = 168 168.00
Ingreso y Fin 43 x 2 = 86 86.00

TOTAL 426.00 PZA


c
L
c
H L
Ls

CONSTEC
SOCIEDAD CONSTRUCTORA

ITEM 32. ROMPE MUELLES A = 2 M ; H = 10 CM

PROGRESIVA LONGITUD M
0+130.00 10.00
0+150.00 10.00
0+330.00 10.00
0+350.00 10.00
0+540.00 10.00
0+560.00 10.00
0+850.00 10.00

TOTAL 70.00 ML
c
L
c
H L
Ls

CONSTEC
SOCIEDAD CONSTRUCTORA

ITEM 33. PAPELERO METALICO

PROGRESIVA CANTIDAD
0+000.00 2.00
0+150.00 1.00
0+210.00 1.00
0+330.00 2.00
0+550.00 2.00
0+630.00 1.00
0+690.00 1.00
0+790.00 1.00
0+830.00 1.00

TOTAL 12.00 PZA


c
L
c
H L
Ls

CONSTEC
SOCIEDAD CONSTRUCTORA

ITEM 34. ARBORIZACION

DE A CANTIDAD
0+000.00 0+140.00 7.00
0+340.00 0+540.00 10.00

TOTAL 17.00 PZA


c
L
c
H L
Ls

CONSTEC
SOCIEDAD CONSTRUCTORA

ITEM 35. PROTECTORES DE MADERA - ARBOL

DE A CANTIDAD
0+000.00 0+140.00 7.00
0+340.00 0+540.00 10.00

TOTAL 17.00 PZA


Lc
LcH
Ls

CONSTEC
SOCIEDAD CONSTRUCTORA

ITEM 40 MEJORAMIENTO DE SUB-RASANTE E = 0,20 M (70% SUELO + 30% MAT. YACIMIENTO)

ANCHO LARGO PROF AREA VOLUMEN VOLUMEN


DESCRIPCION
M M M M² M³ M³
AREA DE BOCACALLES
AREA 1 0.20 14.50 2.90 2.90
AREA 2 0.20 21.58 4.32 7.22
AREA 3 0.20 15.36 3.07 10.29
AREA 4 0.20 24.35 4.87 15.16
AREA 5 0.20 36.37 7.27 22.43
AREA 6 0.20 19.83 3.97 26.40
AREA 7 0.20 36.89 7.38 33.78
AREA 8 0.20 19.57 3.91 37.69
AREA 9 0.20 19.38 3.88 41.57
AREA 10 0.20 33.90 6.78 48.35
AREA 11 0.20 19.39 3.88 52.23
AREA 12 0.20 16.02 3.20 55.43
AREA 13 0.20 13.66 2.73 58.16
AREA 14 0.20 16.09 3.22 61.38
AREA 15 0.20 17.02 3.40 64.78
AREA 16 0.20 17.63 3.53 68.31
AREA 17 0.20 111.75 22.35 90.66

VOLUMEN TOTAL DE SUB RASANTE M³ 64.78


RESPALDO FOTOGRÁFICO

VERIFICACION DE DENSIDADES EN BOCACALLES

CONTROL DE RESISTENCIAS
UMSA
RESPALDO FOTOGRÁFICO

CONSTRUCCION DE SUMIDEROS

HORMIGONADO DE LOSA 0 + 700


RESPALDO FOTOGRÁFICO

LETRERO DE OBRA
RESPALDO FOTOGRÁFICO

CORTE DE LOSA PARA EL SELLADO

HORMIGONADO DE LA LOSA
OBRA:

PAVIMENTADO AV. BAUTISTA


SAAVEDRA SECTOR "F" Y "G"

30. CARPETA DE PROCESO DE ADJUDICACION (Si


corresponde)

EL ALTO, AGOSTO DE 2010


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

También podría gustarte