Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Fletes
Fletes
FLETE TERRESTRE
N° de elementos N° de viajes Peso/tubo (5m) Peso Total
202.12 0.04 0.78 158.26 157.6536
152.68 0.05 1.01 153.74 154.2068
283.09 0.15 1.27 360.37 359.5243
45.71 0.05 2.38 108.89 108.7898
75.74 0.14 3.75 284.17 284.025
1.6 0.01 8.02 12.84 12.832
23 0.16 12.29 282.72 282.67
13 0.05 22.55 293.15 293.15
27 2.25 22.5 607.5 607.5
ÚMERO TOTAL DE VIAJES 2.9
DONDEO DE N° DE VIAJES 3
SO TOTAL DE TUBERIAS PVC 1360.99
SO TOTAL DE TUBERIAS F°G° 293.15
UNIDAD BÁSICA DE SANEAMIENTO (UBS)
CIMIENTO SOBRECIMIENTO MUROS
HORMIGON PIEDRA CEMENTO CEMENTO ARENA
HORMIGON PIEDRA
(LATAS) (LATAS) (BOLSAS) (BOLSAS) (LATAS)
60 23 4 33 4 2 35
0.02 0.02 42.5 0.02 0.02 42.5 0.02
2004 768.2 170 1102.2 133.6 85 1169
POZO PERCOLADOR
LADRILLO GRAVA TAPA DE POZO
ARTESANAL (LATAS) CEMENTO ARENA GRAVA
240 80 1
2.8 0.02 42.5
672 2672 42.5 3386.5
356695.8
68331.06
425,026.86
15,741.74
ANEAMIENTO (UBS)
MUROS COLUMNAS
CEMENTO ARENA GRAVA DE CEMENTO
LADRILLO
BOLSAS DE RÍO 1/2'' (KG)
4 380 6 4 47.5
42.5 2.8 0.02 0.02 1
170 382.8 200.4 133.6 47.5 6366.3 KG
9,752.80