Eje 5-5 = Eje 1-1/A-B (PRIMER PISO)

A) CARGA MUERTA:
 ALIGERADO= 0.30 Tn/m2 * 1.64m = 0.492 tn/m

 ACABADOS: 0.10 tn/m2 * 1.64m = 0.164 tn/m

 VIGAS: 2.40 tn/m3 * 0.25m *0.40m = 0.24 tn/m

 COLUMNAS: 2.40 tn/m3 * 0.25m * 0.25 = 0.15tn/m

2.40 tn/m3 * 0.3m *0.3m = 0.216 tn/m

 ALBAÑILERIA: 1.80 tn/m3 * 0.25m * 2.80m = 1.26 tn/m

CARGA MUERTA TOTAL (Wd = 2.522 tn/m)

B) CARGA VIVA:
 SOBRECARGA = 0.20 Tn/m2 * 4.88m = 0.976 tn/m

CARGA VIVA TOTAL (Wl = 0.976 tn/m)

C) CARGA DE SISMO:
WCS = 100% Wd + 25% Wl = 2.522 + (0.25*0.976) = 2.766 tn/m

CARGA DE SISMO TOTAL (Wcs = 2.766 tn/m)

D) COMBINACION DE CARGAS 1:
Wu1 = 1.2 Wd + 1.6 Wl = (1.2*2.522) + (1.6*0.976) = 4.588 tn/m

COMBO 1 = 4.588 tn/m

E) COMBINACION DE CARGAS 2:
Wu2 = 1.25wd + 1.25Wl + Wcs

Wu2 = (1.25*2.522) +(1.25*0.976) + (2.766) = 7.139 tn/m

COMBO 2 = 7.139 tn/m


Eje 5-5 = Eje 1-1/B-C (PRIMER PISO)
F) CARGA MUERTA:
 ALIGERADO= 0.30 Tn/m2 * 1.64m = 0.492 tn/m

 ACABADOS: 0.10 tn/m2 * 1.64m = 0.164 tn/m

 VIGAS: 2.40 tn/m3 * 0.30m *0.60m = 0.432 tn/m

 COLUMNAS: 2.40 tn/m3 * 0.25m * 0.25 = 0.15 tn/m

2.40 tn/m3 * 0.3m *0.3m = 0.216 tn/m

 ALBAÑILERIA: 1.80 tn/m3 * 0.25m * 2.80m = 1.26 tn/m

CARGA MUERTA TOTAL (Wd = 2.714 tn/m)

G) CARGA VIVA:
 SOBRECARGA = 0.20 Tn/m2 * 7.31m = 1.462 tn/m

CARGA VIVA TOTAL (Wl = 1.462 tn/m)

H) CARGA DE SISMO:
WCS = 100% Wd + 25% Wl = 2.714 + (0.25*1.462) = 3.08 tn/m

CARGA DE SISMO TOTAL (Wcs = 3.08 tn/m)

I) COMBINACION DE CARGAS 1:
Wu1 = 1.2 Wd + 1.6 Wl = (1.2*2.714) + (1.6*1.462) = 5.596 tn/m

COMBO 1 = 5.596 tn/m

J) COMBINACION DE CARGAS 2:
Wu2 = 1.25wd + 1.25Wl + Wcs

Wu2 = (1.25*2.714) +(1.25*1.462) + (3.08) = 8.30 tn/m

COMBO 2 = 8.30 tn/m


SEGÚN RNE 060 CONCRETO ARMADO, CAPITULO 8,
(8.3.METODO DEL ANALISIS)

- MOMENTO POSITIVO:
tramos interiores [M+ = 1/16 (Wu*L*L)]
- MOMENTO NEGATIVO:
Dos tramos [M- = 1/9 (Wu*L*L)]

a) EJE 5-5 = EJE 1-1/A-B

a.1) CARGA MUERTA:


M(+) = 1/16 (2.522*(4.88)^2) = 3.75 tn-m
M(-) = 1/9 (2.522*(4.88)^2) = 6.67 tn-m

a.2) CARGA VIVA:


M(+) = 1/16 (0.976*(4.88)^2) = 1.45 tn-m
M(-) = 1/9 (0.976*(4.88)^2) = 2.58 tn-m

a.3) CARGA DE SISMO:


M(+) = 1/16 (2.766*(4.88)^2) = 4.117 tn-m
M(-) = 1/9 (2.766*(4.88)^2) = 7.319 tn-m

a.4) COMBO 1:
M(+) = 1/16 (4.588*(4.88)^2) = 6.829 tn-m
M(-) = 1/9 (4.588*(4.88)^2) = 12.14 tn-m

a.5) COMBO 2:
M(+) = 1/16 (7.139*(4.88)^2) = 10.626 tn-m
M(-) = 1/9 (7.139*(4.88)^2) = 18.89 tn-m
b) EJE 5-5 = EJE 1-1 /B-C

b.1) CARGA MUERTA:


M(+) = 1/16 (2.714*(7.31)^2) = 4.0395 tn-m
M(-) = 1/9 (2.714*(7.31)^2) = 7.181 tn-m

b.2) CARGA VIVA:


M(+) = 1/16 (1.462*(7.31)^2) = 2.176 tn-m
M(-) = 1/9 (1.462*(7.31)^2) = 3.869 tn-m

b.3) CARGA DE SISMO:


M(+) = 1/16 (3.08*(7.31)^2) = 4.584 tn-m
M(-) = 1/9 (3.08*(7.31)^2) = 8.1498 tn-m

b.4) COMBO 1:
M(+) = 1/16 (5.596*(7.31)^2) = 8.329 tn-m
M(-) = 1/9 (5.596*(7.31)^2) = 14.807tn-m

b.5) COMBO 2:
M(+) = 1/16 (8.30*(7.31)^2) = 12.35 tn-m
M(-) = 1/9 (8.30*(7.31)^2) = 21.962 tn-m
Eje 4-4 = Eje 3-3 = Eje 2-2/A-B (2 = 3 = 4 PISO)
K) CARGA MUERTA:
 ALIGERADO= 0.30 Tn/m2 * 1.64m = 0.492 tn/m

 ACABADOS: 0.10 tn/m2 * 1.64m = 0.164 tn/m

 VIGAS: 2.40 tn/m3 * 0.25m *0.40m = 0.24 tn/m

 COLUMNAS: 2.40 tn/m3 * 0.30m * 0.30m = 0.216tn/m

2.40 tn/m3 * 0.40m *0.40m = 0.384 tn/m

 ALBAÑILERIA: 1.80 tn/m3 * 0.25m * 2.70m = 1.215 tn/m

CARGA MUERTA TOTAL (Wd = 2.711 tn/m)

L) CARGA VIVA:
 SOBRECARGA = 0.20 Tn/m2 * 4.88m = 0.976 tn/m

CARGA VIVA TOTAL (Wl = 0.976 tn/m)

M) CARGA DE SISMO:
WCS = 100% Wd + 25% Wl = 2.711 + (0.25*0.976) = 2.955 tn/m

CARGA DE SISMO TOTAL (Wcs = 2.955 tn/m)

N) COMBINACION DE CARGAS 1:
Wu1 = 1.2 Wd + 1.6 Wl = (1.2*2.711) + (1.6*0.976) = 4.81 tn/m

COMBO 1 = 4.81 tn/m

O) COMBINACION DE CARGAS 2:
Wu2 = 1.25wd + 1.25Wl + Wcs

Wu2 = (1.25*2.711) +(1.25*0.976) + (2.955) = 7.56 tn/m

COMBO 2 = 7.56 tn/m


Eje 4-4=3-3=2-2/B-C (2 = 3 = 4 PISO)
P) CARGA MUERTA:
 ALIGERADO= 0.30 Tn/m2 * 1.64m = 0.492 tn/m

 ACABADOS: 0.10 tn/m2 * 1.64m = 0.164 tn/m

 VIGAS: 2.40 tn/m3 * 0.30m *0.60m = 0.432 tn/m

 COLUMNAS: 2.40 tn/m3 * 0.30m * 0.30m = 0.216 tn/m

2.40 tn/m3 * 0.40m *0.40m = 0.384 tn/m

 ALBAÑILERIA: 1.80 tn/m3 * 0.25m * 2.70m = 1.215 tn/m

CARGA MUERTA TOTAL (Wd = 2.903 tn/m)

Q) CARGA VIVA:
 SOBRECARGA = 0.20 Tn/m2 * 7.31m = 1.462 tn/m

CARGA VIVA TOTAL (Wl = 1.462 tn/m)

R) CARGA DE SISMO:
WCS = 100% Wd + 25% Wl = 2.903 + (0.25*1.462) = 3.269 tn/m

CARGA DE SISMO TOTAL (Wcs = 3.269 tn/m)

S) COMBINACION DE CARGAS 1:
Wu1 = 1.2 Wd + 1.6 Wl = (1.2*2.903) + (1.6*1.462) = 5.82 tn/m

COMBO 1 = 5.82 tn/m

T) COMBINACION DE CARGAS 2:
Wu2 = 1.25wd + 1.25Wl + Wcs

Wu2 = (1.25*2.903) +(1.25*1.462) + (3.269) = 8.725 tn/m

COMBO 2 = 8.725 tn/m


SEGÚN RNE 060 CONCRETO ARMADO, CAPITULO 8,
(8.3.METODO DEL ANALISIS)

- MOMENTO POSITIVO:
tramos interiores [M+ = 1/16 (Wu*L*L)]
- MOMENTO NEGATIVO:
Dos tramos [M- = 1/9 (Wu*L*L)]

c) EJE 4-4 /A-B

a.1) CARGA MUERTA:


M(+) = 1/16 (2.711*(4.88)^2) = 4.035 tn-m
M(-) = 1/9 (2.711*(4.88)^2) = 7.173 tn-m

a.2) CARGA VIVA:


M(+) = 1/16 (0.976*(4.88)^2) = 1.45 tn-m
M(-) = 1/9 (0.976*(4.88)^2) = 2.58 tn-m

a.3) CARGA DE SISMO:


M(+) = 1/16 (2.955*(4.88)^2) = 4.398 tn-m
M(-) = 1/9 (2.955*(4.88)^2) = 7.819 tn-m

a.4) COMBO 1:
M(+) = 1/16 (4.81*(4.88)^2) = 7.159 tn-m
M(-) = 1/9 (4.81*(4.88)^2) = 12.727 tn-m

a.5) COMBO 2:
M(+) = 1/16 (7.56*(4.88)^2) = 11.252 tn-m
M(-) = 1/9 (7.56*(4.88)^2) = 20.00 tn-m
d) EJE 4-4 /B-C

b.1) CARGA MUERTA:


M(+) = 1/16 (2.903*(7.31)^2) = 9.695 tn-m
M(-) = 1/9 (2.903*(7.31)^2) = 17.236 tn-m

b.2) CARGA VIVA:


M(+) = 1/16 (1.462*(7.31)^2) = 4.88 tn-m
M(-) = 1/9 (1.462*(7.31)^2) = 8.68 tn-m

b.3) CARGA DE SISMO:


M(+) = 1/16 (3.269*(7.31)^2) = 10.918 tn-m
M(-) = 1/9 (3.269*(7.31)^2) = 19.409 tn-m

b.4) COMBO 1:
M(+) = 1/16 (5.82*(7.31)^2) = 19.437 tn-m
M(-) = 1/9 (5.82*(7.31)^2) = 34.555tn-m

b.5) COMBO 2:
M(+) = 1/16 (8.725*(7.31)^2) = 29.139 tn-m
M(-) = 1/9 (8.725*(7.31)^2) = 51.803 tn-m
Eje 5-5/A-B (5TO PISO)
U) CARGA MUERTA:
 ALIGERADO= 0.30 Tn/m2 * 1.64m = 0.492 tn/m

 ACABADOS: 0.10 tn/m2 * 1.64m = 0.164 tn/m

 VIGAS: 2.40 tn/m3 * 0.25m *0.40m = 0.24 tn/m

 COLUMNAS: 2.40 tn/m3 * 0.30m * 0.30m = 0.216tn/m

2.40 tn/m3 * 0.40m *0.40m = 0.384 tn/m

 ALBAÑILERIA: 1.80 tn/m3 * 0.25m * 2.70m = 1.215 tn/m

CARGA MUERTA TOTAL (Wd = 2.711 tn/m)

V) CARGA VIVA:
 SOBRECARGA = 0.15 Tn/m2 * 4.88m = 0.732 tn/m

CARGA VIVA TOTAL (Wl = 0.732 tn/m)

W)CARGA DE SISMO:
WCS = 100% Wd + 25% Wl = 2.711 + (0.25*0.732) = 3.693 tn/m

CARGA DE SISMO TOTAL (Wcs = 3.693 tn/m)

X) COMBINACION DE CARGAS 1:
Wu1 = 1.2 Wd + 1.6 Wl = (1.2*2.711) + (1.6*0.732) = 4.42 tn/m

COMBO 1 = 4.42 tn/m

Y) COMBINACION DE CARGAS 2:
Wu2 = 1.25wd + 1.25Wl + Wcs

Wu2 = (1.25*2.711) +(1.25*0.732) + (3.693) = 8.267 tn/m

COMBO 2 = 8.267 tn/m


Eje 5-5/B-C (5TO PISO)
Z) CARGA MUERTA:
 ALIGERADO= 0.30 Tn/m2 * 1.64m = 0.492 tn/m

 ACABADOS: 0.10 tn/m2 * 1.64m = 0.164 tn/m

 VIGAS: 2.40 tn/m3 * 0.30m *0.60m = 0.432 tn/m

 COLUMNAS: 2.40 tn/m3 * 0.30m * 0.30m = 0.216 tn/m

2.40 tn/m3 * 0.40m *0.40m = 0.384 tn/m

 ALBAÑILERIA: 1.80 tn/m3 * 0.25m * 2.70m = 1.215 tn/m

CARGA MUERTA TOTAL (Wd = 2.903 tn/m)

AA) CARGA VIVA:


 SOBRECARGA = 0.15 Tn/m2 * 7.31m = 1.097 tn/m

CARGA VIVA TOTAL (Wl = 1.097 tn/m)

BB) CARGA DE SISMO:


WCS = 100% Wd + 25% Wl = 2.903 + (0.25*1.097) = 3.187 tn/m

CARGA DE SISMO TOTAL (Wcs = 3.187 tn/m)

CC) COMBINACION DE CARGAS 1:


Wu1 = 1.2 Wd + 1.6 Wl = (1.2*2.903) + (1.6*1.907) = 5.239 tn/m

COMBO 1 = 5.239 tn/m

DD) COMBINACION DE CARGAS 2:


Wu2 = 1.25wd + 1.25Wl + Wcs

Wu2 = (1.25*2.903) +(1.25*1.907) + (3.187) = 9.1995 tn/m

COMBO 2 = 9.1995 tn/m


SEGÚN RNE 060 CONCRETO ARMADO, CAPITULO 8,
(8.3.METODO DEL ANALISIS)

- MOMENTO POSITIVO:
tramos interiores [M+ = 1/16 (Wu*L*L)]
- MOMENTO NEGATIVO:
Dos tramos [M- = 1/9 (Wu*L*L)]

e) EJE 5-5 /A-B

a.1) CARGA MUERTA:


M(+) = 1/16 (2.711*(4.88)^2) = 4.035 tn-m
M(-) = 1/9 (2.711*(4.88)^2) = 7.173 tn-m

a.2) CARGA VIVA:


M(+) = 1/16 (0.732*(4.88)^2) = 1.0895 tn-m
M(-) = 1/9 (0.732*(4.88)^2) = 1.937 tn-m

a.3) CARGA DE SISMO:


M(+) = 1/16 (3.693*(4.88)^2) = 5.497 tn-m
M(-) = 1/9 (3.693*(4.88)^2) = 9.7718 tn-m

a.4) COMBO 1:
M(+) = 1/16 (4.42*(4.88)^2) = 6.579 tn-m
M(-) = 1/9 (4.42*(4.88)^2) = 11.696 tn-m

a.5) COMBO 2:
M(+) = 1/16 (8.267*(4.88)^2) = 12.30 tn-m
M(-) = 1/9 (8.267*(4.88)^2) = 21.87 tn-m
f) EJE 5-5 /B-C

b.1) CARGA MUERTA:


M(+) = 1/16 (2.903*(7.31)^2) = 9.695 tn-m
M(-) = 1/9 (2.903*(7.31)^2) = 17.236 tn-m

b.2) CARGA VIVA:


M(+) = 1/16 (1.097*(7.31)^2) = 1.63 tn-m
M(-) = 1/9 (1.097*(7.31)^2) = 2.90 tn-m

b.3) CARGA DE SISMO:


M(+) = 1/16 (3.187*(7.31)^2) = 4.74 tn-m
M(-) = 1/9 (3.187*(7.31)^2) = 8.43 tn-m

b.4) COMBO 1:
M(+) = 1/16 (5.239*(7.31)^2) = 7.798 tn-m
M(-) = 1/9 (5.239*(7.31)^2) = 34. tn-m

b.5) COMBO 2:
M(+) = 1/16 (9.1995*(7.31)^2) = 13.69 tn-m
M(-) = 1/9 (9.1995*(7.31)^2) = 24.34 tn-m