Documentos de Académico
Documentos de Profesional
Documentos de Cultura
producción
PO semanal Ventas
Proveedor Cliente
Horario diario
LT: 4.0 hr(s) LT: 2.0 hr(s) LT: 0.7 hr(s) LT: 1.0 hr(s) LT: 0.7 hr(s) LT: 0.5 hr(s) Total lead time: 8.84 hr(s)
Total cycle time (VA): 4.42 hr(s)
CT: 2.0 hr(s) CT: 0.8 hr(s) CT: 0.4 hr(s) CT: 0.5 hr(s) CT: 0.5 hr(s) CT: 0.2 hr(s)