A) CARGA MUERTA:
ALIGERADO= 0.30 Tn/m2 * 1.64m = 0.492 tn/m
B) CARGA VIVA:
SOBRECARGA = 0.20 Tn/m2 * 4.88m = 0.976 tn/m
C) CARGA DE SISMO:
WCS = 100% Wd + 25% Wl = 2.522 + (0.25*0.976) = 2.766 tn/m
D) COMBINACION DE CARGAS 1:
Wu1 = 1.2 Wd + 1.6 Wl = (1.2*2.522) + (1.6*0.976) = 4.588 tn/m
E) COMBINACION DE CARGAS 2:
Wu2 = 1.25wd + 1.25Wl + Wcs
G) CARGA VIVA:
SOBRECARGA = 0.20 Tn/m2 * 7.31m = 1.462 tn/m
H) CARGA DE SISMO:
WCS = 100% Wd + 25% Wl = 2.714 + (0.25*1.462) = 3.08 tn/m
I) COMBINACION DE CARGAS 1:
Wu1 = 1.2 Wd + 1.6 Wl = (1.2*2.714) + (1.6*1.462) = 5.596 tn/m
J) COMBINACION DE CARGAS 2:
Wu2 = 1.25wd + 1.25Wl + Wcs
- MOMENTO POSITIVO:
tramos interiores [M+ = 1/16 (Wu*L*L)]
- MOMENTO NEGATIVO:
Dos tramos [M- = 1/9 (Wu*L*L)]
a.4) COMBO 1:
M(+) = 1/16 (4.588*(4.88)^2) = 6.829 tn-m
M(-) = 1/9 (4.588*(4.88)^2) = 12.14 tn-m
a.5) COMBO 2:
M(+) = 1/16 (7.139*(4.88)^2) = 10.626 tn-m
M(-) = 1/9 (7.139*(4.88)^2) = 18.89 tn-m
b) EJE 5-5 = EJE 1-1 /B-C
b.4) COMBO 1:
M(+) = 1/16 (5.596*(7.31)^2) = 8.329 tn-m
M(-) = 1/9 (5.596*(7.31)^2) = 14.807tn-m
b.5) COMBO 2:
M(+) = 1/16 (8.30*(7.31)^2) = 12.35 tn-m
M(-) = 1/9 (8.30*(7.31)^2) = 21.962 tn-m
Eje 4-4 = Eje 3-3 = Eje 2-2/A-B (2 = 3 = 4 PISO)
K) CARGA MUERTA:
ALIGERADO= 0.30 Tn/m2 * 1.64m = 0.492 tn/m
L) CARGA VIVA:
SOBRECARGA = 0.20 Tn/m2 * 4.88m = 0.976 tn/m
M) CARGA DE SISMO:
WCS = 100% Wd + 25% Wl = 2.711 + (0.25*0.976) = 2.955 tn/m
N) COMBINACION DE CARGAS 1:
Wu1 = 1.2 Wd + 1.6 Wl = (1.2*2.711) + (1.6*0.976) = 4.81 tn/m
O) COMBINACION DE CARGAS 2:
Wu2 = 1.25wd + 1.25Wl + Wcs
Q) CARGA VIVA:
SOBRECARGA = 0.20 Tn/m2 * 7.31m = 1.462 tn/m
R) CARGA DE SISMO:
WCS = 100% Wd + 25% Wl = 2.903 + (0.25*1.462) = 3.269 tn/m
S) COMBINACION DE CARGAS 1:
Wu1 = 1.2 Wd + 1.6 Wl = (1.2*2.903) + (1.6*1.462) = 5.82 tn/m
T) COMBINACION DE CARGAS 2:
Wu2 = 1.25wd + 1.25Wl + Wcs
- MOMENTO POSITIVO:
tramos interiores [M+ = 1/16 (Wu*L*L)]
- MOMENTO NEGATIVO:
Dos tramos [M- = 1/9 (Wu*L*L)]
a.4) COMBO 1:
M(+) = 1/16 (4.81*(4.88)^2) = 7.159 tn-m
M(-) = 1/9 (4.81*(4.88)^2) = 12.727 tn-m
a.5) COMBO 2:
M(+) = 1/16 (7.56*(4.88)^2) = 11.252 tn-m
M(-) = 1/9 (7.56*(4.88)^2) = 20.00 tn-m
d) EJE 4-4 /B-C
b.4) COMBO 1:
M(+) = 1/16 (5.82*(7.31)^2) = 19.437 tn-m
M(-) = 1/9 (5.82*(7.31)^2) = 34.555tn-m
b.5) COMBO 2:
M(+) = 1/16 (8.725*(7.31)^2) = 29.139 tn-m
M(-) = 1/9 (8.725*(7.31)^2) = 51.803 tn-m
Eje 5-5/A-B (5TO PISO)
U) CARGA MUERTA:
ALIGERADO= 0.30 Tn/m2 * 1.64m = 0.492 tn/m
V) CARGA VIVA:
SOBRECARGA = 0.15 Tn/m2 * 4.88m = 0.732 tn/m
W)CARGA DE SISMO:
WCS = 100% Wd + 25% Wl = 2.711 + (0.25*0.732) = 3.693 tn/m
X) COMBINACION DE CARGAS 1:
Wu1 = 1.2 Wd + 1.6 Wl = (1.2*2.711) + (1.6*0.732) = 4.42 tn/m
Y) COMBINACION DE CARGAS 2:
Wu2 = 1.25wd + 1.25Wl + Wcs
- MOMENTO POSITIVO:
tramos interiores [M+ = 1/16 (Wu*L*L)]
- MOMENTO NEGATIVO:
Dos tramos [M- = 1/9 (Wu*L*L)]
a.4) COMBO 1:
M(+) = 1/16 (4.42*(4.88)^2) = 6.579 tn-m
M(-) = 1/9 (4.42*(4.88)^2) = 11.696 tn-m
a.5) COMBO 2:
M(+) = 1/16 (8.267*(4.88)^2) = 12.30 tn-m
M(-) = 1/9 (8.267*(4.88)^2) = 21.87 tn-m
f) EJE 5-5 /B-C
b.4) COMBO 1:
M(+) = 1/16 (5.239*(7.31)^2) = 7.798 tn-m
M(-) = 1/9 (5.239*(7.31)^2) = 34. tn-m
b.5) COMBO 2:
M(+) = 1/16 (9.1995*(7.31)^2) = 13.69 tn-m