Está en la página 1de 105

97 DIAS

ITEM DESCRIPCION UND.

OBRA
02 CALLE MANCO CAPAC
02.01 OBRAS PRELIMINARES
02.01.01 TRAZOS NIVELES Y REPLANTEO
02.01.01.01 TRAZO Y REPLANTEO PRELIMINAR m2
MATERIALES
CLAVOS PARA MADERA CON CABEZA DE 3" kg

HOMRIGON m3

CEMENTO PORTLAND TIPO 1 (42.5 kg) bol

YESO BOLSA 28 kg bol

PINTURA ESMALTE gal

CORDEL m

02.01.01.02 TRAZO Y REPLANTEO DURANTE LA OBRA m2


MATERIALES
CLAVOS PARA MADERA CON CABEZA DE 3" kg
YESO BOLSA 28 kg bol
PINTURA ESMALTE gal
CORDEL m

02.02 MOVIMIENTO DE TIERRAS


02.02.01 CORTE MASIVO DE TERRENO CON MAQUINA EN ZONA URBANA m3
MATERIALES
PETROLEO D -2 gal

02.02.02 RELLENO Y COMPACTACION CON MATERIAL PROPIO SELECCIONADO m3


MATERIALES
PETROLEO D -2 gal

AGUA m3

02.02.03 RELLENO Y COMPACTACION CON MATERIAL DE CANTERA m3


MATERIALES
PETROLEO D -2 gal

MATERIAL DE PRESTAMO SELECCIONADO OBRA m3

AGUA m3

02.02.04 PERFILADO, NIVELACION Y COMPACTACION DE TERRENO m3


MATERIALES
GASOLINA 84 gal

AGUA m3

02.02.05 ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACION m3


MATERIALES
PETROLEO D -2 gal

AGUA m3
02.02.06 ELIMINACION DE MATERIAL EXCEDENTE DM=5km m3
MATERIALES
PETROLEO D -2 gal

02.03 DEMOLICIONES Y DESMONTAJES


02.03.01 DEMOLICION DE ESTRUCTURAS DE CONCRETO EN FORMA MANUAL m3
02.03.02 DEMOLICION DE PAVIMENTO DE 0.05m m2
02.04 MUROS DE CONTENCION
02.04.01 CONCRETO SIMPLE
02.04.01.01 CONCRETO SIMPLE M.C.H. 1:10 E=10CM (SOLADO) m2
MATERIALES
GASOLINA 84 gal

PIEDRA CHANCADA 1/2" Y 3/4" m3

ARENA GRUESA m3

AGUA m3

CEMENTO PORTLAND TIPO 1 (42.5 kg) bol

02.04.02 CONCRETO ARMADO


02.04.02.01 CONCRETO PARA MUROS DE CONCRETO fc= 175 kg/cm2 m3
MATERIALES
GASOLINA 84 gal

PIEDRA CHANCADA 1/2" Y 3/4" m3

ARENA GRUESA m3

AGUA m3

CEMENTO PORTLAND TIPO 1 (42.5 kg) bol

02.04.02.02 ENCOFRADO Y DESENCOFRADO PARA MURO DE CONTENCION m2


MATERIALES
ALAMBRE NEGRO N°8 kg

CLAVOS PARA MADERA CON CABEZA DE 3" kg

CLAVOS PARA MADERA CON CABEZA DE 4" kg

MADERA TORNILLO p2

02.04.03 OTROS
02.04.03.01 COLOCACION DE DRENES 2" und.
MATERIALES
TUBERIA PVC SAL 2" x 3M m

TUBERIA PVC-SAP CRIBADO PARA DRENAJE 6" m

02.04.03.02 COLOCACION DE GRAVA PARA FILTRO DE DRENAJE m3


MATERIALES
PIEDRA CHANCADA DE 3/4" m3

02.04.03.03 JUNTA DE DILATACION CON ESPUMA PLASTICA CON SELLADOR m


MATERIALES
JUNTA NEGRA gal

IMPRIMANTE PARA JUNTA SIM. CHEMA JUNTA gal

PEGAMENTO EN BASE DE CAUCHO SINTETICO gal

ESPUMA PLASTICA DURA A/DENSIDAD 2 X 1M E=2" und.

02.04.03.04 BARANDA METALICA TIPO 1 m


MATERIALES
ACERO CORRUGADO fy= 4200 kg/cm2 GRADO 60 kg

PLANCHA DE METAL DE 4" X 4" X1/4" und.

CEMENTO PORTLAND TIPO 1 (42.5 kg) bol

SOLDADURA CELLOCROD 3/16" kg

TUBO FIERRO GALVANIZADO ESTANDAR ISO-I 2 1/2" m

TUBO FIERRO GALVANIZADO ESTANDAR ISO-I 2 1/4" m

02.04.03.05 PINTADO DE MURO EXTERIOR CON LATEX SUPERMATE m2


MATERIALES
PINTURA LATEX SUPERMATE gal

PINTURA IMPRIMANTE PARA MUROS gal

02.04.03.06 PINTURA EN CARPINTERIA METALICA CON ANTICORROSIVA + DOS m2


MANOS DE ESMALTE
MATERIALES
PINTURA ESMALTE SINTETICO gal

PINTURA ANTICORROSIVA gal

THINNER gal

02.04.04 CONTROL DE CALIDAD


02.04.04.01 CONTROL DE CALIDAD DE CONCRETO g/b
02.05 PAVIMENTO FLEXIBLE
02.05.01 BASE ESTABILIZADA CON LIGANTE ASFALTICO MODIFICADO m3
MATERIALES
PETROLEO D -2 gal

EMULSION ASFALTICA gal

PIEDRA CHANCADA 1/2" m3

MATERIAL GRANULAR PARA BASE m3

AGUA m3

02.05.02 MORTERO CON LIGANTE ASFALTICO MODIFICADO E=1.00cm (2 CAPAS) m2


MATERIALES
PETROLEO D -2 gal

EMULSION ASFALTICA gal

ARENA FINA m3

AGUA m3

CEMENTO PORTLAND TIPO 1 (42.5 kg) bol

02.06 SARDINEL ARMADO


02.06.01 CONCRETO ARMADO
02.06.01.01 CONCRETO PARA SARDINEL fc= 175 kg/cm2 m3
02.06.01.02 ENCOFRADO Y DESENCOFRADO DE SARDINEL m2
02.06.01.03 ACERO DE REFUERZO fy=4,200 kg/cm2 kg
MATERIALES
ALAMBRE NEGRO N°16 kg

ACERO CORRUGADO fy= 4200 kg/cm2 GRADO 60 kg

02.07 OBRAS DE ARTE


02.07.01 VEREDAS
02.07.01.01 VEREDAS DE CONCRETO
02.07.01.01.01 BASE GRANULAR PARA VEREDAS m2
MATERIALES
GASOLINA 84 gal

MATERIAL DE PRESTAMO SELECCIONADO OBRA m3

AGUA m3

02.07.01.01.02 EXCAVACION MANUAL PARA UÑA DE VEREDA m3


02.07.01.01.03 EMPEDRADO e=0.10m m2
MATERIALES
PIEDRA MEDIANA DE 4" m3

02.07.01.01.04 CONCRETO PARA VEREDA fc=140 kg/cm2 m3


MATERIALES
GASOLINA 84 gal

PIEDRA CHANCADA DE 1/2" Y 3/4" m3

ARENA GRUESA m3

AGUA m3

CEMENTO PORTLAND TIPO 1 (42.5 kg) bol

02.07.01.01.05 ENCOFRADO Y DESENCOFRADO DE VEREDA m2


MATERIALES
ALAMBRE NEGRO N°8 kg

CLAVOS DE MADERA CON CABEZA DE 3" kg

CLAVOS DE MADERA CON CABEZA DE 4" kg

MADERA TORNILLO p2

02.07.01.01.06 JUNTA DE DILATACION CON ESPUMA PLASTICA CON SELLADOR m


MATERIALES
JUNTA NEGRA gal

IMPRIMANTE PARA JUNTA SIM. CHEMA JUNTA gal

PEGAMENTO EN BASE DE CAUCHO SINTETICO gal

ESPUMA PLASTICA DURA A/DENSIDAD 2 X 1M E=2" und.

02.07.01.02 REVESTIMIENTO + BRUÑADO


02.07.01.02.01 FORJADO Y REVESTIMIENTO DE VEREDAS m2
MATERIALES
ARENA FINA m3

ARENA GRUESA m3

AGUA m3

CEMENTO PORTLAND TIPO 1 (42.5 kg) bol

02.07.01.02.02 BRUÑAS DE 1 x 1 cm EN VEREDAS m


MATERIALES
AGUA m3

CEMENTO PORTLAND TIPO 1 (42.5 kg) bol

REGLA DE MADERA p2

02.08 AREAS VERDES


02.08.01 COLOCACION DE GRASS (TEPES) m2
02.09 INSTALACIONES SANITARIAS
02.09.01 SANEAMIENTO BASICO DE AGUA POTABLE
02.09.01.01 SUMINISTRO E INSTALACION DE LA LINEA DE RED
02.09.01.01.01 TUBERIA 110 MM (4") PVC ISO C - 7.5 m
MATERIALES
TUBERIA PVC 110MM (4") ISO C-7.5 m

ANILLO DE JEBE 110MM und.

02.09.01.02 INSTALACION DE TUBERIA


02.09.01.02.01 INSTALACION DE TUBERIA PVC - ISO 110 mm C- 10 m
MATERIALES
LUBRICANTE PARA PVC gal

02.09.01.03 PRUEBAS HIDRAULICAS Y DESINFECCION DE TUBERIAS


02.09.01.03.01 PRUEBA HIDRAULICA + DESINFECCION DE TUBERIA DE AGUA POTABLE m
MATERIALES
AGUA m3

HIPOCLORITO DE CALCIO AL 70% kg

02.09.01.04 ACCESORIOS DE REDES


02.09.01.04.01 SUMINISTRO E INSTALACION DE TEE PVC ISO 110 MM und.
MATERIALES
TEE PVC 110MM pza

LUBRICANTE PARA PVC gal

ANILLO DE JEBE 110MM und.

02.09.01.05 CONEXIONES DOMICILIARIAS


02.09.01.05.01 CONEXIÓN DOMICILIARIA DE AGUA 4" A 1/2" (CONSIDERA und.
ABRAZADERA Y LLAVE CORPORATION)
MATERIALES
ABRAZADERA DE FIERRO GALVANIZADO 1/2" und.

TUBERIA PVC - CLASE 10 1/2" X 5M CR m

CODO PVC SAP S/P 1/2" X 90° und.

MARCO Y TAPA DE FIERRO FUNDIDO 1/2" - 3/4" und.

NIPLE-TUERCA-EMPAQUETADURA 1/2" und.

CAJA DE CONCRETO P/MEDIDOR 1/2" - 3/4" und.

PEGAMENTO PARA PVC gal

CINTA TEFLON rll

NIPLE DE FIERRO GALVANIZADO DE 3/4" X 1/2" und.

UNION SIMPLE PVC SAP CLASE 10 1/2" C/R und.

VALVULA DE PASO 1/2" und.

02.09.01.06 CONEXIÓN DOMICILIARIA PROVISIONAL


02.09.01.06.01 CONEXIÓN DOMICILIARIA DE AGUA 4" A 1/2" PROVISIONAL und.
02.09.02 RED DE DESAGUE
02.09.02.01 CONEXIONES DOMICILIARIAS
02.09.02.01.01 CONEXIÓN DOMICILIARIA DE DESAGUE und.
02.09.02.02 CONEXIÓN DOMICILIARIA PROVISIONAL
02.09.02.02.01 CONEXIÓN DOMICILIARIA DE DESAGUE PROVISIONAL und.
MATERIALES
ABRAZADERA DE 4" und.

MANGA REFORZADA DE 4" m


PROGRAMADO EXP. TECNICO AVANCE ANTERIOR AVANCE SEMANAL

METRADO //
PRECIO
CANTIDAD DE COSTO PARCIAL METRADO MONTO DE LA % 9/3/2019
MAT. UNITARIO VALORIZACION
TOTAL

165.33 1.81 299.25 165.33

0.0050 4.80 0.02 0.83


0.0002 45.00 0.01 0.03
0.0008 22.00 0.02 0.13
0.0300 15.50 0.47 4.96
0.0200 35.00 0.70 3.31
0.1200 0.15 0.02 19.84
165.33 1.89 312.47 20.66

0.0050 4.80 0.02 0.10


0.0300 15.50 0.47 0.62
0.0200 35.00 0.70 0.41
0.1200 0.15 0.02 2.48

527.22 5.13 2,704.64 32.95

0.0080 12.00 0.10 0.26


261.17 8.98 2,345.31

0.0184 12.00 0.22


0.0500 5.00 0.25
174.11 56.23 9,790.21

0.0184 12.00 0.22


1.0500 45.00 47.25
0.0500 5.00 0.25
91.58 89.01 8,151.54

0.3067 13.50 4.14


0.0500 5.00 0.25
345.87 8.37 2,894.93

0.1903 12.00 2.28


0.0180 5.00 0.09
345.87 16.83 5,820.99

0.4010 12.00 4.81

36.34 136.91 4,975.31


144.75 25.56 3,699.81

84.87 36.03 3,057.87

0.0288 13.50 0.39


0.0650 45.00 2.93
0.0550 45.00 2.48
0.0100 5.00 0.05
0.4000 22.00 8.80

122.72 420.79 51,639.35

0.3577 13.50 4.83


0.6500 45.00 29.25
0.5500 45.00 24.75
0.1860 5.00 0.93
8.5000 22.00 187.00
349.99 76.77 26,868.73

0.1200 4.50 0.54


0.1100 4.80 0.53
0.1100 4.80 0.53
4.0700 5.60 22.79

22.00 29.44 647.68

0.5000 2.00 1.00


2.5000 6.00 15.00
24.75 70.85 1,753.54

1.0000 45.00 45.00


64.32 46.89 3,015.96

0.1700 58.00 9.86


0.0430 180.00 7.74
0.0020 48.00 0.10
0.6000 29.00 17.40
49.50 110.41 5,465.30
0.2200 3.50 0.77
2.0000 3.00 6.00
0.0500 22.00 1.10
0.2000 15.00 3.00
2.2000 25.00 55.00
1.0000 20.00 20.00
111.38 18.43 2,052.73

0.0800 60.00 4.80


0.1300 35.00 4.55

29.70 10.19 302.64

0.0500 35.00 1.75


0.0500 35.00 1.75
0.0120 15.00 0.18

1.00 2,245.00 2,245.00


0.00
14.85 508.14 7,545.88

0.4784 12.00 5.74


24.0000 18.00 432.00
0.2500 45.00 11.25
1.0500 35.00 36.75
0.0950 5.00 0.48
148.50 18.09 2,686.37

0.0460 12.00 0.55


0.6250 18.00 11.25
0.0120 80.00 0.96
0.4491 5.00 2.25
0.0080 22.00 0.18

6.35 420.79 2,672.02


34.00 50.17 1,705.78
115.61 5.24 605.80

0.0600 4.50 0.27


1.0500 3.50 3.68

120.50 27.14 3,270.37


0.0307 13.50 0.41
0.3600 45.00 16.20
0.0180 5.00 0.09
5.73 34.23 196.14
120.50 58.14 7,005.87

1.2 45.00 54.00


24.59 359.27 8,834.45

0.1917 13.50 2.59


0.5500 45.00 24.75
0.5400 45.00 24.30
0.1860 5.00 0.93
6.5000 22.00 143.00
38.01 64.70 2,459.25

0.2600 4.50 1.17


0.0700 4.80 0.34
0.0600 4.80 0.29
4.8300 5.60 27.05
169.77 46.89 7,960.52

0.1700 58.00 9.86


0.0430 180.00 7.74
0.0002 48.00 0.01
0.6000 29.00 17.40

120.50 11.80 1,421.90

0.0150 80.00 1.20


0.0480 45.00 2.16
0.0040 5.00 0.02
0.1400 22.00 3.08
373.91 1.05 392.61

0.0030 5.00 0.02


0.0010 22.00 0.02
0.0030 4.50 0.01

9.96 13.00 129.48

48.48 20.34 986.08


1.0300 19.00 19.57
0.1600 4.80 0.77

48.48 1.96 95.02

0.0050 115.00 0.58

48.48 3.52 170.65

0.1700 5.00 0.85


0.0050 6.00 0.03

4.00 84.85 339.40

1.0000 55.00 55.00


0.0050 115.00 0.58
2.0000 4.80 9.60

4.00 142.82 571.28

1.0000 15.00 15.00

1.0000 2.30 2.30


1.0000 1.50 1.50
1.0000 25.00 25.00

1.0000 6.00 6.00

1.0000 24.00 24.00

0.0200 115.00 2.30


0.0160 1.50 0.02

1.0000 15.00 15.00

1.0000 1.50 1.50


1.0000 12.00 12.00

4.00 61.63 246.52

4.00 193.12 772.48

4.00 80.55 322.20

4.0000 2.50 10.00


10.0000 5.00 50.00
AVANCE SEMANAL - SEPTIEMBRE AVANCE ACTUAL AVANC

MONTO DE LA
9/4/2019 9/5/2019 9/6/2019 9/7/2019 METRADO VALORIZACION % 9/9/2019
TOTAL

165.33 299.25 100

0.83 3.98
0.03 1.35
0.13 2.86
4.96 76.88
3.31 115.85
19.84 2.98
20.66 20.66 20.66 20.66 103.3 195.24 62.48 20.66

0.10 0.10 0.10 0.10 0.52 2.48 0.10


0.62 0.62 0.62 0.62 3.10 48.03 0.62
0.41 0.41 0.41 0.41 2.07 72.31 0.41
2.48 2.48 2.48 2.48 12.40 1.86 2.48

32.95 32.95 32.95 32.95 164.75 845.17 31.25 32.95

0.26 0.26 0.26 0.26 1.32 15.82 0.26


AVANCE SEMANAL SEPTIEMBRE AVANCE ACTUAL

MONTO DE
9/10/2019 9/11/2019 9/12/2019 9/13/2019 9/14/2019 METRADO LA %
VALORIZACI
ON TOTAL

20.66 20.66 61.98 117.14 37.49

0.10 0.10 0.30 1.44


0.62 0.62 1.86 28.83
0.41 0.41 1.23 43.05
2.48 2.48 7.44 1.12

32.95 32.95 32.95 32.95 32.95 197.7 1014.20 37.50

0.26 0.26 0.26 0.26 0.26 1.56 18.72


AVANCE SEMANAL SEPTIEMBRE AVANCE ACTUAL

MONTO DE
9/16/2019 9/17/2019 9/18/2019 9/19/2019 9/20/2019 9/21/2019 METRADO LA
VALORIZACI
ON TOTAL

32.95 32.95 32.95 32.95 32.95 164.75 845.17

0.26 0.26 0.26 0.26 0.26 1.3 15.60


6.06 6.06 12.12 1659.35

21.22 21.22 21.22 63.66 2293.67

0.61 0.61 0.61 1.83 24.75


1.38 1.38 1.38 4.14 186.21
1.17 1.17 1.17 3.50 157.56
0.21 0.21 0.21 0.64 3.18
8.49 8.49 8.49 25.46 560.21

10.23 10.23 20.46 8609.36

3.66 3.66 7.32 98.80


6.65 6.65 13.30 598.46
5.63 5.63 11.25 506.39
1.90 1.90 3.81 19.03
86.96 86.96 173.91 3826.02
6.25 6.25 6.25 18.75 1439.44

0.75 0.75 0.75 2.25 10.13


0.69 0.69 0.69 2.06 9.90
0.69 0.69 0.69 2.06 9.90
25.44 25.44 25.44 76.31 427.35

11.00 11.00 22 647.68

5.50 5.50 11.00 22.00


27.50 27.50 55.00 330.00
12.38 12.38 24.76 1754.25

12.38 12.38 24.76 1114.20


16.08 16.08 16.08 48.24 2261.97

2.7336 2.7336 2.7336 8.2008 475.65


0.69144 0.69144 0.69144 2.07432 373.38
0.03216 0.03216 0.03216 0.09648 4.63
9.648 9.648 9.648 28.944 839.38
49.50 49.5 5465.30
10.89 10.89 38.12
99.00 99.00 297.00
2.48 2.48 54.45
9.90 9.90 148.50
108.90 108.90 2722.50
49.50 49.50 990.00
15.91 15.91 15.91 47.73 879.66

1.2728 1.2728 1.2728 3.8184 60.00


2.0683 2.0683 2.0683 6.2049 35.00

14.85 14.85 29.7 302.64

0.7425 0.7425 1.485 51.98


0.7425 0.7425 1.485 51.98
0.1782 0.1782 0.3564 5.35
ANCE ACTUAL AVANCE SEMANAL SEPTIEMBRE AVANCE ACTUAL

% 23/0919 9/24/2019 9/25/2019 9/26/2019 9/27/2019 9/28/2019 METRADO

31.25
33.35 6.06 6.06 6.06 6.06 24.24
16.08 16.08 16.08 16.08 64.32

75.01 21.22 21.22

0.61 0.61
1.38 1.38
1.17 1.17
0.21 0.21
8.49 8.49

16.67 10.23 10.23 10.23 10.23 10.23 10.23 61.38

3.66 3.66 3.66 3.66 3.66 3.66 21.96


6.65 6.65 6.65 6.65 6.65 6.65 39.90
5.63 5.63 5.63 5.63 5.63 5.63 33.76
1.90 1.90 1.90 1.90 1.90 1.90 11.42
86.96 86.96 86.96 86.96 86.96 86.96 521.73
5.36 6.25 6.25 6.25 6.25 6.25 6.25 37.5

0.75 0.75 0.75 0.75 0.75 0.75 4.50


0.69 0.69 0.69 0.69 0.69 0.69 4.13
0.69 0.69 0.69 0.69 0.69 0.69 4.13
25.44 25.44 25.44 25.44 25.44 25.44 152.63

100.00

100.04

75.00 16.08 16.08

2.7336 2.7336
0.69144 0.69144
0.03216 0.03216
9.648 9.648
100.00
42.85 15.91 15.91 15.91 15.91 63.64

1.2728 1.2728 1.2728 1.2728 5.0912


2.0683 2.0683 2.0683 2.0683 8.2732

100.00
4.85 4.85 4.85 4.85 4.85 4.85 29.1

0.02425 0.02425 0.02425 0.02425 0.02425 0.02425 0.1455

24.24 24.24 48.48

4.1208 4.1208 8.2416


0.1212 0.1212 0.2424

0.8 0.8 0.8 0.8 0.8 4.00

0.80 0.80 0.80 0.80 0.80 4.00

0.80 0.80 0.80 0.80 0.80 4.00


0.80 0.80 0.80 0.80 0.80 4.00
0.80 0.80 0.80 0.80 0.80 4.00

0.80 0.80 0.80 0.80 0.80 4.00

0.80 0.80 0.80 0.80 0.80 4.00

0.02 0.02 0.02 0.02 0.02 0.08


0.01 0.01 0.01 0.01 0.01 0.06

0.80 0.80 0.80 0.80 0.80 4.00

0.80 0.80 0.80 0.80 0.80 4.00


0.80 0.80 0.80 0.80 0.80 4.00

0.8 0.8 0.8 0.8 0.8 4.00

1.33 1.33 1.33 3.99

1.00 1.00 1.00 3.00

4.00 4.00 4.00 12.00


10.00 10.00 10.00 30.00
AVANCE ACTUAL AVANCE SEMANAL OCTUBRE

MONTO DE
LA % 9/30/2019 10/1/2019 10/2/2019 10/3/2019 10/4/2019 10/5/2019
VALORIZACI
ON TOTAL
3318.70 66.70
1644.02 44.44 16.08 16.08 16.08 16.08 16.08

764.56 25.00

8.25
62.07
52.52
1.06
186.74

25828.09 50.02 10.23 10.23 10.23 10.23

296.40 3.66 3.66 3.66 3.66


1795.37 6.65 6.65 6.65 6.65
1519.16 5.63 5.63 5.63 5.63
57.08 1.90 1.90 1.90 1.90
11478.06 86.96 86.96 86.96 86.96
2878.88 10.71 6.25 6.25 6.25 6.25 6.25 6.25

20.25 0.75 0.75 0.75 0.75 0.75 0.75


19.80 0.69 0.69 0.69 0.69 0.69 0.69
19.80 0.69 0.69 0.69 0.69 0.69 0.69
854.70 25.44 25.44 25.44 25.44 25.44 25.44

753.99 25.00

158.55
124.46
1.54
279.79
1172.89 57.14

305.47
289.56
57.04 60.02 4.85 4.85 4.85 4.85

16.73 0.02425 0.02425 0.02425 0.02425

170.65 100.00

41.21
1.45

571.28 100.00

60.00

9.20
6.00
100.00

24.00

96.00

9.20
0.10

60.00

6.00
48.00

246.52 100.00

770.55 99.75

241.65 75.00 1.00

30.00 4.00
150.00 10.00
AVANCE ACTUAL AVANCE SEMANAL OCTUBRE

MONTO DE
METRADO LA % 10/7/2019 10/9/2019 10/10/2019 10/11/2019 10/12/2019
VALORIZACI
ON TOTAL

6.87 6.87

0.13 0.13
0.34 0.34
6.00 6.00

0.11 0.11
6.30 6.30
0.30 0.30
80.4 2055.02 55.54

40.92 17218.73 33.34

14.64 197.60
26.60 1196.91
22.51 1012.77
7.61 38.06
347.82 7652.04
37.5 2878.88 10.71 6.25 6.25 6.25 6.25 6.25

4.50 20.25 0.75 0.75 0.75 0.75 0.75


4.13 19.80 0.69 0.69 0.69 0.69 0.69
4.13 19.80 0.69 0.69 0.69 0.69 0.69
152.63 854.70 25.44 25.44 25.44 25.44 25.44
19.4 38.02 40.02

0.097 11.16

1 80.55 25.00

4.00 10.00
10.00 50.00
AVANCE ACTUAL AVANCE SEMANAL OCTUBRE

MONTO DE
METRADO LA % 10/14/2019 10/15/2019 10/16/2019 10/17/2019 10/18/2019
VALORIZACI
ON TOTAL

13.74 123.39 5.26 6.87 6.87 6.87 6.87 6.87

0.25 3.03 0.13 0.13 0.13 0.13 0.13


0.69 3.44 0.34 0.34 0.34 0.34 0.34
12.00 674.76 6.89 6.00 6.00 6.00 6.00 6.00

0.22 2.65 0.11 0.11 0.11 0.11 0.11


12.60 567.00 6.30 6.30 6.30 6.30 6.30
0.60 3.00 0.30 0.30 0.30 0.30 0.30
31.25 2399.06 8.93 6.25 6.25 6.25 6.25 6.25

3.75 16.88 0.75 0.75 0.75 0.75 0.75


3.44 16.50 0.69 0.69 0.69 0.69 0.69
3.44 16.50 0.69 0.69 0.69 0.69 0.69
127.19 712.25 25.44 25.44 25.44 25.44 25.44
AVANCE ACTUAL AVANCE SEMANAL OCTUBRE

MONTO DE
10/19/2019 METRADO LA % 10/21/2019 10/22/2019 10/23/2019 10/24/2019
VALORIZACI
ON TOTAL

6.87 41.22 370.16 15.78 6.87 6.87 6.87 6.87

0.13 0.76 9.10 0.13 0.13 0.13 0.13


0.34 2.06 10.31 0.34 0.34 0.34 0.34
6.00 36.00 2024.28 20.68 6.00 6.00 6.00 6.00

0.11 0.66 7.95 0.11 0.11 0.11 0.11


6.30 37.80 1701.00 6.30 6.30 6.30 6.30
0.30 1.80 9.00 0.30 0.30 0.30 0.30
6.25 37.5 2878.88 10.71 6.25 6.25 6.25 6.25

0.75 4.50 20.25 0.75 0.75 0.75 0.75


0.69 4.13 19.80 0.69 0.69 0.69 0.69
0.69 4.13 19.80 0.69 0.69 0.69 0.69
25.44 152.63 854.70 25.44 25.44 25.44 25.44
16.16 16.16 328.69 33.33 16.16 16.16
16.6448 16.6448 316.25 16.64 16.64
2.5856 2.5856 12.41 2.59 2.59

4.00 4.00 339.40 100.00

4.00 4.00 220.00


0.02 0.02 2.30
8.00 8.00 38.40
AL OCTUBRE AVANCE ACTUAL AVANCE SEMANAL NOVIEMBRE

MONTO DE
10/25/2019 10/26/2019 METRADO LA % 10/28/2019 10/29/2019 10/30/2019
VALORIZACI
ON TOTAL

6.87 6.87 41.22 370.16 15.78 6.87 6.87 6.87

0.13 0.13 0.76 9.10 0.13 0.13 0.13


0.34 0.34 2.06 10.31 0.34 0.34 0.34
6.00 6.00 36.00 2024.28 20.68 6.00 6.00 6.00

0.11 0.11 0.66 7.95 0.11 0.11 0.11


6.30 6.30 37.80 1701.00 6.30 6.30 6.30
0.30 0.30 1.80 9.00 0.30 0.30 0.30
6.25 6.25 37.50 2878.88 10.71 6.25 6.25 6.25

0.75 0.75 4.50 20.25 0.75 0.75 0.75


0.69 0.69 4.13 19.80 0.69 0.69 0.69
0.69 0.69 4.13 19.80 0.69 0.69 0.69
25.44 25.44 152.63 854.70 25.44 25.44 25.44
0.50 0.50 1122.50 50.00 0.5
32.32 657.39 66.67
33.29 632.50
5.17 24.82
MANAL NOVIEMBRE AVANCE ACTUAL AVANCE SEMANAL NOVIEMBRE

MONTO DE
10/31/2019 11/2/2019 METRADO LA % 11/4/2019 11/5/2019 11/6/2019
VALORIZACI
ON TOTAL

6.87 6.87 34.35 308.46 13.15 6.87 6.87 6.87

0.13 0.13 0.63 7.58 0.13 0.13 0.13


0.34 0.34 1.72 8.59 0.34 0.34 0.34
6.00 6.00 30.00 1686.90 17.23 6.00 6.00 6.00

0.11 0.11 0.55 6.62 0.11 0.11 0.11


6.30 6.30 31.50 1417.50 6.30 6.30 6.30
0.30 0.30 1.50 7.50 0.30 0.30 0.30
6.25 6.25 31.25 2399.06 8.93 6.25 6.25 6.25

0.75 0.75 3.75 16.88 0.75 0.75 0.75


0.69 0.69 3.44 16.50 0.69 0.69 0.69
0.69 0.69 3.44 16.50 0.69 0.69 0.69
25.44 25.44 127.19 712.25 25.44 25.44 25.44
0.50 1122.50 50.00

14.85

7.10
356.40
3.71
15.59
1.41
NCE SEMANAL NOVIEMBRE AVANCE ACTUAL AVANCE SEMANAL NO

MONTO DE
11/7/2019 11/8/2019 11/9/2019 METRADO LA % 11/11/2019 12//11/19
VALORIZACI
ON TOTAL

6.87 6.87 6.87 41.22 370.16 15.78 6.87 6.87

0.13 0.13 0.13 0.76 9.10 0.13 0.13


0.34 0.34 0.34 2.06 10.31 0.34 0.34
6.00 6.00 6.00 36.00 2024.28 20.68 6.00 6.00

0.11 0.11 0.11 0.66 7.95 0.11 0.11


6.30 6.30 6.30 37.80 1701.00 6.30 6.30
0.30 0.30 0.30 1.80 9.00 0.30 0.30
6.25 6.25 6.25 37.50 2878.88 10.71 6.25 6.25

0.75 0.75 0.75 4.50 20.25 0.75 0.75


0.69 0.69 0.69 4.13 19.80 0.69 0.69
0.69 0.69 0.69 4.13 19.80 0.69 0.69
25.44 25.44 25.44 152.63 854.70 25.44 25.44
14.85 7545.88 100.00

7.10 85.25
356.40 6415.20
3.71 167.06
15.59 545.74
1.41 7.05
0.82 0.82 1.64 56.14 28.62 0.82 0.82

12.295

2.36
6.76
6.64
2.29
79.92
12.67 12.67 819.75 33.33 12.67 12.67

3.29 3.29 8.00 3.29 3.29


0.89 0.89 4.26 0.89 0.89
0.76 0.76 3.65 0.76 0.76
61.20 61.20 342.70 61.20 61.20
AVANCE SEMANAL NOVIEMBRE AVANCE ACTUAL AVANCE

MONTO DE
11/13/2019 11/14/2019 15/11/119 11/16/2019 METRADO LA % 11/18/2019
VALORIZACI
ON TOTAL

6.87 6.87 6.87 6.87 41.22 370.16 15.78 6.87

0.13 0.13 0.13 0.13 0.76 9.10 0.13


0.34 0.34 0.34 0.34 2.06 10.31 0.34
6.00 6.00 24.00 1349.52 13.78

0.11 0.11 0.44 5.30


6.30 6.30 25.20 1134.00
0.30 0.30 1.20 6.00
6.25 6.25 6.25 6.25 37.50 2878.88 10.71 6.25

0.75 0.75 0.75 0.75 4.50 20.25 0.75


0.69 0.69 0.69 0.69 4.13 19.80 0.69
0.69 0.69 0.69 0.69 4.13 19.80 0.69
25.44 25.44 25.44 25.44 152.63 854.70 25.44
21.21 21.21 21.21 21.21 84.84 1534.76 57.13 21.21

0.97566 0.97566 0.97566 0.97566 3.90 46.83 0.97566


13.25625 13.25625 13.25625 13.25625 53.03 954.45 13.25625
0.25452 0.25452 0.25452 0.25452 1.02 81.45 0.25452
9.525411 9.525411 9.525411 9.525411 38.10 190.51 9.525411
0.16968 0.16968 0.16968 0.16968 0.68 14.93 0.16968

11.33 11.33 568.43 33.32 11.33


0.82 0.82 0.82 4.10 140.34 71.55

12.295 24.59 8834.45 100.00

2.36 4.71 63.64


6.76 13.52 608.60
6.64 13.28 597.54
2.29 4.57 22.87
79.92 159.84 3516.37
25.34 1639.50 66.67

6.59 29.65
1.77 8.51
1.52 7.30
122.39 685.40
AVANCE SEMANAL NOVIEMBRE AVANCE ACTUAL

MONTO DE
11/19/2019 11/20/2019 11/21/2019 11/22/2019 11/23/2019 METRADO LA %
VALORIZACI
ON TOTAL

6.87 6.87 6.87 6.87 6.87 41.22 370.16 15.78

0.13 0.13 0.13 0.13 0.13 0.76 9.10


0.34 0.34 0.34 0.34 0.34 2.06 10.31

15.72 15.72 31.44 263.15 9.09

2.99 2.99 5.98 71.80


0.28 0.28 0.57 2.83
6.25 6.25 6.25 6.25 6.25 37.50 2878.88 10.71

0.75 0.75 0.75 0.75 0.75 4.50 20.25


0.69 0.69 0.69 0.69 0.69 4.13 19.80
0.69 0.69 0.69 0.69 0.69 4.13 19.80
25.44 25.44 25.44 25.44 25.44 152.63 854.70
21.21 21.21 63.63 1151.07 42.85

0.97566 0.97566 2.93 35.12


13.25625 13.25625 39.77 715.84
0.25452 0.25452 0.76 61.08
9.525411 9.525411 28.58 142.88
0.16968 0.16968 0.51 11.20

11.33 22.66 1136.85 66.65


14.45 14.45 14.45 14.45 57.80 302.87 50.00

0.87 0.87 0.87 0.87 3.47 15.61


15.17 15.17 15.17 15.17 60.69 212.42
30.13 30.13 60.26 3503.52 50.01

36.156 36.156 72.31 3254.04


AVANCE SEMANAL NOVIEMBRE AVANCE ACTUAL

MONTO DE
11/25/2019 11/26/2019 11/27/2019 11/28/2019 11/29/2019 11/30/2019 METRADO LA
VALORIZACI
ON TOTAL

6.87 6.87 61.69

0.13 0.13 1.52


0.34 0.34 1.72

45.79 45.79 91.58 8151.54

14.04 14.04 28.09 379.18


2.29 2.29 4.58 22.90
15.72 15.72 15.72 15.72 15.72 15.72 94.32 789.46

2.99 2.99 2.99 2.99 2.99 2.99 17.95 215.39


0.28 0.28 0.28 0.28 0.28 0.28 1.70 8.49
6.25 6.25 479.81

0.75 0.75 3.38


0.69 0.69 3.30
0.69 0.69 3.30
25.44 25.44 142.45
6.35 6.35 2672.02

14.45 14.45 14.45 14.45 57.80 302.87

0.87 0.87 0.87 0.87 3.47 15.61


15.17 15.17 15.17 15.17 60.69 212.42

24.10 24.10 24.10 24.10 24.10 120.50 3270.37


7.40 7.40 7.40 7.40 7.40 36.99 499.41
8.68 8.68 8.68 8.68 8.68 43.38 1952.10
0.43 0.43 0.43 0.43 0.43 2.17 10.85

30.13 30.13 60.26 3503.52

36.156 36.156 72.31 3254.04

18.86 18.86 18.86 56.58 2653.04

3.21 3.21 3.21 9.62 557.88


0.81 0.81 0.81 2.43 437.93
0.00 0.00 0.00 0.01 0.54
11.32 11.32 11.32 33.95 984.49

17.21 17.21 17.21 17.21 68.84 812.31

0.26 0.26 0.26 0.26 1.03 82.61


0.83 0.83 0.83 0.83 3.30 148.69
0.07 0.07 0.07 0.07 0.28 1.38
2.41 2.41 2.41 2.41 9.64 212.03
41.55 41.55 41.55 124.65 130.88

0.12 0.12 0.12 0.37 1.87


0.04 0.04 0.04 0.12 2.74
0.12 0.12 0.12 0.37 1.68
ANCE ACTUAL AVANCE SEMANAL DICIEMBRE AVANCE ACTUAL

% 12/2/2019 12/3/2019 12/4/2019 12/5/2019 12/6/2019 12/7/2019 METRADO

2.63

100.00

27.27 15.72 15.72 15.72 15.72 15.72 15.72 94.32

2.99 2.99 2.99 2.99 2.99 2.99 17.95


0.28 0.28 0.28 0.28 0.28 0.28 1.70
1.79
100.00

50.00

100.00
50.01

33.33 18.86 18.86 18.86 18.86 18.86 18.86 113.16

3.21 3.21 3.21 3.21 3.21 3.21 19.24


0.81 0.81 0.81 0.81 0.81 0.81 4.87
0.00 0.00 0.00 0.00 0.00 0.00 0.02
11.32 11.32 11.32 11.32 11.32 11.32 67.90

57.13 17.21 17.21 17.21 51.63

0.26 0.26 0.26 0.77


0.83 0.83 0.83 2.48
0.07 0.07 0.07 0.21
2.41 2.41 2.41 7.23
33.34 41.55 41.55 41.55 41.55 41.55 41.55 249.30

0.12 0.12 0.12 0.12 0.12 0.12 0.75


0.04 0.04 0.04 0.04 0.04 0.04 0.25
0.12 0.12 0.12 0.12 0.12 0.12 0.75

9.96 9.96
AVANCE ACTUAL AVANCE SEMANAL DICIEMBRE

MONTO DE
LA % 12/9/2019 12/10/2019 12/11/2019 12/12/2019 12/13/2019 12/14/2019
VALORIZACI
ON TOTAL

789.46 27.27 15.72 15.72 15.72 15.72 15.72 15.72

215.39 2.99 2.99 2.99 2.99 2.99 2.99


8.49 0.28 0.28 0.28 0.28 0.28 0.28
5306.07 66.65

1115.76
875.86
1.09
1968.98

609.23 42.85

61.96
111.52
1.03
159.02
261.77 66.67

3.74
5.48
3.37

129.48 100.00
AVANCE ACTUAL AVANCE SEMANAL DICIEMNBRE

MONTO DE
METRADO LA % 12/16/2019 12/17/2019 12/18/2019 12/19/2019 12/20/2019
VALORIZACIO
N TOTAL

94.32 789.46 27.27 15.72 15.72

17.95 215.39 2.99 2.99


1.70 8.49 0.28 0.28
57.645 57.645 57.645 57.645

23.12 23.12 23.12 23.12


E AVANCE ACTUAL AVANCE SEMANAL DICIEMBRE

MONTO DE
12/21/2019 METRADO LA % 12/23/2019 12/24/2019 12/26/2019 12/27/2019
VALORIZACI
ON TOTAL

31.44 263.15 9.09

5.98 71.80
0.57 2.83
57.645 288.23 4850.83 83.33 57.645

23.12 115.58 1386.94 23.12


EMBRE AVANCE ACTUAL

MONTO DE
12/28/2019 METRADO LA %
VALORIZACI
ON TOTAL
57.65 970.17 16.67

23.12 277.44

También podría gustarte