Está en la página 1de 1

LEGEND

GALVANIZED STEEL CABLE TRAY, PROTECTION IP2X INDICATOR LIGHT


WITH COVER (LIGHTING/EFM/ICT) P - PRIVILEGED
GALVANIZED STEEL CABLE TRAY, PROTECTION IP2X I - ICT
WITH COVER (SAFETY/SECURITY) M - MEDICAL
TRUNKING PROTECTED REI 120 ME - MEDICAL EQUIPMENT
AHU - HVAC
ALUMINIUM BUSBAR GE - DIESEL GENERATOR
COMPARTEMENT
ALUMINIUM BUSBAR DUCT IN SHAFT FIRE RESISTANT REI 120

FIRE BARRIER PASS-TROUGH


EL.. SERVICE SHAFT

SMSB SUB MAIN SWITCH BOARD

FDB FINAL DISTRIBUTION BOARD ED01


MEB MEDICAL EQUIPMENT BOARD
MDB MEDICAL DISTRIBUTION BOARD IDENTIFICATION OF COMPARTMENT
FIRE PROTECTION
SDB SUB DISTRIBUTION BOARD PROGRESSIVE ITEM
LEVEL INDICATION:
TELECOMMUNICATIONS CABINET FOR DATA & TELEPHONE Z - ROOF TOP I - 3rd FLOOR
A - 11th FLOOR L - 2nd FLOOR
VERTICAL DIRECTIONAL INDICATION BUSBAR B - 10th FLOOR M - 1st FLOOR
C - 9th FLOOR N - GROUND FLOOR
VERTICAL DIRECTIONAL INDICATION D - 8th FLOOR O - BASEMENT 01
E - 7th FLOOR P - BASEMENT 02
EQUIPOTENTIAL NODE F - 6th FLOOR Q - BASEMENT 03
G - 5th FLOOR R - BASEMENT 04
JUNCTION BOX H - 4th FLOOR

PIPELINE SECTION DETAILS: 10H00574PE_DD_MH_HV_D_0045_00

EMERGENCY VOLTAGE SHUT DOWN PUSH BUTTON

NOTE
1. LAYOUTS SHALL BE VERIFIED WITH FINALISED ARCHITECTURAL AND STRUCTURAL DRAWINGS. LAYOUTS HERE ARE FOR REFERENCE ONLY.

KEY-PLAN DISTRIBUTION SPECIAL SYSTEMS ZONES


Patient Bedroom Private 1 Bed Patient Bedroom Private 1 Bed

C
C
Patient Bedroom Private 1 Bed 1960 2003
1963 Patient Bedroom Private 1 Bed

C
P(m) A(m²) H(m) P(m) A(m²) H(m) 2006
P(m) A(m²) H(m) 24.7 29 3.20 24.8 29 3.20
24.9 28.9 3.20 P(m) A(m²) H(m)
24.8 29 3.20
C C

C
Patient Bedroom Private 1 Bed

C
Patient Bedroom Private 1 Bed 2007

C
1964

C
P(m) A(m²) H(m) Patient Bedroom Private 1 Bed
P(m) A(m²) H(m) 24.9 29.1 3.20 2369

C
Patient Bedroom Private 1 Bed 24.9 29.2 3.20 C
1967 P(m) A(m²) H(m)
24.5 27.7 3.20

C
P(m) A(m²) H(m) C
24.7 29.3 3.20

CHD

CHD

DH C
CHD
C

C
C

C
C
Patient Bedroom Private 1 Bed
2010

C
P(m) A(m²) H(m)
24.7 29.3 3.20

C HD

C HD

C
Inpatient Bathroom Inpatient Bathroom
1961 2004
P(m) A(m²) H(m) P(m) A(m²) H(m)
Inpatient Bathroom 9.6 5.8 2.50 9.6 5.8 2.50
1962 Inpatient Bathroom
Inpatient Bathroom
Patient Bedroom Private 1 Bed 1965 2005 Inpatient Bathroom
P(m) A(m²) H(m) 2008 Patient Bedroom Private 1 Bed
2368 9.5 5.7 2.50 2014
P(m) A(m²) H(m) P(m) A(m²) H(m)

CHD

C HD
P(m) A(m²) H(m) 9.6 5.8 2.50 9.5 5.7 2.50 P(m) A(m²) H(m)
9.6 5.8 2.50 P(m) A(m²) H(m)

C
24.5 27.7 3.20
FDB7.2.05

C
25.4 30.3 3.20

DH
D
C

C H
Inpatient Bathroom
FDB7.1.02 FDB7.2.01
Inpatient Bathroom
2009
Patient Bedroom Private 1 Bed
2015

C
1966
P(m) A(m²) H(m) P(m) A(m²) H(m)
P(m) A(m²) H(m)

FDB7.1.01 FDB7.2.02 10.4 5.5 2.50 25.4 30 3.20

C
10.4 5.5 2.50
FDB7.1.03

C
C
Patient Bedroom Private 1 Bed
1971

C
FDB7.1.06 P(m) A(m²) H(m) Inpatient Bathroom
FDB7.1.05 FDB7.2.03

C
25.4 30.3 3.20 1968
Patient Bedroom Private 1 Bed
1972
P(m) A(m²) H(m)
P(m) A(m²) H(m)
9.4 5.4 2.50 FDB7.2.06
25.3 30 3.20 Inpatient Bathroom
2011

FDB7.1.04 P(m) A(m²) H(m)


9.4 5.4 2.50
FDB7.2.04 Inpatient Bathroom

D
Inpatient Bathroom 2012

D
1969

CH
P(m) A(m²) H(m)

CH
P(m) A(m²) H(m) Corridor

C
C 7203 11.1 5.4 2.50
11.1 5.4 2.50

DH
D
P(m) A(m²) H(m) Patient Bedroom Private 1 Bed
2016
148.4 180.6 2.50
CH

FDB7.1.07 Corridor
P(m) A(m²) H(m)

C
Patient Bedroom Private 1 Bed 26.1 30.5 3.20
1973 7204

CHD
P(m) A(m²) H(m)

DHC
P(m) A(m²) H(m)

C
26.1 30.5 3.20 149.1 180.9 2.50
C

Patient Bedroom Private 1 Bed


2017

P(m) A(m²) H(m)


25.4 30.4 3.20

C
C

DH
C
D

C C

C
C
CH

C
C.02
C
Lounge Physicians

C
Office Physicians Other Kitchenette 2333
Inpatient Bathroom 2320 2322 Lounge Physicians Office Physicians Other Inpatient Bathroom
C

1981 C P(m) A(m²) H(m) 2206 Kitchenette 2195 C 2024


2207
P(m) A(m²) H(m) P(m) A(m²) H(m)

C
17 17.5 3.00 P(m) A(m²) H(m) P(m) A(m²) H(m)
P(m) A(m²) H(m) P(m) A(m²) H(m)
FDB7.1.09 13.7 11.7 3.00 12.2 8.5 3.00 P(m) A(m²) H(m)

C
9.5 5.8 2.50 17 17.9 3.00 13.7 11.7 3.00 C

C
Patient Bedroom Private 1 Bed 12.2 8.5 3.00 9.5 5.8 2.50
1974 C
FDB7.2.07

C
C

P(m) A(m²) H(m)


Toilet Staff Female C
25.4 30.4 3.20 C 2326
P(m) A(m²) H(m)
Toilet Staff Female
2211 FDB7.2.08

CHD

CHD
9.3 5.1 2.50 P(m) A(m²) H(m)
Nurse Station
2002 9.3 5.1 2.50

DH
P(m) A(m²) H(m)
D

EA02
Nurse Station
26.9 29.6 3.00 2373
CH

EB02
C C

EI02
C
Inpatient Bathroom P(m) A(m²) H(m)

EL02

C
1982 26.9 29.6 3.00
Inpatient Bathroom
P(m) A(m²) H(m) 2025
Office Physicians Other
9.5 5.8 2.50 2323 P(m) A(m²) H(m)
Patient Bedroom Private 1 Bed 9.5 5.8 2.50
1975 P(m) A(m²) H(m)
13.6 11.2 3.00

C
P(m) A(m²) H(m)
25.4 29.6 3.20
FDB7.1.08
C

Patient Bedroom Private 1 Bed


Pneumatic tube Alcove 2018
2266 Office Physicians Other CHD
P(m) A(m²) H(m)
CHD 2208
Pneumatic tube Alcove
P(m) A(m²) H(m)
4.5 1.2 2.50 P(m) A(m²) H(m) 2269
FDB7.2.09 25.2 29.8 3.20

D
13.6 11.2 3.00
D

C
C
C P(m) A(m²) H(m)
Technical Area

H
H

4.5 1.2 2.50


3009
C C Technical Area
SDB7.2.02

C
C

P(m) A(m²) H(m) 3008


Inpatient Bathroom
C Inpatient Bathroom 8 3.4 0.00 P(m) A(m²) H(m) 2026

C
1983
8 3.4 0.00 P(m) A(m²) H(m) Patient Bedroom Private 1 Bed
P(m) A(m²) H(m) 2019
9.5 5.8 2.50
9.5 5.8 2.50 Crash Cart Alcove P(m) A(m²) H(m)
SMK 18 2245
C C C C Crash Cart Alcove
2289
SMK 19 25.6 30.8 3.20
C

(140 x 734) (140 x 742)


Patient Bedroom Private 1 Bed
1976 SDB7.1.02 P(m) A(m²) H(m)
5.9 2 2.50 Cubicles Staff
2329
C C
Cubicles Staff
2214
P(m) A(m²) H(m)
5.9 2 2.50
Utility Room Clean
2318
C

P(m) A(m²) H(m)


P(m) A(m²) H(m)

C
25.6 30.8 3.20 P(m) A(m²) H(m) P(m) A(m²) H(m)
14.1 10.1 3.00 11.4 6.1 2.50
14.1 10.1 3.00
ST1285

ST1285
Office Physicians Senior Office Physicians Senior
CHD

CHD
2331 2216
SDBP.U7.1/R2
D
D

D
H

H
P(m) A(m²) H(m) P(m) A(m²) H(m)
H

SDBP.P7.1/R2 16.2 13.1 3.00 16.2 13.1 3.00

FDB7.2.10
CC

C
Utility Room Soiled
2319
Toilet Staff Male
P(m) A(m²) H(m) 2317
Inpatient Bathroom Toilet Staff Male Utility Room Soiled Utility Room Clean Inpatient Bathroom
1984 2261 2263 9.9 5.3 2.50
P(m) A(m²) H(m) P(m) A(m²) H(m)
C HD
P(m) A(m²) H(m)
2262
P(m) A(m²) H(m)
DH C P(m) A(m²) H(m)
8.9 4.6 2.50
2027

CHD P(m) A(m²) H(m)


10.8 6.1 2.50 8.9 4.6 2.50 9.9 5.3 2.50 11.4 6.1 2.50
CHD 10 5.7 2.50
FDB7.1.10 Corridor
311 Corridor Patient Bedroom Private 1 Bed

C
C 313 2020

C
P(m) A(m²) H(m)
12.3 9.3 2.50
L01 L02 L03 L04 L05 L06 P(m) A(m²) H(m)
12.3 9.3 2.50
P(m) A(m²) H(m)
27.6 30.4 3.20

C
C C C C
SDBP.U7.1/R2 Internal Corridor
Internal Corridor
2332
C

Patient Bedroom Private 1 Bed


SDBP.P7.1/R2

C
1977 2217
P(m) A(m²) H(m)
C

C
P(m) A(m²) H(m) +108.40 P(m) A(m²) H(m)
27.6 30.3 3.20 C C
38.1 23.4 2.50
38.1 23.4 2.50 C C
FDB7.2.11
FDB7.1.11
P-I AHU P-I AHU
Inpatient Bathroom
DISTRIBUTION CABINET ZONE

D
Inpatient Bathroom
D

1985 2028
H

H
Office Administrative Office Administrative
P(m) A(m²) H(m) 2260 2316 P(m) A(m²) H(m)
Office Physician In charge Cubicles Staff

C
C

P-I AHU P-I AHU


9.5 5.8 2.50 Cubicles Staff 2210 2215 9.5 5.8 2.50
P(m) A(m²) H(m) Office Physician In charge P(m) A(m²) H(m)
2330 2325
11.1 7.7 3.00 P(m) A(m²) H(m) P(m) A(m²) H(m) 11.1 7.7 3.00
P(m) A(m²) H(m) P(m) A(m²) H(m) 14.8 13.7 3.00 14.1 10.1 3.00

FDB7.1.13 14.1 10.1 3.00 14.8 13.7 3.00

L11-C02 L11-C03 Patient Bedroom Private 1 Bed

C
C C C C C 2021

SDBP.U7.1/R2
Office Head Nurse
2258
L11-C01 L11-C02 Office Head Nurse
2314 P(m) A(m²) H(m)
C

26 29.7 3.20

CABINET - FD.07A CABINET - FD.07C


P(m) A(m²) H(m)
Corridor Internal Corridor P(m) A(m²) H(m)

C
14.1 12.3 3.00 Internal Corridor 2178
SDBP.P7.1/R2 2259 Corridor
2135
2315 14.1 12.3 3.00

+121.90 P(m) A(m²) H(m) P(m) A(m²) H(m) +121.90


C

Patient Bedroom Private 1 Bed P(m) A(m²) H(m)


30.6 40.6 2.50
1978 11.1 7.7 2.50 P(m) A(m²) H(m) 11.1 7.7 2.50
FDB7.2.12

C
C 30.6 40.6 2.50
P(m) A(m²) H(m)
26 29.7 3.20

FDB7.1.12 EB01 EC02


C C C C

EB03
Inpatient Bathroom
EH02

D
D

1986
Office Ward Clerk Inpatient Bathroom
H

H
P(m) A(m²) H(m) Office Ward Clerk 2312 2029
2256

C
C

9.5 5.8 2.50 P(m) A(m²) H(m)


P(m) A(m²) H(m)

CABINET - FD.07B CABINET - FD.07D


P(m) A(m²) H(m) 14.1 12.1 3.00 9.5 5.8 2.50
14.1 12.1 3.00

Corridor
314
Office Concurrent Coding Clerk C C
2257 P(m) A(m²) H(m)
21 20.6 2.50 Office Concurrent Coding Clerk
SDBP.U7.1/Y2 P(m) A(m²) H(m) 2313

C
11.1 7.7 3.00 Office Physicians Other Office Physicians Other
2324 2209 P(m) A(m²) H(m)

C
C Patient Bedroom Private 1 Bed
Patient Bedroom Private 1 Bed 11.1 7.7 3.00 2022
P(m) A(m²) H(m) P(m) A(m²) H(m)
1979 SDBP.P7.1/Y2 Storage Clean Linen
2222
15.1 13.4 3.00 15.1 13.4 3.00 Storage Clean Linen P(m) A(m²) H(m)

C
P(m) A(m²) H(m) Corridor 2272 25.4 30.4 3.20
25.4 30.4 3.20 P(m) A(m²) H(m) M23 312
M24 P(m) A(m²) H(m)
C

15.2 10.9 2.50 (176 x 703) P(m) A(m²) H(m) 15.1 10.8 2.50
(176 x 703)
21 20.6 2.50
C

C
Inpatient Bathroom Inpatient Bathroom
1987 2030
P(m) A(m²) H(m)
P(m) A(m²) H(m)
10.5 5.7 2.50
SMSB.L7.1 FDB7.2.13 10.6 5.7 2.50

D C
SMSB.L7.2 C
D

H
H
C L P FD07A-1 FD07A-2 FD07B-1 FD07B-2
L P C
Data & Tele-Comunications
Office Physicians Other

EA01
Room

EA03
2328

KEY-PLAN DISTRIBUTION ELECTRICAL SERVICE ZONES


Data & Tele-Comunications 3101
Room
2341
Data & Tele-Comunications S3 P(m) A(m²) H(m)
Office Physicians Other
2213 P(m) A(m²) H(m)

S.PAT
Room 14.5 11.9 3.00 S4 SDBP.U7.2
S.PAT

3100 9.6 5.4 0.00


P(m) A(m²) H(m) P(m) A(m²) H(m)
SDBP.U7.1/Y2 14.1 11 0.00 P(m) A(m²) H(m) 14.5 11.9 3.00
8.8 4.7 0.00 Toilet Staff Male Toilet Staff Male
2327 2212
SDBP.P7.2
EL2
Conference - Report Room
SDBP.P7.1/Y2 2251
SDB7.1.00 Waiting - Lounge
SDB7.2.00 Data & Tele-Comunications

EL1
P(m) A(m²) H(m) 6668 P(m) A(m²) H(m) Room Conference - Report Room
C P(m) A(m²) H(m) SMK 16 8.8 4.8 2.50 Waiting - Lounge 8.8 4.8 2.50 2342 SMK 17 2308

C
C P(m) A(m²) H(m)

FDB7.1.14
17.7 16.7 3.00
(250 x 651)
SDBP.U7.1 E1
C C
33.3 46 3.00
2192
P(m) A(m²) H(m) C C
P(m) A(m²) H(m)
14.2 10.2 0.00
E2
(255 x 85)
SMSB.L7.2
(257 x 599) P(m) A(m²) H(m)
18.7 18.1 3.00 Patient Bedroom Private 1 Bed
2023

ICT2
33.3 46 3.00 C
ICT2

(247 x 85) P(m) A(m²) H(m)

C
E1 E2

C
C
SDBP.P7.1 25.9 29.7 3.20

ICT2.P ICT2.P FDB7.2.14

C
Patient Bedroom Private 1 Bed C Reception Station
1980 C Reception Station 2291 C
Inpatient Bathroom 2198 Inpatient Bathroom
P(m) A(m²) H(m) 1988 2031
C
C P(m) A(m²) H(m) C
25.2 29.9 3.20 P(m) A(m²) H(m) 16.4 11.5 3.00 D
P(m) A(m²) H(m) P(m) A(m²) H(m)
D 16.4 11.5 3.00 H
9.5 5.8 2.50 9.5 5.8 2.50

C
H C
C
FDB7.1.15 C C C C

SDBP.U7.1/Y2 Charting-Dictation Area-Nurses


M16 C C
2343
SMSB.L7.1 (283 x 530) Corridor
Corridor
2134 M17 On-Call Toilet - Shower
2307
On-Call Toilet - Shower
2306 Charting-Dictation Area-Nurses
C

P(m) A(m²) H(m) 2372 (283 x 534) 2376


P(m) A(m²) H(m) P(m) A(m²) H(m)
P(m) A(m²) H(m)
SMSB.L7.2 General Purpose Treatment Inpatient Physical Therapy

ED02
12.8 8.6 3.00 On-Call Toilet - Shower Corridor
C HD

C HD
2066 Room Treatment cubicle 11.7 6.2 2.50 11.7 6.2 2.50 P(m) A(m²) H(m)

EF02
2249 On-Call Toilet - Shower P(m) A(m²) H(m) 29.9 37.8 2.50
SDBP.P7.1/Y2 P(m) A(m²) H(m)
2250 Inpatient Physical Therapy
Treatment cubicle
General Purpose Treatment
Room P(m) A(m²) H(m)
Corridor
2371 29.9 23.9 2.50
2299 2300 12.8 8.6 3.00

11.7 6.2 2.50 P(m) A(m²) H(m) 2238 2237 29.9 37.8 2.50 P(m) A(m²) H(m) P(m) A(m²) H(m)
C
P(m) A(m²) H(m) 19 18.9 3.00 19 18.8 3.00
11.7 6.2 2.50 P(m) A(m²) H(m) P(m) A(m²) H(m)
SDB7.1.01 29.9 23.9 2.50
SDB7.2.01

C
C 19 18.8 3.00 19 18.8 3.00

C.01
C

C Expansion Area
2346
FDB7.2.15
P(m) A(m²) H(m)
Inpatient Bathroom 13.1 9.9 0.00
1989 Vending Machine Area Vending Machine Area Inpatient Bathroom Patient Bedroom Bariatric
C
P(m) A(m²) H(m) C
C 2197 2219
C C 2032 2035
C

Toilet Dedicated Housekeeping D


D 9.9 6.2 2.50 DHC Toilet Dedicated Housekeeping
- Porter
P(m) A(m²) H(m)
5 1.6 3.20
P(m) A(m²) H(m)
5 1.6 3.20 - Porter C HD P(m) A(m²) H(m)
9.9 6.2 2.50
H P(m) A(m²) H(m)
25.9 32.1 3.20

C
H On Call Sleep Room On Call Sleep Room C C 2200 2293 C
C
C 2248 2247 Stretcher - Wheelchair Alcove
2240 P(m) A(m²) H(m) P(m) A(m²) H(m) Stretcher - Wheelchair Alcove
Expansion Area 2302
2347 P(m) A(m²) H(m) P(m) A(m²) H(m) 7.3 3.3 2.50 7.3 3.3 2.50
C

C
14.1 11.9 3.00 15.3 11.5 3.00 P(m) A(m²) H(m) On Call Sleep Room On Call Sleep Room
Patient Bedroom Bariatric P(m) A(m²) H(m)

C.03
2305
C

2589 P(m) A(m²) H(m) Nourishment Station 11.5 7.6 2.50 C 2304 Medication Room
2220 11.5 7.6 2.50
13.1 9.9 0.00 P(m) A(m²) H(m) 2303
P(m) A(m²) H(m) Consultation Room P(m) A(m²) H(m)
Medication Room P(m) A(m²) H(m) 14.1 11.9 3.00
26.1 32.2 3.20 SDBP.U7.1/B2 2241 2196 Consultation Room Nourishment Station 14 11.6 3.00 P(m) A(m²) H(m)
C

C
Dressing Room - Cubicle 14.5 13.1 3.00 Housekeeping - Porter Housekeeping - Porter 2218 2334 Dressing Room - Cubicle 13.6 11.2 3.00
2252 P(m) A(m²) H(m) Vestibule Vestibule Dressing Room - Cubicle 2310
P(m) A(m²) H(m)
13.6 11.2 3.00 Dressing Room - Cubicle L07 L08 L09 L10 13.1 10.5 3.00 2199 2292 P(m) A(m²) H(m) L11 L12 L13 L14 P(m) A(m²) H(m) 2309
2253 P(m) A(m²) H(m) 13.1 10.5 3.00 14.5 13 3.00 P(m) A(m²) H(m)
9.4 5.2 2.50 P(m) A(m²) H(m) P(m) A(m²) H(m) P(m) A(m²) H(m) 9.4 5.4 2.50
SDBP.P7.1/B2 P(m) A(m²) H(m)
9.4 5.5 2.50
10.5 6.3 2.50 10.5 6.3 2.50 9.5 5.2 2.50

Mobile X-Ray Machine Alcove


2255
C

C
C

C
CD
DC
CHD

DH C
C
P(m) A(m²) H(m)
9.2 3.4 2.50
C FDB7.1.16 C C C C FDB7.2.16
C
C
Corridor Corridor
316 317

P(m) A(m²) H(m) P(m) A(m²) H(m)


Inpatient Bathroom 17.8 12.7 2.50 Inpatient Bathroom
17.8 12.7 2.50 2036
2590
P(m) A(m²) H(m) P(m) A(m²) H(m)
10.6 6.3 2.50 Housekeeping Room Housekeeping Room 10.7 6.3 2.50
2202 Porter Room 2295

EH01 2201 Porter Room

EC01 EE02 P(m) A(m²) H(m) 2294 P(m) A(m²) H(m)


12.4 9.8 3.00 P(m) A(m²) H(m) P(m) A(m²) H(m) 12.4 9.8 3.00
13.5 9.5 3.00 13.5 9.5 3.00

EC03 EH03
CHD

CHD
EG02
C HD

DHC
Lounge Staff Toilet Multiple Female Toilet Multiple Male Lounge Staff
2239 2205 2298 2301
P(m) A(m²) H(m) CHD P(m) A(m²) H(m) P(m) A(m²) H(m)
DHC P(m) A(m²) H(m)
18.2 17.1 3.00 Lockers Room - Staff Male -
Female ST1285 Utility Room Soiled 22.8 31.5 2.70 22.8 31.5 2.70 ST1285 Lockers Room - Staff Male -
Female
18.2 17.1 3.00
2228 2242 2278
C

D
D

P(m) A(m²) H(m) P(m) A(m²) H(m) P(m) A(m²) H(m)


M26 Utility Room Soiled

H
C 15.6 12.1 2.50 14 11.1 2.50 M25 2286 12.7 9.2 2.50
C
H

(145 x 55)

C
CHD

(145 x 55)

DHC
P(m) A(m²) H(m)
M12
C

Ablution
2204 14 11.1 2.50
M13
C

(259 x 552) Ablution C


Storage Equipment P(m) A(m²) H(m) 2297
2069 Prayer Room Female Prayer Room Male Storage Equipment (259 x 552) Toilet Staff Male-Female
Toilet Staff Male 11 6.1 2.50 2203 2296 2275 2283
P(m) A(m²) H(m)
2233 P(m) A(m²) H(m) 11 6.1 2.50
P(m) A(m²) H(m) P(m) A(m²) H(m) P(m) A(m²) H(m) P(m) A(m²) H(m)
P(m) A(m²) H(m) 16.4 16.9 2.50 16.4 16.9 2.50 9.7 5.3 2.50
Utility Room Clean 18.1 20.2 3.00 18.1 20.2 3.00
C Toilet Staff Male-Female 9 4.7 2.50
2244 2243 Utility Room Clean Toilet Staff Female
Storage Soiled Linen

C
2287 2288
2221 P(m) A(m²) H(m)
P(m) A(m²) H(m) P(m) A(m²) H(m)
9 4.7 2.50 P(m) A(m²) H(m) 15.1 8.2 2.50 P(m) A(m²) H(m) Storage Soiled Linen
15.1 8.2 2.50 2271 8.8 4.6 2.50
Lockers Room - Staff Male - 12.2 7.5 2.50 Lockers Room - Staff Male -
Female
CHD

CHD
P(m) A(m²) H(m) Female
2229 2279
C 12.2 7.5 2.50 C
Patient Bedroom Private 1 Bed P(m) A(m²) H(m) P(m) A(m²) H(m)
2587 13.1 9.4 2.50 13.7 9.8 2.50
P(m) A(m²) H(m) D H H D
24.4 28.3 3.20
C C
Pneumatic tube Alcove C Internal Corridor
2282
C
PACS 2979 PACS
Internal Corridor 2345 2378 Mobile X-Ray Machine Alcove
SDBP.U7.1/B2 2232
Expansion Area P(m) A(m²) H(m)
P(m) A(m²) H(m)
Pneumatic tube Alcove
2980 P(m) A(m²) H(m)
16.4 10.1 2.50
2311 Patient Bedroom Private 1 Bed
2236 6.3 1.2 3.00 P(m) A(m²) H(m) 2033
P(m) A(m²) H(m)

EL3
17.4 3.7 3.00 P(m) A(m²) H(m) 17.4 3.7 3.00 P(m) A(m²) H(m)
16.4 10.1 2.50 Toilet Staff Male-Female
Toilet Staff Female
2234 Data & Tele-Comunications
P(m) A(m²) H(m) DHC Nurse Sub-Station SMK 1 SMK 1 6.3 1.2 3.00 CHD Expansion Area
2285 Data & Tele-Comunications
2284 10.5 5.7 2.50 P(m) A(m²) H(m)
24.3 28.3 3.20
FDB7.1.17 SDBP.P7.1/B2 P(m) A(m²) H(m)
9.9 5.5 2.50
Room
2431
30.3 40.9 0.00
Charting-Dictation
Area-Physicians
2344
2246
P(m) A(m²) H(m)
(248 x 435) (248 x 435)
Charting-Dictation
P(m) A(m²) H(m)
27.5 35.6 0.00
Room
2432
P(m) A(m²) H(m)
10.3 6.2 2.50
P(m) A(m²) H(m) 22.7 20.5 3.00 M14 M15 Nurse Sub-Station
2375 Area-Physicians P(m) A(m²) H(m)

S5
13.2 8 0.00 P(m) A(m²) H(m)
12.8 7.4 3.00
(260 x 671) M27
(230 x 100)
(260 x 571)
P(m) A(m²) H(m)
2377
P(m) A(m²) H(m)
11.2 6.4 0.00
FDB7.2.17
22.5 20.5 3.00
12.8 7.4 3.00 S6
Lockers Room - Staff Male - Lockers Room - Staff Male -
Female Female
2230 2280

P(m) A(m²) H(m) P(m) A(m²) H(m)


13.1 9.4 2.50 13.5 9.6 2.50

Inpatient Bathroom
C C C C C C C C
2034
C C
P(m) A(m²) H(m)
11.4 6.2 2.50
C
C
C
Inpatient Bathroom
ED01 EE03 ED03 EF03 EG03
EG01 EE01
2588
Corridor
P(m) A(m²) H(m)

EF01
Corridor 7207
11.4 6.4 2.50 7206
P(m) A(m²) H(m)
Corridor Corridor
2267 P(m) A(m²) H(m) 27.3 29.4 2.50 2339

C
C
27.2 29.3 2.50

DISTRIBUTION BOARD ZONE


P(m) A(m²) H(m) P(m) A(m²) H(m)
335.1 466.8 2.50 332 473.9 2.50

D H H D
Patient Bedroom Bariatric
2591
C SDBP.P7.1/Y3 SDBP.U7.1/Y3 SDBP.P7.1/Y3 SDBP.U7.1/Y3 SDBP.P7.1/B3 SDBP.U7.1/B3 SDBP.P7.1/B3 SDBP.U7.1/B3 SDBP.P7.1/B3 SDBP.U7.1/B3 SDBP.P7.1/B3 SDBP.U7.1/B3 SDBP.U7.2/B3 SDBP.P7.2/B3 SDBP.U7.2/B3 SDBP.P7.2/B3 SDBP.U7.2/B3 SDBP.P7.2/B3 SDBP.U7.2/B3 SDBP.P7.2/B3 SDBP.P7.2/Y3 SDBP.U7.2/Y3 SDBP.U7.2/Y3 SDBP.P7.2/Y3 SDBP.P7.2/Y3 SDBP.U7.2/Y3 C
P(m) A(m²) H(m)
26.1 33.4 3.20
C
C
Patient Bedroom Bariatric
2037
SDBP.P7.1/B2 P(m) A(m²) H(m)
Pneumatic tube Alcove
DHC CHD DHC CHD DHC CHD DHC CHD Pneumatic tube Alcove
25.8 33.3 3.20
2977 2978
P(m) A(m²) H(m) P(m) A(m²) H(m)

SDB7.1.01 SDB7.2.01
4.6 1.2 3.00 4.6 1.2 3.00
SDBP.U7.1/B2 Ante Room Ante Room Ante Room Ante Room
C
2089 2088
C 2095 2096
FDB7.2.18
C

C
FDB7.1.18 Ante Room
2083
Ante Room
2082 P(m) A(m²) H(m)
10 6.2 2.50
P(m) A(m²) H(m)
10 6.2 2.50
C
C
P(m) A(m²) H(m)
10 6.2 2.50
P(m) A(m²) H(m)
10 6.2 2.50
Utility Room Clean
2276
C

C
P(m) A(m²) H(m) P(m) A(m²) H(m)
Utility Room Soiled
CHD

CHD
C

10 6.2 2.50 P(m) A(m²) H(m)


C

2227 10 6.2 2.50


Utility Room Soiled 15 10.9 2.50
Ante Room Ante Room 2277
C

C
P(m) A(m²) H(m)
2100 2101
10.7 6.7 2.50 C

CHD P(m) A(m²) H(m)


DHC
H

H
P(m) A(m²) H(m) P(m) A(m²) H(m) 10.5 6.5 2.50
C

Inpatient Bathroom 10 6.2 2.50 10 6.2 2.50


D

D
Inpatient Bathroom
C

C 2075
2106
Inpatient Bathroom P(m) A(m²) H(m) C C
Utility Room Clean P(m) A(m²) H(m)

SDB7.1.02 SDB7.2.02
C

2598 2226 10.1 5.8 2.50 Patient Bedroom Airborne Patient Bedroom Airborne C
C 10.1 5.8 2.50 Inpatient Bathroom
Infection Isolation - Protective Infection Isolation - Protective

C
C

C
P(m) A(m²) H(m)
FDB7.2.23 2044 C
C

Patient Bedroom Protective Patient Bedroom Airborne


C

10.6 7.1 2.50


Nurse Workroom
P(m) A(m²) H(m)
13.9 11.3 2.50
Patient Bedroom Semi-Private
2 Bed FDB7.1.23
Patient Bedroom Semi-Private
2 Bed
Patient Bedroom Semi-Private
2 Bed
Patient Bedroom Airborne
Infection Isolation (AII)
Patient Bedroom Airborne
Infection Isolation (AII)
Patient Bedroom Protective
Environment (PE)
Enviroment (AII/PE)
2090
Conference - Classroom
2091
Conference - Classroom
2092
Enviroment (AII/PE)
2093 Environment (PE) Infection Isolation (AII) Patient Bedroom Airborne
Infection Isolation (AII)
Patient Bedroom Semi-Private
2 Bed
Patient Bedroom Semi-Private
Nurse Workroom P(m) A(m²) H(m)
C

2098 2099 2 Bed

C
Patient Bedroom Semi-Private 2374
C

C
2231 2072 2074 2078 2079 2084 2085 2104 2105 2108 10.6 7.1 2.50

C
C CHD P(m) A(m²) H(m) P(m) A(m²) H(m) P(m) A(m²) H(m) P(m) A(m²) H(m) 2 Bed CHD
P(m) A(m²) H(m) P(m) A(m²) H(m)
C

C
P(m) A(m²) H(m) P(m) A(m²) H(m) P(m) A(m²) H(m) P(m) A(m²) H(m) P(m) A(m²) H(m) P(m) A(m²) H(m) P(m) A(m²) H(m) 22.7 29.9 3.20 25.2 34.5 3.00 25.2 34.5 3.00 22.7 29.9 3.20 2109 P(m) A(m²) H(m)
H

H
P(m) A(m²) H(m) P(m) A(m²) H(m) P(m) A(m²) H(m)
C

13.5 9 3.00 23.8 33.9 3.20 23.8 33.2 3.20 23.7 33.4 3.20 22.3 28.8 3.20 22.3 28.8 3.20 22.7 29.6 3.20 22.7 29.6 3.20 22.3 28.8 3.20 13.5 9 3.00
22.3 28.8 3.20 23.7 33.4 3.20 24.9 33.4 3.20 P(m) A(m²) H(m)
D

D
23.8 33.9 3.20
C C C C C C

Inpatient Bathroom
2107
C

Inpatient Bathroom Patient Bedroom Private 1 Bed


P(m) A(m²) H(m) 2039 2040
C

C
10.1 5.8 2.50 P(m) A(m²) H(m) P(m) A(m²) H(m)
9.1 5.4 2.50 28.1 30.4 3.20
Inpatient Bathroom
2080 Inpatient Bathroom Future Medication Room
Inpatient Bathroom 2081 Inpatient Bathroom Inpatient Bathroom Inpatient Bathroom Inpatient Bathroom Inpatient Bathroom Inpatient Bathroom Inpatient Bathroom 2843
Patient Bedroom Private 1 Bed Inpatient Bathroom Future Medication Room Inpatient Bathroom 2087 2111
2077 2076 P(m) A(m²) H(m) 2086 2094 2097 2102 2103
2594 2593 2859 P(m) A(m²) H(m) P(m) A(m²) H(m)
0.2
P(m) A(m²) H(m) P(m) A(m²) H(m) P(m) A(m²) H(m) P(m) A(m²) H(m)
10.5 6.5 2.50 FDB7.1.22 P(m) A(m²) H(m)
10.1 5.8 2.50
11.8 6.9 2.50
9.9 6.1 2.50 P(m) A(m²) H(m)
9.9 6.1 2.50
P(m) A(m²) H(m)
11.8 6.9 2.50 FDB7.1.28 P(m) A(m²) H(m)
11.8 6.9 2.50
P(m) A(m²) H(m)
9.9 6.1 2.50
P(m) A(m²) H(m)
9.9 6.1 2.50
P(m) A(m²) H(m)
11.8 6.9 2.50
P(m) A(m²) H(m)
10.3 6.3 2.50
15.2 11.7 3.00 28
28.1 30.4 3.20 9.1 5.4 2.50 15.3 11.4 3.00
C C FDB7.1.24 C C C
FDB7.2.22 C

FDB7.1.27 FDB7.2.24
C
C

FDB7.1.25 FDB7.1.26 FDB7.2.28 FDB7.2.27 FDB7.2.25


FDB7.2.26
C

FDB7.2.19
C

D D

C
H
C

H C
C
Storage Medical Gas
2225 Storage Medical Gas
2336
C

C
P(m) A(m²) H(m)
9.3 5.3 2.50 P(m) A(m²) H(m)
9.1 4.8 2.50
M22 M21
FDB7.1.19 (310 x 487) (310 x 487)

SDBP.U7.2/R3
SDBP.P7.2/R3
D D Patient Bedroom Private 1 Bed
H 2041
H C
Patient Bedroom Private 1 Bed C P(m) A(m²) H(m)
2595 23.6 26.8 3.20
P(m) A(m²) H(m)
23.4 26.9 3.20
C HHousekeeping
D 2273Aids Closet
FDB7.1.20

SDBP.P7.1/R3
Janitor Toilet
2224
P(m) A(m²) H(m)
8.8 4.7 2.50
P(m) A(m²) H(m)
13.4 9.2 3.00
GENERAL NOTE:
FDB7.2.20
All measurements are to be checked and verified on site by the Contractor before proceeding with the works.
Do not scale the drawings.
Inpatient Bathroom
SDBP.P7.2/R3 2042
C

C
SDBP.U7.2/R3 P(m) A(m²) H(m)
C
C 11.2 5.9 2.50

SDBP.U7.1/R3

C
Inpatient Bathroom
2596
P(m) A(m²) H(m)
11.2 5.9 2.50
Housekeeping Aids Closet
2223
C
Measures are cm unless otherwise noted.
This document must be read in conjunction with all other design documents and related guidelines codes and regulations.
P(m) A(m²) H(m)
18.2 14.5 3.00 Corridor Corridor
Corridor 7295 7296
D

D
7293 Corridor
7294 P(m) A(m²) H(m) P(m) A(m²) H(m)
P(m) A(m²) H(m)
H

H
SDBP.U7.1/R3 9.2 5.1 2.50 P(m) A(m²) H(m) 9.2 5.1 2.50 9.2 5.1 2.50
C

C
9.2 5.1 2.50
SDBP.P7.1/R3

Janitor Toilet
FDB7.2.21
All items shall be sized and selected as per actual loads for the selected equipment, maintaining proper performace requirements
FDB7.1.21 2335
P(m) A(m²) H(m)
7.3 3.3 2.50
SMK21 SMK20
(165 x 177) (165 x 177)

Patient Bedroom Semi-Private


2 Bed
2597

P(m) A(m²) H(m)


30.2 37.2 3.20
L18 L19 M11
(433 x 132)
L20 L21
Patient Bedroom Semi-Private
2 Bed
2043
P(m) A(m²) H(m)
30.4 37.2 3.20
TRANSMITTAL NO.: DATE:
C
S7 M11 S9 C

CHD (130 x 218)


M10
Inpatient Bathroom (122 x 286)
2592 Inpatient Bathroom
2038
P(m) A(m²) H(m)
11.1 5.8 2.50 P(m) A(m²) H(m)
11.1 5.8 2.50
C C

ACTION FROM THE ENGINEER REPRESENTATIVE:


A: NO OBJECTIONS Checking is only for conformity with the design concept of
project and compliance with the information given in the
contract documents contractor is responsible for dimensions to
B: NO OBJECTIONS SUBJECT TO INCORPORATION OF ALL COMMENTS be confirmed and correlated at the job site for the information
that pertains solely to the fabrication process or to techniques of
C: REJECTED, TO BE RESUBMITTED construction and for the co-ordination of the work of all trades.

02 AUG. 2015 REVISION

01 JUL. 2015 REVISION AFTER WORKSHOP

00 FEB. 2015 SUBMISSION

REVISION DELIVERY DESCRIPTION DRAWN CONTR. APPR.

PHASE 4:

FINAL DESIGN

DRAWING TITLE:

MAIN ELECTRICAL LOW AND MEDIUM VOLTAGE DISTRIBUTION


7th FLOOR

PROJ. CODE

1 0.H. 0 0 5 7 4.P C
DRAWING CODE

F D .M H .E L .D. 0 0 2 0
REVISION SCALE

0 2 1:200

LOCATION
KUWAIT - KUWAIT CITY

Xrif .\X-ref\ISO A0.dwg