BÁSICOS ORIGINALES

Análisis: 100 UM: M3


CONCRETO DE F'C= 100KG/CM2. HECHO EN OBRA, T.M.A. = 19MM, 3/4", REVENIMIENTO 8 - 10 CM., RESISTENCIA
NORMAL

MATERIALES U.M. CANTIDAD OP. COSTO IMPORTE


0.260 T CEMENTO + 3% DE DESP. TON 0.2678 * $2,350.00 $629.33
0.500 M3 DE ARENA + 8% DE DESP. M3 0.5400 * $140.00 $75.60
0.680 M3 DE GRAVA + 8% DE DESP. M3 0.7344 * $140.00 $102.82
0.195 M3 DE AGUA + 30 % DE DESP. M3 0.2535 * $80.00 $20.28
TOTAL: $828.03

Análisis: 150 UM: M3


CONCRETO DE F'C= 150KG/CM2. HECHO EN OBRA, T.M.A. = 19MM, 3/4", REVENIMIENTO 8 - 10 CM., RESISTENCIA
NORMAL

MATERIALES U.M. CANTIDAD OP. COSTO IMPORTE


0.323 T CEMENTO + 3% DE DESP. TON 0.3327 * $2,350.00 $781.82
0.480 M3 DE ARENA + 8% DE DESP. M3 0.5184 * $140.00 $72.58
0.670 M3 DE GRAVA + 8% DE DESP. M3 0.7236 * $140.00 $101.30
0.210 M3 DE AGUA + 30 % DE DESP. M3 0.2730 * $80.00 $21.84
TOTAL: $977.54

Análisis: 200 UM: M3


CONCRETO DE F'C= 200KG/CM2. HECHO EN OBRA, T.M.A. = 19MM, 3/4", REVENIMIENTO 8 - 10 CM., RESISTENCIA
NORMAL

MATERIALES U.M. CANTIDAD OP. COSTO IMPORTE


0.355 T CEMENTO + 3% DE DESP. TON 0.3657 * $2,350.00 $859.28
0.470 M3 DE ARENA + 8% DE DESP. M3 0.5076 * $140.00 $71.06
0.650 M3 DE GRAVA + 8% DE DESP. M3 0.7020 * $140.00 $98.28
0.195 M3 DE AGUA + 30 % DE DESP. M3 0.2535 * $80.00 $20.28
TOTAL: $1048.90

Análisis: 1:1:6 UM: M3


MORTERO CEMENTO - CAL- ARENA 1:1:4

MATERIALES U.M. CANTIDAD OP. COSTO IMPORTE


0.300 T CEMENTO + 3% DE DESP TON 0.3090 * $2,350.00 $726.15
0.150 T CALHIDRA + 3% DE DESP TON 0.1545 * $1,300.00 $200.85
1.000 M3 DE ARENA + 8% DE DESP. M3 1.0800 * $140.00 $151.20
0.280 M3 DE AGUA + 30 % DE DESP. M3 0.3640 * $80.00 $29.12
TOTAL: $1107.32
BÁSICOS AJUSTADOS A LA PRIMERA ESCALACION ( ARENA SUBE A $185)
Análisis: 100 UM: M3
CONCRETO DE F'C= 100KG/CM2. HECHO EN OBRA, T.M.A. = 19MM, 3/4", REVENIMIENTO 8 - 10 CM., RESISTENCIA
NORMAL

MATERIALES U.M. CANTIDAD OP. COSTO IMPORTE


0.260 T CEMENTO + 3% DE DESP. TON 0.2678 * $2,350.00 $629.33
0.500 M3 DE ARENA + 8% DE DESP. M3 0.5400 * $185.00 $99.90
0.680 M3 DE GRAVA + 8% DE DESP. M3 0.7344 * $140.00 $102.82
0.195 M3 DE AGUA + 30 % DE DESP. M3 0.2535 * $80.00 $20.28
TOTAL: $852.33

Análisis: 150 UM: M3


CONCRETO DE F'C= 150KG/CM2. HECHO EN OBRA, T.M.A. = 19MM, 3/4", REVENIMIENTO 8 - 10 CM., RESISTENCIA
NORMAL

MATERIALES U.M. CANTIDAD OP. COSTO IMPORTE


0.323 T CEMENTO + 3% DE DESP. TON 0.3327 * $2,350.00 $781.82
0.480 M3 DE ARENA + 8% DE DESP. M3 0.5184 * $185.00 $95.90
0.670 M3 DE GRAVA + 8% DE DESP. M3 0.7236 * $140.00 $101.30
0.210 M3 DE AGUA + 30 % DE DESP. M3 0.2730 * $80.00 $21.84
TOTAL: $1000.87

Análisis: 200 UM: M3


CONCRETO DE F'C= 200KG/CM2. HECHO EN OBRA, T.M.A. = 19MM, 3/4", REVENIMIENTO 8 - 10 CM., RESISTENCIA
NORMAL

MATERIALES U.M. CANTIDAD OP. COSTO IMPORTE


0.355 T CEMENTO + 3% DE DESP. TON 0.3657 * $2,350.00 $859.28
0.470 M3 DE ARENA + 8% DE DESP. M3 0.5076 * $185.00 $93.91
0.650 M3 DE GRAVA + 8% DE DESP. M3 0.7020 * $140.00 $98.28
0.195 M3 DE AGUA + 30 % DE DESP. M3 0.2535 * $80.00 $20.28
TOTAL: $1071.74

Análisis: 1:1:6 UM: M3


MORTERO CEMENTO - CAL- ARENA 1:1:4

MATERIALES U.M. CANTIDAD OP. COSTO IMPORTE


0.300 T CEMENTO + 3% DE DESP TON 0.3090 * $2,350.00 $726.15
0.150 T CALHIDRA + 3% DE DESP TON 0.1545 * $1,300.00 $200.85
1.000 M3 DE ARENA + 8% DE DESP. M3 1.0800 * $185.00 $199.80
0.280 M3 DE AGUA + 30 % DE DESP. M3 0.3640 * $80.00 $29.12
TOTAL: $1155.92
PRIMERA ESCALACIÓN
PRECION UNITARIOS NUEVOS
(SOLO LOS CONCEPTOS QUE TUVIERON ESCALACIÓN)

Análisis: CP883 UM: M3

CIMIENTO DE PIEDRA BRAZA DE 0.80 M DE ALTURA POR 0.80 M DE BASE Y CORONA DE 0.30 M., ASENTADA CON
MORTERO - CAL - ARENA 1:4, ACABADO COMÚN INCLUYE: MATERIALES, ACARREOS, CORTES, DESPERDICIOS,
MANO DE OBRA EQUIPO Y HERRAMIENTA. (CIM 1 COLINDANCIA)

CÓDIGO CONCEPTO U.M. CANTIDAD OP. COSTO IMPORTE


MORTERO - CAL - ARENA M3 *
PROPORCION 1:4 0.3090 $1,155.92 $357.18

1 M3 DE PIEDRA BRAZA + 60% DE M3 *


ABUNDAMIENTO + 8% DE 1.7280 $500.00 $864.00
DESPERDICIO
MATERIALES
HILO (100 M) PZA 0.0999 * $35.00 $3.50
VARILLA DE 1/2" KG 2.0483 * $11.20 $22.94
ALAMBRE KG 0.0125 * $15.00 $0.19
AGUA LTS 14.7725 * $0.08 $1.18
SUBTOTAL: MATERIALES $1248.99

MANO DE
CUADRILLA No 5 (1 OFICIAL JOR 0.333 * $500.00 $166.65
OBRA
ALBAÑIL + 1 PEON)
SUBTOTAL: MANO DE OBRA $166.65

EQUIPO Y
HERRAMIENT HERRAMIENTA MENOR % 0.0300 * $166.65 $5.00
A
SUBTOTAL: EQUIPO Y HERRAMIENTA $5.00

(CD) COSTO DIRECTO $1,420.64


(CI) COSTO INDIRECTO (30%) $426.19
TOTAL $1,846.83
Análisis: PLANH5 UM: M2
PLANTILLA DE CONCRETO SIMPLE DE 5 CM. DE ESPESOR. F'C=100KG/CM2. INCLUYE: PREPARACION DE LA
SUPERFICIE, NIVELACION, MAESTREADO Y COLOCADO, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

CÓDIGO CONCEPTO U.M. CANTIDAD OP. COSTO IMPORTE


CONCRETO M3 0.0515 * $852.33 $43.89
MATERIALES
AGUA M3 0.0065 * $80.00 $0.52
SUBTOTAL: MATERIALES $44.41

MANO DE
CUADRILLA No 2 (0.25 DE JOR 0.0714 * $275.00 $19.64
OBRA
0FICIAL ALBAÑIL+1 PEON)
SUBTOTAL: MANO DE OBRA $19.64

EQUIPO Y
HERRAMIENT HERRAMIENTA MENOR % 0.0300 * $19.64 $0.59
A

REVOLVEDORA HR 0.0275 * $80.00 $2.20


SUBTOTAL: EQUIPO Y HERRAMIENTA $2.79

(CD) COSTO DIRECTO $66.84


(CI) COSTO INDIRECTO (30%) $20.05
TOTAL $86.89
Análisis: CP883 UM: ML

CADENA DE DESPLANTE DE 15 X 20 CM DE CONCRETO HECHO EN OBRA DE F'C= 200 KG/CM2 ACABADO COMÚN
ARMADO CON 4 V # 3, ESTRIBOS # 2 @ 15 CM, INCLUYE: MATERIALES ACARREO, CORTES, DESPERDICIOS,
TRASLAPES, AMARRES, CIMBRADO, CIMBRADO, COLADO,DECIMBRADO, MANO DE OBRA EQUIPO Y
HERRAMIENTA.

CÓDIGO CONCEPTO U.M. CANTIDAD OP. COSTO IMPORTE


CONCRETO DE F'C 200 KG/ CM2 M3 0.0309 * $1,071.74 $33.12
TABLA DE 20 CM X 2.5 M PZA 0.2200 * $80.00 $17.60
VARILLA # 3 KG 2.3484 * $13.50 $31.70
DIESEL LTS 0.2640 * $12.38 $3.27
MATERIALES CLAVOS 2 1/2 KG 0.1325 * $28.00 $3.71
ALAMBRE RECOCIDO KG 0.3240 * $15.00 $4.86
DUELAS (10 X 2.5 X 250 CM) PZA 0.1980 * $40.00 $7.92
ALAMBRON # 2 KG 1.1582 * $14.00 $16.21
AGUA M3 0.0250 * $80.00 $2.00
SUBTOTAL: MATERIALES $120.39

CUADRILLA No 4 (0.5 OFICIAL


FIERRERO + 1 AYUDANTE JOR 0.0215 * $7.53
FIERRERO)
$350.00
CUADRILLA No 3 (1 OFICIAL
CARPINTERO + 1 AYUDANTE
CARPINTERO) JOR 0.0421 $21.05
MANO DE
OBRA * $500.00
CUADRILLA No 7 (1 OPERADOR
+ 4 AYUDANTES)
JOR 0.0021 $2.31

* $1,100.00
CUADRILLA No 2 (0.25 DE JOR 0.0200 * $275.00 $5.50
OFICIAL ALBAÑIL + 1 PEON)
SUBTOTAL: MANO DE OBRA $36.39

EQUIPO Y
HERRAMIENT HERRAMIENTA MENOR % 0.0300 * $36.39 $1.09
A
REVOLVEDORA HR. 0.0164 * $80.00 $1.31
SUBTOTAL: EQUIPO Y HERRAMIENTA $2.40

(CD) COSTO DIRECTO $159.18


(CI) COSTO INDIRECTO (30%) $47.75
TOTAL $206.94
Análisis: CP883 UM: PZA

ANCLAJE DE CASTILLO K-1, F'C=200KG/CM2, DE 16X16 CM, (ANCLAJE DE 50 CM), ARMADO CON 4 V # 3 ESTRIBOS
# 2 @ 15 CM, INCLUYENDO ELABORACION DEL CONCRETO.

CÓDIGO CONCEPTO U.M. CANTIDAD OP. COSTO IMPORTE


CONCRETO DE F'C 200 KG/CM2 M3 0.0132 * $1,071.74 $14.15
VARILLA # 3 KG 1.8787 *$13.50 $25.36
MATERIALES ALAMBRON # 2 KG 0.5990 *$14.00 $8.39
ALAMBRE RECOCIDO KG 0.0880 * $15.00 $1.32
SUBTOTAL: MATERIALES $49.22

CUADRILLA No 5 (1 OFICIAL
MANO DE ALBAÑIL + 1 PEÓN) JOR 0.1 $500.00 $50.00
OBRA
*
SUBTOTAL: MANO DE OBRA $50.00

EQUIPO Y REVOLVEDORA HR. 0.007 * $80.00 $0.56


HERRAMIENTA
HERRAMIENTA MENOR % 0.030 * $50.00 $1.50
SUBTOTAL: EQUIPO Y HERRAMIENTA $1.50

(CD) COSTO DIRECTO $100.72


(CI) COSTO INDIRECTO (30%) $30.21
TOTAL $130.93

Análisis: CP883 UM: PZA

ANCLAJE DE CASTILLO K-2, F'C=200KG/CM2, DE 16X20 CM, (ANCLAJE DE 50 CM), ARMADO CON 4 V # 3 ESTRIBOS
# 2 @ 15 CM, INCLUYENDO ELABORACION DEL CONCRETO.

CÓDIGO CONCEPTO U.M. CANTIDAD OP. COSTO IMPORTE


CONCRETO DE F'C 200 KG/CM2 M3 0.0165 * $1,071.74 $17.66
VARILLA # 3 KG 1.8787 * $13.50 $25.36
MATERIALES ALAMBRON # 2 KG 0.6826 * $14.00 $9.56
ALAMBRE RECOCIDO KG 0.0880 * $15.00 $1.32
SUBTOTAL: MATERIALES $53.90

CUADRILLA No 5 (1 OFICIAL
MANO DE ALBAÑIL + 1 PEÓN) JOR 0.1 * $500.00 $50.00
OBRA

SUBTOTAL: MANO DE OBRA $50.00

EQUIPO Y REVOLVEDORA HR. 0.0088 * $80.00 $0.70


HERRAMIENTA
HERRAMIENTA MENOR % 0.030 * $50.00 $1.50
SUBTOTAL: EQUIPO Y HERRAMIENTA $2.20
(CD) COSTO DIRECTO $106.11
(CI) COSTO INDIRECTO (30%) $31.83
TOTAL $137.94

Análisis: C151543 UM: ML

CASTILLO K-1 DE 16 X 16 CM DE CONCRETO HECHO EN OBRA DE F'C= 200 KG/CM2, ACABADO COMUN, ARMADO
CON 4 V # 3 ESTRIBOS # 2 @ 15 CM., INCLUYE: MATERIALES, ACARREOS, CORTES, DESPERDICIOS, TRASLAPES
AMARRES, CIMBRADO, COLADO, DECIMBRADO, MANO DE OBRA, EQUIPO Y HERRAMINTA (K1)

CÓDIGO CONCEPTO U.M. CANTIDAD OP. COSTO IMPORTE


CONCRETO DE F'C 200 KG/ CM2 M3 0.0263 * $1,071.74 $28.23
TABLA DE 20 CM X 2.5 M PZA 0.1760 * $80.00 $14.08
VARILLA # 3 KG 2.3484 * $13.50 $31.70
DIESEL LTS 0.2112 * $12.38 $2.61
CLAVOS 2 1/2 KG 0.1232 * $28.00 $3.45
MATERIALES
ALAMBRE RECOCIDO KG 0.2861 * $15.00 $4.29
DUELA (10 X 2.5 X 250CM) PZA 0.1320 * $40.00 $5.28
BARROTE (10 X 5 X 250 CM) PZA 0.1320 * $60.00 $7.92
ALAMBRON # 2 KG 1.0496 * $14.00 $14.69
AGUA M3 0.0065 * $80.00 $0.52
SUBTOTAL: MATERIALES $112.78

CUADRILLA No 4 (0.5 OFICIAL


FIERRERO + 1 AYUDANTE JOR 0.0222 * $350.00 $7.77
FIERRERO)

CUADRILLA No 3 (1 OFICIAL
CARPINTERO + 1 AYUDANTE
CARPINTERO) JOR 0.0427 $500.00 $21.35
MANO DE
OBRA *
CUADRILLA No 7 (1 OPERADOR
+ 4 AYUDANTES)
JOR 0.0018 $1,100.00 $1.93

*
CUADRILLA No 2 (0.25 DE JOR 0.0301 * $275.00 $8.28
OFICIAL ALBAÑIL + 1 PEON)
SUBTOTAL: MANO DE OBRA $39.32

EQUIPO Y HERRAMIENTA MENOR % 0.0300 * $39.32 $1.18


HERRAMIENT
A REVOLVEDORA HR. 0.0140 * $80.00 $1.12
SUBTOTAL: EQUIPO Y HERRAMIENTA $2.30

(CD) COSTO DIRECTO $154.41


(CI) COSTO INDIRECTO (30%) $46.32
TOTAL $200.73
Análisis: C151543 UM: ML

CASTILLO K-2 DE 16 X 20 CM DE CONCRETO HECHO EN OBRA DE F'C= 200 KG/CM2, ACABADO COMUN, ARMADO
CON 4 V # 3 ESTRIBOS # 2 @ 15 CM., INCLUYE: MATERIALES, ACARREOS, CORTES, DESPERDICIOS, TRASLAPES
AMARRES, CIMBRADO, COLADO, DECIMBRADO, MANO DE OBRA, EQUIPO Y HERRAMIENTA (K2)

CÓDIGO CONCEPTO U.M. CANTIDAD OP. COSTO IMPORTE


CONCRETO DE F'C 200 KG/ CM2 M3 0.0329 * $1,071.74 $35.26
TABLA DE 30 CM X 2.5 M PZA 0.1467 * $120.00 $17.60
VARILLA # 3 KG 2.3484 * $13.50 $31.70
DIESEL LTS 0.2640 * $12.38 $3.27
CLAVOS 2 1/2 KG 0.1030 * $28.00 $2.88
MATERIALES
ALAMBRE RECOCIDO KG 0.2578 * $15.00 $3.87
DUELA (10 X 2.5 X 250CM) PZA 0.1320 * $40.00 $5.28
BARROTE (10 X 5 X 250 CM) PZA 0.0880 * $60.00 $5.28
ALAMBRON # 2 KG 1.1944 * $14.00 $16.72
AGUA M3 0.0065 * $80.00 $0.52
SUBTOTAL: MATERIALES $122.39

CUADRILLA No 4 (0.5 OFICIAL


FIERRERO + 1 AYUDANTE JOR 0.0231 * $350.00 $8.09
FIERRERO)

CUADRILLA No 3 (1 OFICIAL
CARPINTERO + 1 AYUDANTE
CARPINTERO) JOR 0.0533 $500.00 $26.65
MANO DE
OBRA *
CUADRILLA No 7 (1 OPERADOR
+ 4 AYUDANTES)
JOR 0.0022 $1,100.00 $2.41

*
CUADRILLA No 2 (0.25 DE JOR 0.0376 * $275.00 $10.35
OFICIAL ALBAÑIL + 1 PEON)
SUBTOTAL: MANO DE OBRA $47.50

EQUIPO Y HERRAMIENTA MENOR % 0.0300 * $47.50 $1.42


HERRAMIENT
A REVOLVEDORA HR. 0.0175 * $80.00 $1.40
SUBTOTAL: EQUIPO Y HERRAMIENTA $2.82

(CD) COSTO DIRECTO $172.71


(CI) COSTO INDIRECTO (30%) $51.81
TOTAL $224.52
Análisis: MUTABREC UM: M2

MURO DE TABIQUE ROJO RECOCIDO DE 7-14-28 CM ASENTADO CON MEZCLA CEMENTO - ARENA 1:4 ACABADO
COMUN, INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

CÓDIGO CONCEPTO U.M. CANTIDAD OP. COSTO IMPORTE


TABIQUE ROJO (7-14-28) PZA 47.4137 * 4.500 $213.36
MATERIALES MEZCLA: CEMENTO, ARENA, *
M3 0.0238 $1,155.92 $27.51
PROPORCIÓN 1:4
SUBTOTAL: MATERIALES $240.87

CUADRILLA No 5 (1 OFICIAL
MANO DE ALBAÑIL + 1 PEÓN) JOR 0.0900 * $500.00 $45.00
OBRA

SUBTOTAL: MANO DE OBRA $45.00

EQUIPO Y
HERRAMIENTA HERRAMIENTA MENOR % 0.030 * $45.00 $1.35

SUBTOTAL: EQUIPO Y HERRAMIENTA $1.35

(CD) COSTO DIRECTO $287.22


(CI) COSTO INDIRECTO (30%) $86.17
TOTAL $373.39

Análisis: ESCC1725 UM: PZA

ESCALON DE CONCRETO SIMPLE CON F'C= 150 KG/CM2 CON DIMENSIONES DE 17 CM DE PERALTE Y 25 CM. DE
HUELLA, INCLUYE MANO DE OBRA, HERRAMIENTA Y EQUIPO

CÓDIGO CONCEPTO U.M. CANTIDAD OP. COSTO IMPORTE


CONCRETO DE F'C 150 KG/ CM2 M3 0.0219 * $1,000.87 $21.92
TABLA DE 20 CM X 2.5 M PZA 0.1169 * $80.00 $9.35
MATERIALES DIESEL LTS 0.1403 * $12.38 $1.74
CLAVOS 2 1/2 KG 0.0264 * $28.00 $0.74
AGUA M3 0.0014 * $80.00 $0.11
SUBTOTAL: MATERIALES $33.86

CUADRILLA No 5 (1 OFICIAL
MANO DE ALBAÑIL + 1 PEON) JOR 0.0667 * $500.00 $33.35
OBRA
CUADRILLA No 7 (1 OPERADOR +
JOR 0.0015 * $1,100.00 $1.61
4 AYUDANTES)
SUBTOTAL: MANO DE OBRA $34.96

EQUIPO Y HERRAMIENTA MENOR % 0.0300 * $34.96 $1.05


HERRAMIENTA REVOLVEDORA HR. 0.0117 * $80.00 $0.94
SUBTOTAL: EQUIPO Y HERRAMIENTA $1.98

(CD) COSTO DIRECTO $70.80


(CI) COSTO INDIRECTO (30%) $21.24
TOTAL $92.04

Análisis: D2016 UM: ML

CADENA DE CERRAMIENTO (CC-1 SOBRE MUROS) DE 20X16 CM, ARMADO CON 4 VARILLAS # 3,ESTRIBOS # 2 @
15 CM, F'C= 150 KG/CM2, INCLUYE: HABILITADO Y ARMADO,MATERIALES, MANO DE OBRA, EQUIPO, CORTES,
TRASLAPES, CIMBRA Y DESCIMBRA, SE DEJA SIN RECUBRIR EN LA PARTE SUPERIOR PARA EL ACERO DE LA
LOSA.

CÓDIGO CONCEPTO U.M. CANTIDAD OP. COSTO IMPORTE


CONCRETO DE F'C 150 KG/ CM2 M3 0.0247 * $1,000.87 $24.72
TABLA DE 20 CM X 2.5 M PZA 0.1650 * $80.00 $13.20
VARILLA # 3 KG 2.3484 * $13.50 $31.70
DIESEL LTS 0.1980 * $12.38 $2.45
MATERIALES CLAVOS 3 1/2 KG 0.0706 * $28.00 $1.98
ALAMBRE RECOCIDO KG 0.3616 * $15.00 $5.42
DUELA (10 X 2.5 X 250CM) PZA 0.1320 * $40.00 $5.28
ALAMBRON # 2 KG 1.1944 * $14.00 $16.72
AGUA M3 0.0020 * $80.00 $0.16
SUBTOTAL: MATERIALES $101.63

CUADRILLA No 4 (0.5 OFICIAL


FIERRERO + 1 AYUDANTE JOR 0.0231 * $350.00 $8.07
FIERRERO)

CUADRILLA No 3 (1 OFICIAL
CARPINTERO + 1 AYUDANTE
CARPINTERO) JOR 0.0352 $500.00 $17.60
MANO DE
OBRA *
CUADRILLA No 7 (1 OPERADOR
+ 4 AYUDANTES)
JOR 0.0016 $1,100.00 $1.80

*
CUADRILLA No 2 (0.25 DE JOR 0.0252 * $275.00 $6.93
OFICIAL ALBAÑIL + 1 PEON)
SUBTOTAL: MANO DE OBRA $34.41

EQUIPO Y HERRAMIENTA MENOR % 0.0300 * $34.41 $1.03


HERRAMIENT
A REVOLVEDORA HR. 0.0132 * $80.00 $1.05
SUBTOTAL: EQUIPO Y HERRAMIENTA $2.09

(CD) COSTO DIRECTO $138.13


(CI) COSTO INDIRECTO (30%) $41.44
TOTAL $179.56

Análisis: TRACE1 UM: ML

TRABE DE CERRAMIENTO (TRABE 1 ) SIN MURO DE APOYO DE 20X30 CM, ARMADO CON 2VAR. # 3 Y 3 VAR. # 4,
ESTRIBOS # 2 @ 15 CM, F'C= 150 KG/CM2, INCLUYE: HABILITADO Y ARMADO,MATERIALES, MANO DE OBRA,
EQUIPO, CORTES, TRASLAPES, CIMBRA Y DESCIMBRA, SIN RECUBRIR EN LA PARTE SUPERIOR PARA EL ACERO
DE LA LOSA.

CANTIDA OP
CÓDIGO CONCEPTO U.M. COSTO IMPORTE
D .
CONCRETO DE F'C 150 KG/ CM2 M3 0.0515 * $1,000.87 $51.54
TABLA DE 30 CM X 2.5 M PZA 0.1835 * $120.00 $22.02
VARILLA # 3 KG 1.1742 * $13.50 $15.85
VARILLA # 4 KG 3.0900 * $10.79 $33.34
DIESEL LTS 0.4620 * $12.38 $5.72
MATERIALES CLAVOS 3 1/2 KG 0.5124 * $28.00 $14.35
ALAMBRE RECOCIDO KG 0.1926 * $15.00 $2.89
BARROTE (10 X 5 X 250 CM) PZA 0.0660 * $60.00 $3.96
DUELA (10 X 2.5 X 250CM) PZA 0.6325 * $40.00 $25.30
ALAMBRON # 2 KG 1.7011 * $14.00 $23.82
AGUA M3 0.0275 * $80.00 $2.20
SUBTOTAL: MATERIALES $200.99

CUADRILLA No 4 (0.5 OFICIAL FIERRERO


+ 1 AYUDANTE FIERRERO) JOR 0.0385 * $350.00 $13.48

CUADRILLA No 3 (1 OFICIAL
CARPINTERO + 1 AYUDANTE
CARPINTERO) JOR 0.0091 $500.00 $4.55
MANO DE
OBRA *
CUADRILLA No 7 (1 OPERADOR + 4
AYUDANTES)
JOR 0.0034 $1,100.00 $3.77

*
CUADRILLA No 2 (0.25 DE OFICIAL JOR 0.0526 * $275.00 $14.47
ALBAÑIL + 1 PEON)
SUBTOTAL: MANO DE OBRA $36.26

EQUIPO Y HERRAMIENTA MENOR % 0.0300 * $36.26 $1.09


HERRAMIENT
A REVOLVEDORA HR. 0.0274 * $80.00 $2.19
SUBTOTAL: EQUIPO Y HERRAMIENTA $3.28

(CD) COSTO DIRECTO $240.53


(CI) COSTO INDIRECTO
$72.16
(30%)
TOTAL $312.70

Análisis: E07001 UM: M2

LOSA DE ENTREPISO DE 10 CM DE ESPESOR CON F'C= 200 KG/CM² ARMADO CON VAR. # 3 @ 20 CM. DE LOS
AMBOS SENTIDOS INCLUYE: CIMBRADO, ACABADO COMÚN, ARMADO, COLADO, MANO DE OBRA, EQUIPO Y
HERRAMIENTA.

CANTIDA
CÓDIGO CONCEPTO U.M. OP. COSTO IMPORTE
D
CONCRETO DE F'C 200 KG/ CM2 M3 0.1030 * $1,071.74 $110.39
TABLA DE 30 CM X 2.5 M PZA 0.3660 * $120.00 $43.92
VARILLA # 3 KG 7.0452 * $13.50 $95.11
POLIN (10 X 10 X 250 CM) PZA 0.1798 * $90.00 $16.18
DIESEL LTS 0.6600 * $12.38 $8.17
MATERIALES LECHADA CEMENTO GRIS KG 0.0052 * $2,912.00 $15.00
CLAVOS 3 1/2 KG 0.0191 * $28.00 $0.53
ALAMBRE RECOCIDO KG 0.2489 * $15.00 $3.73
BARROTE (10 X 5 X 250 CM) PZA 0.1191 * $60.00 $7.15
DUELA (10 X 2.5 X 250CM) PZA 0.0729 * $40.00 $2.92
AGUA M3 0.0325 * $80.00 $2.60
SUBTOTAL: MATERIALES $305.70

CUADRILLA No 4 (0.5 OFICIAL FIERRERO


+ 1 AYUDANTE FIERRERO) JOR 0.0453 * $350.00 $15.86

CUADRILLA No 3 (1 OFICIAL CARPINTERO


+ 1 AYUDANTE CARPINTERO)
JOR 0.1111 $500.00 $55.55

*
MANO DE
CUADRILLA No 1 (0.1 DE CABO + 1 PEÓN)
OBRA
JOR 0.0033 $230.00 $0.76

*
CUADRILLA No 7 (1 OPERADOR + 4
AYUDANTES)
JOR 0.0069 $1,100.00 $7.59

*
CUADRILLA No 2 (0.25 DE OFICIAL ALBAÑIL JOR 0.1053 * $275.00 $28.96
+ 1 PEON)
SUBTOTAL: MANO DE OBRA $108.71

EQUIPO Y HERRAMIENTA MENOR % 0.0300 * $108.71 $3.26


HERRAMIENT
A REVOLVEDORA HR. 0.0549 * $80.00 $4.39
SUBTOTAL: EQUIPO Y HERRAMIENTA $7.65

(CD) COSTO DIRECTO $422.06


(CI) COSTO INDIRECTO
$126.62
(30%)
TOTAL $548.68

Análisis: FCS10 UM: M2

FIRME DE CONCRETO DE 10 CM DE ESPESOR, CONCRETO F'C= 150 KG/CM2, ACABADO COMÚN INCLUYE:
MATERIALES, ACARREOS, PREPARACIÓN DE LA SUPERFICIE, NIVELACIÓN, CIMBRADO, DESCIMBRADO, COLADO,
MANO DE OBRA, EQUIPO Y HERRAMIENTA.

CÓDIGO CONCEPTO U.M. CANTIDAD OP. COSTO IMPORTE


CONCRETO DE F'C 150 KG/ CM2 M3 0.1030 *
$1,000.87 $103.09
MATERIAL
AGUA M3 0.0325 * $80.00 $2.60
SUBTOTAL: MATERIALES $105.69

CUADRILLA No 2 (0.25 DE
JOR 0.0667 $500.00 $33.35
OFICIAL ALBAÑIL + 1 PEON) *
CUADRILLA No 7 (1 OPERADOR
MANO DE + 4 AYUDANTES) JOR 0.0069 * $1,100.00 $7.59
OBRA

SUBTOTAL: MANO DE OBRA $40.94

HERREMIENTA
O EQUIPO HERRAMIENTA MENOR % 0.030 * $40.94 $1.23

REVOLVEDORA HR 0.055 * $80.00 $4.39


SUBTOTAL: EQUIPO Y HERRAMIENTA $5.62

(CD) COSTO DIRECTO $152.25


(CI) COSTO INDIRECTO (30%) $45.67
TOTAL $197.92

Análisis: FCS150 UM: M2

FIRME DE CONCRETO SIMPLE F'C= 150 KG/CM2 PARA ANDADOR DE AUTOMOVILES, CON ESPESOR DE 15CM. NO
INCLUYE CIMBRA.

CÓDIGO CONCEPTO U.M. CANTIDAD OP. COSTO IMPORTE


CONCRETO DE F'C 150 KG/ CM2 M3 0.1545 * $1,000.87 $154.63
MATERIAL
AGUA M3 0.0065 * $80.00 $0.52
SUBTOTAL: MATERIALES $155.15

CUADRILLA No 2 (0.25 DE
JOR 0.1 $500.00 $50.00
OFICIAL ALBAÑIL + 1 PEON) *
CUADRILLA No 5 (1 OFICIAL
ALBAÑIL + 1 PEON)
JOR 0.0285 * $500.00 $14.25
MANO DE
OBRA
CUADRILLA No 7 (1 OPERADOR
+ 4 AYUDANTES)
JOR 0.0103 * $1,100.00 $11.33

SUBTOTAL: MANO DE OBRA $75.58

HERREMIENTA HERRAMIENTA MENOR % 0.030 * $75.58 $2.27


O EQUIPO REVOLVEDORA HR 0.082 * $80.00 $6.59
SUBTOTAL: EQUIPO Y HERRAMIENTA $8.86

(CD) COSTO DIRECTO $239.59


(CI) COSTO INDIRECTO (30%) $71.88
TOTAL $311.47

Análisis: COLAZO UM: M2

LOSA DE AZOTEA HORIZONTAL DE CONCRETO ARMADO F'C= 200 KG/CM2 CON UN ESPESOR DE 10CM, ARMADO
CON VARILLA DE 3/8" FY= 4200 KG/CM2, @ 20 CM DE SEPARACIÓN EN AMBOS SENTIDOS, CON UNA PENDIENTE
DE 10° INCLUYE: ARMANO, CIMBRADO, TRASLAPES, BAYONES, DECIMBRADO, MATERIALES, MANO DE OBRA,
HERRAMIENTA, ACABADO COMÚN.

CANTIDA
CÓDIGO CONCEPTO U.M. OP. COSTO IMPORTE
D
CONCRETO DE F'C 200 KG/ CM2 M3 0.1030 * $1,071.74 $110.39
TABLA DE 30 CM X 2.5 M PZA 0.3660 * $120.00 $43.92
VARILLA # 3 KG 7.0452 * $13.50 $95.11
POLIN (10 X 10 X 250 CM) PZA 0.1798 * $90.00 $16.18
DIESEL LTS 0.6600 * $12.38 $8.17
MATERIALES LECHADA CEMENTO GRIS M3 0.0052 * $2,912.00 $15.00
CLAVOS 3 1/2 KG 0.0191 * $28.00 $0.53
ALAMBRE RECOCIDO KG 0.2489 * $15.00 $3.73
BARROTE (10 X 5 X 250 CM) PZA 0.1191 * $60.00 $7.15
DUELA (10 X 2.5 X 250CM) PZA 0.0729 * $40.00 $2.92
AGUA M3 0.0325 * $80.00 $2.60
SUBTOTAL: MATERIALES $305.70

CUADRILLA No 4 (0.5 OFICIAL FIERRERO


+ 1 AYUDANTE FIERRERO) JOR 0.0453 * $350.00 $15.86
MANO DE
OBRA
CUADRILLA No 3 (1 OFICIAL CARPINTERO
+ 1 AYUDANTE CARPINTERO) JOR 0.1111 $500.00 $55.55
*
CUADRILLA No 1 (0.1 DE CABO + 1 PEÓN)

JOR 0.0033 $230.00 $0.76

*
CUADRILLA No 7 (1 OPERADOR + 4
AYUDANTES)
JOR 0.0069 $1,100.00 $7.59

*
CUADRILLA No 2 (0.25 DE OFICIAL ALBAÑIL JOR 0.1053 * $275.00 $28.96
+ 1 PEON)
SUBTOTAL: MANO DE OBRA $108.71

EQUIPO Y HERRAMIENTA MENOR % 0.0300 * $108.71 $3.26


HERRAMIENT
A REVOLVEDORA HR. 0.0549 * $80.00 $4.39
SUBTOTAL: EQUIPO Y HERRAMIENTA $7.65

(CD) COSTO DIRECTO $422.06


(CI) COSTO INDIRECTO
$126.62
(30%)
TOTAL $548.68

Análisis: LOSAAZOTE UM: M2

LOSA DE AZOTEA CON PENDIENTE DE CONCRETO ARMADO F'C= 200 KG/CM2 CON UN ESPESOR DE 10CM,
ARMADO CON VARILLA DE 3/8" FY= 4200 KG/CM2, @ 20 CM DE SEPARACIÓN EN AMBOS SENTIDOS, CON UNA
PENDIENTE DE 10° INCLUYE: ARMANO, CIMBRADO, TRASLAPES, BAYONES, DECIMBRADO, MATERIALES, MANO
DE OBRA, HERRAMIENTA, ACABADO COMÚN.

CANTIDA
CÓDIGO CONCEPTO U.M. OP. COSTO IMPORTE
D
CONCRETO DE F'C 200 KG/ CM2 M3 0.1030 * $1,071.74 $110.39
TABLA DE 30 CM X 2.5 M PZA 0.3666 * $120.00 $43.99
VARILLA # 3 KG 7.0452 * $13.50 $95.11
POLIN (10 X 10 X 250 CM) PZA 0.2408 * $90.00 $21.67
DIESEL LTS 0.6600 * $12.38 $8.17
MATERIALES LECHADA CEMENTO GRIS KG 0.0052 * $2,912.00 $15.00
CLAVOS 3 1/2 KG 0.0302 * $28.00 $0.85
ALAMBRE RECOCIDO KG 0.2606 * $15.00 $3.91
BARROTE (10 X 5 X 250 CM) PZA 0.1720 * $60.00 $10.32
DUELA (10 X 2.5 X 250CM) PZA 0.0898 * $40.00 $3.59
AGUA M3 0.0325 * $80.00 $2.60
SUBTOTAL: MATERIALES $315.60

CUADRILLA No 4 (0.5 OFICIAL FIERRERO


MANO DE + 1 AYUDANTE FIERRERO) JOR 0.0453 * $350.00 $15.86
OBRA
CUADRILLA No 3 (1 OFICIAL CARPINTERO
+ 1 AYUDANTE CARPINTERO)
JOR 0.1111 $500.00 $55.55

*
CUADRILLA No 1 (0.1 DE CABO + 1 PEÓN)

JOR 0.0033 $230.00 $0.76

*
CUADRILLA No 7 (1 OPERADOR + 4
AYUDANTES)
JOR 0.0069 $1,100.00 $7.59

*
CUADRILLA No 2 (0.25 DE OFICIAL ALBAÑIL JOR 0.1053 * $275.00 $28.96
+ 1 PEON)
SUBTOTAL: MANO DE OBRA $108.71

EQUIPO Y HERRAMIENTA MENOR % 0.0300 * $108.71 $3.26


HERRAMIENT
A REVOLVEDORA HR. 0.0549 * $80.00 $4.39
SUBTOTAL: EQUIPO Y HERRAMIENTA $7.65

(CD) COSTO DIRECTO $431.96


(CI) COSTO INDIRECTO
$129.59
(30%)
TOTAL $561.55

Análisis: BASTIN UM: PZA

BASE PARA TINACO DE 1 X 1 X O.8 M. DE ALTURA A BASE DE TABIQUES ROJO RECOSIDO 7-14-25 ASENTADO
CON MORTERO CEMENTO-ARENA PROPORCIÓN 1;4, Y APLANADO CON EL MISMO, MORTERO DE 2 CM DE
ESPESOR. CON JUNTEO PROMEDIO DE 1CM INCLUYE SUMINISTRO Y ELABORACIÓN, LOSA DE CONCRETO DE
F'C= 150 KG/CM2 CON UN ESPESOR DE 10 CM, ARMADO CON VARILLA DE 3/8" @ 20 CM. EN AMBOS SENTIDOS.

CANTIDA
CÓDIGO CONCEPTO U.M. OP. COSTO IMPORTE
D
TABIQUE ROJO RECOSIDO 7-14-25 MILLAR 0.0990 * $3,000.00 $297.00
APLANADO M2 3.4480 * $2.72 $9.38
CONCRETO F'C 150 KG/CM2 M3 0.1030 * $1,000.87 $103.09
VARILLA DE # 3 KG 7.0452 * $13.50 $95.11
DIESEL LTS 0.6600 * $12.38 $8.17
TABLA DE 20 X 2.5 X 250 CM PZA 0.3960 * $80.00 $31.68
MATERIALES
CLAVOS 3 1/2 KG 0.1144 * $28.00 $3.20
ALAMBRE RECOCIDO KG 0.1982 * $15.00 $2.97
BARROTE (10 X 5 X 250 CM) PZA 0.1646 * $60.00 $9.88
DUELA (10 X 2.5 X 250CM) PZA 0.1100 * $40.00 $4.40
M3 *
AGUA PARA HUMEDECER MURO Y 0.0325 $80.00 $2.60
CURADO DEL APLANADO
SUBTOTAL: MATERIALES $567.48

JOR 0.0453 * $350.00 $15.86


CUADRILLA No 4 (0.5 OFICIAL FIERRERO
+ 1 AYUDANTE FIERRERO)
CUADRILLA No 3 (1 OFICIAL CARPINTERO
+ 1 AYUDANTE CARPINTERO)
JOR 0.0800 $500.00 $40.00

*
CUADRILLA No 5 (1 OFICIAL ALBAÑIL + 1
PEÓN)
JOR 0.1272 $500.00 $63.60

MANO DE *
OBRA CUADRILLA No 7 (1 OPERADOR + 4
AYUDANTES)
JOR 0.0069 $1,100.00 $7.59

*
CUADRILLA No 5 (1 OFICIAL ALBAÑIL + 1
PEÓN)
JOR 0.0030 $500.00 $1.50

*
CUADRILLA No 2 (0.25 DE OFICIAL ALBAÑIL JOR 0.1053 * $275.00 $28.96
+ 1 PEON)
SUBTOTAL: MANO DE OBRA $157.50

EQUIPO Y HERRAMIENTA MENOR % 0.0300 * $157.50 $4.73


HERRAMIENT
A REVOLVEDORA HR. 0.0068 * $80.00 $0.54
SUBTOTAL: EQUIPO Y HERRAMIENTA $5.27

(CD) COSTO DIRECTO $730.25


(CI) COSTO INDIRECTO
$219.08
(30%)
TOTAL $949.33

Análisis: CIS2M UM: M2

CISTERNA DE 2 M. DE LARGO, 1.70 M DE ANCHO A BASE DE TABIQUE 7-14-25, APLANADO CON MEZCLA MORTERO
- ARENA 1:4 DE 2CM DE ESPESOR LOSA DE CONCRETO CON F'C= 200 KG/CM2 REFORZADA CON MALLA ARMEX
6X6 6/6, LOSA DE FONDO DE CONCRETO SIMPLE F'C= 200 KG/CM2 CON ESPESOR DE 10 CM, CADENA CON ARMEX
DE 15X20 CON F'C= 150 KG/CM2, CHAFLAN DE MORTERO DE 7X7 CM., CASTILLO DE ARMEX DE 15X15 CM CON F'C=
150 KG/CM2, PASTA DE CEMENTO GRIS DE 2 MM DE ESPESOR INCLUYENDO: CIMBRA, EXCAVACIÓN, COLADO Y
COMPACTACIÓN.

CÓDIGO CONCEPTO U.M. CANTIDAD OP. COSTO IMPORTE


CONCRETO FONDO DE F'C DE 200 KG/CM2 M3 *
0.2884 $1,071.74 $309.09
TABIQUE ROJO RECOSIDO (7-14-28) MILLAR *
0.8970 $3,000.00 $2691.00
CASTILLO ARMEX 15 X 15 CM PZA 1.6109 * $77.00 $124.04
CIMBRA PARA CASTILLO M2 2.0400 * $44.10 $89.96
CONCRETO PARA CASTILLO DE F'C DE 200 M3 *
KG/CM2 0.1576 $934.17 $147.23
CADENA ARMEX 15 X 20 CM PZA 2.0188 * $75.00 $151.41
CIMBRA PARA CADENA M2 2.9600 * $15.68 $46.41
CONCRETO PARA CADENA DE F'C DE 200 M3 *
KG/CM2 0.2287 $1,071.74 $245.11
CIMBRA PARA LOSA M2 2.8000 * $99.77 $279.36
MALLA ARMEX PARA LOSA 6X6 6/6 PZA *
0.0391 $2,150.00 $84.07
CONCRETO PARA LOSA DE F'C DE 200 M3 *
KG/CM2 0.4027 $1,071.74 $431.59
APLANADO M2 11.5600 * $18.24 $210.85
CHAFLAN DE MORTERO M3 0.0172 * $657.04 $11.30
APLANADO PULIDO A LLANA M3 0.0374 * $3,272.00 $122.37
SUBTOTAL: MATERIALES $4943.79

CUADRILLA No 4 (0.5 OFICIAL FIERRERO +


1 AYUDANTE FIERRERO)

CASTILLO (ARMEX) JOR 0.0606 * $350.00 $21.22


CADENA (ARMEX) JOR 0.0756 * $350.00 $26.47
LOSA (MALLA) JOR 0.0782 * $350.00 $27.37
CUADRILLA No 3 (1 OFICIAL CARPINTERO
+ 1 AYUDANTE CARPINTERO)

MURO DE TABIQUE JOR 1.0509 * $500.00 $525.45


CIMBRA Y DECIMBRA (CASTILLO) JOR 0.2720 * $500.00 $136.00
CIMBRA Y DECIMBRA (CADENA) JOR 0.3482 * $500.00 $174.12
CIMBRA Y DECIMBRA (LOSA) JOR 0.3111 * $500.00 $155.56
CUADRILLA No 1 (0.1 DE CABO + 1 PEÓN)
MANO DE
OBRA

EXCAVACIÓN JOR 1.7595 * $230.00 $404.69


ACARREO JOR 0.3519 * $230.00 $80.94
CUADRILLA No 7 (1 OPERADOR + 4
AYUDANTES)

ELAB. CONCRETO PARA FIRME JOR 0.0192 * $1,100.00 $21.15


ELAB. CONCRETO PARA CASTILLO
JOR 0.0105 $1,100.00 $11.56
*
ELAB. CONCRETO PARA CADENA JOR 0.0152 * $1,100.00 $16.77
ELAB. CONCRETO PARA LOSA JOR 0.0268 * $1,100.00 $29.53
CUADRILLA No 2 (0.25 DE OFICIAL ALBAÑIL
+ 1 PEON)
COLADO PARA FIRME JOR 0.1867 * $275.00 $51.33
COLADO PARA CASTILLO JOR 0.1020 * $275.00 $28.05
COLADO PARA CADENA JOR 0.2337 * $275.00 $64.26
COLADO PARA LOSA JOR 0.2607 * $275.00 $71.68
CUADRILLA No 5 (1 OFICIAL ALBAÑIL + 1
PEON)
APLANADO JOR 0.6084 * $500.00 $304.21
CHAFLAN DE MORTERO JOR 0.2833 * $500.00 $141.67
APLANADO PULIDO A LLANA JOR 1.4960 * $500.00 $748.00
SUBTOTAL: MANO DE OBRA $3040.02

EQUIPO Y HERRAMIENTA MENOR % 0.0300 * $3,040.02 $91.20


HERRAMIENTA REVOLVEDORA HR. 0.5746 * $80.00 $45.97
SUBTOTAL: EQUIPO Y HERRAMIENTA $137.17

(CD) COSTO DIRECTO $8,120.98


(CI) COSTO INDIRECTO
$2,436.29
(30%)
TOTAL $10,557.27

REPAST UM: M2

4Análisis:

REPELLADO PARA BASE DE PASTA, PARA AMBOS LADOS DE LOS MUROS DE PLANTA ALTA Y BAJA CON MORTERO
CEMENTO ARENA PROPORCIÓN 1:4 CON ESPESOR DE 1.5 CM EN PROMEDIO, CON MEZCLA CEMENTO-ARENA,
MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMEINTA.

CÓDIGO CONCEPTO U.M. CANTIDAD OP. COSTO IMPORTE


MORTERO PROPORCIÓN 1:4 M3 0.0165 * $1,155.92 $19.07
MATERIAL
AGUA M3 0.0055 * $80.00 $0.44
SUBTOTAL: MATERIALES $19.51

MANO DE CUADRILLA No 5 (1 OFICIAL


OBRA ALBAÑIL + 1 PEON) JOR 0.0526 $500.00 $26.30
*
SUBTOTAL: MANO DE OBRA $26.30

HERREMIENTA
HERRAMIENTA MENOR % 0.030 * $26.30 $0.79
O EQUIPO
SUBTOTAL: EQUIPO Y HERRAMIENTA $0.79

(CD) COSTO DIRECTO $46.60


(CI) COSTO INDIRECTO (30%) $13.98
TOTAL $60.58

Análisis: APLF15PBV UM: M2

APLANADO FINO EN PLAFÓN CON ESPESOR DE 1/4 DE CM. CON MEZCLA-CEMENTO-ARENA PROPORCIÓN 1;5
INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA MENOR.

CÓDIGO CONCEPTO U.M. CANTIDAD OP. COSTO IMPORTE


MEZCLA-CEMENTO ARENA M3 *
0.0028 $1,155.92 $3.18
MATERIAL PROPORCIÓN 1:4
AGUA M3 0.0013 * $80.00 $0.10
SUBTOTAL: MATERIALES $3.28

MANO DE CUADRILLA No 5 (1 OFICIAL


JOR 0.0909 $500.00 $45.45
OBRA ALBAÑIL + 1 PEON) *
SUBTOTAL: MANO DE OBRA $45.45

HERREMIENTA
O EQUIPO HERRAMIENTA MENOR % 0.030 * $45.45 $1.36

SUBTOTAL: EQUIPO Y HERRAMIENTA $1.36

(CD) COSTO DIRECTO $50.10


(CI) COSTO INDIRECTO (30%) $15.03
TOTAL $65.13

Análisis: EMBOPUETVEN UM: ML

EMBOQUILLADO PARA PUERTA Y VENTANA DE 15 CM. DE ANCHO POR 2 CM. DE ESPESOR, CON MEZCLA CEMENTO-
ARENA PROPOCIÓN 1;5, INCLUYE MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ANDAMIO

CÓDIGO CONCEPTO U.M. CANTIDAD OP. COSTO IMPORTE


MEZCLA CEMENTO ARENA M3 *
0.0042 $1,155.92 $4.85
PROPORCIÓN: 1:4
MATERIALES DUELA (10 X 2.5 X 250CM) PZA 0.2200 * $40.00 $8.80
GRAPA CON VAR. # 3 KG 0.4110 * $14.20 $5.84
AGUA M3 0.0013 * $80.00 $0.10
SUBTOTAL: MATERIALES $19.60

CUADRILLA No 6 (1 OFICIAL
MANO DE ALBAÑIL + 1 PEÓN)
JOR 0.0625 $500.00 $31.25
OBRA
*
SUBTOTAL: MANO DE OBRA $31.25

EQUIPO Y HERRAMIENTA MENOR % 0.0300 * $31.25 $0.94


HERRAMIENTA ANDAMIO METALICO % 0.0500 * $31.25 $1.56
SUBTOTAL: EQUIPO Y HERRAMIENTA $2.50

(CD) COSTO DIRECTO $53.35


(CI) COSTO INDIRECTO (30%) $16.00
TOTAL $69.35

Análisis: TEJAA UM: M2

SUMINISTRO Y COLOCACIÓN DE TEJAS EN EL TECHO DE LA PLANTA ALTA INCLUYE: MATERIALES MANO DE OBRA,
HERRAMIENTAS CON DIMENSIONES DE 15.5 X 23.5 X 1.3 CM UN M2 DE TEJAS VIDREADAS O BARNIZADAS SON 32
PZAS

CÓDIGO CONCEPTO U.M. CANTIDAD OP. COSTO IMPORTE


TEJAS M2 1.1 * $400.00 $440.00
MATERIALES MEZCLA CEMENTO - ARENA
M3 0.11 * $1,155.92 $127.15
PROPORCIÓN 1:4
SUBTOTAL: MATERIALES $567.15

CUADRILLA No 6 (1 OFICIAL
MANO DE ESPECIALISTA + 1 PEÓN) JOR 0.0625 * $500.00 $31.25
OBRA

SUBTOTAL: MANO DE OBRA $31.25

HERRAMIENTA
O EQUIPO HERRAMIENTA MENOR % 0.030 * $31.25 $0.94

SUBTOTAL: EQUIPO Y HERRAMIENTA $0.94


(CD) COSTO DIRECTO $599.34
(CI) COSTO INDIRECTO (30%) $179.80
TOTAL $779.14

Análisis: RPEC UM: M2

RAMPA PARA ESCALERA DE CONCRETO CON F'C= 150 KG/CM2, ARMADO CON VARILLA # 3 @ 20 EN AMBOS
SENTIDOS, VERTICAL Y HORIZONTAL, CON UN ESPESOR DE 10CM, INCLUYE: MATERIALES, ACARREOS,
CORTES, DESPERDICIOS, TRASLAPES AMARRES, CIMBRADO, COLADO, DECIMBRADO, MANO DE OBRA, EQUIPO
Y HERRAMIENTA

CÓDIGO CONCEPTO U.M. CANTIDAD OP. COSTO IMPORTE


CONCRETO DE F'C 150 KG/ CM2 M3 0.1030 * $1,000.87 $103.09
TABLA DE 20 X 2.5 X 250 CM PZA 0.5500 * $80.00 $44.00
VARILLA # 3 KG 7.0452 * $13.50 $95.11
DIESEL LTS 0.6600 * $12.38 $8.17
CLAVOS 3 1/2 KG 52.8000 * $28.00 $1478.40
MATERIALES
ALAMBRE RECOCIDO KG 0.1376 * $15.00 $2.06
BARROTE (10 X 8 X 250 CM) PZA 0.0576 * $65.00 $3.74
DUELA (10 X 2.5 X 250CM) PZA 0.4686 * $40.00 $18.74
POLÍN 10 X 10 X 250 CM PZA 0.3366 * $90.00 $30.29
AGUA M3 0.0065 * $80.00 $0.52
SUBTOTAL: MATERIALES $1784.14
CUADRILLA No 4 (0.5 OFICIAL FIERRERO
+ 1 AYUDANTE FIERRERO) JOR 0.0375 * $350.00 $13.13

CUADRILLA No 3 (1 OFICIAL
CARPINTERO + 1 AYUDANTE
CARPINTERO) JOR 0.1111 $500.00 $55.55
MANO DE
OBRA *
CUADRILLA No 7 (1 OPERADOR + 4
AYUDANTES)
JOR 0.0068 $1,100.00 $7.48

*
CUADRILLA No 2 (0.25 DE OFICIAL
JOR 0.1052 * $275.00 $28.93
ALBAÑIL + 1 PEON)
SUBTOTAL: MANO DE OBRA $105.09

EQUIPO Y HERRAMIENTA MENOR % 0.0300 * $105.09 $3.15


HERRAMIENTA REVOLVEDORA HR. 0.0549 * $80.00 $4.39
SUBTOTAL: EQUIPO Y HERRAMIENTA $7.54

(CD) COSTO DIRECTO $1,896.77


(CI) COSTO INDIRECTO
$569.03
(30%)
TOTAL $2,465.80

COLOCACIÓN Y TENDIDO DE TUBERÍA DE CONCRETO DE 6" DE DIAMETRO PARA DRENAJE SANITARIO TIPO
ALBAÑAL. CON MORTERO CEMENTO- ARENA, PROPORCIÓN 1:4 INCLUYE: CAMA DE ARENA PARA APOYAR
TUBERÍA, COMPACTADO CON PISON MANUAL, ACCESORIOS DE UNIÓN, MATERIAL, MANO DE OBRA, PRUEBA Y
HERRAMEINTA, CON LONGITUD DE DESARROLLO DE 4.31 M.

CÓDIGO CONCEPTO U.M. CANTIDAD OP. COSTO IMPORTE


TUBO ALBAÑAL PZA 6.1800 * $130.00 $803.40
MORTERO CEMENTO - ARENA M3 *
MATERIALES 0.0018 $1,155.92 $2.08
PROPORCIÓN 1:4
ARENA M3 0.1296 * $185.00 $23.98
SUBTOTAL: MATERIALES $829.46

CUADRILLA No G (1 PEÓN) JOR 0.1428 * $200.00 $28.56


CUADRILLA No 8 (1 PLOMERO +
MANO DE 1 AYUDANTE ) JOR 0.0385 * $500.00 $19.25
OBRA

SUBTOTAL: MANO DE OBRA $19.25


EQUIPO Y
HERRAMIENTA HERRAMIENTA MENOR % 0.0300 * $19.25 $0.58

SUBTOTAL: EQUIPO Y HERRAMIENTA $0.58

(CD) COSTO DIRECTO $849.28


(CI) COSTO INDIRECTO (30%) $254.79
TOTAL $1,104.07

Análisis: RESA100 UM: PZA

REGISTRO SANITARIO DE 60 X 40 X 100 CM. A BASE DE MURO DE TABIQUE ROJO RECOCIDO 7-12-25 CM.
ASENTADO Y APLANADO CON MORTERO CEMENTO- ARENA EN EL INTERIOR, PILIDO, PISO DE 10 CM. DE
ESPESOR CON F'C DE 150 KG/CM2, INCLUYE: MANO DE OBRA, HERRAMIENTA Y MATERIALES, EXCAVACIÓN Y
ACARREO.

CÓDIGO CONCEPTO U.M. CANTIDAD OP. COSTO IMPORTE


BARROTE (10 X 5 X 250 CM) PZA 0.1548 * $60.00 $9.29
TABIQUE ROJO RECOCIDO PZA 119.92 * $3.00 $359.76
MORTERO PROPORCIÓN 1:4 M3 0.0335 * $1,155.92 $38.72
AGUA M3 0.0181 * $80.00 $1.45
CONCRETO F'C DE 150 KG/CM2 M3 0.0649 * $1,000.87 $64.96
REPELLADO M3 0.0424 * $1,083.05 $45.92
MATERIALES
PASTA M3 0.0053 * $3,272.00 $17.34
RELLENO M3 0.2500 * $72.04 $18.01
DIESEL LTS 0.1200 * $12.38 $1.49
CLAVOS DE 2 1/2" KG 0.0704 * $28.00 $1.97
DUELAS PZA 0.1100 * $40.00 $4.40
EXCAVACIÓN M3 0.8800 * $76.99 $67.75
SUBTOTAL: MATERIALES $631.05

CUADRILLA No 5 (1 OFICIAL
MANO DE ALBAÑIL + 1 PEÓN ) JOR 0.5000 * $500.00 $250.00
OBRA

SUBTOTAL: MANO DE OBRA $250.00

EQUIPO Y
HERRAMIENTA MENOR % 0.0300 * $250.00 $7.50
HERRAMIENTA
SUBTOTAL: EQUIPO Y HERRAMIENTA $7.50

(CD) COSTO DIRECTO $888.55


(CI) COSTO INDIRECTO (30%) $266.57
TOTAL $1,155.12

BÁSICOS AJUSTADOS A LA SEGUNDA ESCALACION (CEMENTO SUBIÓ A $3100)

Análisis: 100 UM: M3


CONCRETO DE F'C= 100KG/CM2. HECHO EN OBRA, T.M.A. = 19MM, 3/4", REVENIMIENTO 8 - 10 CM., RESISTENCIA
NORMAL

MATERIALES U.M. CANTIDAD OP. COSTO IMPORTE


0.260 T CEMENTO + 3% DE DESP. TON 0.2678 * $3,100.00 $830.18
0.500 M3 DE ARENA + 8% DE DESP. M3 0.5400 * $185.00 $99.90
0.680 M3 DE GRAVA + 8% DE DESP. M3 0.7344 * $140.00 $102.82
0.195 M3 DE AGUA + 30 % DE DESP. M3 0.2535 * $80.00 $20.28
TOTAL: $1053.18

Análisis: 150 UM: M3


CONCRETO DE F'C= 150KG/CM2. HECHO EN OBRA, T.M.A. = 19MM, 3/4", REVENIMIENTO 8 - 10 CM., RESISTENCIA
NORMAL

MATERIALES U.M. CANTIDAD OP. COSTO IMPORTE


0.323 T CEMENTO + 3% DE DESP. TON 0.3327 * $3,100.00 $1031.34
0.480 M3 DE ARENA + 8% DE DESP. M3 0.5184 * $185.00 $95.90
0.670 M3 DE GRAVA + 8% DE DESP. M3 0.7236 * $140.00 $101.30
0.210 M3 DE AGUA + 30 % DE DESP. M3 0.2730 * $80.00 $21.84
TOTAL: $1250.39

Análisis: 200 UM: M3


CONCRETO DE F'C= 200KG/CM2. HECHO EN OBRA, T.M.A. = 19MM, 3/4", REVENIMIENTO 8 - 10 CM., RESISTENCIA
NORMAL

MATERIALES U.M. CANTIDAD OP. COSTO IMPORTE


0.355 T CEMENTO + 3% DE DESP. TON 0.3657 * $3,100.00 $1133.52
0.470 M3 DE ARENA + 8% DE DESP. M3 0.5076 * $185.00 $93.91
0.650 M3 DE GRAVA + 8% DE DESP. M3 0.7020 * $140.00 $98.28
0.195 M3 DE AGUA + 30 % DE DESP. M3 0.2535 * $80.00 $20.28
TOTAL: $1345.98

Análisis: 1:1:4 UM: M3


MORTERO CEMENTO - CAL- ARENA 1:1:4

MATERIALES U.M. CANTIDAD OP. COSTO IMPORTE


0.300 T CEMENTO + 3% DE DESP TON 0.3090 * $3,100.00 $957.90
0.150 T CALHIDRA + 3% DE DESP TON 0.1545 * $1,300.00 $200.85
1.000 M3 DE ARENA + 8% DE DESP. M3 1.0800 * $185.00 $199.80
0.280 M3 DE AGUA + 30 % DE DESP. M3 0.3640 * $80.00 $29.12
TOTAL: $1387.67
Análisis: PAST UM: M3
PASTA DE CEMENTO GRIS

MATERIALES U.M. CANTIDAD OP. COSTO IMPORTE


1.500 T CEMENTO + 3% DE DESP TON 1.5450 * $3,100.00 $4789.50
0.700 M3 DE AGUA + 30 % DE DESP. M3 0.9100 * $80.00 $72.80
TOTAL: $4862.30

Análisis: CA UM: M3
LECHADA CEMENTO GRIS

MATERIALES U.M. CANTIDAD OP. COSTO IMPORTE


1.300 T CEMENTO + 3% DE DESP TON 1.3390 * $3,100.00 $4150.90
0.900 M3 DE AGUA + 30 % DE DESP. M3 1.1700 * $80.00 $93.60
TOTAL: $4244.50

SEGUNDA ESCALACIÓN
PRECION UNITARIOS NUEVOS
(SOLO LOS CONCEPTOS QUE TUVIERON ESCALACIÓN)
Análisis: PLANH5 UM: M2
PLANTILLA DE CONCRETO SIMPLE DE 5 CM. DE ESPESOR. F'C=100KG/CM2. INCLUYE: PREPARACION DE LA
SUPERFICIE, NIVELACION, MAESTREADO Y COLOCADO, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

CÓDIGO CONCEPTO U.M. CANTIDAD OP. COSTO IMPORTE


CONCRETO M3 0.0515 * $1,053.18 $54.24
MATERIALES
AGUA M3 0.0065 * $80.00 $0.52
SUBTOTAL: MATERIALES $54.76
MANO DE CUADRILLA No 2 (0.25 DE
OBRA JOR 0.0714 * $275.00 $19.64
0FICIAL ALBAÑIL+1 PEON)
SUBTOTAL: MANO DE OBRA $19.64

EQUIPO Y
HERRAMIENTA HERRAMIENTA MENOR % 0.0300 * $19.64 $0.59

REVOLVEDORA HR 0.0275 * $80.00 $2.20


SUBTOTAL: EQUIPO Y HERRAMIENTA $2.79

(CD) COSTO DIRECTO $77.18


(CI) COSTO INDIRECTO (30%) $23.15
TOTAL $100.34

Análisis: CP883 UM: M3

CIMIENTO DE PIEDRA BRAZA DE 0.80 M DE ALTURA POR 0.80 M DE BASE Y CORONA DE 0.30 M., ASENTADA CON
CEMENTO - CAL - ARENA 1:4, ACABADO COMÚN INCLUYE: MATERIALES, ACARREOS, CORTES, DESPERDICIOS,
MANO DE OBRA EQUIPO Y HERRAMIENTA. (CIM 1 COLINDANCIA)

CÓDIGO CONCEPTO U.M. CANTIDAD OP. COSTO IMPORTE


CEMENTO - CAL - ARENA M3 *
0.3090 $1,387.67 $428.79
PROPORCION 1:4
1 M3 DE PIEDRA BRAZA + 60% DE M3 *
ABUNDAMIENTO + 8% DE 1.7280 $500.00 $864.00
MATERIALES DESPERDICIO
HILO (100 M) PZA 0.0999 * $35.00 $3.50
VARILLA DE 1/2" KG 2.0483 * $11.20 $22.94
ALAMBRE KG 0.0125 * $19.00 $0.24
AGUA LTS 14.7725 * $0.08 $1.18
SUBTOTAL: MATERIALES $1320.65

MANO DE CUADRILLA No 5 (1 OFICIAL


JOR 0.333 * $500.00 $166.65
OBRA ALBAÑIL + 1 PEON)
SUBTOTAL: MANO DE OBRA $166.65

EQUIPO Y
HERRAMIENTA HERRAMIENTA MENOR % 0.0300 * $166.65 $5.00

SUBTOTAL: EQUIPO Y HERRAMIENTA $5.00

(CD) COSTO DIRECTO $1,492.30


(CI) COSTO INDIRECTO (30%) $447.69
TOTAL $1,939.99

Análisis: CP883 UM: ML

CADENA DE DESPLANTE DE 15 X 20 CM DE CONCRETO HECHO EN OBRA DE F'C= 200 KG/CM2 ACABADO COMÚN
ARMADO CON 4 V # 3, ESTRIBOS # 2 @ 15 CM, INCLUYE: MATERIALES ACARREO, CORTES, DESPERDICIOS,
TRASLAPES, AMARRES, CIMBRADO, CIMBRADO, COLADO,DECIMBRADO, MANO DE OBRA EQUIPO Y
HERRAMIENTA.

CÓDIGO CONCEPTO U.M. CANTIDAD OP. COSTO IMPORTE

MATERIALES CONCRETO DE F'C 200 KG/ CM2 M3 0.0309 * $1,345.98 $41.59


TABLA DE 20 CM X 2.5 M PZA 0.2200 * $80.00 $17.60
VARILLA # 3 KG 2.3484 * $13.50 $31.70
DIESEL LTS 0.2640 * $12.38 $3.27
CLAVOS 2 1/2 KG 0.1325 * $28.00 $3.71
ALAMBRE RECOCIDO KG 0.3240 * $19.00 $6.16
DUELAS (10 X 2.5 X 250 CM) PZA 0.1980 * $40.00 $7.92
ALAMBRON # 2 KG 1.1582 * $14.00 $16.21
AGUA M3 0.0250 * $80.00 $2.00
SUBTOTAL: MATERIALES $130.16

CUADRILLA No 4 (0.5 OFICIAL


FIERRERO + 1 AYUDANTE JOR 0.0215 * $7.53
FIERRERO)
$350.00
CUADRILLA No 3 (1 OFICIAL
CARPINTERO + 1 AYUDANTE
CARPINTERO) JOR 0.0421 $21.05
MANO DE
OBRA * $500.00
CUADRILLA No 7 (1 OPERADOR
+ 4 AYUDANTES)
JOR 0.0021 $2.31

* $1,100.00
CUADRILLA No 2 (0.25 DE JOR 0.0200 * $275.00 $5.50
OFICIAL ALBAÑIL + 1 PEON)
SUBTOTAL: MANO DE OBRA $36.39

EQUIPO Y
HERRAMIENT HERRAMIENTA MENOR % 0.0300 * $36.39 $1.09
A
REVOLVEDORA HR. 0.0164 * $80.00 $1.31
SUBTOTAL: EQUIPO Y HERRAMIENTA $2.40

(CD) COSTO DIRECTO $168.95


(CI) COSTO INDIRECTO (30%) $50.69
TOTAL $219.64

Análisis: CP883 UM: PZA

ANCLAJE DE CASTILLO K-1, F'C=200KG/CM2, DE 16X16 CM, (ANCLAJE DE 50 CM), ARMADO CON 4 V # 3 ESTRIBOS # 2
@ 15 CM, INCLUYENDO ELABORACION DEL CONCRETO.

CÓDIGO CONCEPTO U.M. CANTIDAD OP. COSTO IMPORTE


CONCRETO DE F'C 200 KG/CM2 M3 0.0132 * $1,345.98 $17.77
VARILLA # 3 KG 1.8787 * $13.50 $25.36
MATERIALES
ALAMBRON # 2 KG 0.5990 * $14.00 $8.39
ALAMBRE RECOCIDO KG 0.0880 * $19.00 $1.67
SUBTOTAL: MATERIALES $53.19

CUADRILLA No 5 (1 OFICIAL
MANO DE ALBAÑIL + 1 PEÓN) JOR 0.1 $500.00 $50.00
OBRA
*
SUBTOTAL: MANO DE OBRA $50.00

EQUIPO Y REVOLVEDORA HR. 0.007 * $80.00 $0.56


HERRAMIENTA
HERRAMIENTA MENOR % 0.030 * $50.00 $1.50
SUBTOTAL: EQUIPO Y HERRAMIENTA $1.50

(CD) COSTO DIRECTO $104.69


(CI) COSTO INDIRECTO (30%) $31.41
TOTAL $136.09

Análisis: CP883 UM: PZA

ANCLAJE DE CASTILLO K-2, F'C=200KG/CM2, DE 16X20 CM, (ANCLAJE DE 50 CM), ARMADO CON 4 V # 3 ESTRIBOS # 2
@ 15 CM, INCLUYENDO ELABORACION DEL CONCRETO.

CÓDIGO CONCEPTO U.M. CANTIDAD OP. COSTO IMPORTE


CONCRETO DE F'C 200 KG/CM2 M3 0.0165 * $1,345.98 $22.18
VARILLA # 3 KG 1.8787 * $13.50 $25.36
MATERIALES ALAMBRON # 2 KG 0.6826 * $14.00 $9.56
ALAMBRE RECOCIDO KG 0.0880 * $19.00 $1.67
SUBTOTAL: MATERIALES $58.77

CUADRILLA No 5 (1 OFICIAL
MANO DE ALBAÑIL + 1 PEÓN) JOR 0.1 * $500.00 $50.00
OBRA

SUBTOTAL: MANO DE OBRA $50.00

EQUIPO Y REVOLVEDORA HR. 0.0088 * $80.00 $0.70


HERRAMIENTA
HERRAMIENTA MENOR % 0.030 * $50.00 $1.50
SUBTOTAL: EQUIPO Y HERRAMIENTA $2.20

(CD) COSTO DIRECTO $110.98


(CI) COSTO INDIRECTO (30%) $33.29
TOTAL $144.27

Análisis: C151543 UM: ML

CASTILLO K-1 DE 16 X 16 CM DE CONCRETO HECHO EN OBRA DE F'C= 200 KG/CM2, ACABADO COMUN, ARMADO
CON 4 V # 3 ESTRIBOS # 2 @ 15 CM., INCLUYE: MATERIALES, ACARREOS, CORTES, DESPERDICIOS, TRASLAPES
AMARRES, CIMBRADO, COLADO, DECIMBRADO, MANO DE OBRA, EQUIPO Y HERRAMINTA (K1)
CÓDIGO CONCEPTO U.M. CANTIDAD OP. COSTO IMPORTE
CONCRETO DE F'C 200 KG/ CM2 M3 0.0263 * $1,345.98 $35.45
TABLA DE 20 CM X 2.5 M PZA 0.1760 * $80.00 $14.08
VARILLA # 3 KG 2.3484 * $13.50 $31.70
DIESEL LTS 0.2112 * $12.38 $2.61
CLAVOS 2 1/2 KG 0.1232 * $28.00 $3.45
MATERIALES
ALAMBRE RECOCIDO KG 0.2861 * $19.00 $5.44
DUELA (10 X 2.5 X 250CM) PZA 0.1320 * $40.00 $5.28
BARROTE (10 X 5 X 250 CM) PZA 0.1320 * $60.00 $7.92
ALAMBRON # 2 KG 1.0496 * $14.00 $14.69
AGUA M3 0.0065 * $80.00 $0.52
SUBTOTAL: MATERIALES $121.15

CUADRILLA No 4 (0.5 OFICIAL


FIERRERO + 1 AYUDANTE JOR 0.0222 * $350.00 $7.77
FIERRERO)

CUADRILLA No 3 (1 OFICIAL
CARPINTERO + 1 AYUDANTE
CARPINTERO) JOR 0.0427 $500.00 $21.35
MANO DE
OBRA *
CUADRILLA No 7 (1 OPERADOR
+ 4 AYUDANTES)
JOR 0.0018 $1,100.00 $1.93

*
CUADRILLA No 2 (0.25 DE JOR 0.0301 * $275.00 $8.28
OFICIAL ALBAÑIL + 1 PEON)
SUBTOTAL: MANO DE OBRA $39.32

EQUIPO Y HERRAMIENTA MENOR % 0.0300 * $39.32 $1.18


HERRAMIENT
A REVOLVEDORA HR. 0.0140 * $80.00 $1.12
SUBTOTAL: EQUIPO Y HERRAMIENTA $2.30

(CD) COSTO DIRECTO $162.78


(CI) COSTO INDIRECTO (30%) $48.83
TOTAL $211.61

Análisis: C151543 UM: ML

CASTILLO K-2 DE 16 X 20 CM DE CONCRETO HECHO EN OBRA DE F'C= 200 KG/CM2, ACABADO COMUN, ARMADO
CON 4 V # 3 ESTRIBOS # 2 @ 15 CM., INCLUYE: MATERIALES, ACARREOS, CORTES, DESPERDICIOS, TRASLAPES
AMARRES, CIMBRADO, COLADO, DECIMBRADO, MANO DE OBRA, EQUIPO Y HERRAMIENTA (K2)
CÓDIGO CONCEPTO U.M. CANTIDAD OP. COSTO IMPORTE
CONCRETO DE F'C 200 KG/ CM2 M3 0.0329 * $1,345.98 $44.28
TABLA DE 30 CM X 2.5 M PZA 0.1467 * $120.00 $17.60
VARILLA # 3 KG 2.3484 * $13.50 $31.70
DIESEL LTS 0.2640 * $12.38 $3.27
CLAVOS 2 1/2 KG 0.1030 * $28.00 $2.88
MATERIALES
ALAMBRE RECOCIDO KG 0.2578 * $19.00 $4.90
DUELA (10 X 2.5 X 250CM) PZA 0.1320 * $40.00 $5.28
BARROTE (10 X 5 X 250 CM) PZA 0.0880 * $60.00 $5.28
ALAMBRON # 2 KG 1.1944 * $14.00 $16.72
AGUA M3 0.0065 * $80.00 $0.52
SUBTOTAL: MATERIALES $132.44

CUADRILLA No 4 (0.5 OFICIAL


FIERRERO + 1 AYUDANTE JOR 0.0231 * $350.00 $8.09
FIERRERO)

CUADRILLA No 3 (1 OFICIAL
CARPINTERO + 1 AYUDANTE
CARPINTERO) JOR 0.0533 $500.00 $26.65
MANO DE
OBRA *
CUADRILLA No 7 (1 OPERADOR
+ 4 AYUDANTES)
JOR 0.0022 $1,100.00 $2.41

*
CUADRILLA No 2 (0.25 DE JOR 0.0376 * $275.00 $10.35
OFICIAL ALBAÑIL + 1 PEON)
SUBTOTAL: MANO DE OBRA $47.50

EQUIPO Y HERRAMIENTA MENOR % 0.0300 * $47.50 $1.42


HERRAMIENT
A REVOLVEDORA HR. 0.0175 * $80.00 $1.40
SUBTOTAL: EQUIPO Y HERRAMIENTA $2.82

(CD) COSTO DIRECTO $182.76


(CI) COSTO INDIRECTO (30%) $54.83
TOTAL $237.59

Análisis: MUTABREC UM: M2

MURO DE TABIQUE ROJO RECOCIDO DE 7-14-28 CM ASENTADO CON MEZCLA CEMENTO - ARENA 1:4 ACABADO
COMUN, INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.
CÓDIGO CONCEPTO U.M. CANTIDAD OP. COSTO IMPORTE
TABIQUE ROJO (7-14-28) PZA 47.4137 * 3.000 $142.24
MATERIALES MEZCLA: CEMENTO, ARENA, *
M3 0.0238 $1,387.67 $33.03
PROPORCIÓN 1:4
SUBTOTAL: MATERIALES $175.27

CUADRILLA No 5 (1 OFICIAL
MANO DE ALBAÑIL + 1 PEÓN) JOR 0.0900 * $500.00 $45.00
OBRA

SUBTOTAL: MANO DE OBRA $45.00

EQUIPO Y
HERRAMIENTA HERRAMIENTA MENOR % 0.030 * $45.00 $1.35

SUBTOTAL: EQUIPO Y HERRAMIENTA $1.35

(CD) COSTO DIRECTO $221.62


(CI) COSTO INDIRECTO (30%) $66.49
TOTAL $288.10

Análisis: ESCC1725 UM: PZA

ESCALON DE CONCRETO SIMPLE CON F'C= 150 KG/CM2 CON DIMENSIONES DE 17 CM DE PERALTE Y 25 CM.
DE HUELLA, INCLUYE MANO DE OBRA, HERRAMIENTA Y EQUIPO

CÓDIGO CONCEPTO U.M. CANTIDAD OP. COSTO IMPORTE


CONCRETO DE F'C 150 KG/ CM2 M3 0.0219 * $1,250.39 $27.38
TABLA DE 20 CM X 2.5 M PZA 0.1169 * $80.00 $9.35
MATERIALES DIESEL LTS 0.1403 * $12.38 $1.74
CLAVOS 2 1/2 KG 0.0264 * $28.00 $0.74
AGUA M3 0.0014 * $80.00 $0.11
SUBTOTAL: MATERIALES $39.32

CUADRILLA No 5 (1 OFICIAL
MANO DE ALBAÑIL + 1 PEON) JOR 0.0667 * $500.00 $33.35
OBRA

CUADRILLA No 7 (1 OPERADOR
JOR 0.0015 * $1,100.00 $1.61
+ 4 AYUDANTES)
SUBTOTAL: MANO DE OBRA $34.96

EQUIPO Y HERRAMIENTA MENOR % 0.0300 * $34.96 $1.05


HERRAMIENTA REVOLVEDORA HR. 0.0117 * $80.00 $0.94
SUBTOTAL: EQUIPO Y HERRAMIENTA $1.98

(CD) COSTO DIRECTO $76.26


(CI) COSTO INDIRECTO (30%) $22.88
TOTAL $99.14
Análisis: D2016 UM: ML

CADENA DE CERRAMIENTO (CC-1 SOBRE MUROS) DE 20X16 CM, ARMADO CON 4 VARILLAS # 3,ESTRIBOS # 2 @
15 CM, F'C= 150 KG/CM2, INCLUYE: HABILITADO Y ARMADO,MATERIALES, MANO DE OBRA, EQUIPO, CORTES,
TRASLAPES, CIMBRA Y DESCIMBRA, SE DEJA SIN RECUBRIR EN LA PARTE SUPERIOR PARA EL ACERO DE LA
LOSA.

CÓDIGO CONCEPTO U.M. CANTIDAD OP. COSTO IMPORTE


CONCRETO DE F'C 150 KG/ CM2 M3 0.0247 * $1,250.39 $30.88
TABLA DE 20 CM X 2.5 M PZA 0.1650 * $80.00 $13.20
VARILLA # 3 KG 2.3484 * $13.50 $31.70
DIESEL LTS 0.1980 * $12.38 $2.45
MATERIALES CLAVOS 3 1/2 KG 0.0706 * $28.00 $1.98
ALAMBRE RECOCIDO KG 0.3616 * $19.00 $6.87
DUELA (10 X 2.5 X 250CM) PZA 0.1320 * $40.00 $5.28
ALAMBRON # 2 KG 1.1944 * $14.00 $16.72
AGUA M3 0.0020 * $80.00 $0.16
SUBTOTAL: MATERIALES $109.24

CUADRILLA No 4 (0.5 OFICIAL


FIERRERO + 1 AYUDANTE JOR 0.0231 * $350.00 $8.07
FIERRERO)

CUADRILLA No 3 (1 OFICIAL
CARPINTERO + 1 AYUDANTE
CARPINTERO) JOR 0.0352 $500.00 $17.60
MANO DE
OBRA *
CUADRILLA No 7 (1 OPERADOR
+ 4 AYUDANTES)
JOR 0.0016 $1,100.00 $1.80

*
CUADRILLA No 2 (0.25 DE JOR 0.0252 * $275.00 $6.93
OFICIAL ALBAÑIL + 1 PEON)
SUBTOTAL: MANO DE OBRA $34.41

EQUIPO Y HERRAMIENTA MENOR % 0.0300 * $34.41 $1.03


HERRAMIENT
A REVOLVEDORA HR. 0.0132 * $80.00 $1.05
SUBTOTAL: EQUIPO Y HERRAMIENTA $2.09

(CD) COSTO DIRECTO $145.74


(CI) COSTO INDIRECTO (30%) $43.72
TOTAL $189.46
Análisis: TRACE1 UM: ML

TRABE DE CERRAMIENTO (TRABE 1 ) SIN MURO DE APOYO DE 20X30 CM, ARMADO CON 2VAR. # 3 Y 3 VAR. # 4,
ESTRIBOS # 2 @ 15 CM, F'C= 150 KG/CM2, INCLUYE: HABILITADO Y ARMADO,MATERIALES, MANO DE OBRA,
EQUIPO, CORTES, TRASLAPES, CIMBRA Y DESCIMBRA, SIN RECUBRIR EN LA PARTE SUPERIOR PARA EL ACERO
DE LA LOSA.

CANTIDA
CÓDIGO CONCEPTO U.M. OP. COSTO IMPORTE
D
CONCRETO DE F'C 150 KG/ CM2 M3 0.0515 * $1,250.39 $64.40
TABLA DE 30 CM X 2.5 M PZA 0.1835 * $120.00 $22.02
VARILLA # 3 KG 1.1742 * $13.50 $15.85
VARILLA # 4 KG 3.0900 * $10.79 $33.34
DIESEL LTS 0.4620 * $12.38 $5.72
MATERIALES CLAVOS 3 1/2 KG 0.5124 * $28.00 $14.35
ALAMBRE RECOCIDO KG 0.1926 * $19.00 $3.66
BARROTE (10 X 5 X 250 CM) PZA 0.0660 * $60.00 $3.96
DUELA (10 X 2.5 X 250CM) PZA 0.6325 * $40.00 $25.30
ALAMBRON # 2 KG 1.7011 * $14.00 $23.82
AGUA M3 0.0275 * $80.00 $2.20
SUBTOTAL: MATERIALES $214.61

CUADRILLA No 4 (0.5 OFICIAL FIERRERO


+ 1 AYUDANTE FIERRERO) JOR 0.0385 * $350.00 $13.48

CUADRILLA No 3 (1 OFICIAL CARPINTERO


+ 1 AYUDANTE CARPINTERO)
JOR 0.0091 $500.00 $4.55
MANO DE
OBRA *
CUADRILLA No 7 (1 OPERADOR + 4
AYUDANTES)
JOR 0.0034 $1,100.00 $3.77

*
CUADRILLA No 2 (0.25 DE OFICIAL ALBAÑIL JOR 0.0526 * $275.00 $14.47
+ 1 PEON)
SUBTOTAL: MANO DE OBRA $36.26

EQUIPO Y HERRAMIENTA MENOR % 0.0300 * $36.26 $1.09


HERRAMIENT
A REVOLVEDORA HR. 0.0274 * $80.00 $2.19
SUBTOTAL: EQUIPO Y HERRAMIENTA $3.28

(CD) COSTO DIRECTO $254.16


(CI) COSTO INDIRECTO
$76.25
(30%)
TOTAL $330.40
Análisis: E07001 UM: M2

LOSA DE ENTREPISO DE 10 CM DE ESPESOR CON F'C= 200 KG/CM² ARMADO CON VAR. # 3 @ 20 CM. DE LOS
AMBOS SENTIDOS INCLUYE: CIMBRADO, ACABADO COMÚN, ARMADO, COLADO, MANO DE OBRA, EQUIPO Y
HERRAMIENTA.

CANTIDA
CÓDIGO CONCEPTO U.M. OP. COSTO IMPORTE
D
CONCRETO DE F'C 200 KG/ CM2 M3 0.1030 * $1,345.98 $138.64
TABLA DE 30 CM X 2.5 M PZA 0.3660 * $120.00 $43.92
VARILLA # 3 KG 7.0452 * $13.50 $95.11
POLIN (10 X 10 X 250 CM) PZA 0.1798 * $90.00 $16.18
DIESEL LTS 0.6600 * $12.38 $8.17
MATERIALES LECHADA CEMENTO GRIS KG 0.0052 * $4,244.50 $21.86
CLAVOS 3 1/2 KG 0.0191 * $28.00 $0.53
ALAMBRE RECOCIDO KG 0.2489 * $19.00 $4.73
BARROTE (10 X 5 X 250 CM) PZA 0.1191 * $60.00 $7.15
DUELA (10 X 2.5 X 250CM) PZA 0.0729 * $40.00 $2.92
AGUA M3 0.0325 * $80.00 $2.60
SUBTOTAL: MATERIALES $341.80

CUADRILLA No 4 (0.5 OFICIAL FIERRERO


+ 1 AYUDANTE FIERRERO) JOR 0.0453 * $350.00 $15.86

CUADRILLA No 3 (1 OFICIAL CARPINTERO


+ 1 AYUDANTE CARPINTERO)
JOR 0.1111 $500.00 $55.55

*
CUADRILLA No 1 (0.1 DE CABO + 1 PEÓN)
MANO DE
OBRA JOR 0.0033 $230.00 $0.76

*
CUADRILLA No 7 (1 OPERADOR + 4
AYUDANTES)
JOR 0.0069 $1,100.00 $7.59

*
CUADRILLA No 2 (0.25 DE OFICIAL ALBAÑIL JOR 0.1053 * $275.00 $28.96
+ 1 PEON)
SUBTOTAL: MANO DE OBRA $108.71

EQUIPO Y HERRAMIENTA MENOR % 0.0300 * $108.71 $3.26


HERRAMIENT
A REVOLVEDORA HR. 0.0549 * $80.00 $4.39
SUBTOTAL: EQUIPO Y HERRAMIENTA $7.65

(CD) COSTO DIRECTO $458.17


(CI) COSTO INDIRECTO
$137.45
(30%)
TOTAL $595.62
Análisis: FCS10 UM: M2

FIRME DE CONCRETO DE 10 CM DE ESPESOR, CONCRETO F'C= 150 KG/CM2, ACABADO COMÚN INCLUYE:
MATERIALES, ACARREOS, PREPARACIÓN DE LA SUPERFICIE, NIVELACIÓN, CIMBRADO, DESCIMBRADO, COLADO,
MANO DE OBRA, EQUIPO Y HERRAMIENTA.

CÓDIGO CONCEPTO U.M. CANTIDAD OP. COSTO IMPORTE


CONCRETO DE F'C 150 KG/ CM2 M3 0.1030 * $1,250.39 $128.79
MATERIAL
AGUA M3 0.0325 * $80.00 $2.60
SUBTOTAL: MATERIALES $131.39

CUADRILLA No 2 (0.25 DE
JOR 0.0667 $500.00 $33.35
OFICIAL ALBAÑIL + 1 PEON) *
CUADRILLA No 7 (1 OPERADOR +
MANO DE 4 AYUDANTES) JOR 0.0069 * $1,100.00 $7.59
OBRA

SUBTOTAL: MANO DE OBRA $40.94

HERREMIENTA
O EQUIPO HERRAMIENTA MENOR % 0.030 * $40.94 $1.23

REVOLVEDORA HR 0.055 * $80.00 $4.39


SUBTOTAL: EQUIPO Y HERRAMIENTA $5.62

(CD) COSTO DIRECTO $177.95


(CI) COSTO INDIRECTO (30%) $53.39
TOTAL $231.34

Análisis: FCS150 UM: M2

FIRME DE CONCRETO SIMPLE F'C= 150 KG/CM2 PARA ANDADOR DE AUTOMOVILES, CON ESPESOR DE 15CM. NO
INCLUYE CIMBRA.

CÓDIGO CONCEPTO U.M. CANTIDAD OP. COSTO IMPORTE


CONCRETO DE F'C 150 KG/ CM2 M3 0.1545 * $1,250.39 $193.19
MATERIAL
AGUA M3 0.0065 * $80.00 $0.52
SUBTOTAL: MATERIALES $193.71

CUADRILLA No 2 (0.25 DE
JOR 0.1 $500.00 $50.00
OFICIAL ALBAÑIL + 1 PEON) *
CUADRILLA No 5 (1 OFICIAL
ALBAÑIL + 1 PEON)
JOR 0.0285 * $500.00 $14.25
MANO DE
OBRA
CUADRILLA No 7 (1 OPERADOR +
4 AYUDANTES)
JOR 0.0103 * $1,100.00 $11.33

SUBTOTAL: MANO DE OBRA $75.58

HERREMIENTA HERRAMIENTA MENOR % 0.030 * $75.58 $2.27


O EQUIPO REVOLVEDORA HR 0.082 * $80.00 $6.59
SUBTOTAL: EQUIPO Y HERRAMIENTA $8.86

(CD) COSTO DIRECTO $278.14


(CI) COSTO INDIRECTO (30%) $83.44
TOTAL $361.59

Análisis: COLAZO UM: M2

LOSA DE AZOTEA HORIZONTAL DE CONCRETO ARMADO F'C= 200 KG/CM2 CON UN ESPESOR DE 10CM, ARMADO
CON VARILLA DE 3/8" FY= 4200 KG/CM2, @ 20 CM DE SEPARACIÓN EN AMBOS SENTIDOS, CON UNA PENDIENTE
DE 10° INCLUYE: ARMANO, CIMBRADO, TRASLAPES, BAYONES, DECIMBRADO, MATERIALES, MANO DE OBRA,
HERRAMIENTA, ACABADO COMÚN.

CANTIDA
CÓDIGO CONCEPTO U.M. OP. COSTO IMPORTE
D
CONCRETO DE F'C 200 KG/ CM2 M3 0.1030 * $1,345.98 $138.64
TABLA DE 30 CM X 2.5 M PZA 0.3660 * $120.00 $43.92
VARILLA # 3 KG 7.0452 * $13.50 $95.11
POLIN (10 X 10 X 250 CM) PZA 0.1798 * $90.00 $16.18
DIESEL LTS 0.6600 * $12.38 $8.17
MATERIALES LECHADA CEMENTO GRIS M3 0.0052 * $4,244.50 $21.86
CLAVOS 3 1/2 KG 0.0191 * $28.00 $0.53
ALAMBRE RECOCIDO KG 0.2489 * $19.00 $4.73
BARROTE (10 X 5 X 250 CM) PZA 0.1191 * $60.00 $7.15
DUELA (10 X 2.5 X 250CM) PZA 0.0729 * $40.00 $2.92
AGUA M3 0.0325 * $80.00 $2.60
SUBTOTAL: MATERIALES $341.80

CUADRILLA No 4 (0.5 OFICIAL FIERRERO


+ 1 AYUDANTE FIERRERO) JOR 0.0453 * $350.00 $15.86

CUADRILLA No 3 (1 OFICIAL CARPINTERO


+ 1 AYUDANTE CARPINTERO)
JOR 0.1111 $500.00 $55.55

*
CUADRILLA No 1 (0.1 DE CABO + 1 PEÓN)
MANO DE
OBRA JOR 0.0033 $230.00 $0.76

*
CUADRILLA No 7 (1 OPERADOR + 4
AYUDANTES)
JOR 0.0069 $1,100.00 $7.59

*
CUADRILLA No 2 (0.25 DE OFICIAL ALBAÑIL JOR 0.1053 * $275.00 $28.96
+ 1 PEON)
SUBTOTAL: MANO DE OBRA $108.71

EQUIPO Y HERRAMIENTA MENOR % 0.0300 * $108.71 $3.26


HERRAMIENT
A REVOLVEDORA HR. 0.0549 * $80.00 $4.39
SUBTOTAL: EQUIPO Y HERRAMIENTA $7.65
(CD) COSTO DIRECTO $458.17
(CI) COSTO INDIRECTO
$137.45
(30%)
TOTAL $595.62

Análisis: LOSAAZOTE UM: M2

LOSA DE AZOTEA CON PENDIENTE DE CONCRETO ARMADO F'C= 200 KG/CM2 CON UN ESPESOR DE 10CM,
ARMADO CON VARILLA DE 3/8" FY= 4200 KG/CM2, @ 20 CM DE SEPARACIÓN EN AMBOS SENTIDOS, CON UNA
PENDIENTE DE 10° INCLUYE: ARMANO, CIMBRADO, TRASLAPES, BAYONES, DECIMBRADO, MATERIALES, MANO
DE OBRA, HERRAMIENTA, ACABADO COMÚN.

CANTIDA OP
CÓDIGO CONCEPTO U.M. COSTO IMPORTE
D .
CONCRETO DE F'C 200 KG/ CM2 M3 0.1030 * $1,345.98 $138.64
TABLA DE 30 CM X 2.5 M PZA 0.3666 * $120.00 $43.99
VARILLA # 3 KG 7.0452 * $13.50 $95.11
POLIN (10 X 10 X 250 CM) PZA 0.2408 * $90.00 $21.67
DIESEL LTS 0.6600 * $12.38 $8.17
MATERIALES LECHADA CEMENTO GRIS KG 0.0052 * $4,244.50 $21.86
CLAVOS 3 1/2 KG 0.0302 * $28.00 $0.85
ALAMBRE RECOCIDO KG 0.2606 * $19.00 $4.95
BARROTE (10 X 5 X 250 CM) PZA 0.1720 * $60.00 $10.32
DUELA (10 X 2.5 X 250CM) PZA 0.0898 * $40.00 $3.59
AGUA M3 0.0325 * $80.00 $2.60
SUBTOTAL: MATERIALES $351.75

CUADRILLA No 4 (0.5 OFICIAL FIERRERO


+ 1 AYUDANTE FIERRERO) JOR 0.0453 * $350.00 $15.86

CUADRILLA No 3 (1 OFICIAL
CARPINTERO + 1 AYUDANTE
CARPINTERO) JOR 0.1111 $500.00 $55.55

*
CUADRILLA No 1 (0.1 DE CABO + 1 PEÓN)
MANO DE
OBRA JOR 0.0033 $230.00 $0.76

*
CUADRILLA No 7 (1 OPERADOR + 4
AYUDANTES)
JOR 0.0069 $1,100.00 $7.59

*
CUADRILLA No 2 (0.25 DE OFICIAL JOR 0.1053 * $275.00 $28.96
ALBAÑIL + 1 PEON)
SUBTOTAL: MANO DE OBRA $108.71

EQUIPO Y HERRAMIENTA MENOR % 0.0300 * $108.71 $3.26


HERRAMIENT
A REVOLVEDORA HR. 0.0549 * $80.00 $4.39
SUBTOTAL: EQUIPO Y HERRAMIENTA $7.65
(CD) COSTO DIRECTO $468.11
(CI) COSTO INDIRECTO
$140.43
(30%)
TOTAL $608.55

Análisis: BASTIN UM: PZA

BASE PARA TINACO DE 1 X 1 X O.8 M. DE ALTURA A BASE DE TABIQUES ROJO RECOSIDO 7-14-25 ASENTADO
CON MORTERO CEMENTO-ARENA PROPORCIÓN 1;4, Y APLANADO CON EL MISMO, MORTERO DE 2 CM DE
ESPESOR. CON JUNTEO PROMEDIO DE 1CM INCLUYE SUMINISTRO Y ELABORACIÓN, LOSA DE CONCRETO DE
F'C= 150 KG/CM2 CON UN ESPESOR DE 10 CM, ARMADO CON VARILLA DE 3/8" @ 20 CM. EN AMBOS SENTIDOS.

CÓDIGO CONCEPTO U.M. CANTIDAD OP. COSTO IMPORTE


TABIQUE ROJO RECOSIDO 7-14-25 MILLAR 0.0990 * $3,000.00 $297.00
APLANADO M2 3.4480 * $2.72 $9.38
CONCRETO F'C 150 KG/CM2 M3 0.1030 * $1,250.39 $128.79
VARILLA DE # 3 KG 7.0452 * $13.50 $95.11
DIESEL LTS 0.6600 * $12.38 $8.17
TABLA DE 20 X 2.5 X 250 CM PZA 0.3960 * $80.00 $31.68
MATERIALES
CLAVOS 3 1/2 KG 0.1144 * $28.00 $3.20
ALAMBRE RECOCIDO KG 0.1982 * $19.00 $3.77
BARROTE (10 X 5 X 250 CM) PZA 0.1646 * $60.00 $9.88
DUELA (10 X 2.5 X 250CM) PZA 0.1100 * $40.00 $4.40
AGUA PARA HUMEDECER MURO Y M3 *
0.0325 $80.00 $2.60
CURADO DEL APLANADO
SUBTOTAL: MATERIALES $593.97

CUADRILLA No 4 (0.5 OFICIAL


FIERRERO + 1 AYUDANTE FIERRERO) JOR 0.0453 * $350.00 $15.86

CUADRILLA No 3 (1 OFICIAL
CARPINTERO + 1 AYUDANTE
CARPINTERO) JOR 0.0800 $500.00 $40.00

*
CUADRILLA No 5 (1 OFICIAL ALBAÑIL + 1
PEÓN)
JOR 0.1272 $500.00 $63.60
MANO DE
OBRA *
CUADRILLA No 7 (1 OPERADOR + 4
AYUDANTES)
JOR 0.0069 $1,100.00 $7.59

*
CUADRILLA No 5 (1 OFICIAL ALBAÑIL + 1
PEÓN)
JOR 0.0030 $500.00 $1.50

*
CUADRILLA No 2 (0.25 DE OFICIAL
JOR 0.1053 * $275.00 $28.96
ALBAÑIL + 1 PEON)
SUBTOTAL: MANO DE OBRA $157.50

HERRAMIENTA MENOR % 0.0300 * $157.50 $4.73


EQUIPO Y
REVOLVEDORA HR. 0.0068 * $80.00 $0.54
HERRAMIENTA
SUBTOTAL: EQUIPO Y HERRAMIENTA $5.27

(CD) COSTO DIRECTO $756.75


(CI) COSTO INDIRECTO (30%) $227.02
TOTAL $983.77

Análisis: CIS2M UM: M2

CISTERNA DE 2 M. DE LARGO, 1.70 M DE ANCHO A BASE DE TABIQUE 7-14-25, APLANADO CON MEZCLA
MORTERO - ARENA 1:4 DE 2CM DE ESPESOR LOSA DE CONCRETO CON F'C= 200 KG/CM2 REFORZADA CON
MALLA ARMEX 6X6 6/6, LOSA DE FONDO DE CONCRETO SIMPLE F'C= 200 KG/CM2 CON ESPESOR DE 10 CM,
CADENA CON ARMEX DE 15X20 CON F'C= 150 KG/CM2, CHAFLAN DE MORTERO DE 7X7 CM., CASTILLO DE ARMEX
DE 15X15 CM CON F'C= 150 KG/CM2, PASTA DE CEMENTO GRIS DE 2 MM DE ESPESOR INCLUYENDO: CIMBRA,
EXCAVACIÓN, COLADO Y COMPACTACIÓN.

CANTIDA
CÓDIGO CONCEPTO U.M. OP. COSTO IMPORTE
D
CONCRETO FONDO DE F'C DE 200 KG/CM2 M3 *
0.2884 $1,345.98 $388.18

TABIQUE ROJO RECOSIDO (7-14-28) MILLAR *


0.8970 $3,000.00 $2691.00
CASTILLO ARMEX 15 X 15 CM PZA 1.6109 * $77.00 $124.04
CIMBRA PARA CASTILLO M2 2.0400 * $44.10 $89.96
CONCRETO PARA CASTILLO DE F'C DE 200 M3 *
KG/CM2 0.1576 $1,345.98 $212.13
CADENA ARMEX 15 X 20 CM PZA 2.0188 * $75.00 $151.41
CIMBRA PARA CADENA M2 2.9600 * $15.68 $46.41
CONCRETO PARA CADENA DE F'C DE 200 M3 *
KG/CM2 0.2287 $1,345.98 $307.83
CIMBRA PARA LOSA M2 2.8000 * $99.77 $279.36
MALLA ARMEX PARA LOSA 6X6 6/6 PZA *
0.0391 $2,150.00 $84.07
CONCRETO PARA LOSA DE F'C DE 200 M3 *
KG/CM2 0.4027 $1,345.98 $542.03
APLANADO M2 11.5600 * $18.24 $210.85
CHAFLAN DE MORTERO M3 0.0172 * $657.04 $11.30
APLANADO PULIDO A LLANA M3 0.0374 * $3,272.00 $122.37
SUBTOTAL: MATERIALES $5260.93

CUADRILLA No 4 (0.5 OFICIAL FIERRERO


+ 1 AYUDANTE FIERRERO)

MANO DE
OBRA CASTILLO (ARMEX) JOR 0.0606 * $350.00 $21.22
CADENA (ARMEX) JOR 0.0756 * $350.00 $26.47
LOSA (MALLA) JOR 0.0782 * $350.00 $27.37
CUADRILLA No 3 (1 OFICIAL CARPINTERO
+ 1 AYUDANTE CARPINTERO)

MURO DE TABIQUE JOR 1.0509 * $500.00 $525.45


CIMBRA Y DECIMBRA (CASTILLO) JOR 0.2720 * $500.00 $136.00
CIMBRA Y DECIMBRA (CADENA) JOR 0.3482 * $500.00 $174.12
CIMBRA Y DECIMBRA (LOSA) JOR 0.3111 * $500.00 $155.56
CUADRILLA No 1 (0.1 DE CABO + 1 PEÓN)

EXCAVACIÓN JOR 1.7595 * $230.00 $404.69


ACARREO JOR 0.3519 * $230.00 $80.94
CUADRILLA No 7 (1 OPERADOR + 4
AYUDANTES)

ELAB. CONCRETO PARA FIRME JOR 0.0192 * $1,100.00 $21.15


ELAB. CONCRETO PARA CASTILLO JOR 0.0105 * $1,100.00 $11.56
ELAB. CONCRETO PARA CADENA JOR 0.0152 * $1,100.00 $16.77
ELAB. CONCRETO PARA LOSA JOR 0.0268 * $1,100.00 $29.53
CUADRILLA No 2 (0.25 DE OFICIAL ALBAÑIL
+ 1 PEON)
COLADO PARA FIRME JOR 0.1867 * $275.00 $51.33
COLADO PARA CASTILLO JOR 0.1020 * $275.00 $28.05
COLADO PARA CADENA JOR 0.2337 * $275.00 $64.26
COLADO PARA LOSA JOR 0.2607 * $275.00 $71.68
CUADRILLA No 5 (1 OFICIAL ALBAÑIL + 1
PEON)
APLANADO JOR 0.6084 * $500.00 $304.21
CHAFLAN DE MORTERO JOR 0.2833 * $500.00 $141.67
APLANADO PULIDO A LLANA JOR 1.4960 * $500.00 $748.00
SUBTOTAL: MANO DE OBRA $3040.02

EQUIPO Y HERRAMIENTA MENOR % 0.0300 * $3,040.02 $91.20


HERRAMIENT
A REVOLVEDORA HR. 0.5746 * $80.00 $45.97
SUBTOTAL: EQUIPO Y HERRAMIENTA $137.17

(CD) COSTO DIRECTO $8,438.13


(CI) COSTO INDIRECTO
$2,531.44
(30%)
TOTAL $10,969.57
Análisis: REPAST UM: M2

REPELLADO PARA BASE DE PASTA, PARA AMBOS LADOS DE LOS MUROS DE PLANTA ALTA Y BAJA CON MORTERO
CEMENTO ARENA PROPORCIÓN 1:4 CON ESPESOR DE 1.5 CM EN PROMEDIO, CON MEZCLA CEMENTO-ARENA,
MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMEINTA.

CÓDIGO CONCEPTO U.M. CANTIDAD OP. COSTO IMPORTE


MORTERO PROPORCIÓN 1:4 M3 0.0165 *
$1,387.67 $22.90
MATERIAL
AGUA M3 0.0055 * $80.00 $0.44
SUBTOTAL: MATERIALES $23.34

MANO DE CUADRILLA No 5 (1 OFICIAL


OBRA ALBAÑIL + 1 PEON) JOR 0.0526 $500.00 $26.30
*
SUBTOTAL: MANO DE OBRA $26.30

HERREMIENTA
HERRAMIENTA MENOR % 0.030 * $26.30 $0.79
O EQUIPO
SUBTOTAL: EQUIPO Y HERRAMIENTA $0.79

(CD) COSTO DIRECTO $50.43


(CI) COSTO INDIRECTO (30%) $15.13
TOTAL $65.55

Análisis: APLF15PBV UM: M2

APLANADO FINO EN PLAFÓN CON ESPESOR DE 1/4 DE CM. CON MEZCLA-CEMENTO-ARENA PROPORCIÓN 1;5
INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA MENOR.

CÓDIGO CONCEPTO U.M. CANTIDAD OP. COSTO IMPORTE


MEZCLA-CEMENTO ARENA M3 *
PROPORCIÓN 1:4 0.0028 $1,387.67 $3.82
MATERIAL
AGUA M3 0.0013 * $80.00 $0.10
SUBTOTAL: MATERIALES $3.92
MANO DE CUADRILLA No 5 (1 OFICIAL
OBRA ALBAÑIL + 1 PEON) JOR 0.0909 $500.00 $45.45
*
SUBTOTAL: MANO DE OBRA $45.45

HERREMIENT
A O EQUIPO HERRAMIENTA MENOR % 0.030 * $45.45 $1.36

SUBTOTAL: EQUIPO Y HERRAMIENTA $1.36

(CD) COSTO DIRECTO $50.73


(CI) COSTO INDIRECTO (30%) $15.22
TOTAL $65.95

Análisis: EMBOPUETVEN UM: ML

EMBOQUILLADO PARA PUERTA Y VENTANA DE 15 CM. DE ANCHO POR 2 CM. DE ESPESOR, CON MEZCLA
CEMENTO-ARENA PROPOCIÓN 1;5, INCLUYE MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ANDAMIO

CÓDIGO CONCEPTO U.M. CANTIDAD OP. COSTO IMPORTE


MEZCLA CEMENTO ARENA M3 *
PROPORCIÓN: 1:4 0.0042 $1,387.67 $5.83

MATERIALES DUELA (10 X 2.5 X 250CM) PZA 0.2200 * $40.00 $8.80


GRAPA CON VAR. # 3 KG 0.4110 * $14.20 $5.84
AGUA M3 0.0013 * $80.00 $0.10
SUBTOTAL: MATERIALES $20.57

CUADRILLA No 6 (1 OFICIAL
MANO DE ALBAÑIL + 1 PEÓN) JOR 0.0625 $500.00 $31.25
OBRA
*
SUBTOTAL: MANO DE OBRA $31.25

EQUIPO Y HERRAMIENTA MENOR % 0.0300 * $31.25 $0.94


HERRAMIENTA ANDAMIO METALICO % 0.0500 * $31.25 $1.56
SUBTOTAL: EQUIPO Y HERRAMIENTA $2.50

(CD) COSTO DIRECTO $54.32


(CI) COSTO INDIRECTO (30%) $16.30
TOTAL $70.61

Análisis: TEJAA UM: M2

SUMINISTRO Y COLOCACIÓN DE TEJAS EN EL TECHO DE LA PLANTA ALTA INCLUYE: MATERIALES MANO DE


OBRA, HERRAMIENTAS CON DIMENSIONES DE 15.5 X 23.5 X 1.3 CM UN M2 DE TEJAS VIDREADAS O BARNIZADAS
SON 32 PZAS

CÓDIGO CONCEPTO U.M. CANTIDAD OP. COSTO IMPORTE


MATERIALES TEJAS M2 1.1 * $400.00 $440.00
MEZCLA CEMENTO - ARENA
M3 0.11 * $1,387.67 $152.64
PROPORCIÓN 1:4
SUBTOTAL: MATERIALES $592.64

CUADRILLA No 6 (1 OFICIAL
MANO DE ESPECIALISTA + 1 PEÓN) JOR 0.0625 * $500.00 $31.25
OBRA

SUBTOTAL: MANO DE OBRA $31.25

HERRAMIENTA
O EQUIPO HERRAMIENTA MENOR % 0.030 * $31.25 $0.94

SUBTOTAL: EQUIPO Y HERRAMIENTA $0.94

(CD) COSTO DIRECTO $624.83


(CI) COSTO INDIRECTO (30%) $187.45
TOTAL $812.28

Análisis: RPEC UM: M2

RAMPA PARA ESCALERA DE CONCRETO CON F'C= 150 KG/CM2, ARMADO CON VARILLA # 3 @ 20 EN AMBOS
SENTIDOS, VERTICAL Y HORIZONTAL, CON UN ESPESOR DE 10CM, INCLUYE: MATERIALES, ACARREOS,
CORTES, DESPERDICIOS, TRASLAPES AMARRES, CIMBRADO, COLADO, DECIMBRADO, MANO DE OBRA, EQUIPO
Y HERRAMIENTA

CANTIDA
CÓDIGO CONCEPTO U.M. OP. COSTO IMPORTE
D
CONCRETO DE F'C 150 KG/ CM2 M3 0.1030 * $1,250.39 $128.79
TABLA DE 20 X 2.5 X 250 CM PZA 0.5500 * $80.00 $44.00
VARILLA # 3 KG 7.0452 * $13.50 $95.11
DIESEL LTS 0.6600 * $12.38 $8.17
CLAVOS 3 1/2 KG 52.8000 * $28.00 $1478.40
MATERIALES
ALAMBRE RECOCIDO KG 0.1376 * $19.00 $2.61
BARROTE (10 X 8 X 250 CM) PZA 0.0576 * $65.00 $3.74
DUELA (10 X 2.5 X 250CM) PZA 0.4686 * $40.00 $18.74
POLÍN 10 X 10 X 250 CM PZA 0.3366 * $90.00 $30.29
AGUA M3 0.0065 * $80.00 $0.52
SUBTOTAL: MATERIALES $1810.39

CUADRILLA No 4 (0.5 OFICIAL FIERRERO


+ 1 AYUDANTE FIERRERO) JOR 0.0375 * $350.00 $13.13

CUADRILLA No 3 (1 OFICIAL CARPINTERO


+ 1 AYUDANTE CARPINTERO)
JOR 0.1111 $500.00 $55.55
MANO DE
OBRA *
CUADRILLA No 7 (1 OPERADOR + 4
AYUDANTES)
JOR 0.0068 $1,100.00 $7.48

*
CUADRILLA No 2 (0.25 DE OFICIAL ALBAÑIL JOR 0.1052 * $275.00 $28.93
+ 1 PEON)
SUBTOTAL: MANO DE OBRA $105.09
EQUIPO Y HERRAMIENTA MENOR % 0.0300 * $105.09 $3.15
HERRAMIENT
A REVOLVEDORA HR. 0.0549 * $80.00 $4.39
SUBTOTAL: EQUIPO Y HERRAMIENTA $7.54

(CD) COSTO DIRECTO $1,923.02


(CI) COSTO INDIRECTO
$576.91
(30%)
TOTAL $2,499.92

Análisis: COLTEN UM: COL

COLOCACIÓN Y TENDIDO DE TUBERÍA DE CONCRETO DE 6" DE DIAMETRO PARA DRENAJE SANITARIO TIPO
ALBAÑAL. CON MORTERO CEMENTO- ARENA, PROPORCIÓN 1:4 INCLUYE: CAMA DE ARENA PARA APOYAR
TUBERÍA, COMPACTADO CON PISON MANUAL, ACCESORIOS DE UNIÓN, MATERIAL, MANO DE OBRA, PRUEBA Y
HERRAMEINTA, CON LONGITUD DE DESARROLLO DE 4.31 M.

CÓDIGO CONCEPTO U.M. CANTIDAD OP. COSTO IMPORTE


TUBO ALBAÑAL PZA 6.1800 * $130.00 $803.40
MORTERO CEMENTO - ARENA M3 *
MATERIALES PROPORCIÓN 1:4 0.0018 $1,387.67 $2.50

ARENA M3 0.1296 * $185.00 $23.98


SUBTOTAL: MATERIALES $829.87

CUADRILLA No G (1 PEÓN) JOR 0.1428 * $200.00 $28.56


CUADRILLA No 8 (1 PLOMERO +
MANO DE 1 AYUDANTE )
JOR 0.0385 * $500.00 $19.25
OBRA

SUBTOTAL: MANO DE OBRA $19.25

EQUIPO Y
HERRAMIENTA
HERRAMIENTA MENOR % 0.0300 * $19.25 $0.58

SUBTOTAL: EQUIPO Y HERRAMIENTA $0.58


(CD) COSTO DIRECTO $849.70
(CI) COSTO INDIRECTO (30%) $254.91
TOTAL $1,104.61

Análisis: RESA100 UM: PZA

REGISTRO SANITARIO DE 60 X 40 X 100 CM. A BASE DE MURO DE TABIQUE ROJO RECOCIDO 7-12-25 CM.
ASENTADO Y APLANADO CON MORTERO CEMENTO- ARENA EN EL INTERIOR, PILIDO, PISO DE 10 CM. DE
ESPESOR CON F'C DE 150 KG/CM2, INCLUYE: MANO DE OBRA, HERRAMIENTA Y MATERIALES, EXCAVACIÓN Y
ACARREO.

CÓDIGO CONCEPTO U.M. CANTIDAD OP. COSTO IMPORTE


BARROTE (10 X 5 X 250 CM) PZA 0.1548 * $60.00 $9.29
TABIQUE ROJO RECOCIDO PZA 119.92 * $3.00 $359.76
MORTERO PROPORCIÓN 1:4 M3 0.0335 * $1,387.67 $46.49
AGUA M3 0.0181 * $80.00 $1.45
CONCRETO F'C DE 150 KG/CM2 M3 0.0649 * $1,250.39 $81.15
REPELLADO M3 0.0424 * $1,083.05 $45.92
MATERIALES
PASTA M3 0.0053 * $4,862.67 $25.77
RELLENO M3 0.2500 * $72.04 $18.01
DIESEL LTS 0.1200 * $12.38 $1.49
CLAVOS DE 2 1/2" KG 0.0704 * $28.00 $1.97
DUELAS PZA 0.1100 * $40.00 $4.40
EXCAVACIÓN M3 0.8800 * $76.99 $67.75
SUBTOTAL: MATERIALES $663.44

CUADRILLA No 5 (1 OFICIAL
MANO DE ALBAÑIL + 1 PEÓN )
JOR 0.5000 * $500.00 $250.00
OBRA

SUBTOTAL: MANO DE OBRA $250.00

EQUIPO Y
HERRAMIENTA
HERRAMIENTA MENOR % 0.0300 * $250.00 $7.50
SUBTOTAL: EQUIPO Y HERRAMIENTA $7.50

(CD) COSTO DIRECTO $920.94

(CI) COSTO INDIRECTO (30%) $276.28

TOTAL $1,197.22

TERCERA ESCALACIÓN
PRECION UNITARIOS NUEVOS
(SOLO LOS CONCEPTOS QUE TUVIERON ESCALACIÓN)
Análisis: SUMCOLOSE UM: M2

SUMINISTRO Y COLOCACIÓN DE LOSETA PORCELANITE DE 33 X 33 CM, INTERCERAMICO SIMILAR, ASENTADO


CON CREST, INCLUYE MATERIALES, MANO DE OBRA, HERRAMIENTA.

CÓDIGO CONCEPTO U.M. CANTIDAD OP. COSTO IMPORTE


PEGACREST 20 KG. KG 0.0153 * $124.00 $1.89
LOSETA PORCELANITE DE 33 X M2 *
MATERIALES 1.0500 $185.00 $194.25
33 CM
AGUA M3 0.0078 * $80.00 $0.62
SUBTOTAL: MATERIALES $196.77

CUADRILLA No 6 (1 OFICIAL
MANO DE ALBAÑIL + 1 PEÓN) JOR 0.0625 $500.00 $31.25
OBRA
*
SUBTOTAL: MANO DE OBRA $31.25

EQUIPO Y
HERRAMIENTA MENOR % 0.0300 * $31.25 $0.94
HERRAMIENTA
SUBTOTAL: EQUIPO Y HERRAMIENTA $0.94

(CD) COSTO DIRECTO $228.96


(CI) COSTO INDIRECTO (30%) $68.69
TOTAL $297.64

Análisis: AZULP UM: M2


SUMINISTRO Y COLOCACIÓN DE AZULEJO VITROMEX DE 20 X 30 CM. EN PISO DE BAÑO, ASENTADO CON CREST
INCLUYE MATERIALES, MANO DE OBRA, HERRAMIENTA

CÓDIGO CONCEPTO U.M. CANTIDAD OP. COSTO IMPORTE


PEGACREST 20 KG. M3 0.0232 * $124.00 $2.87
MATERIALES AZULEJO VITROMEX (20 X 30 CM) M2 1.0500 * $185.00 $194.25
AGUA M3 0.0078 * $60.00 $0.47
SUBTOTAL: MATERIALES $197.59

CUADRILLA No 6 (1 OFICIAL
MANO DE ALBAÑIL + 1 PEÓN)
JOR 0.1818 $500.00 $90.90
OBRA
*
SUBTOTAL: MANO DE OBRA $90.90

EQUIPO Y
HERRAMIENTA HERRAMIENTA MENOR % 0.0300 * $90.90 $2.73

SUBTOTAL: EQUIPO Y HERRAMIENTA $2.73

(CD) COSTO DIRECTO $291.22


(CI) COSTO INDIRECTO (30%) $87.37
TOTAL $378.59