LEGEND

GALVANIZED STEEL CABLE TRAY, PROTECTION IP2X INDICATOR LIGHT


WITH COVER (LIGHTING/EFM/ICT) P - PRIVILEGED
GALVANIZED STEEL CABLE TRAY, PROTECTION IP2X I - ICT
WITH COVER (SAFETY/SECURITY) M - MEDICAL
TRUNKING PROTECTED REI 120 ME - MEDICAL EQUIPMENT
AHU - HVAC
ALUMINIUM BUSBAR GE - DIESEL GENERATOR
COMPARTEMENT
ALUMINIUM BUSBAR DUCT IN SHAFT FIRE RESISTANT REI 120

FIRE BARRIER PASS-TROUGH


EL.. SERVICE SHAFT

SMSB SUB MAIN SWITCH BOARD

FDB FINAL DISTRIBUTION BOARD ED01


MEB MEDICAL EQUIPMENT BOARD
MDB MEDICAL DISTRIBUTION BOARD IDENTIFICATION OF COMPARTMENT
FIRE PROTECTION
SDB SUB DISTRIBUTION BOARD PROGRESSIVE ITEM
LEVEL INDICATION:
TELECOMMUNICATIONS CABINET FOR DATA & TELEPHONE Z - ROOF TOP I - 3rd FLOOR
A - 11th FLOOR L - 2nd FLOOR
VERTICAL DIRECTIONAL INDICATION BUSBAR B - 10th FLOOR M - 1st FLOOR
C - 9th FLOOR N - GROUND FLOOR
VERTICAL DIRECTIONAL INDICATION D - 8th FLOOR O - BASEMENT 01
E - 7th FLOOR P - BASEMENT 02
EQUIPOTENTIAL NODE F - 6th FLOOR Q - BASEMENT 03
G - 5th FLOOR R - BASEMENT 04
JUNCTION BOX H - 4th FLOOR

PIPELINE SECTION DETAILS: 10H00574PE_DD_MH_HV_D_0045_00

EMERGENCY VOLTAGE SHUT DOWN PUSH BUTTON

NOTE
1. LAYOUTS SHALL BE VERIFIED WITH FINALISED ARCHITECTURAL AND STRUCTURAL DRAWINGS. LAYOUTS HERE ARE FOR REFERENCE ONLY.

C
C

C
C

C
KEY-PLAN DISTRIBUTION SPECIAL SYSTEMS ZONES

C
Office Director Office Chief
2499 2500

P(m) A(m²) H(m) P(m) A(m²) H(m)


17.7 18.4 3.00 17.7 18.3 3.00
C

Conference Room
2563

C
P(m) A(m²) H(m)

C
25.7 33.6 3.00

C
Expansion Area
6716
Dedicated Bathroom Dedicated Bathroom Reference Library Teaching
P(m) A(m²) H(m) 2509
2508 Classroom
29.2 48.5 0.00
P(m) A(m²) H(m) 2564
P(m) A(m²) H(m) C

C
9.3 4.8 2.50 9.3 4.8 2.50 P(m) A(m²) H(m)
25 34.1 3.00

Office Secretary and Waiting

C
2510
C
P(m) A(m²) H(m)
27.7 30.2 3.00

C
Immunopathology

C
CD
2565

C
P(m) A(m²) H(m)
41.5 101.3 3.00

C
CD
Hematology Routine
Laboratory
2490

C
P(m) A(m²) H(m)

C
73.5 230.9 3.00

030
LB2 D
C
C

C
FDB5.1.01

C HD C
C

GB02 GH02
C

C
CH
D

C
C C
Corridor Cytology Laboratory
3015 2622

Technical Area P(m) A(m²) H(m) P(m) A(m²) H(m)


D 3018 25.6 20.1 2.50 44.4 107.3 3.00

C P(m) A(m²) H(m)


D 8.3 3.7 0.00 C C

C
C C C

SDB5.1.02 Cubicles Medical Staff


Cubicles Medical Staff
2497
2496 Cubicles Medical Staff Cubicles Medical Staff Cubicles Medical Staff P(m) A(m²) H(m)
2511 2512 2513 16.7 16.2 3.00
C

P(m) A(m²) H(m)


14 12.1 3.00 P(m) A(m²) H(m) P(m) A(m²) H(m) P(m) A(m²) H(m) D
Cubicles Medical Staff
14.2 11.2 3.00 15.4 11.3 3.00 14.2 11.2 3.00 2495 CH C
P(m) A(m²) H(m)
C 15.4 13 3.00
C C D
Vestibule C C
C C
C C
CH
2649 On Call Sleep Room
2624
P(m) A(m²) H(m)

C
P(m) A(m²) H(m) E
8 3.9 2.50

GC03
C

14.7 12.7 3.00 C

GA02

C
C

C
On Call Sleep Room
FDB5.2.02 E

C
2623 On-Call Toilet - Shower Storage Bulk
2626 2506
P(m) A(m²) H(m) Office Professional Non
14.3 12.5 3.00 P(m) A(m²) H(m) Physicians
2514 P(m) A(m²) H(m) C
12.7 7 2.50 16.3 16.4 2.50
P(m) A(m²) H(m) Frozen and Gross Section
16.9 15.7 3.00 Laboratory

C
2621
Cubicles Medical Staff
Office Professional Non 2498 P(m) A(m²) H(m)
Physicians
2518 P(m) A(m²) H(m) 45.8 95.7 3.00

C
Storage Refrigerated Storage Refrigerated
2504 15.3 13 3.00 2507
On-Call Toilet - Shower P(m) A(m²) H(m)
C

P(m) A(m²) H(m) 2625 16.9 15.2 3.00 P(m) A(m²) H(m)
9.6 5.7 2.50 10.7 6.8 2.50
P(m) A(m²) H(m)

C
11.9 6.2 2.50 C C
C

C C
C C
Toilet Staff Male-Female C C
2628
CH Storage Bulk P(m) A(m²) H(m) Corridor
D 2505 9.7 4.9 2.50 7198
P(m) A(m²) H(m)
SMK 18 P(m) A(m²) H(m)
C 18.2 16.7 2.50 (140 x 734) 147.6 139.3 2.50
Hematology Coagulation
Laboratory
SMK 19
Office Section Head Toilet Staff Male-Female
2489 2515 2631 (140 x 742)
P(m) A(m²) H(m)
58.6 156.1 3.00
P(m) A(m²) H(m)
17.2 13.8 3.00 Office Section Head
2519
P(m) A(m²) H(m)
9.8 5.8 2.50
FDB5.2.03
FDB5.1.02 P(m) A(m²) H(m)
15.8 14.2 3.00 D C

C
H
C
C

C
Toilet Staff Male-Female

C
E
2629 C
C
C
P(m) A(m²) H(m)
9 5 2.50

L01 L02 L03 L04 L05 L06


Receiving Area
Office Consultants

C
349 C
Corridor C 2520
3016 Office Consultants
2516 P(m) A(m²) H(m)

C
P(m) A(m²) H(m) 14.8 11.4 3.00
P(m) A(m²) H(m) 15.8 14.7 3.00
72.6 66.1 2.50 P(m) A(m²) H(m) Copy Room
15.3 13.5 3.00 2635
P(m) A(m²) H(m)

DISTRIBUTION CABINET ZONE

C
14.1 11.2 3.00

P-I ME AHV P-I ME AHU

C
+108.40

C
C

C C

P-I ME AHV P-I ME AHU


C

C
C C
C

C C
Secretary Pool & Waiting
2561 C C
P(m) A(m²) H(m)
L5-C01 L5-C02

C.02
C

C
+112.90 11.6 8.2 3.00 +112.90

C
Expansion Area
2653

Server L5-C01 Corridor


6632 L5-C02 P(m) A(m²) H(m)
C

CABINET - FD.05A CABINET - FD.05C


Office Consultants 34.3 66.7 0.00 D
C

363 2517 Corridor


P(m) A(m²) H(m) 6635 C
P(m) A(m²) H(m) 30.3 40.6 2.50 Office Consultants
P(m) A(m²) H(m) 2521
32.6 64.5 3.00 16.2 15.7 3.00 P(m) A(m²) H(m)
P(m) A(m²) H(m) 30.3 40.6 2.50
15.8 14.7 3.00
+121.90 C
GG02 GB03 D Histology Laboratory
2620
C

GC02
H P(m) A(m²) H(m)
C
GB01
49.9 121.7 3.00
+121.90 C D
DOOR DOOR H

CABINET - FD.05B CABINET - FD.05D


C

D
C C

C
FDB5.1.03
Janitor Toilet Expansion Area
Office Consultants Housekeeping Aids Closet 2630 2654
Expansion Area Office Consultants
2494 M23 2522
2553 6626
P(m) A(m²) H(m) P(m) A(m²) H(m)
(176 x 700) P(m) A(m²) H(m) CHD P(m) A(m²) H(m) 8.3 4.2 2.50 M24 19.3 15.3 0.00
P(m) A(m²) H(m) P(m) A(m²) H(m) 16 14.3 3.00 (176 x 700)
13.5 9.5 3.00
15.9 14.2 3.00
18.9 15.2 0.00 C
FDB5.2.04

C
SMSB.L5.2

C
SMSB.L5.1 C
Automated Data Processing C
C Processor Area

L P 2652
L P

C
C C C C
FD05A FD05B
C

P(m) A(m²) H(m)


H

C 10.2 4.3 2.50


Data & Tele-Comunications

KEY-PLAN DISTRIBUTION ELECTRICAL SERVICE ZONES


D

C
Data & Tele-Comunications
Room S3 Pneumatic tube Alcove
2971
S4 Room

C
3096 3097
C

MED. EQ
P(m) A(m²) H(m) P(m) A(m²) H(m)
Corridor P(m) A(m²) H(m)

GA01
3042 5.7 1.9 3.00 Pneumatic tube Alcove 9.6 5.4 0.00

C
Data & Tele-Comunications
ME 2

8.8 4.7 0.00 2634


Room Waiting - Lounge Data & Tele-Comunications
P(m) A(m²) H(m) 6630 2562 P(m) A(m²) H(m) Room
SMSB.L5.2
GA03
EL1
41.3 33.8 2.50 Secretary Pool & Waiting 6631

EL2
P(m) A(m²) H(m) 5.7 1.9 3.00 2633 C
SMK 16
(250 x 651)
SMSB.L5.1 15.1 13.3 0.00
P(m) A(m²) H(m)
23.9 26.3 3.00 P(m) A(m²) H(m)
16.6 14.4 3.00
P(m) A(m²) H(m)
14.4 12.1 0.00
SMK 17
(257 x 599)

C
C
E1

ICT2
C
(247 x 85) E2

C
ICT2

C
C (255 x 85)

CD
Blood Bank Blood Product
Storage Testing and Issuance
2488 Reception
C 2636 Corridor
P(m) A(m²) H(m) C 5138
C Technical Dialysis P(m) A(m²) H(m)
56.8 148.6 2.50 2641 P(m) A(m²) H(m)
11.2 7.7 3.00
C

P(m) A(m²) H(m) 133.5 116.7 2.50


33.7 39.6

Automated Data Processing


Control Area
Dressing Room - Cubicle 2559
SDB5.2.00 Histology Laboratory

C
SDB5.1.00 2637 348
C

P(m) A(m²) H(m) Specimen Accessioning


P(m) A(m²) H(m) Processing and Distribution P(m) A(m²) H(m)
27.1 38.6 2.50

C
8.3 4.2 2.50 Room 31.2 53.5 3.00
2560

SDB5.1.01 Corridor Corridor


7201
P(m) A(m²) H(m)
36.9 64.1 3.00 Corridor
SDB5.2.01 M17
(283 x 522) C
6633 6634 E
C Corridor
P(m) A(m²) H(m) P(m) A(m²) H(m) 7347 P(m) A(m²) H(m)
M16 29.9 37.8 2.50 29 23.1 2.50
P(m) A(m²) H(m)
29.9 37.8 2.50
(283 x 522) 22.1 20.4 2.50
CHD
C

E
CHD

C
C
Storage General Storage General Fluorescent Microscopy Room
C 2487 2503
CD

2611

C
P(m) A(m²) H(m) Toilet Staff Male-Female P(m) A(m²) H(m) C
2632 Technical P(m) A(m²) H(m)

C
C

Water Treatment Concentrate 48.8 100.7 2.50 52.6 100.9 2.50 2640 C C
18.2 18.7 3.00
Room P(m) A(m²) H(m) C
2683 P(m) A(m²) H(m)
Procedure Room Consultation Exam Room 11 7.5 2.50 H
34.8 64.8

C
C 2557 2558 Storage Bulk
C

P(m) A(m²) H(m) D


2567
19 22.3 3.00 P(m) A(m²) H(m) P(m) A(m²) H(m)

C.01 C.03

C
Storage Bulk 25 38 3.00 16.7 15.3 3.00 P(m) A(m²) H(m) C
6624 20.4 15.9 2.50
C

C
C

P(m) A(m²) H(m) Pneumatic tube Alcove

E
CD

C
C 20.5 15.9 2.50 ↔

2969
H

FDB5.3.D2

#
D C

P(m) A(m²) H(m)


L07 L08 L09 L10 L11 L12 L13 L14 6.4 2.4 3.00


C

#
C
Pneumatic tube Alcove Reception
C
2972
CHD CHD FDB5.3.D2 2639

C
P(m) A(m²) H(m) P(m) A(m²) H(m)
4.7 1.3 2.50

C C 16.8 15.5 3.00


#
C

Automated Data Processing


2638
FDB5.2.08
C

P(m) A(m²) H(m)


15.1 11.6 2.50

GD01 GC01
Corridor
7200
P(m) A(m²) H(m)
102 89.9 2.50
GF02 GE03 GD03
GD02 ↔
#

C
C

C
C

C C
C C C C C C C C C C

C
Data & Tele-Comunications
H

C
Room

#

Technical Area C C
D C

2472

P(m) A(m²) H(m) DI D


SDB5.2.02 3017

CD CD
FDB5.1.06

C
DI D
C

P(m) A(m²) H(m)


8.7 3.7 0.00
7.8 3.6 0.00 C HD

H
Urine (Urinalysis)
Lockers Room - Staff Male - C 2571

C
Toilet Staff Male-Female Reception Automated Data

D
Female

CHD
C HD
6625 2535 Processing P(m) A(m²) H(m)
Chemistry Special Chemistry Janitor Toilet 2613
P(m) A(m²) H(m) 2644 19.7 20.7 3.00
2482 Lockers Room - Staff Male - Lockers Room - Staff Male - P(m) A(m²) H(m)

S
C
Female Female 10.9 6.7 2.50 Lockers Room - Staff Male - Lockers Room - Staff Male - Lockers Room - Staff Male - Lockers Room - Staff Male - 12.7 9.3 2.50 P(m) A(m²) H(m)
P(m) A(m²) H(m) 2531 2532 Female P(m) A(m²) H(m) 15.2 14.2 3.00 Janitor Toilet
E

RO
Female Female Female 6692
59.1 122.6 2.50 M12 M25 Ante Room 2610 2540 2534 2533 M26 7.1 3.1 2.50 M13 Sterilization Fluids Room

ST1100
P(m) A(m²) H(m) P(m) A(m²) H(m) P(m) A(m²) H(m)
(274 x 552) (259 x 552) 2501

CHD
7385 P(m) A(m²) H(m)
(145 x 55) 12.3 9.3 2.50 12.3 9.3 2.50 P(m) A(m²) H(m) P(m) A(m²) H(m) P(m) A(m²) H(m) (144 x 54) LB1730 10.3 6.8 2.50

C
12.7 9.8 2.50 12.3 9.3 2.50 12.3 9.3 2.50 12.3 9.3 2.50 P(m) A(m²) H(m)
L22 P(m) A(m²) H(m) Internal Corridor
13.5 11.3 3.00 17.9 18.8 3.00
C H D RO 5137
C

C
Staff Lounge Staff Lounge P(m) A(m²) H(m)
2616 2617 10.5 6 2.50
S5 P(m) A(m²) H(m) P(m) A(m²) H(m) C
CHD
C

C
15.8 15.2 3.00 15.7 15.1 3.00

ELB5.2.01 Housekeeping Aids Closet


2502 C E
C

P(m) A(m²) H(m)


12.9 9 3.00
Lockers Room - Staff Male -

CHD
Female C
DI D

2536
P(m) A(m²) H(m)
C

Toilet Staff Male-Female


C

12.7 9.3 2.50 2614

P(m) A(m²) H(m)


Internal Corridor 9.1 4.8 2.50
5132 Internal Corridor Storage Refrigerated

EL3
C 5133 Storage Incubators Fridges 2643
P(m) A(m²) H(m) Freezers
C

SMK 1 SMK 1 17.4 11 2.50 P(m) A(m²) H(m) 2612 P(m) A(m²) H(m)
C

C C C 14 12.3 2.50 Housekeeping Aids Closet


(248 x 435) (248 x 435) 17.4 11 2.50 6693
M27 P(m) A(m²) H(m)
Storage Bulk
22.4 25.4 2.50
Corridor
6637
M14 (276 x 112) Pantry - kitchenette
2618
2645 P(m) A(m²) H(m)
12.2 9.1 3.00
(321 x 671) M15 P(m) A(m²) H(m)
P(m) A(m²) H(m) P(m) A(m²) H(m)
(321 x 559) Lockers Room - Staff Male - Lockers Room - Staff Male - 16.1 16.1 2.50
215.9 199.3 2.50
Female 18.6 16.1 3.00 Female S6
6628 2537
C

P(m) A(m²) H(m) P(m) A(m²) H(m) Toilet Staff Male-Female


2615

CHD
13.3 9.4 2.50 CHD 12.7 9.3 2.50
P(m) A(m²) H(m)
C 9.6 4.6 2.50
C
C
CHD

C
Corridor
C

GE02
C

298

GF03
C

Corridor
P(m) A(m²) H(m) 5136

GE03
Compressor Room
3077 CD CD 69.9 60.7 2.50
P(m) A(m²) H(m)
P(m) A(m²) H(m) 66.1 55.8 2.50
16.6 12.2

Compressor Room 1000 Tube


FDB5.2.07
DISTRIBUTION BOARD ZONE
Ambient
Stockyard
C C C C C Expansion Area
C

6717
Decontamination P(m) A(m²) H(m)
7331 Decontamination
7327 40.5 70.6 0.00
Gowning
FDB5.1.04 C P(m) A(m²) H(m)
8.4 4.4 3.00 Gowning P(m) A(m²) H(m) CHD CHD 7324
Ante Room
7355
Gowning
7328

D CHD 7326
8.4 4.4 3.00 Decontamination
7325
P(m) A(m²) H(m)
11.6 7.9 3.00
P(m) A(m²) H(m) P(m) A(m²) H(m) Decontamination
P(m) A(m²) H(m) 16 12.8 2.50 11.4 7.6 3.00 7330
C HD 13.9 10.4 3.00 CHD CD P(m) A(m²) H(m) CHD CHD CD
Centrifuge Molecular Testing Room Molecular Testing Room
C

8.8 4.8 3.00 P(m) A(m²) H(m)


CD

2543 2544 CHD 8.8 4.8 3.00


CD

P(m) A(m²) H(m) P(m) A(m²) H(m)

C
C
14.5 13 3.00 14.5 13 3.00
Non-spun

SDB5.1.01 SDB5.2.01
DI HD DI HD Outlet Inlet

C
LB1865 Decapper
C

CHD

CHD
C C C C C C C C
CD
C HD

Clinical Chemistry
C

2479
P(m) A(m²) H(m)
NITROGEN

116.2 606.4 3.00


ARGON

E C
C
AIR

C
CD CD

C
CHD

C
FDB5.2.06
C
Internal Corridor Internal Corridor
361 5131

SDB5.1.02 SDB5.2.02
C
C

C P(m) A(m²) H(m)


C C Expansion Area Parasitology Laboratory P(m) A(m²) H(m)
14.3 9.6 2.50

C
7323 2542 13.5 10.1 2.50

C
C C C Virology Laboratory 30A Microbiology Clinical Microbiology Biosafety Microbiology Mycology Microbiology Mycobacteriology
P(m) A(m²) H(m) P(m) A(m²) H(m) 346

C
ISO Microbiology Laboratory Laboratory (TB) Laboratory
CD

Microbiology Media Sterilization and Preparation


C

24.2 32.6 0.00 25.2 34.7 3.00 347 2570 2569 2568
P(m) A(m²) H(m) Preparation Room Room
C

CHD
C

C
Microbiology Clinical

C
Expansion Area 20.3 16.3 3.00 2547 2546 P(m) A(m²) H(m) P(m) A(m²) H(m) P(m) A(m²) H(m) P(m) A(m²) H(m)
Microbiology Pneumatic tube Alcove
2492 C 2548 2970 30 53.7 3.00 25.5 39.4 3.00 20.7 25.6 3.00 22.4 30 3.00

E
P(m) A(m²) H(m) P(m) A(m²) H(m)

C
P(m) A(m²) H(m) 20.6 24.6 3.00 77.2 164.2 3.00
C

P(m) A(m²) H(m) P(m) A(m²) H(m)


LocaleLocale

C
27.7 47 0.00
ridondante3.00
ridondante 5.7 1.3 2.50
E

E
C

CHD

Office Consultants C E 30A C C Office Consultants

C
C

C
2523 ISO 2648
CD

Office Consultants

C
P(m) A(m²) H(m)
LB1730

P(m) A(m²) H(m) 2528


C HD

16.6 14.2 3.00 18.4 13.9 3.00

C
Office Consultants P(m) A(m²) H(m)
CD

C
2525
E

16.5 14 3.00
E

CHD
P(m) A(m²) H(m)

C HD
18.4 13.9 3.00 Virology Laboratory

C
2545
CHD

P(m) A(m²) H(m) 30A


25.7 23.5 3.00 ISO
Toilet Staff Male-Female Toilet Staff Male-Female

C
2486 2651
C

C
C
P(m) A(m²) H(m) CHD P(m) A(m²) H(m)
E
C

9.4 4.9 2.50 C C C C C C 9.4 4.9 2.50


CD

C
C C C

E
C

Toilet Staff Male-Female


2650
P(m) A(m²) H(m)
9.5 5.3 2.50

M22 M21
FDB5.1.05 (295 x 512) Storage Refrigerated
2484
(295 x 517)

Toilet Staff Male-Female P(m) A(m²) H(m)


2485 19.2 22.3 2.50
P(m) A(m²) H(m)
9.6 5.4 2.50

Corridor
5130

Office Section Head P(m) A(m²) H(m)


2526 30.7 26.1 2.50
C

P(m) A(m²) H(m) Corridor Office Section Head

C
15.8 15.2 3.00 7199 2530

C
P(m) A(m²) H(m) P(m) A(m²) H(m)
Expansion Area
2566
29.7 26.2 2.50 15.7 15.2 3.00

C
GENERAL NOTE:
GH03 GG03 GI03
C P(m) A(m²) H(m)
34.1 34.2 0.00

GG01 GE01 GF01 Data & Tele-Comunications


Corridor
5139
C

All measurements are to be checked and verified on site by the Contractor before proceeding with the works.
Room P(m) A(m²) H(m) Secretary Pool & Waiting
C Secretary Pool & Waiting 2468 2556
C 2554 176.2 166.4 2.50
P(m) A(m²) H(m) P(m) A(m²) H(m)
P(m) A(m²) H(m) 8.7 3.8 0.00 12.3 8.2 3.00
12.3 8.2 3.00

C
Housekeeping Aids Closet
Do not scale the drawings.
Measures are cm unless otherwise noted.
2481
P(m) A(m²) H(m)
15.9 13.6 3.00

Corridor Corridor
7285 Corridor C
7287

This document must be read in conjunction with all other design documents and related guidelines codes and regulations.
7286 Corridor
C HD

P(m) A(m²) H(m) 7288


P(m) A(m²) H(m) P(m) A(m²) H(m)
9.2 5.1 2.50 9.2 5.1 2.50 P(m) A(m²) H(m)
C 9.2 5.1 2.50
9.2 5.1 2.50
C

C
C
Office Consultants
2524
P(m) A(m²) H(m)
19.4 13.9 3.00
Office Consultants
2527
P(m) A(m²) H(m)
17.9 14 3.00
All items shall be sized and selected as per actual loads for the selected equipment, maintaining proper performace requirements
FDB5.2.05

C
SMK21
(165 x 177) M11
C

DATE:
(433 x 140)

TRANSMITTAL NO.:
SMK20
C

Office Consultants Copy Room


(165 x 177) 2647 6627
Copy Room Office Consultants
L18 L19 L20 L21 P(m) A(m²) H(m) P(m) A(m²) H(m)

C
2555 2529 Janitor Toilet
2646 15.7 14 3.00 13.8 11.2 3.00
P(m) A(m²) H(m) P(m) A(m²) H(m)
C 13.8 11.2 3.00 15.6 13.9 3.00 P(m) A(m²) H(m)
10.3 6.2 2.50
S7

C
S9
M11
M10 (130 x 210)
C
C

(286 x 122)

ACTION FROM THE ENGINEER REPRESENTATIVE:


A: NO OBJECTIONS Checking is only for conformity with the design concept of
project and compliance with the information given in the
contract documents contractor is responsible for dimensions to
B: NO OBJECTIONS SUBJECT TO INCORPORATION OF ALL COMMENTS be confirmed and correlated at the job site for the information
that pertains solely to the fabrication process or to techniques of
C: REJECTED, TO BE RESUBMITTED construction and for the co-ordination of the work of all trades.

02 AUG. 2015 REVISION

01 JUL. 2015 REVISION AFTER WORKSHOP

00 FEB. 2015 SUBMISSION

REVISION DELIVERY DESCRIPTION DRAWN CONTR. APPR.

PHASE 4:

FINAL DESIGN

DRAWING TITLE:

MAIN ELECTRICAL LOW AND MEDIUM VOLTAGE DISTRIBUTION


5th FLOOR

PROJ. CODE

1 0.H. 0 0 5 7 4.P C
DRAWING CODE

F D .M H . E L .D. 0 0 2 2
REVISION SCALE
1:200
0 2
LOCATION
KUWAIT - KUWAIT CITY

Xrif .\X-ref\ISO A0.dwg