Está en la página 1de 42

97 DIAS

ITEM DESCRIPCION UND.

OBRA
02 CALLE MANCO CAPAC
02.01 OBRAS PRELIMINARES
02.01.01 TRAZOS NIVELES Y REPLANTEO
02.01.01.01 TRAZO Y REPLANTEO PRELIMINAR m2
02.01.01.02 TRAZO Y REPLANTEO DURANTE LA OBRA m2
02.02 MOVIMIENTO DE TIERRAS
02.02.01 CORTE MASIVO DE TERRENO CON MAQUINA EN ZONA URBANA m3
02.02.02 RELLENO Y COMPACTACION CON MATERIAL PROPIO SELECCIONADO m3
02.02.03 RELLENO Y COMPACTACION CON MATERIAL DE CANTERA m3
02.02.04 PERFILADO, NIVELACION Y COMPACTACION DE TERRENO m3
02.02.05 ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACION m3
02.02.06 ELIMINACION DE MATERIAL EXCEDENTE DM=5km m3
02.03 DEMOLICIONES Y DESMONTAJES
02.03.01 DEMOLICION DE ESTRUCTURAS DE CONCRETO EN FORMA MANUAL m3
02.03.02 DEMOLICION DE PAVIMENTO DE 0.05m m2
02.04 MUROS DE CONTENCION
02.04.01 CONCRETO SIMPLE
02.04.01.01 CONCRETO SIMPLE M.C.H. 1:10 E=10CM (SOLADO) m2
02.04.02 CONCRETO ARMADO
02.04.02.01 CONCRETO PARA MUROS DE CONCRETO fc= 175 kg/cm2 m3
02.04.02.02 ENCOFRADO Y DESENCOFRADO PARA MURO DE CONTENCION m2
02.04.03 OTROS
02.04.03.01 COLOCACION DE DRENES 2" und.
02.04.03.02 COLOCACION DE GRAVA PARA FILTRO DE DRENAJE m3
02.04.03.03 JUNTA DE DILATACION CON ESPUMA PLASTICA CON SELLADOR m
02.04.03.04 BARANDA METALICA TIPO 1 m
02.04.03.05 PINTADO DE MURO EXTERIOR CON LATEX SUPERMATE m2

02.04.03.06 PINTURA EN CARPINTERIA METALICA CON ANTICORROSIVA + DOS m2


MANOS DE ESMALTE
02.04.04 CONTROL DE CALIDAD
02.04.04.01 CONTROL DE CALIDAD DE CONCRETO g/b
02.05 PAVIMENTO FLEXIBLE
02.05.01 BASE ESTABILIZADA CON LIGANTE ASFALTICO MODIFICADO m3
02.05.02 MORTERO CON LIGANTE ASFALTICO MODIFICADO E=1.00cm (2 CAPAS) m2
02.06 SARDINEL ARMADO
02.06.01 CONCRETO ARMADO
02.06.01.01 CONCRETO PARA SARDINEL fc= 175 kg/cm2 m3
02.06.01.02 ENCOFRADO Y DESENCOFRADO DE SARDINEL m2
02.06.01.03 ACERO DE REFUERZO fy=4,200 kg/cm2 kg
02.07 OBRAS DE ARTE
02.07.01 VEREDAS
02.07.01.01 VEREDAS DE CONCRETO
02.07.01.01.01 BASE GRANULAR PARA VEREDAS m2
02.07.01.01.02 EXCAVACION MANUAL PARA UÑA DE VEREDA m3
02.07.01.01.03 EMPEDRADO e=0.10m m2
02.07.01.01.04 CONCRETO PARA VEREDA fc=140 kg/cm2 m3
02.07.01.01.05 ENCOFRADO Y DESENCOFRADO DE VEREDA m2
02.07.01.01.06 JUNTA DE DILATACION CON ESPUMA PLASTICA CON SELLADOR m
02.07.01.02 REVESTIMIENTO + BRUÑADO
02.07.01.02.01 FORJADO Y REVESTIMIENTO DE VEREDAS m2
02.07.01.02.02 BRUÑAS DE 1 x 1 cm EN VEREDAS m
02.08 AREAS VERDES
02.08.01 COLOCACION DE GRASS (TEPES) m2
02.09 INSTALACIONES SANITARIAS
02.09.01 SANEAMIENTO BASICO DE AGUA POTABLE
02.09.01.01 SUMINISTRO E INSTALACION DE LA LINEA DE RED
02.09.01.01.01 TUBERIA 110 MM (4") PVC ISO C - 7.5 m
02.09.01.02 INSTALACION DE TUBERIA
02.09.01.02.01 INSTALACION DE TUBERIA PVC - ISO 110 mm C- 10 m
02.09.01.03 PRUEBAS HIDRAULICAS Y DESINFECCION DE TUBERIAS
02.09.01.03.01 PRUEBA HIDRAULICA + DESINFECCION DE TUBERIA DE AGUA POTABLE m
02.09.01.04 ACCESORIOS DE REDES
02.09.01.04.01 SUMINISTRO E INSTALACION DE TEE PVC ISO 110 MM und.
02.09.01.05 CONEXIONES DOMICILIARIAS
02.09.01.05.01 CONEXIÓN DOMICILIARIA DE AGUA 4" A 1/2" (CONSIDERA und.
ABRAZADERA Y LLAVE CORPORATION)
02.09.01.06 CONEXIÓN DOMICILIARIA PROVISIONAL
02.09.01.06.01 CONEXIÓN DOMICILIARIA DE AGUA 4" A 1/2" PROVISIONAL und.
02.09.02 RED DE DESAGUE
02.09.02.01 CONEXIONES DOMICILIARIAS
02.09.02.01.01 CONEXIÓN DOMICILIARIA DE DESAGUE und.
02.09.02.02 CONEXIÓN DOMICILIARIA PROVISIONAL
02.09.02.02.01 CONEXIÓN DOMICILIARIA DE DESAGUE PROVISIONAL und.

COSTO DIRECTO
GASTOS GENERALES 13%
GASTOS DE SUPERVISION 4%
GASTOS DE LIQUIDACION 1.5%
GASTOS DE SEGURIDAD 1.5%
GASTOS ADMINISTRATIVOS 5%
LICENCIA DE OBRA

TOTAL PRESUPUESTO
PROGRAMADO EXP. TECNICO AVANCE ANTERIOR AVANCE SEMANAL

PRECIO
METRADO COSTO PARCIAL METRADO MONTO DE LA % 9/3/2019
UNITARIO VALORIZACION
TOTAL

165.33 1.81 299.25 165.33


165.33 1.89 312.47 20.66

527.22 5.13 2,704.64 32.95


261.17 8.98 2,345.31
174.11 56.23 9,790.21
91.58 89.01 8,151.54
345.87 8.37 2,894.93
345.87 16.83 5,820.99

36.34 136.91 4,975.31


144.75 25.56 3,699.81

84.87 36.03 3,057.87

122.72 420.79 51,639.35


349.99 76.77 26,868.73

22.00 29.44 647.68


24.75 70.85 1,753.54
64.32 46.89 3,015.96
49.50 110.41 5,465.30
111.38 18.43 2,052.73

29.70 10.19 302.64

1.00 2,245.00 2,245.00


0.00
14.85 508.14 7,545.88
148.50 18.09 2,686.37

6.35 420.79 2,672.02


34.00 50.17 1,705.78
115.61 5.24 605.80

120.50 27.14 3,270.37


5.73 34.23 196.14
120.50 58.14 7,005.87
24.59 359.27 8,834.45
38.01 64.70 2,459.25
169.77 46.89 7,960.52

120.50 11.80 1,421.90


373.91 1.05 392.61

9.96 13.00 129.48

48.48 20.34 986.08

48.48 1.96 95.02

48.48 3.52 170.65

4.00 84.85 339.40

4.00 142.82 571.28

4.00 61.63 246.52

4.00 193.12 772.48

4.00 80.55 322.20

188,433.30
24,496.33
7,537.33
2,826.50
2,826.50
9,421.66
26,229.10

261,770.72
AVANCE SEMANAL - SEPTIEMBRE AVANCE ACTUAL AVANC

MONTO DE LA
9/4/2019 9/5/2019 9/6/2019 9/7/2019 METRADO VALORIZACION % 9/9/2019
TOTAL

165.33 299.25 100


20.66 20.66 20.66 20.66 103.3 195.24 62.48 20.66

32.95 32.95 32.95 32.95 164.75 845.17 31.25 32.95


1,339.65
174.15
53.59
20.09
20.09
66.98
26,229.10

27,903.66
AVANCE SEMANAL SEPTIEMBRE AVANCE ACTUAL

MONTO DE
9/10/2019 9/11/2019 9/12/2019 9/13/2019 9/14/2019 METRADO LA %
VALORIZACI
ON TOTAL

20.66 20.66 61.98 117.14 37.49

32.95 32.95 32.95 32.95 32.95 197.7 1014.20 37.50


1,131.34
147.07
45.25
16.97
16.97
56.57
26,229.10

27,643.28
AVANCE SEMANAL SEPTIEMBRE AVANCE ACTUAL

MONTO DE
9/16/2019 9/17/2019 9/18/2019 9/19/2019 9/20/2019 9/21/2019 METRADO LA
VALORIZACI
ON TOTAL

32.95 32.95 32.95 32.95 32.95 164.75 845.17

6.06 6.06 12.12 1659.35

21.22 21.22 21.22 63.66 2293.67

10.23 10.23 20.46 8609.36


6.25 6.25 6.25 18.75 1439.44

11.00 11.00 22 647.68


12.38 12.38 24.76 1754.25
16.08 16.08 16.08 48.24 2261.97
49.50 49.5 5465.30
15.91 15.91 15.91 47.73 879.66

14.85 14.85 29.7 302.64


26,158.49
3,400.60
1,046.34
392.38
392.38
1,307.92
26,229.10

58,927.21
ANCE ACTUAL AVANCE SEMANAL SEPTIEMBRE AVANCE ACTUAL

% 23/0919 9/24/2019 9/25/2019 9/26/2019 9/27/2019 9/28/2019 METRADO

31.25

33.35 6.06 6.06 6.06 6.06 24.24


16.08 16.08 16.08 16.08 64.32

75.01 21.22 21.22

16.67 10.23 10.23 10.23 10.23 10.23 10.23 61.38


5.36 6.25 6.25 6.25 6.25 6.25 6.25 37.5

100.00
100.04
75.00 16.08 16.08
100.00
42.85 15.91 15.91 15.91 15.91 63.64

100.00
4.85 4.85 4.85 4.85 4.85 4.85 29.1

24.24 24.24 48.48

0.8 0.8 0.8 0.8 0.8 4

0.8 0.8 0.8 0.8 0.8 4

1.33 1.33 1.33 3.99

1.00 1.00 1.00 3


AVANCE ACTUAL AVANCE SEMANAL OCTUBRE

MONTO DE
LA % 9/30/2019 10/1/2019 10/2/2019 10/3/2019 10/4/2019 10/5/2019
VALORIZACI
ON TOTAL

3318.70 66.70
1644.02 44.44 16.08 16.08 16.08 16.08 16.08

764.56 25.00

25828.09 50.02 10.23 10.23 10.23 10.23


2878.88 10.71 6.25 6.25 6.25 6.25 6.25 6.25

753.99 25.00

1172.89 57.14
57.04 60.02 4.85 4.85 4.85 4.85

170.65 100.00

571.28 100.00

246.52 100.00

770.55 99.75

241.65 75.00 1.00

38,418.80
4,994.44
1,536.75
576.28
576.28
1,920.94
26,229.10

74,252.60
AVANCE ACTUAL AVANCE SEMANAL OCTUBRE

MONTO DE
METRADO LA % 10/7/2019 10/9/2019 10/10/2019 10/11/2019 10/12/2019
VALORIZACI
ON TOTAL

6.87 6.87
6.00 6.00

80.4 2055.02 55.54

40.92 17218.73 33.34


37.5 2878.88 10.71 6.25 6.25 6.25 6.25 6.25
19.4 38.02 40.02

1 80.55 25.00

22,271.20
2,895.26
890.85
334.07
334.07
1,113.56
26,229.10

54,068.10
AVANCE ACTUAL AVANCE SEMANAL OCTUBRE

MONTO DE
METRADO LA % 10/14/2019 10/15/2019 10/16/2019 10/17/2019 10/18/2019
VALORIZACI
ON TOTAL

13.74 123.39 5.26 6.87 6.87 6.87 6.87 6.87


12 674.76 6.89 6.00 6.00 6.00 6.00 6.00

31.25 2399.06 8.93 6.25 6.25 6.25 6.25 6.25


3,197.21
415.64
127.89
47.96
47.96
159.86
26,229.10

30,225.61
AVANCE ACTUAL AVANCE SEMANAL OCTUBRE

MONTO DE
10/19/2019 METRADO LA % 10/21/2019 10/22/2019 10/23/2019 10/24/2019
VALORIZACI
ON TOTAL

6.87 41.22 370.16 15.78 6.87 6.87 6.87 6.87


6.00 36 2024.28 20.68 6.00 6.00 6.00 6.00

6.25 37.5 2878.88 10.71 6.25 6.25 6.25 6.25


16.16 16.16 328.69 33.33 16.16 16.16

4.00 4 339.40 100

5,941.41
772.38
237.66
89.12
89.12
297.07
26,229.10

33,655.86
AL OCTUBRE AVANCE ACTUAL AVANCE SEMANAL NOVIEMBRE

MONTO DE
10/25/2019 10/26/2019 METRADO LA % 10/28/2019 10/29/2019 10/30/2019
VALORIZACI
ON TOTAL

6.87 6.87 41.22 370.16 15.78 6.87 6.87 6.87


6.00 6.00 36.00 2024.28 20.68 6.00 6.00 6.00

6.25 6.25 37.50 2878.88 10.71 6.25 6.25 6.25

0.5 0.50 1122.50 50.00 0.5


32.32 657.39 66.67

7,053.20
916.92
282.13
105.80
105.80
352.66
26,229.10

35,045.60
MANAL NOVIEMBRE AVANCE ACTUAL AVANCE SEMANAL NOVIEMBRE

MONTO DE
10/31/2019 11/2/2019 METRADO LA % 11/4/2019 11/5/2019 11/6/2019
VALORIZACI
ON TOTAL

6.87 6.87 34.35 308.46 13.15 6.87 6.87 6.87


6.00 6.00 30.00 1686.90 17.23 6.00 6.00 6.00

6.25 6.25 31.25 2399.06 8.93 6.25 6.25 6.25

0.50 1122.50 50.00

14.85
5,516.93
717.20
220.68
82.75
82.75
275.85
26,229.10

33,125.26
NCE SEMANAL NOVIEMBRE AVANCE ACTUAL AVANCE SEMANAL NO

MONTO DE
11/7/2019 11/8/2019 11/9/2019 METRADO LA % 11/11/2019 12//11/19
VALORIZACI
ON TOTAL

6.87 6.87 6.87 41.22 370.16 15.78 6.87 6.87


6.00 6.00 6.00 36.00 2024.28 20.68 6.00 6.00

6.25 6.25 6.25 37.50 2878.88 10.71 6.25 6.25

14.85 7545.88 100.00


0.82 0.82 1.64 56.14 28.62 0.82 0.82

12.295
12.67 12.67 819.75 33.33 12.67 12.67

13,695.08
1,780.36
547.80
205.43
205.43
684.75
26,229.10

43,347.94
AVANCE SEMANAL NOVIEMBRE AVANCE ACTUAL AVANCE S

MONTO DE
11/13/2019 11/14/2019 15/11/119 11/16/2019 METRADO LA % 11/18/2019
VALORIZACI
ON TOTAL

6.87 6.87 6.87 6.87 41.22 370.16 15.78 6.87


6.00 6.00 24.00 1349.52 13.78

6.25 6.25 6.25 6.25 37.50 2878.88 10.71 6.25

21.21 21.21 21.21 21.21 84.84 1534.76 57.13 21.21

11.33 11.33 568.43 33.32 11.33


0.82 0.82 0.82 4.10 140.34 71.55

12.295 24.59 8834.45 100.00


25.34 1639.50 66.67

17,316.02
2,251.08
692.64
259.74
259.74
865.80
26,229.10

47,874.13
AVANCE SEMANAL NOVIEMBRE AVANCE ACTUAL

MONTO DE
11/19/2019 11/20/2019 11/21/2019 11/22/2019 11/23/2019 METRADO LA %
VALORIZACI
ON TOTAL

6.87 6.87 6.87 6.87 6.87 41.22 370.16 15.78

15.72 15.72 31.44 263.15 9.09

6.25 6.25 6.25 6.25 6.25 37.50 2878.88 10.71

21.21 21.21 63.63 1151.07 42.85

11.33 22.66 1136.85 66.65


14.45 14.45 14.45 14.45 57.80 302.87 50.00

30.13 30.13 60.26 3503.52 50.01

9,606.49
1,248.84
384.26
144.10
144.10
480.32
26,229.10

38,237.21
AVANCE SEMANAL NOVIEMBRE AVANCE ACTUAL

MONTO DE
11/25/2019 11/26/2019 11/27/2019 11/28/2019 11/29/2019 11/30/2019 METRADO LA
VALORIZACI
ON TOTAL

6.87 6.87 61.69

45.79 45.79 91.58 8151.54


15.72 15.72 15.72 15.72 15.72 15.72 94.32 789.46

6.25 6.25 479.81

6.35 6.35 2672.02


14.45 14.45 14.45 14.45 57.80 302.87

24.10 24.10 24.10 24.10 24.10 120.50 3270.37

30.13 30.13 60.26 3503.52

18.86 18.86 18.86 56.58 2653.04

17.21 17.21 17.21 17.21 68.84 812.31


41.55 41.55 41.55 124.65 130.88

22,827.50
2,967.58
913.10
342.41
342.41
1,141.38
26,229.10

54,763.48
ANCE ACTUAL AVANCE SEMANAL DICIEMBRE AVANCE ACTUAL

% 12/2/2019 12/3/2019 12/4/2019 12/5/2019 12/6/2019 12/7/2019 METRADO

2.63

100.00
27.27 15.72 15.72 15.72 15.72 15.72 15.72 94.32

1.79

100.00
50.00

100.00

50.01

33.33 18.86 18.86 18.86 18.86 18.86 18.86 113.16

57.13 17.21 17.21 17.21 51.63


33.34 41.55 41.55 41.55 41.55 41.55 41.55 249.30

9.96 9.96
AVANCE ACTUAL AVANCE SEMANAL DICIEMBRE

MONTO DE
LA % 12/9/2019 12/10/2019 12/11/2019 12/12/2019 12/13/2019 12/14/2019
VALORIZACI
ON TOTAL

789.46 27.27 15.72 15.72 15.72 15.72 15.72 15.72


5306.07 66.65

609.23 42.85
261.77 66.67

129.48 100.00

7,096.01
922.48
283.84
106.44
106.44
354.80
26,229.10

35,099.11
AVANCE ACTUAL AVANCE SEMANAL DICIEMNBRE

MONTO DE
METRADO LA % 12/16/2019 12/17/2019 12/18/2019 12/19/2019 12/20/2019
VALORIZACIO
N TOTAL

94.32 789.46 27.27 15.72 15.72


57.645 57.645 57.645 57.645
789.46
102.63
31.58
11.84
11.84
39.47
26,229.10

27,215.92
E AVANCE ACTUAL AVANCE SEMANAL DICIEMBRE

MONTO DE
12/21/2019 METRADO LA % 12/23/2019 12/24/2019 12/26/2019 12/27/2019
VALORIZACI
ON TOTAL

31.44 263.15 9.09


57.645 288.23 4850.83 83.33 57.645
5,113.98
664.82
204.56
76.71
76.71
255.70
26,229.10

32,621.57
EMBRE AVANCE ACTUAL

MONTO DE
12/28/2019 METRADO LA %
VALORIZACI
ON TOTAL

57.65 970.17 16.67


970.17
126.12
38.81
14.55
14.55
48.51
26,229.10

27,441.81