Documentos de Académico
Documentos de Profesional
Documentos de Cultura
0.10
L = 10.00 MT.
CARGA MUERTA:
0.60 0.70
CM = 1104 KG/M y= 0.4
U = 1.5 CM + 1.8 CV
2 Ø 5/8"
DATOS DE DISEÑO:
2 Ø 1/2"
b 2 Ø 5/8"
As = 6.48 cm2
Area cm2
POR LO TANTO: 2 Ø 5/8" + 2 Ø 1/2" = 6.49 cm2 3/8" 0.713 0.375
1/2" 1.267 0.500
5/8" 1.979 0.625
CALCULO DEL ACERO MINIMO: (As min) 3/4" 2.850 0.750
3.09 cm2
As min =
4.27 cm2
POR LO TANTO
CORTANTE ACTUANTE:
Vu = 5.90 TN.
Vud = 4.67 TN.
CORTANTE ADMISIBLE:
Ø Vc = Ø 0.53 F´c b d
Ø Vc = 8.36 TN.
Ø Vc > Vud
POR LO TANTO: NO NECESITA COLOCAR ESTRIBOS POR QUE EL CONCRETO SOPORTA EL CORTE
POR LO QUE COLOCAREMOS UNA ESTRIBACION MINIMA SEGÚN REGLAMENTO
0.25 X d = 16.00 cm
8 Ø 5/8" = 12.70 cm
30.00 = 30.00 cm
So = 10.00 cm
So / 2 = 5.00 cm
So 1 =
5.00 = 5.00 cm
So 1 = 5.00 cm
r < d/2
d/2 = 32
30 r = 30 cm
POR LO TANTO:
1 ø 3/8" a 5 cm.
15 ø 3/8" a 10 cm.
r ø 3/8" a 30 cm.
0.60 0.70
0.4
0.10
0.20 0.70 0.20
1-Empuje de terreno,
h= 0.80
h'= 0.00
C= Tang2(45-Ø/2) 0.41
E= 0,5*W*h (h+2h")*C 0.208 TN
Xv=Mt/Pi 0.211 m
Z=Eh*Dh/Pi 0.067 m Esfuerzo a compresión del concreto F`c= 0,4(Fc)
e=b/2-(Xv-Z) 0.055 m F`c= 700 Tn/m2
Chequeo al volteo
Chequeo al Deslizamiento
Página 3 de 12
DISEÑO ESTRUCTURAL DE ESTRIBO
PROYECTO : "CONSTRUCCION DEL CANAL DE RIEGO TIESTO SAN MIGUEL"
DPTO. : SAN MARTIN PROV. : TOCACHE DIST. : TOCACHE
Chequeo al volteo
Chequeo al Deslizamiento
Xv=Mt/Pi 0.609 m
Yh=Mi/Pi 2.101
Z= 0.078
e= 0.069
VERIFICACIONES
Chequeo al volteo
Página 4 de 12
DISEÑO ESTRUCTURAL DE ESTRIBO
PROYECTO : "CONSTRUCCION DEL CANAL DE RIEGO TIESTO SAN MIGUEL"
DPTO. : SAN MARTIN PROV. : TOCACHE DIST. : TOCACHE
Chequeo al Deslizamiento
VERIFICACIONES
Chequeo al volteo
Chequeo al Deslizamiento
Xv=Mt/Pi 1.221 m
Página 5 de 12
DISEÑO ESTRUCTURAL DE ESTRIBO
PROYECTO : "CONSTRUCCION DEL CANAL DE RIEGO TIESTO SAN MIGUEL"
DPTO. : SAN MARTIN PROV. : TOCACHE DIST. : TOCACHE
R2 1.071 4.30 4.605
Total 3.052 6.256
Yh=Mi/Pi 2.05
Z= 0.09
e= -0.13 <b/6 CONFORME
VERIFICACIONES
P =Fv(1+6e/b)/(ab) 7.91 <d CONFORME Asimismo, se pondra una losa armada de cimentación
e=20 cm, ya que la capacidad portante es 1 Kg/cm2
Chequeo al volteo
Chequeo al Deslizamiento
Página 6 de 12
DISEÑO DE ACUEDUCTO
PROYECTO : "CONSTRUCCION DEL CANAL DE RIEGO TIESTO SAN MIGUEL"
DPTO. : SAN MARTIN PROV. : TOCACHE DIST. : TOCACHE
0.10
L = 13.00 MT.
CARGA MUERTA:
0.65 0.75
CM = 1152 KG/M y= 0.45
U = 1.5 CM + 1.8 CV
3 Ø 5/8"
DATOS DE DISEÑO:
b 4 Ø 3/4"
As = 11.16 cm2
Area cm2
POR LO TANTO: 4 Ø 3/4" = 11.40 cm2 3/8" 0.713 0.375
1/2" 1.267 0.500
5/8" 1.979 0.625
CALCULO DEL ACERO MINIMO: (As min) 3/4" 2.850 0.750
3.33 cm2
As min =
4.60 cm2
POR LO TANTO
CORTANTE ACTUANTE:
Vu = 8.10 TN.
Vud = 6.74 TN.
CORTANTE ADMISIBLE:
Ø Vc = Ø 0.53 F´c b d
Ø Vc = 9.01 TN.
Ø Vc > Vud
POR LO TANTO: NO NECESITA COLOCAR ESTRIBOS POR QUE EL CONCRETO SOPORTA EL CORTE
POR LO QUE COLOCAREMOS UNA ESTRIBACION MINIMA SEGÚN REGLAMENTO
0.25 X d = 17.25 cm
8 Ø 5/8" = 12.70 cm
30.00 = 30.00 cm
So = 10.00 cm
So / 2 = 5.00 cm
So 1 =
5.00 = 5.00 cm
So 1 = 5.00 cm
r < d/2
d/2 = 34.5
30 r = 30 cm
POR LO TANTO:
1 ø 3/8" a 5 cm.
15 ø 3/8" a 10 cm.
r ø 3/8" a 30 cm.
0.65 0.75
0.45
0.10
0.20 0.70 0.20
1-Empuje de terreno,
h= 0.80
h'= 0.00
C= Tang2(45-Ø/2) 0.41
E= 0,5*W*h (h+2h")*C 0.208 TN
Xv=Mt/Pi 0.211 m
Z=Eh*Dh/Pi 0.067 m Esfuerzo a compresión del concreto F`c= 0,4(Fc)
e=b/2-(Xv-Z) 0.055 m F`c= 700 Tn/m2
Chequeo al volteo
Chequeo al Deslizamiento
Página 9 de 12
DISEÑO ESTRUCTURAL DE ESTRIBO
PROYECTO : "CONSTRUCCION DEL CANAL DE RIEGO TIESTO SAN MIGUEL"
DPTO. : SAN MARTIN PROV. : TOCACHE DIST. : TOCACHE
Chequeo al volteo
Chequeo al Deslizamiento
Xv=Mt/Pi 0.614 m
Yh=Mi/Pi 2.038
Z= 0.111
e= 0.097
VERIFICACIONES
Chequeo al volteo
Página 10 de 12
DISEÑO ESTRUCTURAL DE ESTRIBO
PROYECTO : "CONSTRUCCION DEL CANAL DE RIEGO TIESTO SAN MIGUEL"
DPTO. : SAN MARTIN PROV. : TOCACHE DIST. : TOCACHE
Chequeo al Deslizamiento
VERIFICACIONES
Chequeo al volteo
Chequeo al Deslizamiento
Xv=Mt/Pi 1.231 m
Página 11 de 12
DISEÑO ESTRUCTURAL DE ESTRIBO
PROYECTO : "CONSTRUCCION DEL CANAL DE RIEGO TIESTO SAN MIGUEL"
DPTO. : SAN MARTIN PROV. : TOCACHE DIST. : TOCACHE
R2 1.071 5.10 5.462
Total 4.523 9.259
Yh=Mi/Pi 2.05
Z= 0.13
e= -0.10 <b/6 CONFORME
VERIFICACIONES
P =Fv(1+6e/b)/(ab) 9.23 <d CONFORME Asimismo, se pondra una losa armada de cimentación
e=20 cm, ya que la capacidad portante es 1 Kg/cm2
Chequeo al volteo
Chequeo al Deslizamiento
Página 12 de 12